HSE INCENTIVE SCHEME 3

Purpose and Overview
Formula & Calculation
Budgeting
Terms & Conditions
SHOC Activities Process

2
HSE INCENTIVE SCHEME 3

EPSCC1+ EPSC2
Target Title

Medical Check-up ratio

Description

Minimum target
yard WORKSITE

The ratio ‘’personnel fully checked / POB’’ will be the base
of remuneration. CONTRACTOR shall provide full
documented report on monthly basis

Minimum target
for SITE

Work Unit 13.3 HSE INCENTIVE SCHEME
Exhibit B
Anomaly Reporting Ratio ($ 73,211 = Rp 827.284.300)
100%

% Amount of Initial
CONTRACT PRICE

Value in USD

0.03%

43,927

0.03%

43,927

HSE training performance ratio

CONTRACTOR shall ensure that all personnel are properly
trained as per CONTRACTOR training matrix approved by
COMPANY. The ratio ‘’personnel fully trained / POB’’ will
be the base of remuneration. CONTRACTOR shall provide
full documented report according to on monthly basis

Anomaly reporting ratio

CONTRACTOR shall maintain ratio of anomaly reported per
million man-hours above target fixed by COMPANY.
Anomaly reported shall have a constructive and pertinent
purpose.

2000/ million MH

0.05%

73,211

Anomaly remedial action close out
ratio

The ratio ‘’number of anomaly action closed out / number
of anomaly action’’ will be the base of remuneration.
CONTRACTOR to maintain this ratio above target fixed by
COMPANY

80%

0.05%

73,211

High Potential (HIPO) incident
remedial action close out ratio

The ratio ‘’number of HIPO action closed out / number of
HIPO action’’ will be the base of remuneration.
CONTRACTOR shall maintain this ratio above target fixed
by COMPANY

80%

0.05%

73,211

CONTRACTOR will be audited by COMPANY at the end of
yard WORKSITE activities. CONTRACTOR will be paid if
Yard WORKSITE activity close out audit audit score target fixed by COMPANY is achieved. The
audit will take into account the SITE installation work
preparation.

set by COMPANY

0.05%

73,211

CONTRACTOR will be audited by COMPANY at the end of
the CONTRACT. CONTRACTOR will be paid if audit score
target fixed by COMPANY is achieved. The audit will take
into account the CONTRACTOR performance on
installation SITE.

set by COMPANY

0.05%

73,211

TRIR<1.5 Payment 100% of the % Amount of initial
contract price at completion of work

0.02%

29,285

LTIF<0.4 Payment 100% of the % Amount of initial contract
price at completion of work

0.02%

29,285

CONTRACT close out audit

Safety statistics

80%

100%

Subtotal value Incentive Scheme 3 EPCC1 & EPSC2

512,479

3
.

-

"
..,

-----­

Anomaly Reporting Ratio: 2,000 SHOe I million Man-hours 

~~
~~
~~
~~
t~
t~
~~
~~

3,500,000 	
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000

500

c .c ... ... ' > c,' -

ao

.... Ll.l :!: <l: :!: ....,

<l:

III

<II ; ItJ

Q. , 1tJ

~t ~

2012

Q.

~ <II
I)

t >J QI ,
u
O

0

(Z

II 0 i

C

- SHoe Report

Man-hours

.c ... ... , > c - ao Q. t
ItJ QJ 1tJ , ~ ~ ~ <11 ' 0
LI. :!:' <l: :!:....
<l: I) .

Ill ' QI

....

2013

Graphic 1 . Anomaly Reporting Ratio 2,000 SHOe I Millions Man-hours on October 2013 

(Actual)
HSE INCENTIVE SCHEME 3

1. With assumption

:
Σ Man-hours Dec 2013
Σ Manpower @Yard 2 (CTR-PTG)

= 4.000.000 Safe Man-hours
= 300 workers

2. Fixed Target Factor as per Contract
:
2,000 SHOC / 1 Millions Man-hours
3. Actual SHOC Report Achievement :
Feb, 2013 → 2,003 SHOC / 1,389,107 Man-hours
4. Plan & Target

5. Formula & Calculation

: (see Graphic 2. Anomaly Reporting Ratio 2,000 SHOC / Million Man-hours)
Oct, 2013 → 4,000 SHOC / 2 Million Man-hours
Nov, 2013 → 6,000 SHOC / 3 Million Man-hours
Dec, 2013 → 8,000 SHOC / 4 Million Man-hours
Note : SHOC Report result is accumulative calculation.
:
Σ SHOC Assumption
Σ Manpower @ PTG YARD 2

= (8,000 – 4,000) SHOC
300
= ± 15 SHOC/man/month
= ± 4,000 SHOC/300 Manpower
5
Anomaly Reporting Ratio: 2,000 SHOe / million Man-hours 

4,500,000
4,000,000
3,500,000
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000

- SHOC Report

- Man-hours
Cumulative

2012

2013

Graphic 2 . Anomaly Reporting Ratio 2,000 SHOe / Millions Man-hours for December 2013 

(Plan)
Rp

Cash

20.000.000

The Best 100 SHOC Report

Rp

20.000.000

IDR 200.000/ 15
SHOC/ man
lOR 200.000 x 100
man

Grenyang, November 27 th , 2013.

prel~

By,

Fitri Ifony
HSE Engineer

Reviewed By,

Approved By,

Ramli Simatupang
Project Manager
HSE INCENTIVE SCHEME 3

1. SHOC form should be socialized in every TBM/Project Mass Meeting by
Safetyman/Safety Officer/HSE Coordinator (HSE Personnel).
2. The minimum SHOC form are 25 copy sheets per HSE Personnel and it should be given
for all of worker per work area.
3. SHOC form should be collected base on minimum target 100 SHOC in every week and
every HSE Personnel.
4. SHOC Analyzed should be prepare daily SHOC form minimum are ± 300 copy per day.

8
HSE INCENTIVE SCHEME 3

9
HSE INCENTIVE SCHEME 3

Step 1

Step 2

Step
3

Step
4

Project HSE
Secretary :

HSE Personnel :
Should be given
& collected
Daily SHOC
Report per work
area / concern
area

Assist of HSE
Engineer
SHOC Analysis
:

HSE Engineer :
Checklist all of
SHOC Report

Should be
done SHOC
entry with
computerized
and find the
winners

10
HSE INCENTIVE SCHEME 3

11

Más contenido relacionado

La actualidad más candente

CV of Prabu-HSE Engineer.DOCX
CV of Prabu-HSE Engineer.DOCXCV of Prabu-HSE Engineer.DOCX
CV of Prabu-HSE Engineer.DOCX
Prabu Thangavel
 
4.2 Risk assessment project (i)
4.2 Risk assessment project (i)4.2 Risk assessment project (i)
4.2 Risk assessment project (i)
Md Farid Talif
 
RESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressed
RESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressedRESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressed
RESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressed
Ali alnasser
 
Updated CV - Aquib Pagarkar - June 2015
Updated CV - Aquib Pagarkar - June 2015Updated CV - Aquib Pagarkar - June 2015
Updated CV - Aquib Pagarkar - June 2015
Aquib Pagarkar
 
Amir Khurshid HSE Officer
Amir Khurshid HSE OfficerAmir Khurshid HSE Officer
Amir Khurshid HSE Officer
Amir Khurshid
 
GE O&amp;G Career Event 2012
GE O&amp;G Career Event 2012GE O&amp;G Career Event 2012
GE O&amp;G Career Event 2012
cfarver
 
SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015
Saiful Amin
 

La actualidad más candente (19)

Safety Manager CV
Safety Manager CVSafety Manager CV
Safety Manager CV
 
Presentation HIRARC Sem 3
Presentation HIRARC Sem 3Presentation HIRARC Sem 3
Presentation HIRARC Sem 3
 
CV of Prabu-HSE Engineer.DOCX
CV of Prabu-HSE Engineer.DOCXCV of Prabu-HSE Engineer.DOCX
CV of Prabu-HSE Engineer.DOCX
 
Mansur HSE Manager - cv
Mansur HSE Manager - cvMansur HSE Manager - cv
Mansur HSE Manager - cv
 
Srinivasa Rao - HSE
Srinivasa Rao - HSESrinivasa Rao - HSE
Srinivasa Rao - HSE
 
Response time of fire tenders
Response time of fire tendersResponse time of fire tenders
Response time of fire tenders
 
4.2 Risk assessment project (i)
4.2 Risk assessment project (i)4.2 Risk assessment project (i)
4.2 Risk assessment project (i)
 
RESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressed
RESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressedRESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressed
RESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressed
 
MANIKANDAN MANODHAS CV
MANIKANDAN MANODHAS CVMANIKANDAN MANODHAS CV
MANIKANDAN MANODHAS CV
 
Updated CV - Aquib Pagarkar - June 2015
Updated CV - Aquib Pagarkar - June 2015Updated CV - Aquib Pagarkar - June 2015
Updated CV - Aquib Pagarkar - June 2015
 
Fire protection
Fire protectionFire protection
Fire protection
 
Amir Khurshid HSE Officer
Amir Khurshid HSE OfficerAmir Khurshid HSE Officer
Amir Khurshid HSE Officer
 
GE O&amp;G Career Event 2012
GE O&amp;G Career Event 2012GE O&amp;G Career Event 2012
GE O&amp;G Career Event 2012
 
Waseem HSE Officer CV
Waseem HSE Officer CVWaseem HSE Officer CV
Waseem HSE Officer CV
 
Prajin CV HSE Officer
Prajin CV HSE OfficerPrajin CV HSE Officer
Prajin CV HSE Officer
 
ANEESH THOMAS CV
ANEESH THOMAS CVANEESH THOMAS CV
ANEESH THOMAS CV
 
SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015
 
Cv for safety officer
Cv for safety officerCv for safety officer
Cv for safety officer
 
Murugan_Resume
Murugan_ResumeMurugan_Resume
Murugan_Resume
 

Destacado

World safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareWorld safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide share
Fitri Ifony
 
Integrated management system training
Integrated management system trainingIntegrated management system training
Integrated management system training
Fitri Ifony
 
1 pengertian ergonomi
1 pengertian ergonomi1 pengertian ergonomi
1 pengertian ergonomi
Garnet Waluyo
 
Ergonomik (atau faktor manusia) new
Ergonomik (atau faktor manusia)   newErgonomik (atau faktor manusia)   new
Ergonomik (atau faktor manusia) new
Stevie Kai
 
Latar belakang pembentukan P2K3
Latar belakang pembentukan P2K3Latar belakang pembentukan P2K3
Latar belakang pembentukan P2K3
Herry Prakoso
 
Happy National Safety Day
Happy National Safety DayHappy National Safety Day
Happy National Safety Day
vasant oak
 
Syarat pembentukan P2K3
Syarat pembentukan  P2K3Syarat pembentukan  P2K3
Syarat pembentukan P2K3
Herry Prakoso
 

Destacado (20)

World safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareWorld safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide share
 
Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1
 
Integrated management system training
Integrated management system trainingIntegrated management system training
Integrated management system training
 
Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)
 
Hse Action Plan
Hse Action PlanHse Action Plan
Hse Action Plan
 
Penyakit akibat kerja (PAK) pekerja pencuci motor
Penyakit akibat kerja (PAK) pekerja pencuci motorPenyakit akibat kerja (PAK) pekerja pencuci motor
Penyakit akibat kerja (PAK) pekerja pencuci motor
 
Melihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaMelihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun Yahya
 
Ergonomi
ErgonomiErgonomi
Ergonomi
 
1 pengertian ergonomi
1 pengertian ergonomi1 pengertian ergonomi
1 pengertian ergonomi
 
Ergonomi kesehatan
Ergonomi kesehatanErgonomi kesehatan
Ergonomi kesehatan
 
Ergonomik (atau faktor manusia) new
Ergonomik (atau faktor manusia)   newErgonomik (atau faktor manusia)   new
Ergonomik (atau faktor manusia) new
 
World day for health & safety rev.00
World day for health & safety rev.00World day for health & safety rev.00
World day for health & safety rev.00
 
Higiene Industri - Potensi Bahaya Industri
Higiene Industri - Potensi Bahaya IndustriHigiene Industri - Potensi Bahaya Industri
Higiene Industri - Potensi Bahaya Industri
 
Latar belakang pembentukan P2K3
Latar belakang pembentukan P2K3Latar belakang pembentukan P2K3
Latar belakang pembentukan P2K3
 
Happy National Safety Day
Happy National Safety DayHappy National Safety Day
Happy National Safety Day
 
Pengertian p2k3
Pengertian p2k3Pengertian p2k3
Pengertian p2k3
 
Syarat pembentukan P2K3
Syarat pembentukan  P2K3Syarat pembentukan  P2K3
Syarat pembentukan P2K3
 
p2k3 training
p2k3 trainingp2k3 training
p2k3 training
 

Similar a Shoc proposal dec 2013 rev.01_ok

Checklist for Cost Control Dept in Contracting Company
Checklist for Cost Control Dept in Contracting CompanyChecklist for Cost Control Dept in Contracting Company
Checklist for Cost Control Dept in Contracting Company
kashif khawja
 
Six-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleSix-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sample
Dheerendra S Negi
 
Schneider, Arnold, (2012) Managerial Accounting, United States, .docx
Schneider, Arnold, (2012) Managerial Accounting, United States, .docxSchneider, Arnold, (2012) Managerial Accounting, United States, .docx
Schneider, Arnold, (2012) Managerial Accounting, United States, .docx
anhlodge
 
Blog Cost and Schedule Risk Analysis
Blog Cost and Schedule Risk AnalysisBlog Cost and Schedule Risk Analysis
Blog Cost and Schedule Risk Analysis
Asaman Patnaik
 
UTSFinmagecapitalbugproject
UTSFinmagecapitalbugprojectUTSFinmagecapitalbugproject
UTSFinmagecapitalbugproject
Joshua C
 
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpmComparative characteristics of pert and cpm
Comparative characteristics of pert and cpm
Kinshook Chaturvedi
 

Similar a Shoc proposal dec 2013 rev.01_ok (20)

Cost management-plan template
Cost management-plan templateCost management-plan template
Cost management-plan template
 
Checklist for Cost Control Dept in Contracting Company
Checklist for Cost Control Dept in Contracting CompanyChecklist for Cost Control Dept in Contracting Company
Checklist for Cost Control Dept in Contracting Company
 
Six sigma-black-belt-project-sample
Six sigma-black-belt-project-sampleSix sigma-black-belt-project-sample
Six sigma-black-belt-project-sample
 
Six-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleSix-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sample
 
Schneider, Arnold, (2012) Managerial Accounting, United States, .docx
Schneider, Arnold, (2012) Managerial Accounting, United States, .docxSchneider, Arnold, (2012) Managerial Accounting, United States, .docx
Schneider, Arnold, (2012) Managerial Accounting, United States, .docx
 
Chap008
Chap008Chap008
Chap008
 
Capital-Budgeting_Grp1-v2.ppt
Capital-Budgeting_Grp1-v2.pptCapital-Budgeting_Grp1-v2.ppt
Capital-Budgeting_Grp1-v2.ppt
 
Chapter 5-depreciation
Chapter 5-depreciationChapter 5-depreciation
Chapter 5-depreciation
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
CAPITAL BUDGETING
CAPITAL BUDGETINGCAPITAL BUDGETING
CAPITAL BUDGETING
 
Managerial_economics_paper.doc
Managerial_economics_paper.docManagerial_economics_paper.doc
Managerial_economics_paper.doc
 
Blog Cost and Schedule Risk Analysis
Blog Cost and Schedule Risk AnalysisBlog Cost and Schedule Risk Analysis
Blog Cost and Schedule Risk Analysis
 
Earned Value Management Project Analysis
Earned Value Management Project Analysis Earned Value Management Project Analysis
Earned Value Management Project Analysis
 
UTSFinmagecapitalbugproject
UTSFinmagecapitalbugprojectUTSFinmagecapitalbugproject
UTSFinmagecapitalbugproject
 
Risk-Analysis.pdf
Risk-Analysis.pdfRisk-Analysis.pdf
Risk-Analysis.pdf
 
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpmComparative characteristics of pert and cpm
Comparative characteristics of pert and cpm
 
group 10 (Depreciation and Depletion).pptx
group 10 (Depreciation and Depletion).pptxgroup 10 (Depreciation and Depletion).pptx
group 10 (Depreciation and Depletion).pptx
 
Earned value Project Management (evpm)
Earned value Project Management (evpm)Earned value Project Management (evpm)
Earned value Project Management (evpm)
 
Chap009
Chap009Chap009
Chap009
 
En business plan
En business planEn business plan
En business plan
 

Más de Fitri Ifony

Más de Fitri Ifony (8)

Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
 
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
 
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
 
Env monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit TuaEnv monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit Tua
 
Hse incentive scheme rev 05 approved by yard (3)
Hse incentive scheme rev 05  approved by yard (3)Hse incentive scheme rev 05  approved by yard (3)
Hse incentive scheme rev 05 approved by yard (3)
 
Qhse objective &amp; target 2015
Qhse objective &amp; target 2015Qhse objective &amp; target 2015
Qhse objective &amp; target 2015
 
Safety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectSafety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc project
 
Hiradc training rev.0
Hiradc training rev.0Hiradc training rev.0
Hiradc training rev.0
 

Último

Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 

Último (20)

Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 

Shoc proposal dec 2013 rev.01_ok

  • 2. HSE INCENTIVE SCHEME 3 Purpose and Overview Formula & Calculation Budgeting Terms & Conditions SHOC Activities Process 2
  • 3. HSE INCENTIVE SCHEME 3 EPSCC1+ EPSC2 Target Title Medical Check-up ratio Description Minimum target yard WORKSITE The ratio ‘’personnel fully checked / POB’’ will be the base of remuneration. CONTRACTOR shall provide full documented report on monthly basis Minimum target for SITE Work Unit 13.3 HSE INCENTIVE SCHEME Exhibit B Anomaly Reporting Ratio ($ 73,211 = Rp 827.284.300) 100% % Amount of Initial CONTRACT PRICE Value in USD 0.03% 43,927 0.03% 43,927 HSE training performance ratio CONTRACTOR shall ensure that all personnel are properly trained as per CONTRACTOR training matrix approved by COMPANY. The ratio ‘’personnel fully trained / POB’’ will be the base of remuneration. CONTRACTOR shall provide full documented report according to on monthly basis Anomaly reporting ratio CONTRACTOR shall maintain ratio of anomaly reported per million man-hours above target fixed by COMPANY. Anomaly reported shall have a constructive and pertinent purpose. 2000/ million MH 0.05% 73,211 Anomaly remedial action close out ratio The ratio ‘’number of anomaly action closed out / number of anomaly action’’ will be the base of remuneration. CONTRACTOR to maintain this ratio above target fixed by COMPANY 80% 0.05% 73,211 High Potential (HIPO) incident remedial action close out ratio The ratio ‘’number of HIPO action closed out / number of HIPO action’’ will be the base of remuneration. CONTRACTOR shall maintain this ratio above target fixed by COMPANY 80% 0.05% 73,211 CONTRACTOR will be audited by COMPANY at the end of yard WORKSITE activities. CONTRACTOR will be paid if Yard WORKSITE activity close out audit audit score target fixed by COMPANY is achieved. The audit will take into account the SITE installation work preparation. set by COMPANY 0.05% 73,211 CONTRACTOR will be audited by COMPANY at the end of the CONTRACT. CONTRACTOR will be paid if audit score target fixed by COMPANY is achieved. The audit will take into account the CONTRACTOR performance on installation SITE. set by COMPANY 0.05% 73,211 TRIR<1.5 Payment 100% of the % Amount of initial contract price at completion of work 0.02% 29,285 LTIF<0.4 Payment 100% of the % Amount of initial contract price at completion of work 0.02% 29,285 CONTRACT close out audit Safety statistics 80% 100% Subtotal value Incentive Scheme 3 EPCC1 & EPSC2 512,479 3
  • 4. . - " .., -----­ Anomaly Reporting Ratio: 2,000 SHOe I million Man-hours ~~ ~~ ~~ ~~ t~ t~ ~~ ~~ 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 500 c .c ... ... ' > c,' - ao .... Ll.l :!: <l: :!: ...., <l: III <II ; ItJ Q. , 1tJ ~t ~ 2012 Q. ~ <II I) t >J QI , u O 0 (Z II 0 i C - SHoe Report Man-hours .c ... ... , > c - ao Q. t ItJ QJ 1tJ , ~ ~ ~ <11 ' 0 LI. :!:' <l: :!:.... <l: I) . Ill ' QI .... 2013 Graphic 1 . Anomaly Reporting Ratio 2,000 SHOe I Millions Man-hours on October 2013 (Actual)
  • 5. HSE INCENTIVE SCHEME 3 1. With assumption : Σ Man-hours Dec 2013 Σ Manpower @Yard 2 (CTR-PTG) = 4.000.000 Safe Man-hours = 300 workers 2. Fixed Target Factor as per Contract : 2,000 SHOC / 1 Millions Man-hours 3. Actual SHOC Report Achievement : Feb, 2013 → 2,003 SHOC / 1,389,107 Man-hours 4. Plan & Target 5. Formula & Calculation : (see Graphic 2. Anomaly Reporting Ratio 2,000 SHOC / Million Man-hours) Oct, 2013 → 4,000 SHOC / 2 Million Man-hours Nov, 2013 → 6,000 SHOC / 3 Million Man-hours Dec, 2013 → 8,000 SHOC / 4 Million Man-hours Note : SHOC Report result is accumulative calculation. : Σ SHOC Assumption Σ Manpower @ PTG YARD 2 = (8,000 – 4,000) SHOC 300 = ± 15 SHOC/man/month = ± 4,000 SHOC/300 Manpower 5
  • 6. Anomaly Reporting Ratio: 2,000 SHOe / million Man-hours 4,500,000 4,000,000 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 - SHOC Report - Man-hours Cumulative 2012 2013 Graphic 2 . Anomaly Reporting Ratio 2,000 SHOe / Millions Man-hours for December 2013 (Plan)
  • 7. Rp Cash 20.000.000 The Best 100 SHOC Report Rp 20.000.000 IDR 200.000/ 15 SHOC/ man lOR 200.000 x 100 man Grenyang, November 27 th , 2013. prel~ By, Fitri Ifony HSE Engineer Reviewed By, Approved By, Ramli Simatupang Project Manager
  • 8. HSE INCENTIVE SCHEME 3 1. SHOC form should be socialized in every TBM/Project Mass Meeting by Safetyman/Safety Officer/HSE Coordinator (HSE Personnel). 2. The minimum SHOC form are 25 copy sheets per HSE Personnel and it should be given for all of worker per work area. 3. SHOC form should be collected base on minimum target 100 SHOC in every week and every HSE Personnel. 4. SHOC Analyzed should be prepare daily SHOC form minimum are ± 300 copy per day. 8
  • 10. HSE INCENTIVE SCHEME 3 Step 1 Step 2 Step 3 Step 4 Project HSE Secretary : HSE Personnel : Should be given & collected Daily SHOC Report per work area / concern area Assist of HSE Engineer SHOC Analysis : HSE Engineer : Checklist all of SHOC Report Should be done SHOC entry with computerized and find the winners 10