SlideShare una empresa de Scribd logo
1 de 20
CONTENT
 INTRODUCTION
 HISTORY OF MONO RAIL
 CONSTRUCTION
 MUMBAI MONORAIL
 MERITS
 DEMERITS
 CONCLUSIONS
Introduction
The traffic in the city is increasing day by day due to increase in population and
improper town planning which is making city not fit to live .
We need to provide a solution for this by providing improved transportation technique.
Monorail is a unique mass transit system which can be put up in any congested and
crowded city within few years for ease and safe transportation, without loss of time.
As the name implies, monorail is a transport system that runs on single rail as against
metro rail that runs on 2 rails like all other trains
HISTORY OF MONO RAIL
Monorails have been around since the 1800s, the first monorail was made in Russia in 1820
by Ivan Elmanov, but only really came to public attention in the 1950s when Walt Disney
installed one in his new theme park: Disneyland, California.
Gyro Monorail in 1909
Monorail at Disneyland, California
Modern monorails are based on a single solid beam that supports and guides the train; the
carriages are either suspended beneath the track, or sit on top. A steel or reinforced concrete
beam in the range of 2 to 3 feet (0.61 to 0.91 m) wide is used as track. The straddle-beam
style was popularized by the German company ALWEG. Conductive shoes on the carriages then
transmit the current to the train. Monorail is raised at a minimum height of 5.5 meters from
ground level on columns.
The carriages have pneumatic rubber tyres, which drive along the top of beam. Rubber-tired
carriage contacts the beam on the top and both sides for traction and to stabilize the vehicle
and to prevent side-to-side swaying of the train, and also helping to guide the carriages.
Wheel Arrangement Of Monorail
Almost all modern monorails are powered by electric motors fed by dual third rails, contact wires or electrified
channels attached to or enclosed in their guidance beams. However, diesel-powered monorail systems also exist.
Laying Saddle beam
Construction of Monorail Track
Inside Monorail
Mumbai Monorail
 It is the first monorail in India since the Kundala Valley Railway and Patiala State
Monorail Train ways were closed in the 1920s. Construction began in 2009 and the
first operational line, between Wadala Depot and Chembur, was opened to the
public on 2 February 2014. Trains run from 7am to 3pm IST in the initial stage. It is
expected to operate for 19 hours straight by the end of March 2014.
 MMRDA( Mumbai Metropolitan Region Development Authority) claims that once
monorail starts its journey on the first 9-km Wadala-Chembur stretch, traffic on
the section will reduce by 30%.
 The Mumbai Monorail, which is the only such system that is currently under
construction in India, is a four-car train, with a capacity of 140 passengers per car.
The maximum capacity of the system is 10,000 passengers per hour per direction.
 A 4-car rake will carry 7,500 passengers per hour per direction and a 6-car rake
will carry 20,000. A 4-car rake can carry 578 passengers while a 6-car train can
carry 862
 The Mumbai Metropolitan Region Development Authority (MMRDA) conceived the
idea of an alternate means of transportation, which included the monorail,
sometime in 2005 as part of Mumbai's transportation expansion plans, but the
decision to introduce monorail as a feeder service to the mass rapid transit system
(MRTS) was taken on 28 September 2008
MERITS
 Monorail can be built faster with less cost. It consumes minimal space.
 For cities that have a population of less than three million, monorail is the ideal mode of transport. For denser cities, monorail
can ideally serve as the feeder line that brings passengers in and takes them out of the Metro network.
 The monorail itself uses no carbon-based fuels and so does not pollute, unlike cars and buses.
 As monorails run around elevated tracks there is no risk of cars getting stuck on crossings.
 Monorails are also practically silent, as opposed to trains which make a noise traveling along rails.
 Monorails contribute to a greener environment as it helps in removing vehicles from the road.
 Monorails regularly operate at an amazing 99.9% reliability. No other form of transit can touch that number. The rubber tires
get little wear running on smooth guide ways. Typically, each load tire gets over 100,000 miles of travel before being replaced
 A metro line requires an expenditure of over Rs 200 crore per km on elevated lines (an underground metro can cost up to Rs
600 crore per km). As against this, the cost for a monorail ranges between Rs 120 and Rs 150 crore per km. The Mumbai
monorail’s construction cost is nearly Rs 123 crore per km. Monorail proponents also cite quicker construction time — a
maximum of 3-4 years. The metro requires over 5-6 years.
DEMERITS
 If a section of track needs to be replaced, the entire system needs to be shut down resulting in no
service.
 The capacity of a Metro system, which can accommodate up to nine cars, is about three to four
times more. Thus, the capacity-to-cost ratio is better for a Metro system, even though the per
kilometer construction cost is more.
 Without electricity it can not be run.
 The Mud Island Monorail, in Memphis, Tennessee (2005)Monorail vehicles are not compatible with
any other type of rail infrastructure, which makes through services onto mainline tracks impossible.
 Monorail tracks do not easily accommodate at-grade intersections.
 In an emergency, passengers may not be able to immediately exit because an elevated monorail
vehicle is high above ground and not all systems have emergency walkways.
 The biggest disadvantage cited in the case of monorail is its limited passenger capacity — typically
ranging from 2,000 passengers per hour per direction (pphpd) to a maximum of 48,000 pphpd.
CONCLUSION :
The advantages of monorail technology are tremendous. For overpopulated Indian urban areas, it
seems to be the best solution for safe, quality, and inexpensive mass public transportation.
After successful run in Mumbai, this technology, will become the solution for urban public
transportation in 21st century for India.
Monorail Presentation

Más contenido relacionado

La actualidad más candente

Ppt on mono rail by rahul
Ppt on mono rail by rahulPpt on mono rail by rahul
Ppt on mono rail by rahul
Vikas Gupta
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
Sourav Paul
 

La actualidad más candente (20)

Ppt on DMRC
Ppt on DMRCPpt on DMRC
Ppt on DMRC
 
Indian railways traffic control (4)
Indian railways traffic control (4)Indian railways traffic control (4)
Indian railways traffic control (4)
 
Summer training from Indian Railway ppt (2)
Summer training from Indian Railway ppt (2)Summer training from Indian Railway ppt (2)
Summer training from Indian Railway ppt (2)
 
Indian railway
Indian railwayIndian railway
Indian railway
 
Metro project
Metro project Metro project
Metro project
 
Sarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training reportSarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training report
 
Bullet train project in india
Bullet train project in indiaBullet train project in india
Bullet train project in india
 
Railway Industrial Training
Railway Industrial TrainingRailway Industrial Training
Railway Industrial Training
 
Monorail Mumbai
Monorail MumbaiMonorail Mumbai
Monorail Mumbai
 
Ppt on mono rail by rahul
Ppt on mono rail by rahulPpt on mono rail by rahul
Ppt on mono rail by rahul
 
Sky bus
Sky busSky bus
Sky bus
 
Urban infrastructure on mono, metro and underground
Urban infrastructure on mono, metro and undergroundUrban infrastructure on mono, metro and underground
Urban infrastructure on mono, metro and underground
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYSINDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
 
Railway signal
Railway signalRailway signal
Railway signal
 
Monorail technology
Monorail technologyMonorail technology
Monorail technology
 
PPT On High Speed Railways
PPT On High Speed RailwaysPPT On High Speed Railways
PPT On High Speed Railways
 
Cmrl ppt
Cmrl pptCmrl ppt
Cmrl ppt
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Bullet train In India
Bullet train In IndiaBullet train In India
Bullet train In India
 

Destacado

Monorail ppt
Monorail pptMonorail ppt
Monorail ppt
BcomBT
 
Trivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary StudyTrivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary Study
Ajay Prasad
 
Thermography.ppt
Thermography.pptThermography.ppt
Thermography.ppt
sohitkc
 

Destacado (17)

Monorail
MonorailMonorail
Monorail
 
Monorail vs Metrorail
Monorail vs MetrorailMonorail vs Metrorail
Monorail vs Metrorail
 
Monorail ppt
Monorail pptMonorail ppt
Monorail ppt
 
Monorail
MonorailMonorail
Monorail
 
Monorail Introduction
Monorail IntroductionMonorail Introduction
Monorail Introduction
 
Monorails railway rbt ppt by MayankOza
Monorails railway rbt ppt by MayankOza Monorails railway rbt ppt by MayankOza
Monorails railway rbt ppt by MayankOza
 
Aqeeb its ppt 1
Aqeeb its ppt 1Aqeeb its ppt 1
Aqeeb its ppt 1
 
Monorail presentation at WebDevelopersCommunity, Feb 1, 2009
Monorail presentation at WebDevelopersCommunity, Feb 1, 2009Monorail presentation at WebDevelopersCommunity, Feb 1, 2009
Monorail presentation at WebDevelopersCommunity, Feb 1, 2009
 
Trivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary StudyTrivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary Study
 
An overview of face liveness detection
An overview of face liveness detectionAn overview of face liveness detection
An overview of face liveness detection
 
Indian Railways 1
Indian Railways 1Indian Railways 1
Indian Railways 1
 
Presentation on Thermography.
Presentation on Thermography.Presentation on Thermography.
Presentation on Thermography.
 
Bullet train
Bullet trainBullet train
Bullet train
 
seminar presentation on high speed train
 seminar presentation on high speed train seminar presentation on high speed train
seminar presentation on high speed train
 
MAGLEV PPT
MAGLEV PPTMAGLEV PPT
MAGLEV PPT
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 
Thermography.ppt
Thermography.pptThermography.ppt
Thermography.ppt
 

Similar a Monorail Presentation

Local train v/s best bus in mumbai
Local train v/s best bus in mumbaiLocal train v/s best bus in mumbai
Local train v/s best bus in mumbai
Anil Prajapati
 

Similar a Monorail Presentation (20)

Case study on monorail
Case study on monorailCase study on monorail
Case study on monorail
 
MRT REPORT TPT 250
MRT REPORT TPT 250MRT REPORT TPT 250
MRT REPORT TPT 250
 
sky bus
sky bussky bus
sky bus
 
Tram train
Tram trainTram train
Tram train
 
A detailed study on infrastructure of monorail
A detailed study on infrastructure of monorailA detailed study on infrastructure of monorail
A detailed study on infrastructure of monorail
 
mrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdfmrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdf
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in india
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and Mumbai
 
348
348348
348
 
CMRL - Urban Design Analysis
CMRL - Urban Design AnalysisCMRL - Urban Design Analysis
CMRL - Urban Design Analysis
 
Bangalore - Metro is not the solution
Bangalore - Metro is not the solutionBangalore - Metro is not the solution
Bangalore - Metro is not the solution
 
TramsLightRailMelbourne
TramsLightRailMelbourneTramsLightRailMelbourne
TramsLightRailMelbourne
 
Trasnportation system of mumbai
Trasnportation system of  mumbaiTrasnportation system of  mumbai
Trasnportation system of mumbai
 
Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)
 
Local train v/s best bus in mumbai
Local train v/s best bus in mumbaiLocal train v/s best bus in mumbai
Local train v/s best bus in mumbai
 
Subway
SubwaySubway
Subway
 
Rapid transit system
Rapid transit systemRapid transit system
Rapid transit system
 
Presentation on monorail
Presentation on monorailPresentation on monorail
Presentation on monorail
 

Último

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 

Último (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 

Monorail Presentation

  • 1.
  • 2. CONTENT  INTRODUCTION  HISTORY OF MONO RAIL  CONSTRUCTION  MUMBAI MONORAIL  MERITS  DEMERITS  CONCLUSIONS
  • 3. Introduction The traffic in the city is increasing day by day due to increase in population and improper town planning which is making city not fit to live . We need to provide a solution for this by providing improved transportation technique. Monorail is a unique mass transit system which can be put up in any congested and crowded city within few years for ease and safe transportation, without loss of time. As the name implies, monorail is a transport system that runs on single rail as against metro rail that runs on 2 rails like all other trains
  • 4. HISTORY OF MONO RAIL Monorails have been around since the 1800s, the first monorail was made in Russia in 1820 by Ivan Elmanov, but only really came to public attention in the 1950s when Walt Disney installed one in his new theme park: Disneyland, California. Gyro Monorail in 1909
  • 6. Modern monorails are based on a single solid beam that supports and guides the train; the carriages are either suspended beneath the track, or sit on top. A steel or reinforced concrete beam in the range of 2 to 3 feet (0.61 to 0.91 m) wide is used as track. The straddle-beam style was popularized by the German company ALWEG. Conductive shoes on the carriages then transmit the current to the train. Monorail is raised at a minimum height of 5.5 meters from ground level on columns. The carriages have pneumatic rubber tyres, which drive along the top of beam. Rubber-tired carriage contacts the beam on the top and both sides for traction and to stabilize the vehicle and to prevent side-to-side swaying of the train, and also helping to guide the carriages.
  • 8.
  • 9.
  • 10.
  • 11. Almost all modern monorails are powered by electric motors fed by dual third rails, contact wires or electrified channels attached to or enclosed in their guidance beams. However, diesel-powered monorail systems also exist.
  • 12. Laying Saddle beam Construction of Monorail Track
  • 13.
  • 14.
  • 16. Mumbai Monorail  It is the first monorail in India since the Kundala Valley Railway and Patiala State Monorail Train ways were closed in the 1920s. Construction began in 2009 and the first operational line, between Wadala Depot and Chembur, was opened to the public on 2 February 2014. Trains run from 7am to 3pm IST in the initial stage. It is expected to operate for 19 hours straight by the end of March 2014.  MMRDA( Mumbai Metropolitan Region Development Authority) claims that once monorail starts its journey on the first 9-km Wadala-Chembur stretch, traffic on the section will reduce by 30%.  The Mumbai Monorail, which is the only such system that is currently under construction in India, is a four-car train, with a capacity of 140 passengers per car. The maximum capacity of the system is 10,000 passengers per hour per direction.  A 4-car rake will carry 7,500 passengers per hour per direction and a 6-car rake will carry 20,000. A 4-car rake can carry 578 passengers while a 6-car train can carry 862  The Mumbai Metropolitan Region Development Authority (MMRDA) conceived the idea of an alternate means of transportation, which included the monorail, sometime in 2005 as part of Mumbai's transportation expansion plans, but the decision to introduce monorail as a feeder service to the mass rapid transit system (MRTS) was taken on 28 September 2008
  • 17. MERITS  Monorail can be built faster with less cost. It consumes minimal space.  For cities that have a population of less than three million, monorail is the ideal mode of transport. For denser cities, monorail can ideally serve as the feeder line that brings passengers in and takes them out of the Metro network.  The monorail itself uses no carbon-based fuels and so does not pollute, unlike cars and buses.  As monorails run around elevated tracks there is no risk of cars getting stuck on crossings.  Monorails are also practically silent, as opposed to trains which make a noise traveling along rails.  Monorails contribute to a greener environment as it helps in removing vehicles from the road.  Monorails regularly operate at an amazing 99.9% reliability. No other form of transit can touch that number. The rubber tires get little wear running on smooth guide ways. Typically, each load tire gets over 100,000 miles of travel before being replaced  A metro line requires an expenditure of over Rs 200 crore per km on elevated lines (an underground metro can cost up to Rs 600 crore per km). As against this, the cost for a monorail ranges between Rs 120 and Rs 150 crore per km. The Mumbai monorail’s construction cost is nearly Rs 123 crore per km. Monorail proponents also cite quicker construction time — a maximum of 3-4 years. The metro requires over 5-6 years.
  • 18. DEMERITS  If a section of track needs to be replaced, the entire system needs to be shut down resulting in no service.  The capacity of a Metro system, which can accommodate up to nine cars, is about three to four times more. Thus, the capacity-to-cost ratio is better for a Metro system, even though the per kilometer construction cost is more.  Without electricity it can not be run.  The Mud Island Monorail, in Memphis, Tennessee (2005)Monorail vehicles are not compatible with any other type of rail infrastructure, which makes through services onto mainline tracks impossible.  Monorail tracks do not easily accommodate at-grade intersections.  In an emergency, passengers may not be able to immediately exit because an elevated monorail vehicle is high above ground and not all systems have emergency walkways.  The biggest disadvantage cited in the case of monorail is its limited passenger capacity — typically ranging from 2,000 passengers per hour per direction (pphpd) to a maximum of 48,000 pphpd.
  • 19. CONCLUSION : The advantages of monorail technology are tremendous. For overpopulated Indian urban areas, it seems to be the best solution for safe, quality, and inexpensive mass public transportation. After successful run in Mumbai, this technology, will become the solution for urban public transportation in 21st century for India.