SlideShare una empresa de Scribd logo
1 de 30
Manufacturing That Eliminates Risk & Improves Reliability
Managing the Development of Your
Overmolded Cable
11.21.2019
Manufacturing That Eliminates Risk & Improves Reliability
2
Agenda
 An Overview of Overmolding
 How To Design An Overmold On Your Cable
 Materials and Design Options
 How To Get Started With Your Custom Overmold
 Summary
Manufacturing That Eliminates Risk & Improves Reliability
3
An Overview of Overmolding
Manufacturing That Eliminates Risk & Improves Reliability
4
When To Use An Overmold on Your Cable
 Provide strain relief and ruggedize the
connector
 Replacement for an OFF THE SHELF
backshell
 Encapsulate delicate components,
soldered connections
 To provide a grip, handle or other means
to mate/unmate your connection
 Replace RTV, potting, or other backfilled
compound
 Waterproofness or environmental
considerations
 Cosmetic or branding for your custom
cable
 No EOL or Obsolesce
Not all cable designs and applications warrant an overmolded cable
Manufacturing That Eliminates Risk & Improves Reliability
5
What is an Overmold?
 Typically an injection molded process using
thermoplastics
 Chemical bond or “interlocked” mechanical
bond between the parent material and
overmold
 One shot or two-shot process requiring
dedicated hard tools
 Innermolds are typically higher durometer for
strength and to protect delicate components
 Overmolds are softer and a cosmetic surface
while offering strain relief
High Durometer Innermold
Micro-USB Connector with Innermold &
Overmolded Connector
Soft Overmold
Manufacturing That Eliminates Risk & Improves Reliability
6
How is Overmolding Performed?
 Pelletized thermoplastic is poured into a
hopper
 Pellets are heated and fed into a network
of channels, runners, and sprues
 Molten thermoplastic is injected into a
2-piece tool that acts as a mold
 The overmolded cable is removed from
the tool
 Excess material is cleaned from the
overmolded cable during a visual
inspection
Overmolding Operation
Pelletized Thermoplastic
Manufacturing That Eliminates Risk & Improves Reliability
7
How To Design An Overmold On Your Cable
Manufacturing That Eliminates Risk & Improves Reliability
8
Understanding the Tooling
 Factory will design a 2-piece mold
– Includes all runners, injector pins, sprue
channels, etc
– Materials have inherent shrink rates
– Draft angles must be considered
 Tolerances
– Generally +/- 0.011”
– Critical dimensions must be noted
– Tighter tolerances are possible- but must
be proved out through tooling
development Bulk Cable
Overmolded Backshell Off The Shelf Connector
Manufacturing That Eliminates Risk & Improves Reliability
9
Understanding the Tooling (cont.)
 Making Changes
– Changes to the connector and cable OD
(outer diameter) will impact the tool
– Tooling overmold design changes irreversible
– Material can be removed- not added
 Different Overmold Materials
– Material shrink rates must be reviewed
– Tool maker may require additional changes
Material shrink rates are accounted for in the tooling design
Tool is designed for shutoff on cable OD
(outer diameter)
Manufacturing That Eliminates Risk & Improves Reliability
10
3D Modeling of Overmold
 Customers typically supply this to Epec
 Epec uses SOLIDWORKS and can design
– Typically an Engineering NRE fee associated
– Customer must provide design requirements
 Exterior shell is critical- internals aren't
– The 3D model should show the outer most surface
– Internal details will be optimized by Epec
– Critical features must be clearly noted
.STP format is preferred for all overmold concepts
Conductors
Overmolded Region
Overmold without
Bulk Cable
Manufacturing That Eliminates Risk & Improves Reliability
11
Critical vs Non-Critical Features
 Critical Features
– Must be noted!
– Critical dimensions
• Max Outer Diameter (OD) or length
• Bulkhead or panelized applications
– Understand the mating connector
 Non-Critical Features
– Strain relief tapered
– Custom materials
– Flexibility to make tooling modifications
– Ruggedized strain reliefs
Allow for design flexibility with non-critical features
Strain Relief Channels Are Generally
Non-critical
Max Outer Diameter (OD) is
a Critical Dimension
Manufacturing That Eliminates Risk & Improves Reliability
12
2D Drawing to Define the Assembly
 3D Model must be paired with a 2D drawing to define the overall assembly
 Tabulated BOM
– Manufacturer’s P/Ns
– Usage
– Source of supply
– Item numbers
– Customer must provide design requirements
 Lengths and Tolerances
 Critical Design Details
Drawing must include dimensions, manufacturers P/Ns, and critical design info
2D Cable Drawing with Tabulated BOM, Lengths and
Tolerances
Manufacturing That Eliminates Risk & Improves Reliability
13
Materials and Design Options
Manufacturing That Eliminates Risk & Improves Reliability
14
Material Options
 Locally Sourced Compounds
– Specialty materials are available, but…
• Risk of sourcing challenges
• MOQs
• Limited manufacturing familiarity
 Broad Range of Compounds Available
– PVC – Polyvinyl Chloride
– SR-PVC – Semi Rigid Polyvinyl Chloride
– PP – Polypropylene
– TPU – Polyurethane
– TPE/TPR – Thermoplastic Elastomers
– Polyurethane/Nylon
UL approved materials are available
Manufacturing That Eliminates Risk & Improves Reliability
15
Material Options (cont.)
 Material Compatibility
– Pair PVC overmold with PVC jacket
– Teflon
 Some Materials Won’t Bond
– Mold release
– Teflon
– Chemical vs Mechanical Bond
 Colorization
– Some materials cannot be colorized
– PMS Pantone color
– Color match sample
Match the overmold material to the jacket
Bulk Cable Jacket
Conductor Jacket
Overmold
Manufacturing That Eliminates Risk & Improves Reliability
16
Durometer
 Lots Of Hardness Tests
– Durometer Shore A is most common
 Tolerances
– +/- 5 Durometer Shore A Scale
 Material Property-Inherent
 If a durometer change is required, it may impact the tooling!
– Must review the shrink rate of the materials
Most overmolded strain relief designs are 80 – 90 Shore A
Typical Durometer: 50-60 Shore A
Typical Durometer: 80-90 Shore A
Manufacturing That Eliminates Risk & Improves Reliability
17
Plasticized PVC
 PVC is a rigid and flame-retardant compound
 Add plasticizers is a common way to increase
flexibility
 Aging and flammability are concerns
 PVC hardness is expressed in P%
 Example Calculation:
– PVC material of 50kg
– Plasticizer material of 40kg
– 40kg Plasticizer / 50kg PVC =80%
– Hardness is 80P
Common hardness for plasticized PVC is “45P” which is about 90 Shore A
Manufacturing That Eliminates Risk & Improves Reliability
18
 Parting lines are inherent in the process
– Tool design can help minimize
– Post processing is another option
 Tooling marks
– Ejector pins
– Gate locations
 Surface finish
Managing the Cosmetics
Optimizing gate location can help mitigate cosmetics
Parting Lines
Tooling Marks
Manufacturing That Eliminates Risk & Improves Reliability
19
Artwork in an Overmold
 Company Logos
 Device Information
 Polarity Markings
 .AI Artwork Files
 Definition
– Include the location
– Preferred pocket depth/emboss
– Layer in 3D Model
Provide Logos and Artwork in .AI vectorized format
ProductionInitial Design
Power Ratings
Manufacturing That Eliminates Risk & Improves Reliability
20
Customization of Features
 Implement design features to pass qualification testing
– Waterproofness
– Radiated / conducted emissions and susceptibility
– Salt fog
 Employ specialty materials, processes
– Fungal resistance jacket
– Encapsulate PCBA, switches, sensors
– LEDs to indicate status
Consider adding passive components and PCBAs to your build plan
Manufacturing That Eliminates Risk & Improves Reliability
21
Custom Connectors
 Use 3D modeling to create desired design
– Solidworks, .STP, .IGS, etc
 Complete control of the design
– Pin engagement
– Customizable overmold
 Add all those design pesky details
– Beryllium copper coating to pins
– Polarity markings
 No EOL or Obsolesce
– Custom tooling is catalogued and
maintained
By owning the tooling, obsolesce can be mitigated.
Manufacturing That Eliminates Risk & Improves Reliability
22
How To Get Started With Your Custom Build
Manufacturing That Eliminates Risk & Improves Reliability
23
Development Timeline
Production tooling typically requires 2 - 6 weeks
Proof of Concept
3D Model
Samples
Fit Check
Production
Typical Tooling Lead-Times
House Tooling 0-2 weeks
Simple Tooling 2-4 weeks
Complex Tooling 4-8 weeks
Manufacturing That Eliminates Risk & Improves Reliability
24
How to Get Started with your Overmold Proof of Concept
1. 3D model of the overmold
2. 2D assembly drawing
3. Overmold material requirements
4. Critical dimensions
 Varies with complexity tooling up an
overmold can take 2 - 6 weeks
 House tooling exists for many standard
connector schemes and sizes
Using house overmold tooling on Industry Connectors can save time and money
Manufacturing That Eliminates Risk & Improves Reliability
25
Epec Inquiry Form
 When starting a project with Epec,
we ask if you could please fill out
our Inquiry Form.
 This allows us to capture all the
information of your design upfront,
eliminating guess work.
 Also allows us to provide you with
an accurate quote.
Manufacturing That Eliminates Risk & Improves Reliability
26
Summary
Manufacturing That Eliminates Risk & Improves Reliability
27
Summary
 Low cost and high reliability cable solutions
 Overmolding is not for every project
 Customer to provide the geometry, factory will develop the process
 Dimensional changes to the overmold will require tooling rework
 Specialty materials are available, but there is a potential for cost and lead-time
impact
Manufacturing That Eliminates Risk & Improves Reliability
28
Our Products
Battery Packs Flex & Rigid-Flex PCBs Cable Assemblies Printed Circuit Boards
RF Products User Interfaces Flexible Heaters EC Fans & Motors
Manufacturing That Eliminates Risk & Improves Reliability
29
Q&A
 Questions?
– Enter any questions you may have
in the Control Panel
– If we don’t have time to get to it, we
will reply via email
Manufacturing That Eliminates Risk & Improves Reliability
30
Thank You
Check out our website at www.epectec.com.
For more information email sales@epectec.com.
Stay Connected with Epec Engineered Technologies
Follow us on our social media sites for continuous technical updates and information:

Más contenido relacionado

Más de Epec Engineered Technologies

Design Options for Low-Cost UL Approved Wire Harnesses
Design Options for Low-Cost UL Approved Wire HarnessesDesign Options for Low-Cost UL Approved Wire Harnesses
Design Options for Low-Cost UL Approved Wire HarnessesEpec Engineered Technologies
 
Why High-Tech Multi-Layer PCB Features Add Cost and Processing Time
Why High-Tech Multi-Layer PCB Features Add Cost and Processing TimeWhy High-Tech Multi-Layer PCB Features Add Cost and Processing Time
Why High-Tech Multi-Layer PCB Features Add Cost and Processing TimeEpec Engineered Technologies
 
Dealing with Component Shortages That Impact Battery Packs Design
Dealing with Component Shortages That Impact Battery Packs DesignDealing with Component Shortages That Impact Battery Packs Design
Dealing with Component Shortages That Impact Battery Packs DesignEpec Engineered Technologies
 
EMI Shielding Methods for Flex & Rigid-Flex PCB Designs
EMI Shielding Methods for Flex & Rigid-Flex PCB DesignsEMI Shielding Methods for Flex & Rigid-Flex PCB Designs
EMI Shielding Methods for Flex & Rigid-Flex PCB DesignsEpec Engineered Technologies
 
PCB Design and Layout - Checklist of What You Need Before You Start
PCB Design and Layout - Checklist of What You Need Before You StartPCB Design and Layout - Checklist of What You Need Before You Start
PCB Design and Layout - Checklist of What You Need Before You StartEpec Engineered Technologies
 
Quick Turn PCBs - Why an Experienced Supply Chain Matters
Quick Turn PCBs - Why an Experienced Supply Chain MattersQuick Turn PCBs - Why an Experienced Supply Chain Matters
Quick Turn PCBs - Why an Experienced Supply Chain MattersEpec Engineered Technologies
 
Design Considerations for Lithium Batteries Used in Portable Devices
Design Considerations for Lithium Batteries Used in Portable DevicesDesign Considerations for Lithium Batteries Used in Portable Devices
Design Considerations for Lithium Batteries Used in Portable DevicesEpec Engineered Technologies
 
Match Your High-Tech PCB Design to Your Suppliers Capabilities
Match Your High-Tech PCB Design to Your Suppliers CapabilitiesMatch Your High-Tech PCB Design to Your Suppliers Capabilities
Match Your High-Tech PCB Design to Your Suppliers CapabilitiesEpec Engineered Technologies
 
Successful Flex & Rigid-Flex Designs for Streamlining Production
Successful Flex & Rigid-Flex Designs for Streamlining ProductionSuccessful Flex & Rigid-Flex Designs for Streamlining Production
Successful Flex & Rigid-Flex Designs for Streamlining ProductionEpec Engineered Technologies
 
From Mechanical HMIs to Touch: Old vs New Technology
From Mechanical HMIs to Touch: Old vs New TechnologyFrom Mechanical HMIs to Touch: Old vs New Technology
From Mechanical HMIs to Touch: Old vs New TechnologyEpec Engineered Technologies
 
Planning Your High-Tech PCB Design for the Lowest Possible Cost
Planning Your High-Tech PCB Design for the Lowest Possible CostPlanning Your High-Tech PCB Design for the Lowest Possible Cost
Planning Your High-Tech PCB Design for the Lowest Possible CostEpec Engineered Technologies
 
How to Ensure Your Flex Circuit Quick-Turn Will Not Get Delayed
How to Ensure Your Flex Circuit Quick-Turn Will Not Get DelayedHow to Ensure Your Flex Circuit Quick-Turn Will Not Get Delayed
How to Ensure Your Flex Circuit Quick-Turn Will Not Get DelayedEpec Engineered Technologies
 
Alternatives to Battery Chemical Fuses in Secondary Safety Circuits
Alternatives to Battery Chemical Fuses in Secondary Safety CircuitsAlternatives to Battery Chemical Fuses in Secondary Safety Circuits
Alternatives to Battery Chemical Fuses in Secondary Safety CircuitsEpec Engineered Technologies
 
RF Filter Topology Constraints: Electrical Performance vs Mechanical Size
RF Filter Topology Constraints: Electrical Performance vs Mechanical SizeRF Filter Topology Constraints: Electrical Performance vs Mechanical Size
RF Filter Topology Constraints: Electrical Performance vs Mechanical SizeEpec Engineered Technologies
 

Más de Epec Engineered Technologies (20)

Design Options for Low-Cost UL Approved Wire Harnesses
Design Options for Low-Cost UL Approved Wire HarnessesDesign Options for Low-Cost UL Approved Wire Harnesses
Design Options for Low-Cost UL Approved Wire Harnesses
 
Effective Ways To Reduce Your CNC Machining Costs
Effective Ways To Reduce Your CNC Machining CostsEffective Ways To Reduce Your CNC Machining Costs
Effective Ways To Reduce Your CNC Machining Costs
 
Why High-Tech Multi-Layer PCB Features Add Cost and Processing Time
Why High-Tech Multi-Layer PCB Features Add Cost and Processing TimeWhy High-Tech Multi-Layer PCB Features Add Cost and Processing Time
Why High-Tech Multi-Layer PCB Features Add Cost and Processing Time
 
Dealing with Component Shortages That Impact Battery Packs Design
Dealing with Component Shortages That Impact Battery Packs DesignDealing with Component Shortages That Impact Battery Packs Design
Dealing with Component Shortages That Impact Battery Packs Design
 
Epec Corporate Overview – 2022
Epec Corporate Overview – 2022Epec Corporate Overview – 2022
Epec Corporate Overview – 2022
 
EMI Shielding Methods for Flex & Rigid-Flex PCB Designs
EMI Shielding Methods for Flex & Rigid-Flex PCB DesignsEMI Shielding Methods for Flex & Rigid-Flex PCB Designs
EMI Shielding Methods for Flex & Rigid-Flex PCB Designs
 
PCB Design and Layout - Checklist of What You Need Before You Start
PCB Design and Layout - Checklist of What You Need Before You StartPCB Design and Layout - Checklist of What You Need Before You Start
PCB Design and Layout - Checklist of What You Need Before You Start
 
Domestic PCB Capabilities
Domestic PCB CapabilitiesDomestic PCB Capabilities
Domestic PCB Capabilities
 
Quick Turn PCBs - Why an Experienced Supply Chain Matters
Quick Turn PCBs - Why an Experienced Supply Chain MattersQuick Turn PCBs - Why an Experienced Supply Chain Matters
Quick Turn PCBs - Why an Experienced Supply Chain Matters
 
Flexible Heater Overview
 Flexible Heater Overview Flexible Heater Overview
Flexible Heater Overview
 
Design Considerations for Lithium Batteries Used in Portable Devices
Design Considerations for Lithium Batteries Used in Portable DevicesDesign Considerations for Lithium Batteries Used in Portable Devices
Design Considerations for Lithium Batteries Used in Portable Devices
 
Match Your High-Tech PCB Design to Your Suppliers Capabilities
Match Your High-Tech PCB Design to Your Suppliers CapabilitiesMatch Your High-Tech PCB Design to Your Suppliers Capabilities
Match Your High-Tech PCB Design to Your Suppliers Capabilities
 
Successful Flex & Rigid-Flex Designs for Streamlining Production
Successful Flex & Rigid-Flex Designs for Streamlining ProductionSuccessful Flex & Rigid-Flex Designs for Streamlining Production
Successful Flex & Rigid-Flex Designs for Streamlining Production
 
From Mechanical HMIs to Touch: Old vs New Technology
From Mechanical HMIs to Touch: Old vs New TechnologyFrom Mechanical HMIs to Touch: Old vs New Technology
From Mechanical HMIs to Touch: Old vs New Technology
 
Planning Your High-Tech PCB Design for the Lowest Possible Cost
Planning Your High-Tech PCB Design for the Lowest Possible CostPlanning Your High-Tech PCB Design for the Lowest Possible Cost
Planning Your High-Tech PCB Design for the Lowest Possible Cost
 
How to Ensure Your Flex Circuit Quick-Turn Will Not Get Delayed
How to Ensure Your Flex Circuit Quick-Turn Will Not Get DelayedHow to Ensure Your Flex Circuit Quick-Turn Will Not Get Delayed
How to Ensure Your Flex Circuit Quick-Turn Will Not Get Delayed
 
Alternatives to Battery Chemical Fuses in Secondary Safety Circuits
Alternatives to Battery Chemical Fuses in Secondary Safety CircuitsAlternatives to Battery Chemical Fuses in Secondary Safety Circuits
Alternatives to Battery Chemical Fuses in Secondary Safety Circuits
 
RF Filter Topology Constraints: Electrical Performance vs Mechanical Size
RF Filter Topology Constraints: Electrical Performance vs Mechanical SizeRF Filter Topology Constraints: Electrical Performance vs Mechanical Size
RF Filter Topology Constraints: Electrical Performance vs Mechanical Size
 
Advanced Rigid-Flex Circuit Constructions
Advanced Rigid-Flex Circuit ConstructionsAdvanced Rigid-Flex Circuit Constructions
Advanced Rigid-Flex Circuit Constructions
 
PCB Capabilities
PCB CapabilitiesPCB Capabilities
PCB Capabilities
 

Último

ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 

Último (20)

ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 

Managing the Development of Your Overmolded Cable

  • 1. Manufacturing That Eliminates Risk & Improves Reliability Managing the Development of Your Overmolded Cable 11.21.2019
  • 2. Manufacturing That Eliminates Risk & Improves Reliability 2 Agenda  An Overview of Overmolding  How To Design An Overmold On Your Cable  Materials and Design Options  How To Get Started With Your Custom Overmold  Summary
  • 3. Manufacturing That Eliminates Risk & Improves Reliability 3 An Overview of Overmolding
  • 4. Manufacturing That Eliminates Risk & Improves Reliability 4 When To Use An Overmold on Your Cable  Provide strain relief and ruggedize the connector  Replacement for an OFF THE SHELF backshell  Encapsulate delicate components, soldered connections  To provide a grip, handle or other means to mate/unmate your connection  Replace RTV, potting, or other backfilled compound  Waterproofness or environmental considerations  Cosmetic or branding for your custom cable  No EOL or Obsolesce Not all cable designs and applications warrant an overmolded cable
  • 5. Manufacturing That Eliminates Risk & Improves Reliability 5 What is an Overmold?  Typically an injection molded process using thermoplastics  Chemical bond or “interlocked” mechanical bond between the parent material and overmold  One shot or two-shot process requiring dedicated hard tools  Innermolds are typically higher durometer for strength and to protect delicate components  Overmolds are softer and a cosmetic surface while offering strain relief High Durometer Innermold Micro-USB Connector with Innermold & Overmolded Connector Soft Overmold
  • 6. Manufacturing That Eliminates Risk & Improves Reliability 6 How is Overmolding Performed?  Pelletized thermoplastic is poured into a hopper  Pellets are heated and fed into a network of channels, runners, and sprues  Molten thermoplastic is injected into a 2-piece tool that acts as a mold  The overmolded cable is removed from the tool  Excess material is cleaned from the overmolded cable during a visual inspection Overmolding Operation Pelletized Thermoplastic
  • 7. Manufacturing That Eliminates Risk & Improves Reliability 7 How To Design An Overmold On Your Cable
  • 8. Manufacturing That Eliminates Risk & Improves Reliability 8 Understanding the Tooling  Factory will design a 2-piece mold – Includes all runners, injector pins, sprue channels, etc – Materials have inherent shrink rates – Draft angles must be considered  Tolerances – Generally +/- 0.011” – Critical dimensions must be noted – Tighter tolerances are possible- but must be proved out through tooling development Bulk Cable Overmolded Backshell Off The Shelf Connector
  • 9. Manufacturing That Eliminates Risk & Improves Reliability 9 Understanding the Tooling (cont.)  Making Changes – Changes to the connector and cable OD (outer diameter) will impact the tool – Tooling overmold design changes irreversible – Material can be removed- not added  Different Overmold Materials – Material shrink rates must be reviewed – Tool maker may require additional changes Material shrink rates are accounted for in the tooling design Tool is designed for shutoff on cable OD (outer diameter)
  • 10. Manufacturing That Eliminates Risk & Improves Reliability 10 3D Modeling of Overmold  Customers typically supply this to Epec  Epec uses SOLIDWORKS and can design – Typically an Engineering NRE fee associated – Customer must provide design requirements  Exterior shell is critical- internals aren't – The 3D model should show the outer most surface – Internal details will be optimized by Epec – Critical features must be clearly noted .STP format is preferred for all overmold concepts Conductors Overmolded Region Overmold without Bulk Cable
  • 11. Manufacturing That Eliminates Risk & Improves Reliability 11 Critical vs Non-Critical Features  Critical Features – Must be noted! – Critical dimensions • Max Outer Diameter (OD) or length • Bulkhead or panelized applications – Understand the mating connector  Non-Critical Features – Strain relief tapered – Custom materials – Flexibility to make tooling modifications – Ruggedized strain reliefs Allow for design flexibility with non-critical features Strain Relief Channels Are Generally Non-critical Max Outer Diameter (OD) is a Critical Dimension
  • 12. Manufacturing That Eliminates Risk & Improves Reliability 12 2D Drawing to Define the Assembly  3D Model must be paired with a 2D drawing to define the overall assembly  Tabulated BOM – Manufacturer’s P/Ns – Usage – Source of supply – Item numbers – Customer must provide design requirements  Lengths and Tolerances  Critical Design Details Drawing must include dimensions, manufacturers P/Ns, and critical design info 2D Cable Drawing with Tabulated BOM, Lengths and Tolerances
  • 13. Manufacturing That Eliminates Risk & Improves Reliability 13 Materials and Design Options
  • 14. Manufacturing That Eliminates Risk & Improves Reliability 14 Material Options  Locally Sourced Compounds – Specialty materials are available, but… • Risk of sourcing challenges • MOQs • Limited manufacturing familiarity  Broad Range of Compounds Available – PVC – Polyvinyl Chloride – SR-PVC – Semi Rigid Polyvinyl Chloride – PP – Polypropylene – TPU – Polyurethane – TPE/TPR – Thermoplastic Elastomers – Polyurethane/Nylon UL approved materials are available
  • 15. Manufacturing That Eliminates Risk & Improves Reliability 15 Material Options (cont.)  Material Compatibility – Pair PVC overmold with PVC jacket – Teflon  Some Materials Won’t Bond – Mold release – Teflon – Chemical vs Mechanical Bond  Colorization – Some materials cannot be colorized – PMS Pantone color – Color match sample Match the overmold material to the jacket Bulk Cable Jacket Conductor Jacket Overmold
  • 16. Manufacturing That Eliminates Risk & Improves Reliability 16 Durometer  Lots Of Hardness Tests – Durometer Shore A is most common  Tolerances – +/- 5 Durometer Shore A Scale  Material Property-Inherent  If a durometer change is required, it may impact the tooling! – Must review the shrink rate of the materials Most overmolded strain relief designs are 80 – 90 Shore A Typical Durometer: 50-60 Shore A Typical Durometer: 80-90 Shore A
  • 17. Manufacturing That Eliminates Risk & Improves Reliability 17 Plasticized PVC  PVC is a rigid and flame-retardant compound  Add plasticizers is a common way to increase flexibility  Aging and flammability are concerns  PVC hardness is expressed in P%  Example Calculation: – PVC material of 50kg – Plasticizer material of 40kg – 40kg Plasticizer / 50kg PVC =80% – Hardness is 80P Common hardness for plasticized PVC is “45P” which is about 90 Shore A
  • 18. Manufacturing That Eliminates Risk & Improves Reliability 18  Parting lines are inherent in the process – Tool design can help minimize – Post processing is another option  Tooling marks – Ejector pins – Gate locations  Surface finish Managing the Cosmetics Optimizing gate location can help mitigate cosmetics Parting Lines Tooling Marks
  • 19. Manufacturing That Eliminates Risk & Improves Reliability 19 Artwork in an Overmold  Company Logos  Device Information  Polarity Markings  .AI Artwork Files  Definition – Include the location – Preferred pocket depth/emboss – Layer in 3D Model Provide Logos and Artwork in .AI vectorized format ProductionInitial Design Power Ratings
  • 20. Manufacturing That Eliminates Risk & Improves Reliability 20 Customization of Features  Implement design features to pass qualification testing – Waterproofness – Radiated / conducted emissions and susceptibility – Salt fog  Employ specialty materials, processes – Fungal resistance jacket – Encapsulate PCBA, switches, sensors – LEDs to indicate status Consider adding passive components and PCBAs to your build plan
  • 21. Manufacturing That Eliminates Risk & Improves Reliability 21 Custom Connectors  Use 3D modeling to create desired design – Solidworks, .STP, .IGS, etc  Complete control of the design – Pin engagement – Customizable overmold  Add all those design pesky details – Beryllium copper coating to pins – Polarity markings  No EOL or Obsolesce – Custom tooling is catalogued and maintained By owning the tooling, obsolesce can be mitigated.
  • 22. Manufacturing That Eliminates Risk & Improves Reliability 22 How To Get Started With Your Custom Build
  • 23. Manufacturing That Eliminates Risk & Improves Reliability 23 Development Timeline Production tooling typically requires 2 - 6 weeks Proof of Concept 3D Model Samples Fit Check Production Typical Tooling Lead-Times House Tooling 0-2 weeks Simple Tooling 2-4 weeks Complex Tooling 4-8 weeks
  • 24. Manufacturing That Eliminates Risk & Improves Reliability 24 How to Get Started with your Overmold Proof of Concept 1. 3D model of the overmold 2. 2D assembly drawing 3. Overmold material requirements 4. Critical dimensions  Varies with complexity tooling up an overmold can take 2 - 6 weeks  House tooling exists for many standard connector schemes and sizes Using house overmold tooling on Industry Connectors can save time and money
  • 25. Manufacturing That Eliminates Risk & Improves Reliability 25 Epec Inquiry Form  When starting a project with Epec, we ask if you could please fill out our Inquiry Form.  This allows us to capture all the information of your design upfront, eliminating guess work.  Also allows us to provide you with an accurate quote.
  • 26. Manufacturing That Eliminates Risk & Improves Reliability 26 Summary
  • 27. Manufacturing That Eliminates Risk & Improves Reliability 27 Summary  Low cost and high reliability cable solutions  Overmolding is not for every project  Customer to provide the geometry, factory will develop the process  Dimensional changes to the overmold will require tooling rework  Specialty materials are available, but there is a potential for cost and lead-time impact
  • 28. Manufacturing That Eliminates Risk & Improves Reliability 28 Our Products Battery Packs Flex & Rigid-Flex PCBs Cable Assemblies Printed Circuit Boards RF Products User Interfaces Flexible Heaters EC Fans & Motors
  • 29. Manufacturing That Eliminates Risk & Improves Reliability 29 Q&A  Questions? – Enter any questions you may have in the Control Panel – If we don’t have time to get to it, we will reply via email
  • 30. Manufacturing That Eliminates Risk & Improves Reliability 30 Thank You Check out our website at www.epectec.com. For more information email sales@epectec.com. Stay Connected with Epec Engineered Technologies Follow us on our social media sites for continuous technical updates and information: