Booster Shot Hiring
5/17/2016 2
Agency Division Classification Status Comments
1 CAP Engineer III S27 1 - Filled Street Light Focus
2 DPZ Zoning Administration Planner III S27 1 - Filled
3 DPZ Zoning Evaluation Planner III S27 1 - Filled
4 DPZ Zoning Evaluation Planner III S27 1 - Filled Filled as Planner III
5 FCDOT Transportation Planner II S24 1 - Filled
6 FCDOT Transportation Planner II S24 1 - Filled
7 Fire Marshal Fire Inspector II S20 1 - Filled
8 Fire Marshal Fire Inspector II S20 1 - Filled
9 Fire Marshal Administrative Assistant II S13 1 - Filled
10 Fire Marshal Engineer III S27 1 - Filled
11
Health
Department Environmental Health Environmental Health Spec II S23 1 - Filled
12 LDS Building Plan Review & Inspections Code Specialist II S24 1 - Filled
13 LDS Director's Office Management Analyst I S21 1 - Filled
14 LDS Code Development & Compliance Engineer Tech II S18 1 - Filled
15 LDS Code Development & Compliance Code Specialist II S24 1 - Filled
16 LDS Site Development & Inspections Senior Engineer III S28 1 - Filled
17 LDS Code Development & Compliance Code Specialist II S24 1 - Filled
18 LDS Code Development & Compliance Engineer Tech III S21 1 - Filled
19 LDS IT Business Analyst III S27 1 - Filled
20 LDS Director's Office Planner IV S29 1 - Filled
21 LDS Building Plan Review & Inspections Engineer III S27 1 - Filled
22 LDS Site Development & Inspections Sr Engineer III S28 1 - Filled Reclassified; filled
23 LDS Site Development & Inspections Senior Engineering Inspector S21 1 - Filled
24 LDS Director's Office Assistant Director S34 1 - Filled LDS Operations Director
25 LDS HR Human Resources Generalist II S24 1 - Filled
26 LDS Building Plan Review & Inspections Engineer IV S29 1 - Filled Reclassified from Eng III to Eng IV
27 Urban Forestry Urban Forester II S24 1 - Filled
28 Fire Marshal Engineer III S27 2 -Interviews re-advertised; interviews in progress
Average Site Plan Timelines
5/17/2016 3
Plan Types Target
Feb -
Apr
Last
Perio
d
(Nov-
Jan)
Avg for
2015
Avg for
2014
Infill Lot
Grading Plan
(INF, Non-
bonded Single
Family)
21 25 29 26.0 25.9
Major Plan
First
Submission
(SP, SD, PI)
60 62 59 58.5 66.8
Major (SP, SD,
PI) Second
DPE
14 /
28
31 27 22.2 33.1
Major (SP, SD,
PI)
Subsequent
Non-DPE
45 49.5 58 62.1 68.6
Average Review Time
Residential Building
5/17/2016 4
Average Review Time
Commercial Building
5/17/2016 5
Average Review Time
Commercial Building
5/17/2016 6
Gartner Update
5/17/2016 7
Gartner Update
5/17/2016 8
Gartner Update
5/17/2016 9
Next Steps
• Presentation of Visioning & Recommendations
Document to Development Process
Committee (Committee of the Whole Board)
• Discussions with Industry
• Road Mapping
5/17/2016 10
Fire Marshal’s Office
5/17/2016 11
PLANS
REVIEW INVENTORY
5/17/2016
12
Plan Type
No. on
Hand
Oldest Date Work Day Lag
Sprinkler, Tenant plans without calculations 16 5-2-16 6
Sprinkler, Tenant plans with calculations 5 4-25-16 11
Sprinkler, Shell Bldgs., NFPA 13 systems 10 4-20-16 14
Sprinkler, Shell Bldgs., NFPA 13-R & 13-D systems 15 4-6-16 24
Town of Herndon Building Tenant 1 5-9-16 1
Fire Alarm, Tenant plans 5 5-10-16 0
Fire Alarm, Shell Bldgs. 2 5-10-16 0
Door Lock / Security plans 3 5-9-16 1
Range Hood/Tanks/Foam/Public Safety Plans /Misc. 18 4-26-16 10
Site Plans/Rezoning 1 / 8 5-9-16 1
High-Piled Storage Plans 0 -- 0
Evacuation / Lockdown Plans 4 5-4-16 4
Burkholder Building Summary 88 4-6-16 XXXXXXXXX
FM Architectural Review done at Herrity Building
(Class 4 and Greater Building Plans)
8 5-2-16 6
FM Architectural Review (Fast Track Tenant Plans) 4 5-10-16 0
FM Arch. Review (non-Fast Track Tenant Plans) 4 5-10-16 0
Herrity Building (B-2) Summary 16 5-2-16 XXXXXXXXX
Planning & Zoning
5/17/2016 13
New NVBIA/NAIOP Webpage
http://www.fairfaxcounty.gov/dpwes/committees/nvbia-naiop-fairfax-committee.htm
5/17/2016 14
Thank you
5/17/2016 15
Next Meeting: April 14, 2016

Más contenido relacionado

La actualidad más candente

Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)Brad Keithley
 
Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Allan Leyte
 
Project Management Diagnostics for Time Management
Project Management Diagnostics for Time ManagementProject Management Diagnostics for Time Management
Project Management Diagnostics for Time ManagementApril Davies, MA, CAPM
 
CarlCharlie_FinalResume
CarlCharlie_FinalResumeCarlCharlie_FinalResume
CarlCharlie_FinalResumeCarl Charlie
 
Abdul basit resume
Abdul basit resumeAbdul basit resume
Abdul basit resumeAbdul Basit
 
An Introduction to Gantt Charts
An Introduction to Gantt Charts An Introduction to Gantt Charts
An Introduction to Gantt Charts Litunya Laurean
 
PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16
PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16
PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16Fermo Balatucan,Jr.
 
Black presentation
Black presentationBlack presentation
Black presentationRPO America
 
2015-01-06 Microsoft Dynamics SL 2014 YE Updates and Processing
2015-01-06 Microsoft Dynamics SL 2014 YE Updates and Processing2015-01-06 Microsoft Dynamics SL 2014 YE Updates and Processing
2015-01-06 Microsoft Dynamics SL 2014 YE Updates and ProcessingRaffa Learning Community
 
Gantt chart PPT, POOJA GODIYAL
Gantt chart PPT, POOJA GODIYALGantt chart PPT, POOJA GODIYAL
Gantt chart PPT, POOJA GODIYALPooja Godiyal
 
2016-01-05 Dynamics SL Year End Closing Procedures
2016-01-05 Dynamics SL Year End Closing Procedures2016-01-05 Dynamics SL Year End Closing Procedures
2016-01-05 Dynamics SL Year End Closing ProceduresRaffa Learning Community
 
NVBIA NAIOP Update July 14, 2016
NVBIA NAIOP Update July 14, 2016NVBIA NAIOP Update July 14, 2016
NVBIA NAIOP Update July 14, 2016Fairfax County
 
Job Profile as a Planning Engineer
Job Profile as a Planning EngineerJob Profile as a Planning Engineer
Job Profile as a Planning EngineerMD TAUSIF ASLAM
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul A'mal Mohd Hanafiah
 
Al Qasr Mall presentation
Al Qasr Mall presentationAl Qasr Mall presentation
Al Qasr Mall presentationMamdouh Attia
 
Gas Nozzle Team Report Out January 31 2008
Gas Nozzle Team Report Out January 31 2008Gas Nozzle Team Report Out January 31 2008
Gas Nozzle Team Report Out January 31 2008ExerciseLeanLLC
 

La actualidad más candente (20)

Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)
 
Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Visio-Planning FlowChart-3
Visio-Planning FlowChart-3
 
Project Management Diagnostics for Time Management
Project Management Diagnostics for Time ManagementProject Management Diagnostics for Time Management
Project Management Diagnostics for Time Management
 
CarlCharlie_FinalResume
CarlCharlie_FinalResumeCarlCharlie_FinalResume
CarlCharlie_FinalResume
 
Abdul basit resume
Abdul basit resumeAbdul basit resume
Abdul basit resume
 
An Introduction to Gantt Charts
An Introduction to Gantt Charts An Introduction to Gantt Charts
An Introduction to Gantt Charts
 
PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16
PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16
PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16
 
Black presentation
Black presentationBlack presentation
Black presentation
 
2015-01-06 Microsoft Dynamics SL 2014 YE Updates and Processing
2015-01-06 Microsoft Dynamics SL 2014 YE Updates and Processing2015-01-06 Microsoft Dynamics SL 2014 YE Updates and Processing
2015-01-06 Microsoft Dynamics SL 2014 YE Updates and Processing
 
Gantt chart PPT, POOJA GODIYAL
Gantt chart PPT, POOJA GODIYALGantt chart PPT, POOJA GODIYAL
Gantt chart PPT, POOJA GODIYAL
 
2016-01-05 Dynamics SL Year End Closing Procedures
2016-01-05 Dynamics SL Year End Closing Procedures2016-01-05 Dynamics SL Year End Closing Procedures
2016-01-05 Dynamics SL Year End Closing Procedures
 
NVBIA NAIOP Update July 14, 2016
NVBIA NAIOP Update July 14, 2016NVBIA NAIOP Update July 14, 2016
NVBIA NAIOP Update July 14, 2016
 
Job Profile as a Planning Engineer
Job Profile as a Planning EngineerJob Profile as a Planning Engineer
Job Profile as a Planning Engineer
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 
Al Qasr Mall presentation
Al Qasr Mall presentationAl Qasr Mall presentation
Al Qasr Mall presentation
 
Instrument_Engg_Sharat
Instrument_Engg_SharatInstrument_Engg_Sharat
Instrument_Engg_Sharat
 
GlennN Resume
GlennN ResumeGlennN Resume
GlennN Resume
 
Gas Nozzle Team Report Out January 31 2008
Gas Nozzle Team Report Out January 31 2008Gas Nozzle Team Report Out January 31 2008
Gas Nozzle Team Report Out January 31 2008
 
Neenan slide deck
Neenan slide deckNeenan slide deck
Neenan slide deck
 

Destacado

Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016Fairfax County
 
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013Fairfax County
 
Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Fairfax County
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream RestorationFairfax County
 
Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Fairfax County
 
Banks Property Stream Restoration (DC9218)
Banks Property Stream Restoration (DC9218)Banks Property Stream Restoration (DC9218)
Banks Property Stream Restoration (DC9218)Fairfax County
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingFairfax County
 
Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016Fairfax County
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectFairfax County
 
Community Gypsy Moth Management
Community Gypsy Moth ManagementCommunity Gypsy Moth Management
Community Gypsy Moth ManagementFairfax County
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Fairfax County
 
Summerton Way Pond Retrofit
Summerton Way Pond RetrofitSummerton Way Pond Retrofit
Summerton Way Pond RetrofitFairfax County
 
Great Falls Nike Field Stormwater Enhancements 2012
Great Falls Nike Field Stormwater Enhancements 2012Great Falls Nike Field Stormwater Enhancements 2012
Great Falls Nike Field Stormwater Enhancements 2012Fairfax County
 
Difficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesDifficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesFairfax County
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationFairfax County
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Fairfax County
 
Fall Cankerworm Sticky Banding: A Community Working Together
Fall Cankerworm Sticky Banding: A Community Working TogetherFall Cankerworm Sticky Banding: A Community Working Together
Fall Cankerworm Sticky Banding: A Community Working TogetherFairfax County
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFairfax County
 
Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Fairfax County
 
Towlston Meadows Restoration Project
Towlston Meadows Restoration ProjectTowlston Meadows Restoration Project
Towlston Meadows Restoration ProjectFairfax County
 

Destacado (20)

Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016
 
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
 
Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream Restoration
 
Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014
 
Banks Property Stream Restoration (DC9218)
Banks Property Stream Restoration (DC9218)Banks Property Stream Restoration (DC9218)
Banks Property Stream Restoration (DC9218)
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public Meeting
 
Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
 
Community Gypsy Moth Management
Community Gypsy Moth ManagementCommunity Gypsy Moth Management
Community Gypsy Moth Management
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016
 
Summerton Way Pond Retrofit
Summerton Way Pond RetrofitSummerton Way Pond Retrofit
Summerton Way Pond Retrofit
 
Great Falls Nike Field Stormwater Enhancements 2012
Great Falls Nike Field Stormwater Enhancements 2012Great Falls Nike Field Stormwater Enhancements 2012
Great Falls Nike Field Stormwater Enhancements 2012
 
Difficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesDifficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton Estates
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream Restoration
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
 
Fall Cankerworm Sticky Banding: A Community Working Together
Fall Cankerworm Sticky Banding: A Community Working TogetherFall Cankerworm Sticky Banding: A Community Working Together
Fall Cankerworm Sticky Banding: A Community Working Together
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly Drive
 
Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015
 
Towlston Meadows Restoration Project
Towlston Meadows Restoration ProjectTowlston Meadows Restoration Project
Towlston Meadows Restoration Project
 

Similar a Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016

CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONcyberyogi07
 
336742956 individual-performance-commitment-and-review-ipcr-form
336742956 individual-performance-commitment-and-review-ipcr-form336742956 individual-performance-commitment-and-review-ipcr-form
336742956 individual-performance-commitment-and-review-ipcr-formEdelyn Ambos
 
Abdul Latif Updated 2022.docx
Abdul Latif   Updated 2022.docxAbdul Latif   Updated 2022.docx
Abdul Latif Updated 2022.docxRASIDULISLAM17
 
2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...
2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...
2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...Greg Babinski
 
Best practices for streamlining your project – A joint demo of Viasys VDC and...
Best practices for streamlining your project – A joint demo of Viasys VDC and...Best practices for streamlining your project – A joint demo of Viasys VDC and...
Best practices for streamlining your project – A joint demo of Viasys VDC and...Viasys VDC
 
From TRL to MRL: Assessing Open Source Project Market Readiness, Cédric Thoma...
From TRL to MRL: Assessing Open Source Project Market Readiness, Cédric Thoma...From TRL to MRL: Assessing Open Source Project Market Readiness, Cédric Thoma...
From TRL to MRL: Assessing Open Source Project Market Readiness, Cédric Thoma...OW2
 
BIM on Project Site - Estella Heights Phase 2 Project
BIM on Project Site - Estella Heights Phase 2 ProjectBIM on Project Site - Estella Heights Phase 2 Project
BIM on Project Site - Estella Heights Phase 2 ProjectHung Lam Vu Ngo
 
Citizens Tower Presentation, November 19, 2015
Citizens Tower Presentation, November 19, 2015Citizens Tower Presentation, November 19, 2015
Citizens Tower Presentation, November 19, 2015City of Lubbock
 
Q2 Review[16061].pptx
Q2 Review[16061].pptxQ2 Review[16061].pptx
Q2 Review[16061].pptxSowmyaKB6
 
City Planning Retrospective of Joseph A. Colón.ppsx
City Planning Retrospective of Joseph A. Colón.ppsxCity Planning Retrospective of Joseph A. Colón.ppsx
City Planning Retrospective of Joseph A. Colón.ppsxJoseph A. Colón
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1DavidJPCChai
 
MinterEllison Gold Coast Planning Act Wayfinder
MinterEllison Gold Coast Planning Act WayfinderMinterEllison Gold Coast Planning Act Wayfinder
MinterEllison Gold Coast Planning Act WayfinderDeveloping InSight
 

Similar a Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016 (20)

Major project highways report
Major project highways reportMajor project highways report
Major project highways report
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATION
 
336742956 individual-performance-commitment-and-review-ipcr-form
336742956 individual-performance-commitment-and-review-ipcr-form336742956 individual-performance-commitment-and-review-ipcr-form
336742956 individual-performance-commitment-and-review-ipcr-form
 
Abdul Latif Updated 2022.docx
Abdul Latif   Updated 2022.docxAbdul Latif   Updated 2022.docx
Abdul Latif Updated 2022.docx
 
MSH_SITE PLAN
MSH_SITE PLANMSH_SITE PLAN
MSH_SITE PLAN
 
2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...
2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...
2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...
 
Best practices for streamlining your project – A joint demo of Viasys VDC and...
Best practices for streamlining your project – A joint demo of Viasys VDC and...Best practices for streamlining your project – A joint demo of Viasys VDC and...
Best practices for streamlining your project – A joint demo of Viasys VDC and...
 
Final April 18 LMKAIZEN
Final April 18 LMKAIZENFinal April 18 LMKAIZEN
Final April 18 LMKAIZEN
 
From TRL to MRL: Assessing Open Source Project Market Readiness, Cédric Thoma...
From TRL to MRL: Assessing Open Source Project Market Readiness, Cédric Thoma...From TRL to MRL: Assessing Open Source Project Market Readiness, Cédric Thoma...
From TRL to MRL: Assessing Open Source Project Market Readiness, Cédric Thoma...
 
Website project summary pages 131107
Website project summary pages 131107Website project summary pages 131107
Website project summary pages 131107
 
BIM on Project Site - Estella Heights Phase 2 Project
BIM on Project Site - Estella Heights Phase 2 ProjectBIM on Project Site - Estella Heights Phase 2 Project
BIM on Project Site - Estella Heights Phase 2 Project
 
BIM Execution Plan
BIM Execution PlanBIM Execution Plan
BIM Execution Plan
 
Citizens Tower Presentation, November 19, 2015
Citizens Tower Presentation, November 19, 2015Citizens Tower Presentation, November 19, 2015
Citizens Tower Presentation, November 19, 2015
 
Risk assessment plan example
Risk assessment plan exampleRisk assessment plan example
Risk assessment plan example
 
The construction programme - assurance and controls
The construction programme - assurance and controlsThe construction programme - assurance and controls
The construction programme - assurance and controls
 
Q2 Review[16061].pptx
Q2 Review[16061].pptxQ2 Review[16061].pptx
Q2 Review[16061].pptx
 
City Planning Retrospective of Joseph A. Colón.ppsx
City Planning Retrospective of Joseph A. Colón.ppsxCity Planning Retrospective of Joseph A. Colón.ppsx
City Planning Retrospective of Joseph A. Colón.ppsx
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1
 
MinterEllison Gold Coast Planning Act Wayfinder
MinterEllison Gold Coast Planning Act WayfinderMinterEllison Gold Coast Planning Act Wayfinder
MinterEllison Gold Coast Planning Act Wayfinder
 
GIRIRAJAN
GIRIRAJANGIRIRAJAN
GIRIRAJAN
 

Más de Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Más de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Último

Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...srinuseo15
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfssuser5750e1
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsVoterMood
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...Andy (Avraham) Blumenthal
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...tewhimanshu23
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...Faga1939
 
Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024Insiger
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...IT Industry
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...anjanibaddipudi1
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptxYasinAhmad20
 
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In DubaiDubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In Dubaikojalkojal131
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdflambardar420420
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...hyt3577
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdomlunadelior
 

Último (20)

call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf
 
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In DubaiDubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
 

Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016

  • 1. Land Development Update NAIOP/NVBIA Joint Meeting May, 12 2016
  • 2. Booster Shot Hiring 5/17/2016 2 Agency Division Classification Status Comments 1 CAP Engineer III S27 1 - Filled Street Light Focus 2 DPZ Zoning Administration Planner III S27 1 - Filled 3 DPZ Zoning Evaluation Planner III S27 1 - Filled 4 DPZ Zoning Evaluation Planner III S27 1 - Filled Filled as Planner III 5 FCDOT Transportation Planner II S24 1 - Filled 6 FCDOT Transportation Planner II S24 1 - Filled 7 Fire Marshal Fire Inspector II S20 1 - Filled 8 Fire Marshal Fire Inspector II S20 1 - Filled 9 Fire Marshal Administrative Assistant II S13 1 - Filled 10 Fire Marshal Engineer III S27 1 - Filled 11 Health Department Environmental Health Environmental Health Spec II S23 1 - Filled 12 LDS Building Plan Review & Inspections Code Specialist II S24 1 - Filled 13 LDS Director's Office Management Analyst I S21 1 - Filled 14 LDS Code Development & Compliance Engineer Tech II S18 1 - Filled 15 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 16 LDS Site Development & Inspections Senior Engineer III S28 1 - Filled 17 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 18 LDS Code Development & Compliance Engineer Tech III S21 1 - Filled 19 LDS IT Business Analyst III S27 1 - Filled 20 LDS Director's Office Planner IV S29 1 - Filled 21 LDS Building Plan Review & Inspections Engineer III S27 1 - Filled 22 LDS Site Development & Inspections Sr Engineer III S28 1 - Filled Reclassified; filled 23 LDS Site Development & Inspections Senior Engineering Inspector S21 1 - Filled 24 LDS Director's Office Assistant Director S34 1 - Filled LDS Operations Director 25 LDS HR Human Resources Generalist II S24 1 - Filled 26 LDS Building Plan Review & Inspections Engineer IV S29 1 - Filled Reclassified from Eng III to Eng IV 27 Urban Forestry Urban Forester II S24 1 - Filled 28 Fire Marshal Engineer III S27 2 -Interviews re-advertised; interviews in progress
  • 3. Average Site Plan Timelines 5/17/2016 3 Plan Types Target Feb - Apr Last Perio d (Nov- Jan) Avg for 2015 Avg for 2014 Infill Lot Grading Plan (INF, Non- bonded Single Family) 21 25 29 26.0 25.9 Major Plan First Submission (SP, SD, PI) 60 62 59 58.5 66.8 Major (SP, SD, PI) Second DPE 14 / 28 31 27 22.2 33.1 Major (SP, SD, PI) Subsequent Non-DPE 45 49.5 58 62.1 68.6
  • 4. Average Review Time Residential Building 5/17/2016 4
  • 5. Average Review Time Commercial Building 5/17/2016 5
  • 6. Average Review Time Commercial Building 5/17/2016 6
  • 10. Next Steps • Presentation of Visioning & Recommendations Document to Development Process Committee (Committee of the Whole Board) • Discussions with Industry • Road Mapping 5/17/2016 10
  • 12. PLANS REVIEW INVENTORY 5/17/2016 12 Plan Type No. on Hand Oldest Date Work Day Lag Sprinkler, Tenant plans without calculations 16 5-2-16 6 Sprinkler, Tenant plans with calculations 5 4-25-16 11 Sprinkler, Shell Bldgs., NFPA 13 systems 10 4-20-16 14 Sprinkler, Shell Bldgs., NFPA 13-R & 13-D systems 15 4-6-16 24 Town of Herndon Building Tenant 1 5-9-16 1 Fire Alarm, Tenant plans 5 5-10-16 0 Fire Alarm, Shell Bldgs. 2 5-10-16 0 Door Lock / Security plans 3 5-9-16 1 Range Hood/Tanks/Foam/Public Safety Plans /Misc. 18 4-26-16 10 Site Plans/Rezoning 1 / 8 5-9-16 1 High-Piled Storage Plans 0 -- 0 Evacuation / Lockdown Plans 4 5-4-16 4 Burkholder Building Summary 88 4-6-16 XXXXXXXXX FM Architectural Review done at Herrity Building (Class 4 and Greater Building Plans) 8 5-2-16 6 FM Architectural Review (Fast Track Tenant Plans) 4 5-10-16 0 FM Arch. Review (non-Fast Track Tenant Plans) 4 5-10-16 0 Herrity Building (B-2) Summary 16 5-2-16 XXXXXXXXX
  • 15. Thank you 5/17/2016 15 Next Meeting: April 14, 2016