SlideShare una empresa de Scribd logo
1 de 41
Descargar para leer sin conexión
1
Making the Impossible Possible
Applying Heliotropic Abundance for creating Program and Project
Management Processes to Increase the Probability of Success
Do not undertake a
project unless it is
manifestly important
and nearly impossible
Making the Impossible Possible, Kim Cameron and Marc Lavine, 2006
Lessons Learned from the Cleanup of America’s most
dangerous Nuclear Weapons Plant
That Success Started with
4
The Ordinary Approach to Success †
¨ Identify and define the problem accurately.
¨ Generate alternate solutions to the problem based
on root causes so that convergence on a solution is
not premature.
¨ Focus on evaluating and selecting the best
alternative.
¨ Implement the chosen alternative solution and follow
up to ensure that the problem or obstacle is
resolved.
† Leading Change, John Kotter Harvard Business School Press, 1996
Organization Change: Theory and Practice, W. W. Burke, Sage, 2002
A Primer on Decision Making: How Decisions Happen, J. G. March, Free Press, 1994
Smart Thinking for Crazy Times: The Art of Solving the Right Problems, I. I. Mitroff, Berrett–Koehler, 1998
5
Abundance Principle of Management
¨ Strive for positive deviance, pursuing the best of the
human condition and working to fulfill the highest
potential of the organization.
¨ Focuses on:
¤ Resilience
¤ Flourishing
¤ Vitality
¤ Extraordinarily positive individual and organizational
outcomes
6
The Abundance Approach
¨ Abundance is not a substitute for ordinary
management – it is a supplement for the problem-
solving approach.
¨ Abundance focuses on:
¤ Closing the gaps between acceptable performance
and spectacular performance.
¤ Emphasizes positively deviant accomplishments rather
than normal or expected accomplishments.
¤ Positive possibilities rather than deficits.
7
Conventional versus Abundance Principles
Conventional Principles Abundance Principles
General Leadership Principles
§ Problem solving and deficit gaps § Virtuousness and abundance gaps
§ A single heroic leader § Multiple leaders playing multiple roles
§ One leader from the beginning to end § A continuity of leaders
§ Congruence and consistency § Paradox and contradiction
Principles Related to Visionary and Symbolic Leadership
§ Logical, rational, and sensible visions – with
SMART goals
§ Symbolic, emotional, and meaningful –
with profound purpose
§ Consistency, stability, and predictability § Revolution and positive deviance
§ Personal benefits and advantages § Meaningfulness beyond personal benefits
§ Organizations absorb the risks of failure
and benefits of success
§ Employees share the risks of failure and
rewards for success
8
Conventional versus Abundance Principles
Conventional Principles Abundance Principles
Careful, Clear, and Controlled Leadership
§ Organizational change at the expense of
the people
§ Organizational change for the benefit of
the people
§ Commitments and priorities based on
environmental demands
§ Unalterable commitments and integrity at
all costs
§ Managing the contract, attaching resources
to performance
§ Managing the contract and ensuring stable
funding
§ Ultimate responsibility and accountability
for measurable success at the top
§ Responsibility and accountability for
measurable success for everyone
9
Conventional versus Abundance Principles
Conventional Principles Abundance Principles
Collaboration, Engagement, and Participation
§ Building on and reinforcing the current
culture
§ Introducing challenges that the culture
cannot address
§ Decision making and leadership at the top
§ Employee and management in
partnerships in planning, decision making,
training, evaluation, and discipline
§ Need–to–know information sharing and
physical separation
§ Early, frequent, and abundant information
sharing with colocation
§ Long–term employment, personal
relations, and use of specialist
§ Long–employability, professional relations,
and retraining
10
Conventional versus Abundance Principles
Conventional Principles Abundance Principles
Rigorous, uncompromising, and results oriented leadership
§ Managing external communications
§ Openness of all message through early and
often communications
§ Keeping critics at a distance
§ Making critics stakeholders, building
relationships, and using positive strategies
§ Clear, stable performance targets that
meet standard coming from the top
§ Escalating performance, virtuousness, and
positive deviance targets from multiple
sources
§ Organizational financial benefit from
outstanding success
§ Financial generosity and benevolence with
employees
11
Four Quadrants of Improvement Guided by
the Abundance Approach
Collaborate Create
Control Compete
12
Collaborate
Relationships, Human Capital, and Collaboration
¨ Develop talent, build strong relationships, and foster
trust between all parties based on:
¤ Culture
¤ Collaboration
¤ Credibility
¤ Human capital and social relationships
13
Create
Vision, Innovation, and Symbolic Leadership
¨ Articulate and reinforce a motivating vision of what
could be in contrast of what occurred in the past.
¤ Forge a clear and shared vision of the future.
¤ Symbolic leadership in support of changing mission.
¤ Innovative and creative ideas about work.
¤ New sense of meaning and importance to pursued tasks.
14
Control
Stability, Discipline, and Process Control
¨ Grounded in virtuousness, extending beyond just
doing well, but developing mechanisms for
producing extraordinary results
¤ Goal clarity
¤ Agreements between producers and suppliers
¤ Planning and objective measures and accountability
¤ Stable support and funding for work efforts
15
Compete
Incentives and Rigorous Performance Standards
¨ Aggressive actions, external constituents, market
forces, performance incentives, and obtaining
measurable results
¤ External stakeholder agreements
¤ Managing external relationships
¤ Taking bold action
¤ Incentives for measurable progress
16
Long Term Flexibility for Change New
Internal
Maintenance Culture Type: CLAN Culture Type: ADHOCRACY
External
Positioning
Orientation: COLLOABORATE Orientation: CREATE
Leader Type: § Facilitator
§ Mentor
§ Team builder
Leader Type: § Innovator
§ Entrepreneur
§ Visionary
Value Drivers: § Commitment
§ Communication
§ Development
Value
Drivers:
§ Innovative outputs
§ Transformational
§ Agility
Theory of
Effectiveness:
§ Human development
and high commitment
produce effectiveness
Theory of
Effectiveness:
§ Innovativeness, vision, and
constant change produce
effectiveness
Culture Type: HEIRARCHY Culture Type: MARKET
Orientation: CONTROL Orientation: COMPETE
Leader Type: § Coordinator
§ Monitor
§ Organizer
Leader Type: § Hard driver
§ Competitor
§ Producer
Value Drivers: § Efficiency
§ Timeliness
§ Consistency and
Uniformity
Value
Drivers:
§ Market share
§ Goal achievement
§ Profitability
Theory of
Effectiveness:
§ Control and efficiency
with capable processes
produce effectiveness
Theory of
Effectiveness:
§ Aggressively competing
and customer focus
produce effectiveness
Incremental Stability Control Fast
Putting These Ideas to Work
¨ With the four quadrants, let’s put them to work to
increase the probability of project success
¨ This success starts with defining what Done looks like
in units of measure meaningful to the decision
makers
¨ In the case study here’s what this meant …
q Close the site, staying on schedule (we can get more
money), adhering to Federal, State, and Local
regulations, and have NO on the job injuries
18
“Why do so many projects overspend
and overrun?
Because they’re managed as if they
were merely Complicated when in fact,
they are Complex.
They’re planned as if everything is
known at the start when in fact, they
involve high levels of uncertainty that
create cost, schedule, and technical
risk.”
In, Architecting Systems: Concepts, Principles and Practice,
Hillary Sillitto, College Publications, 2014.
1. Where Are We Going?
2. How Do We Get There?
3. Do We Have Enough
Time, Resources, And
Money To Get There?
4. What Impediments Will
We Encounter Along The
Way?
5. How Do We Know We
Are Making Progress?
5 Immutable Principles of Project Success
19
What Does Done Look Like?
§ Develop a list of features or deliverables and
describe the technical capabilities for each in units
of measure meaningful to the decision makers.
§ Model the interdependencies between these
deliverables.
§ Develop the Measures of Effectiveness and
Measures of Performance and Key Performance
Parameters for each Capability
20
21
“Done” Provides the Capability to Do
Something
How Do We Get to Done when needed
for the planned cost?
§ Build a Plan and a Schedule for the work to be
performed.
§ Define “packages of work” for all the activities
with deliverables defined as “exit criteria”
§ Link the Accomplishment and Criteria
vertically First and then link the Work
Packages horizontally
Principle ②
22
23
The Schedule Tells Us the Order of the
Planned Work
24
The Schedule Shows Progress to Plan
§ Deliverables represent the required mission
capabilities and its value as defined by the business
and shared by the contractor team.
§ When all deliverables and their Work Packages are
complete, they are not revisited or reopened.
– They are 100% done.
§ The progression of Work Packages defines the
increasing maturity of the deliverables.
– The mission value of the deliverables to the customer
increases as Work Packages are completed.
§ Completion of Work Packages is represented by the
Physical Percent Completion of the deliverables.
– Either 0%/100% or Apportioned Milestones are used
to state the completion of each Work Package.
Mission
Capabilities
Technical
Capabilities
Work Packages
Deliverables
25
The Schedule Connects Work to
Deliverables
§ Vertical traceability ACè SAè PE
§ Horizontal traceability WPè WPèAC
Program Deliverables
Define the maturity
of a Capability at a point in
time.
Significant Accomplishments
Represent requirements
that enable Capabilities.
Accomplishment Criteria
Exit Criteria for the Work
Packages that fulfill Requirements.
Work
Package
Work
Package
Work
Package
Work
Package
Work
Package
Work
package
Work
Package
Work
Package
Do We Have the Resources Needed to
Reach Done?
¨ List the needed staff and materials for the project
¨ Assign these staff and materials to the work
packages
¨ Estimate the cost of the staff and materials and the
impact of this variance on the total project cost and
delivery schedule
26
27
We need the right people, with the right
skills, at the right cost, at the right time to
have any hope of project success
27
What Are The Impediments to
Reaching Done?
¨ Make a list of risks and rank them by priority.
¨ Assess impact on cost and schedule for each risk
and the dependencies of these risks on external
and internal drivers
¨ Assess the probability of occurrence and the
probabilistic impact on cost and schedule impact,
cost of handling, and cost of the residual risk after
handling
28
29
All Risk Come From Uncertainty
How Do We Measures Progress Toward
Done?
¨ Describe the outcomes of the work effort using
language the customer understands
¨ Assign Technical Performance Measures to the
Deliverables
¨ Assign Measures of Performance, Measures of
Effectiveness, Key Performance Parameters, and
Integrate these throughout the project
30
The goal of all project management
processes are to align all measures of
Effectiveness and Performance into a
cohesive process to
Increase Probability of Success
31
This is What DONE Looks Like
32
Backup Material
35
Apply Continuous Risk
Management to each
Performance Based Management
process area
Identify Needed
Capabilities to achieve the
project objectives or the
end state for a specific
scenario.
Elicit Technical &
Operational Requirements
needed for the system capabilities
to be fulfilled.
Establish Performance
Measurement Baseline time–
phased network of work
activities describing the
work to be performed
Execute Performance
Measurement Baseline
activities while assuring
technical performance is met
I II
III
IV
V
36
I ‒ Identify Needed Capabilities
A Capability is …
“Planning, under uncertainty, to provide capabilities
suitable for a wide range of modern-day challenges
and circumstances while working within an economic
framework that necessitates choice.”
By Identifying system capabilities, the elicited technical
and operational requirements can be traced from the
Measures of Effectiveness (MOE) to each deliverable in
the Integrated Master Plan and Schedule.
Capabilities state the “why” of the system.
† Analytic Architecture for Capabilities-Based Planning, Mission-System Analysis, and Transformation, Paul Davis, RAND, 2002
37
II ‒ Establish the Technical and
Operational Requirements
Technical and Operational requirements are the basis of
Work Packages and Planning Packages and the work
efforts needed to produce the deliverables from these
Packages.
These deliverables fulfill the technical and operational
requirements needed to deliver the system Capabilities.
Tracing Capabilities to Requirements and back again,
assures each requirement has a “home” in the system.
38
III ‒ Establish the Performance
Measurement Baseline
The Performance Measurement Baseline (PMB) is the
integration of scope, schedule, cost used to assess
progress to plan with measures of physical percent
complete for the Effectiveness and Performance of the
delivered Capabilities.
Starting at the Work Package level, a pre–defined
performance measure is established.
During the performance period assessment of “progress
to plan” produce measures of Physical Percent
Complete.
39
IV ‒ Execute the Performance Measurement
Baseline
Using the Performance Measurement Baseline (PMB),
each Work Package must start as planned, complete on
or near the planned date, and produce the planned
technical performance.
This is the key to success for any credible Performance
Based Management plan.
In the absence of this, the project is behind schedule,
over budget, and non–compliant with the technical
goals.
40
V ‒ Perform Continuous Risk Management
41

Más contenido relacionado

La actualidad más candente

Why do projects fail - the project execution maturity model - basic collabor...
Why do projects fail  - the project execution maturity model - basic collabor...Why do projects fail  - the project execution maturity model - basic collabor...
Why do projects fail - the project execution maturity model - basic collabor...
Pinnacle Strategies
 
A Repeatable Project Management Methodology
A Repeatable Project Management MethodologyA Repeatable Project Management Methodology
A Repeatable Project Management Methodology
Shaun Smith, MSPM, PMP
 

La actualidad más candente (20)

Why do projects fail - the project execution maturity model - basic collabor...
Why do projects fail  - the project execution maturity model - basic collabor...Why do projects fail  - the project execution maturity model - basic collabor...
Why do projects fail - the project execution maturity model - basic collabor...
 
Key Concepts for Project Mgmt
Key Concepts for Project MgmtKey Concepts for Project Mgmt
Key Concepts for Project Mgmt
 
Five Immutable Principles of Project Success
Five Immutable Principles of Project SuccessFive Immutable Principles of Project Success
Five Immutable Principles of Project Success
 
Project Management for the Accidental Project Manager
Project Management for the Accidental Project ManagerProject Management for the Accidental Project Manager
Project Management for the Accidental Project Manager
 
Deliverables based planning
Deliverables based planning Deliverables based planning
Deliverables based planning
 
A Gentle Introduction to Deliverables Based Planning
A Gentle Introduction to Deliverables Based PlanningA Gentle Introduction to Deliverables Based Planning
A Gentle Introduction to Deliverables Based Planning
 
Introduction of software project management
Introduction of software project managementIntroduction of software project management
Introduction of software project management
 
Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2
 
Project Management Basics
Project Management BasicsProject Management Basics
Project Management Basics
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
Project management and Success Criteria
Project management and Success Criteria Project management and Success Criteria
Project management and Success Criteria
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Presentation Project managment
Presentation Project managmentPresentation Project managment
Presentation Project managment
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)
 
Project Management
Project ManagementProject Management
Project Management
 
A Repeatable Project Management Methodology
A Repeatable Project Management MethodologyA Repeatable Project Management Methodology
A Repeatable Project Management Methodology
 
PMP selected topics and ideas
PMP selected topics and ideasPMP selected topics and ideas
PMP selected topics and ideas
 
Nine best practices of project management
Nine best practices of project managementNine best practices of project management
Nine best practices of project management
 
Adaptive Project Management
Adaptive Project ManagementAdaptive Project Management
Adaptive Project Management
 
Project Management
Project ManagementProject Management
Project Management
 

Similar a Making the impossible possible

Project Management - A Personal Perspective
Project Management - A Personal PerspectiveProject Management - A Personal Perspective
Project Management - A Personal Perspective
Peter Gross
 
3 Conversations For Designing a Self-Sustaining Talent Management Process
3 Conversations For Designing a Self-Sustaining Talent Management Process 3 Conversations For Designing a Self-Sustaining Talent Management Process
3 Conversations For Designing a Self-Sustaining Talent Management Process
David Lipsky, PhD
 
Sample ProposalsTypical ApproachProposals can vary a great d.docx
Sample ProposalsTypical ApproachProposals can vary a great d.docxSample ProposalsTypical ApproachProposals can vary a great d.docx
Sample ProposalsTypical ApproachProposals can vary a great d.docx
todd331
 
Fierce Program Outcomes
Fierce Program OutcomesFierce Program Outcomes
Fierce Program Outcomes
Said Hamood
 

Similar a Making the impossible possible (20)

Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
 
People leaders. brf leadership
People leaders. brf leadershipPeople leaders. brf leadership
People leaders. brf leadership
 
BGT PwC - Benintende
 BGT PwC - Benintende  BGT PwC - Benintende
BGT PwC - Benintende
 
Leading change
Leading changeLeading change
Leading change
 
Leading & Managing Transformational Change
Leading & Managing Transformational ChangeLeading & Managing Transformational Change
Leading & Managing Transformational Change
 
Leading and Managing Transformational Change
Leading and Managing Transformational ChangeLeading and Managing Transformational Change
Leading and Managing Transformational Change
 
Project Management - A Personal Perspective
Project Management - A Personal PerspectiveProject Management - A Personal Perspective
Project Management - A Personal Perspective
 
The HCC Way
The HCC Way The HCC Way
The HCC Way
 
Consulting 101 day 1
Consulting 101 day 1Consulting 101 day 1
Consulting 101 day 1
 
Consulting 101 day 1
Consulting 101 day 1Consulting 101 day 1
Consulting 101 day 1
 
3 Conversations For Designing a Self-Sustaining Talent Management Process
3 Conversations For Designing a Self-Sustaining Talent Management Process 3 Conversations For Designing a Self-Sustaining Talent Management Process
3 Conversations For Designing a Self-Sustaining Talent Management Process
 
Sample ProposalsTypical ApproachProposals can vary a great d.docx
Sample ProposalsTypical ApproachProposals can vary a great d.docxSample ProposalsTypical ApproachProposals can vary a great d.docx
Sample ProposalsTypical ApproachProposals can vary a great d.docx
 
TQM - DEMING CONTRIBUTION
TQM - DEMING CONTRIBUTIONTQM - DEMING CONTRIBUTION
TQM - DEMING CONTRIBUTION
 
Essential Leadership Skills
Essential Leadership SkillsEssential Leadership Skills
Essential Leadership Skills
 
Scope or: How to Manage Projects for Organization Success
Scope or: How to Manage Projects for Organization SuccessScope or: How to Manage Projects for Organization Success
Scope or: How to Manage Projects for Organization Success
 
Engagement Teams, Creative Spaces and Correlations™
Engagement Teams, Creative Spaces and Correlations™Engagement Teams, Creative Spaces and Correlations™
Engagement Teams, Creative Spaces and Correlations™
 
SODEI behaviours
SODEI behavioursSODEI behaviours
SODEI behaviours
 
Fierce Program Outcomes
Fierce Program OutcomesFierce Program Outcomes
Fierce Program Outcomes
 
Connectics: Tips and Tricks to Drive Engagement Across Your Organisation
Connectics: Tips and Tricks to Drive Engagement Across Your OrganisationConnectics: Tips and Tricks to Drive Engagement Across Your Organisation
Connectics: Tips and Tricks to Drive Engagement Across Your Organisation
 
Business Transformation infographic
Business Transformation infographicBusiness Transformation infographic
Business Transformation infographic
 

Más de Glen Alleman

Más de Glen Alleman (20)

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPM
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk management
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk Management
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guide
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planning
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement Baseline
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six Sigma
 
Integrated Master Plan Development
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Integrated Master Plan Development
 
Project Management Theory
Project Management TheoryProject Management Theory
Project Management Theory
 

Último

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 

Último (20)

The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 

Making the impossible possible

  • 1. 1 Making the Impossible Possible Applying Heliotropic Abundance for creating Program and Project Management Processes to Increase the Probability of Success Do not undertake a project unless it is manifestly important and nearly impossible
  • 2. Making the Impossible Possible, Kim Cameron and Marc Lavine, 2006 Lessons Learned from the Cleanup of America’s most dangerous Nuclear Weapons Plant
  • 4. 4 The Ordinary Approach to Success † ¨ Identify and define the problem accurately. ¨ Generate alternate solutions to the problem based on root causes so that convergence on a solution is not premature. ¨ Focus on evaluating and selecting the best alternative. ¨ Implement the chosen alternative solution and follow up to ensure that the problem or obstacle is resolved. † Leading Change, John Kotter Harvard Business School Press, 1996 Organization Change: Theory and Practice, W. W. Burke, Sage, 2002 A Primer on Decision Making: How Decisions Happen, J. G. March, Free Press, 1994 Smart Thinking for Crazy Times: The Art of Solving the Right Problems, I. I. Mitroff, Berrett–Koehler, 1998
  • 5. 5 Abundance Principle of Management ¨ Strive for positive deviance, pursuing the best of the human condition and working to fulfill the highest potential of the organization. ¨ Focuses on: ¤ Resilience ¤ Flourishing ¤ Vitality ¤ Extraordinarily positive individual and organizational outcomes
  • 6. 6 The Abundance Approach ¨ Abundance is not a substitute for ordinary management – it is a supplement for the problem- solving approach. ¨ Abundance focuses on: ¤ Closing the gaps between acceptable performance and spectacular performance. ¤ Emphasizes positively deviant accomplishments rather than normal or expected accomplishments. ¤ Positive possibilities rather than deficits.
  • 7. 7 Conventional versus Abundance Principles Conventional Principles Abundance Principles General Leadership Principles § Problem solving and deficit gaps § Virtuousness and abundance gaps § A single heroic leader § Multiple leaders playing multiple roles § One leader from the beginning to end § A continuity of leaders § Congruence and consistency § Paradox and contradiction Principles Related to Visionary and Symbolic Leadership § Logical, rational, and sensible visions – with SMART goals § Symbolic, emotional, and meaningful – with profound purpose § Consistency, stability, and predictability § Revolution and positive deviance § Personal benefits and advantages § Meaningfulness beyond personal benefits § Organizations absorb the risks of failure and benefits of success § Employees share the risks of failure and rewards for success
  • 8. 8 Conventional versus Abundance Principles Conventional Principles Abundance Principles Careful, Clear, and Controlled Leadership § Organizational change at the expense of the people § Organizational change for the benefit of the people § Commitments and priorities based on environmental demands § Unalterable commitments and integrity at all costs § Managing the contract, attaching resources to performance § Managing the contract and ensuring stable funding § Ultimate responsibility and accountability for measurable success at the top § Responsibility and accountability for measurable success for everyone
  • 9. 9 Conventional versus Abundance Principles Conventional Principles Abundance Principles Collaboration, Engagement, and Participation § Building on and reinforcing the current culture § Introducing challenges that the culture cannot address § Decision making and leadership at the top § Employee and management in partnerships in planning, decision making, training, evaluation, and discipline § Need–to–know information sharing and physical separation § Early, frequent, and abundant information sharing with colocation § Long–term employment, personal relations, and use of specialist § Long–employability, professional relations, and retraining
  • 10. 10 Conventional versus Abundance Principles Conventional Principles Abundance Principles Rigorous, uncompromising, and results oriented leadership § Managing external communications § Openness of all message through early and often communications § Keeping critics at a distance § Making critics stakeholders, building relationships, and using positive strategies § Clear, stable performance targets that meet standard coming from the top § Escalating performance, virtuousness, and positive deviance targets from multiple sources § Organizational financial benefit from outstanding success § Financial generosity and benevolence with employees
  • 11. 11 Four Quadrants of Improvement Guided by the Abundance Approach Collaborate Create Control Compete
  • 12. 12 Collaborate Relationships, Human Capital, and Collaboration ¨ Develop talent, build strong relationships, and foster trust between all parties based on: ¤ Culture ¤ Collaboration ¤ Credibility ¤ Human capital and social relationships
  • 13. 13 Create Vision, Innovation, and Symbolic Leadership ¨ Articulate and reinforce a motivating vision of what could be in contrast of what occurred in the past. ¤ Forge a clear and shared vision of the future. ¤ Symbolic leadership in support of changing mission. ¤ Innovative and creative ideas about work. ¤ New sense of meaning and importance to pursued tasks.
  • 14. 14 Control Stability, Discipline, and Process Control ¨ Grounded in virtuousness, extending beyond just doing well, but developing mechanisms for producing extraordinary results ¤ Goal clarity ¤ Agreements between producers and suppliers ¤ Planning and objective measures and accountability ¤ Stable support and funding for work efforts
  • 15. 15 Compete Incentives and Rigorous Performance Standards ¨ Aggressive actions, external constituents, market forces, performance incentives, and obtaining measurable results ¤ External stakeholder agreements ¤ Managing external relationships ¤ Taking bold action ¤ Incentives for measurable progress
  • 16. 16 Long Term Flexibility for Change New Internal Maintenance Culture Type: CLAN Culture Type: ADHOCRACY External Positioning Orientation: COLLOABORATE Orientation: CREATE Leader Type: § Facilitator § Mentor § Team builder Leader Type: § Innovator § Entrepreneur § Visionary Value Drivers: § Commitment § Communication § Development Value Drivers: § Innovative outputs § Transformational § Agility Theory of Effectiveness: § Human development and high commitment produce effectiveness Theory of Effectiveness: § Innovativeness, vision, and constant change produce effectiveness Culture Type: HEIRARCHY Culture Type: MARKET Orientation: CONTROL Orientation: COMPETE Leader Type: § Coordinator § Monitor § Organizer Leader Type: § Hard driver § Competitor § Producer Value Drivers: § Efficiency § Timeliness § Consistency and Uniformity Value Drivers: § Market share § Goal achievement § Profitability Theory of Effectiveness: § Control and efficiency with capable processes produce effectiveness Theory of Effectiveness: § Aggressively competing and customer focus produce effectiveness Incremental Stability Control Fast
  • 17. Putting These Ideas to Work ¨ With the four quadrants, let’s put them to work to increase the probability of project success ¨ This success starts with defining what Done looks like in units of measure meaningful to the decision makers ¨ In the case study here’s what this meant … q Close the site, staying on schedule (we can get more money), adhering to Federal, State, and Local regulations, and have NO on the job injuries
  • 18. 18 “Why do so many projects overspend and overrun? Because they’re managed as if they were merely Complicated when in fact, they are Complex. They’re planned as if everything is known at the start when in fact, they involve high levels of uncertainty that create cost, schedule, and technical risk.” In, Architecting Systems: Concepts, Principles and Practice, Hillary Sillitto, College Publications, 2014.
  • 19. 1. Where Are We Going? 2. How Do We Get There? 3. Do We Have Enough Time, Resources, And Money To Get There? 4. What Impediments Will We Encounter Along The Way? 5. How Do We Know We Are Making Progress? 5 Immutable Principles of Project Success 19
  • 20. What Does Done Look Like? § Develop a list of features or deliverables and describe the technical capabilities for each in units of measure meaningful to the decision makers. § Model the interdependencies between these deliverables. § Develop the Measures of Effectiveness and Measures of Performance and Key Performance Parameters for each Capability 20
  • 21. 21 “Done” Provides the Capability to Do Something
  • 22. How Do We Get to Done when needed for the planned cost? § Build a Plan and a Schedule for the work to be performed. § Define “packages of work” for all the activities with deliverables defined as “exit criteria” § Link the Accomplishment and Criteria vertically First and then link the Work Packages horizontally Principle ② 22
  • 23. 23 The Schedule Tells Us the Order of the Planned Work
  • 24. 24 The Schedule Shows Progress to Plan § Deliverables represent the required mission capabilities and its value as defined by the business and shared by the contractor team. § When all deliverables and their Work Packages are complete, they are not revisited or reopened. – They are 100% done. § The progression of Work Packages defines the increasing maturity of the deliverables. – The mission value of the deliverables to the customer increases as Work Packages are completed. § Completion of Work Packages is represented by the Physical Percent Completion of the deliverables. – Either 0%/100% or Apportioned Milestones are used to state the completion of each Work Package. Mission Capabilities Technical Capabilities Work Packages Deliverables
  • 25. 25 The Schedule Connects Work to Deliverables § Vertical traceability ACè SAè PE § Horizontal traceability WPè WPèAC Program Deliverables Define the maturity of a Capability at a point in time. Significant Accomplishments Represent requirements that enable Capabilities. Accomplishment Criteria Exit Criteria for the Work Packages that fulfill Requirements. Work Package Work Package Work Package Work Package Work Package Work package Work Package Work Package
  • 26. Do We Have the Resources Needed to Reach Done? ¨ List the needed staff and materials for the project ¨ Assign these staff and materials to the work packages ¨ Estimate the cost of the staff and materials and the impact of this variance on the total project cost and delivery schedule 26
  • 27. 27 We need the right people, with the right skills, at the right cost, at the right time to have any hope of project success 27
  • 28. What Are The Impediments to Reaching Done? ¨ Make a list of risks and rank them by priority. ¨ Assess impact on cost and schedule for each risk and the dependencies of these risks on external and internal drivers ¨ Assess the probability of occurrence and the probabilistic impact on cost and schedule impact, cost of handling, and cost of the residual risk after handling 28
  • 29. 29 All Risk Come From Uncertainty
  • 30. How Do We Measures Progress Toward Done? ¨ Describe the outcomes of the work effort using language the customer understands ¨ Assign Technical Performance Measures to the Deliverables ¨ Assign Measures of Performance, Measures of Effectiveness, Key Performance Parameters, and Integrate these throughout the project 30
  • 31. The goal of all project management processes are to align all measures of Effectiveness and Performance into a cohesive process to Increase Probability of Success 31
  • 32. This is What DONE Looks Like 32
  • 33.
  • 35. 35 Apply Continuous Risk Management to each Performance Based Management process area Identify Needed Capabilities to achieve the project objectives or the end state for a specific scenario. Elicit Technical & Operational Requirements needed for the system capabilities to be fulfilled. Establish Performance Measurement Baseline time– phased network of work activities describing the work to be performed Execute Performance Measurement Baseline activities while assuring technical performance is met I II III IV V
  • 36. 36 I ‒ Identify Needed Capabilities A Capability is … “Planning, under uncertainty, to provide capabilities suitable for a wide range of modern-day challenges and circumstances while working within an economic framework that necessitates choice.” By Identifying system capabilities, the elicited technical and operational requirements can be traced from the Measures of Effectiveness (MOE) to each deliverable in the Integrated Master Plan and Schedule. Capabilities state the “why” of the system. † Analytic Architecture for Capabilities-Based Planning, Mission-System Analysis, and Transformation, Paul Davis, RAND, 2002
  • 37. 37 II ‒ Establish the Technical and Operational Requirements Technical and Operational requirements are the basis of Work Packages and Planning Packages and the work efforts needed to produce the deliverables from these Packages. These deliverables fulfill the technical and operational requirements needed to deliver the system Capabilities. Tracing Capabilities to Requirements and back again, assures each requirement has a “home” in the system.
  • 38. 38 III ‒ Establish the Performance Measurement Baseline The Performance Measurement Baseline (PMB) is the integration of scope, schedule, cost used to assess progress to plan with measures of physical percent complete for the Effectiveness and Performance of the delivered Capabilities. Starting at the Work Package level, a pre–defined performance measure is established. During the performance period assessment of “progress to plan” produce measures of Physical Percent Complete.
  • 39. 39 IV ‒ Execute the Performance Measurement Baseline Using the Performance Measurement Baseline (PMB), each Work Package must start as planned, complete on or near the planned date, and produce the planned technical performance. This is the key to success for any credible Performance Based Management plan. In the absence of this, the project is behind schedule, over budget, and non–compliant with the technical goals.
  • 40. 40 V ‒ Perform Continuous Risk Management
  • 41. 41