Pike Branch Tributary Ridgeview Park - May 19, 2016
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Pike Branch Tributary
at Ridgeview Park
Stream Restoration Project
May 19, 2016
2. Stormwater Planning Division
Agenda
Brief Review of initial meeting on October 20, 2015
Social Goals
Watershed Planning
Environmental Benefits
Project Goals
Existing Conditions
Concept Design
Next steps
Contact information
2
3. Stormwater Planning Division
Social Goals
1. Maintain open dialog and share information.
2. Coordinate with all the stakeholders and the community.
3. Design Team – Stantec Consulting Services, Park Authority,
Utilities Design and Construction Division, and Stormwater
Planning Division.
3
4. Stormwater Planning Division
Stormwater Program Drivers
• Municipal Separate Storm Sewer Permit (MS-4)
• Chesapeake Bay Total Maximum Daily Loads (TMDL)
– Regulates amount of pollutants in waterways
• Other Local TMDLs
• Maintenance of Existing Facilities
• Dam Regulations
• Public Safety /Emergency Response
– Flooding
– Snow Removal
4
5. Cameron Run Watershed
• 33 sq. mi. in Fairfax County.
• 95% of watershed is
developed with a majority
of development occurring
before implementation of
modern stormwater
facilities.
• Cameron Run discharges
into the Potomac River.
• Project CA9203 in the
Cameron Run Watershed
Management Plan.
5
http://www.fairfaxcounty.gov/dpwes/watersheds/cameronrun.htm
Stormwater Planning Division
7. Stormwater Planning Division
Project Goals
Restore up to 2,800 feet of stream in Ridgeview Park and
surrounding properties
Stabilize streambed and banks
Reduces sediment and nutrient inputs into stream system
Improve habitat for better ecology
Maintain close coordination with stakeholders
7
8. Project Area Limits
8
Fort Hill Dr.
Ridge View Dr.
Duvawn St.
Red Wood Ln.
Approximate limits of disturbance
Stormwater Planning Division
31. What could the project look like after construction?
31Stormwater Planning Division
32. Stormwater Planning Division 32
Next Steps – Schedule
• Completed initial concept review – May 2016
• Refined conceptual design due – June 2016
• Completed permitting (VDOT Land Use, Army Corps of Engineers Nationwide
Permit) – December 2016
• Design Completed – Winter 2017
33. Online Resources
33
Stormwater Planning Division Website
http://www.fairfaxcounty.gov/dpwes/stormwater/
Fairfax County Watershed Planning
http://www.fairfaxcounty.gov/nvswcd/newsletter/planning.htm
Cameron Run Watershed Plan
http://www.fairfaxcounty.gov/dpwes/watersheds/cameronrun.htm
Stormwater Planning Division
34. Stormwater Planning Division
Contact Information
Contact Information
Design
Fred Wilkins – Project Manager
703-324-5189
Fred.Wilkins@fairfaxcounty.gov
Fairfax County Stormwater Planning Division
703-324-5500 TTY 711
12000 Government Center Parkway
Suite 449
Fairfax, Virginia 22035
www.fairfaxcounty.gov/publicworks/stormwater
To request this information in an alternate format call 703-324-5500, TTY 711