Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Mason Neck Trail - Segment 2B
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Contract No. CN14307297
Project No. ST-000028-002
VDOT Project No. EN98-029-145, PE101, PE102, RW201, C503 Phase 2B
Mount Vernon District
Tax Map Nos. 114-3 & 114-4
SEPTEMBER 26, 2017
MASON NECK TRAIL - SEGMENT 2B
2. MASON NECK TRAIL - SEGMENT 2B
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
3. Project Details
MASON NECK TRAIL - SEGMENT 2B
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Description:
The Mason Neck Trail – Segment 2B project was substantially complete on August 24, 2017. This
project provided approximately 9,900 linear feet of an 8-foot wide asphalt trail along Gunston Road
between Pohick Bay Drive and the entrance to Pohick Bay Golf Course.
Project Overview:
• Approximately 570 linear feet of HR-1 and HR-2 handrails installed for safety considerations.
• Approximately 1,060 linear feet of storm sewer culverts were installed or extended to provide
drainage under the trail or driveway entrances to improve drainage within the vicinity of the
trail.
• Existing driveway entrances within the project limits were replaced with new PE-1 paved
entrances.
Project Team:
• Utilities Design & Construction Division (UDCD) – Andy Royse, Tom Cutler
• Land Acquisition Division – Carol Kresge
• Project Inspection, UDCD – Howard Champ
• Land Survey Branch, UDCD – Greg Harper
• Consultant Inspector, ALPHA Corporation – Don Buckbee
4. MASON NECK TRAIL - SEGMENT 2B
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Mount Vernon District, Tax Map(s)114-3 & 114-4
END OF TRAIL
BEGINNING OF TRAIL
5. MASON NECK TRAIL - SEGMENT 2B
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Construction of Trail & Culvert
6. Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
MASON NECK TRAIL - SEGMENT 2B
Completed Trail & Culvert
7. Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
MASON NECK TRAIL - SEGMENT 2B
Completed Trail
8. Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
MASON NECK TRAIL - SEGMENT 2B
Completed Trail
9. Before After
MASON NECK TRAIL - SEGMENT 2B
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
10. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
MASON NECK TRAIL - SEGMENT 2B
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Matthew Kaiser, Public Information Officer
703-324-8455, TTY 711
Matthew.Kaiser@fairfaxcounty.gov
Notas del editor
Description:
The Mason Neck Trail – Segment 2B project was substantially complete on August 24, 2017. This project provided approximately 9,900 linear feet of an 8-foot wide asphalt trail along Gunston Road between Pohick Bay Drive and the entrance to Pohick Bay Golf Course.