The second in our series of workshops designed to gather input from stakeholders involved in existing off-grid projects in Africa, Asia and Latin America. This event is workshop scheduled to be held in Malaysia for the ASEAN countries will be organised by the Academy of Sciences Malaysia (ASM) in collaboration with Universiti Malaysia Sarawak (UNIMAS).
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)
1. Local Practitioners’ WorksLocal Practitioners Works
• North Shan StateNorth Shan State
Recorded assessment surveys by REAM andRecorded assessment surveys by REAM and
Local People U Sai Htun Hla and Group
3. 2 Business Plans2 Business Plans
• Implementation of Micro Hydro 7 Types
• Na Ta‐la Fund
DRD• DRD
• Co‐operated Limited owned
• WB supported V‐owned Micro Hydro
C B i G• Co. Business Groups
• V‐owned
• Private owned
4. 2 Business Plans2 Business Plans
• Implementation of Micro Hydro 7 TypesImplementation of Micro Hydro 7 Types
• Na Ta‐la Fund
• DRD
• Co‐operated Limited owned
• WB supported V‐owned Micro Hydro
• Co. Business GroupsCo. Business Groups
• V‐owned
P i d• Private owned
5. 3 Short Term Long Term Business Plan3 Short Term Long Term Business Plan
• Production in present and aim more to produceProduction in present and aim more to produce
• Micro Hydro MHP Turbines; Small Power
Transformers;Transformers;
• MHP Spare parts manufacture;
Mostly Budget is fine for manufacture, and some
hardships in some regions; eg.,
Cost 20 Lah Kyat / 1 KW max make fair Quality
materials was found
6. 4 Challenges4 Challenges
• Regions no Peace and Tranquility
• Inadequate Budget
• Rare Skilled Workers
• Weak Tech
• Non Complete MHP Policy yet• Non Complete MHP Policy yet
• Due to little Profit appear few Investor Groups
• Grid reach make the Local Self‐alone MHP
Practitioner face hard‐to‐stand
• Lack of good Transportation
7. 5 Request5 Request
• Technological Trainings ;
• Public Awareness;
• Capacity Buildings;p y g
• Needed Policy to define for sufficient and secure
• Village Electrification, i.e., Village Energy SecurityVillage Electrification, i.e., Village Energy Security
and Adequacy;
• To solve Fund Long Term Loan in fair interest fromTo solve Fund, Long Term Loan in fair interest from
Org. or Suitable Bank
• would develop Village Electrification• would develop Village Electrification
works/Projects well‐done
8. L l W k hLocal Workshop
produce Village
Electrification
Transformer
REAM 8