SlideShare una empresa de Scribd logo
1 de 28
Role of HOST ENTITY in GCDP
Ensuring AIESEC
Support to EP
including
accommodation,
support, logistics,
travel etc!
JD Alignment
between EP and the
project/NGO along
with the right
expectation setting
Effective
Integration of EP
into the city,
culture etc!
START UP LC
0-10 Realisations LCVP Comm/
Marketing
Member 1 Member 2
KPI:
• Number of EP’s Raised
(that fit the right Matchable EP Profiles)
• # of Leads/ Registrations from each strategy
• Increased Conversation Rate from Sign up to Raise
NOTE:
• Marketing team has 1-3 members (including LCVP)
• Marketing Team needs to focus on establishing their
market penetration for just 1 Programme
(oGIP/oGCDP) and just 1-2 Sub-products/ Issues
under this programme
10 to 40
Realisations
30 to 70+
Raised
50 to 150+
Sign ups
(Ideally, Sign up to
Raise Conversion rate
is greater than 30%)
Sample Backwards Planning:
This means that recruitment
activities must be focused
enough to get this number of
registrations from the right
target market
Based on Statistics, how
many Raises do you nee to
get this many
realisations?
Based on Statistics, how
many Sign-ups do you nee
to get this many raises?
STARTHERE
WHY?
Right
number of
People to
Deliver high
volume QUALITY
Experiences
Clear JD
and KPI for
members working
on delivery
Growing in Exchange means
we NEED to have enough
People to MANAGE
experiences for high quality.
This is the most important!
HOW?
STEP 1:
Plan for Capacity
for Quality
STEP 2:
Structure, JD and
KPI in different LC
Volumes in iGIP
STEP 1: Plan for Capacity for Summer
Use the TM Planning tool to plan
iGCDP
STEP 1: Plan for Capacity for Summer
Here enter
number of
interns/EPs one
member can
deliver Eg: 1
member – 3 EPs
iGCDP
STEP 1: Plan for Capacity for Summer
That number from
slide 2 will multiply
with Re goal you enter
for the quarter so you
know how many
members are needed
for delivery in each
programme
iGCDP
GCDP Clustering for LC
iGCDP
Beginner 0-25 X RE
Intermediate 25-100 X RE
Advanced 100-200 X RE
Mature +200 X RE
STEP 2: Create structures for quality delivery
Structures by
Volume of
Realizations the LC
does
Customize your
structures for the
fruit peak if needed
STEP 2: An LC that has planned between 0-25 in 2014
Basic Consideration:
• As start up, LC manage the basic process of iGCDP
delivery
• There is no need to manage iGCDP as a project yet -
in general experience delivery will be TN based
• Member Efficiency: 0-4 X / member
Number of members: Use TM Planning tool to determine
Job Description:
• Selling and raising, matching, and realizing
• Incoming preparation seminar
• Experience Co-delivery
VP
Member Member Member
∞
Ra-Ma-Re
STEP 2: An LC that has planned between 0-25 in 2014
JD for Delivery
0 Supporting Eps through the match process (especially for visa) and at realization
0 Delivery through fulfilling all exchange minimums
0 Very important: Airport pick up, Logistics, Supporting Accommodation of EPs , Integration of EPs, Ensuring alignment
between EP and company
0 FAST firefighting on NPS in case of any EP issues/complaints
0 Showcasing promoter EP stories
0 During sales process ensure there is clear understanding of JD so that there is no issue in JD alignment at the realized
stage
Recommendation: Even though most detractor issues/comments are at
realized stage, by taking the right actions (through the right JD) during raise
and match, the level of issues at the realized stage can be decreased!
STEP 2: KPI within the structure
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
For a Team - % of Promoters/Total Realizations of the team
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC
STEP 2: An LC that has planned between 25-100 in 2014
VP
OCP OCP OCP
∞
Ra-Ma-Re
∞
Ra-Ma-Re
∞
Ra-Ma-Re
Number of members: Use TM Planning framework
Job Description:
• Selling and raising, matching, and realizing
• Project concept development and execution
• Incoming preparation seminar
• Experience Co-delivery (country-country partnership management)
• LCs have more capacity in project management
• Project concept will be centralized Nationally
(National project implementation in LCs)
• Start to have the needs of event/project
management
STEP 2: JD within the structure
JD of Delivery members in the team
During Raising period During Matching period During Realization
• Ensure clear and high
quality JD in a specific
issue segment and for a
specific national project
• Clear expectation
setting with NGO about
role of EP, salary etc.
• Visa Support (The key
issue is Eps want MORE
and ACCURATE
information about the
process and documents
related to visa)
• As soon as matches are
confirmed start working
on accommodation
• By now accommodation
should be confirmed and
ready
• Arrange for EP Pick up
and integration into the
LC and city
• Trainee Buddy assigned
for EP
STEP 2: JD within the structure
JD of Delivery members in the team
Who is a trainee buddy? – An LC member (doesn’t need to be
only from the iGIP team) who is responsible for meeting and
communicating with the EP regularly, who support the delivery
team in the EP Pick up, integration etc
Having trainee buddy makes the job of a delivery team simpler
and also allows members to have a great experience interacting
with Eps
At this stage, make sure you are firefighting fast on NPS incase
EP has a comment/issue
During Realization
• By now accommodation
should be confirmed and
ready
• Arrange for EP Pick up
and integration into the
LC and city
• Trainee Buddy assigned
for EP
• Induction meeting with
EP and company
STEP 2: JD within the structure
Synergy of members in the team
- Since each team is working on projects and is responsible
for the whole exchange process, the synergy between the 3
teams and members within the team has to be very good:
1. Each member is responsible for the right raise and
expectation setting with NGO
2. There is/are specific member working on ensuring the visa
information and process
3. There are 2-3 members working on accommodation while
the others are working on airport pick up, logistics, trainee
buddy etc.
Each member is
responsible for
his/her raised and
matched EPs
Big tasks needed
for all Eps like
accommodation etc
are done by specific
members
STEP 2: KPI within the structure for delivery members in the
team
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC
STEP 2: Ideal duration of teams
Makes sense for teams
to be for 3-4 months –
This gives members
time to deliver the
Realization effectively
It is important to MAKE
SURE that once the
team duration ends the
same members are
communicating and
supporting Eps and this
is still part of their role
iGCDP EPs generally are in the LC for 6-8 weeks so even if a members term
ends, he/she can continue being responsible for his/her realization
STEP 2: An LC that has planned between 100-200 in 2014
VP
OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local)
Number of members: Use TM Planning Framework
Job Description:
• Selling and raising, matching, and realizing
• Project concept development and execution
• Project brand management
• Incoming preparation seminar
• Experience Co-delivery (LC-LC partnership management)
Basic Consideration:
• LC is considered to have the capacity in
understanding Project management concept
and put into implementation
• LC has capacity in innovate a project based
on issue
• Member Efficiency: 4-6 X /member
STEP 2: JD within the structure
JD of Delivery members in the team
• The JD is very similar to LCs doing 25-100
The 2 key differences are:
1. Since the volume is more in this case, LC can start working on outsourcing some
services to make processes more efficient
2. This LC structure is working on local projects as well as national projects
implementation so make sure the local project delivery is very well planned
STEP 2: JD within the structure
JD of Delivery members in the team
During Raising period During Matching period During Realization
• Ensure clear and high
quality JD in a specific
issue segment and for a
specific national project
• Clear expectation
setting with NGO about
role of EP, salary etc.
• Visa Support (The key
issue is Eps want MORE
and ACCURATE
information about the
process and documents
related to visa)
• As soon as matches are
confirmed start working
on accommodation
• By now accommodation
should be confirmed and
ready
• Arrange for EP Pick up
and integration into the
LC and city
• Trainee Buddy assigned
for EP
STEP 2: JD within the structure
JD of Delivery members in the team
Who is a trainee buddy? – An LC member (doesn’t need to be
only from the iGIP team) who is responsible for meeting and
communicating with the EP regularly, who support the delivery
team in the EP Pick up, integration etc
Having trainee buddy makes the job of a delivery team simpler
and also allows members to have a great experience interacting
with Eps
At this stage, make sure you are firefighting fast on NPS incase
EP has a comment/issue
During Realization
• By now accommodation
should be confirmed and
ready
• Arrange for EP Pick up
and integration into the
LC and city
• Trainee Buddy assigned
for EP
• Induction meeting with
EP and company
STEP 2: An LC that has planned 200+ in 2014
VP
OCP OCP OCP OCP Mid. Manager
• With high volume of iGCDP delivery, Project team need to be
really focus on Customer experience
• Prevent the tendency of non- innovative JDs
• Account management and Customer loyalty for Organization
management (TN Takers, Learning partners, etc)
• Multi stakeholders and another level of accommodation
management
• Every team does all Raise – Match – Realize process (5-
6 members)
• Full responsibility in managing Inner-Outer journey of
EP
• Have other separate team/person managing
stakeholders or other process outside exchange
process delivery
• Example JD for Middle Management person:
• Customer Loyalty for Organization (partner
relation management)
• Accommodation management (home stay
program)
VP
OCP OCP OCP OCP Mid. Manager
STEP 2: An LC that has planned 200+ in 2014
STEP 2: JD within the structure
The middle manager in the structure and his/her team manage EXPERIENCE DELIVERY
Middle Manager and team
Account
Managers
- Market research
- Selling and marketing
- CRM
- Re-Raising
Hosting
- Managing “Hosting
Program” Product
- Managing Allocation
Process to
accommodation and
host families
- Managing EP
Reception and
Accommodation
STEP 2: JD within the structure
0 The OCP teams are very involved with EP Preparation (virtually), EP Integration into
project and delivery of inner-outer journey but the Middle manager team is focused on
accommodation, host family (Hosting Programme Product) and Reception activities –
this is the division of JD between both teams
0 This means there has to be good synergy between teams and alignment of exchange
timeline
0 In case of high volume LCs, it is important for the whole LC to support EP Integration and
EP Reception to deliver high quality experiences!
STEP 2: KPI within the structure for delivery members in the
team
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC

Más contenido relacionado

La actualidad más candente

GCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issueGCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issueFirnando Buenayre
 
APM Registered Project Professional: what you need to know by Peter Wakeling,...
APM Registered Project Professional: what you need to know by Peter Wakeling,...APM Registered Project Professional: what you need to know by Peter Wakeling,...
APM Registered Project Professional: what you need to know by Peter Wakeling,...Association for Project Management
 
Carol Bell APM Registered Project Professional presentation 25th June 2015 to...
Carol Bell APM Registered Project Professional presentation 25th June 2015 to...Carol Bell APM Registered Project Professional presentation 25th June 2015 to...
Carol Bell APM Registered Project Professional presentation 25th June 2015 to...Association for Project Management
 
AIESEC WAT PHNOM Internal Recruitment
AIESEC WAT PHNOM Internal Recruitment AIESEC WAT PHNOM Internal Recruitment
AIESEC WAT PHNOM Internal Recruitment Bun Socheata
 
AIESEC | Italy 1415| MC | OD for LCPs
AIESEC | Italy 1415| MC | OD for LCPsAIESEC | Italy 1415| MC | OD for LCPs
AIESEC | Italy 1415| MC | OD for LCPsGuiscardo Urso
 

La actualidad más candente (8)

GCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issueGCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issue
 
APM Registered Project Professional: what you need to know by Peter Wakeling,...
APM Registered Project Professional: what you need to know by Peter Wakeling,...APM Registered Project Professional: what you need to know by Peter Wakeling,...
APM Registered Project Professional: what you need to know by Peter Wakeling,...
 
APM Registered Project Professional
APM Registered Project ProfessionalAPM Registered Project Professional
APM Registered Project Professional
 
RPP presentation by Emma Carroll-Walsh on 20th October 2016
RPP presentation by Emma Carroll-Walsh on 20th October 2016RPP presentation by Emma Carroll-Walsh on 20th October 2016
RPP presentation by Emma Carroll-Walsh on 20th October 2016
 
Carol Bell APM Registered Project Professional presentation 25th June 2015 to...
Carol Bell APM Registered Project Professional presentation 25th June 2015 to...Carol Bell APM Registered Project Professional presentation 25th June 2015 to...
Carol Bell APM Registered Project Professional presentation 25th June 2015 to...
 
Plusxp training
Plusxp trainingPlusxp training
Plusxp training
 
AIESEC WAT PHNOM Internal Recruitment
AIESEC WAT PHNOM Internal Recruitment AIESEC WAT PHNOM Internal Recruitment
AIESEC WAT PHNOM Internal Recruitment
 
AIESEC | Italy 1415| MC | OD for LCPs
AIESEC | Italy 1415| MC | OD for LCPsAIESEC | Italy 1415| MC | OD for LCPs
AIESEC | Italy 1415| MC | OD for LCPs
 

Destacado

Cultural Intelligence _CQ
Cultural Intelligence _CQCultural Intelligence _CQ
Cultural Intelligence _CQphyowai44
 
Five Steps to a world class onboarding program presentation
Five Steps to a world class onboarding program presentationFive Steps to a world class onboarding program presentation
Five Steps to a world class onboarding program presentationEmilyBennington
 
A journey from a bad kpi to an excellent strategy
A journey from a bad kpi to an excellent strategyA journey from a bad kpi to an excellent strategy
A journey from a bad kpi to an excellent strategyAleksey Savkin
 
Induction and Orientation
Induction and OrientationInduction and Orientation
Induction and OrientationRahul Kantak
 
Induction and orientation in HRM
Induction and orientation in HRMInduction and orientation in HRM
Induction and orientation in HRMRajath Kashyap
 
Employee Orientation Ppt Final
Employee Orientation Ppt FinalEmployee Orientation Ppt Final
Employee Orientation Ppt FinalShruthi Choudary
 
KPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRKPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRYodhia Antariksa
 
New employee onboarding
New employee onboardingNew employee onboarding
New employee onboardingWilliam Chin
 
Organizational culture
Organizational cultureOrganizational culture
Organizational cultureTaufik Bintang
 
Political Development of the Philippine Government
Political Development of the Philippine GovernmentPolitical Development of the Philippine Government
Political Development of the Philippine GovernmentJheng Reyes
 
4 Critical Elements of Your Onboarding Process
4 Critical Elements of Your Onboarding Process4 Critical Elements of Your Onboarding Process
4 Critical Elements of Your Onboarding ProcessUrbanBound
 
KEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATORKEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATORspeedcars
 

Destacado (16)

On Boarding Ppt
On Boarding PptOn Boarding Ppt
On Boarding Ppt
 
Cultural Intelligence _CQ
Cultural Intelligence _CQCultural Intelligence _CQ
Cultural Intelligence _CQ
 
Five Steps to a world class onboarding program presentation
Five Steps to a world class onboarding program presentationFive Steps to a world class onboarding program presentation
Five Steps to a world class onboarding program presentation
 
A journey from a bad kpi to an excellent strategy
A journey from a bad kpi to an excellent strategyA journey from a bad kpi to an excellent strategy
A journey from a bad kpi to an excellent strategy
 
Induction and Orientation
Induction and OrientationInduction and Orientation
Induction and Orientation
 
Induction and Orientation
Induction and OrientationInduction and Orientation
Induction and Orientation
 
Employee Induction[1]
Employee Induction[1]Employee Induction[1]
Employee Induction[1]
 
Induction and orientation in HRM
Induction and orientation in HRMInduction and orientation in HRM
Induction and orientation in HRM
 
Employee Orientation Ppt Final
Employee Orientation Ppt FinalEmployee Orientation Ppt Final
Employee Orientation Ppt Final
 
KPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRKPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HR
 
New employee onboarding
New employee onboardingNew employee onboarding
New employee onboarding
 
Organizational culture
Organizational cultureOrganizational culture
Organizational culture
 
Political Development of the Philippine Government
Political Development of the Philippine GovernmentPolitical Development of the Philippine Government
Political Development of the Philippine Government
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIs
 
4 Critical Elements of Your Onboarding Process
4 Critical Elements of Your Onboarding Process4 Critical Elements of Your Onboarding Process
4 Critical Elements of Your Onboarding Process
 
KEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATORKEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATOR
 

Similar a iGCDP Quality Capacity

Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP AIESEC
 
oGCDP Capacity Quality Delivery
oGCDP Capacity Quality DeliveryoGCDP Capacity Quality Delivery
oGCDP Capacity Quality DeliveryFirnando Buenayre
 
oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences AIESEC
 
iGIP capacity for Quality Delivery
iGIP capacity for Quality DeliveryiGIP capacity for Quality Delivery
iGIP capacity for Quality DeliveryFirnando Buenayre
 
Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1AIESEC
 
Structures and learning oGCDP Tier 3
Structures and learning oGCDP Tier 3Structures and learning oGCDP Tier 3
Structures and learning oGCDP Tier 3AIESEC
 
oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyAIESEC
 
oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DAIESEC
 
Tier 1 oGCDP Structures for peak and off-peak management
Tier 1 oGCDP Structures for peak and off-peak managementTier 1 oGCDP Structures for peak and off-peak management
Tier 1 oGCDP Structures for peak and off-peak managementAIESEC
 
Codelivery strategy
Codelivery strategyCodelivery strategy
Codelivery strategyPaulo Cortez
 
GCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueGCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueFirnando Buenayre
 
AIESEC Vietnam | Talent planning for dummies
AIESEC Vietnam | Talent planning for dummiesAIESEC Vietnam | Talent planning for dummies
AIESEC Vietnam | Talent planning for dummiesAmy Phan
 
oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementAIESEC
 
Tier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementTier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementAIESEC
 
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4AIESEC
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationAIESEC
 
National project OCP|OC information and application booklet
National project OCP|OC information and application bookletNational project OCP|OC information and application booklet
National project OCP|OC information and application bookletAnastasiia Isakii
 

Similar a iGCDP Quality Capacity (20)

Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP
 
oGCDP Capacity Quality Delivery
oGCDP Capacity Quality DeliveryoGCDP Capacity Quality Delivery
oGCDP Capacity Quality Delivery
 
oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences
 
iGIP capacity for Quality Delivery
iGIP capacity for Quality DeliveryiGIP capacity for Quality Delivery
iGIP capacity for Quality Delivery
 
Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1
 
Structures and learning oGCDP Tier 3
Structures and learning oGCDP Tier 3Structures and learning oGCDP Tier 3
Structures and learning oGCDP Tier 3
 
oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergy
 
oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&D
 
Tier 1 oGCDP Structures for peak and off-peak management
Tier 1 oGCDP Structures for peak and off-peak managementTier 1 oGCDP Structures for peak and off-peak management
Tier 1 oGCDP Structures for peak and off-peak management
 
TD Area Plan
TD Area PlanTD Area Plan
TD Area Plan
 
Codelivery strategy
Codelivery strategyCodelivery strategy
Codelivery strategy
 
GCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueGCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issue
 
AIESEC Vietnam | Talent planning for dummies
AIESEC Vietnam | Talent planning for dummiesAIESEC Vietnam | Talent planning for dummies
AIESEC Vietnam | Talent planning for dummies
 
oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline Management
 
Tier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementTier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline Management
 
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4
 
TM Structures
TM StructuresTM Structures
TM Structures
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementation
 
Excel: AIESEC India
Excel: AIESEC IndiaExcel: AIESEC India
Excel: AIESEC India
 
National project OCP|OC information and application booklet
National project OCP|OC information and application bookletNational project OCP|OC information and application booklet
National project OCP|OC information and application booklet
 

Más de Firnando Buenayre

HARA - Global & Transparent Blockchain-based Data Exchange
HARA - Global & Transparent Blockchain-based Data Exchange HARA - Global & Transparent Blockchain-based Data Exchange
HARA - Global & Transparent Blockchain-based Data Exchange Firnando Buenayre
 
GCDP Quality Strategy - Communication Issue
GCDP Quality Strategy - Communication IssueGCDP Quality Strategy - Communication Issue
GCDP Quality Strategy - Communication IssueFirnando Buenayre
 
Balance GCDP and GIP for Quality Delivery
Balance GCDP and GIP for Quality DeliveryBalance GCDP and GIP for Quality Delivery
Balance GCDP and GIP for Quality DeliveryFirnando Buenayre
 
L&D for quality experience delivery
L&D for quality experience deliveryL&D for quality experience delivery
L&D for quality experience deliveryFirnando Buenayre
 
GIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration IssueGIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration IssueFirnando Buenayre
 
GIP Quality Strategy - Accommodation Issue
GIP Quality Strategy - Accommodation IssueGIP Quality Strategy - Accommodation Issue
GIP Quality Strategy - Accommodation IssueFirnando Buenayre
 
GIP Quality Strategy - Job Description Clarity Issue
GIP Quality Strategy - Job Description Clarity IssueGIP Quality Strategy - Job Description Clarity Issue
GIP Quality Strategy - Job Description Clarity IssueFirnando Buenayre
 
IGN regional s&d GCDP 1-15 May 2014
IGN regional s&d GCDP 1-15 May 2014IGN regional s&d GCDP 1-15 May 2014
IGN regional s&d GCDP 1-15 May 2014Firnando Buenayre
 
AP regional s&d GCDP 1-15 May 2014
AP regional s&d GCDP 1-15 May 2014AP regional s&d GCDP 1-15 May 2014
AP regional s&d GCDP 1-15 May 2014Firnando Buenayre
 
Role of MC in TM Driving Quality Delivery
Role of MC in TM Driving Quality DeliveryRole of MC in TM Driving Quality Delivery
Role of MC in TM Driving Quality DeliveryFirnando Buenayre
 
Talent Capacity in Quality Delivery Introduction
Talent Capacity in Quality Delivery IntroductionTalent Capacity in Quality Delivery Introduction
Talent Capacity in Quality Delivery IntroductionFirnando Buenayre
 
Nps goal setting yearly quarterly - monthly
Nps goal setting yearly   quarterly - monthlyNps goal setting yearly   quarterly - monthly
Nps goal setting yearly quarterly - monthlyFirnando Buenayre
 
Nps goal setting let's get it started!
Nps goal setting   let's get it started!Nps goal setting   let's get it started!
Nps goal setting let's get it started!Firnando Buenayre
 

Más de Firnando Buenayre (19)

HARA - Global & Transparent Blockchain-based Data Exchange
HARA - Global & Transparent Blockchain-based Data Exchange HARA - Global & Transparent Blockchain-based Data Exchange
HARA - Global & Transparent Blockchain-based Data Exchange
 
GCDP Quality Strategy - Communication Issue
GCDP Quality Strategy - Communication IssueGCDP Quality Strategy - Communication Issue
GCDP Quality Strategy - Communication Issue
 
Balance GCDP and GIP for Quality Delivery
Balance GCDP and GIP for Quality DeliveryBalance GCDP and GIP for Quality Delivery
Balance GCDP and GIP for Quality Delivery
 
L&D for quality experience delivery
L&D for quality experience deliveryL&D for quality experience delivery
L&D for quality experience delivery
 
GIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration IssueGIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration Issue
 
GIP Quality Strategy - Accommodation Issue
GIP Quality Strategy - Accommodation IssueGIP Quality Strategy - Accommodation Issue
GIP Quality Strategy - Accommodation Issue
 
GIP Quality Strategy - Job Description Clarity Issue
GIP Quality Strategy - Job Description Clarity IssueGIP Quality Strategy - Job Description Clarity Issue
GIP Quality Strategy - Job Description Clarity Issue
 
GCDP GIP strategy intro
GCDP GIP strategy introGCDP GIP strategy intro
GCDP GIP strategy intro
 
IGN S&D GIP 1-15 May 2014
IGN S&D GIP 1-15 May 2014IGN S&D GIP 1-15 May 2014
IGN S&D GIP 1-15 May 2014
 
AP S&D GIP 1-15 May 2014
AP S&D GIP 1-15 May 2014AP S&D GIP 1-15 May 2014
AP S&D GIP 1-15 May 2014
 
WENA S&D GCDP 1-15 May 2014
WENA S&D GCDP 1-15 May 2014WENA S&D GCDP 1-15 May 2014
WENA S&D GCDP 1-15 May 2014
 
IGN regional s&d GCDP 1-15 May 2014
IGN regional s&d GCDP 1-15 May 2014IGN regional s&d GCDP 1-15 May 2014
IGN regional s&d GCDP 1-15 May 2014
 
AP regional s&d GCDP 1-15 May 2014
AP regional s&d GCDP 1-15 May 2014AP regional s&d GCDP 1-15 May 2014
AP regional s&d GCDP 1-15 May 2014
 
WENA S&D GIP 1-15 May 2014
WENA S&D GIP 1-15 May 2014WENA S&D GIP 1-15 May 2014
WENA S&D GIP 1-15 May 2014
 
Role of MC in TM Driving Quality Delivery
Role of MC in TM Driving Quality DeliveryRole of MC in TM Driving Quality Delivery
Role of MC in TM Driving Quality Delivery
 
Talent Capacity in Quality Delivery Introduction
Talent Capacity in Quality Delivery IntroductionTalent Capacity in Quality Delivery Introduction
Talent Capacity in Quality Delivery Introduction
 
Quality Planning
Quality PlanningQuality Planning
Quality Planning
 
Nps goal setting yearly quarterly - monthly
Nps goal setting yearly   quarterly - monthlyNps goal setting yearly   quarterly - monthly
Nps goal setting yearly quarterly - monthly
 
Nps goal setting let's get it started!
Nps goal setting   let's get it started!Nps goal setting   let's get it started!
Nps goal setting let's get it started!
 

Último

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 

Último (20)

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 

iGCDP Quality Capacity

  • 1.
  • 2. Role of HOST ENTITY in GCDP Ensuring AIESEC Support to EP including accommodation, support, logistics, travel etc! JD Alignment between EP and the project/NGO along with the right expectation setting Effective Integration of EP into the city, culture etc!
  • 3. START UP LC 0-10 Realisations LCVP Comm/ Marketing Member 1 Member 2 KPI: • Number of EP’s Raised (that fit the right Matchable EP Profiles) • # of Leads/ Registrations from each strategy • Increased Conversation Rate from Sign up to Raise NOTE: • Marketing team has 1-3 members (including LCVP) • Marketing Team needs to focus on establishing their market penetration for just 1 Programme (oGIP/oGCDP) and just 1-2 Sub-products/ Issues under this programme 10 to 40 Realisations 30 to 70+ Raised 50 to 150+ Sign ups (Ideally, Sign up to Raise Conversion rate is greater than 30%) Sample Backwards Planning: This means that recruitment activities must be focused enough to get this number of registrations from the right target market Based on Statistics, how many Raises do you nee to get this many realisations? Based on Statistics, how many Sign-ups do you nee to get this many raises? STARTHERE
  • 4. WHY? Right number of People to Deliver high volume QUALITY Experiences Clear JD and KPI for members working on delivery Growing in Exchange means we NEED to have enough People to MANAGE experiences for high quality. This is the most important!
  • 5. HOW? STEP 1: Plan for Capacity for Quality STEP 2: Structure, JD and KPI in different LC Volumes in iGIP
  • 6. STEP 1: Plan for Capacity for Summer Use the TM Planning tool to plan iGCDP
  • 7. STEP 1: Plan for Capacity for Summer Here enter number of interns/EPs one member can deliver Eg: 1 member – 3 EPs iGCDP
  • 8. STEP 1: Plan for Capacity for Summer That number from slide 2 will multiply with Re goal you enter for the quarter so you know how many members are needed for delivery in each programme iGCDP
  • 9. GCDP Clustering for LC iGCDP Beginner 0-25 X RE Intermediate 25-100 X RE Advanced 100-200 X RE Mature +200 X RE
  • 10. STEP 2: Create structures for quality delivery Structures by Volume of Realizations the LC does Customize your structures for the fruit peak if needed
  • 11. STEP 2: An LC that has planned between 0-25 in 2014 Basic Consideration: • As start up, LC manage the basic process of iGCDP delivery • There is no need to manage iGCDP as a project yet - in general experience delivery will be TN based • Member Efficiency: 0-4 X / member Number of members: Use TM Planning tool to determine Job Description: • Selling and raising, matching, and realizing • Incoming preparation seminar • Experience Co-delivery VP Member Member Member ∞ Ra-Ma-Re
  • 12. STEP 2: An LC that has planned between 0-25 in 2014 JD for Delivery 0 Supporting Eps through the match process (especially for visa) and at realization 0 Delivery through fulfilling all exchange minimums 0 Very important: Airport pick up, Logistics, Supporting Accommodation of EPs , Integration of EPs, Ensuring alignment between EP and company 0 FAST firefighting on NPS in case of any EP issues/complaints 0 Showcasing promoter EP stories 0 During sales process ensure there is clear understanding of JD so that there is no issue in JD alignment at the realized stage Recommendation: Even though most detractor issues/comments are at realized stage, by taking the right actions (through the right JD) during raise and match, the level of issues at the realized stage can be decreased!
  • 13. STEP 2: KPI within the structure KPI 1: For a single member - % of Promoters/Total Realizations of the member For a Team - % of Promoters/Total Realizations of the team KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC
  • 14. STEP 2: An LC that has planned between 25-100 in 2014 VP OCP OCP OCP ∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re Number of members: Use TM Planning framework Job Description: • Selling and raising, matching, and realizing • Project concept development and execution • Incoming preparation seminar • Experience Co-delivery (country-country partnership management) • LCs have more capacity in project management • Project concept will be centralized Nationally (National project implementation in LCs) • Start to have the needs of event/project management
  • 15. STEP 2: JD within the structure JD of Delivery members in the team During Raising period During Matching period During Realization • Ensure clear and high quality JD in a specific issue segment and for a specific national project • Clear expectation setting with NGO about role of EP, salary etc. • Visa Support (The key issue is Eps want MORE and ACCURATE information about the process and documents related to visa) • As soon as matches are confirmed start working on accommodation • By now accommodation should be confirmed and ready • Arrange for EP Pick up and integration into the LC and city • Trainee Buddy assigned for EP
  • 16. STEP 2: JD within the structure JD of Delivery members in the team Who is a trainee buddy? – An LC member (doesn’t need to be only from the iGIP team) who is responsible for meeting and communicating with the EP regularly, who support the delivery team in the EP Pick up, integration etc Having trainee buddy makes the job of a delivery team simpler and also allows members to have a great experience interacting with Eps At this stage, make sure you are firefighting fast on NPS incase EP has a comment/issue During Realization • By now accommodation should be confirmed and ready • Arrange for EP Pick up and integration into the LC and city • Trainee Buddy assigned for EP • Induction meeting with EP and company
  • 17. STEP 2: JD within the structure Synergy of members in the team - Since each team is working on projects and is responsible for the whole exchange process, the synergy between the 3 teams and members within the team has to be very good: 1. Each member is responsible for the right raise and expectation setting with NGO 2. There is/are specific member working on ensuring the visa information and process 3. There are 2-3 members working on accommodation while the others are working on airport pick up, logistics, trainee buddy etc. Each member is responsible for his/her raised and matched EPs Big tasks needed for all Eps like accommodation etc are done by specific members
  • 18. STEP 2: KPI within the structure for delivery members in the team KPI 1: For a single member - % of Promoters/Total Realizations of the member KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC
  • 19. STEP 2: Ideal duration of teams Makes sense for teams to be for 3-4 months – This gives members time to deliver the Realization effectively It is important to MAKE SURE that once the team duration ends the same members are communicating and supporting Eps and this is still part of their role iGCDP EPs generally are in the LC for 6-8 weeks so even if a members term ends, he/she can continue being responsible for his/her realization
  • 20. STEP 2: An LC that has planned between 100-200 in 2014 VP OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local) Number of members: Use TM Planning Framework Job Description: • Selling and raising, matching, and realizing • Project concept development and execution • Project brand management • Incoming preparation seminar • Experience Co-delivery (LC-LC partnership management) Basic Consideration: • LC is considered to have the capacity in understanding Project management concept and put into implementation • LC has capacity in innovate a project based on issue • Member Efficiency: 4-6 X /member
  • 21. STEP 2: JD within the structure JD of Delivery members in the team • The JD is very similar to LCs doing 25-100 The 2 key differences are: 1. Since the volume is more in this case, LC can start working on outsourcing some services to make processes more efficient 2. This LC structure is working on local projects as well as national projects implementation so make sure the local project delivery is very well planned
  • 22. STEP 2: JD within the structure JD of Delivery members in the team During Raising period During Matching period During Realization • Ensure clear and high quality JD in a specific issue segment and for a specific national project • Clear expectation setting with NGO about role of EP, salary etc. • Visa Support (The key issue is Eps want MORE and ACCURATE information about the process and documents related to visa) • As soon as matches are confirmed start working on accommodation • By now accommodation should be confirmed and ready • Arrange for EP Pick up and integration into the LC and city • Trainee Buddy assigned for EP
  • 23. STEP 2: JD within the structure JD of Delivery members in the team Who is a trainee buddy? – An LC member (doesn’t need to be only from the iGIP team) who is responsible for meeting and communicating with the EP regularly, who support the delivery team in the EP Pick up, integration etc Having trainee buddy makes the job of a delivery team simpler and also allows members to have a great experience interacting with Eps At this stage, make sure you are firefighting fast on NPS incase EP has a comment/issue During Realization • By now accommodation should be confirmed and ready • Arrange for EP Pick up and integration into the LC and city • Trainee Buddy assigned for EP • Induction meeting with EP and company
  • 24. STEP 2: An LC that has planned 200+ in 2014 VP OCP OCP OCP OCP Mid. Manager • With high volume of iGCDP delivery, Project team need to be really focus on Customer experience • Prevent the tendency of non- innovative JDs • Account management and Customer loyalty for Organization management (TN Takers, Learning partners, etc) • Multi stakeholders and another level of accommodation management
  • 25. • Every team does all Raise – Match – Realize process (5- 6 members) • Full responsibility in managing Inner-Outer journey of EP • Have other separate team/person managing stakeholders or other process outside exchange process delivery • Example JD for Middle Management person: • Customer Loyalty for Organization (partner relation management) • Accommodation management (home stay program) VP OCP OCP OCP OCP Mid. Manager STEP 2: An LC that has planned 200+ in 2014
  • 26. STEP 2: JD within the structure The middle manager in the structure and his/her team manage EXPERIENCE DELIVERY Middle Manager and team Account Managers - Market research - Selling and marketing - CRM - Re-Raising Hosting - Managing “Hosting Program” Product - Managing Allocation Process to accommodation and host families - Managing EP Reception and Accommodation
  • 27. STEP 2: JD within the structure 0 The OCP teams are very involved with EP Preparation (virtually), EP Integration into project and delivery of inner-outer journey but the Middle manager team is focused on accommodation, host family (Hosting Programme Product) and Reception activities – this is the division of JD between both teams 0 This means there has to be good synergy between teams and alignment of exchange timeline 0 In case of high volume LCs, it is important for the whole LC to support EP Integration and EP Reception to deliver high quality experiences!
  • 28. STEP 2: KPI within the structure for delivery members in the team KPI 1: For a single member - % of Promoters/Total Realizations of the member KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC