XRS Consulting Engineers and Project
Managers 1
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
Section 17
Operation & Maintenance
XRS Consulting Engineers and Project
Managers 4
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
OVERVIEW
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 7
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
But the operations and maintenance phase is the heart
of the SIS lifecycle, and the Operations and
Maintenance teams will play an essential role — from
reacting properly if the SIS is activated, to conducting
periodic proof tests, to monitoring and maintaining
the equipment.
OVERVIEW
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 10
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
IEC 61511 requires that there be operations and
maintenance planning for the SIS.
This planning has two objectives:
Proper maintenance to ensure that each safety
instrumented function continues to have its defined
safety integrity level throughout its life.
Proper operations to ensure that the SIS as a whole
gives the required level of risk reduction.
PLANNING
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 13
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
The planning should cover such topics as:
The requirements for identifying, analyzing, and
documenting discrepancies between expected SIS
behavior and actual behavior following a system
demand trip.
How to ensure the SIS is fully restored to verified
operational state upon completion of routine or
emergency maintenance.
PLANNING
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 16
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
The planning should cover such topics as:
Remember, too, that operations and maintenance
responsibilities are not always confined to traditional
roles and departments.
For example, if the SIS uses automated alerts to notify
key personnel, the systems for communicating those
alerts may be the responsibility of an Information
Technology (IT) group.
In such instances, the plans should include how that
group will deal with software upgrades, changes in
user assignments, and other events that might
influence the SIS solution.
PLANNING
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 19
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
Once the operations and maintenance work has been
completed, It will be necessary to complete the
procedures that define how to work the plan.
These should include:
How information about the system will be gathered —
including demand rates and system failure rates, as
well as the results of audits and tests of the system
What Maintenance personnel will do when there is a
fault or failure in the SIS
What test equipment will be used and how it will be
calibrated and maintained
PROCEDURES
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 22
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
Operations
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 25
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
Similarly, operators must understand the SIS testing
requirements, and what happens if tests are delayed.
For example, the tendency to run processes longer
between shutdowns also means longer intervals
between proof testing to verify SIS performance, and
therefore less assurance that the SIS will function
properly when needed. (In-service partial-stroke
testing of SIS control valves can help compensate for
the longer intervals.)
OPERATIONS
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 28
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
Maintenance
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 31
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
Different systems, different maintenance. In most
cases the same Maintenance personnel who work on
the BPCS will also work on the SIS. These people need
to understand that SIS sensors, logic solvers, and final
control elements may be different from similar
devices used for the BPCS.
Even when SIS instruments look similar to standard
devices, they may be different "under the hood" — and
require different maintenance procedures.
MAINTENANCE
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 34
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
The frequency of future proof tests will be determined
by the same PFD calculations that were used when the
system was designed.
Maintenance must therefore update the demand rate
for the SIS and failure rate for its components to
reflect the actual numbers that have been logged
during plant operation.
The frequency (and cost) of these and other
maintenance tasks can be significantly reduced by
making greater use of predictive maintenance.
MAINTENANCE
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 37
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
Traditional preventive maintenance requires that
equipment be calibrated, lubricated, rebuilt, or
undergo some other service periodically, whether it
needs it or not.
Predictive maintenance, on the other hand, uses real-
time information from intelligent devices to predict
when each device's performance will reach the point
where maintenance makes sense — neither before it's
needed, nor after it's too late.
PREDICTIVE MAINTENANCE
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 40
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
For a host of reasons — from equipment contamination
to human error — it's not uncommon for some of the
instruments and valves to be worse after the
recalibration and rebuild than before.
With predictive maintenance tools, however, you can
identify which instruments and valves will actually
need work before the next scheduled shutdown, and
leave the others alone.
PREDICTIVE MAINTENANCE
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 43
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
Overlaying the results of the current signature test
with those of tests run in the past can indicate if valve
response has degraded over time.
This increases valve availability and ensures that the
valve responds upon demand.
It also reduces the amount of scheduled maintenance
on the valve, because the tests can be used to predict
when the valve needs maintenance.
PREDICTIVE MAINTENANCE
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
XRS Consulting Engineers and Project
Managers 46
Section 17
Safety Instrumented Systems (SIS) & Emergency Shutdown
(IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control
Safety Instrumented Systems
Section 16 of IEC 61511 includes a fairly extensive list of
SIS operation and maintenance requirements, but they all
really come down to two things:
Both Operations and Maintenance must possess a
thorough understanding of what's required of them to
maintain the SIS's validated state.
Every discrepancy between expected and actual SIS
behavior must be analyzed, the findings thoroughly
documented, and appropriate corrections developed,
implemented, and tested.
Summary
Operation & Maintenance
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
1
Flevy (www.flevy.com) is the marketplace
for premium documents. These
documents can range from Business
Frameworks to Financial Models to
PowerPoint Templates.
Flevy was founded under the principle that
companies waste a lot of time and money
recreating the same foundational business
documents. Our vision is for Flevy to
become a comprehensive knowledge base
of business documents. All organizations,
from startups to large enterprises, can use
Flevy— whether it's to jumpstart projects, to
find reference or comparison materials, or
just to learn.
Contact Us
Please contact us with any questions you may have
about our company.
• General Inquiries
support@flevy.com
• Media/PR
press@flevy.com
• Billing
billing@flevy.com

Más contenido relacionado

Más de Flevy.com Best Practices

[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...Flevy.com Best Practices
 
[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines Model[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines ModelFlevy.com Best Practices
 
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...Flevy.com Best Practices
 
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...Flevy.com Best Practices
 
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?Flevy.com Best Practices
 
[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain Management[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain ManagementFlevy.com Best Practices
 
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...Flevy.com Best Practices
 
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...Flevy.com Best Practices
 
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...Flevy.com Best Practices
 
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative BehaviorsFlevy.com Best Practices
 
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...Flevy.com Best Practices
 
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...Flevy.com Best Practices
 
Six Sigma - Statistical Process Control (SPC)
Six Sigma - Statistical Process Control (SPC)Six Sigma - Statistical Process Control (SPC)
Six Sigma - Statistical Process Control (SPC)Flevy.com Best Practices
 
Lean Six Sigma - Process Risk Analysis (FMEA)
Lean Six Sigma - Process Risk Analysis (FMEA)Lean Six Sigma - Process Risk Analysis (FMEA)
Lean Six Sigma - Process Risk Analysis (FMEA)Flevy.com Best Practices
 
Effective Staff Suggestion System (Kaizen Teian)
Effective Staff Suggestion System (Kaizen Teian)Effective Staff Suggestion System (Kaizen Teian)
Effective Staff Suggestion System (Kaizen Teian)Flevy.com Best Practices
 

Más de Flevy.com Best Practices (20)

[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
 
[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines Model[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines Model
 
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
 
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
 
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
 
[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain Management[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain Management
 
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
 
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
 
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
 
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
 
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
 
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
 
The Top 101 Consulting Frameworks of 2020
The Top 101 Consulting Frameworks of 2020The Top 101 Consulting Frameworks of 2020
The Top 101 Consulting Frameworks of 2020
 
Six Sigma - Statistical Process Control (SPC)
Six Sigma - Statistical Process Control (SPC)Six Sigma - Statistical Process Control (SPC)
Six Sigma - Statistical Process Control (SPC)
 
Lean Six Sigma - Process Risk Analysis (FMEA)
Lean Six Sigma - Process Risk Analysis (FMEA)Lean Six Sigma - Process Risk Analysis (FMEA)
Lean Six Sigma - Process Risk Analysis (FMEA)
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Effective Staff Suggestion System (Kaizen Teian)
Effective Staff Suggestion System (Kaizen Teian)Effective Staff Suggestion System (Kaizen Teian)
Effective Staff Suggestion System (Kaizen Teian)
 
Sales Excellence - Diagnostic Tool
Sales Excellence - Diagnostic ToolSales Excellence - Diagnostic Tool
Sales Excellence - Diagnostic Tool
 
Variance Analysis
Variance AnalysisVariance Analysis
Variance Analysis
 
Change Management Models
Change Management ModelsChange Management Models
Change Management Models
 

Último

Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 

Último (20)

Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 

SIS & ESD (IEC 61511, 61508) Training - Operation & Maintenance

  • 1. XRS Consulting Engineers and Project Managers 1 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems Section 17 Operation & Maintenance
  • 2. XRS Consulting Engineers and Project Managers 4 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems OVERVIEW Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 3. XRS Consulting Engineers and Project Managers 7 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems But the operations and maintenance phase is the heart of the SIS lifecycle, and the Operations and Maintenance teams will play an essential role — from reacting properly if the SIS is activated, to conducting periodic proof tests, to monitoring and maintaining the equipment. OVERVIEW Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 4. XRS Consulting Engineers and Project Managers 10 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems IEC 61511 requires that there be operations and maintenance planning for the SIS. This planning has two objectives: Proper maintenance to ensure that each safety instrumented function continues to have its defined safety integrity level throughout its life. Proper operations to ensure that the SIS as a whole gives the required level of risk reduction. PLANNING Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 5. XRS Consulting Engineers and Project Managers 13 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems The planning should cover such topics as: The requirements for identifying, analyzing, and documenting discrepancies between expected SIS behavior and actual behavior following a system demand trip. How to ensure the SIS is fully restored to verified operational state upon completion of routine or emergency maintenance. PLANNING Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 6. XRS Consulting Engineers and Project Managers 16 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems The planning should cover such topics as: Remember, too, that operations and maintenance responsibilities are not always confined to traditional roles and departments. For example, if the SIS uses automated alerts to notify key personnel, the systems for communicating those alerts may be the responsibility of an Information Technology (IT) group. In such instances, the plans should include how that group will deal with software upgrades, changes in user assignments, and other events that might influence the SIS solution. PLANNING Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 7. XRS Consulting Engineers and Project Managers 19 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems Once the operations and maintenance work has been completed, It will be necessary to complete the procedures that define how to work the plan. These should include: How information about the system will be gathered — including demand rates and system failure rates, as well as the results of audits and tests of the system What Maintenance personnel will do when there is a fault or failure in the SIS What test equipment will be used and how it will be calibrated and maintained PROCEDURES Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 8. XRS Consulting Engineers and Project Managers 22 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems Operations Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 9. XRS Consulting Engineers and Project Managers 25 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems Similarly, operators must understand the SIS testing requirements, and what happens if tests are delayed. For example, the tendency to run processes longer between shutdowns also means longer intervals between proof testing to verify SIS performance, and therefore less assurance that the SIS will function properly when needed. (In-service partial-stroke testing of SIS control valves can help compensate for the longer intervals.) OPERATIONS Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 10. XRS Consulting Engineers and Project Managers 28 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems Maintenance Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 11. XRS Consulting Engineers and Project Managers 31 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems Different systems, different maintenance. In most cases the same Maintenance personnel who work on the BPCS will also work on the SIS. These people need to understand that SIS sensors, logic solvers, and final control elements may be different from similar devices used for the BPCS. Even when SIS instruments look similar to standard devices, they may be different "under the hood" — and require different maintenance procedures. MAINTENANCE Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 12. XRS Consulting Engineers and Project Managers 34 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems The frequency of future proof tests will be determined by the same PFD calculations that were used when the system was designed. Maintenance must therefore update the demand rate for the SIS and failure rate for its components to reflect the actual numbers that have been logged during plant operation. The frequency (and cost) of these and other maintenance tasks can be significantly reduced by making greater use of predictive maintenance. MAINTENANCE Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 13. XRS Consulting Engineers and Project Managers 37 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems Traditional preventive maintenance requires that equipment be calibrated, lubricated, rebuilt, or undergo some other service periodically, whether it needs it or not. Predictive maintenance, on the other hand, uses real- time information from intelligent devices to predict when each device's performance will reach the point where maintenance makes sense — neither before it's needed, nor after it's too late. PREDICTIVE MAINTENANCE Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 14. XRS Consulting Engineers and Project Managers 40 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems For a host of reasons — from equipment contamination to human error — it's not uncommon for some of the instruments and valves to be worse after the recalibration and rebuild than before. With predictive maintenance tools, however, you can identify which instruments and valves will actually need work before the next scheduled shutdown, and leave the others alone. PREDICTIVE MAINTENANCE Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 15. XRS Consulting Engineers and Project Managers 43 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems Overlaying the results of the current signature test with those of tests run in the past can indicate if valve response has degraded over time. This increases valve availability and ensures that the valve responds upon demand. It also reduces the amount of scheduled maintenance on the valve, because the tests can be used to predict when the valve needs maintenance. PREDICTIVE MAINTENANCE Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 16. XRS Consulting Engineers and Project Managers 46 Section 17 Safety Instrumented Systems (SIS) & Emergency Shutdown (IEC 61511 & IEC 61508) and Boiler/Gas Turbine Control Safety Instrumented Systems Section 16 of IEC 61511 includes a fairly extensive list of SIS operation and maintenance requirements, but they all really come down to two things: Both Operations and Maintenance must possess a thorough understanding of what's required of them to maintain the SIS's validated state. Every discrepancy between expected and actual SIS behavior must be analyzed, the findings thoroughly documented, and appropriate corrections developed, implemented, and tested. Summary Operation & Maintenance This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/sis-and-esd-iec-61511-61508-training-operation-and-maintenance-3090
  • 17. 1 Flevy (www.flevy.com) is the marketplace for premium documents. These documents can range from Business Frameworks to Financial Models to PowerPoint Templates. Flevy was founded under the principle that companies waste a lot of time and money recreating the same foundational business documents. Our vision is for Flevy to become a comprehensive knowledge base of business documents. All organizations, from startups to large enterprises, can use Flevy— whether it's to jumpstart projects, to find reference or comparison materials, or just to learn. Contact Us Please contact us with any questions you may have about our company. • General Inquiries support@flevy.com • Media/PR press@flevy.com • Billing billing@flevy.com