SlideShare una empresa de Scribd logo
1 de 26
County of Fairfax, Virginia




             Dulles Corridor
             Metrorail Project
         Phase 2 & Station Names
                         Community Meetings
                            March 2012


Department of Transportation
County of Fairfax, Virginia


• Meeting Format
     –    Open Session – 30 minutes
     –    Presentation – 20 minutes
     –    Question and Answers – 20 minutes
     –    Open Session/Questions and Answers at Stations


• Purpose of Presentation
     – Provide background and current status on Phase 2 of the Dulles Corridor
       Metrorail Project
     – Inform and seek input from the public on Fairfax County’s Phase 2 cost,
       financing, project elements, and station names
     – Schedule/Next Steps
          • Project Schedule
          • County Schedule



Department of Transportation
                                           2
County of Fairfax, Virginia




Department of Transportation
                                     3
County of Fairfax, Virginia




Department of Transportation
                                     4
County of Fairfax, Virginia




Department of Transportation
                                     5
County of Fairfax, Virginia




                   Tysons East Guideway
County of Fairfax, Virginia




                     Tysons East Station
County of Fairfax, Virginia




             Route 7 and Route 123 Tunnels
County of Fairfax, Virginia




9              Tysons West Guideway at Route 7
County of Fairfax, Virginia




10
                         Tysons West Station
Wiehle Avenue Station: Prototype for Phase 2
County of Fairfax, Except for Dulles Airport Station
     Stations Virginia
County of Fairfax, Virginia

                               Description
•   Metropolitan Washington Airports Authority (MWAA) is building the
    DCMP
•   Phase 2 begins west of Wiehle Avenue and ends at Route 772 in
    eastern Loudoun County
•   All stations at-grade or above grade
•   Phase 2 is a 11.4 mile extension and includes 6 stations and 5
    parking garages:
     – Reston Parkway
     – Herndon-Monroe (1,950 new parking spaces, existing 1,600 parking
       spaces remain)
     – Route 28 (2,000 parking spaces)
     – Dulles Airport
     – Route 606 (1,950 parking spaces)
     – Route 772 (2 garages 3,000 parking spaces)
Department of Transportation
                                     12
County of Fairfax, Virginia

            Phase 2 Cost Estimate Summary
                           Memorandum of       100% Preliminary   Independent
                           Agreement (MOA)       Engineering        Analysis
Original Design,               $3.825 B               --              --
Underground Dulles
Airport Station

Modified Design,               $3.273 B            $3.156 B        $3.298 B
Aerial Dulles Airport          ($552 M)
Station
MOA and Value                  $3.138 B            $3.093 B        $3.235 B
Engineering Savings            ($135 M)             ($63 M)         ($63 M)

Route 28 Station and           $2.820 B            $2.689 B        $2.831 B
Parking Garage                 ($318 M)            ($404 M)        ($404 M)
Responsibilities to
Fairfax and Loudoun
Counties
Department of Transportation
                                          13
County of Fairfax, Virginia

            Phase 2 Cost Estimate Summary

• Estimates are consistent with the Memorandum of
  Agreement’s Targeted Project Reductions
• Forecasted difference between Preliminary Engineering
  and Independent Estimate is due to different rates of
  inflation (3.0% Preliminary Est. vs. 4.5% Independent
  Est.)
• Costs associated with the Route 28 station and parking
  garages fall back into the project if the County is unable
  to secure alternative methods to fund these elements
  that are cost neutral to Fairfax County
     – Cost allocated per the funding agreement if back in the project
Department of Transportation
                                     14
County of Fairfax, Virginia

                               Cost Reductions
• Value Engineering and Memorandum of
  Agreement
     – Aerial Station at Dulles Airport
     – Shorten tail tracks at end of line
     – Reduced Rail Yard Capacity
     – Canopy Reductions
     – Best efforts to fund garages outside of project (Fairfax
       and Loudoun)
     – Best effort to fund Route 28 Station outside of project
       (Fairfax)

Department of Transportation
                                       15
County of Fairfax, Virginia

                                       Cost Allocation
Funding Agreement distribution of project cost
                              Fairfax County                   16.1%
                              Loudoun County                    4.8%
                              MWAA                              4.1%
                              Other (Federal, State,           75.0%
                              Tolls)


Projected Distribution of project costs Phase 1 & 2
(assumptions: no new State or Federal money in Phase 2, project cost = $5.994B)

                             Fairfax County                     16.1%
                             Loudoun County                     4.8%
                             MWAA                               4.1%
                             Federal ($975M Phase1)             16.3%
                             State ($200M Phase 1 & 2)          3.3%
                             DTR Tolls                          55.4%

Department of Transportation
                                                         16
County of Fairfax, Virginia

                          Fairfax County Cost
• Total Project Cost (planning, design, engineering, construction)
     – $5.590 to $5.994B (estimated)
          • Phase 1                  $2.901B
          • Phase 2                  $2.689B to $3.093B


• Fairfax County’s Funding Requirement Phase 1 & 2
     – $900 to $965 million (estimated)
          • Phase 1                  $467M
          • Phase 2                  $433M - $498M




Department of Transportation
                                       17
County of Fairfax, Virginia

                      Fairfax County Funding
•   County responsible for 16.1% of Phase 1 and 2 project cost
     – County Established Two Special (Commercial & Industrial) Tax Districts
       to Fund Dulles Rail - $730M
         • Phase 1Tax Districts (.22 per 100) ($400M)
         • Phase 2 Tax District (.15 per $100) ($330M)
•   County Obligation Phase1 & 2 = $900- $965M
     – Gap $170M - $235M
        • Sources to close the gap
            – Developer Contributions
            – Commercial and Industrial Tax
            – Federal and State Grant Programs
            – Transportation Infrastructure Finance and Innovation Act
              (TIFIA) Credit Assistance
            – Other
Department of Transportation
                                      18
County of Fairfax, Virginia

     Fairfax County (w/Silver Line) – Total Metrorail Operating Cost
                    (Projection) FY 2013 – 2020

                               Fiscal Year    Operating Cost

                               2013               $26.1M

                               2014               $34.7M

                               2015               $35.7M

                               2016               $37.1M

                               2017               $38.6M

                               2018               $46.4M

                               2019               $48.2M

                               2020               $50.0M


Department of Transportation
                                             19
County of Fairfax, Virginia




Department of Transportation
                                     20
County of Fairfax, Virginia




Department of Transportation
                                     21
County of Fairfax, Virginia

                          Next Steps – Phase 2
•   County review of PE and cost estimate – 90 Days
     –    Decision by funding partners no later than June 4, 2012
•   County process for public outreach and input on Phase 2
     –    “Ask Fairfax” chat (March 9)
     –    Four Community Meetings (March 12, 14, 15, 19)
     –    Submit comments or questions online (by March 16) at
          http://www.fairfaxcounty.gov/fcdot/dullesmetro/
     –    March 20th, 5pm Public Hearing - Board of Supervisors
           • Confirm Participation in Phase 2
•   County seeks alternative funding for parking garages and station
•   MWAA Phase 2 procurement
     –    Initiate procurement                                      March 2012
     –    Identify “Short-List” competitors                         June 2012
     –    Complete 90 day County review                             June 4, 2012
     –    Complete Environmental & WMATA approvals                  July 2012
     –    Award Design-Build contract                               January 2013

Department of Transportation
                                                 22
County of Fairfax, Virginia




                 You Decide Take The…….




Department of Transportation
                                     23
County of Fairfax, Virginia

                  Phase 1 & 2 Station Names
• The Metro Board did not approve previous names
  submitted by the Fairfax County Board of Supervisors
• Previous names were repetitive, not unique, and
  potentially confusing to riders and non-riders alike
    (“Tysons, Tysons, Tysons, Tysons;” “Reston, Reston;”
    “Herndon, Herndon”)
• WMATA criteria:
     – Relevant: Identify station locations by geographical features, centers of
       activity or be derived from the names of communities, neighborhoods or
       landmarks within one-half mile;
     – Brief: Limited to 19 characters with spaces and punctuation;
     – Unique: Distinctive and not easily confused with other station names;
     – Evocative: Evoke imagery in the mind of the patron.
Department of Transportation
                                       24
County of Fairfax, Virginia

                  Phase 1 & 2 Station Names
• FCDOT and WMATA staff are working to engage the
  public for recommendations meeting the criteria
• Timeline:
     – March 9: Station Name discussion during an Ask Fairfax! online
       chat
     – March 12, 14, 15, & 19: Station Name discussion at Dulles Rail
       public meetings
     – Now until March 21: take the online Silver Line Station Names
        Survey,     www.wmata.com/silversurvey
     – April: Board of Supervisors’ recommends names to WMATA
     – May: WMATA Board approves Silver Line station names

Department of Transportation
                                     25
County of Fairfax, Virginia




                               Questions ?

                      http://www.fairfaxcounty.gov/fcdot/dullesmetro/




Department of Transportation
                                          26

Más contenido relacionado

La actualidad más candente

Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...Fairfax County
 
Policy on Level of Service in Activity Centers
Policy on Level of Service in Activity CentersPolicy on Level of Service in Activity Centers
Policy on Level of Service in Activity CentersFairfax County
 
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Fairfax County
 
Countywide Transit Network Study: Public Meeting July 10, 2013
Countywide Transit Network Study: Public Meeting July 10, 2013Countywide Transit Network Study: Public Meeting July 10, 2013
Countywide Transit Network Study: Public Meeting July 10, 2013Fairfax County
 
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal MobilitySouthrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal MobilityFairfax County
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumFairfax County
 
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Fairfax County
 
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...Fairfax County
 
Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016Fairfax County
 
Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Fairfax County
 
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013Fairfax County
 
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Fairfax County
 
Reston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsReston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsFairfax County
 
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016Fairfax County
 
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3Fairfax County
 
Continuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationContinuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationFairfax County
 
Dulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study InvestigationDulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study InvestigationFairfax County
 
Dulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 UpdateDulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 UpdateFairfax County
 
Improving Project Delivery Status Report
Improving Project DeliveryStatus ReportImproving Project DeliveryStatus Report
Improving Project Delivery Status ReportFairfax County
 

La actualidad más candente (20)

Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
 
Policy on Level of Service in Activity Centers
Policy on Level of Service in Activity CentersPolicy on Level of Service in Activity Centers
Policy on Level of Service in Activity Centers
 
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
 
Countywide Transit Network Study: Public Meeting July 10, 2013
Countywide Transit Network Study: Public Meeting July 10, 2013Countywide Transit Network Study: Public Meeting July 10, 2013
Countywide Transit Network Study: Public Meeting July 10, 2013
 
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal MobilitySouthrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
 
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
 
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
 
Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016
 
Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016
 
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
 
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
 
Reston Funding Plan
Reston Funding PlanReston Funding Plan
Reston Funding Plan
 
Reston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsReston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation Results
 
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
 
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
 
Continuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationContinuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on Transportation
 
Dulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study InvestigationDulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study Investigation
 
Dulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 UpdateDulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 Update
 
Improving Project Delivery Status Report
Improving Project DeliveryStatus ReportImproving Project DeliveryStatus Report
Improving Project Delivery Status Report
 

Destacado

Dulles Rail Silver Line Phase 2 Status and Funding
Dulles Rail Silver Line Phase 2 Status and FundingDulles Rail Silver Line Phase 2 Status and Funding
Dulles Rail Silver Line Phase 2 Status and FundingFairfax County
 
Silver Line Phase 1 Status Report
Silver Line Phase 1 Status ReportSilver Line Phase 1 Status Report
Silver Line Phase 1 Status ReportFairfax County
 
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...Fairfax County
 
Silver Line Update: Board Transportation Committee: Feb. 7, 2017
Silver Line Update: Board Transportation Committee: Feb. 7, 2017Silver Line Update: Board Transportation Committee: Feb. 7, 2017
Silver Line Update: Board Transportation Committee: Feb. 7, 2017Fairfax County
 
Operational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to TysonsOperational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to TysonsFairfax County
 
Shirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyShirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyFairfax County
 
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...Fairfax County
 
North Kings Highway (VA 241) Intersection Improvements Study
North Kings Highway (VA 241) Intersection Improvements StudyNorth Kings Highway (VA 241) Intersection Improvements Study
North Kings Highway (VA 241) Intersection Improvements StudyFairfax County
 
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016Fairfax County
 
Reston Funding Plan: Potential Cost Allocations
Reston Funding Plan: Potential Cost AllocationsReston Funding Plan: Potential Cost Allocations
Reston Funding Plan: Potential Cost AllocationsFairfax County
 
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016Fairfax County
 
Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....
Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....
Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....Fairfax County
 
Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)Fairfax County
 
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016 Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016 Fairfax County
 
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016 Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016 Fairfax County
 
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016Fairfax County
 
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementI-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementFairfax County
 
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...Fairfax County
 
Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014Fairfax County
 
Countywide Transit Network Study: Introductory Public Meeting
Countywide Transit Network Study: Introductory Public MeetingCountywide Transit Network Study: Introductory Public Meeting
Countywide Transit Network Study: Introductory Public MeetingFairfax County
 

Destacado (20)

Dulles Rail Silver Line Phase 2 Status and Funding
Dulles Rail Silver Line Phase 2 Status and FundingDulles Rail Silver Line Phase 2 Status and Funding
Dulles Rail Silver Line Phase 2 Status and Funding
 
Silver Line Phase 1 Status Report
Silver Line Phase 1 Status ReportSilver Line Phase 1 Status Report
Silver Line Phase 1 Status Report
 
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
 
Silver Line Update: Board Transportation Committee: Feb. 7, 2017
Silver Line Update: Board Transportation Committee: Feb. 7, 2017Silver Line Update: Board Transportation Committee: Feb. 7, 2017
Silver Line Update: Board Transportation Committee: Feb. 7, 2017
 
Operational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to TysonsOperational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to Tysons
 
Shirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyShirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning Study
 
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
 
North Kings Highway (VA 241) Intersection Improvements Study
North Kings Highway (VA 241) Intersection Improvements StudyNorth Kings Highway (VA 241) Intersection Improvements Study
North Kings Highway (VA 241) Intersection Improvements Study
 
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
 
Reston Funding Plan: Potential Cost Allocations
Reston Funding Plan: Potential Cost AllocationsReston Funding Plan: Potential Cost Allocations
Reston Funding Plan: Potential Cost Allocations
 
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
 
Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....
Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....
Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....
 
Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)
 
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016 Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
 
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016 Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
 
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
 
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementI-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
 
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
 
Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014
 
Countywide Transit Network Study: Introductory Public Meeting
Countywide Transit Network Study: Introductory Public MeetingCountywide Transit Network Study: Introductory Public Meeting
Countywide Transit Network Study: Introductory Public Meeting
 

Similar a Dulles Corridor Metrorail Project Phase 2 & Station Names: Community Meetings March 2012

Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...Fairfax County
 
Fairfax County and the NVTA TransAction Update: Feb. 7, 2017
Fairfax County and the NVTA TransAction Update: Feb. 7, 2017Fairfax County and the NVTA TransAction Update: Feb. 7, 2017
Fairfax County and the NVTA TransAction Update: Feb. 7, 2017Fairfax County
 
Silver Line Update: December 1, 2015
Silver Line Update: December 1, 2015Silver Line Update: December 1, 2015
Silver Line Update: December 1, 2015Fairfax County
 
Silver Line Update: Dec. 1, 2015
Silver Line Update: Dec. 1, 2015Silver Line Update: Dec. 1, 2015
Silver Line Update: Dec. 1, 2015Fairfax County
 
Reston Transportation Service District FY 2019 Tax Rate Discussion
Reston Transportation Service DistrictFY 2019 Tax Rate DiscussionReston Transportation Service DistrictFY 2019 Tax Rate Discussion
Reston Transportation Service District FY 2019 Tax Rate DiscussionFairfax County
 
North Kings Highway (VA 241) Intersection Improvement Study
North Kings Highway (VA 241) Intersection Improvement StudyNorth Kings Highway (VA 241) Intersection Improvement Study
North Kings Highway (VA 241) Intersection Improvement StudyFairfax County
 
Potential Fairfax County Photo Red Light Program
Potential Fairfax County Photo Red Light ProgramPotential Fairfax County Photo Red Light Program
Potential Fairfax County Photo Red Light ProgramFairfax County
 
Update on Reston Development and Transportation Projects
Update on Reston Development and Transportation ProjectsUpdate on Reston Development and Transportation Projects
Update on Reston Development and Transportation ProjectsFairfax County
 
Balls Hill Road & Old Dominion Drive Roadway Spot Improvement - Community Inf...
Balls Hill Road & Old Dominion Drive Roadway Spot Improvement - Community Inf...Balls Hill Road & Old Dominion Drive Roadway Spot Improvement - Community Inf...
Balls Hill Road & Old Dominion Drive Roadway Spot Improvement - Community Inf...Fairfax County
 
Reston Funding Plan-Funding Scenarios
Reston Funding Plan-Funding ScenariosReston Funding Plan-Funding Scenarios
Reston Funding Plan-Funding ScenariosFairfax County
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Fairfax County
 
Map 21 webinar 081312
Map 21 webinar 081312Map 21 webinar 081312
Map 21 webinar 081312AmericaBikes
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Fairfax County
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Fairfax County
 
Reston Transportation Service District Advisory Board - 2019 Spring Meeting #1
Reston Transportation Service District Advisory Board - 2019 Spring Meeting #1Reston Transportation Service District Advisory Board - 2019 Spring Meeting #1
Reston Transportation Service District Advisory Board - 2019 Spring Meeting #1Fairfax County
 
Reston Network Analysis Umitigated Results: Jan. 11, 2016
Reston Network Analysis Umitigated Results: Jan. 11, 2016Reston Network Analysis Umitigated Results: Jan. 11, 2016
Reston Network Analysis Umitigated Results: Jan. 11, 2016Fairfax County
 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016Fairfax County
 
Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Fairfax County
 
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding UpdateDulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding UpdateFairfax County
 
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Fairfax County
 

Similar a Dulles Corridor Metrorail Project Phase 2 & Station Names: Community Meetings March 2012 (20)

Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
 
Fairfax County and the NVTA TransAction Update: Feb. 7, 2017
Fairfax County and the NVTA TransAction Update: Feb. 7, 2017Fairfax County and the NVTA TransAction Update: Feb. 7, 2017
Fairfax County and the NVTA TransAction Update: Feb. 7, 2017
 
Silver Line Update: December 1, 2015
Silver Line Update: December 1, 2015Silver Line Update: December 1, 2015
Silver Line Update: December 1, 2015
 
Silver Line Update: Dec. 1, 2015
Silver Line Update: Dec. 1, 2015Silver Line Update: Dec. 1, 2015
Silver Line Update: Dec. 1, 2015
 
Reston Transportation Service District FY 2019 Tax Rate Discussion
Reston Transportation Service DistrictFY 2019 Tax Rate DiscussionReston Transportation Service DistrictFY 2019 Tax Rate Discussion
Reston Transportation Service District FY 2019 Tax Rate Discussion
 
North Kings Highway (VA 241) Intersection Improvement Study
North Kings Highway (VA 241) Intersection Improvement StudyNorth Kings Highway (VA 241) Intersection Improvement Study
North Kings Highway (VA 241) Intersection Improvement Study
 
Potential Fairfax County Photo Red Light Program
Potential Fairfax County Photo Red Light ProgramPotential Fairfax County Photo Red Light Program
Potential Fairfax County Photo Red Light Program
 
Update on Reston Development and Transportation Projects
Update on Reston Development and Transportation ProjectsUpdate on Reston Development and Transportation Projects
Update on Reston Development and Transportation Projects
 
Balls Hill Road & Old Dominion Drive Roadway Spot Improvement - Community Inf...
Balls Hill Road & Old Dominion Drive Roadway Spot Improvement - Community Inf...Balls Hill Road & Old Dominion Drive Roadway Spot Improvement - Community Inf...
Balls Hill Road & Old Dominion Drive Roadway Spot Improvement - Community Inf...
 
Reston Funding Plan-Funding Scenarios
Reston Funding Plan-Funding ScenariosReston Funding Plan-Funding Scenarios
Reston Funding Plan-Funding Scenarios
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Map 21 webinar 081312
Map 21 webinar 081312Map 21 webinar 081312
Map 21 webinar 081312
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
 
Reston Transportation Service District Advisory Board - 2019 Spring Meeting #1
Reston Transportation Service District Advisory Board - 2019 Spring Meeting #1Reston Transportation Service District Advisory Board - 2019 Spring Meeting #1
Reston Transportation Service District Advisory Board - 2019 Spring Meeting #1
 
Reston Network Analysis Umitigated Results: Jan. 11, 2016
Reston Network Analysis Umitigated Results: Jan. 11, 2016Reston Network Analysis Umitigated Results: Jan. 11, 2016
Reston Network Analysis Umitigated Results: Jan. 11, 2016
 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016
 
Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016
 
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding UpdateDulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
 
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...
 

Más de Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Más de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Último

05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...Andy (Avraham) Blumenthal
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...srinuseo15
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackPsychicRuben LoveSpells
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Developmentnarsireddynannuri1
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeRahatulAshafeen
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...Axel Bruns
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...narsireddynannuri1
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhbhavenpr
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...hyt3577
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreiebhavenpr
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPsychicRuben LoveSpells
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Delhi Call girls
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...AlexisTorres963861
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Tableget joys
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceDelhi Call girls
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 

Último (20)

05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Table
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 

Dulles Corridor Metrorail Project Phase 2 & Station Names: Community Meetings March 2012

  • 1. County of Fairfax, Virginia Dulles Corridor Metrorail Project Phase 2 & Station Names Community Meetings March 2012 Department of Transportation
  • 2. County of Fairfax, Virginia • Meeting Format – Open Session – 30 minutes – Presentation – 20 minutes – Question and Answers – 20 minutes – Open Session/Questions and Answers at Stations • Purpose of Presentation – Provide background and current status on Phase 2 of the Dulles Corridor Metrorail Project – Inform and seek input from the public on Fairfax County’s Phase 2 cost, financing, project elements, and station names – Schedule/Next Steps • Project Schedule • County Schedule Department of Transportation 2
  • 3. County of Fairfax, Virginia Department of Transportation 3
  • 4. County of Fairfax, Virginia Department of Transportation 4
  • 5. County of Fairfax, Virginia Department of Transportation 5
  • 6. County of Fairfax, Virginia Tysons East Guideway
  • 7. County of Fairfax, Virginia Tysons East Station
  • 8. County of Fairfax, Virginia Route 7 and Route 123 Tunnels
  • 9. County of Fairfax, Virginia 9 Tysons West Guideway at Route 7
  • 10. County of Fairfax, Virginia 10 Tysons West Station
  • 11. Wiehle Avenue Station: Prototype for Phase 2 County of Fairfax, Except for Dulles Airport Station Stations Virginia
  • 12. County of Fairfax, Virginia Description • Metropolitan Washington Airports Authority (MWAA) is building the DCMP • Phase 2 begins west of Wiehle Avenue and ends at Route 772 in eastern Loudoun County • All stations at-grade or above grade • Phase 2 is a 11.4 mile extension and includes 6 stations and 5 parking garages: – Reston Parkway – Herndon-Monroe (1,950 new parking spaces, existing 1,600 parking spaces remain) – Route 28 (2,000 parking spaces) – Dulles Airport – Route 606 (1,950 parking spaces) – Route 772 (2 garages 3,000 parking spaces) Department of Transportation 12
  • 13. County of Fairfax, Virginia Phase 2 Cost Estimate Summary Memorandum of 100% Preliminary Independent Agreement (MOA) Engineering Analysis Original Design, $3.825 B -- -- Underground Dulles Airport Station Modified Design, $3.273 B $3.156 B $3.298 B Aerial Dulles Airport ($552 M) Station MOA and Value $3.138 B $3.093 B $3.235 B Engineering Savings ($135 M) ($63 M) ($63 M) Route 28 Station and $2.820 B $2.689 B $2.831 B Parking Garage ($318 M) ($404 M) ($404 M) Responsibilities to Fairfax and Loudoun Counties Department of Transportation 13
  • 14. County of Fairfax, Virginia Phase 2 Cost Estimate Summary • Estimates are consistent with the Memorandum of Agreement’s Targeted Project Reductions • Forecasted difference between Preliminary Engineering and Independent Estimate is due to different rates of inflation (3.0% Preliminary Est. vs. 4.5% Independent Est.) • Costs associated with the Route 28 station and parking garages fall back into the project if the County is unable to secure alternative methods to fund these elements that are cost neutral to Fairfax County – Cost allocated per the funding agreement if back in the project Department of Transportation 14
  • 15. County of Fairfax, Virginia Cost Reductions • Value Engineering and Memorandum of Agreement – Aerial Station at Dulles Airport – Shorten tail tracks at end of line – Reduced Rail Yard Capacity – Canopy Reductions – Best efforts to fund garages outside of project (Fairfax and Loudoun) – Best effort to fund Route 28 Station outside of project (Fairfax) Department of Transportation 15
  • 16. County of Fairfax, Virginia Cost Allocation Funding Agreement distribution of project cost Fairfax County 16.1% Loudoun County 4.8% MWAA 4.1% Other (Federal, State, 75.0% Tolls) Projected Distribution of project costs Phase 1 & 2 (assumptions: no new State or Federal money in Phase 2, project cost = $5.994B) Fairfax County 16.1% Loudoun County 4.8% MWAA 4.1% Federal ($975M Phase1) 16.3% State ($200M Phase 1 & 2) 3.3% DTR Tolls 55.4% Department of Transportation 16
  • 17. County of Fairfax, Virginia Fairfax County Cost • Total Project Cost (planning, design, engineering, construction) – $5.590 to $5.994B (estimated) • Phase 1 $2.901B • Phase 2 $2.689B to $3.093B • Fairfax County’s Funding Requirement Phase 1 & 2 – $900 to $965 million (estimated) • Phase 1 $467M • Phase 2 $433M - $498M Department of Transportation 17
  • 18. County of Fairfax, Virginia Fairfax County Funding • County responsible for 16.1% of Phase 1 and 2 project cost – County Established Two Special (Commercial & Industrial) Tax Districts to Fund Dulles Rail - $730M • Phase 1Tax Districts (.22 per 100) ($400M) • Phase 2 Tax District (.15 per $100) ($330M) • County Obligation Phase1 & 2 = $900- $965M – Gap $170M - $235M • Sources to close the gap – Developer Contributions – Commercial and Industrial Tax – Federal and State Grant Programs – Transportation Infrastructure Finance and Innovation Act (TIFIA) Credit Assistance – Other Department of Transportation 18
  • 19. County of Fairfax, Virginia Fairfax County (w/Silver Line) – Total Metrorail Operating Cost (Projection) FY 2013 – 2020 Fiscal Year Operating Cost 2013 $26.1M 2014 $34.7M 2015 $35.7M 2016 $37.1M 2017 $38.6M 2018 $46.4M 2019 $48.2M 2020 $50.0M Department of Transportation 19
  • 20. County of Fairfax, Virginia Department of Transportation 20
  • 21. County of Fairfax, Virginia Department of Transportation 21
  • 22. County of Fairfax, Virginia Next Steps – Phase 2 • County review of PE and cost estimate – 90 Days – Decision by funding partners no later than June 4, 2012 • County process for public outreach and input on Phase 2 – “Ask Fairfax” chat (March 9) – Four Community Meetings (March 12, 14, 15, 19) – Submit comments or questions online (by March 16) at http://www.fairfaxcounty.gov/fcdot/dullesmetro/ – March 20th, 5pm Public Hearing - Board of Supervisors • Confirm Participation in Phase 2 • County seeks alternative funding for parking garages and station • MWAA Phase 2 procurement – Initiate procurement March 2012 – Identify “Short-List” competitors June 2012 – Complete 90 day County review June 4, 2012 – Complete Environmental & WMATA approvals July 2012 – Award Design-Build contract January 2013 Department of Transportation 22
  • 23. County of Fairfax, Virginia You Decide Take The……. Department of Transportation 23
  • 24. County of Fairfax, Virginia Phase 1 & 2 Station Names • The Metro Board did not approve previous names submitted by the Fairfax County Board of Supervisors • Previous names were repetitive, not unique, and potentially confusing to riders and non-riders alike (“Tysons, Tysons, Tysons, Tysons;” “Reston, Reston;” “Herndon, Herndon”) • WMATA criteria: – Relevant: Identify station locations by geographical features, centers of activity or be derived from the names of communities, neighborhoods or landmarks within one-half mile; – Brief: Limited to 19 characters with spaces and punctuation; – Unique: Distinctive and not easily confused with other station names; – Evocative: Evoke imagery in the mind of the patron. Department of Transportation 24
  • 25. County of Fairfax, Virginia Phase 1 & 2 Station Names • FCDOT and WMATA staff are working to engage the public for recommendations meeting the criteria • Timeline: – March 9: Station Name discussion during an Ask Fairfax! online chat – March 12, 14, 15, & 19: Station Name discussion at Dulles Rail public meetings – Now until March 21: take the online Silver Line Station Names Survey, www.wmata.com/silversurvey – April: Board of Supervisors’ recommends names to WMATA – May: WMATA Board approves Silver Line station names Department of Transportation 25
  • 26. County of Fairfax, Virginia Questions ? http://www.fairfaxcounty.gov/fcdot/dullesmetro/ Department of Transportation 26