Lanier Street Bike/Pedestrian Connection
Contract No. CN18124120
Project No. 2G40-088-034
Mason District
February 28, 2018
Lanier Street Bike/Pedestrian Connection
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Project Details
Lanier Street Bike/Pedestrian Connection
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Description:
The Lanier Street Bike/Pedestrian Connection project was substantially completed on January
05, 2018. The scope of this project included construction of approximately 170 linear feet of 6-
foot asphalt walkway connecting Lanier Street to Carrico Drive and associated drainage
improvements.
Project Overview:
• Installed 170 linear feet of asphalt walkway to provide safer bike/pedestrian access.
• Installed storm piping and a connecting storm structure to insure better stormwater
conveyance.
• Project Team:
• Department of Transportation – Francesco Lauretti
• Utilities Design and Construction Division (UDCD) – Michael J. Stevens
• Project Inspector, UDCD – Yagya Bhandari
• Land Survey Branch, UDCD – Mike Perry
Lanier Street Bike/Pedestrian Connection
Mason District, Tax Map 71-1
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lanier Street Bike/Pedestrian Connection
Pre-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lanier Street Bike/Pedestrian Connection
Pre-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lanier Street Bike/Pedestrian Connection
Storm Structure under Construction
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lanier Street Bike/Pedestrian Connection
Asphalt Trail under Construction
Lanier Street Bike/Pedestrian Connection
Completed Project
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Before After
Lanier Street Bike/Pedestrian Connection
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Lanier Street Bike/Pedestrian Connection
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Matthew Kaiser, Public Information Officer
703-324-8455, TTY 711
Matthew.kaiser@fairfaxcounty.gov

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Parcher Avenue Pedestrian Access Improvement
Parcher Avenue Pedestrian Access ImprovementParcher Avenue Pedestrian Access Improvement
Parcher Avenue Pedestrian Access Improvement
 
Fairfax County Old Courthouse Road Walkway Improvements August 2020
Fairfax County Old Courthouse Road Walkway Improvements August 2020Fairfax County Old Courthouse Road Walkway Improvements August 2020
Fairfax County Old Courthouse Road Walkway Improvements August 2020
 
Chesterbrook Road Walkway Improvement Project August 2020
Chesterbrook Road Walkway Improvement Project August 2020Chesterbrook Road Walkway Improvement Project August 2020
Chesterbrook Road Walkway Improvement Project August 2020
 
Old Keene Mill Road Walkway at Carrleigh Pkwy
Old Keene Mill Road Walkway at Carrleigh PkwyOld Keene Mill Road Walkway at Carrleigh Pkwy
Old Keene Mill Road Walkway at Carrleigh Pkwy
 
Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020
 
Edsall Road Walkway Pedestrian Improvements
Edsall Road Walkway Pedestrian ImprovementsEdsall Road Walkway Pedestrian Improvements
Edsall Road Walkway Pedestrian Improvements
 
Silverbrook Road & Southrun Road Intersection Improvements
Silverbrook Road & Southrun Road Intersection ImprovementsSilverbrook Road & Southrun Road Intersection Improvements
Silverbrook Road & Southrun Road Intersection Improvements
 
PowerPoint Westmoreland Street Bike Lanes - substantial completion
PowerPoint   Westmoreland Street Bike Lanes - substantial completionPowerPoint   Westmoreland Street Bike Lanes - substantial completion
PowerPoint Westmoreland Street Bike Lanes - substantial completion
 
Tysons Boulevard and Galleria Drive Pedestrian Access Improvements
Tysons Boulevard and Galleria Drive Pedestrian Access ImprovementsTysons Boulevard and Galleria Drive Pedestrian Access Improvements
Tysons Boulevard and Galleria Drive Pedestrian Access Improvements
 
Sunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
Sunrise Valley Drive from Hitchcock Drive to Colts Neck DriveSunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
Sunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
 
Silverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway ProjectSilverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway Project
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
 
Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020
 
Substantial Completion - HMSAMS-Innovation Center to Arrowbrook Trail
Substantial Completion - HMSAMS-Innovation Center to Arrowbrook TrailSubstantial Completion - HMSAMS-Innovation Center to Arrowbrook Trail
Substantial Completion - HMSAMS-Innovation Center to Arrowbrook Trail
 
Vesper St. Shared Use Path
Vesper St. Shared Use PathVesper St. Shared Use Path
Vesper St. Shared Use Path
 
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020 Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
 
Dead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation ProjectDead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation Project
 
Route 50 sidewalk - South Street to Aspen Lane
Route 50 sidewalk - South Street to Aspen LaneRoute 50 sidewalk - South Street to Aspen Lane
Route 50 sidewalk - South Street to Aspen Lane
 
Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020
Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020
Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020
 
Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021
 

Similar a Lanier St. Bicycle and Pedestrian Connection

Similar a Lanier St. Bicycle and Pedestrian Connection (20)

Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy CircleSunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
 
Chain Bridge Road Walkway
Chain Bridge Road WalkwayChain Bridge Road Walkway
Chain Bridge Road Walkway
 
Guinea Road and Lakepointe Drive Sidewalk and Intersection Improvements
Guinea Road and Lakepointe Drive Sidewalk and Intersection ImprovementsGuinea Road and Lakepointe Drive Sidewalk and Intersection Improvements
Guinea Road and Lakepointe Drive Sidewalk and Intersection Improvements
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Chichester Lane Sidewalk Improvements
Chichester Lane Sidewalk ImprovementsChichester Lane Sidewalk Improvements
Chichester Lane Sidewalk Improvements
 
Workhouse Arts Foundation Access Road
Workhouse Arts Foundation Access RoadWorkhouse Arts Foundation Access Road
Workhouse Arts Foundation Access Road
 
Chichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane WalkwayChichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane Walkway
 
Fort Hunt Road Walkway
Fort Hunt Road WalkwayFort Hunt Road Walkway
Fort Hunt Road Walkway
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
 
Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020
 
Hunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
Hunter Mill Road and Sunrise Valley Drive Pedestrian ImprovementsHunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
Hunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
 
Quander Road Walkway
Quander Road WalkwayQuander Road Walkway
Quander Road Walkway
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020
 
Bus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsBus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility Improvements
 
Cinder Bed Road Realignment
Cinder Bed Road RealignmentCinder Bed Road Realignment
Cinder Bed Road Realignment
 
Oakton Community Park Phase 2A
Oakton Community Park Phase 2AOakton Community Park Phase 2A
Oakton Community Park Phase 2A
 
Innovation Ave Walkway (Innovation Metro Station to Dulles Greene blvd)
Innovation Ave Walkway (Innovation Metro Station to Dulles Greene blvd)Innovation Ave Walkway (Innovation Metro Station to Dulles Greene blvd)
Innovation Ave Walkway (Innovation Metro Station to Dulles Greene blvd)
 
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
 
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe DriveChain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
 

Más de Fairfax County

Más de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Último

Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi EscortsRussian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Monica Sydney
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
MadhuKothuru
 

Último (20)

AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
Lorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationLorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final Presentation
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx
 
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
 
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
 
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi EscortsRussian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
 
tOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTRtOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTR
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery ServicePrivate Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
 
sponsor for poor old age person food.pdf
sponsor for poor old age person food.pdfsponsor for poor old age person food.pdf
sponsor for poor old age person food.pdf
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
 

Lanier St. Bicycle and Pedestrian Connection

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Lanier Street Bike/Pedestrian Connection Contract No. CN18124120 Project No. 2G40-088-034 Mason District February 28, 2018
  • 2. Lanier Street Bike/Pedestrian Connection Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 3. Project Details Lanier Street Bike/Pedestrian Connection Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Description: The Lanier Street Bike/Pedestrian Connection project was substantially completed on January 05, 2018. The scope of this project included construction of approximately 170 linear feet of 6- foot asphalt walkway connecting Lanier Street to Carrico Drive and associated drainage improvements. Project Overview: • Installed 170 linear feet of asphalt walkway to provide safer bike/pedestrian access. • Installed storm piping and a connecting storm structure to insure better stormwater conveyance. • Project Team: • Department of Transportation – Francesco Lauretti • Utilities Design and Construction Division (UDCD) – Michael J. Stevens • Project Inspector, UDCD – Yagya Bhandari • Land Survey Branch, UDCD – Mike Perry
  • 4. Lanier Street Bike/Pedestrian Connection Mason District, Tax Map 71-1 Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 5. Lanier Street Bike/Pedestrian Connection Pre-Construction Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 6. Lanier Street Bike/Pedestrian Connection Pre-Construction Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 7. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Lanier Street Bike/Pedestrian Connection Storm Structure under Construction
  • 8. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Lanier Street Bike/Pedestrian Connection Asphalt Trail under Construction
  • 9. Lanier Street Bike/Pedestrian Connection Completed Project Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 10. Before After Lanier Street Bike/Pedestrian Connection Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 11. Additional Information For additional Information, please call www.fairfaxcounty.gov/dpwes Lanier Street Bike/Pedestrian Connection Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Matthew Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.kaiser@fairfaxcounty.gov