8. Industrial & Commercial Transfer Switches Open and Closed Transition Bypass Isolation Available 100 - 2600 Amps Available in NEMA 1, 12, 3R, 4 and 4X (stainless or fiberglass) configurations
9. Waukesha Manufacturing Plant 265,000 ft 2 (24,600 m 2 ) on a 61 acre (24.7 ha) site Corporate Headquarters and Water-cooled Genset Production
10. Eagle Manufacturing Plant 240,000 ft 2 (22,300 M 2 ) on a 20 acre (8.1ha) Site Metal Fabrication and Water-cooled Genset Final Assembly 2003 - Added 6,000 ft 2 Training Center
11. Whitewater Manufacturing Plant 135,000 ft 2 (12,500m 2 ) on a 20 acre (8.1ha) site Recently expanded to over 285,000 ft 2