This bicycle/pedestrian improvement project included construction of approximately 170 linear feet of six-foot asphalt walkway connecting Lanier Street to Carrico Drive and associated drainage improvements.
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Lanier Street Bike/Pedestrian Connection
Contract No. CN18124120
Project No. 2G40-088-034
Mason District
February 28, 2018
2. Lanier Street Bike/Pedestrian Connection
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
3. Project Details
Lanier Street Bike/Pedestrian Connection
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Description:
The Lanier Street Bike/Pedestrian Connection project was substantially completed on January
05, 2018. The scope of this project included construction of approximately 170 linear feet of 6-
foot asphalt walkway connecting Lanier Street to Carrico Drive and associated drainage
improvements.
Project Overview:
• Installed 170 linear feet of asphalt walkway to provide safer bike/pedestrian access.
• Installed storm piping and a connecting storm structure to insure better stormwater
conveyance.
• Project Team:
• Department of Transportation – Francesco Lauretti
• Utilities Design and Construction Division (UDCD) – Michael J. Stevens
• Project Inspector, UDCD – Yagya Bhandari
• Land Survey Branch, UDCD – Mike Perry
4. Lanier Street Bike/Pedestrian Connection
Mason District, Tax Map 71-1
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
5. Lanier Street Bike/Pedestrian Connection
Pre-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
6. Lanier Street Bike/Pedestrian Connection
Pre-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
7. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lanier Street Bike/Pedestrian Connection
Storm Structure under Construction
8. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lanier Street Bike/Pedestrian Connection
Asphalt Trail under Construction
9. Lanier Street Bike/Pedestrian Connection
Completed Project
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
10. Before After
Lanier Street Bike/Pedestrian Connection
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
11. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Lanier Street Bike/Pedestrian Connection
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch