This project consisted of construction of a box culvert extension, concrete sidewalk, asphalt trail, curb and gutter, 24-inch water line relocation, 8,650 feet of additional asphalt pavement, two bio-retention filters, five signalized intersections, and other related items.
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Lee Highway, U.S. Route 29 Phase III Widening
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Lee Highway, U.S. Route 29 - Phase III Widening
Contract No. CN15124101
Project No. 5G25-052-000
Braddock District
February 26, 2018
2. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Completed Road Way
Lee Highway, U.S. Route 29 - Phase III Widening
3. Project Details
Lee Highway, U.S. Route 29 - Phase III Widening
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Description:
The Lee Highway, U.S. Route 29 Phase III Widening Project was substantially completed on
November 14, 2017. This project consisted of construction of a box culvert extension, concrete
sidewalk, asphalt trail, curb & gutter, 24” water line relocation, 8,650 feet of additional asphalt
pavement, two Bio-retention Filters, five signalized intersections and other related items.
Project Overview:
• Additional travel lane north bound on Lee Highway between the intersections with Legato
Road and Shirley Gate Road.
• Installation of box culvert extension.
• Installation of RCP concrete pipe to improve drainage flow
Project Team:
• Department of Transportation – Brook Khorashadi
• Land Acquisition Division – Beth Shubert
• Utilities Design and Construction Division (UDCD) – Ben Samiyi
• Project Inspector, MBP – Tony Knave
4. Braddock District, Tax Map N. 56-1, 56-2 & 56-3
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lee Highway, U.S. Route 29 - Phase III Widening
END OF ROAD WIDENING
BEGINNING OF
ROAD WIDENING
5. Lee Highway, U.S. Route 29 - Phase III Widening
Installation of Final Pavement Making & Striping
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
6. Lee Highway, U.S. Route 29 - Phase III Widening
Construction of Route 29, Phase III
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
7. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lee Highway, U.S. Route 29 - Phase III Widening
Bio-Retention Media under Construction
8. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lee Highway, U.S. Route 29 - Phase III Widening
Box Culvert Extension under Construction
9. Before After
Lee Highway, U.S. Route 29 - Phase III Widening
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
10. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Matthew Kaiser, Public Information Officer
703-324-8455, TTY 711
Matthew.Kaiser@fairfaxcounty.gov