A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Contract No. CN16125154
Project No. SD-000031-149
Braddock District
Tax Map No. 69-4
January 8, 2019
LONG BRANCH TRIBUTARY AT LONG BRANCH FALLS
PARK
Project Details
Long Branch Tributary At Long Branch Falls Park
Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch
Description:
The Long Branch Tributary At Long Branch Falls Park project was substantially completed on
November 20, 2018. This project restored approximately 670 linear feet of stream within the Accotink Creek
watershed. The stream channel was enhanced and stabilized using Natural Channel Design elements. Existing
erosion damage was repaired and future water quality has been improved. The project included: channel
realignment, in-stream rock structures, log structures, constructed wetlands, wood habitat clusters, deer
exclusion fence, removal of invasive plants and the re-establishment of the riparian buffer with native species.
This project will provide pollution reductions of 70 pounds per year of phosphorus, 217 pounds per year of
nitrogen, 325 pounds per year of sediment.
Project Overview:
• Imbricated rock wall to stabilize forested slope
• Protection of an existing waterfall
• Creation of wetland features
• Placement of in-stream habitat rocks
Project Team:
• Project Manager - Shannon Bell, Stormwater Planning Division
• Construction Engineer - Jay Horstman, Utilities Design and Construction Branch (UDCD)
• Construction Inspector - Keith Ferrell, UDCD
Long Branch Tributary At Long Branch Falls Park
Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch
5021 King David Boulevard, Tax Map 69-4
SITE
Long Branch Tributary At Long Branch Falls Park
Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch
Pre-Existing Conditions
Before After
Long Branch Tributary At Long Branch Falls Park
Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch
Before After
Long Branch Tributary At Long Branch Falls Park
Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch
Long Branch Tributary At Long Branch Falls Park
Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch
Final Conditions
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/publicworks
Long Branch Tributary At Long Branch Falls Park
Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch
Matthew Kaiser, Public Information Officer
703-324-8455, TTY 711
Matthew.Kaiser@fairfaxcounty.gov

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015
 
Long Branch Central Watershed Management Area Project Overview October 26, 2020
Long Branch Central Watershed Management Area Project Overview October 26, 2020Long Branch Central Watershed Management Area Project Overview October 26, 2020
Long Branch Central Watershed Management Area Project Overview October 26, 2020
 
Indian Run at Indian Run Court Stream Restoration
Indian Run at Indian Run Court Stream RestorationIndian Run at Indian Run Court Stream Restoration
Indian Run at Indian Run Court Stream Restoration
 
9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream Restoration
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park North
 
Introduction to Biohabitats presentation public meeting number one 02 11-21
Introduction to Biohabitats presentation public meeting number one 02 11-21Introduction to Biohabitats presentation public meeting number one 02 11-21
Introduction to Biohabitats presentation public meeting number one 02 11-21
 
Fairfax County Land Conservation Awards 2016
Fairfax County Land Conservation Awards 2016Fairfax County Land Conservation Awards 2016
Fairfax County Land Conservation Awards 2016
 
Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014
 
Long Branch Central Watershed Management Area 03-03-2021
Long Branch Central Watershed Management Area 03-03-2021Long Branch Central Watershed Management Area 03-03-2021
Long Branch Central Watershed Management Area 03-03-2021
 
Piney Run Public Meeting 1 October 17, 2018
Piney Run Public Meeting 1 October 17, 2018Piney Run Public Meeting 1 October 17, 2018
Piney Run Public Meeting 1 October 17, 2018
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Pohick Creek Tributary Stream Restoration Project
Pohick Creek Tributary Stream Restoration ProjectPohick Creek Tributary Stream Restoration Project
Pohick Creek Tributary Stream Restoration Project
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly Drive
 
Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013
 
Pohick Creek Tributary at Greentree Village Park Stream Restoration
Pohick Creek Tributary at Greentree Village Park Stream RestorationPohick Creek Tributary at Greentree Village Park Stream Restoration
Pohick Creek Tributary at Greentree Village Park Stream Restoration
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency Repair
 
Turkeycock Run at Mason District Park Stream Restoration Project
Turkeycock Run at Mason District Park Stream Restoration ProjectTurkeycock Run at Mason District Park Stream Restoration Project
Turkeycock Run at Mason District Park Stream Restoration Project
 
Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3
Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3
Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3
 

Similar a Long Branch Tributary at Long Branch Falls Park

Similar a Long Branch Tributary at Long Branch Falls Park (20)

Snakeden Branch at Lake Audubon January 2021
Snakeden Branch at Lake Audubon January 2021Snakeden Branch at Lake Audubon January 2021
Snakeden Branch at Lake Audubon January 2021
 
Oakton Community Park Phase 2A
Oakton Community Park Phase 2AOakton Community Park Phase 2A
Oakton Community Park Phase 2A
 
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectAccotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration Project
 
Bull Neck Run at Spring Hill Recreation Center Stream Restoration
Bull Neck Run at Spring Hill Recreation Center Stream RestorationBull Neck Run at Spring Hill Recreation Center Stream Restoration
Bull Neck Run at Spring Hill Recreation Center Stream Restoration
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Rabbit Branch Tributary Restoration Project
Rabbit Branch Tributary Restoration ProjectRabbit Branch Tributary Restoration Project
Rabbit Branch Tributary Restoration Project
 
Flatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFlatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration Project
 
Scotts Run Tributary at Windy Hill Road Stream Stabilization
Scotts Run Tributary at Windy Hill Road Stream StabilizationScotts Run Tributary at Windy Hill Road Stream Stabilization
Scotts Run Tributary at Windy Hill Road Stream Stabilization
 
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFranklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
 
Lake Martin Tributary at Foxwood HOA Stream Restoration
Lake Martin Tributary at Foxwood HOA Stream RestorationLake Martin Tributary at Foxwood HOA Stream Restoration
Lake Martin Tributary at Foxwood HOA Stream Restoration
 
Sutton Oaks Pond Improvements
Sutton Oaks Pond ImprovementsSutton Oaks Pond Improvements
Sutton Oaks Pond Improvements
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream Restoration
 
Hunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream RestorationHunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream Restoration
 
Towlston Meadows Restoration Project
Towlston Meadows Restoration ProjectTowlston Meadows Restoration Project
Towlston Meadows Restoration Project
 
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationPike Branch at Wilton Road Presentation
Pike Branch at Wilton Road Presentation
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Pohick Creek Tributary at Queen Victoria - Stream Restoration
Pohick Creek Tributary at Queen Victoria - Stream RestorationPohick Creek Tributary at Queen Victoria - Stream Restoration
Pohick Creek Tributary at Queen Victoria - Stream Restoration
 
Flatlick Branch III Stream Restoration June 6, 2020
Flatlick Branch III Stream Restoration June 6, 2020Flatlick Branch III Stream Restoration June 6, 2020
Flatlick Branch III Stream Restoration June 6, 2020
 
Substantial completion flatlick branch iii stream restoration
Substantial completion   flatlick branch iii stream restorationSubstantial completion   flatlick branch iii stream restoration
Substantial completion flatlick branch iii stream restoration
 
Barnack Drive Outfall Restoration Project Completion
Barnack Drive Outfall Restoration Project CompletionBarnack Drive Outfall Restoration Project Completion
Barnack Drive Outfall Restoration Project Completion
 

Más de Fairfax County

Más de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 
Reston Fire Station #25
Reston Fire Station #25Reston Fire Station #25
Reston Fire Station #25
 

Último

Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
HyderabadDolls
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
arnab132
 

Último (20)

Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
 
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
 
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterYil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
 
Deforestation
DeforestationDeforestation
Deforestation
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
 

Long Branch Tributary at Long Branch Falls Park

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Contract No. CN16125154 Project No. SD-000031-149 Braddock District Tax Map No. 69-4 January 8, 2019 LONG BRANCH TRIBUTARY AT LONG BRANCH FALLS PARK
  • 2. Project Details Long Branch Tributary At Long Branch Falls Park Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch Description: The Long Branch Tributary At Long Branch Falls Park project was substantially completed on November 20, 2018. This project restored approximately 670 linear feet of stream within the Accotink Creek watershed. The stream channel was enhanced and stabilized using Natural Channel Design elements. Existing erosion damage was repaired and future water quality has been improved. The project included: channel realignment, in-stream rock structures, log structures, constructed wetlands, wood habitat clusters, deer exclusion fence, removal of invasive plants and the re-establishment of the riparian buffer with native species. This project will provide pollution reductions of 70 pounds per year of phosphorus, 217 pounds per year of nitrogen, 325 pounds per year of sediment. Project Overview: • Imbricated rock wall to stabilize forested slope • Protection of an existing waterfall • Creation of wetland features • Placement of in-stream habitat rocks Project Team: • Project Manager - Shannon Bell, Stormwater Planning Division • Construction Engineer - Jay Horstman, Utilities Design and Construction Branch (UDCD) • Construction Inspector - Keith Ferrell, UDCD
  • 3. Long Branch Tributary At Long Branch Falls Park Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch 5021 King David Boulevard, Tax Map 69-4 SITE
  • 4. Long Branch Tributary At Long Branch Falls Park Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch Pre-Existing Conditions
  • 5. Before After Long Branch Tributary At Long Branch Falls Park Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch
  • 6. Before After Long Branch Tributary At Long Branch Falls Park Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch
  • 7. Long Branch Tributary At Long Branch Falls Park Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch Final Conditions
  • 8. Additional Information For additional Information, please call www.fairfaxcounty.gov/publicworks Long Branch Tributary At Long Branch Falls Park Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch Matthew Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.Kaiser@fairfaxcounty.gov