Lee Highway, U.S. Route 29 - Phase III Widening
Contract No. CN15124101
Project No. 5G25-052-000
Braddock District
February 26, 2018
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Completed Road Way
Lee Highway, U.S. Route 29 - Phase III Widening
Project Details
Lee Highway, U.S. Route 29 - Phase III Widening
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Description:
The Lee Highway, U.S. Route 29 Phase III Widening Project was substantially completed on
November 14, 2017. This project consisted of construction of a box culvert extension, concrete
sidewalk, asphalt trail, curb & gutter, 24” water line relocation, 8,650 feet of additional asphalt
pavement, two Bio-retention Filters, five signalized intersections and other related items.
Project Overview:
• Additional travel lane north bound on Lee Highway between the intersections with Legato
Road and Shirley Gate Road.
• Installation of box culvert extension.
• Installation of RCP concrete pipe to improve drainage flow
Project Team:
• Department of Transportation – Brook Khorashadi
• Land Acquisition Division – Beth Shubert
• Utilities Design and Construction Division (UDCD) – Ben Samiyi
• Project Inspector, MBP – Tony Knave
Braddock District, Tax Map N. 56-1, 56-2 & 56-3
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lee Highway, U.S. Route 29 - Phase III Widening
END OF ROAD WIDENING
BEGINNING OF
ROAD WIDENING
Lee Highway, U.S. Route 29 - Phase III Widening
Installation of Final Pavement Making & Striping
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lee Highway, U.S. Route 29 - Phase III Widening
Construction of Route 29, Phase III
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lee Highway, U.S. Route 29 - Phase III Widening
Bio-Retention Media under Construction
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Lee Highway, U.S. Route 29 - Phase III Widening
Box Culvert Extension under Construction
Before After
Lee Highway, U.S. Route 29 - Phase III Widening
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Matthew Kaiser, Public Information Officer
703-324-8455, TTY 711
Matthew.Kaiser@fairfaxcounty.gov

Más contenido relacionado

La actualidad más candente

Rick presentation about central artery for stephaine pollocks class
Rick presentation about central artery for stephaine pollocks classRick presentation about central artery for stephaine pollocks class
Rick presentation about central artery for stephaine pollocks class
DorothyFennell
 

La actualidad más candente (20)

Dead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation ProjectDead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation Project
 
Six Points Reconfiguration - Community Update June, 2014
Six Points Reconfiguration - Community Update June, 2014Six Points Reconfiguration - Community Update June, 2014
Six Points Reconfiguration - Community Update June, 2014
 
Ce 4710 presentation 2
Ce 4710 presentation 2Ce 4710 presentation 2
Ce 4710 presentation 2
 
Miami-Dade MPO 2015 Transportation Summit Presentation
Miami-Dade MPO 2015 Transportation Summit PresentationMiami-Dade MPO 2015 Transportation Summit Presentation
Miami-Dade MPO 2015 Transportation Summit Presentation
 
Turkey Creek Road and F&B Road Status
Turkey Creek Road and F&B Road StatusTurkey Creek Road and F&B Road Status
Turkey Creek Road and F&B Road Status
 
LYNX Blue Line Extension Construction Update
LYNX Blue Line Extension Construction UpdateLYNX Blue Line Extension Construction Update
LYNX Blue Line Extension Construction Update
 
West Ox Road Walkway
West Ox Road WalkwayWest Ox Road Walkway
West Ox Road Walkway
 
Rick presentation about central artery for stephaine pollocks class
Rick presentation about central artery for stephaine pollocks classRick presentation about central artery for stephaine pollocks class
Rick presentation about central artery for stephaine pollocks class
 
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
 
PowerPoint Westmoreland Street Bike Lanes - substantial completion
PowerPoint   Westmoreland Street Bike Lanes - substantial completionPowerPoint   Westmoreland Street Bike Lanes - substantial completion
PowerPoint Westmoreland Street Bike Lanes - substantial completion
 
Center Road sidewalk
Center Road sidewalkCenter Road sidewalk
Center Road sidewalk
 
Silverbrook Road & Southrun Road Intersection Improvements
Silverbrook Road & Southrun Road Intersection ImprovementsSilverbrook Road & Southrun Road Intersection Improvements
Silverbrook Road & Southrun Road Intersection Improvements
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meeting
 
ORahman-Resume
ORahman-ResumeORahman-Resume
ORahman-Resume
 
Substantial Completion: Franconia Road Sidewalk
Substantial Completion: Franconia Road SidewalkSubstantial Completion: Franconia Road Sidewalk
Substantial Completion: Franconia Road Sidewalk
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meeting
 
Georgetown Pike Walkway Phase III
Georgetown Pike Walkway Phase IIIGeorgetown Pike Walkway Phase III
Georgetown Pike Walkway Phase III
 
Southeast Quadrant Bailey's Demolition
Southeast Quadrant Bailey's DemolitionSoutheast Quadrant Bailey's Demolition
Southeast Quadrant Bailey's Demolition
 
Harbor Ring Campaign
Harbor Ring CampaignHarbor Ring Campaign
Harbor Ring Campaign
 

Similar a Lee Highway, U.S. Route 29 Phase III Widening

Similar a Lee Highway, U.S. Route 29 Phase III Widening (20)

Chain Bridge Road Walkway
Chain Bridge Road WalkwayChain Bridge Road Walkway
Chain Bridge Road Walkway
 
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Pohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian ImprovementsPohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian Improvements
 
Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
 
Franconia at Westchester Drive Median Refuge
Franconia at Westchester Drive Median RefugeFranconia at Westchester Drive Median Refuge
Franconia at Westchester Drive Median Refuge
 
Sunset Hills Road Walkway
Sunset Hills Road WalkwaySunset Hills Road Walkway
Sunset Hills Road Walkway
 
Lanier St. Bicycle and Pedestrian Connection
Lanier St. Bicycle and Pedestrian ConnectionLanier St. Bicycle and Pedestrian Connection
Lanier St. Bicycle and Pedestrian Connection
 
Gallows Road and Prosperity Avenue Improvements
Gallows Road and Prosperity Avenue ImprovementsGallows Road and Prosperity Avenue Improvements
Gallows Road and Prosperity Avenue Improvements
 
Cinder Bed Road Realignment
Cinder Bed Road RealignmentCinder Bed Road Realignment
Cinder Bed Road Realignment
 
Oakton Community Park Phase 2A
Oakton Community Park Phase 2AOakton Community Park Phase 2A
Oakton Community Park Phase 2A
 
Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020
 
Vesper St. Shared Use Path
Vesper St. Shared Use PathVesper St. Shared Use Path
Vesper St. Shared Use Path
 
Chichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane WalkwayChichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane Walkway
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Quander Road Walkway
Quander Road WalkwayQuander Road Walkway
Quander Road Walkway
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
 
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian ImprovementsElm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
 
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview RoadIntersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
 

Más de Fairfax County

Más de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 

Último

Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
ScottMeyers35
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 

Último (20)

Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
 
Call Girl In Prayagraj Call Girls Service 👉 6378878445 👉 Just📲 Call Ruhi Call...
Call Girl In Prayagraj Call Girls Service 👉 6378878445 👉 Just📲 Call Ruhi Call...Call Girl In Prayagraj Call Girls Service 👉 6378878445 👉 Just📲 Call Ruhi Call...
Call Girl In Prayagraj Call Girls Service 👉 6378878445 👉 Just📲 Call Ruhi Call...
 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
 
Our nurses, our future. The economic power of care.
Our nurses, our future. The economic power of care.Our nurses, our future. The economic power of care.
Our nurses, our future. The economic power of care.
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Premium Prayagraj ❤️🍑 6378878445 👄🫦Independent Escort Service
Premium  Prayagraj ❤️🍑 6378878445 👄🫦Independent Escort ServicePremium  Prayagraj ❤️🍑 6378878445 👄🫦Independent Escort Service
Premium Prayagraj ❤️🍑 6378878445 👄🫦Independent Escort Service
 
Lorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationLorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final Presentation
 
Bhubaneswar Call Girls Chandrashekharpur 👉👉 9777949614 Top Class Call Girl S...
Bhubaneswar Call Girls Chandrashekharpur  👉👉 9777949614 Top Class Call Girl S...Bhubaneswar Call Girls Chandrashekharpur  👉👉 9777949614 Top Class Call Girl S...
Bhubaneswar Call Girls Chandrashekharpur 👉👉 9777949614 Top Class Call Girl S...
 
tOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTRtOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTR
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
 

Lee Highway, U.S. Route 29 Phase III Widening

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Lee Highway, U.S. Route 29 - Phase III Widening Contract No. CN15124101 Project No. 5G25-052-000 Braddock District February 26, 2018
  • 2. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Completed Road Way Lee Highway, U.S. Route 29 - Phase III Widening
  • 3. Project Details Lee Highway, U.S. Route 29 - Phase III Widening Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Description: The Lee Highway, U.S. Route 29 Phase III Widening Project was substantially completed on November 14, 2017. This project consisted of construction of a box culvert extension, concrete sidewalk, asphalt trail, curb & gutter, 24” water line relocation, 8,650 feet of additional asphalt pavement, two Bio-retention Filters, five signalized intersections and other related items. Project Overview: • Additional travel lane north bound on Lee Highway between the intersections with Legato Road and Shirley Gate Road. • Installation of box culvert extension. • Installation of RCP concrete pipe to improve drainage flow Project Team: • Department of Transportation – Brook Khorashadi • Land Acquisition Division – Beth Shubert • Utilities Design and Construction Division (UDCD) – Ben Samiyi • Project Inspector, MBP – Tony Knave
  • 4. Braddock District, Tax Map N. 56-1, 56-2 & 56-3 Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Lee Highway, U.S. Route 29 - Phase III Widening END OF ROAD WIDENING BEGINNING OF ROAD WIDENING
  • 5. Lee Highway, U.S. Route 29 - Phase III Widening Installation of Final Pavement Making & Striping Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 6. Lee Highway, U.S. Route 29 - Phase III Widening Construction of Route 29, Phase III Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 7. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Lee Highway, U.S. Route 29 - Phase III Widening Bio-Retention Media under Construction
  • 8. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Lee Highway, U.S. Route 29 - Phase III Widening Box Culvert Extension under Construction
  • 9. Before After Lee Highway, U.S. Route 29 - Phase III Widening Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 10. Additional Information For additional Information, please call www.fairfaxcounty.gov/dpwes Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Matthew Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.Kaiser@fairfaxcounty.gov