Background
 Hetauda is a major Tarai town to the north of Brigunj,
  situated on route to Kathmandu, a capital city of Nepal
 Existing roads:
   Prithivi Highway: 224 km, 6-8 hours, 90% of ADTT
   Tribhuvan Highway: 133 km, 6-8 hours, difficult terrain
 50% of trade between India and Nepal passes through
  this crossing
 "Fast Track" has a potential to substantially reduce
  travel distance to around 60 km, travel time by 75% and
  overall cost of transportation
Road Network: Nepal
Kathmandu – Hetauda Fast Track Highway
Prithivi Highway
224 km long
7-8 hours drive




                           Proposed Highway
                           60 km long
Tribhuvan Highway          1-1.5 hours drive
130 km long
6-8 hours drive
Brief History: Feasibility Studies
 1974: COMTEC in collaboration with Alpine and
  Macchi submitted ―Kathmandu-Birgunj Corridor
  Feasibility Study‖ report
 1991: International Engineering Consultants
  Association, Tokyo, Japan conducted preliminary study
 1992: Swiss study carried out by Aegerter and
  Mosshardt
 1993: Finnish International Development Agency
  carried out pre-feasibility study
 2003: Feasibility Study of the Bagmati Corridor Road
  by Nepal Engineering Consultancy Services Center Ltd
Brief History: Implementation Program




   Source: International Engineering Consultants Association (1991)
Assessment of Alternatives
Fast Track Options:
 Kathmandu to Hetauda Fast Track: includes tunnel
  and options for a new alignment or upgrading the
  existing road
 Bagmati Corridor Route: connect with the East-
  West Highway and Hetauda. Geologically
  hazardous, difficult terrain
 Sindhuli Bardibas Road: may not improve
  connection network to Indian port
 Upgrade the existing roads with limited re-
  alignment, the ―do nothing‖ option
Alternative Alignments
             Tribhuvan Highway
                                               Kathmandu


                                 Thankot   1
                                                  2
                                                  Chobhar
                  Tistung          Chitlang
                            1
                                           2      3
                     Markhu
                                           Pharping
                            Kulekhani

                        Chisapani
                                           3
                        Bhimphedi                  N
                1, 2, & 3
         Bhaise
                                       Tunnel
                                       Roadway
                                 Route 1: 59 km
   Hetauda                       Route 2: 62 km
                                 Route 3: 64 km
                                                            Source: Dahal (2005)
Alternative Alignments
Descriptions                            Route 1        Route 2       Route 3
                                        (59 km)        (62 km)       (64 km)
New Road                                  27,804,000    36,612,000    40,110,000

Rehabilitation of Existing Road            1,700,000     1,900,000     1,900,000

Tunnel Construction                      112,000,000    52,000,000    90,000,000

Bridges                                   14,950,000    17,550,000    19,500,000

Erosion Control & Slope Stabilization      8,797,000    27,026,500    15,832,000

Operation & Maintenance                    1,493,000     1,493,000     1,493,000

Security, Fire, & Rescue                    122,000        114,000       118,000

TOTAL (USD)                             166,866,500 136,145,500 168,953,000

                                                  Source: FINNIDA (1993)
Design Parameters


Two lane:
Lane width=3.5m

Design Speed:
120 km/h (level terrain)
40 km/h (steep terrain)

Gradient:
3.5 – 7 %
Design Parameters
AADT (1992): 1200
AADT (2030): 4000
(single lane Sindhuli road)

Tunnel Diameter: 9 - 12 m
Length: 500 – 3800 m

Capacity of two lane tunnel
(each directions):
5000-7000 vehicles per day

                  Emergency
                  Stopping Area
Economic Analysis
 Total cost: USD 130 - 167 million (price at 1993)
 Internal Rate of Return (IRR): 14-17%
 Net Present Value (NPV): USD 66-88 million
 Existing road (458 km) fuel consumption: 120 liter
  diesel
 Fast track (60 km) fuel consumption: 30 liter diesel
 Saving per vehicle= 90 liter diesel

If AADT is 3500, project will return the investment
within 17 years
Project Benefits
 Reduced fuel consumption help save foreign
  currency
 Saves time and energy
 Reduction in existing road maintenance cost
 Decrease traffic accident and save life
 Promote employment opportunities
 Help lower the product cost in Kathmandu valley
 Positive impact on economic of surrounding regions
Provisions in Development Plans

 Eighth Development Plan (1992-1997) : Build, Own,
  Operate and Transfer (BOOT)
 Tenth Development Plan (2002—2007)
  Private Sector Participation (PSP); Build, Operate
  and Transfer (BOT); and BOOT modalities
 Three-Year Interim Plan (2007/08-2009/10):
  BT, BOT, BOOT, BTO, LOT (L= Lease), LBOT,
  DOT (D=Develop), and other similar methods
Challenges and Issues

 Stable government and strong commitment from all
  political parties
 Traffic tunnels are new to Nepal and fragile geology
 Requires trained personal, special equipments, and
  continuous power supply for operation and
  maintenance
 High construction cost
 Disciplined traffic culture for the safe use of tunnel
Conclusions
 Fast Track highway is financially feasible
 It reduces travel distance, travel time and overall cost
  of transportation
 Help save foreign currency and also promote
  employment opportunities
 Stable road network and reduced price of imported
  goods in Kathmandu
 Positive impact on economies of surrounding regions
 Stable government and strong commitment from all
  political parties to implement the project
THAK YOU
    FOR
YOU ATTENTION
References
Kathmandu-Birgunj Corridor Feasibility Study (March 1974) by COMTEC in
collaboration with Alpine and Macchi for UN-HMG

Preliminary Study Repot on Kathmandu –Hetauda Raod Tunnel Project (September
1991) by International Engineering Consultants Association, Tokyo Japan

Direct Link between Hetauda and Kathmandu, Nepal. Pre-feasibility Study (June 1993)
by FINNIDA.

Feasibility Study of the Bagmati Corridor Road (April 2003) by Nepal Engineering
Consultancy Services Center Ltd (NEPECON).

Nepal: Preparing the North–South Fast Track Road Project (September 2006) by South
Asian Department, Asian Development Bak

Nepal: Regional Development Strategy (October 2007) by Halcrow Group (Urban
Development) UK, in association with GHK (UK), Full bright Consultancy Services (P)
Ltd., Development Management
Institute (P) Ltd., and Genesis (P) Ltd
Acronyms
AADT: Annual average daily traffic is the total volume of vehicle traffic of a
highway for a year divided by 365 days

ADTT: Average Daily Truck Traffic

Más contenido relacionado

La actualidad más candente

A Case Study on Ecotourism.
A Case Study on Ecotourism.A Case Study on Ecotourism.
A Case Study on Ecotourism.VishwaPatel89
 
UTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUttipec Dda
 
Planning for mumbai the development plan for greater mumbai 2014 2034
Planning for mumbai the development plan for greater mumbai 2014 2034Planning for mumbai the development plan for greater mumbai 2014 2034
Planning for mumbai the development plan for greater mumbai 2014 2034Mumbaikar Le
 
Lakefront development at kanelav lake
Lakefront development at kanelav lakeLakefront development at kanelav lake
Lakefront development at kanelav lakeharshilshah546931
 
Overview - Bangalore Metropolitan Region
Overview - Bangalore Metropolitan RegionOverview - Bangalore Metropolitan Region
Overview - Bangalore Metropolitan RegionAman Kudesia
 
Elements of Neighbourhood_Building and Town Planning
Elements of Neighbourhood_Building and Town PlanningElements of Neighbourhood_Building and Town Planning
Elements of Neighbourhood_Building and Town PlanningA Makwana
 
Jaipur municipal corporation
Jaipur municipal corporationJaipur municipal corporation
Jaipur municipal corporationSandeep Kumar
 
IT/ITeS Growth Corridor Series_Outer Ring Road, Bangalore
IT/ITeS Growth Corridor Series_Outer Ring Road, BangaloreIT/ITeS Growth Corridor Series_Outer Ring Road, Bangalore
IT/ITeS Growth Corridor Series_Outer Ring Road, BangaloreShailendra Chandrasekar
 
A study report on Kutch-Bhuj
A study report on Kutch-BhujA study report on Kutch-Bhuj
A study report on Kutch-BhujYajush Sonar
 
World Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreWorld Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreKiran Shaw
 
Urban nodes of soft infrastructure in Amsterdam and Berlin
Urban nodes of soft infrastructure in Amsterdam and BerlinUrban nodes of soft infrastructure in Amsterdam and Berlin
Urban nodes of soft infrastructure in Amsterdam and BerlinNico Janssen
 
Development study of aurangabad
Development study of aurangabadDevelopment study of aurangabad
Development study of aurangabadAkshataFarakate
 
Mumbai metro - Planning
Mumbai metro - PlanningMumbai metro - Planning
Mumbai metro - PlanningRADHIKASARDA8
 

La actualidad más candente (20)

Placemaking
PlacemakingPlacemaking
Placemaking
 
KURNOOL MUNICIPAL CORPORATION STATUS REPORT
KURNOOL MUNICIPAL CORPORATION   STATUS REPORTKURNOOL MUNICIPAL CORPORATION   STATUS REPORT
KURNOOL MUNICIPAL CORPORATION STATUS REPORT
 
Mount abu - ECO SENSITIVE ZONE
Mount abu - ECO SENSITIVE ZONEMount abu - ECO SENSITIVE ZONE
Mount abu - ECO SENSITIVE ZONE
 
A Case Study on Ecotourism.
A Case Study on Ecotourism.A Case Study on Ecotourism.
A Case Study on Ecotourism.
 
UTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINES
 
Planning for mumbai the development plan for greater mumbai 2014 2034
Planning for mumbai the development plan for greater mumbai 2014 2034Planning for mumbai the development plan for greater mumbai 2014 2034
Planning for mumbai the development plan for greater mumbai 2014 2034
 
Holy city kolhapur
Holy city kolhapurHoly city kolhapur
Holy city kolhapur
 
Lakefront development at kanelav lake
Lakefront development at kanelav lakeLakefront development at kanelav lake
Lakefront development at kanelav lake
 
Overview - Bangalore Metropolitan Region
Overview - Bangalore Metropolitan RegionOverview - Bangalore Metropolitan Region
Overview - Bangalore Metropolitan Region
 
Elements of Neighbourhood_Building and Town Planning
Elements of Neighbourhood_Building and Town PlanningElements of Neighbourhood_Building and Town Planning
Elements of Neighbourhood_Building and Town Planning
 
Jaipur ,urban planning
Jaipur ,urban planningJaipur ,urban planning
Jaipur ,urban planning
 
Jaipur municipal corporation
Jaipur municipal corporationJaipur municipal corporation
Jaipur municipal corporation
 
IT/ITeS Growth Corridor Series_Outer Ring Road, Bangalore
IT/ITeS Growth Corridor Series_Outer Ring Road, BangaloreIT/ITeS Growth Corridor Series_Outer Ring Road, Bangalore
IT/ITeS Growth Corridor Series_Outer Ring Road, Bangalore
 
A study report on Kutch-Bhuj
A study report on Kutch-BhujA study report on Kutch-Bhuj
A study report on Kutch-Bhuj
 
World Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreWorld Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for Bangalore
 
Urban nodes of soft infrastructure in Amsterdam and Berlin
Urban nodes of soft infrastructure in Amsterdam and BerlinUrban nodes of soft infrastructure in Amsterdam and Berlin
Urban nodes of soft infrastructure in Amsterdam and Berlin
 
Gift, Gujarat
Gift, GujaratGift, Gujarat
Gift, Gujarat
 
IMPACT OF BRTS ON CITIES
IMPACT OF BRTS ON CITIESIMPACT OF BRTS ON CITIES
IMPACT OF BRTS ON CITIES
 
Development study of aurangabad
Development study of aurangabadDevelopment study of aurangabad
Development study of aurangabad
 
Mumbai metro - Planning
Mumbai metro - PlanningMumbai metro - Planning
Mumbai metro - Planning
 

Destacado

Nepal east west rail project-feasibility study draft report presentation
Nepal east west rail project-feasibility study draft report presentationNepal east west rail project-feasibility study draft report presentation
Nepal east west rail project-feasibility study draft report presentationBhim Upadhyaya
 
Nepaleast westrailproject-feasibilitystudydraftreportpresentation-12010800153...
Nepaleast westrailproject-feasibilitystudydraftreportpresentation-12010800153...Nepaleast westrailproject-feasibilitystudydraftreportpresentation-12010800153...
Nepaleast westrailproject-feasibilitystudydraftreportpresentation-12010800153...Durga Rai
 
History of road in Nepal
History of road in NepalHistory of road in Nepal
History of road in Nepalpnbastola
 
Rail transport
Rail transportRail transport
Rail transportNiren Gada
 
Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1Hasan Gunes
 
Presentation railways
Presentation railwaysPresentation railways
Presentation railwaysjags_champ
 
Design of the South Doña Ana Dam
Design of the South Doña Ana DamDesign of the South Doña Ana Dam
Design of the South Doña Ana DamDesh Sonyok
 
Health promotion exhibition
Health promotion exhibitionHealth promotion exhibition
Health promotion exhibitionNepha Sangh
 
Kathmandu kulekhani hetauda tunnel (kkht) road financial study
Kathmandu kulekhani hetauda tunnel (kkht) road financial studyKathmandu kulekhani hetauda tunnel (kkht) road financial study
Kathmandu kulekhani hetauda tunnel (kkht) road financial studyUjjwal Chand
 
Berlin Central Station , Berlin, Deutschland.
Berlin Central Station , Berlin, Deutschland.Berlin Central Station , Berlin, Deutschland.
Berlin Central Station , Berlin, Deutschland.Invisible Architect
 
Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...
Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...
Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...Desh Sonyok
 
Berlin hauptbanhof central railway
Berlin hauptbanhof central railwayBerlin hauptbanhof central railway
Berlin hauptbanhof central railwaySneha Lata
 
Sagarika patil academic portfolio
Sagarika patil academic portfolioSagarika patil academic portfolio
Sagarika patil academic portfolioSagarikapatil321
 
Outer ring road network in valley
Outer ring road network in valleyOuter ring road network in valley
Outer ring road network in valleyNarayan Rijal
 
High Speed Rail Station Design
High Speed Rail Station DesignHigh Speed Rail Station Design
High Speed Rail Station DesignErik Jalowy
 
Beijing railway railway atation
Beijing railway railway atationBeijing railway railway atation
Beijing railway railway atationSneha Lata
 

Destacado (20)

Nepal east west rail project-feasibility study draft report presentation
Nepal east west rail project-feasibility study draft report presentationNepal east west rail project-feasibility study draft report presentation
Nepal east west rail project-feasibility study draft report presentation
 
Railway
RailwayRailway
Railway
 
Nepaleast westrailproject-feasibilitystudydraftreportpresentation-12010800153...
Nepaleast westrailproject-feasibilitystudydraftreportpresentation-12010800153...Nepaleast westrailproject-feasibilitystudydraftreportpresentation-12010800153...
Nepaleast westrailproject-feasibilitystudydraftreportpresentation-12010800153...
 
Prospectus
ProspectusProspectus
Prospectus
 
History of road in Nepal
History of road in NepalHistory of road in Nepal
History of road in Nepal
 
Rail transport
Rail transportRail transport
Rail transport
 
Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1
 
Presentation railways
Presentation railwaysPresentation railways
Presentation railways
 
Design of the South Doña Ana Dam
Design of the South Doña Ana DamDesign of the South Doña Ana Dam
Design of the South Doña Ana Dam
 
Health promotion exhibition
Health promotion exhibitionHealth promotion exhibition
Health promotion exhibition
 
Kathmandu kulekhani hetauda tunnel (kkht) road financial study
Kathmandu kulekhani hetauda tunnel (kkht) road financial studyKathmandu kulekhani hetauda tunnel (kkht) road financial study
Kathmandu kulekhani hetauda tunnel (kkht) road financial study
 
Berlin Central Station , Berlin, Deutschland.
Berlin Central Station , Berlin, Deutschland.Berlin Central Station , Berlin, Deutschland.
Berlin Central Station , Berlin, Deutschland.
 
Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...
Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...
Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...
 
History of road
History of road History of road
History of road
 
Berlin hauptbanhof central railway
Berlin hauptbanhof central railwayBerlin hauptbanhof central railway
Berlin hauptbanhof central railway
 
Sagarika patil academic portfolio
Sagarika patil academic portfolioSagarika patil academic portfolio
Sagarika patil academic portfolio
 
Outer ring road network in valley
Outer ring road network in valleyOuter ring road network in valley
Outer ring road network in valley
 
Station yards
Station yardsStation yards
Station yards
 
High Speed Rail Station Design
High Speed Rail Station DesignHigh Speed Rail Station Design
High Speed Rail Station Design
 
Beijing railway railway atation
Beijing railway railway atationBeijing railway railway atation
Beijing railway railway atation
 

Similar a Kathmandu – Hetauda Fast Track Highway

Llone!! maha,krishna
Llone!! maha,krishnaLlone!! maha,krishna
Llone!! maha,krishnamarudhurimaha
 
life lines of notional economy
life lines of notional economylife lines of notional economy
life lines of notional economymarudhurimaha
 
Life lines and economy
Life lines and economyLife lines and economy
Life lines and economySHANTANU TYAGI
 
Introduction to tranportation
Introduction to tranportationIntroduction to tranportation
Introduction to tranportationSatyamkumar Jha
 
Transport and communications
Transport and communicationsTransport and communications
Transport and communicationsMasudHossain27
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081Anush verma
 
Life lines of national economy
Life  lines of national economyLife  lines of national economy
Life lines of national economyRakesh Kumar
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineeringAavani Thampi
 
metro system & engineering - Copy.ppt
metro system & engineering - Copy.pptmetro system & engineering - Copy.ppt
metro system & engineering - Copy.pptSudiptaKolay2
 
Presentation of Cambodian Railway Development & on Costing and Pricing of Rai...
Presentation of Cambodian Railway Development & on Costing and Pricing of Rai...Presentation of Cambodian Railway Development & on Costing and Pricing of Rai...
Presentation of Cambodian Railway Development & on Costing and Pricing of Rai...Sok-Tharath CHREUNG
 
Summer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling StockSummer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling StockRahul Rai
 
IMPACT OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
IMPACT  OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA IMPACT  OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
IMPACT OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA Chiranjib Mahapatra
 
Chennai salem expressway highway case study
Chennai salem expressway highway case studyChennai salem expressway highway case study
Chennai salem expressway highway case studyblackstar uvan
 

Similar a Kathmandu – Hetauda Fast Track Highway (20)

Feasibility Report of Hyd Metro
Feasibility Report of Hyd MetroFeasibility Report of Hyd Metro
Feasibility Report of Hyd Metro
 
R.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdfR.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdf
 
Metro project in inda
Metro project in indaMetro project in inda
Metro project in inda
 
Llone!! maha,krishna
Llone!! maha,krishnaLlone!! maha,krishna
Llone!! maha,krishna
 
life lines of notional economy
life lines of notional economylife lines of notional economy
life lines of notional economy
 
Life lines and economy
Life lines and economyLife lines and economy
Life lines and economy
 
Introduction to tranportation
Introduction to tranportationIntroduction to tranportation
Introduction to tranportation
 
Transport and communications
Transport and communicationsTransport and communications
Transport and communications
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
Metro project
Metro project Metro project
Metro project
 
Life lines of national economy
Life  lines of national economyLife  lines of national economy
Life lines of national economy
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineering
 
The poster
The posterThe poster
The poster
 
metro system & engineering - Copy.ppt
metro system & engineering - Copy.pptmetro system & engineering - Copy.ppt
metro system & engineering - Copy.ppt
 
Transpot system in India
Transpot system in IndiaTranspot system in India
Transpot system in India
 
Presentation of Cambodian Railway Development & on Costing and Pricing of Rai...
Presentation of Cambodian Railway Development & on Costing and Pricing of Rai...Presentation of Cambodian Railway Development & on Costing and Pricing of Rai...
Presentation of Cambodian Railway Development & on Costing and Pricing of Rai...
 
Summer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling StockSummer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling Stock
 
IMPACT OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
IMPACT  OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA IMPACT  OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
IMPACT OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
 
Usbrlp at a glance
Usbrlp at a glanceUsbrlp at a glance
Usbrlp at a glance
 
Chennai salem expressway highway case study
Chennai salem expressway highway case studyChennai salem expressway highway case study
Chennai salem expressway highway case study
 

Más de Desh Sonyok

Reliability-based design of pile foundations
Reliability-based design of pile foundations Reliability-based design of pile foundations
Reliability-based design of pile foundations Desh Sonyok
 
Ground Improvement by Vibro Stone Columns
Ground Improvement by Vibro Stone ColumnsGround Improvement by Vibro Stone Columns
Ground Improvement by Vibro Stone ColumnsDesh Sonyok
 
Ground Penetration Radar as a Tool for Pavement Condition Diagnostics
Ground Penetration Radar as a Tool for Pavement Condition DiagnosticsGround Penetration Radar as a Tool for Pavement Condition Diagnostics
Ground Penetration Radar as a Tool for Pavement Condition DiagnosticsDesh Sonyok
 
Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...
Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...
Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...Desh Sonyok
 
Preliminary Study on Evolutionary Physiology as a Deductive-Nomological Model...
Preliminary Study on Evolutionary Physiology as a Deductive-Nomological Model...Preliminary Study on Evolutionary Physiology as a Deductive-Nomological Model...
Preliminary Study on Evolutionary Physiology as a Deductive-Nomological Model...Desh Sonyok
 
Emergence of Nepalese Diaspora in the USA
Emergence of Nepalese Diaspora in the USAEmergence of Nepalese Diaspora in the USA
Emergence of Nepalese Diaspora in the USADesh Sonyok
 

Más de Desh Sonyok (6)

Reliability-based design of pile foundations
Reliability-based design of pile foundations Reliability-based design of pile foundations
Reliability-based design of pile foundations
 
Ground Improvement by Vibro Stone Columns
Ground Improvement by Vibro Stone ColumnsGround Improvement by Vibro Stone Columns
Ground Improvement by Vibro Stone Columns
 
Ground Penetration Radar as a Tool for Pavement Condition Diagnostics
Ground Penetration Radar as a Tool for Pavement Condition DiagnosticsGround Penetration Radar as a Tool for Pavement Condition Diagnostics
Ground Penetration Radar as a Tool for Pavement Condition Diagnostics
 
Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...
Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...
Quantitative Verification of Some Standard Support Patterns in Japanese Tunne...
 
Preliminary Study on Evolutionary Physiology as a Deductive-Nomological Model...
Preliminary Study on Evolutionary Physiology as a Deductive-Nomological Model...Preliminary Study on Evolutionary Physiology as a Deductive-Nomological Model...
Preliminary Study on Evolutionary Physiology as a Deductive-Nomological Model...
 
Emergence of Nepalese Diaspora in the USA
Emergence of Nepalese Diaspora in the USAEmergence of Nepalese Diaspora in the USA
Emergence of Nepalese Diaspora in the USA
 

Último

Call Girls Aligarh Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Aligarh Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Aligarh Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Aligarh Just Call 8617370543 Top Class Call Girl Service AvailableNitya salvi
 
Just Call Vip call girls Farrukhabad Escorts ☎️8617370543 Two shot with one g...
Just Call Vip call girls Farrukhabad Escorts ☎️8617370543 Two shot with one g...Just Call Vip call girls Farrukhabad Escorts ☎️8617370543 Two shot with one g...
Just Call Vip call girls Farrukhabad Escorts ☎️8617370543 Two shot with one g...Nitya salvi
 
Call Girls In Chattarpur | Contact Me ☎ +91-9953040155
Call Girls In Chattarpur | Contact Me ☎ +91-9953040155Call Girls In Chattarpur | Contact Me ☎ +91-9953040155
Call Girls In Chattarpur | Contact Me ☎ +91-9953040155SaketCallGirlsCallUs
 
New Call Girls In Shamli 8617370543 Shamli Escorts Service
New Call Girls In Shamli 8617370543 Shamli Escorts ServiceNew Call Girls In Shamli 8617370543 Shamli Escorts Service
New Call Girls In Shamli 8617370543 Shamli Escorts ServiceNitya salvi
 
Sonbhadra Escorts 📞 8617370543 | Sonbhadra Call Girls
Sonbhadra  Escorts 📞 8617370543 | Sonbhadra Call GirlsSonbhadra  Escorts 📞 8617370543 | Sonbhadra Call Girls
Sonbhadra Escorts 📞 8617370543 | Sonbhadra Call GirlsNitya salvi
 
Azamgarh Call Girls WhatsApp Chat: 📞 8617370543 (24x7 ) Service Available Nea...
Azamgarh Call Girls WhatsApp Chat: 📞 8617370543 (24x7 ) Service Available Nea...Azamgarh Call Girls WhatsApp Chat: 📞 8617370543 (24x7 ) Service Available Nea...
Azamgarh Call Girls WhatsApp Chat: 📞 8617370543 (24x7 ) Service Available Nea...Nitya salvi
 
Khambhalia Escorts 8617370543 Khambhalia Call Girls Service
Khambhalia Escorts 8617370543 Khambhalia Call Girls ServiceKhambhalia Escorts 8617370543 Khambhalia Call Girls Service
Khambhalia Escorts 8617370543 Khambhalia Call Girls ServiceNitya salvi
 
THE ARTS OF THE PHILIPPINE BALLET PRESN
THE ARTS OF  THE PHILIPPINE BALLET PRESNTHE ARTS OF  THE PHILIPPINE BALLET PRESN
THE ARTS OF THE PHILIPPINE BALLET PRESNAlvinFerdinandAceCas
 
Call Girls Bhavnagar - 📞 8617370543 Our call girls are sure to provide you wi...
Call Girls Bhavnagar - 📞 8617370543 Our call girls are sure to provide you wi...Call Girls Bhavnagar - 📞 8617370543 Our call girls are sure to provide you wi...
Call Girls Bhavnagar - 📞 8617370543 Our call girls are sure to provide you wi...Nitya salvi
 
SB_ Scott Pilgrim_ Rough_ RiverPhan (2024)
SB_ Scott Pilgrim_ Rough_ RiverPhan (2024)SB_ Scott Pilgrim_ Rough_ RiverPhan (2024)
SB_ Scott Pilgrim_ Rough_ RiverPhan (2024)River / Thao Phan
 
Call Girls Ahwa Just Call 📞 8617370543 Top Class Call Girl Service Available
Call Girls Ahwa Just Call 📞 8617370543 Top Class Call Girl Service AvailableCall Girls Ahwa Just Call 📞 8617370543 Top Class Call Girl Service Available
Call Girls Ahwa Just Call 📞 8617370543 Top Class Call Girl Service AvailableNitya salvi
 
Digital C-Type Printing: Revolutionizing The Future Of Photographic Prints
Digital C-Type Printing: Revolutionizing The Future Of Photographic PrintsDigital C-Type Printing: Revolutionizing The Future Of Photographic Prints
Digital C-Type Printing: Revolutionizing The Future Of Photographic PrintsMatte Image
 
Jaunpur Escorts Service Girl ^ 9332606886, WhatsApp Anytime Jaunpur
Jaunpur Escorts Service Girl ^ 9332606886, WhatsApp Anytime JaunpurJaunpur Escorts Service Girl ^ 9332606886, WhatsApp Anytime Jaunpur
Jaunpur Escorts Service Girl ^ 9332606886, WhatsApp Anytime Jaunpurmeghakumariji156
 
Mussafah Call Girls +971525373611 Call Girls in Mussafah Abu Dhabi
Mussafah Call Girls +971525373611 Call Girls in Mussafah Abu DhabiMussafah Call Girls +971525373611 Call Girls in Mussafah Abu Dhabi
Mussafah Call Girls +971525373611 Call Girls in Mussafah Abu Dhabiromeke1848
 
Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...
Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...
Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...Nitya salvi
 
Nehru Nagar, Call Girls ☎️ ((#9711106444)), 💘 Full enjoy Low rate girl💘 Genui...
Nehru Nagar, Call Girls ☎️ ((#9711106444)), 💘 Full enjoy Low rate girl💘 Genui...Nehru Nagar, Call Girls ☎️ ((#9711106444)), 💘 Full enjoy Low rate girl💘 Genui...
Nehru Nagar, Call Girls ☎️ ((#9711106444)), 💘 Full enjoy Low rate girl💘 Genui...delhimunirka15
 
codes and conventions of film magazine and website.pptx
codes and conventions of film magazine and website.pptxcodes and conventions of film magazine and website.pptx
codes and conventions of film magazine and website.pptx17duffyc
 
WhatsApp Chat: 📞 8617370543 Call Girls In Siddharth Nagar At Low Cost Cash Pa...
WhatsApp Chat: 📞 8617370543 Call Girls In Siddharth Nagar At Low Cost Cash Pa...WhatsApp Chat: 📞 8617370543 Call Girls In Siddharth Nagar At Low Cost Cash Pa...
WhatsApp Chat: 📞 8617370543 Call Girls In Siddharth Nagar At Low Cost Cash Pa...Nitya salvi
 
Call Girls Varanasi Just Call 8617370543Top Class Call Girl Service Available
Call Girls Varanasi Just Call 8617370543Top Class Call Girl Service AvailableCall Girls Varanasi Just Call 8617370543Top Class Call Girl Service Available
Call Girls Varanasi Just Call 8617370543Top Class Call Girl Service AvailableNitya salvi
 
Theoretical Framework- Explanation with Flow Chart.docx
Theoretical Framework- Explanation with Flow Chart.docxTheoretical Framework- Explanation with Flow Chart.docx
Theoretical Framework- Explanation with Flow Chart.docxAman119787
 

Último (20)

Call Girls Aligarh Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Aligarh Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Aligarh Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Aligarh Just Call 8617370543 Top Class Call Girl Service Available
 
Just Call Vip call girls Farrukhabad Escorts ☎️8617370543 Two shot with one g...
Just Call Vip call girls Farrukhabad Escorts ☎️8617370543 Two shot with one g...Just Call Vip call girls Farrukhabad Escorts ☎️8617370543 Two shot with one g...
Just Call Vip call girls Farrukhabad Escorts ☎️8617370543 Two shot with one g...
 
Call Girls In Chattarpur | Contact Me ☎ +91-9953040155
Call Girls In Chattarpur | Contact Me ☎ +91-9953040155Call Girls In Chattarpur | Contact Me ☎ +91-9953040155
Call Girls In Chattarpur | Contact Me ☎ +91-9953040155
 
New Call Girls In Shamli 8617370543 Shamli Escorts Service
New Call Girls In Shamli 8617370543 Shamli Escorts ServiceNew Call Girls In Shamli 8617370543 Shamli Escorts Service
New Call Girls In Shamli 8617370543 Shamli Escorts Service
 
Sonbhadra Escorts 📞 8617370543 | Sonbhadra Call Girls
Sonbhadra  Escorts 📞 8617370543 | Sonbhadra Call GirlsSonbhadra  Escorts 📞 8617370543 | Sonbhadra Call Girls
Sonbhadra Escorts 📞 8617370543 | Sonbhadra Call Girls
 
Azamgarh Call Girls WhatsApp Chat: 📞 8617370543 (24x7 ) Service Available Nea...
Azamgarh Call Girls WhatsApp Chat: 📞 8617370543 (24x7 ) Service Available Nea...Azamgarh Call Girls WhatsApp Chat: 📞 8617370543 (24x7 ) Service Available Nea...
Azamgarh Call Girls WhatsApp Chat: 📞 8617370543 (24x7 ) Service Available Nea...
 
Khambhalia Escorts 8617370543 Khambhalia Call Girls Service
Khambhalia Escorts 8617370543 Khambhalia Call Girls ServiceKhambhalia Escorts 8617370543 Khambhalia Call Girls Service
Khambhalia Escorts 8617370543 Khambhalia Call Girls Service
 
THE ARTS OF THE PHILIPPINE BALLET PRESN
THE ARTS OF  THE PHILIPPINE BALLET PRESNTHE ARTS OF  THE PHILIPPINE BALLET PRESN
THE ARTS OF THE PHILIPPINE BALLET PRESN
 
Call Girls Bhavnagar - 📞 8617370543 Our call girls are sure to provide you wi...
Call Girls Bhavnagar - 📞 8617370543 Our call girls are sure to provide you wi...Call Girls Bhavnagar - 📞 8617370543 Our call girls are sure to provide you wi...
Call Girls Bhavnagar - 📞 8617370543 Our call girls are sure to provide you wi...
 
SB_ Scott Pilgrim_ Rough_ RiverPhan (2024)
SB_ Scott Pilgrim_ Rough_ RiverPhan (2024)SB_ Scott Pilgrim_ Rough_ RiverPhan (2024)
SB_ Scott Pilgrim_ Rough_ RiverPhan (2024)
 
Call Girls Ahwa Just Call 📞 8617370543 Top Class Call Girl Service Available
Call Girls Ahwa Just Call 📞 8617370543 Top Class Call Girl Service AvailableCall Girls Ahwa Just Call 📞 8617370543 Top Class Call Girl Service Available
Call Girls Ahwa Just Call 📞 8617370543 Top Class Call Girl Service Available
 
Digital C-Type Printing: Revolutionizing The Future Of Photographic Prints
Digital C-Type Printing: Revolutionizing The Future Of Photographic PrintsDigital C-Type Printing: Revolutionizing The Future Of Photographic Prints
Digital C-Type Printing: Revolutionizing The Future Of Photographic Prints
 
Jaunpur Escorts Service Girl ^ 9332606886, WhatsApp Anytime Jaunpur
Jaunpur Escorts Service Girl ^ 9332606886, WhatsApp Anytime JaunpurJaunpur Escorts Service Girl ^ 9332606886, WhatsApp Anytime Jaunpur
Jaunpur Escorts Service Girl ^ 9332606886, WhatsApp Anytime Jaunpur
 
Mussafah Call Girls +971525373611 Call Girls in Mussafah Abu Dhabi
Mussafah Call Girls +971525373611 Call Girls in Mussafah Abu DhabiMussafah Call Girls +971525373611 Call Girls in Mussafah Abu Dhabi
Mussafah Call Girls +971525373611 Call Girls in Mussafah Abu Dhabi
 
Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...
Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...
Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...
 
Nehru Nagar, Call Girls ☎️ ((#9711106444)), 💘 Full enjoy Low rate girl💘 Genui...
Nehru Nagar, Call Girls ☎️ ((#9711106444)), 💘 Full enjoy Low rate girl💘 Genui...Nehru Nagar, Call Girls ☎️ ((#9711106444)), 💘 Full enjoy Low rate girl💘 Genui...
Nehru Nagar, Call Girls ☎️ ((#9711106444)), 💘 Full enjoy Low rate girl💘 Genui...
 
codes and conventions of film magazine and website.pptx
codes and conventions of film magazine and website.pptxcodes and conventions of film magazine and website.pptx
codes and conventions of film magazine and website.pptx
 
WhatsApp Chat: 📞 8617370543 Call Girls In Siddharth Nagar At Low Cost Cash Pa...
WhatsApp Chat: 📞 8617370543 Call Girls In Siddharth Nagar At Low Cost Cash Pa...WhatsApp Chat: 📞 8617370543 Call Girls In Siddharth Nagar At Low Cost Cash Pa...
WhatsApp Chat: 📞 8617370543 Call Girls In Siddharth Nagar At Low Cost Cash Pa...
 
Call Girls Varanasi Just Call 8617370543Top Class Call Girl Service Available
Call Girls Varanasi Just Call 8617370543Top Class Call Girl Service AvailableCall Girls Varanasi Just Call 8617370543Top Class Call Girl Service Available
Call Girls Varanasi Just Call 8617370543Top Class Call Girl Service Available
 
Theoretical Framework- Explanation with Flow Chart.docx
Theoretical Framework- Explanation with Flow Chart.docxTheoretical Framework- Explanation with Flow Chart.docx
Theoretical Framework- Explanation with Flow Chart.docx
 

Kathmandu – Hetauda Fast Track Highway

  • 1. Kathmandu – Hetauda Fast Track Highway: Viable Alternative for Sustainable Transportation Network March 23, 2009 Desh Raj Sonyok Ph.D. Student Department of Civil Engineering New Mexico State University Email: drsonyok@nmsu.edu
  • 2. Background  Hetauda is a major Tarai town to the north of Brigunj, situated on route to Kathmandu, a capital city of Nepal  Existing roads: Prithivi Highway: 224 km, 6-8 hours, 90% of ADTT Tribhuvan Highway: 133 km, 6-8 hours, difficult terrain  50% of trade between India and Nepal passes through this crossing  "Fast Track" has a potential to substantially reduce travel distance to around 60 km, travel time by 75% and overall cost of transportation
  • 4. Kathmandu – Hetauda Fast Track Highway Prithivi Highway 224 km long 7-8 hours drive Proposed Highway 60 km long Tribhuvan Highway 1-1.5 hours drive 130 km long 6-8 hours drive
  • 5. Brief History: Feasibility Studies  1974: COMTEC in collaboration with Alpine and Macchi submitted ―Kathmandu-Birgunj Corridor Feasibility Study‖ report  1991: International Engineering Consultants Association, Tokyo, Japan conducted preliminary study  1992: Swiss study carried out by Aegerter and Mosshardt  1993: Finnish International Development Agency carried out pre-feasibility study  2003: Feasibility Study of the Bagmati Corridor Road by Nepal Engineering Consultancy Services Center Ltd
  • 6. Brief History: Implementation Program Source: International Engineering Consultants Association (1991)
  • 7. Assessment of Alternatives Fast Track Options:  Kathmandu to Hetauda Fast Track: includes tunnel and options for a new alignment or upgrading the existing road  Bagmati Corridor Route: connect with the East- West Highway and Hetauda. Geologically hazardous, difficult terrain  Sindhuli Bardibas Road: may not improve connection network to Indian port  Upgrade the existing roads with limited re- alignment, the ―do nothing‖ option
  • 8. Alternative Alignments Tribhuvan Highway Kathmandu Thankot 1 2 Chobhar Tistung Chitlang 1 2 3 Markhu Pharping Kulekhani Chisapani 3 Bhimphedi N 1, 2, & 3 Bhaise Tunnel Roadway Route 1: 59 km Hetauda Route 2: 62 km Route 3: 64 km Source: Dahal (2005)
  • 9. Alternative Alignments Descriptions Route 1 Route 2 Route 3 (59 km) (62 km) (64 km) New Road 27,804,000 36,612,000 40,110,000 Rehabilitation of Existing Road 1,700,000 1,900,000 1,900,000 Tunnel Construction 112,000,000 52,000,000 90,000,000 Bridges 14,950,000 17,550,000 19,500,000 Erosion Control & Slope Stabilization 8,797,000 27,026,500 15,832,000 Operation & Maintenance 1,493,000 1,493,000 1,493,000 Security, Fire, & Rescue 122,000 114,000 118,000 TOTAL (USD) 166,866,500 136,145,500 168,953,000 Source: FINNIDA (1993)
  • 10. Design Parameters Two lane: Lane width=3.5m Design Speed: 120 km/h (level terrain) 40 km/h (steep terrain) Gradient: 3.5 – 7 %
  • 11. Design Parameters AADT (1992): 1200 AADT (2030): 4000 (single lane Sindhuli road) Tunnel Diameter: 9 - 12 m Length: 500 – 3800 m Capacity of two lane tunnel (each directions): 5000-7000 vehicles per day Emergency Stopping Area
  • 12. Economic Analysis  Total cost: USD 130 - 167 million (price at 1993)  Internal Rate of Return (IRR): 14-17%  Net Present Value (NPV): USD 66-88 million  Existing road (458 km) fuel consumption: 120 liter diesel  Fast track (60 km) fuel consumption: 30 liter diesel  Saving per vehicle= 90 liter diesel If AADT is 3500, project will return the investment within 17 years
  • 13. Project Benefits  Reduced fuel consumption help save foreign currency  Saves time and energy  Reduction in existing road maintenance cost  Decrease traffic accident and save life  Promote employment opportunities  Help lower the product cost in Kathmandu valley  Positive impact on economic of surrounding regions
  • 14. Provisions in Development Plans  Eighth Development Plan (1992-1997) : Build, Own, Operate and Transfer (BOOT)  Tenth Development Plan (2002—2007) Private Sector Participation (PSP); Build, Operate and Transfer (BOT); and BOOT modalities  Three-Year Interim Plan (2007/08-2009/10): BT, BOT, BOOT, BTO, LOT (L= Lease), LBOT, DOT (D=Develop), and other similar methods
  • 15. Challenges and Issues  Stable government and strong commitment from all political parties  Traffic tunnels are new to Nepal and fragile geology  Requires trained personal, special equipments, and continuous power supply for operation and maintenance  High construction cost  Disciplined traffic culture for the safe use of tunnel
  • 16. Conclusions  Fast Track highway is financially feasible  It reduces travel distance, travel time and overall cost of transportation  Help save foreign currency and also promote employment opportunities  Stable road network and reduced price of imported goods in Kathmandu  Positive impact on economies of surrounding regions  Stable government and strong commitment from all political parties to implement the project
  • 17. THAK YOU FOR YOU ATTENTION
  • 18. References Kathmandu-Birgunj Corridor Feasibility Study (March 1974) by COMTEC in collaboration with Alpine and Macchi for UN-HMG Preliminary Study Repot on Kathmandu –Hetauda Raod Tunnel Project (September 1991) by International Engineering Consultants Association, Tokyo Japan Direct Link between Hetauda and Kathmandu, Nepal. Pre-feasibility Study (June 1993) by FINNIDA. Feasibility Study of the Bagmati Corridor Road (April 2003) by Nepal Engineering Consultancy Services Center Ltd (NEPECON). Nepal: Preparing the North–South Fast Track Road Project (September 2006) by South Asian Department, Asian Development Bak Nepal: Regional Development Strategy (October 2007) by Halcrow Group (Urban Development) UK, in association with GHK (UK), Full bright Consultancy Services (P) Ltd., Development Management Institute (P) Ltd., and Genesis (P) Ltd
  • 19. Acronyms AADT: Annual average daily traffic is the total volume of vehicle traffic of a highway for a year divided by 365 days ADTT: Average Daily Truck Traffic