SlideShare una empresa de Scribd logo
1 de 43
County of Fairfax, Virginia
1
Reston Network Analysis
2030 Results & Roadway Classifications
March 13, 2017: Advisory Group Meeting
March 17, 2017: Stakeholders Meeting
Kristin Calkins
Fairfax County Department of Transportation
County of Fairfax, Virginia
Agenda
• Study Purpose
• Project Progress Overview
• 2050 Network & Results
• Project Prioritization
• 2030 Network & Results
• Grid of Streets – Roadway Classifications
• Next Steps
• Questions and Answers
2
County of Fairfax, Virginia
Purpose of Study
• Conduct a detailed analysis of the grid of streets
to determine:
– Number of lanes between and at intersections
– How to best serve pedestrians, bikes and transit
– Right-of-way needs
• Assign urban street types and modal emphasis
based on Department of Rail and Public
Transportation Multimodal System Design
Guidelines
• Conduct a phasing analysis to estimate when
larger projects are needed
3
Data
Collection
• Traffic
Counts in
June 2015
• Travel Time
Runs
Existing
Conditions
• Capacity
Analysis
• Level of
Service
Test Grid of
Streets (2030
& 2050)
• Traffic
Forecasting
Capacity
Analysis
• Level of
Service
Mitigation
• Signal re-
timing
• New links
• Turn lanes
• Additional
lanes
Roadway
Classification
• DRPT Design
Guidelines
• Bike lanes
• Sidewalks/
Pedestrian
routes
• On-Street
Parking
• Transit Routes
Finalize Grid of
Streets (2030
& 2050)
Based on:
• Advisory Group
input
• Stakeholder
input
• Community
input
Phasing
Analysis
• Prioritization
of larger
projects
Network Analysis Project Process
Advisory Group input, Stakeholder input, Community input
4
County of Fairfax, Virginia
Level of Service Standard
• LOS E (55 – 80 seconds of average delay for
signalized intersections) is the standard for the
Reston Transit Station Areas
• LOS F (greater than 80 seconds of average delay)
is considered operationally failing
• Greater than 120 seconds of delay is set as a
benchmark for problem locations in the Network
Analysis
• These locations will likely need significant mitigation
measures.
5
County of Fairfax, Virginia
Mitigation Options
• Mitigation Measures - Tiered Approach
– Tier 1: No right of way (ROW) impact
– Tier 2: Some right of way impact
– Tier 3: Large scale mitigations
• Each grid link is initially assumed to be one
lane in each direction (with bike/ped facilities
as specified in the Comprehensive Plan)
6
County of Fairfax, Virginia
2050 Network & Results
7
County of Fairfax, Virginia
2050 (Full Buildout) Network
8
County of Fairfax, Virginia
Full Buildout Network
9
• All grid links are one lane in each direction
• Widening of Fairfax County Parkway to 6 lanes w/ HOV as
lanes 5 & 6
• South Lakes Overpass at Dulles Toll Road
• Soapstone Overpass at Dulles Toll Road
• Town Center Underpass at Dulles Toll Road
• Interchange improvements on Fairfax County Parkway at
– Sunrise Valley Drive
– Spring Street
• Extension of Pinecrest Road
County of Fairfax, Virginia
Full Buildout Network (Cont.)
10
• Widening of Fox Mill Road: Reston Parkway to Monroe Street
• Widening of West Ox Road: Lawyers Road to Centreville
Road
• Loop road through Reston Park & Ride: Reston Parkway to
Lawyers Road
• Rock Hill Road Overpass at DTR
• Extension of McLearen Road: West Ox Road to Reston
Parkway
• Widening of Monroe Street from Fox Mill Road to Town of
Herndon
• Reston Parkway Widening: South Lakes Drive to DTR
County of Fairfax, Virginia
Full buildout Signals
11
26 New Signals
Sunrise Valley Dr. @ Wood Oak Dr. Sunrise Valley Dr. @ Commerce Park Dr. East
Sunrise Valley Dr. @ Colts Brook Dr. Soapstone Overpass @ Indian Ridge Rd. Extension
Frying Pan Rd. @ Greg Roy Ln. Sunset Hills Rd. @ West of Town Center Pkwy.
Monroe St. @ Future Connection to Herndon Metro Town Center Pkwy. @ North of Sunset Hills
Glade Dr. @ Pinecrest Rd. Town Center Pkwy. @ Market St.
South Lakes Dr. @ Pinecrest Rd. Sunset Hills Rd. @ Library St.
Sunrise Valley Dr. @ Pinecrest Rd. Extended Sunset Hills Rd. @ Soapstone Overpass
Sunrise Valley Dr. @ Town Center Pkwy. Sunset Hills Rd. @ East of Soapstone Overpass
Town Center Pkwy. @ North of Sunrise Valley Dr. Sunset Hills Rd. @ South Lakes Overpass
West of Reston Pkwy. with grid street Reston Station Blvd. @ Metro Center Dr.
Sunrise Valley Dr. @ Roland Clarke Place Reston Station Blvd. @ Michael Faraday Dr.
Sunrise Valley Dr. @ Indian Ridge Rd.
Isaac Newton Square S. @ Isaac Newton Square
W.
Sunrise Valley Dr. @ Commerce Park Dr. West Wiehle Ave. @ Isaac Newton Square N.
County of Fairfax, Virginia
Full Buildout Network - Signals
12
County of Fairfax, Virginia
Full Buildout 3rd Tier Problem Locations
(After Tier 3 Mitigation)
13
County of Fairfax, Virginia
Full Buildout Problem Locations
14
Intersections – 120+ Seconds of Delay
Intersections
2050
Unmitigated
After 2050
1st Tier
After 2050
2nd Tier
After 2050
3rd Tier
20 10 7 1*
With Tier 3 mitigations a significant reduction in
the projected number of intersections
experiencing delays in excess of 120 seconds
can be seen.
*Centreville Road & Sunrise Valley Drive: PM 138 seconds in Innovation TSA.
• The intersection was included in the analysis of the Innovation TSA.
There is ongoing evaluation of the improvements at this location.
County of Fairfax, Virginia
Remaining LOS F Intersections
Of the 42 key signalized intersections on the major roadways
in the Reston TSA, only 5 continue to have 80 seconds of
delay or greater after Tier 3 Mitigation.
42 Key Intersections – LOS F
Peak Hour
2050
Unmitigated
After
2050 1st Tier
After
2050 2nd Tier
After
2050 3rd Tier
Total 24 11 9 5
15
County of Fairfax, Virginia
Tier 3 LOS F Intersections
• Fairfax County Parkway at Baron Cameron Avenue
– 100 seconds of delay in the PM
• Reston Parkway at Sunrise Valley Drive
– 92 seconds of delay in the PM
• Reston Parkway at South Lakes Drive
– 95 seconds of delay in the AM
• Reston Parkway at Sunset Hills Road
– 83 seconds of delay in the PM
• Centreville Road at Sunrise Valley Drive
– Innovation TSA
16
County of Fairfax, Virginia
Project Prioritization
17
County of Fairfax, Virginia
Phasing Analysis
18
• Conducted for Existing Conditions and Full Buildout
– AM and PM peak hours
• Showed which projects had the greatest benefit in each
scenario
• Showed hours saved during the peak hours
• Informed how projects were prioritized
County of Fairfax, Virginia
Phasing Analysis Results
19
Improvements Description
2016
Hours
Saved
2050
Hours
Saved
1 Grid of Streets Construct an enhanced grid of streets to increase connectivity 1,216 4,817
2 Town Center
Town Center Parkway Underpass (4 lanes) from Town Center Parkway
and Sunset Hills Road to Sunrise Valley Drive
374 1,322
3 FCP/HOV Widen Fairfax County Parkway: 6 lanes with HOV lane(s) 299 851
4 Soapstone
Soapstone Overpass (3 lanes) across the DTR from Sunset Hills Road
to Sunrise Valley Drive
300 600
5 Sunset Hills
Widen Sunset Hills Road: 6 lanes from Wiehle Ave to Fairfax County Pkwy,
and 4 lanes from Wiehle Ave to Hunter Mill Road
257 478
6 Fox Mill Widen Fox Mill Road: 4 lanes from Reston Parkway to Monroe Street 0 714
7 South Lakes
South Lakes Overpass (4 lanes ) across the DTR from Sunset Hills Road
to Sunrise Valley Drive
240 462
8 FCP/SRV
Grade-separated interchange at Fairfax County Parkway and Sunrise
Valley Drive
184 514
9 Reston Pkwy Widen Reston Parkway: 6 lanes from South Lakes Drive to the DTR 82 313
10 West Ox Widen West Ox Road: 4 lanes from Lawyers Road to Centreville Road -28 253
11 Monroe Widen Monroe Street: 4 lanes from West Ox Road to Town of Herndon 27 154
12 Pinecrest Extend Pinecrest Road from South Lakes Drive to Sunrise Valley Drive 2 118
County of Fairfax, Virginia
Project Prioritization
20
Priority 1
1. Soapstone Overpass
2. Town Center Underpass
3. Reston Parkway Widening
4. Fairfax County Parkway Widening/HOV (from West Ox to the Dulles Toll
Road)
Priority 2
1. Sunrise Valley Drive/Fairfax County Parkway Interchange
2. South Lakes Overpass
3. Fox Mill Widening
Priority 3
1. West Ox Road Widening
2. Monroe Street Widening
3. Pinecrest extension
County of Fairfax, Virginia
2030 Network & Results
21
County of Fairfax, Virginia
Mid Buildout Scenario
22
• 2030 is a representation of the ‘mid buildout’
of the Reston TSAs
• Assumptions about development levels and
improvements were made by the Department
of Planning and Zoning (DPZ)
• Helps staff understand where improvements
may be needed to support a midpoint in
development
County of Fairfax, Virginia
Bid Buildout Improvements
23
• Roadways:
– Soapstone Connector
– Town Center Parkway Underpass
– Reston Parkway – 6 lanes from EB DTR to South
Lakes Drive
• Intersection Modifications:
– Reston Parkway & Sunrise Valley Drive
– Reston Parkway & South Lakes Drive
– Reston Parkway & Baron Cameron Avenue
County of Fairfax, Virginia
Mid Buildout Improvements (Cont.)
24
• New Signals
– Town Center Parkway north of Sunset Hills Road
– New Dominion Parkway and Explorer Street
– Soapstone Connector and Sunset Hills Road
– Reston Station Boulevard Extended and Sunset
Hills Road
– Sunrise Valley Drive and Town Center Parkway
County of Fairfax, Virginia
Mid Buildout Grid
25
County of Fairfax, Virginia
Tier 3 LOS F Intersections
26
• Fairfax County Parkway at Sunrise Valley Drive
– 132 seconds of delay in the AM, ok in PM
• Sunset Hills Road at Town Center Parkway
– 123 seconds of delay in the AM, ok in PM
• Reston Parkway at South Lakes Drive
– 143 seconds of delay in the AM, ok in PM
• Sunrise Valley Drive at Hunter Mill Road
– 121 seconds of delay in the AM, ok in PM
• Sunset Hills Road at Hunter Mill Road
– 87 seconds of delay in the AM, ok in the PM
• Sunrise Valley Drive at Preston White Drive/South Lakes Drive
– 113 seconds of delay in the PM, ok in the AM
County of Fairfax, Virginia
Mid Buildout LOS F Intersections
27
County of Fairfax, Virginia
Mid Buildout LOS F Intersections
Fairfax County Parkway at Sunrise Valley Drive
28
2030 2050
Same geometry as existing conditions. Single Point Urban Interchange and 6
lane widening of Fairfax County Parkway
AM: 132 sec.
PM: 64 sec.
AM: 64 sec.
PM: 53 sec.
County of Fairfax, Virginia
Mid Buildout LOS F Intersections
Town Center Parkway and Sunset Hills Road
29
2030 2050
Sunset Hills Road 4 lanes. Sunset Hills Road 6 lanes.
AM: 123 sec.
PM: 76 sec.
AM: 67 sec.
PM: 61 sec.
County of Fairfax, Virginia
Mid Buildout LOS F Intersections
Reston Parkway at South Lakes Drive
30
2030 2050
AM: 143 sec.
PM: 71 sec.
AM: 95 sec.
PM: 71 sec.
No Fox Mill Widening or Pinecrest
Road Extension
Includes Fox Mill Widening or
Pinecrest Road Extension
County of Fairfax, Virginia
Mid Buildout LOS F Intersections
Sunrise Valley Drive at Hunter Mill Road
31
2030 2050
Sunrise Valley
Drive
HunterMillRoad
AM: 121 sec.
PM: 60 sec.
AM: 39 sec.
PM: 33 sec.
No South Lakes Crossing
HunterMillRoad
Sunrise Valley
Drive
Includes South Lakes Crossing
*The Hunter Mill Road Study has Recommendations influencing this intersection
County of Fairfax, Virginia
Mid Buildout LOS F Intersections
Sunset Hills Road at Hunter Mill Road
32
2030 2050
Sunset Hills Road
HunterMillRoad
AM: 87 sec.
PM: 64 sec.
AM: 71 sec.
PM: 34 sec.
No South Lakes Crossing
HunterMillRoad
Sunset Hills Road
Includes South Lakes Crossing
*The Hunter Mill Road Study has Recommendations influencing this intersection
County of Fairfax, Virginia
Mid Buildout LOS F Intersections
Sunrise Valley Drive at South Lakes Drive
33
2030 2050
AM: 72 sec.
PM: 113 sec.
AM: 64 sec.
PM: 78 sec.
No South Lakes Crossing Includes South Lakes Crossing
To South Lakes
Crossing
County of Fairfax, Virginia
Mid Buildout Scenario Summary
34
• Only seven intersection have issues
• Improvements in place by 2050 will result in
acceptable operations
• County staff will continue to assess
transportation and development in Reston and
will modify recommendations as necessary
County of Fairfax, Virginia
Urban Street Standards
35
County of Fairfax, Virginia
Reston TSAs Full Buildout # of Lanes
36
County of Fairfax, Virginia
Reston TSAs Full Buildout Bike Network
37
County of Fairfax, Virginia
Wiehle TSA – Roadway Classifications
38
County of Fairfax, Virginia
Reston Town Center
TSA – Roadway
Classifications
39
County of Fairfax, Virginia
Herndon TSA – Roadway Classifications
40
County of Fairfax, Virginia
Next Steps
• Community Meeting April (TBD)
• Public Comment
• Documentation
• Final Report Summer 2017
41
County of Fairfax, Virginia
Schedule
42
Task Description
1A Land Use and Networks - Task is Complete
1B Traffic Counts - Task is Complete
2A Establish Existing Conditions - Task is Complete
2B Calibrate Against Existing Conditions - Task is Complete
3A2 Analyze Future Conditions (2050) - Task complete advance
to Tier 3 Mitigation
3A1 Analyze Future Conditions (2030)
3B Simulation of the Dulles Toll Road
4A Meetings/Presentations
5A Phasing Analysis - Existing Conditions- Ths Task is complete
5B Phasing Analysis - 2050 - Optional
6 Determination of DRPT Guidelines Roadway Classification
7 Documentation
8 Reston Parkway Capacity Improvements
9 Fairfax County Parkway & Spring Street Interchange
10 Fairfax County Parkway & Sunrise Valley Drive
11 Rock Hill Bridge at Sunrise Valley Drive
12A Meetings/Presentations
07
3/17
County of Fairfax, Virginia
Questions & Comments
For questions and comments about the study please
contact:
Kristin Calkins: Kristin.Calkins@fairfaxcounty.gov
(703) 877-5710
http://www.fairfaxcounty.gov/fcdot/restonnetworkanalysis/
43

Más contenido relacionado

La actualidad más candente

North Kings Highway (VA 241) Intersection Improvements Study Community Meeting
North Kings Highway (VA 241) Intersection Improvements Study Community MeetingNorth Kings Highway (VA 241) Intersection Improvements Study Community Meeting
North Kings Highway (VA 241) Intersection Improvements Study Community MeetingFairfax County
 
Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Fairfax County
 
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Fairfax County
 
I-66 Beltway to Haymarket - VDOT
 I-66 Beltway to Haymarket - VDOT I-66 Beltway to Haymarket - VDOT
I-66 Beltway to Haymarket - VDOTFairfax County
 
Georgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IVGeorgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IVFairfax County
 
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017Fairfax County
 
Hunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyHunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyFairfax County
 
Route 1 Multimodal Alternative Analysis Status Update
Route 1 Multimodal Alternative Analysis Status UpdateRoute 1 Multimodal Alternative Analysis Status Update
Route 1 Multimodal Alternative Analysis Status UpdateFairfax County
 
Hillside Rd and Greeley Blvd: 2017 VDOT Repaving
Hillside Rd and Greeley Blvd: 2017 VDOT RepavingHillside Rd and Greeley Blvd: 2017 VDOT Repaving
Hillside Rd and Greeley Blvd: 2017 VDOT RepavingFairfax County
 
2017 VDOT Repaving: Rose Hill Drive
2017 VDOT Repaving: Rose Hill Drive2017 VDOT Repaving: Rose Hill Drive
2017 VDOT Repaving: Rose Hill DriveFairfax County
 
Reston Network Analysis: Mid-Buildout Results and Roadway Classifications- Ap...
Reston Network Analysis: Mid-Buildout Results and Roadway Classifications- Ap...Reston Network Analysis: Mid-Buildout Results and Roadway Classifications- Ap...
Reston Network Analysis: Mid-Buildout Results and Roadway Classifications- Ap...Fairfax County
 
Silver Line Phase 1-Status Report: Sept. 2013
Silver Line Phase 1-Status Report: Sept. 2013Silver Line Phase 1-Status Report: Sept. 2013
Silver Line Phase 1-Status Report: Sept. 2013Fairfax County
 
Fairfax County Parkway Corridor Study
Fairfax County Parkway Corridor StudyFairfax County Parkway Corridor Study
Fairfax County Parkway Corridor StudyFairfax County
 
Dulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 UpdateDulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 UpdateFairfax County
 
Fairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public MeetingsFairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public MeetingsFairfax County
 
Snow Removal on Sidewalks
Snow Removal on SidewalksSnow Removal on Sidewalks
Snow Removal on SidewalksFairfax County
 
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Fairfax County
 
Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013Fairfax County
 
Vienna Metro Station Area Bicycle Access Study
Vienna Metro Station Area Bicycle Access StudyVienna Metro Station Area Bicycle Access Study
Vienna Metro Station Area Bicycle Access StudyFairfax County
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Fairfax County
 

La actualidad más candente (20)

North Kings Highway (VA 241) Intersection Improvements Study Community Meeting
North Kings Highway (VA 241) Intersection Improvements Study Community MeetingNorth Kings Highway (VA 241) Intersection Improvements Study Community Meeting
North Kings Highway (VA 241) Intersection Improvements Study Community Meeting
 
Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
 
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
 
I-66 Beltway to Haymarket - VDOT
 I-66 Beltway to Haymarket - VDOT I-66 Beltway to Haymarket - VDOT
I-66 Beltway to Haymarket - VDOT
 
Georgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IVGeorgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IV
 
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
 
Hunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyHunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road Study
 
Route 1 Multimodal Alternative Analysis Status Update
Route 1 Multimodal Alternative Analysis Status UpdateRoute 1 Multimodal Alternative Analysis Status Update
Route 1 Multimodal Alternative Analysis Status Update
 
Hillside Rd and Greeley Blvd: 2017 VDOT Repaving
Hillside Rd and Greeley Blvd: 2017 VDOT RepavingHillside Rd and Greeley Blvd: 2017 VDOT Repaving
Hillside Rd and Greeley Blvd: 2017 VDOT Repaving
 
2017 VDOT Repaving: Rose Hill Drive
2017 VDOT Repaving: Rose Hill Drive2017 VDOT Repaving: Rose Hill Drive
2017 VDOT Repaving: Rose Hill Drive
 
Reston Network Analysis: Mid-Buildout Results and Roadway Classifications- Ap...
Reston Network Analysis: Mid-Buildout Results and Roadway Classifications- Ap...Reston Network Analysis: Mid-Buildout Results and Roadway Classifications- Ap...
Reston Network Analysis: Mid-Buildout Results and Roadway Classifications- Ap...
 
Silver Line Phase 1-Status Report: Sept. 2013
Silver Line Phase 1-Status Report: Sept. 2013Silver Line Phase 1-Status Report: Sept. 2013
Silver Line Phase 1-Status Report: Sept. 2013
 
Fairfax County Parkway Corridor Study
Fairfax County Parkway Corridor StudyFairfax County Parkway Corridor Study
Fairfax County Parkway Corridor Study
 
Dulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 UpdateDulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 Update
 
Fairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public MeetingsFairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public Meetings
 
Snow Removal on Sidewalks
Snow Removal on SidewalksSnow Removal on Sidewalks
Snow Removal on Sidewalks
 
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
 
Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013
 
Vienna Metro Station Area Bicycle Access Study
Vienna Metro Station Area Bicycle Access StudyVienna Metro Station Area Bicycle Access Study
Vienna Metro Station Area Bicycle Access Study
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
 

Destacado

Silver Line Update: Board Transportation Committee: Feb. 7, 2017
Silver Line Update: Board Transportation Committee: Feb. 7, 2017Silver Line Update: Board Transportation Committee: Feb. 7, 2017
Silver Line Update: Board Transportation Committee: Feb. 7, 2017Fairfax County
 
Reston Network Analysis: Existing Conditions
Reston Network Analysis: Existing ConditionsReston Network Analysis: Existing Conditions
Reston Network Analysis: Existing ConditionsFairfax County
 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016Fairfax County
 
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...Fairfax County
 
Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...Fairfax County
 
Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016Fairfax County
 
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016Fairfax County
 
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Fairfax County
 
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia RoadProposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia RoadFairfax County
 
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...Fairfax County
 
Transportation Services Group: Employer Services in Fairfax County
Transportation Services Group: Employer Services in Fairfax CountyTransportation Services Group: Employer Services in Fairfax County
Transportation Services Group: Employer Services in Fairfax CountyFairfax County
 
Fairfax Connector Riders Advisory Committee
Fairfax Connector Riders Advisory CommitteeFairfax Connector Riders Advisory Committee
Fairfax Connector Riders Advisory CommitteeFairfax County
 
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016 Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016 Fairfax County
 
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495Fairfax County
 
Reston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsReston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsFairfax County
 
I-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayI-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayFairfax County
 
Student Free Fare Program
Student Free Fare ProgramStudent Free Fare Program
Student Free Fare ProgramFairfax County
 
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...Fairfax County
 
I-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework DocumentI-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework DocumentFairfax County
 

Destacado (20)

Silver Line Update: Board Transportation Committee: Feb. 7, 2017
Silver Line Update: Board Transportation Committee: Feb. 7, 2017Silver Line Update: Board Transportation Committee: Feb. 7, 2017
Silver Line Update: Board Transportation Committee: Feb. 7, 2017
 
Reston Network Analysis: Existing Conditions
Reston Network Analysis: Existing ConditionsReston Network Analysis: Existing Conditions
Reston Network Analysis: Existing Conditions
 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016
 
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
 
Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...
 
Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016
 
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
 
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
 
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia RoadProposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
 
Protective Helmets
Protective HelmetsProtective Helmets
Protective Helmets
 
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
 
Transportation Services Group: Employer Services in Fairfax County
Transportation Services Group: Employer Services in Fairfax CountyTransportation Services Group: Employer Services in Fairfax County
Transportation Services Group: Employer Services in Fairfax County
 
Fairfax Connector Riders Advisory Committee
Fairfax Connector Riders Advisory CommitteeFairfax Connector Riders Advisory Committee
Fairfax Connector Riders Advisory Committee
 
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016 Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
 
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
 
Reston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsReston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation Results
 
I-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayI-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the Beltway
 
Student Free Fare Program
Student Free Fare ProgramStudent Free Fare Program
Student Free Fare Program
 
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
 
I-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework DocumentI-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework Document
 

Similar a Reston Network Analysis: 2030 Results and Roadway Classifications

Reston Network Analysis: Community Meeting Tier 1 & Tier 2
Reston Network Analysis: Community Meeting Tier 1 & Tier 2Reston Network Analysis: Community Meeting Tier 1 & Tier 2
Reston Network Analysis: Community Meeting Tier 1 & Tier 2Fairfax County
 
Reston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation ResultsReston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation ResultsFairfax County
 
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3Fairfax County
 
Reston Network Analysis Umitigated Results: Jan. 11, 2016
Reston Network Analysis Umitigated Results: Jan. 11, 2016Reston Network Analysis Umitigated Results: Jan. 11, 2016
Reston Network Analysis Umitigated Results: Jan. 11, 2016Fairfax County
 
Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Fairfax County
 
Shirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyShirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyFairfax County
 
Citizens Information Meeting: Sleepy Hollow Road Walkway - April 23, 2018
Citizens Information Meeting: Sleepy Hollow Road Walkway - April 23, 2018Citizens Information Meeting: Sleepy Hollow Road Walkway - April 23, 2018
Citizens Information Meeting: Sleepy Hollow Road Walkway - April 23, 2018Fairfax County
 
FCDOT: Spring 2015 Proposed Service Changes
FCDOT: Spring 2015 Proposed Service ChangesFCDOT: Spring 2015 Proposed Service Changes
FCDOT: Spring 2015 Proposed Service ChangesFairfax County
 
Reston Network Analysis: Stakeholder Kick-off Meeting
Reston Network Analysis: Stakeholder Kick-off Meeting Reston Network Analysis: Stakeholder Kick-off Meeting
Reston Network Analysis: Stakeholder Kick-off Meeting Fairfax County
 
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...Fairfax County
 
Bi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County RoadsBi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County RoadsFairfax County
 
September 2017 Proposed Service Changes
September 2017 Proposed Service ChangesSeptember 2017 Proposed Service Changes
September 2017 Proposed Service ChangesFairfax County
 
Reston Network Analysis: Existing Conditions
Reston Network Analysis: Existing ConditionsReston Network Analysis: Existing Conditions
Reston Network Analysis: Existing ConditionsFairfax County
 
Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...
Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...
Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...Fairfax County
 
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Fairfax County
 
Design Public Hearing Presentation for Wiehle Avenue at W&OD Trail
Design Public Hearing Presentation for Wiehle Avenue at W&OD TrailDesign Public Hearing Presentation for Wiehle Avenue at W&OD Trail
Design Public Hearing Presentation for Wiehle Avenue at W&OD TrailFairfax County
 
Fairfax County Transportation Advisory Commission: Dulles Rail Phase I Bus Se...
Fairfax County Transportation Advisory Commission: Dulles Rail Phase I Bus Se...Fairfax County Transportation Advisory Commission: Dulles Rail Phase I Bus Se...
Fairfax County Transportation Advisory Commission: Dulles Rail Phase I Bus Se...Fairfax County
 
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon DistrictProposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon DistrictFairfax County
 
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...Fairfax County
 
Soapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental AssessmentSoapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental AssessmentFairfax County
 

Similar a Reston Network Analysis: 2030 Results and Roadway Classifications (20)

Reston Network Analysis: Community Meeting Tier 1 & Tier 2
Reston Network Analysis: Community Meeting Tier 1 & Tier 2Reston Network Analysis: Community Meeting Tier 1 & Tier 2
Reston Network Analysis: Community Meeting Tier 1 & Tier 2
 
Reston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation ResultsReston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation Results
 
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
 
Reston Network Analysis Umitigated Results: Jan. 11, 2016
Reston Network Analysis Umitigated Results: Jan. 11, 2016Reston Network Analysis Umitigated Results: Jan. 11, 2016
Reston Network Analysis Umitigated Results: Jan. 11, 2016
 
Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016
 
Shirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyShirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning Study
 
Citizens Information Meeting: Sleepy Hollow Road Walkway - April 23, 2018
Citizens Information Meeting: Sleepy Hollow Road Walkway - April 23, 2018Citizens Information Meeting: Sleepy Hollow Road Walkway - April 23, 2018
Citizens Information Meeting: Sleepy Hollow Road Walkway - April 23, 2018
 
FCDOT: Spring 2015 Proposed Service Changes
FCDOT: Spring 2015 Proposed Service ChangesFCDOT: Spring 2015 Proposed Service Changes
FCDOT: Spring 2015 Proposed Service Changes
 
Reston Network Analysis: Stakeholder Kick-off Meeting
Reston Network Analysis: Stakeholder Kick-off Meeting Reston Network Analysis: Stakeholder Kick-off Meeting
Reston Network Analysis: Stakeholder Kick-off Meeting
 
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
 
Bi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County RoadsBi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County Roads
 
September 2017 Proposed Service Changes
September 2017 Proposed Service ChangesSeptember 2017 Proposed Service Changes
September 2017 Proposed Service Changes
 
Reston Network Analysis: Existing Conditions
Reston Network Analysis: Existing ConditionsReston Network Analysis: Existing Conditions
Reston Network Analysis: Existing Conditions
 
Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...
Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...
Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...
 
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
 
Design Public Hearing Presentation for Wiehle Avenue at W&OD Trail
Design Public Hearing Presentation for Wiehle Avenue at W&OD TrailDesign Public Hearing Presentation for Wiehle Avenue at W&OD Trail
Design Public Hearing Presentation for Wiehle Avenue at W&OD Trail
 
Fairfax County Transportation Advisory Commission: Dulles Rail Phase I Bus Se...
Fairfax County Transportation Advisory Commission: Dulles Rail Phase I Bus Se...Fairfax County Transportation Advisory Commission: Dulles Rail Phase I Bus Se...
Fairfax County Transportation Advisory Commission: Dulles Rail Phase I Bus Se...
 
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon DistrictProposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
 
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
 
Soapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental AssessmentSoapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental Assessment
 

Más de Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Más de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Último

BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...AlexisTorres963861
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxjohnandrewcarlos
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreiebhavenpr
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Pooja Nehwal
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfFahimUddin61
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docxkfjstone13
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Krish109503
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPsychicRuben LoveSpells
 
28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhbhavenpr
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsVashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsPooja Nehwal
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackPsychicRuben LoveSpells
 

Último (20)

BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdf
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsVashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 

Reston Network Analysis: 2030 Results and Roadway Classifications

  • 1. County of Fairfax, Virginia 1 Reston Network Analysis 2030 Results & Roadway Classifications March 13, 2017: Advisory Group Meeting March 17, 2017: Stakeholders Meeting Kristin Calkins Fairfax County Department of Transportation
  • 2. County of Fairfax, Virginia Agenda • Study Purpose • Project Progress Overview • 2050 Network & Results • Project Prioritization • 2030 Network & Results • Grid of Streets – Roadway Classifications • Next Steps • Questions and Answers 2
  • 3. County of Fairfax, Virginia Purpose of Study • Conduct a detailed analysis of the grid of streets to determine: – Number of lanes between and at intersections – How to best serve pedestrians, bikes and transit – Right-of-way needs • Assign urban street types and modal emphasis based on Department of Rail and Public Transportation Multimodal System Design Guidelines • Conduct a phasing analysis to estimate when larger projects are needed 3
  • 4. Data Collection • Traffic Counts in June 2015 • Travel Time Runs Existing Conditions • Capacity Analysis • Level of Service Test Grid of Streets (2030 & 2050) • Traffic Forecasting Capacity Analysis • Level of Service Mitigation • Signal re- timing • New links • Turn lanes • Additional lanes Roadway Classification • DRPT Design Guidelines • Bike lanes • Sidewalks/ Pedestrian routes • On-Street Parking • Transit Routes Finalize Grid of Streets (2030 & 2050) Based on: • Advisory Group input • Stakeholder input • Community input Phasing Analysis • Prioritization of larger projects Network Analysis Project Process Advisory Group input, Stakeholder input, Community input 4
  • 5. County of Fairfax, Virginia Level of Service Standard • LOS E (55 – 80 seconds of average delay for signalized intersections) is the standard for the Reston Transit Station Areas • LOS F (greater than 80 seconds of average delay) is considered operationally failing • Greater than 120 seconds of delay is set as a benchmark for problem locations in the Network Analysis • These locations will likely need significant mitigation measures. 5
  • 6. County of Fairfax, Virginia Mitigation Options • Mitigation Measures - Tiered Approach – Tier 1: No right of way (ROW) impact – Tier 2: Some right of way impact – Tier 3: Large scale mitigations • Each grid link is initially assumed to be one lane in each direction (with bike/ped facilities as specified in the Comprehensive Plan) 6
  • 7. County of Fairfax, Virginia 2050 Network & Results 7
  • 8. County of Fairfax, Virginia 2050 (Full Buildout) Network 8
  • 9. County of Fairfax, Virginia Full Buildout Network 9 • All grid links are one lane in each direction • Widening of Fairfax County Parkway to 6 lanes w/ HOV as lanes 5 & 6 • South Lakes Overpass at Dulles Toll Road • Soapstone Overpass at Dulles Toll Road • Town Center Underpass at Dulles Toll Road • Interchange improvements on Fairfax County Parkway at – Sunrise Valley Drive – Spring Street • Extension of Pinecrest Road
  • 10. County of Fairfax, Virginia Full Buildout Network (Cont.) 10 • Widening of Fox Mill Road: Reston Parkway to Monroe Street • Widening of West Ox Road: Lawyers Road to Centreville Road • Loop road through Reston Park & Ride: Reston Parkway to Lawyers Road • Rock Hill Road Overpass at DTR • Extension of McLearen Road: West Ox Road to Reston Parkway • Widening of Monroe Street from Fox Mill Road to Town of Herndon • Reston Parkway Widening: South Lakes Drive to DTR
  • 11. County of Fairfax, Virginia Full buildout Signals 11 26 New Signals Sunrise Valley Dr. @ Wood Oak Dr. Sunrise Valley Dr. @ Commerce Park Dr. East Sunrise Valley Dr. @ Colts Brook Dr. Soapstone Overpass @ Indian Ridge Rd. Extension Frying Pan Rd. @ Greg Roy Ln. Sunset Hills Rd. @ West of Town Center Pkwy. Monroe St. @ Future Connection to Herndon Metro Town Center Pkwy. @ North of Sunset Hills Glade Dr. @ Pinecrest Rd. Town Center Pkwy. @ Market St. South Lakes Dr. @ Pinecrest Rd. Sunset Hills Rd. @ Library St. Sunrise Valley Dr. @ Pinecrest Rd. Extended Sunset Hills Rd. @ Soapstone Overpass Sunrise Valley Dr. @ Town Center Pkwy. Sunset Hills Rd. @ East of Soapstone Overpass Town Center Pkwy. @ North of Sunrise Valley Dr. Sunset Hills Rd. @ South Lakes Overpass West of Reston Pkwy. with grid street Reston Station Blvd. @ Metro Center Dr. Sunrise Valley Dr. @ Roland Clarke Place Reston Station Blvd. @ Michael Faraday Dr. Sunrise Valley Dr. @ Indian Ridge Rd. Isaac Newton Square S. @ Isaac Newton Square W. Sunrise Valley Dr. @ Commerce Park Dr. West Wiehle Ave. @ Isaac Newton Square N.
  • 12. County of Fairfax, Virginia Full Buildout Network - Signals 12
  • 13. County of Fairfax, Virginia Full Buildout 3rd Tier Problem Locations (After Tier 3 Mitigation) 13
  • 14. County of Fairfax, Virginia Full Buildout Problem Locations 14 Intersections – 120+ Seconds of Delay Intersections 2050 Unmitigated After 2050 1st Tier After 2050 2nd Tier After 2050 3rd Tier 20 10 7 1* With Tier 3 mitigations a significant reduction in the projected number of intersections experiencing delays in excess of 120 seconds can be seen. *Centreville Road & Sunrise Valley Drive: PM 138 seconds in Innovation TSA. • The intersection was included in the analysis of the Innovation TSA. There is ongoing evaluation of the improvements at this location.
  • 15. County of Fairfax, Virginia Remaining LOS F Intersections Of the 42 key signalized intersections on the major roadways in the Reston TSA, only 5 continue to have 80 seconds of delay or greater after Tier 3 Mitigation. 42 Key Intersections – LOS F Peak Hour 2050 Unmitigated After 2050 1st Tier After 2050 2nd Tier After 2050 3rd Tier Total 24 11 9 5 15
  • 16. County of Fairfax, Virginia Tier 3 LOS F Intersections • Fairfax County Parkway at Baron Cameron Avenue – 100 seconds of delay in the PM • Reston Parkway at Sunrise Valley Drive – 92 seconds of delay in the PM • Reston Parkway at South Lakes Drive – 95 seconds of delay in the AM • Reston Parkway at Sunset Hills Road – 83 seconds of delay in the PM • Centreville Road at Sunrise Valley Drive – Innovation TSA 16
  • 17. County of Fairfax, Virginia Project Prioritization 17
  • 18. County of Fairfax, Virginia Phasing Analysis 18 • Conducted for Existing Conditions and Full Buildout – AM and PM peak hours • Showed which projects had the greatest benefit in each scenario • Showed hours saved during the peak hours • Informed how projects were prioritized
  • 19. County of Fairfax, Virginia Phasing Analysis Results 19 Improvements Description 2016 Hours Saved 2050 Hours Saved 1 Grid of Streets Construct an enhanced grid of streets to increase connectivity 1,216 4,817 2 Town Center Town Center Parkway Underpass (4 lanes) from Town Center Parkway and Sunset Hills Road to Sunrise Valley Drive 374 1,322 3 FCP/HOV Widen Fairfax County Parkway: 6 lanes with HOV lane(s) 299 851 4 Soapstone Soapstone Overpass (3 lanes) across the DTR from Sunset Hills Road to Sunrise Valley Drive 300 600 5 Sunset Hills Widen Sunset Hills Road: 6 lanes from Wiehle Ave to Fairfax County Pkwy, and 4 lanes from Wiehle Ave to Hunter Mill Road 257 478 6 Fox Mill Widen Fox Mill Road: 4 lanes from Reston Parkway to Monroe Street 0 714 7 South Lakes South Lakes Overpass (4 lanes ) across the DTR from Sunset Hills Road to Sunrise Valley Drive 240 462 8 FCP/SRV Grade-separated interchange at Fairfax County Parkway and Sunrise Valley Drive 184 514 9 Reston Pkwy Widen Reston Parkway: 6 lanes from South Lakes Drive to the DTR 82 313 10 West Ox Widen West Ox Road: 4 lanes from Lawyers Road to Centreville Road -28 253 11 Monroe Widen Monroe Street: 4 lanes from West Ox Road to Town of Herndon 27 154 12 Pinecrest Extend Pinecrest Road from South Lakes Drive to Sunrise Valley Drive 2 118
  • 20. County of Fairfax, Virginia Project Prioritization 20 Priority 1 1. Soapstone Overpass 2. Town Center Underpass 3. Reston Parkway Widening 4. Fairfax County Parkway Widening/HOV (from West Ox to the Dulles Toll Road) Priority 2 1. Sunrise Valley Drive/Fairfax County Parkway Interchange 2. South Lakes Overpass 3. Fox Mill Widening Priority 3 1. West Ox Road Widening 2. Monroe Street Widening 3. Pinecrest extension
  • 21. County of Fairfax, Virginia 2030 Network & Results 21
  • 22. County of Fairfax, Virginia Mid Buildout Scenario 22 • 2030 is a representation of the ‘mid buildout’ of the Reston TSAs • Assumptions about development levels and improvements were made by the Department of Planning and Zoning (DPZ) • Helps staff understand where improvements may be needed to support a midpoint in development
  • 23. County of Fairfax, Virginia Bid Buildout Improvements 23 • Roadways: – Soapstone Connector – Town Center Parkway Underpass – Reston Parkway – 6 lanes from EB DTR to South Lakes Drive • Intersection Modifications: – Reston Parkway & Sunrise Valley Drive – Reston Parkway & South Lakes Drive – Reston Parkway & Baron Cameron Avenue
  • 24. County of Fairfax, Virginia Mid Buildout Improvements (Cont.) 24 • New Signals – Town Center Parkway north of Sunset Hills Road – New Dominion Parkway and Explorer Street – Soapstone Connector and Sunset Hills Road – Reston Station Boulevard Extended and Sunset Hills Road – Sunrise Valley Drive and Town Center Parkway
  • 25. County of Fairfax, Virginia Mid Buildout Grid 25
  • 26. County of Fairfax, Virginia Tier 3 LOS F Intersections 26 • Fairfax County Parkway at Sunrise Valley Drive – 132 seconds of delay in the AM, ok in PM • Sunset Hills Road at Town Center Parkway – 123 seconds of delay in the AM, ok in PM • Reston Parkway at South Lakes Drive – 143 seconds of delay in the AM, ok in PM • Sunrise Valley Drive at Hunter Mill Road – 121 seconds of delay in the AM, ok in PM • Sunset Hills Road at Hunter Mill Road – 87 seconds of delay in the AM, ok in the PM • Sunrise Valley Drive at Preston White Drive/South Lakes Drive – 113 seconds of delay in the PM, ok in the AM
  • 27. County of Fairfax, Virginia Mid Buildout LOS F Intersections 27
  • 28. County of Fairfax, Virginia Mid Buildout LOS F Intersections Fairfax County Parkway at Sunrise Valley Drive 28 2030 2050 Same geometry as existing conditions. Single Point Urban Interchange and 6 lane widening of Fairfax County Parkway AM: 132 sec. PM: 64 sec. AM: 64 sec. PM: 53 sec.
  • 29. County of Fairfax, Virginia Mid Buildout LOS F Intersections Town Center Parkway and Sunset Hills Road 29 2030 2050 Sunset Hills Road 4 lanes. Sunset Hills Road 6 lanes. AM: 123 sec. PM: 76 sec. AM: 67 sec. PM: 61 sec.
  • 30. County of Fairfax, Virginia Mid Buildout LOS F Intersections Reston Parkway at South Lakes Drive 30 2030 2050 AM: 143 sec. PM: 71 sec. AM: 95 sec. PM: 71 sec. No Fox Mill Widening or Pinecrest Road Extension Includes Fox Mill Widening or Pinecrest Road Extension
  • 31. County of Fairfax, Virginia Mid Buildout LOS F Intersections Sunrise Valley Drive at Hunter Mill Road 31 2030 2050 Sunrise Valley Drive HunterMillRoad AM: 121 sec. PM: 60 sec. AM: 39 sec. PM: 33 sec. No South Lakes Crossing HunterMillRoad Sunrise Valley Drive Includes South Lakes Crossing *The Hunter Mill Road Study has Recommendations influencing this intersection
  • 32. County of Fairfax, Virginia Mid Buildout LOS F Intersections Sunset Hills Road at Hunter Mill Road 32 2030 2050 Sunset Hills Road HunterMillRoad AM: 87 sec. PM: 64 sec. AM: 71 sec. PM: 34 sec. No South Lakes Crossing HunterMillRoad Sunset Hills Road Includes South Lakes Crossing *The Hunter Mill Road Study has Recommendations influencing this intersection
  • 33. County of Fairfax, Virginia Mid Buildout LOS F Intersections Sunrise Valley Drive at South Lakes Drive 33 2030 2050 AM: 72 sec. PM: 113 sec. AM: 64 sec. PM: 78 sec. No South Lakes Crossing Includes South Lakes Crossing To South Lakes Crossing
  • 34. County of Fairfax, Virginia Mid Buildout Scenario Summary 34 • Only seven intersection have issues • Improvements in place by 2050 will result in acceptable operations • County staff will continue to assess transportation and development in Reston and will modify recommendations as necessary
  • 35. County of Fairfax, Virginia Urban Street Standards 35
  • 36. County of Fairfax, Virginia Reston TSAs Full Buildout # of Lanes 36
  • 37. County of Fairfax, Virginia Reston TSAs Full Buildout Bike Network 37
  • 38. County of Fairfax, Virginia Wiehle TSA – Roadway Classifications 38
  • 39. County of Fairfax, Virginia Reston Town Center TSA – Roadway Classifications 39
  • 40. County of Fairfax, Virginia Herndon TSA – Roadway Classifications 40
  • 41. County of Fairfax, Virginia Next Steps • Community Meeting April (TBD) • Public Comment • Documentation • Final Report Summer 2017 41
  • 42. County of Fairfax, Virginia Schedule 42 Task Description 1A Land Use and Networks - Task is Complete 1B Traffic Counts - Task is Complete 2A Establish Existing Conditions - Task is Complete 2B Calibrate Against Existing Conditions - Task is Complete 3A2 Analyze Future Conditions (2050) - Task complete advance to Tier 3 Mitigation 3A1 Analyze Future Conditions (2030) 3B Simulation of the Dulles Toll Road 4A Meetings/Presentations 5A Phasing Analysis - Existing Conditions- Ths Task is complete 5B Phasing Analysis - 2050 - Optional 6 Determination of DRPT Guidelines Roadway Classification 7 Documentation 8 Reston Parkway Capacity Improvements 9 Fairfax County Parkway & Spring Street Interchange 10 Fairfax County Parkway & Sunrise Valley Drive 11 Rock Hill Bridge at Sunrise Valley Drive 12A Meetings/Presentations 07 3/17
  • 43. County of Fairfax, Virginia Questions & Comments For questions and comments about the study please contact: Kristin Calkins: Kristin.Calkins@fairfaxcounty.gov (703) 877-5710 http://www.fairfaxcounty.gov/fcdot/restonnetworkanalysis/ 43