npower’s
Energy Journey
How we energised our
energy management
Contents
▲ Where did we start
▲ Where we are now
▲ How we did it
▲ Building on the basics and going forward
▲ Summary of savings
Performance
Indicator
2010 Outturn Value Compared to 2009
npower energy usage 61.0 GWh 7.2%
Total energy spend £5.55m 7.8%
CO2 produced 28,800 Tonnes 7.5%
# Sites not supplied
by npower
14 No Change
Electricity Price npower 2010 – £91.00/MWh (Retail price No VAT)
The beginning − 2010
09
Performance
Indicator
2015 End of Year
Forecast
Compared to 2010
npower energy usage 31.5 GWh -48%
Total energy spend £3.33m -40%
CO2 produced 14,600 Tonnes -49%
# Sites not supplied
by npower 0 -100%
Electricity Price npower 2015 – £105.57/MWh (Retail price No VAT)
Where we are now – 2015
How did the Sustainability team
achieve this?
Forecasting Measure
Targeting Controlled Energy Budget
SingleGroup AccountMinimise
Monitor
AMR
ISO50001
EASY
Management Systems
Monthly Report
Year on year comparison
Flex Purchasing
Carbon intensity target
Sub-metering
CO2 Reduction
Encompass
Ska Gold Refits
New Equipment
Audits
Benchmarking
▲ Monthly comparison and communication of energy spend
against budget.
▲ Comparisons of year on year energy reduction by sites.
▲ AMR & sub-metering ensures accurate data. and has been
installed across the entire portfolio.
▲ Collaborating with the optimisation desk to forecast
site specific consumption and cost.
▲ Targeting using benchmarks e.g. 2008 CRC Committee
carbon intensity reduction target of 50% reduction by end
of 2015 (Currently at 56.13%)
▲ Future possibility of rating each segment of the business
by their energy consumption.
Business area
Total billed
year to date
(exc VAT)
Budget
year to date
(exc VAT)
Difference
Electricity
Corp Gen and Ren £355,848.90 £377,162 -£21,313
Retail £754,708.88 £783,573 -£28,864
£1,110,557.78 £1,160,735 -£50,177
Gas
Corp Gen and Ren £43,359 £69,556 -£26,196
Retail £53,997 £119,108 -£65,111
£97,356.86 £188,664 -£91,307
£1,207,914.64 £1,349,399 -£141,484
Site MPAN Jan Feb Mar
Swindon – Trigonos 2000027385659 -9% -8% -5%
Worcester – Oak House 1410627113007 -20% -21% -16%
Oldbury – Birchfield House 1414236103000 -5% -2% -30%
Oldbury – Birch House 1410705013000 -10% -15% -25%
Solihull – Princes Way 1419570413007 -9% -15% -43%
Worcester – Acorn House 1413056013004 -5% -5% -18%
Peterlee – Tyne House 1507889210116 -12% -7% -5%
Kingswinford – Larch House UPS 1424340100003 -15% -15% -35%
Leeds – Limewood House 2300001075238 -8% -15% -25%
Leeds – Scarcroft House 2300001080655 -17% -6% -14%
Hull – Bridge House 2390000004330 -13% -19% -43%
Thornaby – Phoenix House 1599001010597 -11% -3% -14%
Peterlee – Tees House 1580000269492 -10% -12% -38%
Taking control − three easy steps to drive performance
▲ Encompass, AMR and sub-meters work together to
empower the energy manager and facilities.
▲ Building Management systems are centralised and
optimised from data analysis.
▲ Site audits can focus on specific issues already identified.
▲ We have also acquired and implemented the prestigious
ISO 50001 Energy Management System to ensure effective
energy monitoring & were the first of the ‘Big 6’ to achieve
this.
▲ The SKA system is used for all major site refits, npower is
currently UK and World leader with 7 Gold awards.
▲ System ensures all refits are conducted in a sustainable
and energy efficient way at no additional cost.
▲ It includes a list of recommended energy efficient
technologies.
▲ If this is adhered to and refits are conducted in an
innovative way then a Ska standard can be awarded – we
achieve the Gold standard on all our refits.
▲ Benefits include an enhanced capital allowance and a
brilliant place to work.
▲ Energy Performance contracts trialled.
▲ State of the art UPS systems installed in Limewood House
and Rainton House
▲ Fantastic energy savings from PIRs, LED lighting
installations
▲ Voltage optimisation at 11 major sites.
▲ Smart STOR generators to generate revenue and reduce
TNUoS charges through the npower TRIAD prediction
service.
▲ Using the EASY initiative (Environment, Action,
Sustainability, You) to engage the workforce, empower
individuals and unify sustainable activities.
Winners of the 2013 Excellence in Carbon Reduction Award
Building on the basics
▲ Flexible Purchasing
▲ By combining our site supplies into one group account we took
advantage of npower’s flex contract, whilst being the first ever
customer allowing us to test the contracts and strategy setting.
▲ In 2013 we saw a 12% (£297,225) saving against an equivalent
fixed-contract energy price.
45
47
49
51
53
55
57
59
61
Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13
RWE npower fixed v. flex cost (£/MWh)
Fixed Contract Price @ 31/08/2011 (£/MWh) Market Average for Strategy (£/MWh)
npower Flex Price (£/MWh)
Building on the basics
▲ Leading The Way In Princes Way
▲ Ska Gold rated refit including the Energy
Innovation Centre – 3rd floor A-block.
▲ 44MWh generated by Solar PV at Princes
Way – enough to power the site for two
weeks.
▲ STOR generation at site capable of net
export during peak times with a second
generator currently being fitted.
▲ Sub-metering with AMR installed to better
understand energy consumption.
▲ This has resulted in a brilliant place to work
and to show our customers how an energy
company manages it’s energy.
▲ Total income from wind, solar and STOR in
excess of £175k p.a.
Across RWE Group UK
Driving performance with the CRC Energy
Efficiency Scheme & ESOS
The npower Sustainability team is also
responsible for managing the CRC Energy
Efficiency Scheme, Carbon Trust Standard
and ESOS submissions for all RWE Group
companies in the UK.
The team drive reductions in CO2 emissions
across Trading, Generation, Energy Services
and Retail arms of the company.
This reduces the spend on CO2 permits, which
is currently in excess of £270k at £12 per Tonne
with permits going up this year. This allows us to
engage customers with the success of our
efficiency journey.
Our ISO50001 accreditation also aids ESOS
compliance & helped finalise our >70TWh ESOS
submission for RWE in the UK.
Our next steps
Driving Performance –
Further refine data analysis
and forecasting
Challenge – Install
brilliantly innovative
energy solutions
Focus – Develop new
finance opportunities to reduce
our CAPEX spend
Collaboration – Work with
I&C, SME and Energy Service
to develop new products
Customer First – Share our energy efficiency
journey with I&C and SME customers
Accountability – Review performance with
external audits which has led to several awards
Respect – Continue to respect
the needs of our employees and customers.
To summarise
Performance Indicator Savings in 2014 compared to 2010
RWE npower energy usage 30.5 GWh
Total energy spend £2.22m
CO2 production 14,200 Tonnes
Cost of CO2 permits (£12/Tonne) £233k
Total Annual Saving £2.45m (44%)
Appendix
Npower’s DBM Offering
DBM Silver
DBM Gold
DBM Platinum
Productsupport
 Strategy
consultation and
design service
 Strategy design &
recommendations
 No obligation for npower
to deliver budget
 VaR tool and mandated
volumes
 Can opt up to DBM
Platinum during contract
term
 Strategy design
service
 Active exposure
management
 Npower appointed as
agent to deliver the
agreed strategy and
guarantee a cap/floor
for the commodity
budget
 Budget written into
contract
17
Building a Hedging Strategy that fits your Risk Appetite
 To build an effective risk management strategy we need to set risk appetites against four key parameters:
 The budget level will control the degree to which you are happy to let the market move from ‘today’s’ levels in order to preserve downside
opportunity. It is essentially your risk capital
 The hedging window is the amount of time you wish to hedge volume for, a long period will provide greater opportunity to hit markets averages
while shorter windows increase the level of fundamental understanding. The Hedge deadline determines how far in advance of delivery you wish to
be 100% hedged and know your final achieved price
The holding period and path flexibility control the level of flexibility afforded to trade execution in order to optimise based on market
intelligence. Opportunity vs. Emotion
The exposure to prompt markets – determines your contract mix. Seasons vs. Quarters vs. Months or day-ahead
18
Min Hedge
Max Hedge
14% Hedged Monthly
86% Volume Hedged Before Seasonal Contract Expires
Setting the Budget
Part of a successful risk management
strategy is understanding your budget
 By understanding your maximum and
target commodity costs you can ensure
you stay within those limits.
 ‘Contracted Budgets’ will ensure you lock
in wholesale prices before they rise too
far.
 Our systems will be configured to provide
warnings based on observed volatility
and VAR in a single day.
 Budgets can be set at contract level or
broken down seasonally.
 ‘Target Price Levels’ allow you to close
out positions to secure lower wholesale
rates in case they rise again
 These don’t have to be set if you do not
want to limit potential gains.
19
The DBM Platinum product contractually guarantees you
will not fall below your commodity budget
Target Price Level
Contracted Budget
Current
market
Risk Capital
Active Management
 Budget price = forward market + volatility allowance
 Summer 2016 Baseload = £40/MWh
 Volatility allowance = 10%
 Budget = £45/MWh * 110% = £44/MWh
Close out to limit upside risk
Close out to lock in profits
The optimisation desk’s approach combines fundamental analysis with risk analytics to best execute the hedge path
within the tolerance limits set out and guaranteed within the strategy.
 The desk develops a structured approach to hedging based around an
average hedge path which is determined by hedging window and the
deadline to become fully hedged
 The longer the hedging window the greater opportunity to ensure that a
contracts market average can be achieved. Statistically speaking you
increase the sample size to achieve a more reliable mean
 Depending on your business requirements you may require achieved
commodity costs in advance of the actual commodity delivery and therefore
there is flexibility to bring forward the hedging deadline
 A degree of tolerance is beneficial in order to provide the flexibility to
acceralate or decelerate hedging in order to take advantage of bullish or
bearish runs, respectively
Hedged
Volume
20
Time
Exposure
Average Hedge Path
Tolerance
Example hedge profile
Hedging
Deadline
Hedging Window
 Strategies are loaded into our fully supported Oracle position management system.
 Configured alongside budget and daily VaR reporting. The customer and the Optimisation Desk receive daily position
emails, VaR and P&L reports alongside market updates and analysis.
 This flexibility to deviate long/short against an average profile has helped import customers take full advantage of the
recent bearish trends through 2015 while saving the bacon for export customers given their long hedge profile and ability
to accelerate
Setting the Hedge Path Profile
21
Strategy Item High Medium Low
Seasonal Hedging 50% 70% 90%
Prompt Hedging 50% 30% 10%
Min/Max Volume 10MW 6MW 3MW
Budget Level 15% 10% 5%
Holding Period 6 months 3 months 1 month
Hedge Window 1 years 1.5 years 2 years
Strategy Risk Level
Selecting the Right Contract Mix – 2014 DBM Performance
Optimisation Desk Performance 2014
 The full benefit of the Optimisation Desk hedge
performance passed onto the customer.
 Absolute DBM 2014 P&L - £850k
 Value delivered of nearly £4/MWh
 DBM RORAC – 42%
Price quality across the portfolio contributes to P&L
 73% of DBM customer trades inside spread
 In 2014 customer shown full benefit of £0.12/MWh
Hedging Strategy – Risk Metrics
 P&L measurement typically includes
… analysing changes in portfolio value due to movements in the forward curve
… but could include performance vs. market average or budget, price quality vs. spread
etc.
 Value at Risk measures the potential loss in portfolio value
… at a user-configured probability (usually 95th percentile = 1/20 worst case)
… using observed market volatility
… and random sampling of potential prices
 Return on risk adjusted capital compares P&L to VaR enabling us to assess
performance against risked capital
… calculate potential losses (anything to the left of the 50th percentile) up to the 95th
percentile
… work out the difference between P50 and P95 (the amount of £ risked that results in a
loss)
… and dividing P&L by the risked capital - typical levels are ~20%
 Wholesale market liquidity and spread analytics alongside netting opportunities
Is +£10k P&L risking £100k better than +£5k risking £20k?
22
Bespoke Reports to Suit
Risk Analytics Available

Más contenido relacionado

La actualidad más candente

Salfix - 100% Interest Free capital finance loans
Salfix - 100% Interest Free capital finance loansSalfix - 100% Interest Free capital finance loans
Salfix - 100% Interest Free capital finance loans
Walt Whitman
 

La actualidad más candente (20)

Business Energy Efficiency Tax Review One Year On
Business Energy Efficiency Tax Review One Year OnBusiness Energy Efficiency Tax Review One Year On
Business Energy Efficiency Tax Review One Year On
 
Healthy Energy Management Practice in Hospitals
Healthy Energy Management Practice in HospitalsHealthy Energy Management Practice in Hospitals
Healthy Energy Management Practice in Hospitals
 
RE:NEW Programme
RE:NEW ProgrammeRE:NEW Programme
RE:NEW Programme
 
Energy as a Service: Cutting Energy Spend and CO2 without Risk or Big Investment
Energy as a Service: Cutting Energy Spend and CO2 without Risk or Big InvestmentEnergy as a Service: Cutting Energy Spend and CO2 without Risk or Big Investment
Energy as a Service: Cutting Energy Spend and CO2 without Risk or Big Investment
 
Securing a yes from your CFO for your Energy Management Business Plan: DSR Ca...
Securing a yes from your CFO for your Energy Management Business Plan: DSR Ca...Securing a yes from your CFO for your Energy Management Business Plan: DSR Ca...
Securing a yes from your CFO for your Energy Management Business Plan: DSR Ca...
 
Lessons from Universities on Energy Management
Lessons from Universities on Energy ManagementLessons from Universities on Energy Management
Lessons from Universities on Energy Management
 
How a Single Infrastructure Decision Saves Universities in Excess of £50,000
How a Single Infrastructure Decision Saves Universities in Excess of £50,000How a Single Infrastructure Decision Saves Universities in Excess of £50,000
How a Single Infrastructure Decision Saves Universities in Excess of £50,000
 
Case Study: Operational Energy Reduction through Data Analysis & Virtual Benc...
Case Study: Operational Energy Reduction through Data Analysis & Virtual Benc...Case Study: Operational Energy Reduction through Data Analysis & Virtual Benc...
Case Study: Operational Energy Reduction through Data Analysis & Virtual Benc...
 
The Importance of Investing in Team
The Importance of Investing in TeamThe Importance of Investing in Team
The Importance of Investing in Team
 
Optimising Buildings through BeMS Analytics
Optimising Buildings through BeMS AnalyticsOptimising Buildings through BeMS Analytics
Optimising Buildings through BeMS Analytics
 
Deep Retrofit: IERC & Enabling collaborative and Industry Driven Energy Rese...
Deep Retrofit:  IERC & Enabling collaborative and Industry Driven Energy Rese...Deep Retrofit:  IERC & Enabling collaborative and Industry Driven Energy Rese...
Deep Retrofit: IERC & Enabling collaborative and Industry Driven Energy Rese...
 
Promoting Collaboration in Energy across the Organisation
Promoting Collaboration in Energy across the OrganisationPromoting Collaboration in Energy across the Organisation
Promoting Collaboration in Energy across the Organisation
 
Deep Retrofit: Retrofit in the UK
Deep Retrofit: Retrofit in the UKDeep Retrofit: Retrofit in the UK
Deep Retrofit: Retrofit in the UK
 
Deep Retrofit: IHER Energy Services, European EPISCOPE Project
Deep Retrofit: IHER Energy Services, European EPISCOPE ProjectDeep Retrofit: IHER Energy Services, European EPISCOPE Project
Deep Retrofit: IHER Energy Services, European EPISCOPE Project
 
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpointCBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
 
EMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building ControlsEMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building Controls
 
Energising Facilities Management
Energising Facilities ManagementEnergising Facilities Management
Energising Facilities Management
 
Salfix - 100% Interest Free capital finance loans
Salfix - 100% Interest Free capital finance loansSalfix - 100% Interest Free capital finance loans
Salfix - 100% Interest Free capital finance loans
 
Deep Retrofit: Lessons from Superhomes
Deep Retrofit: Lessons from SuperhomesDeep Retrofit: Lessons from Superhomes
Deep Retrofit: Lessons from Superhomes
 
Network Charging Policy – The Small Print
Network Charging Policy – The Small PrintNetwork Charging Policy – The Small Print
Network Charging Policy – The Small Print
 

Destacado

Destacado (20)

ESOS – Business as Usual?
ESOS – Business as Usual?ESOS – Business as Usual?
ESOS – Business as Usual?
 
Unlocking demand flexibility for lower electricity bills
Unlocking demand flexibility for lower electricity billsUnlocking demand flexibility for lower electricity bills
Unlocking demand flexibility for lower electricity bills
 
Energy Efficient and Sustainable Buildings for the Future
Energy Efficient and Sustainable Buildings for the FutureEnergy Efficient and Sustainable Buildings for the Future
Energy Efficient and Sustainable Buildings for the Future
 
Haven Energy Bridge – Electrolysing Renewable Generation to Inject Hydrogen i...
Haven Energy Bridge – Electrolysing Renewable Generation to Inject Hydrogen i...Haven Energy Bridge – Electrolysing Renewable Generation to Inject Hydrogen i...
Haven Energy Bridge – Electrolysing Renewable Generation to Inject Hydrogen i...
 
The Future of the Energy Management Profession
The Future of the Energy Management ProfessionThe Future of the Energy Management Profession
The Future of the Energy Management Profession
 
Monitoring of Business Energy Performance for Fit-out Redevelopment Potential...
Monitoring of Business Energy Performance for Fit-out Redevelopment Potential...Monitoring of Business Energy Performance for Fit-out Redevelopment Potential...
Monitoring of Business Energy Performance for Fit-out Redevelopment Potential...
 
DEPU Successor Programme
DEPU Successor ProgrammeDEPU Successor Programme
DEPU Successor Programme
 
Water Market Deregulation
Water Market DeregulationWater Market Deregulation
Water Market Deregulation
 
Practical Procurement Solutions to Drive Down Costs
Practical Procurement Solutions to Drive Down CostsPractical Procurement Solutions to Drive Down Costs
Practical Procurement Solutions to Drive Down Costs
 
Behaviour Change – it’s not all about turning off the lights
Behaviour Change – it’s not all about turning off the lightsBehaviour Change – it’s not all about turning off the lights
Behaviour Change – it’s not all about turning off the lights
 
Demonstrating Energy Excellence: Increasing Investment Yield – What Every Fac...
Demonstrating Energy Excellence: Increasing Investment Yield – What Every Fac...Demonstrating Energy Excellence: Increasing Investment Yield – What Every Fac...
Demonstrating Energy Excellence: Increasing Investment Yield – What Every Fac...
 
RE:FIT LONDON – Making London a resilient, sustainable and resource efficient...
RE:FIT LONDON – Making London a resilient, sustainable and resource efficient...RE:FIT LONDON – Making London a resilient, sustainable and resource efficient...
RE:FIT LONDON – Making London a resilient, sustainable and resource efficient...
 
Trials and Tribulations of Getting into Energy Management
Trials and Tribulations of Getting into Energy ManagementTrials and Tribulations of Getting into Energy Management
Trials and Tribulations of Getting into Energy Management
 
How to Win an Investment Approval from your Board
How to Win an Investment Approval from your BoardHow to Win an Investment Approval from your Board
How to Win an Investment Approval from your Board
 
How do Third Party Charges Affect your Energy Bill
How do Third Party Charges Affect your Energy BillHow do Third Party Charges Affect your Energy Bill
How do Third Party Charges Affect your Energy Bill
 
Guide to Energy Procurement - How to Procure Energy as an Energy Manager
Guide to Energy Procurement - How to Procure Energy as an Energy ManagerGuide to Energy Procurement - How to Procure Energy as an Energy Manager
Guide to Energy Procurement - How to Procure Energy as an Energy Manager
 
Owen Square Community Energy Project
Owen Square Community Energy ProjectOwen Square Community Energy Project
Owen Square Community Energy Project
 
Battery Storage Can Work in Every Level from Large to Small Companies to SMEs
Battery Storage Can Work in Every Level from Large to Small Companies to SMEsBattery Storage Can Work in Every Level from Large to Small Companies to SMEs
Battery Storage Can Work in Every Level from Large to Small Companies to SMEs
 
Find the hidden “DNA” in your AMR data….
Find the hidden “DNA” in your AMR data….Find the hidden “DNA” in your AMR data….
Find the hidden “DNA” in your AMR data….
 
Getting most out of bio-energy on industrial sites
Getting most out of bio-energy on industrial sitesGetting most out of bio-energy on industrial sites
Getting most out of bio-energy on industrial sites
 

Similar a How RWE nPower Energised Their Energy Management

Low Carbon Energy Brochure - Capability Statement.PDF
Low Carbon Energy Brochure - Capability Statement.PDFLow Carbon Energy Brochure - Capability Statement.PDF
Low Carbon Energy Brochure - Capability Statement.PDF
Jason Roberts
 
EnergiMidt International Energy Solutions
EnergiMidt International Energy SolutionsEnergiMidt International Energy Solutions
EnergiMidt International Energy Solutions
Elena Markova
 
Intro slides cm sustainable manufacture 23 sept 2010
Intro slides cm sustainable manufacture 23 sept 2010Intro slides cm sustainable manufacture 23 sept 2010
Intro slides cm sustainable manufacture 23 sept 2010
mikegolfbravo1
 
Carbon trust-financing-energy-saving-projects-geoff-smyth
Carbon trust-financing-energy-saving-projects-geoff-smythCarbon trust-financing-energy-saving-projects-geoff-smyth
Carbon trust-financing-energy-saving-projects-geoff-smyth
Invest Northern Ireland
 

Similar a How RWE nPower Energised Their Energy Management (20)

Anglian Water Trial – Cambridge
Anglian Water Trial – CambridgeAnglian Water Trial – Cambridge
Anglian Water Trial – Cambridge
 
Low Carbon Energy Brochure - Capability Statement.PDF
Low Carbon Energy Brochure - Capability Statement.PDFLow Carbon Energy Brochure - Capability Statement.PDF
Low Carbon Energy Brochure - Capability Statement.PDF
 
Implications of CRC on Landlords and Tenants
Implications of CRC on Landlords and TenantsImplications of CRC on Landlords and Tenants
Implications of CRC on Landlords and Tenants
 
Energise Ltd - Company Introduction
Energise Ltd - Company IntroductionEnergise Ltd - Company Introduction
Energise Ltd - Company Introduction
 
Love the Planet: Love your bottom line
Love the Planet: Love your bottom lineLove the Planet: Love your bottom line
Love the Planet: Love your bottom line
 
Financing energy storage - Masterclass By MACQUARIE
Financing energy storage - Masterclass By MACQUARIEFinancing energy storage - Masterclass By MACQUARIE
Financing energy storage - Masterclass By MACQUARIE
 
SESPco Presentation for Crowd for Angels
SESPco Presentation for Crowd for AngelsSESPco Presentation for Crowd for Angels
SESPco Presentation for Crowd for Angels
 
energyTEAM Brochure
energyTEAM BrochureenergyTEAM Brochure
energyTEAM Brochure
 
Energy Services Overview
Energy Services OverviewEnergy Services Overview
Energy Services Overview
 
DWP supplier event 23 May 2014 Andrew Forzani
DWP supplier event 23 May 2014 Andrew ForzaniDWP supplier event 23 May 2014 Andrew Forzani
DWP supplier event 23 May 2014 Andrew Forzani
 
Get Solutions
Get SolutionsGet Solutions
Get Solutions
 
david mason, low carbon construction - challenges, trends and technologies, l...
david mason, low carbon construction - challenges, trends and technologies, l...david mason, low carbon construction - challenges, trends and technologies, l...
david mason, low carbon construction - challenges, trends and technologies, l...
 
Bringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserBringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the User
 
EnergiMidt International Energy Solutions
EnergiMidt International Energy SolutionsEnergiMidt International Energy Solutions
EnergiMidt International Energy Solutions
 
Coal_Operation_Booklet_V2
Coal_Operation_Booklet_V2Coal_Operation_Booklet_V2
Coal_Operation_Booklet_V2
 
REI_Brochure
REI_BrochureREI_Brochure
REI_Brochure
 
The Carbon Trust
The Carbon TrustThe Carbon Trust
The Carbon Trust
 
Intro slides cm sustainable manufacture 23 sept 2010
Intro slides cm sustainable manufacture 23 sept 2010Intro slides cm sustainable manufacture 23 sept 2010
Intro slides cm sustainable manufacture 23 sept 2010
 
Carbon trust-financing-energy-saving-projects-geoff-smyth
Carbon trust-financing-energy-saving-projects-geoff-smythCarbon trust-financing-energy-saving-projects-geoff-smyth
Carbon trust-financing-energy-saving-projects-geoff-smyth
 
Crc Presentation For Business Risk Seminar
Crc Presentation For Business Risk SeminarCrc Presentation For Business Risk Seminar
Crc Presentation For Business Risk Seminar
 

Más de EMEX

Más de EMEX (20)

Driving Sustainable Business: Why Generation Z is the key
Driving Sustainable Business: Why Generation Z is the keyDriving Sustainable Business: Why Generation Z is the key
Driving Sustainable Business: Why Generation Z is the key
 
UK’s Climate Change transition – A progress update and the next challenge?  (...
UK’s Climate Change transition – A progress update and the next challenge?  (...UK’s Climate Change transition – A progress update and the next challenge?  (...
UK’s Climate Change transition – A progress update and the next challenge?  (...
 
Keynote Presentation by the Committee on Climate Change
Keynote Presentation by the Committee on Climate ChangeKeynote Presentation by the Committee on Climate Change
Keynote Presentation by the Committee on Climate Change
 
UK’s Climate Change transition – A progress update and the next challenge?   ...
UK’s Climate Change transition – A progress update and the next challenge?   ...UK’s Climate Change transition – A progress update and the next challenge?   ...
UK’s Climate Change transition – A progress update and the next challenge?   ...
 
New Guidance & Standards for Climate Change Adaptation (Maria Pooley)
New Guidance & Standards for Climate Change Adaptation (Maria Pooley)New Guidance & Standards for Climate Change Adaptation (Maria Pooley)
New Guidance & Standards for Climate Change Adaptation (Maria Pooley)
 
New Guidance & Standards for Climate Change Adaptation (John Dora)
New Guidance & Standards for Climate Change Adaptation (John Dora)New Guidance & Standards for Climate Change Adaptation (John Dora)
New Guidance & Standards for Climate Change Adaptation (John Dora)
 
Is your Facilities Management (FM) provider the key to Energy reduction?
Is your Facilities Management (FM) provider the key to Energy reduction?Is your Facilities Management (FM) provider the key to Energy reduction?
Is your Facilities Management (FM) provider the key to Energy reduction?
 
Environmental skills in the workplace
Environmental skills in the workplaceEnvironmental skills in the workplace
Environmental skills in the workplace
 
Environmental Management Systems & Auditing for climate change action (Nigel ...
Environmental Management Systems & Auditing for climate change action (Nigel ...Environmental Management Systems & Auditing for climate change action (Nigel ...
Environmental Management Systems & Auditing for climate change action (Nigel ...
 
Environmental Management Systems & Auditing for climate change action (Anna-L...
Environmental Management Systems & Auditing for climate change action (Anna-L...Environmental Management Systems & Auditing for climate change action (Anna-L...
Environmental Management Systems & Auditing for climate change action (Anna-L...
 
Climate Change & Sustainability Reporting: Core to Business Solutions( Dr Ton...
Climate Change & Sustainability Reporting: Core to Business Solutions( Dr Ton...Climate Change & Sustainability Reporting: Core to Business Solutions( Dr Ton...
Climate Change & Sustainability Reporting: Core to Business Solutions( Dr Ton...
 
Climate Change & Sustainability Reporting: Core to Business Solutions (Jamie ...
Climate Change & Sustainability Reporting: Core to Business Solutions (Jamie ...Climate Change & Sustainability Reporting: Core to Business Solutions (Jamie ...
Climate Change & Sustainability Reporting: Core to Business Solutions (Jamie ...
 
British Standards for Carbon Management- including PAS 2080 – The world’s fir...
British Standards for Carbon Management- including PAS 2080 – The world’s fir...British Standards for Carbon Management- including PAS 2080 – The world’s fir...
British Standards for Carbon Management- including PAS 2080 – The world’s fir...
 
British Standards for Carbon Management- including PAS 2080 – The world’s fir...
British Standards for Carbon Management- including PAS 2080 – The world’s fir...British Standards for Carbon Management- including PAS 2080 – The world’s fir...
British Standards for Carbon Management- including PAS 2080 – The world’s fir...
 
Breaking new ground – Farming and forestry providing new opportunities for Cl...
Breaking new ground – Farming and forestry providing new opportunities for Cl...Breaking new ground – Farming and forestry providing new opportunities for Cl...
Breaking new ground – Farming and forestry providing new opportunities for Cl...
 
Breaking new ground – Farming and forestry providing new opportunities for Cl...
Breaking new ground – Farming and forestry providing new opportunities for Cl...Breaking new ground – Farming and forestry providing new opportunities for Cl...
Breaking new ground – Farming and forestry providing new opportunities for Cl...
 
Update on the Streamlined Energy and Carbon Reporting
Update on the Streamlined Energy and Carbon ReportingUpdate on the Streamlined Energy and Carbon Reporting
Update on the Streamlined Energy and Carbon Reporting
 
Independent Energy Audits and Funding
Independent Energy Audits and FundingIndependent Energy Audits and Funding
Independent Energy Audits and Funding
 
Public Sector Energy Storage Investment
Public Sector Energy Storage InvestmentPublic Sector Energy Storage Investment
Public Sector Energy Storage Investment
 
Foundations of Energy Auditing
Foundations of Energy AuditingFoundations of Energy Auditing
Foundations of Energy Auditing
 

Último

Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Anamikakaur10
 

Último (20)

Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 

How RWE nPower Energised Their Energy Management

  • 1. npower’s Energy Journey How we energised our energy management
  • 2. Contents ▲ Where did we start ▲ Where we are now ▲ How we did it ▲ Building on the basics and going forward ▲ Summary of savings
  • 3. Performance Indicator 2010 Outturn Value Compared to 2009 npower energy usage 61.0 GWh 7.2% Total energy spend £5.55m 7.8% CO2 produced 28,800 Tonnes 7.5% # Sites not supplied by npower 14 No Change Electricity Price npower 2010 – £91.00/MWh (Retail price No VAT) The beginning − 2010 09
  • 4. Performance Indicator 2015 End of Year Forecast Compared to 2010 npower energy usage 31.5 GWh -48% Total energy spend £3.33m -40% CO2 produced 14,600 Tonnes -49% # Sites not supplied by npower 0 -100% Electricity Price npower 2015 – £105.57/MWh (Retail price No VAT) Where we are now – 2015
  • 5. How did the Sustainability team achieve this?
  • 6. Forecasting Measure Targeting Controlled Energy Budget SingleGroup AccountMinimise Monitor AMR ISO50001 EASY Management Systems Monthly Report Year on year comparison Flex Purchasing Carbon intensity target Sub-metering CO2 Reduction Encompass Ska Gold Refits New Equipment Audits Benchmarking
  • 7. ▲ Monthly comparison and communication of energy spend against budget. ▲ Comparisons of year on year energy reduction by sites. ▲ AMR & sub-metering ensures accurate data. and has been installed across the entire portfolio. ▲ Collaborating with the optimisation desk to forecast site specific consumption and cost. ▲ Targeting using benchmarks e.g. 2008 CRC Committee carbon intensity reduction target of 50% reduction by end of 2015 (Currently at 56.13%) ▲ Future possibility of rating each segment of the business by their energy consumption. Business area Total billed year to date (exc VAT) Budget year to date (exc VAT) Difference Electricity Corp Gen and Ren £355,848.90 £377,162 -£21,313 Retail £754,708.88 £783,573 -£28,864 £1,110,557.78 £1,160,735 -£50,177 Gas Corp Gen and Ren £43,359 £69,556 -£26,196 Retail £53,997 £119,108 -£65,111 £97,356.86 £188,664 -£91,307 £1,207,914.64 £1,349,399 -£141,484 Site MPAN Jan Feb Mar Swindon – Trigonos 2000027385659 -9% -8% -5% Worcester – Oak House 1410627113007 -20% -21% -16% Oldbury – Birchfield House 1414236103000 -5% -2% -30% Oldbury – Birch House 1410705013000 -10% -15% -25% Solihull – Princes Way 1419570413007 -9% -15% -43% Worcester – Acorn House 1413056013004 -5% -5% -18% Peterlee – Tyne House 1507889210116 -12% -7% -5% Kingswinford – Larch House UPS 1424340100003 -15% -15% -35% Leeds – Limewood House 2300001075238 -8% -15% -25% Leeds – Scarcroft House 2300001080655 -17% -6% -14% Hull – Bridge House 2390000004330 -13% -19% -43% Thornaby – Phoenix House 1599001010597 -11% -3% -14% Peterlee – Tees House 1580000269492 -10% -12% -38% Taking control − three easy steps to drive performance
  • 8. ▲ Encompass, AMR and sub-meters work together to empower the energy manager and facilities. ▲ Building Management systems are centralised and optimised from data analysis. ▲ Site audits can focus on specific issues already identified. ▲ We have also acquired and implemented the prestigious ISO 50001 Energy Management System to ensure effective energy monitoring & were the first of the ‘Big 6’ to achieve this.
  • 9. ▲ The SKA system is used for all major site refits, npower is currently UK and World leader with 7 Gold awards. ▲ System ensures all refits are conducted in a sustainable and energy efficient way at no additional cost. ▲ It includes a list of recommended energy efficient technologies. ▲ If this is adhered to and refits are conducted in an innovative way then a Ska standard can be awarded – we achieve the Gold standard on all our refits. ▲ Benefits include an enhanced capital allowance and a brilliant place to work. ▲ Energy Performance contracts trialled.
  • 10. ▲ State of the art UPS systems installed in Limewood House and Rainton House ▲ Fantastic energy savings from PIRs, LED lighting installations ▲ Voltage optimisation at 11 major sites. ▲ Smart STOR generators to generate revenue and reduce TNUoS charges through the npower TRIAD prediction service. ▲ Using the EASY initiative (Environment, Action, Sustainability, You) to engage the workforce, empower individuals and unify sustainable activities. Winners of the 2013 Excellence in Carbon Reduction Award
  • 11. Building on the basics ▲ Flexible Purchasing ▲ By combining our site supplies into one group account we took advantage of npower’s flex contract, whilst being the first ever customer allowing us to test the contracts and strategy setting. ▲ In 2013 we saw a 12% (£297,225) saving against an equivalent fixed-contract energy price. 45 47 49 51 53 55 57 59 61 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 RWE npower fixed v. flex cost (£/MWh) Fixed Contract Price @ 31/08/2011 (£/MWh) Market Average for Strategy (£/MWh) npower Flex Price (£/MWh)
  • 12. Building on the basics ▲ Leading The Way In Princes Way ▲ Ska Gold rated refit including the Energy Innovation Centre – 3rd floor A-block. ▲ 44MWh generated by Solar PV at Princes Way – enough to power the site for two weeks. ▲ STOR generation at site capable of net export during peak times with a second generator currently being fitted. ▲ Sub-metering with AMR installed to better understand energy consumption. ▲ This has resulted in a brilliant place to work and to show our customers how an energy company manages it’s energy. ▲ Total income from wind, solar and STOR in excess of £175k p.a.
  • 13. Across RWE Group UK Driving performance with the CRC Energy Efficiency Scheme & ESOS The npower Sustainability team is also responsible for managing the CRC Energy Efficiency Scheme, Carbon Trust Standard and ESOS submissions for all RWE Group companies in the UK. The team drive reductions in CO2 emissions across Trading, Generation, Energy Services and Retail arms of the company. This reduces the spend on CO2 permits, which is currently in excess of £270k at £12 per Tonne with permits going up this year. This allows us to engage customers with the success of our efficiency journey. Our ISO50001 accreditation also aids ESOS compliance & helped finalise our >70TWh ESOS submission for RWE in the UK.
  • 14. Our next steps Driving Performance – Further refine data analysis and forecasting Challenge – Install brilliantly innovative energy solutions Focus – Develop new finance opportunities to reduce our CAPEX spend Collaboration – Work with I&C, SME and Energy Service to develop new products Customer First – Share our energy efficiency journey with I&C and SME customers Accountability – Review performance with external audits which has led to several awards Respect – Continue to respect the needs of our employees and customers.
  • 15. To summarise Performance Indicator Savings in 2014 compared to 2010 RWE npower energy usage 30.5 GWh Total energy spend £2.22m CO2 production 14,200 Tonnes Cost of CO2 permits (£12/Tonne) £233k Total Annual Saving £2.45m (44%)
  • 17. Npower’s DBM Offering DBM Silver DBM Gold DBM Platinum Productsupport  Strategy consultation and design service  Strategy design & recommendations  No obligation for npower to deliver budget  VaR tool and mandated volumes  Can opt up to DBM Platinum during contract term  Strategy design service  Active exposure management  Npower appointed as agent to deliver the agreed strategy and guarantee a cap/floor for the commodity budget  Budget written into contract 17
  • 18. Building a Hedging Strategy that fits your Risk Appetite  To build an effective risk management strategy we need to set risk appetites against four key parameters:  The budget level will control the degree to which you are happy to let the market move from ‘today’s’ levels in order to preserve downside opportunity. It is essentially your risk capital  The hedging window is the amount of time you wish to hedge volume for, a long period will provide greater opportunity to hit markets averages while shorter windows increase the level of fundamental understanding. The Hedge deadline determines how far in advance of delivery you wish to be 100% hedged and know your final achieved price The holding period and path flexibility control the level of flexibility afforded to trade execution in order to optimise based on market intelligence. Opportunity vs. Emotion The exposure to prompt markets – determines your contract mix. Seasons vs. Quarters vs. Months or day-ahead 18 Min Hedge Max Hedge 14% Hedged Monthly 86% Volume Hedged Before Seasonal Contract Expires
  • 19. Setting the Budget Part of a successful risk management strategy is understanding your budget  By understanding your maximum and target commodity costs you can ensure you stay within those limits.  ‘Contracted Budgets’ will ensure you lock in wholesale prices before they rise too far.  Our systems will be configured to provide warnings based on observed volatility and VAR in a single day.  Budgets can be set at contract level or broken down seasonally.  ‘Target Price Levels’ allow you to close out positions to secure lower wholesale rates in case they rise again  These don’t have to be set if you do not want to limit potential gains. 19 The DBM Platinum product contractually guarantees you will not fall below your commodity budget Target Price Level Contracted Budget Current market Risk Capital Active Management  Budget price = forward market + volatility allowance  Summer 2016 Baseload = £40/MWh  Volatility allowance = 10%  Budget = £45/MWh * 110% = £44/MWh Close out to limit upside risk Close out to lock in profits
  • 20. The optimisation desk’s approach combines fundamental analysis with risk analytics to best execute the hedge path within the tolerance limits set out and guaranteed within the strategy.  The desk develops a structured approach to hedging based around an average hedge path which is determined by hedging window and the deadline to become fully hedged  The longer the hedging window the greater opportunity to ensure that a contracts market average can be achieved. Statistically speaking you increase the sample size to achieve a more reliable mean  Depending on your business requirements you may require achieved commodity costs in advance of the actual commodity delivery and therefore there is flexibility to bring forward the hedging deadline  A degree of tolerance is beneficial in order to provide the flexibility to acceralate or decelerate hedging in order to take advantage of bullish or bearish runs, respectively Hedged Volume 20 Time Exposure Average Hedge Path Tolerance Example hedge profile Hedging Deadline Hedging Window  Strategies are loaded into our fully supported Oracle position management system.  Configured alongside budget and daily VaR reporting. The customer and the Optimisation Desk receive daily position emails, VaR and P&L reports alongside market updates and analysis.  This flexibility to deviate long/short against an average profile has helped import customers take full advantage of the recent bearish trends through 2015 while saving the bacon for export customers given their long hedge profile and ability to accelerate Setting the Hedge Path Profile
  • 21. 21 Strategy Item High Medium Low Seasonal Hedging 50% 70% 90% Prompt Hedging 50% 30% 10% Min/Max Volume 10MW 6MW 3MW Budget Level 15% 10% 5% Holding Period 6 months 3 months 1 month Hedge Window 1 years 1.5 years 2 years Strategy Risk Level Selecting the Right Contract Mix – 2014 DBM Performance Optimisation Desk Performance 2014  The full benefit of the Optimisation Desk hedge performance passed onto the customer.  Absolute DBM 2014 P&L - £850k  Value delivered of nearly £4/MWh  DBM RORAC – 42% Price quality across the portfolio contributes to P&L  73% of DBM customer trades inside spread  In 2014 customer shown full benefit of £0.12/MWh
  • 22. Hedging Strategy – Risk Metrics  P&L measurement typically includes … analysing changes in portfolio value due to movements in the forward curve … but could include performance vs. market average or budget, price quality vs. spread etc.  Value at Risk measures the potential loss in portfolio value … at a user-configured probability (usually 95th percentile = 1/20 worst case) … using observed market volatility … and random sampling of potential prices  Return on risk adjusted capital compares P&L to VaR enabling us to assess performance against risked capital … calculate potential losses (anything to the left of the 50th percentile) up to the 95th percentile … work out the difference between P50 and P95 (the amount of £ risked that results in a loss) … and dividing P&L by the risked capital - typical levels are ~20%  Wholesale market liquidity and spread analytics alongside netting opportunities Is +£10k P&L risking £100k better than +£5k risking £20k? 22 Bespoke Reports to Suit Risk Analytics Available