The	
  Integrated	
  Master	
  Plan	
  And	
  
Integrated	
  Master	
  Schedule	
  
The	
  Integrated	
  Master	
  Plan	
  and	
  Integrated	
  Master	
  Schedule	
  are	
  one	
  of	
  the	
  
six	
  elements	
  of	
  a	
  Credible	
  Performance	
  Measurement	
  Baseline	
  (PMB).	
  
The	
  PMB	
  is	
  the	
  source	
  of	
  data	
  for	
  the	
  Program	
  Manager.	
  Some	
  of	
  this	
  data	
  is	
  
used	
  in	
  the	
  Integrated	
  Program	
  Measurement	
  Report	
  (IPMR).	
  Some	
  is	
  used	
  
in	
  the	
  assessment	
  of	
  the	
  Program’s	
  risk.	
  Some	
  define	
  the	
  deliverables	
  and	
  
their	
  Technical	
  Performance	
  Measures.	
  	
  
1	
  
5
V8.5	
  
The	
  IMP	
  tells	
  us	
  where	
  is	
  the	
  program	
  going?	
  
The	
  Plan	
  describes	
  where	
  we	
  are	
  going,	
  the	
  various	
  paths	
  we	
  can	
  take	
  to	
  reach	
  our	
  
desLnaLon,	
  and	
  the	
  progress	
  or	
  performance	
  assessment	
  points	
  along	
  the	
  way	
  to	
  
assure	
  we	
  are	
  on	
  the	
  right	
  path.	
  
These	
  assessment	
  points	
  measures	
  the	
  “maturity”	
  of	
  the	
  product	
  or	
  service	
  against	
  
the	
  planned	
  maturity.	
  This	
  is	
  the	
  only	
  real	
  measure	
  of	
  progress	
  –	
  not	
  the	
  passage	
  
of	
  Lme	
  or	
  consumpLon	
  of	
  money.	
  
The	
  Integrated	
  Master	
  Plan	
  (IMP)	
  Is	
  A	
  Strategy	
  For	
  
The	
  Successful	
  Comple=on	
  Of	
  The	
  Project	
  
2	
  
5.0	
  Start	
  with	
  the	
  IMP	
  
3	
  
5.0	
  Start	
  with	
  the	
  IMP	
  
Quick	
  View	
  to	
  IMP/IMS	
  
!  VerLcal	
  traceability	
  defines	
  the	
  increasing	
  maturity	
  of	
  
key	
  deliverables	
  
!  Horizontal	
  traceability	
  defines	
  the	
  work	
  acLviLes	
  
needed	
  to	
  produce	
  this	
  increasing	
  maturity	
  
!  Both	
  are	
  needed,	
  but	
  the	
  verLcal	
  traceability	
  is	
  the	
  
starLng	
  point	
  
!  Program	
  Events,	
  Significant	
  Accomplishments,	
  and	
  
Accomplishment	
  Criteria	
  must	
  be	
  defined	
  before	
  the	
  
horizontal	
  work	
  acLviLes	
  can	
  be	
  idenLfied	
  
!  For	
  all	
  IMP	
  elements,	
  Key	
  Risks	
  must	
  be	
  idenLfied	
  and	
  
assigned	
  from	
  Day	
  One,	
  even	
  without	
  miLgaLons	
  
4	
  
5.0	
  Start	
  with	
  the	
  IMP	
  
The	
  IMP/IMS	
  is	
  Needed	
  on	
  	
  
Both	
  Sides	
  of	
  the	
  Contract	
  
!  Ver%cal	
  traceability	
  defines	
  the	
  increasing	
  maturity	
  of	
  
the	
  program’s	
  deliverables	
  measures	
  in	
  EffecLveness	
  
(MoE)	
  and	
  Performance	
  (MoP)	
  for	
  the	
  Government.	
  
!  Horizontal	
  traceability	
  defines	
  the	
  progress	
  to	
  plan	
  for	
  
MoE’s	
  and	
  MoP’s	
  with	
  tangible	
  evidence	
  for	
  both	
  the	
  
Government	
  and	
  the	
  Contractor.	
  
!  Ver%cal	
  traceability	
  provides	
  the	
  Government	
  with	
  
insight	
  into	
  the	
  progress	
  of	
  the	
  MoE’s	
  and	
  MoP’s	
  and	
  
Technical	
  Performance	
  Measures.	
  
!  Horizontal	
  traceability	
  provides	
  insight	
  into	
  Cost	
  and	
  
Schedule	
  performance	
  for	
  the	
  Contractor,	
  reportable	
  
through	
  the	
  IPMR	
  to	
  the	
  Government.	
  
5	
  
5.0	
  Start	
  with	
  the	
  IMP	
  
MisconcepLons	
  of	
  	
  
the	
  IMP	
  /	
  IMS	
  
Why	
  we	
  don’t	
  need/want	
  an	
  IMP/IMS	
  	
  
!  Only	
  required	
  for	
  ACAT	
  I	
  programs	
  
!  Too	
  big	
  and	
  burdensome	
  for	
  our	
  small	
  dollar	
  value	
  program	
  
!  Contractor	
  spends	
  B&P	
  and	
  program	
  budget	
  generaLng	
  and	
  
maintaining	
  the	
  IMP,	
  without	
  measurable	
  benefit	
  
!  Doesn’t	
  apply	
  on	
  a	
  services	
  contractors	
  
!  Management	
  tool,	
  not	
  a	
  technical	
  tool	
  
!  Doesn’t	
  apply	
  to	
  technology	
  programs	
  
!  Doesn’t	
  apply	
  to	
  R&D	
  efforts	
  
!  Doesn’t	
  apply	
  to	
  the	
  government	
  
!  Help	
  me	
  get	
  a	
  waiver	
  so	
  I	
  don’t	
  have	
  to	
  use	
  an	
  IMP/IMS	
  
6	
  
5.0	
  Start	
  with	
  the	
  IMP	
  
Aeributes	
  of	
  IMP	
  
!  Traceability	
  
–  Expands	
  and	
  complies	
  with	
  the	
  SOO,	
  Performance	
  
Requirements,	
  CWBS,	
  and	
  CSOW	
  
–  Based	
  on	
  the	
  customers	
  WBS	
  
–  Is	
  the	
  basis	
  of	
  the	
  IMS,	
  cost	
  reports,	
  and	
  award	
  fees	
  
!  Implements	
  a	
  measurable	
  and	
  trackable	
  program	
  
–  Accomplishes	
  integrated	
  product	
  development	
  
–  Integrates	
  the	
  funcLonal	
  acLviLes	
  of	
  the	
  program	
  
–  Incorporates	
  funcLonal,	
  lower	
  level	
  and	
  S/C	
  IMPs	
  
!  Provides	
  for	
  evaluaLon	
  of	
  Program	
  Maturity	
  
–  Provides	
  insight	
  into	
  the	
  overall	
  effort	
  
–  Level	
  of	
  detail	
  is	
  consistent	
  with	
  risk	
  and	
  complexity	
  per	
  §L	
  
–  Decomposes	
  events	
  into	
  a	
  logical	
  series	
  of	
  accomplishments	
  
–  Measurable	
  criteria	
  demonstrate	
  compleLon	
  /	
  quality	
  of	
  
accomplishments	
  
7	
  
5.0	
  Start	
  with	
  the	
  IMP	
  
Aeributes	
  of	
  the	
  IMS	
  
!  Integrated,	
  networked,	
  mulL-­‐layered	
  schedule	
  of	
  
efforts	
  required	
  to	
  achieve	
  each	
  IMP	
  
accomplishment	
  
–  Detailed	
  tasks	
  and	
  work	
  to	
  be	
  completed	
  
–  Calendar	
  schedule	
  shows	
  work	
  compleLon	
  dates	
  
–  Network	
  schedule	
  shows	
  interrelaLonships	
  and	
  
criLcal	
  path	
  
–  Expanded	
  granularity,	
  frequency,	
  and	
  depth	
  of	
  risk	
  
areas	
  
!  Resource	
  loading	
  
!  Correlates	
  IMS	
  work	
  with	
  IMP	
  events	
  
8	
  
5.0	
  Start	
  with	
  the	
  IMP	
  
The	
  Importance	
  of	
  the	
  IMP	
  
!  The	
  IMP/IMS	
  is	
  the	
  single	
  most	
  important	
  document	
  to	
  
a	
  program’s	
  success	
  
–  It	
  clearly	
  demonstrates	
  the	
  providers	
  understanding	
  of	
  the	
  
program	
  requirements	
  and	
  the	
  soundness	
  of	
  the	
  approach	
  
a	
  represented	
  by	
  the	
  plan	
  
!  The	
  program	
  uses	
  the	
  IMP/IMS	
  to	
  provide:	
  
–  Up	
  Front	
  Planning	
  and	
  commitment	
  from	
  all	
  parLcipants	
  
–  A	
  balanced	
  design	
  discipline	
  with	
  risk	
  miLgaLon	
  acLviLes	
  
–  Integrated	
  requirements	
  including	
  producLon	
  and	
  support	
  
–  Management	
  with	
  an	
  incremental	
  verificaLon	
  for	
  
informed	
  program	
  decisions	
  
9	
  
5.0	
  Start	
  with	
  the	
  IMP	
  
Just	
  A	
  Reminder,	
  before	
  moving	
  on	
  
10	
  
Page	
  47,	
  Defense	
  AcquisiLon	
  Guide,	
  January	
  10,	
  2012	
  
Page	
  317,	
  Defense	
  AcquisiLon	
  Guide,	
  January	
  10,	
  2012	
  
5.0	
  Start	
  with	
  the	
  IMP	
  
Our	
  Goal	
  is	
  simple	
  …	
  	
  
How	
  can	
  we	
  recognize	
  the	
  Reality	
  of	
  the	
  Program’s	
  
current	
  status	
  and	
  its	
  future	
  performance?	
  
The	
  top	
  spins	
  conLnuous	
  while	
  in	
  a	
  dream	
  –	
  stops	
  
spinning	
  in	
  the	
  real	
  world	
  –	
  Cobb’s	
  totem,	
  Incep=on	
  
11	
  
5.0	
  Start	
  with	
  the	
  IMP	
  
12	
  
Principles	
  of	
  Building	
  a	
  Credible	
  
Integrated	
  Master	
  Plan	
  
Building	
  the	
  IMP	
  is	
  a	
  Systems	
  Engineering	
  ac<vity.	
  The	
  Integrated	
  Master	
  Plan	
  is	
  
the	
  Program	
  Architecture	
  in	
  the	
  same	
  way	
  the	
  hardware	
  and	
  soBware	
  are	
  the	
  
Product	
  Architecture.	
  
Poor,	
  a	
  weak,	
  or	
  unstructured	
  Programma<c	
  Architecture	
  reduces	
  visibility	
  to	
  
the	
  Product	
  Architecture’s	
  performance	
  measures	
  of	
  cost	
  and	
  schedule	
  
connected	
  with	
  Technical	
  Performance	
  Measures.	
  
	
  
1	
  
6
V8.5	
  
Quick	
  View	
  of	
  Building	
  the	
  IMP	
  
!  Start	
  with	
  each	
  Program	
  Event	
  and	
  define	
  the	
  
Significant	
  Accomplishments	
  their	
  entry	
  and	
  
exit	
  criteria	
  to	
  assess	
  the	
  needed	
  maturity	
  of	
  
the	
  key	
  deliverables	
  
!  Arrange	
  the	
  Significant	
  Accomplishments	
  in	
  
the	
  proper	
  dependency	
  order	
  	
  
!  Segregate	
  these	
  Significant	
  Accomplishments	
  
into	
  swim	
  lanes	
  for	
  IPTs	
  
!  Define	
  the	
  dependencies	
  between	
  each	
  SA	
  
2	
  
6.0	
  Build	
  IMP	
  
A	
  Cri<cal	
  Understanding	
  of	
  the	
  IMP	
  
3	
  
The	
  IMP	
  defines	
  the	
  connec<ons	
  between	
  the	
  Product	
  maturity	
  –	
  Ver<cal	
  –	
  and	
  the	
  
implementa<on	
  of	
  this	
  Product	
  maturity	
  through	
  the	
  Func<onal	
  ac<vi<es	
  –	
  the	
  Horizontal	
  	
  
6.0	
  Build	
  IMP	
  
Benefits	
  of	
  this	
  Formality	
  
4	
  
Objec&ve	
   Implementa&on	
  
Event	
  Driven	
  Plan	
  versus	
  Schedule	
  
Driven	
  Plan	
  is	
  based	
  on	
  comple<on	
  of	
  
tasks	
  not	
  passage	
  of	
  <me	
  
Separate	
  the	
  plan	
  (IMP)	
  from	
  the	
  
schedule	
  (IMS)	
  but	
  link	
  elements	
  with	
  
numbering	
  system	
  
Condensed,	
  easy	
  to	
  read	
  “Plan”	
  showing	
  
the	
  “Events”	
  rather	
  than	
  the	
  work	
  effort	
  
Indentured,	
  outline	
  format	
  –	
  not	
  text	
  
Pre-­‐defined	
  entry	
  and	
  exit	
  criteria	
  for	
  
major	
  Program	
  Events	
  
Significant	
  Accomplishments	
  for	
  each	
  
key	
  Program	
  Event	
  
Objec<ve	
  measures	
  of	
  progress	
  and	
  
comple<on	
  for	
  each	
  Accomplishment	
  
Pre-­‐defined	
  Accomplishment	
  Criteria	
  
(AC)	
  for	
  each	
  Significant	
  
Accomplishment	
  (SA)	
  
Stable,	
  contracture	
  plan,	
  flexible	
  enough	
  
to	
  portray	
  program	
  status	
  
IMP	
  part	
  of	
  the	
  contract,	
  IMS	
  is	
  a	
  data	
  
item	
  
Capture	
  essence	
  of	
  the	
  func<onal	
  
progress	
  without	
  manda<ng	
  a	
  par<cular	
  
process	
  for	
  performing	
  the	
  work	
  
Split	
  IMP	
  into	
  Product	
  and	
  Process	
  
6.0	
  Build	
  IMP	
  
Risk	
  Management	
  
Building	
  the	
  IMP	
  Starts	
  at	
  the	
  RFP	
  
5	
  
SOW	
  
SOO	
  
ConOps	
  
WBS	
  
Techncial	
  and	
  Opera<onal	
  
Requirements	
  
CWBS	
  &	
  
CWBS	
  Dic<onary	
  
Integrated	
  Master	
  Plan	
  
(IMP)	
  
Integrated	
  Master	
  Schedule	
  
(IMS)	
  	
  
Earned	
  Value	
  Management	
  
System	
  
Objec<ve	
  Status	
  and	
  Essen<al	
  Views	
  to	
  support	
  the	
  proac<ve	
  management	
  
processes	
  needed	
  to	
  keep	
  the	
  program	
  GREEN	
  
Performance	
  Measurement	
  Baseline	
  
Measures	
  of	
  
Effec<veness	
  
Measures	
  of	
  
Performance	
  
Measures	
  of	
  
Progress	
  
JROC	
  	
  
Key	
  Performance	
  Parameters	
  
Program	
  	
  Specific	
  
Key	
  Performance	
  Parameters	
  
Technical	
  Performance	
  
Measures	
  
1.0	
  Introduc<on	
  
The	
  IMP	
  /	
  IMS	
  Structure	
  
6	
  
IMS
IMP
Describes how program
capabilities will be
delivered and
how these
capabilities will
be recognized
as ready for
delivery
Supplemental Schedules
Work Packages and Tasks
Criteria
Accomplishment
Events
or
Milestones
1	
  
6.0	
  Build	
  IMP	
  
The	
  IMP/IMS	
  provides	
  Horizontal	
  and	
  
Ver<cal	
  Traceability	
  of	
  	
  
progress	
  to	
  plan	
  
!  Ver<cal	
  traceability	
  AC	
  "	
  SA	
  "	
  PE	
  
!  Horizontal	
  traceability	
  WP	
  "	
  WP	
  "	
  AC	
  
7	
  
Program Events
Define the maturity
of a Capability at a point in
time.
Significant Accomplishments
Represent requirements
that enable Capabilities.
Accomplishment Criteria
Exit Criteria for the Work
Packages that fulfill Requirements.
Work	
  
Package	
  
Work	
  
Package	
  
Work	
  
Package	
  
Work	
  
Package	
  
Work	
  
Package	
  
Work	
  
Package	
  
Work	
  
package	
  
6.0	
  Build	
  IMP	
  
The	
  IMP’s	
  role	
  during	
  Execu<on	
  
8	
  
Program ExecutionPMB for IBRProposal SubmittalDRFP & RFP
Performance Measurement Baseline
Tasks (T)
BOE
% Complete
Statement of Work
Program Deliverables
IMP
Accomplishments (A)
Criteria (C)
EVMS
Events (E)
Budget Spreads by CA & WPCAIV
Capabilities Based Requirements
X BCWS =
Probabilistic Risk Analysis
=
Time keeping and ODC =
Technical Performance Measure
BCWP
ACWP
Cost & Schedule Risk Model
BCWS
Decreasing technical and programmatic risk using Risk Management Methods
IMS
Physical % Complete
Continuity and consistency from DRFP through Program Execution
WBS
6.0	
  Build	
  IMP	
  
1st,	
  Principle	
  –	
  	
  
IMP	
  Building	
  is	
  a	
  Full	
  Contact	
  Sport	
  
9	
  
6.0	
  Build	
  IMP	
  
Our	
  First	
  Approach	
  to	
  the	
  	
  
IMP	
  /	
  IMS	
  Paradigm	
  
!  The	
  1st	
  approach	
  defines	
  Program	
  Events	
  (PE),	
  
Significant	
  Accomplishments	
  (SA),	
  and	
  
Accomplishment	
  Criteria	
  (AC),	
  derived	
  from	
  the	
  
Work	
  Breakdown	
  Structure	
  or	
  the	
  SOW	
  
!  This	
  1st	
  approach	
  can	
  be	
  done	
  in	
  6	
  easy	
  steps	
  
10	
  
6.0	
  Build	
  IMP	
  
1.  Iden<fy	
  the	
  Program	
  Events	
  (PE)	
  
(as	
  the	
  ACQ	
  Guide	
  tells	
  us)	
  
2.  Iden<fy	
  the	
  Significant	
  
Accomplishments	
  (SA)	
  from	
  the	
  
WBS	
  deliverables	
  	
  
3.  Iden<fy	
  the	
  Accomplishment	
  
Criteria	
  (AC)	
  needed	
  to	
  produce	
  
these	
  deliverables	
  
4.  Iden<fy	
  the	
  Work	
  Packages	
  for	
  
each	
  Accomplishment	
  Criteria	
  
5.  Sequence	
  the	
  Work	
  Packages	
  
6.  Assemble	
  the	
  IMP/IMS	
  
This	
  approach	
  doesn’t	
  give	
  us	
  
visibility	
  into	
  what	
  “done”	
  looks	
  like	
  
!  We	
  must	
  measure	
  increasing	
  product	
  maturity	
  in	
  
units	
  meaningful	
  to	
  the	
  decision	
  makers	
  
!  We	
  must	
  see	
  the	
  risks	
  before	
  they	
  arrive	
  so	
  we	
  
can	
  take	
  correc<ve	
  ac<on	
  
11	
  
6.0	
  Build	
  IMP	
  
First	
  Look	
  at	
  a	
  Significant	
  
Accomplishment	
  (SA)	
  
!  SAs	
  are	
  interim	
  and	
  final	
  steps	
  to	
  define,	
  design,	
  develop,	
  
verify,	
  produce,	
  and	
  deploy	
  the	
  product	
  or	
  system.	
  	
  
!  SAs	
  must	
  occur	
  in	
  a	
  manner	
  that	
  ensures	
  a	
  logical	
  path	
  is	
  
maintained	
  throughout	
  the	
  development	
  effort.	
  	
  
!  SAs	
  are	
  event	
  related	
  and	
  not	
  just	
  <me	
  coincidental.	
  	
  
!  SAs	
  should	
  have	
  one	
  or	
  more	
  of	
  the	
  following	
  
characteris<cs:	
  	
  
–  Consists	
  of	
  a	
  discrete	
  step	
  in	
  the	
  process	
  of	
  planned	
  
development	
  that	
  must	
  be	
  complete	
  prior	
  to	
  an	
  event	
  
–  Produces	
  a	
  desired	
  result	
  at	
  a	
  specified	
  event	
  that	
  indicates	
  a	
  
level	
  of	
  design	
  maturity	
  (or	
  progress)	
  directly	
  related	
  to	
  each	
  
product	
  and	
  process	
  
–  Defines	
  interrela<onships,	
  interdependencies,	
  or	
  “hand-­‐off”	
  
points	
  of	
  different	
  func<onal	
  disciplines	
  applied	
  to	
  the	
  program	
  	
  
12	
  
6.0	
  Build	
  IMP	
  
First	
  look	
  at	
  an	
  Accomplishment	
  
Criteria	
  (AC)	
  
!  ACs	
  are	
  defini<ve	
  measures	
  directly	
  suppor<ng	
  successful	
  
comple<on	
  of	
  a	
  significant	
  accomplishment.	
  	
  
!  ACs	
  show	
  objec<ve	
  evidence	
  of	
  work	
  progress	
  (maturity	
  of	
  
a	
  product);	
  i.e.,	
  be	
  seen,	
  read,	
  demonstrated,	
  or	
  quan<fied.	
  
These	
  results	
  are	
  usually	
  incorporated	
  into	
  a	
  report	
  or	
  
document	
  as	
  evidence	
  of	
  accomplishment.	
  	
  
!  ACs	
  are	
  prerequisites	
  for	
  comple<on	
  of	
  an	
  SA	
  (i.e.,	
  exit	
  
criteria).	
  	
  
!  The	
  ques<ons	
  that	
  need	
  to	
  be	
  repeatedly	
  asked	
  when	
  
developing	
  ACs	
  are:	
  
–  How	
  do	
  I	
  know	
  when	
  an	
  accomplishment	
  has	
  been	
  completed?	
  
–  Is	
  the	
  criteria	
  directly	
  related	
  to	
  the	
  accomplishment?	
  	
  
–  Is	
  it	
  proof?	
  	
  
–  What	
  is	
  the	
  work	
  product?”	
  
13	
  
6.0	
  Build	
  IMP	
  
The	
  IMP	
  speaks	
  to	
  Measures	
  of	
  Effec<veness	
  
(MoE)	
  and	
  Measures	
  of	
  Performance	
  (MoP)	
  
14	
  
6.0	
  Build	
  IMP	
  
!  This	
  is	
  where	
  TPMs	
  	
  
are	
  connected	
  with	
  
the	
  MoE’s	
  and	
  
MoP’s	
  
!  For	
  each	
  
deliverable	
  from	
  
the	
  program,	
  all	
  
the	
  “measures”	
  
must	
  be	
  defined	
  in	
  
units	
  meaningful	
  
to	
  the	
  decision	
  
makers.	
  
!  Here’s	
  some	
  “real”	
  
examples.	
  
1.  Provide	
  Precision	
  
Approach	
  for	
  a	
  200	
  
FT/0.5	
  NM	
  DH	
  
2.  Provide	
  bearing	
  and	
  
range	
  to	
  AC	
  plaporm	
  
3.  Provide	
  AC	
  
surveillance	
  to	
  GRND	
  
plaporm	
  	
  
Measures	
  of	
  
Effec<veness	
  (MoE)	
  
1.  Net	
  Ready	
  
2.  Guidance	
  Quality	
  
3.  Land	
  Interoperability	
  
4.  Manpower	
  
5.  Availability	
  
JROC	
  Key	
  Performance	
  
Parameters	
  (KPP)	
  
1.  Net	
  Ready	
  
! IPv4/6	
  compliance	
  
! 1Gb	
  Ethernet	
  
2.  Guidance	
  quality	
  
! Accuracy	
  threshold	
  p70	
  
@	
  6M	
  
! 	
  Integrity	
  threshold	
  4M	
  
@	
  10-­‐6	
  /approach	
  
3.  Land	
  interoperability	
  
! Processing	
  capability	
  
meets	
  LB	
  growth	
  matrix	
  
4.  Manpower	
  
! MTBC	
  >1000	
  hrs	
  
! MCM	
  <	
  2	
  hrs	
  
5.  Availability	
  
! Clear	
  threshold	
  >99%	
  
! Jam	
  threshold	
  >90%	
  
Measures	
  of	
  Performance	
  
(MoP)	
  
1.  Net	
  Ready	
  
! Standard	
  message	
  packets	
  
2.  Guidance	
  Quality	
  
! Mul<path	
  alloca<on	
  budget	
  
! Mul<path	
  bias	
  protec<on	
  
3.  Land	
  Interoperability	
  
! MOSA	
  compliant	
  
! Civil	
  compliant	
  
4.  Manpower	
  
! Opera<ng	
  elapsed	
  <me	
  
meters	
  
! Standby	
  elapsed	
  <me	
  
indicators	
  
5.  Availability	
  
! Phase	
  center	
  varia<ons	
  	
  
Technical	
  Performance	
  
Measures	
  (TPM)	
  
Mission	
  Capabili<es	
  and	
  Opera<onal	
  Need	
  
Technical	
  Insight	
  –	
  Risk	
  adjusted	
  performance	
  to	
  plan	
  	
  
The	
  1st	
  Problem	
  with	
  the	
  Ini<al	
  
IMP/IMS	
  Paradigm	
  
!  There	
  is	
  no	
  single	
  source	
  of	
  guidance	
  for	
  
construc<ng	
  a	
  credible	
  IMP	
  and	
  IMS	
  
– A	
  DOD	
  Guidebook,	
  but	
  s<ll	
  in	
  Version	
  0.9	
  
– A	
  few	
  DOD	
  service	
  pamphlets	
  
– A	
  commercial	
  guidebook	
  
– Many	
  contractor	
  guidelines	
  
!  No	
  defini<ve	
  guidance	
  from	
  DoD	
  on	
  what	
  
makes	
  a	
  good	
  IMP	
  
!  No	
  defini<ve	
  DID	
  requiring	
  an	
  IMP	
  on	
  specific	
  
programs	
  
15	
  
6.0	
  Build	
  IMP	
  
The	
  IMP	
  is	
  a	
  good	
  start,	
  but	
  we’re	
  
really	
  aBer	
  the	
  IMP	
  Narra<ves	
  
!  The	
  IMP	
  Narra<ves	
  start	
  with	
  the	
  Statement	
  
of	
  Objec<ves	
  (SOO)	
  or	
  Concept	
  of	
  Opera<ons	
  
(ConOps)	
  
– These	
  iden<fy	
  the	
  top	
  level	
  program	
  objec<ves	
  
– They	
  define	
  the	
  big	
  picture	
  and	
  provide	
  pre-­‐award	
  
trade	
  space	
  
– They	
  provide	
  the	
  framework	
  for	
  the	
  Contractor	
  to	
  
develop	
  the	
  proposal	
  through	
  the	
  IMP	
  
!  With	
  the	
  Government’s	
  Execu<ve	
  summary,	
  
provides	
  the	
  contractor	
  an	
  understanding	
  of	
  
what	
  is	
  needed	
  and	
  what	
  is	
  important	
  
16	
  
6.0	
  Build	
  IMP	
  
The	
  IMP	
  Process	
  Narra<ve	
  
The	
  IMP	
  Process	
  Narra<ve	
  describes	
  how	
  the	
  
technical	
  and	
  business	
  elements	
  of	
  the	
  program	
  
will	
  be	
  conducted,	
  monitored,	
  and	
  controlled.	
  	
  
Narra<ves	
  provide	
  the	
  customer	
  visibility	
  into	
  
the	
  contractor’s	
  key	
  func<onal	
  processes	
  and	
  
procedures,	
  the	
  rela<onship	
  of	
  these	
  processes	
  
and	
  procedures,	
  and	
  an	
  overview	
  of	
  the	
  effort	
  
required	
  to	
  implement	
  them.	
  
17	
  
6.0	
  Build	
  IMP	
  
IMP	
  Narra<ve	
  for	
  PDR	
  
Program	
  
Event	
  
Event	
  Descrip&on	
  
PE	
  Maturity	
  Assessment	
  
shown	
  in	
  SAs	
  
PDR	
   PDR	
  establishes	
  the	
  “design-­‐	
  to”	
  allocated	
  
baseline	
  to	
  the	
  subsystem	
  level,	
  assures	
  this	
  
design	
  meets	
  the	
  func<onal	
  baseline,	
  assures	
  
system	
  requirements	
  have	
  been	
  properly	
  
allocated	
  to	
  the	
  proper	
  subsystem.	
  
PDR	
  establishes	
  the	
  feasibility	
  of	
  the	
  design	
  
approach	
  to	
  meet	
  the	
  technical	
  requirements	
  and	
  
provide	
  acceptable	
  interface	
  rela<onships	
  
between	
  the	
  hardware	
  and	
  other	
  interfacing	
  
items.	
  	
  
Any	
  changes	
  to	
  the	
  requirements	
  that	
  have	
  
occurred	
  since	
  the	
  System	
  Requirements	
  Review	
  
(SRR2)	
  will	
  be	
  verified	
  at	
  the	
  PDR.	
  	
  
PDR	
  assures	
  the	
  design	
  is	
  verifiable,	
  does	
  not	
  pose	
  
major	
  IMS	
  or	
  Cost	
  risk,	
  and	
  is	
  mature	
  enough	
  to	
  
advance	
  to	
  the	
  detailed	
  design	
  phase	
  –	
  CDR	
  
!  Subsystem	
  level	
  
opera<onal	
  concepts	
  
defined	
  
!  System	
  level	
  interfaces	
  
baselined	
  
!  Supportability	
  plans	
  
established	
  
!  SoBware	
  requirements	
  
finalized	
  
!  Subsystem	
  requirements	
  
finalized	
  &	
  allocated	
  
!  System	
  verifica<on,	
  
valida<on	
  &	
  cer<fica<on	
  
plans	
  updated	
  
!  PDR	
  subsystem	
  design	
  
completed	
  
18	
  
6.0	
  Build	
  IMP	
  
What	
  the	
  IMP	
  Narra<ve	
  Tells	
  Us?	
  
!  States	
  the	
  objec<ve	
  of	
  the	
  processes	
  used	
  to	
  build	
  the	
  
products	
  
!  Provides	
  the	
  governing	
  documents,	
  compliance,	
  and	
  
reference	
  for	
  the	
  process	
  ac<vi<es	
  
!  Explains	
  the	
  process	
  approach	
  
–  Portrays	
  the	
  key	
  ac<vi<es	
  of	
  the	
  approach	
  
–  Illustrates	
  the	
  processes	
  tailored	
  for	
  the	
  specific	
  program	
  
19	
  
Inputs	
  
Ac<vity	
  
3	
  
Ac<vity	
  
5	
  
Ac<vity	
  
4	
  
Tools	
  
Ac<vity	
  
1	
  
Ac<vity	
  
2	
  
Outputs	
  
Metrics	
  
6.0	
  Build	
  IMP	
  
Some	
  Guidance	
  	
  
20	
  
6.0	
  Build	
  IMP	
  
The	
  Defense	
  Acquisi<on	
  Guide	
  
(DAG)	
  Tells	
  Us	
  About	
  the	
  IMP	
  
21	
  
6.0	
  Build	
  IMP	
  
The	
  DAG	
  Also	
  Tells	
  Us	
  
22	
  
6.0	
  Build	
  IMP	
  
5000.01	
  Part	
  2.B.3	
  Acquisi<on	
  Strategies,	
  
Exit	
  Criteria,	
  and	
  Risk	
  Management	
  
“Event	
  driven	
  acquisi<on	
  strategies	
  and	
  program	
  plans	
  
must	
  be	
  based	
  on	
  rigorous,	
  objec<ve	
  assessments	
  of	
  a	
  
program’s	
  status	
  and	
  the	
  plans	
  for	
  managing	
  risk	
  during	
  
the	
  next	
  phase	
  and	
  the	
  remainder	
  of	
  the	
  program.	
  	
  
The	
  acquisi<on	
  strategy	
  and	
  associated	
  contrac<ng	
  
ac<vi<es	
  must	
  explicitly	
  link	
  milestone	
  decision	
  reviews	
  
to	
  events	
  and	
  demonstrated	
  accomplishments	
  in	
  
development,	
  tes<ng,	
  and	
  ini<al	
  produc<on.	
  	
  
The	
  acquisi<on	
  strategy	
  must	
  reflect	
  the	
  
interrela<onships	
  and	
  schedule	
  of	
  acquisi<on	
  phases	
  and	
  
events	
  based	
  on	
  logical	
  sequence	
  of	
  demonstrated	
  
accomplishments	
  not	
  on	
  fiscal	
  or	
  calendar	
  expediency.”	
  
23	
  
6.0	
  Build	
  IMP	
  
What	
  makes	
  a	
  good	
  	
  
Program	
  Event	
  (PE)?	
  
!  Events	
  are	
  the	
  conclusion	
  of	
  an	
  interval	
  of	
  major	
  
program	
  accomplishments	
  (SA)	
  with	
  their	
  criteria	
  (AC)	
  	
  
!  IMP	
  events	
  represent	
  key	
  decision	
  transi<on	
  points	
  
between	
  major	
  ac<vi<es	
  distributed	
  over	
  the	
  contract	
  
period	
  
–  The	
  IMP	
  is	
  a	
  Mini	
  Authoriza;on’s	
  to	
  Proceed	
  (ATP)	
  to	
  the	
  
next	
  Program	
  Event	
  (PE)	
  
!  Some	
  guidance	
  for	
  establishing	
  program/product	
  
events:	
  
–  Customer	
  Given	
  Events.	
  	
  
–  Key	
  Decisions	
  Needed	
  
–  Risk	
  Mi<ga<on	
  Event	
  
–  DOD	
  Systems	
  Engineering	
  Technology	
  Review	
  (SETR)	
  
Guidance	
  
24	
  
6.0	
  Build	
  IMP	
  
What	
  makes	
  a	
  good	
  
Significant	
  Accomplishment	
  (SA)?	
  
!  IPT	
  can	
  manage	
  it	
  at	
  a	
  working	
  level	
  
!  Shows	
  comple<on	
  and	
  result	
  s	
  of	
  discrete	
  steps	
  in	
  the	
  
development	
  process	
  
!  Indicates	
  maturity	
  of	
  the	
  product	
  through	
  MoEs	
  and	
  MoPs	
  
!  Its	
  “significance”	
  measures	
  program	
  event	
  status	
  
!  Relevant	
  and	
  logically	
  linked	
  to	
  the	
  proper	
  PE	
  
–  Just	
  because	
  the	
  work	
  occurs	
  during	
  the	
  <me-­‐frame	
  for	
  PE	
  A	
  
doesn’t	
  mean	
  it’s	
  logically	
  linked	
  to	
  PE	
  A	
  
!  Uses	
  consistent	
  language,	
  style,	
  format	
  through	
  verb	
  
dic<onary,	
  for	
  example:	
  
–  Segment	
  build	
  4	
  detailed	
  design	
  completed	
  
–  Analysis	
  of	
  structural	
  integrity	
  completed	
  
–  Structural	
  integrity	
  verified	
  
25	
  
6.0	
  Build	
  IMP	
  
IMP	
  Significant	
  Accomplishments	
  
!  SAs	
  are	
  NOT	
  just	
  a	
  list	
  of	
  “things”	
  to	
  do	
  before	
  
the	
  Program	
  Event	
  (PE)	
  
!  They	
  are	
  sequenced	
  accomplishments,	
  each	
  of	
  
which	
  leads	
  to	
  the	
  PE,	
  e.g.	
  Cri<cal	
  Design	
  Review	
  
(CDR)	
  
–  SA	
  #	
  1	
  =	
  CDR	
  mee<ng	
  conducted	
  
–  SA	
  #	
  2	
  =	
  CDR	
  ac<on	
  item	
  work-­‐off	
  plan	
  established	
  
–  SA	
  #	
  3	
  =	
  85%	
  drawings	
  completed	
  
–  SA	
  #	
  4	
  =	
  CDR	
  CDRLs	
  delivered	
  
–  SA	
  #	
  5	
  =	
  Development	
  environment	
  opera<onal	
  
–  SA	
  #	
  6	
  =	
  Cri<cal	
  methods	
  analyses	
  completed	
  
–  SA	
  #	
  7	
  =	
  RVTM	
  approved	
  
26	
  
6.0	
  Build	
  IMP	
  
What	
  makes	
  a	
  good	
  
Accomplishment	
  Criteria	
  (AC)?	
  
!  Provides	
  objec<ve,	
  measureable	
  and,	
  explicit	
  
proof	
  of	
  comple<on	
  and	
  closure	
  of	
  the	
  work	
  
ac<vi<es	
  
!  Defines	
  condi<ons	
  for	
  closing	
  the	
  Significant	
  
Accomplishment	
  (SA)	
  
!  Answers	
  the	
  ques<on	
  how	
  do	
  we	
  know	
  when	
  
a	
  Significant	
  Accomplishment	
  has	
  been	
  
completed?	
  
27	
  
6.0	
  Build	
  IMP	
  
!  Not	
  Significant	
  
–  Too	
  small	
  to	
  significantly	
  contribute	
  to	
  successful	
  event	
  comple<on	
  
–  Would	
  lead	
  to	
  trivial	
  tasks	
  (e.g.,	
  1	
  day	
  dura<on)	
  
!  Ambiguous	
  
–  Read	
  can’t	
  tell	
  what	
  Done	
  looks	
  like	
  
!  Wrong	
  verb	
  
–  Uses	
  a	
  verb	
  that’s	
  not	
  on	
  the	
  list	
  (Dic<onary)	
  
–  Uses	
  a	
  listed	
  verb	
  incorrectly	
  
–  Doesn’t	
  have	
  a	
  verb	
  at	
  all	
  
!  Not	
  measurable	
  
–  Can’t	
  tell	
  when	
  we’re	
  done	
  
!  Too	
  Many	
  SAs	
  or	
  ACs	
  
–  Confuses	
  the	
  reader	
  and	
  confuses	
  the	
  execu<on	
  process	
  of	
  the	
  
program	
  
–  Dilutes	
  the	
  MoE	
  and	
  MoP	
  
–  Reduces	
  visibility	
  into	
  increasing	
  maturity	
  
28	
  
What	
  makes	
  a	
  Not	
  So	
  Good	
  	
  
SA	
  or	
  AC?	
  
6.0	
  Build	
  IMP	
  
!  Program	
  Event	
  (PE)	
  
–  A	
  PE	
  assess	
  the	
  readiness	
  or	
  comple<on	
  as	
  a	
  measure	
  
of	
  progress	
  
–  First	
  Flight	
  Complete	
  
!  Significant	
  Accomplishment	
  (SA)	
  
–  The	
  desired	
  result(s)	
  prior	
  to	
  or	
  at	
  comple<on	
  of	
  an	
  
event	
  demonstrate	
  the	
  level	
  of	
  the	
  program’s	
  
progress	
  
–  Flight	
  Test	
  Readiness	
  Review	
  Complete	
  
!  Accomplishment	
  Criteria	
  (AC)	
  
–  Defini<ve	
  evidence	
  (measures	
  or	
  indicators)	
  that	
  
verify	
  a	
  specific	
  accomplishment	
  has	
  been	
  completed	
  
–  SEEK	
  EAGLE	
  Flight	
  Clearance	
  Obtained	
  
29	
  
F-­‐22	
  Example	
  
6.0	
  Build	
  IMP	
  
!  PE’s	
  are	
  easy,	
  they	
  are	
  in	
  the	
  SETR	
  and	
  Integrated	
  
Logis<cs	
  Lifecycle	
  Management	
  System	
  
!  The	
  SA’s	
  can	
  be	
  defined	
  from	
  the	
  program’s	
  
deliverables	
  –	
  these	
  may	
  not	
  be	
  obvious	
  but	
  can	
  
be	
  discovered	
  with	
  a	
  Product	
  Development	
  
Kaizen	
  process	
  (more	
  later)	
  
!  It’s	
  the	
  AC’s	
  that	
  are	
  hard	
  part	
  –	
  the	
  ACs	
  must	
  
represent	
  the	
  exit	
  criteria	
  for	
  the	
  series	
  of	
  Work	
  
Packages	
  that	
  do	
  the	
  work	
  to	
  produce	
  the	
  
product	
  
30	
  
Now	
  the	
  Hard	
  Part	
  
6.0	
  Build	
  IMP	
  
6	
  Steps	
  to	
  IMP	
  Development	
  
Let’s	
  start	
  to	
  build	
  the	
  IMP.	
  	
  
This	
  step-­‐by-­‐step	
  process	
  needs	
  to	
  be	
  followed	
  carefully.	
  
The	
  IMP	
  is	
  constructed	
  one	
  Program	
  Event	
  at	
  a	
  Cme	
  –	
  LeE	
  to	
  Right	
  in	
  Cme.	
  	
  
To	
  do	
  otherwise	
  allows	
  confusion	
  and	
  disconnecCon	
  between	
  Program	
  Events	
  to	
  
occur	
  and	
  dilutes	
  our	
  focus	
  on	
  defining	
  what	
  Done	
  looks	
  like	
  for	
  each	
  Program	
  
Event.	
  
	
  	
  
1	
  
7
V8.5	
  
2	
  
7.0	
  6	
  Steps	
  
Quick	
  View	
  of	
  Step-­‐By-­‐Step	
  IMP	
  
IdenCfy	
  Program	
  Events	
  
IdenCfy	
  Significant	
  Accomplishments	
  
IdenCfy	
  Accomplishment	
  Criteria	
  
IdenCfy	
  Work	
  Packages	
  needed	
  to	
  complete	
  
the	
  Accomplishment	
  Criteria	
  
Sequence	
  the	
  Work	
  Packages	
  (WP),	
  Planning	
  
Packages	
  (PP),	
  Summary	
  Level	
  Planning	
  
Packages	
  (SLPP)	
  	
  in	
  a	
  logical	
  network.	
  
Adjust	
  the	
  sequence	
  of	
  WPs,	
  PPs,	
  &	
  SLPPs	
  to	
  
miCgate	
  major	
  risks.	
  
3	
  
7.0	
  6	
  Steps	
  
1
2
3
4
5
6
IdenCfy	
  the	
  Program	
  Events	
  
Actors	
   Processes	
   Outcomes	
  
Systems	
  Engineer	
  
Define	
  the	
  process	
  flow	
  for	
  
product	
  producCon	
  from	
  
contract	
  award	
  to	
  end	
  of	
  
contract	
  
!  Confirm	
  Program	
  Events	
  represent	
  the	
  
logical	
  process	
  flow	
  for	
  program	
  
maturity	
  
Program	
  Manager	
  
Confirm	
  customer	
  is	
  willing	
  to	
  
accept	
  the	
  process	
  flows	
  
developed	
  by	
  the	
  IMP	
  
!  Engage	
  with	
  contracts	
  and	
  customer	
  
for	
  PE	
  definiCon	
  
Project	
  Engineer	
  
IdenCfy	
  interdependencies	
  
between	
  program	
  event	
  work	
  
streams	
  
!  IdenCfy	
  Value	
  Stream	
  components	
  at	
  
the	
  PE	
  level	
  before	
  flowing	
  them	
  down	
  
to	
  the	
  SA	
  level	
  
IMP/IMS	
  Architect	
  
Capture	
  Program	
  Event	
  
contents	
  for	
  each	
  IPT	
  or	
  work	
  
stream	
  
!  Establish	
  foundaCon	
  for	
  a	
  structure	
  to	
  
support	
  the	
  descripCon	
  of	
  the	
  
increasing	
  mature	
  as	
  well	
  as	
  the	
  flow	
  
to	
  needed	
  work.	
  
Copyright	
  ©	
  2012,	
  Glen	
  B.	
  Alleman,	
  Niwot	
  Ridge,	
  LLC	
   4	
  
1
7.0	
  6	
  Steps	
  
Outcomes	
  of	
  Step	
  
!  Confirm	
  the	
  end	
  to	
  end	
  descripCon	
  of	
  the	
  
increasing	
  maturity	
  of	
  the	
  program’s	
  
deliverables	
  
!  Establish	
  of	
  RFP	
  or	
  Contract	
  target	
  dates	
  for	
  
each	
  Event.	
  	
  
!  Socialize	
  the	
  language	
  of	
  speaking	
  in	
  “Events”	
  
rather	
  than	
  Cme	
  and	
  efforts	
  
5	
  
1
7.0	
  6	
  Steps	
  
Events	
  Define	
  the	
  Assessment	
  	
  
of	
  the	
  Program’s	
  Maturity	
  
6	
  
! Program	
  Events	
  are	
  maturity	
  
assessment	
  points	
  in	
  the	
  program	
  
! They	
  define	
  what	
  levels	
  of	
  maturity	
  
for	
  the	
  products	
  and	
  services	
  are	
  
needed	
  before	
  proceeding	
  to	
  the	
  next	
  
maturity	
  assessment	
  point	
  
! The	
  entry	
  criteria	
  for	
  each	
  Event	
  
defines	
  the	
  units	
  of	
  measure	
  for	
  the	
  
successful	
  compleCon	
  of	
  the	
  Event	
  
! The	
  example	
  below	
  is	
  typical	
  of	
  the	
  
purpose	
  of	
  a	
  Program	
  Event	
  
The	
  Cri+cal	
  Design	
  Review	
  (CDR)	
  is	
  a	
  mul+-­‐disciplined	
  product	
  and	
  process	
  assessment	
  to	
  ensure	
  
that	
  the	
  system	
  under	
  review	
  can	
  proceed	
  into	
  system	
  fabrica+on,	
  demonstra+on,	
  and	
  test,	
  and	
  
can	
  meet	
  the	
  stated	
  performance	
  requirements	
  within	
  cost	
  (program	
  budget),	
  schedule	
  (program	
  
schedule),	
  risk,	
  and	
  other	
  system	
  constraints.	
  	
  
1
7.0	
  6	
  Steps	
  
IdenCfy	
  the	
  Significant	
  Accomplishments	
  
(SA)	
  for	
  Each	
  Program	
  Event	
  (PE)	
  
7	
  
Actors	
   Processes	
   Outcomes	
  
System	
  Engineer	
  
IdenCfy	
  Integrated	
  Product	
  Teams	
  
(IPT)	
  responsible	
  for	
  the	
  SA’s	
  	
  
!  Define	
  the	
  boundaries	
  of	
  these	
  
programmaCc	
  interfaces	
  
!  Define	
  technical	
  and	
  process	
  risk	
  
categories	
  and	
  their	
  bounds	
  
Technical	
  Lead	
  
Confirm	
  the	
  sequence	
  of	
  SA’s	
  has	
  
the	
  proper	
  dependency	
  
relaConships	
  
!  Define	
  the	
  product	
  development	
  
flow	
  process	
  improves	
  maturity	
  
!  Define	
  technical	
  risk	
  drivers	
  
Project	
  Engineer	
  
Confirm	
  logic	
  of	
  SA’s	
  for	
  project	
  
sequence	
  integrity	
  
!  Define	
  the	
  program	
  flows	
  
improves	
  maturity	
  	
  
Control	
  Account	
  
Manager	
  
Validate	
  SA	
  outcomes	
  in	
  support	
  of	
  
PE	
  entry	
  condiCons	
  
!  Confirm	
  budget	
  and	
  resources	
  
adequate	
  for	
  defined	
  work	
  effort	
  
IMP/IMS	
  Architect	
  
Assure	
  the	
  assessment	
  points	
  
provide	
  a	
  logical	
  flow	
  of	
  maturity	
  at	
  
the	
  proper	
  intervals	
  for	
  the	
  
program	
  
!  Maintain	
  the	
  integrity	
  of	
  the	
  IMP,	
  
WBS,	
  and	
  IMS	
  
2
7.0	
  6	
  Steps	
  
Outcomes	
  of	
  Step	
  
!  The	
  Significant	
  Accomplishments	
  are	
  the	
  
“road	
  map”	
  to	
  the	
  increasing	
  maturity	
  of	
  the	
  
program	
  
!  The	
  “Value	
  Stream	
  Map”	
  resulCng	
  from	
  the	
  
flow	
  of	
  SA’s	
  describes	
  how	
  the	
  products	
  or	
  
services	
  move	
  through	
  the	
  maturaCon	
  process	
  
while	
  reducing	
  risk	
  
!  The	
  SA	
  map	
  is	
  the	
  path	
  to	
  “done”	
  	
  
8	
  
2
7.0	
  6	
  Steps	
  
SAs	
  define	
  the	
  entry	
  criteria	
  for	
  
each	
  Program	
  Event	
  
9	
  
Preliminary	
  Design	
  Review	
  Complete	
  
3
7.0	
  6	
  Steps	
  
IdenCfy	
  Accomplishment	
  Criteria	
  (AC)	
  for	
  each	
  
Significant	
  Accomplishment	
  (SA)	
  
Actors	
   Processes	
   Outcomes	
  
CAM	
  
Define	
  and	
  sequence	
  the	
  contents	
  
of	
  each	
  Work	
  Package	
  and	
  select	
  
the	
  EV	
  criteria	
  for	
  each	
  Task	
  
needed	
  to	
  roll	
  up	
  the	
  BCWP	
  
measurement	
  
!  Establish	
  ownership	
  for	
  the	
  
content	
  of	
  each	
  Work	
  Package	
  
and	
  the	
  Exit	
  Criteria	
  –	
  the	
  
Accomplishment	
  Criteria	
  (AC)	
  
Project	
  Engineer	
  
IdenCfy	
  the	
  logical	
  process	
  flow	
  of	
  
the	
  Work	
  Package	
  to	
  assure	
  the	
  
least	
  effort,	
  maximum	
  value	
  and	
  
lowest	
  risk	
  path	
  to	
  the	
  Program	
  
Event	
  
!  Establish	
  ownership	
  for	
  the	
  
process	
  flow	
  of	
  the	
  product	
  or	
  
service	
  
Technical	
  Lead	
  
Assure	
  all	
  technical	
  processes	
  are	
  
covered	
  in	
  each	
  Work	
  Package	
  
!  Establish	
  ownership	
  for	
  the	
  
technical	
  outcome	
  of	
  each	
  Work	
  
Package	
  
IMP/IMS	
  Architect	
  
Confirm	
  the	
  process	
  flow	
  of	
  the	
  ACs	
  
can	
  follow	
  the	
  DID	
  81650	
  
structuring	
  and	
  Risk	
  Assessment	
  
processes	
  
!  Guide	
  the	
  development	
  of	
  
outcomes	
  for	
  each	
  Work	
  Package	
  
to	
  assure	
  increasing	
  maturity	
  of	
  
the	
  program	
   10	
  
3
7.0	
  6	
  Steps	
  
Outcomes	
  of	
  Step	
  
!  The	
  definiCon	
  of	
  “done”	
  emerges	
  in	
  the	
  form	
  
of	
  deliverables	
  rather	
  than	
  measures	
  of	
  cost	
  
and	
  passage	
  of	
  Cme.	
  
!  At	
  each	
  Program	
  Event,	
  the	
  increasing	
  
maturity	
  of	
  the	
  deliverables	
  is	
  defined	
  through	
  
the	
  Measures	
  of	
  EffecCveness	
  (MoE)	
  and	
  
Measures	
  of	
  Performance	
  (MoP)	
  
11	
  
3
7.0	
  6	
  Steps	
  
ACs	
  are	
  higher	
  fidelity	
  
descripCons	
  of	
  “Done”	
  than	
  SAs	
  
12	
  Cri9cal	
  Design	
  Review	
  Complete	
  
4
7.0	
  6	
  Steps	
  
IdenCfy	
  the	
  Work	
  for	
  Each	
  Accomplishment	
  
Criteria	
  in	
  Work	
  Packages	
  
Actors	
   Processes	
   Outcomes	
  
Control	
  Account	
  
Manager	
  
IdenCfy	
  or	
  confirm	
  the	
  work	
  
acCviCes	
  in	
  the	
  Work	
  Package	
  
represent	
  the	
  allocated	
  work	
  
!  Define	
  bounded	
  work	
  effort	
  
defined	
  “inside”	
  each	
  Work	
  
Package	
  
Technical	
  Lead	
  
Confirm	
  this	
  work	
  covers	
  the	
  SOW	
  
and	
  CDRLs	
  
!  Define	
  all	
  work	
  effort	
  for	
  100%	
  
compleCon	
  of	
  deliverable	
  visible	
  in	
  
a	
  single	
  locaCon	
  –	
  the	
  Work	
  
Package	
  
!  Confirm	
  risk	
  drivers	
  and	
  duraCon	
  
variances	
  
IMP/IMS	
  Architect	
  
Assist	
  in	
  the	
  sequencing	
  the	
  work	
  
efforts	
  in	
  a	
  logical	
  manner	
  
!  Develop	
  foundaCon	
  of	
  the	
  
maturity	
  flow	
  starCng	
  to	
  emerge	
  
from	
  the	
  contents	
  of	
  the	
  Work	
  
Packages	
  
Earned	
  Value	
  
Analyst	
  
Assign	
  iniCal	
  BCWS	
  from	
  BOE	
  to	
  
Work	
  Package	
  
!  ConfirmaCon	
  of	
  work	
  effort	
  
against	
  BOEs	
  
!  Define	
  EVT	
  for	
  measures	
  progress	
  
to	
  plan	
   13	
  
4
7.0	
  6	
  Steps	
  
Outcomes	
  of	
  Step	
  
!  The	
  work	
  idenCfied	
  that	
  produces	
  a	
  
measurable	
  outcome.	
  
!  This	
  work	
  defined	
  in	
  each	
  Work	
  Package	
  
!  The	
  Accomplishment	
  Criteria	
  (AC)	
  state	
  
explicitly	
  what	
  “done”	
  looks	
  like	
  for	
  this	
  effort	
  
!  With	
  “done”	
  stated,	
  measures	
  of	
  Performance	
  
and	
  measures	
  of	
  EffecCveness	
  can	
  be	
  defined	
  
14	
  
4
7.0	
  6	
  Steps	
  
Work	
  is	
  done	
  in	
  “packages”	
  that	
  
produce	
  measureable	
  outcomes	
  
15	
  
Launch	
  Readiness	
  Review	
  Complete	
  
5
7.0	
  6	
  Steps	
  
Sequence	
  Work	
  Packages	
  (ACs)	
  for	
  each	
  
Significant	
  Accomplishment	
  (SA)	
  
16	
  
Actors	
   Processes	
   Outcomes	
  
Control	
  Account	
  
Manager	
  
Define	
  the	
  order	
  of	
  the	
  Work	
  
Packages	
  needed	
  to	
  meet	
  the	
  
Significant	
  Accomplishments	
  for	
  
each	
  Program	
  Event	
  
!  Define	
  the	
  process	
  flow	
  of	
  work	
  
and	
  the	
  resulCng	
  
accomplishments.	
  
!  Assure	
  value	
  is	
  being	
  produced	
  at	
  
each	
  SA	
  and	
  the	
  AC’s	
  that	
  drive	
  
them	
  
IMP/IMS	
  Architect	
  
Assure	
  that	
  the	
  sequence	
  of	
  Work	
  
Packages	
  adheres	
  to	
  the	
  guidance	
  
provided	
  by	
  DCMA	
  and	
  the	
  EVMS	
  
System	
  descripCon	
  
!  Begin	
  the	
  structuring	
  of	
  the	
  IMS	
  
for	
  compliance	
  and	
  loading	
  into	
  
the	
  cost	
  system	
  
Program	
  Controls	
  
Staff	
  
Baseline	
  the	
  sequence	
  of	
  Work	
  
Packages	
  using	
  Earned	
  Value	
  
Techniques	
  (EVT)	
  with	
  measures	
  of	
  
Physical	
  Percent	
  Complete	
  
!  Develop	
  insight	
  to	
  progress	
  to	
  
plan	
  with	
  measures	
  of	
  physical	
  
progress	
  for	
  each	
  Work	
  Packages	
  
(EVT)	
  
5
7.0	
  6	
  Steps	
  
Outcomes	
  of	
  Step	
  
!  Work	
  Packages	
  parCCon	
  work	
  efforts	
  into	
  
“bounded”	
  scope	
  
!  Interdependencies	
  constrained	
  to	
  Work	
  
Package	
  boundaries	
  prevents	
  “spaghek	
  code”	
  
style	
  schedule	
  flow	
  
!  Visibility	
  of	
  the	
  Increasing	
  Flow	
  of	
  Maturity	
  
starCng	
  to	
  emerge	
  from	
  the	
  flow	
  of	
  
Accomplishment	
  Criteria	
  (AC)	
  
17	
  
5
7.0	
  6	
  Steps	
  
Sequence	
  Work	
  Packages	
  (AC’s)	
  into	
  
an	
  IMS	
  for	
  each	
  Program	
  Event	
  
18	
  
6
7.0	
  6	
  Steps	
  
Assemble	
  Final	
  IMP/IMS	
  
Actors	
   Processes	
   Outcomes	
  
IMP/IMS	
  Architect	
  
StarCng	
  with	
  the	
  AC’s	
  under	
  each	
  
SA’s	
  connect	
  Work	
  Packages	
  in	
  the	
  
proper	
  order	
  for	
  each	
  Program	
  
Event	
  
!  Establish	
  the	
  Performance	
  
Measurement	
  Baseline	
  
framework.	
  
!  IdenCfy	
  MoE	
  and	
  MoP	
  points	
  in	
  
the	
  IMP	
  
Program	
  Manager	
  
Confirm	
  the	
  work	
  efforts	
  represent	
  
the	
  commiled	
  acCviCes	
  for	
  the	
  
contract	
  
!  Review	
  and	
  approval	
  of	
  the	
  IMS	
  –	
  
ready	
  for	
  baseline.	
  
!  Review	
  and	
  approve	
  risk	
  drivers	
  
and	
  duraCon	
  variance	
  models	
  
Project	
  Engineer	
  
Assess	
  the	
  product	
  development	
  
flow	
  for	
  opCmizaCons	
  
!  Review	
  and	
  approval	
  of	
  the	
  IMS	
  –	
  
ready	
  for	
  baseline.	
  
!  IdenCfy	
  risk	
  drivers	
  and	
  their	
  
miCgaCons	
  
Systems	
  Engineer	
  
Confirm	
  the	
  work	
  process	
  flows	
  
result	
  in	
  the	
  proper	
  products	
  being	
  
built	
  in	
  the	
  right	
  order	
  
!  Confirm	
  risk	
  drivers	
  and	
  duraCon	
  
variances.	
  
!  Review	
  and	
  approval	
  of	
  the	
  IMS	
  –	
  
ready	
  for	
  baseline	
   19	
  
6
7.0	
  6	
  Steps	
  
Outcomes	
  of	
  Step	
  
!  Both	
  the	
  maturity	
  assessment	
  criteria	
  and	
  the	
  
work	
  needed	
  to	
  reach	
  that	
  level	
  of	
  maturity	
  are	
  
described	
  in	
  a	
  single	
  locaCon	
  
!  Risks	
  are	
  integrated	
  with	
  the	
  IMP	
  and	
  IMS	
  at	
  
their	
  appropriate	
  levels	
  
–  Risks	
  to	
  EffecCveness	
  –	
  risk	
  to	
  JROC	
  KPPs	
  
–  Risks	
  to	
  Performance	
  –	
  risk	
  to	
  program	
  KPPs	
  and	
  
TPMs	
  
!  Leading	
  and	
  Lagging	
  indicator	
  data	
  provide	
  
through	
  each	
  measure	
  to	
  forecast	
  future	
  
performance	
  
	
   20	
  
6
7.0	
  6	
  Steps	
  
The	
  Previous	
  6	
  Steps	
  Result	
  In	
  A	
  
Credible	
  IMP/IMS	
  
21	
  
!  The	
  IMP	
  is	
  the	
  “Outer	
  Mold	
  
Line”,	
  the	
  Framework,	
  the	
  
“Going	
  Forward”	
  Strategy	
  for	
  
the	
  Program.	
  
!  The	
  IMP	
  describes	
  the	
  path	
  
to	
  increasing	
  maturity	
  and	
  
the	
  Events	
  measuring	
  that	
  
maturity.	
  
!  The	
  IMP	
  tells	
  us	
  “How”	
  the	
  
program	
  will	
  flow	
  with	
  the	
  
least	
  risk,	
  the	
  maximum	
  
value,	
  and	
  the	
  clearest	
  
visibility	
  to	
  progress.	
  
!  The	
  IMS	
  tells	
  us	
  what	
  work	
  is	
  
needed	
  to	
  produce	
  the	
  
product	
  or	
  service	
  at	
  the	
  
Work	
  Package	
  level.	
  
Our	
  Plan	
  Tells	
  Us	
  “How”	
  We	
  
are	
  Going	
  to	
  Proceed	
  
The	
  Schedule	
  Tells	
  Us	
  
“What”	
  Work	
  is	
  Needed	
  to	
  
Proceed	
  
7.0	
  6	
  Steps	
  
Significant	
  Accomplishments	
  for	
  an	
  actual	
  
Program	
  Event	
  
Flight	
  Test	
  Ascent	
  Aerodynamics	
  Confirmed	
  
22	
  
7.0	
  6	
  Steps	
  
Horizontal	
  and	
  VerCcal	
  Traceability	
  
of	
  the	
  IMP/IMS	
  
Integrated	
  Master	
  Schedule	
  
Work	
  sequenced	
  to	
  
produce	
  outcomes	
  
for	
  each	
  WP.	
  
!  VerCcal	
  traceability	
  AC	
  "	
  SA	
  "	
  PE	
  
!  Horizontal	
  traceability	
  WP	
  "	
  WP	
  "AC	
  
Program Events
Define the maturity
of a Capability at a point in
time.
Significant Accomplishments
Represent requirements
that enable Capabilities.
Accomplishment Criteria
Exit Criteria for the Work
Packages that fulfill Requirements.
Work	
  
Package	
  
Work	
  
Package	
  
Work	
  
Package	
  
Work	
  
Package	
  
Work	
  
Package	
  
Work	
  
package	
  
Work	
  
Package	
  
Work	
  
Package	
  
23	
  
7.0	
  6	
  Steps	
  
The	
  IMP’s	
  connecCon	
  to	
  the	
  WBS	
  
!  Start	
  with	
  the	
  Significant	
  Accomplishments	
  and	
  sequence	
  
them	
  to	
  the	
  maturity	
  flow	
  for	
  each	
  Program	
  Event	
  
!  The	
  WBS	
  connecCons	
  then	
  become	
  orthogonal	
  to	
  this	
  flow	
  
24	
  
7.0	
  6	
  Steps	
  
Program	
  Event	
  
SRR	
   SDR	
   PDR	
   CDR	
   TRR	
   ATLO	
  
Work	
  Breakdown	
  
Structure	
  
4.920-­‐SDAI	
   A01,	
  A02	
   B01	
   C01,	
  C02	
   D01	
   E01	
   F01	
  
4.200-­‐Sys	
  Test	
   A05	
   B03,	
  B04	
   D02,	
  D03	
   E02	
   F02	
  
4.300-­‐Radar	
   A03	
   B02	
   C03	
   E03	
  
4.330-­‐O&C	
  Sys	
   A06,	
  A07	
   B05	
   C04	
   D04	
   E04	
   F03,	
  F04	
  
4.400-­‐	
  I&T	
   A08	
   C05	
   E05,	
  E06	
   F05	
  
4.500-­‐Support	
   A09	
   D05	
   E07	
   F06,	
  F07	
  
25	
  
7.0	
  6	
  Steps	
  
26	
  
7.0	
  6	
  Steps	
  
27	
  
7.0	
  6	
  Steps	
  
28	
  
7.0	
  6	
  Steps	
  
29	
  
7.0	
  6	
  Steps	
  
30	
  
7.0	
  6	
  Steps	
  
Nuances	
  Of	
  These	
  6	
  Steps	
  
Building	
  the	
  Program	
  Event,	
  to	
  Significant	
  Accomplishment,	
  to	
  Accomplishment	
  
decomposi?on	
  is	
  straight	
  forward.	
  
For	
  each	
  Program	
  Event,	
  simply	
  iden?fy	
  what	
  are	
  the	
  needed	
  Significant	
  
Accomplishment	
  for	
  the	
  entry	
  and	
  exit	
  criteria,	
  and	
  the	
  Accomplishment	
  Criteria	
  
for	
  the	
  Work	
  Packages	
  that	
  produce	
  the	
  AC.	
  
Yea	
  Right,	
  no	
  problem	
  
1	
  
8
V8.5	
  
2	
  
8.0	
  Nuances	
  
Quick	
  View	
  of	
  the	
  Nuances	
  
!  Unfortunately	
  building	
  a	
  credible	
  IMP/IMS	
  is	
  a	
  
nuanced	
  process,	
  subject	
  to	
  many	
  opportuni?es	
  
for	
  diversions,	
  blind	
  alleys,	
  and	
  false	
  starts	
  	
  
!  It	
  is	
  slightly	
  counter	
  intui?ve	
  from	
  the	
  tradi?onal	
  
scheduling	
  approach	
  to	
  start	
  with	
  the	
  ver?cal	
  
integra?on	
  –	
  but	
  it	
  is	
  cri?cal	
  to	
  start	
  ver?cally	
  
!  Success	
  requires	
  the	
  full	
  par?cipa?on	
  of	
  Systems	
  
Engineering,	
  CAMs,	
  and	
  the	
  Program	
  Manager	
  
!  Success	
  requires	
  everyone	
  to	
  understand	
  the	
  
nuances	
  of	
  the	
  IMP	
  building	
  efforts	
  
3	
  
8.0	
  Nuances	
  
The	
  1st	
  Nuance	
  
We	
  need	
  to	
  change	
  the	
  Planning	
  Paradigm	
  
Beginner	
  	
   Intermediate	
   Advanced	
  
! Take	
  the	
  program	
  events	
  
and	
  use	
  the	
  WBS	
  to	
  define	
  
the	
  SAs	
  and	
  ACs.	
  
! Iden?fy	
  the	
  tasks	
  to	
  produce	
  
the	
  ACs	
  and	
  SAs	
  
! Collect	
  them	
  into	
  Program	
  
Events	
  
! Organize	
  the	
  tasks	
  by	
  Work	
  
Package	
  
! Sequence	
  the	
  work	
  packages	
  
(AC’s)	
  	
  
! Examine	
  the	
  exit	
  criteria	
  for	
  
the	
  Program	
  Events	
  –	
  what	
  
does	
  Done	
  look	
  like?	
  
! Ask	
  what	
  the	
  entry	
  criteria	
  
are	
  for	
  each	
  Program	
  Event	
  
! Build	
  the	
  AC’s	
  to	
  support	
  
these	
  entry	
  criteria	
  
! Pull	
  these	
  together	
  under	
  
each	
  SA	
  
! Determine	
  the	
  Technical	
  and	
  
Programma?c	
  maturity	
  for	
  
each	
  Program	
  Event	
  from	
  
the	
  Concept	
  of	
  Opera?ons	
  
! Assess	
  the	
  SA’s	
  for	
  each	
  
Integrated	
  Product	
  Team	
  in	
  
terms	
  of	
  their	
  streams	
  
maturity	
  at	
  that	
  point	
  in	
  the	
  
program	
  
! Sequence	
  the	
  SA’s	
  for	
  each	
  
PE	
  and	
  assess	
  the	
  units	
  of	
  
measure	
  of	
  “maturity”	
  
! Build	
  the	
  AC’s	
  to	
  support	
  
each	
  SA’s	
  level	
  of	
  maturity	
  
Copyright	
  ©	
  2012,	
  Glen	
  B.	
  Alleman,	
  Niwot	
  Ridge,	
  LLC	
   4	
  
8.0	
  Nuances	
  
The	
  2nd	
  Nuance	
  
We	
  need	
  to	
  speak	
  about	
  Increasing	
  Maturity	
  
Beginner	
   Intermediate	
   Advanced	
  
! The	
  sequence	
  of	
  work	
  
closely	
  matches	
  the	
  
horizontal	
  schedules	
  of	
  the	
  
past	
  
! Align	
  this	
  work	
  with	
  the	
  WBS	
  
elements	
  
! Focus	
  on	
  the	
  WBS	
  Dic?onary	
  
of	
  the	
  delivered	
  products	
  or	
  
services	
  
! No	
  explicit	
  TPM,	
  MOE,	
  and	
  
MOP	
  elements	
  
	
  
! The	
  sequence	
  of	
  work	
  is	
  
related	
  to	
  the	
  Program	
  
Events,	
  but	
  essen?ally	
  
“hangs”	
  from	
  the	
  PE	
  to	
  the	
  
SA’s	
  and	
  then	
  the	
  AC’s	
  
! All	
  deliverables	
  are	
  visible	
  
but	
  their	
  TPMs	
  and	
  other	
  
system	
  measures	
  are	
  not	
  
stated	
  in	
  the	
  IMP	
  or	
  its	
  
narra?ve.	
  
! There	
  is	
  a	
  narra?ve	
  in	
  the	
  
form	
  of	
  SA’s	
  and	
  AC’s	
  that	
  
describes	
  how	
  the	
  program	
  
moves	
  from	
  lef	
  to	
  right	
  
alone	
  its	
  maturity	
  path	
  
! Risk	
  buy	
  down	
  and	
  
re?rement	
  are	
  visible	
  
! Intermediate	
  Technical	
  
Performance	
  Measures,	
  
Measures	
  of	
  Effec?veness,	
  
and	
  Measures	
  of	
  
Performance	
  are	
  visible	
  in	
  
the	
  IMP	
  
Copyright	
  ©	
  2012,	
  Glen	
  B.	
  Alleman,	
  Niwot	
  Ridge,	
  LLC	
   5	
  
8.0	
  Nuances	
  
The	
  3rd	
  Nuance	
  
Everything	
  Foot	
  and	
  Ties	
  to	
  the	
  IMP	
  &	
  IMS	
  
Beginner	
   Intermediate	
   Advanced	
  
! The	
  IMS	
  contains	
  all	
  the	
  
proper	
  fields	
  in	
  columns	
  and	
  
is	
  horizontally	
  linked	
  
! The	
  WBS	
  elements	
  can	
  be	
  
found	
  for	
  all	
  work	
  elements	
  
! CDRL’s	
  are	
  visible	
  and	
  their	
  
mul?ple	
  delivery	
  dates	
  
connected	
  to	
  each	
  Program	
  
Event	
  
! WBS	
  is	
  structured	
  in	
  a	
  
product	
  manner	
  or	
  possibly	
  
a	
  func?onal	
  manner	
  with	
  
some	
  deliverables	
  defined	
  in	
  
the	
  terminal	
  nodes	
  
! The	
  WBS	
  is	
  properly	
  formed	
  
inside	
  each	
  AC	
  with	
  
incremental	
  deliverables	
  
! WBS	
  numbers	
  form	
  a	
  “well	
  
structured”	
  tree,	
  but	
  s?ll	
  is	
  
not	
  “pure”	
  in	
  the	
  sense	
  of	
  
deliverables	
  only,	
  no	
  
func?onal	
  
! Each	
  column	
  and	
  each	
  field	
  
can	
  be	
  “pivoted”	
  to	
  form	
  a	
  
proper	
  “tree”	
  of	
  value	
  flow.	
  
! The	
  WBS	
  is	
  a	
  “pure”	
  Product	
  
Breakdown	
  Structure	
  (PBS)	
  
and	
  the	
  services	
  needed	
  to	
  
produce	
  those	
  products	
  
! The	
  WBS	
  defines	
  the	
  
structure	
  of	
  the	
  delivered	
  
product	
  or	
  service	
  
! The	
  Ver?cal	
  trace	
  of	
  the	
  IPM	
  
describes	
  the	
  flow	
  of	
  
increasing	
  maturity	
  of	
  these	
  
products	
  or	
  services	
  
! The	
  Horizontal	
  trace	
  of	
  the	
  
IMP	
  describes	
  to	
  work	
  to	
  be	
  
done	
  to	
  produce	
  this	
  
maturity	
   6	
  
8.0	
  Nuances	
  
The	
  4th	
  Nuance	
  
IMP/IMS	
  is	
  Programma?c	
  Architecture	
  
Beginner	
   Intermediate	
   Advanced	
  
! The	
  IMP	
  is	
  built	
  from	
  the	
  
WBS	
  for	
  each	
  Program	
  
Event.	
  
! The	
  IMP	
  is	
  seen	
  as	
  a	
  
compliance	
  document	
  that	
  
lists	
  the	
  Program	
  Events	
  and	
  
a	
  “bunch	
  of	
  stuff”	
  
underneath.	
  	
  
! The	
  IMP	
  is	
  structured	
  
around	
  separate	
  Program	
  
Events,	
  but	
  below	
  the	
  SA’s	
  
looks	
  like	
  a	
  “shop	
  floor”	
  
schedule	
  with	
  lijle	
  ver?cal	
  
connec?vity.	
  
! The	
  IMP	
  is	
  built	
  as	
  a	
  “value	
  
stream”	
  flow	
  for	
  the	
  
program	
  but	
  the	
  Systems	
  
Engineers	
  
! This	
  programma?c	
  
architecture	
  is	
  built	
  in	
  the	
  
same	
  way	
  the	
  technical	
  
system	
  architecture	
  is	
  built	
  
! It	
  is	
  derived	
  from	
  the	
  
ConOps	
  and	
  Tier	
  1	
  System	
  
Requirements	
  
! The	
  IMP	
  shows	
  explicitly	
  
how	
  these	
  are	
  supported	
  in	
  
the	
  flow	
  of	
  the	
  SA’s	
  
7	
  
8.0	
  Nuances	
  
The	
  5th	
  Nuance	
  
The	
  IMP/IMS	
  connects	
  all	
  the	
  dots	
  
8	
  
8.0	
  Nuances	
  
Measure	
  of	
  
Effec?veness	
  
Measure	
  of	
  
Performance	
  
Technical	
  
Performance	
  
Measure	
  
Risk	
  
Aleatory	
  
Uncertainty	
  
Epistemic	
  
Uncertainty	
  
Reference	
  
Classes	
  
Past	
  
Performance	
  
SME	
  
Past	
  
Performance	
  
System	
  
Architecture	
  
AHP	
  
Connec&ng	
  The	
  IMP	
  To	
  Program	
  
Performance	
  Measures	
  
Assembling	
  the	
  IMS	
  from	
  the	
  IMP	
  appears	
  to	
  be	
  a	
  straight	
  forward	
  process	
  –	
  
details	
  the	
  tasks	
  that	
  support	
  the	
  Accomplishment	
  Criteria.	
  But	
  there	
  are	
  some	
  
cri&cal	
  steps	
  that	
  must	
  be	
  done	
  in	
  the	
  right	
  order	
  to	
  end	
  up	
  with	
  a	
  risk	
  tolerant	
  
IMS.	
  
Let’s	
  do	
  this	
  for	
  TSAS	
  
1	
  
9
V8.5	
  
The	
  Primary	
  Role	
  for	
  the	
  IMP	
  is	
  to	
  describe	
  
what	
  done	
  looks	
  like	
  in	
  MoE’s	
  and	
  MoP’s	
  
2	
  19	
  October	
  1899	
  Robert	
  Goddard	
  decided	
  that	
  he	
  wanted	
  to	
  "fly	
  without	
  wings"	
  to	
  Moon.	
  
9.0	
  Framework	
  
Quick	
  View	
  to	
  IMP/IMS	
  Framework	
  
!  Measures	
  of	
  increasing	
  maturity	
  for	
  the	
  key	
  
deliverables	
  is	
  the	
  founda&on	
  for	
  increasing	
  
the	
  Probability	
  of	
  Program	
  Success	
  
!  Measures	
  of	
  Effec&veness	
  (MoE)	
  and	
  
Measures	
  of	
  Performance	
  (MoP)	
  are	
  defined	
  
in	
  the	
  Integrated	
  Master	
  Plan	
  (IMP)	
  Narra&ve	
  
!  Key	
  Performance	
  Parameters	
  (KPP)	
  –	
  both	
  
JROC	
  and	
  program	
  specific	
  are	
  needed	
  
!  Technical	
  Performance	
  Measures	
  (TPM)	
  are	
  
needed	
  for	
  all	
  key	
  deliverables	
  
3	
  
9.0	
  Framework	
  
Star&ng	
  out	
  on	
  the	
  Right	
  Foot	
  …	
  
!  Most	
  IMP/IMS	
  literature	
  states	
  how	
  to	
  build	
  an	
  IMP	
  from	
  the	
  RFP	
  and	
  
contractual	
  elements,	
  in	
  simple	
  and	
  maybe	
  simple	
  minded	
  terms	
  
–  Decompose	
  the	
  events	
  into	
  SAs,	
  ACs,	
  and	
  their	
  Tasks	
  –	
  sounds	
  easy	
  
!  This	
  approach	
  fails	
  to	
  provide	
  advice	
  for	
  several	
  things:	
  
–  How	
  to	
  minimize	
  the	
  topological	
  connec&ons	
  between	
  Events	
  
–  How	
  to	
  increase	
  the	
  concurrency	
  between	
  IPTs	
  
–  How	
  to	
  increase	
  the	
  tolerance	
  of	
  the	
  IMS	
  to	
  disrup&ve	
  events	
  
•  Known	
  and	
  knowable	
  risk	
  
•  Unknown	
  and	
  possibly	
  unknowable	
  risk	
  
!  The	
  construc&on	
  of	
  the	
  IMS	
  needs	
  to	
  take	
  place	
  in	
  what	
  seems	
  to	
  be	
  a	
  
reverse	
  order	
  
–  Build	
  the	
  IMP	
  as	
  a	
  Value	
  Stream	
  Map	
  describing	
  the	
  increasing	
  maturity	
  –	
  and	
  
therefore	
  the	
  increasing	
  VALUE	
  of	
  the	
  deliverables	
  to	
  the	
  customer.	
  
–  It’s	
  the	
  delivery	
  of	
  Customer	
  Value	
  that	
  inverts	
  the	
  management	
  process,	
  and	
  
focuses	
  on	
  Keeping	
  the	
  Program	
  GREEN	
  as	
  planned	
  that	
  maximizes	
  value	
  to	
  
the	
  customer	
  (the	
  Government)	
  	
   4	
  
9.0	
  Framework	
  
SETR	
  Program	
  Events	
  
5	
  hdps://acc.dau.mil/docs/technicalreviews/dod_tech_reviews.htm	
  
9.0	
  Framework	
  
Build	
  PEs	
  Leg	
  to	
  Right	
  
Start	
  with	
  SRR	
  (or	
  something	
  on	
  the	
  leA)	
  and	
  completely	
  
define	
  its	
  compleDon,	
  before	
  moving	
  to	
  the	
  next	
  PE	
  
!  Define	
  the	
  SAs	
  for	
  an	
  Event	
  and	
  construct	
  a	
  work	
  flow	
  
of	
  the	
  ac&vi&es	
  needed	
  to	
  sa&sfy	
  the	
  SA	
  
–  These	
  ac&vi&es	
  are	
  yet	
  tasks,	
  so	
  don’t	
  commit	
  too	
  soon	
  to	
  
defining	
  the	
  detailed	
  work	
  
–  Isolate	
  the	
  SAs	
  by	
  event	
  first	
  –	
  only	
  work	
  on	
  one	
  event	
  at	
  a	
  
&me	
  
!  Iden&fy	
  the	
  par&cipants	
  in	
  the	
  work	
  
–  What	
  IPTs	
  par&cipate	
  in	
  this	
  work?	
  
–  What	
  swim	
  lanes	
  are	
  needed	
  to	
  isolate	
  the	
  IPTs?	
  
!  Define	
  the	
  elements	
  	
  
–  Ac&vi&es	
  performed	
  to	
  sa&sfy	
  the	
  SA	
  
–  Deliverables	
  that	
  result	
  from	
  these	
  ac&vi&es	
  
!  There	
  are	
  s&ll	
  not	
  Accomplishment	
  Criteria	
  (AC),	
  but	
  
that	
  comes	
  next	
   6	
  
9.0	
  Framework	
  
The	
  Accomplishment	
  Criteria	
  (AC)	
  
!  A	
  defini&ve	
  measure	
  or	
  indicator	
  that	
  verifies	
  
comple&on	
  of	
  work	
  for	
  the	
  accomplishment	
  
– Completed	
  work	
  effort	
  	
  
•  Manufacturing	
  Plan	
  Completed	
  
– Confirma&on	
  of	
  performance	
  compliance	
  	
  
•  Flight	
  Test	
  Report	
  Approved	
  
– Incremental	
  verifica&on	
  	
  
•  Maintenance	
  Demonstra&on	
  Completed	
  
– Completed	
  cri&cal	
  process	
  ac&vi&es	
  
•  Risk	
  Management	
  Plan	
  Approved	
  
7	
  
9.0	
  Framework	
  
The	
  Accomplishment	
  Criteria	
  (AC)	
  
!  Defines	
  the	
  measure	
  by	
  which	
  an	
  Accomplishment	
  (SA)	
  is	
  
considered	
  “done”	
  
!  Terms	
  like	
  complete,	
  delivered,	
  closed	
  have	
  no	
  “units	
  of	
  
measure”	
  in	
  the	
  context	
  of	
  a	
  Significant	
  Accomplishment	
  
(SA)	
  and	
  are	
  open	
  to	
  interpreta&on	
  
!  Terms	
  like	
  …	
  
–  Measures	
  of	
  comple&on	
  –	
  80%	
  of	
  drawings	
  approved	
  for	
  release	
  
–  Counts	
  of	
  available	
  items	
  –	
  75%	
  of	
  pin-­‐outs	
  assigned	
  voltage	
  
–  Fidelity	
  of	
  a	
  design	
  –	
  outer	
  mold	
  line	
  defined	
  within	
  90%	
  of	
  
target	
  
–  Error	
  bounds	
  –	
  spacecraA	
  mass	
  known	
  to	
  ±20%	
  
–  Performance	
  parameters	
  –	
  disconnect	
  force	
  within	
  allowed	
  
limits	
  
–  Maturity	
  parameters	
  –	
  flight	
  arDcle	
  successful	
  in	
  last	
  3	
  tests	
  
…	
  are	
  used	
  to	
  define	
  the	
  “exit	
  criteria”	
  
8	
  
9.0	
  Framework	
  
2	
  Types	
  of	
  Accomplishment	
  	
  
Criteria:	
  Entry	
  and	
  Exit	
  
!  Entry	
  Criteria	
  –	
  Substan&ates	
  readiness	
  for	
  the	
  
review	
  
!  Exit	
  Criteria	
  –	
  Substan&ates	
  successful	
  
comple&on	
  of	
  the	
  review	
  
!  Cri&cal	
  Design	
  Review	
  (CDR)	
  example	
  
– Are	
  we	
  ready	
  for	
  the	
  Flight	
  Test	
  Readiness	
  
Review?	
  
– How	
  do	
  we	
  know	
  the	
  FTRR	
  a	
  success?	
  
– What	
  did	
  we	
  learn	
  from	
  the	
  FTRR	
  that	
  increases	
  
the	
  maturity	
  of	
  the	
  program’s	
  deliverables.	
  
9	
  
9.0	
  Framework	
  
The	
  IMP	
  Focuses	
  us	
  on	
  Measures	
  
of	
  Effec&veness	
  and	
  Performance	
  
10	
  
MoE	
  
KPP	
  
MoP	
   TPM	
  
Mission	
  
Need	
  
Acquirer	
  Defines	
  the	
  Needs	
  and	
  Capabili&es	
  
in	
  terms	
  of	
  Opera&onal	
  Scenarios	
  
Supplier	
  Defines	
  Physical	
  Solu&ons	
  that	
  
meet	
  the	
  needs	
  of	
  the	
  Stakeholders	
  
Opera3onal	
  
measures	
  of	
  success	
  
related	
  to	
  the	
  
achievement	
  of	
  the	
  
mission	
  or	
  
opera3onal	
  
objec3ve	
  being	
  
evaluated.	
  
Measures	
  that	
  
characterize	
  
physical	
  or	
  
func3onal	
  aAributes	
  
rela3ng	
  to	
  the	
  
system	
  opera3on.	
  
Measures	
  used	
  to	
  
assess	
  design	
  
progress,	
  
compliance	
  to	
  
performance	
  
requirements,	
  and	
  
technical	
  risks.	
  
9.0	
  Framework	
  
Measure	
  of	
  Effec&veness	
  (MoE)	
  
!  Measures	
  of	
  Effec&veness	
  …	
  
!  Are	
  stated	
  in	
  units	
  meaningful	
  to	
  the	
  buyer,	
  
!  Focus	
  on	
  capabili&es	
  independent	
  of	
  any	
  
technical	
  implementa&on,	
  
!  Are	
  connected	
  to	
  the	
  mission	
  success.	
  
The	
  opera&onal	
  measures	
  of	
  success	
  that	
  are	
  closely	
  related	
  to	
  the	
  
achievements	
  of	
  the	
  mission	
  or	
  opera&onal	
  objec&ves	
  evaluated	
  in	
  
the	
  opera&onal	
  environment,	
  under	
  a	
  specific	
  set	
  of	
  condi&ons.	
  
“Technical	
  Measurement,”	
  INCOSE–TP–2003–020–01	
  
MoE’s	
  Belong	
  to	
  the	
  End	
  User	
  
11	
  
9.0	
  Framework	
  
Measure	
  of	
  Performance	
  (MoP)	
  
!  Measures	
  of	
  Performance	
  are	
  …	
  
!  Adributes	
  that	
  assure	
  the	
  system	
  has	
  the	
  
capability	
  to	
  perform,	
  
!  Assessment	
  of	
  the	
  system	
  to	
  assure	
  it	
  meets	
  
design	
  requirements	
  to	
  sa&sfy	
  the	
  MoE.	
  
Measures	
  that	
  characterize	
  physical	
  or	
  func&onal	
  adributes	
  
rela&ng	
  to	
  the	
  system	
  opera&on,	
  measured	
  or	
  es&mated	
  
under	
  specific	
  condi&ons.	
  
“Technical	
  Measurement,”	
  INCOSE–TP–2003–020–01	
  
MoP’s	
  belong	
  to	
  the	
  Program	
  –	
  Developed	
  by	
  the	
  Systems	
  
Engineer,	
  Measured	
  By	
  CAMs,	
  and	
  Analyzed	
  by	
  PP&C	
  	
  
12	
  
9.0	
  Framework	
  
Key	
  Performance	
  Parameters	
  (KPP)	
  
Both	
  JROC	
  and	
  Program	
  Specific	
  
!  Key	
  Performance	
  Parameters	
  …	
  
!  Have	
  a	
  threshold	
  or	
  objec&ve	
  value,	
  
!  Characterize	
  the	
  major	
  drivers	
  of	
  
performance,	
  
!  Are	
  considered	
  Cri&cal	
  to	
  Customer	
  (CTC).	
  
Represent	
  the	
  capabili&es	
  and	
  characteris&cs	
  so	
  
significant	
  that	
  failure	
  to	
  meet	
  them	
  can	
  be	
  cause	
  for	
  
reevalua&on,	
  reassessing,	
  or	
  termina&on	
  of	
  the	
  program	
  
“Technical	
  Measurement,”	
  INCOSE–TP–2003–020–01	
  
The	
  acquirer	
  defines	
  the	
  KPPs	
  during	
  the	
  opera&onal	
  
concept	
  development	
  –	
  KPPs	
  say	
  what	
  DONE	
  looks	
  like	
  
13	
  
9.0	
  Framework	
  
 
Technical	
  Performance	
  Measures	
  
(TPM)	
  for	
  key	
  deliverables	
  	
  
!  Technical	
  Performance	
  Measures	
  …	
  
!  Assess	
  design	
  progress,	
  
!  Define	
  compliance	
  to	
  performance	
  
requirements,	
  
!  Iden&fy	
  technical	
  risk,	
  
!  Are	
  limited	
  to	
  cri&cal	
  thresholds,	
  
!  Include	
  projected	
  performance.	
  “Technical	
  Measurement,”	
  INCOSE–TP–2003–020–01	
  
Adributes	
  that	
  determine	
  how	
  well	
  a	
  system	
  or	
  system	
  
element	
  is	
  sa&sfying	
  or	
  expected	
  to	
  sa&sfy	
  a	
  technical	
  
requirement	
  or	
  goal	
  
14	
  
9.0	
  Framework	
  
What	
  are	
  Technical	
  Performance	
  
Measures	
  Really?	
  
!  TPMs	
  are	
  measures	
  of	
  the	
  system	
  
technical	
  performance	
  that	
  have	
  
been	
  chosen	
  because	
  they	
  are	
  
indicators	
  of	
  system	
  success.	
  They	
  
are	
  based	
  on	
  the	
  driving	
  
requirements	
  or	
  technical	
  
parameters	
  of	
  high	
  risk	
  or	
  
significance	
  -­‐	
  e.g.,	
  mass,	
  power	
  or	
  
data	
  rate.	
  
!  TPMs	
  are	
  analogous	
  to	
  the	
  
programma&c	
  measures	
  of	
  
expected	
  total	
  cost	
  or	
  es&mated	
  
&me-­‐to-­‐comple&on.	
  There	
  is	
  a	
  
required	
  performance,	
  a	
  current	
  
best	
  es&mate,	
  and	
  a	
  trend	
  line.	
  
!  Actual	
  versus	
  planned	
  progress	
  of	
  
TPMs	
  are	
  tracked	
  so	
  the	
  systems	
  
engineer	
  or	
  project	
  manager	
  can	
  
assess	
  progress	
  and	
  the	
  risk	
  
associated	
  with	
  each	
  TPM.	
  	
  
!  The	
  final,	
  delivered	
  system	
  value	
  
can	
  be	
  es&mated	
  by	
  extending	
  the	
  
TPM	
  trend	
  line	
  and	
  using	
  the	
  
recommended	
  con&ngency	
  values	
  
for	
  each	
  project	
  phase.	
  
!  The	
  project	
  life	
  trend-­‐to-­‐date,	
  
current	
  value,	
  and	
  forecast	
  of	
  all	
  
TPMs	
  are	
  reviewed	
  periodically	
  
(typically	
  monthly)	
  and	
  at	
  all	
  major	
  
milestone	
  reviews.	
  
15	
  
9.0	
  Framework	
  
!  Tracking	
  TPMs	
  and	
  comparing	
  them	
  to	
  the	
  resource	
  growth	
  
provides	
  an	
  early	
  warning	
  system	
  to	
  detect	
  deficiencies	
  or	
  
excesses	
  
!  Reserve	
  alloca&ons	
  narrow	
  as	
  design	
  proceeds	
  
!  TPMs	
  that	
  violate	
  reserve	
  alloca&ons	
  or	
  have	
  trends	
  that	
  
do	
  not	
  meet	
  the	
  final	
  performance	
  trigger	
  correc&ve	
  
ac&ons	
  
16	
  
Tracking	
  the	
  Technical	
  	
  
Performance	
  Measures	
  
9.0	
  Framework	
  
No&onal	
  TPM	
  Design	
  Margin	
  
Guidelines	
  
17	
  
9.0	
  Framework	
  
Sample	
  IMP:	
  
A	
  Flight	
  Avionics	
  System	
  (Con&nued)	
  
Hardware	
  PDR	
  –	
  Purpose	
  
	
  
!  Ensure	
  system	
  hardware	
  ini&al	
  design	
  has	
  been	
  updated,	
  and	
  meets	
  
func&onal	
  and	
  allocated	
  performance	
  requirements	
  within	
  program	
  
constraints.	
  	
  
!  Opera&onal	
  security	
  concept	
  assessed.	
  	
  
!  Ensure	
  training	
  requirements	
  have	
  been	
  analyzed	
  and	
  their	
  objec&ves	
  
have	
  been	
  defined	
  for	
  training	
  missions.	
  	
  
!  Confirma&on	
  training	
  objec&ves	
  and	
  MTC	
  design	
  and	
  integra&on	
  conform	
  
to	
  the	
  Air	
  Force	
  syllabus	
  and	
  Ready	
  Aircrew	
  Program	
  (RAP).	
  	
  
!  Training	
  plan	
  will	
  be	
  updated.	
  
!  Hardware	
  PDR	
  –	
  Expecta&ons	
  
!  Team	
  agrees	
  system	
  hardware	
  ini&al	
  design	
  has	
  been	
  updated	
  and	
  can	
  
proceed	
  to	
  the	
  detailed	
  design	
  phase.	
  	
  
!  Team	
  agrees	
  training	
  plans	
  and	
  objec&ves	
  correlate	
  with	
  the	
  Air	
  Force	
  
syllabus,	
  RAP	
  and	
  training	
  planning,	
  development	
  can	
  con&nue.	
  	
  
!  System	
  Specifica&on	
  and	
  TTL	
  requirements	
  are	
  traceable	
  to	
  the	
  allocated	
  
hardware	
  design.	
  	
  
18	
  
9.0	
  Framework	
  
Sample	
  IMP:	
  
A	
  Flight	
  Avionics	
  System	
  (Con&nued)	
  
!  Hardware	
  PDR	
  –	
  Entry	
  Criteria	
  
!  Func&onal	
  Baseline	
  Authen&cated	
  (FBA)	
  
!  Ini&ate	
  system	
  hardware	
  ini&al	
  design	
  and	
  
allocate	
  func&ons	
  to	
  the	
  appropriate	
  
Configura&on	
  Items	
  
!  All	
  specifica&ons	
  updated	
  and	
  required	
  
documenta&on	
  is	
  made	
  available	
  including	
  
an&cipated	
  lower	
  level	
  design	
  documenta&on	
  
!  All	
  SRR/SFR	
  ac&on	
  items	
  closed	
  or	
  
disposi&oned	
  	
  
19	
  
9.0	
  Framework	
  
Sample	
  IMP:	
  
A	
  Flight	
  Avionics	
  System	
  (Con&nued)	
  
Hardware	
  PDR	
  –	
  Accomplishments	
  
!  System	
  hardware	
  ini&al	
  design	
  complete.	
  	
  
–  Func&ons	
  allocated	
  to	
  one	
  or	
  more	
  hardware	
  configura&on	
  items	
  and	
  
are	
  traceable	
  to	
  the	
  MTC	
  SSS	
  and	
  TSSC	
  SSS.	
  	
  
–  Human,	
  safety,	
  R&M,	
  EMI,	
  opera&onal	
  security,	
  instructor	
  and	
  
operator	
  interfaces,	
  etc,	
  design	
  factors	
  have	
  been	
  reviewed.	
  	
  
!  Drag	
  instructor	
  and	
  operator	
  manuals	
  reviewed	
  	
  
!  Program	
  risks	
  updated,	
  assessed,	
  and	
  reviewed.	
  	
  
–  Mi&ga&on	
  plans	
  in	
  place.	
  
!  Program	
  schedule	
  and	
  constraints	
  updated	
  and	
  reviewed.	
  	
  
–  Cri&cal	
  schedule	
  path	
  drivers	
  reviewed.	
  	
  
!  Design	
  criteria	
  for	
  the	
  simula&on	
  and	
  database	
  development	
  
reviewed	
  and	
  updated.	
  
!  Program	
  processes	
  and	
  metrics	
  reviewed.	
  
!  Test	
  Planning	
  ac&vi&es	
  and	
  relevant	
  documenta&on	
  reviewed	
  by	
  
test	
  team.	
  
20	
  
9.0	
  Framework	
  
Sample	
  IMP:	
  
A	
  Flight	
  Avionics	
  System	
  (Concluded)	
  
Hardware	
  PDR	
  –	
  Exit	
  Criteria	
  
	
  
!  Hardware	
  (ownership,	
  visual,	
  IOS,	
  brief/debrief)	
  design	
  reviewed,	
  allocated	
  to	
  a	
  
hardware	
  configura&on	
  item	
  and	
  updated	
  to	
  include	
  instructor	
  and	
  operators	
  
interfaces,	
  malfunc&on	
  and	
  control	
  requirements,	
  etc.	
  	
  
!  RTM	
  updated,	
  MTC	
  SSS,	
  TSSC	
  SSS	
  and	
  TTL	
  traceable	
  to	
  allocated	
  hardware	
  design	
  
to	
  include	
  ESOH	
  requirements.	
  	
  
!  Human,	
  safety,	
  R&M,	
  EMI,	
  opera&onal	
  security,	
  instructor	
  and	
  operator	
  interfaces,	
  
etc,	
  design	
  factors	
  reviewed.	
  	
  
!  MTC	
  and	
  TSSC	
  allocated	
  baselines	
  established	
  and	
  controlled	
  by	
  appropriate	
  level	
  
documenta&on	
  for	
  PDR.	
  
!  Drag	
  instructor	
  and	
  operator	
  manuals	
  reviewed	
  with	
  user	
  concurrence	
  and	
  
incorporate	
  sa&sfactory	
  human	
  factor	
  design	
  factors	
  into	
  the	
  operator	
  interfaces.	
  	
  
!  Risk	
  management	
  and	
  mi&ga&on	
  plans	
  updated,	
  in	
  place,	
  addresses	
  ESOH	
  plans	
  
and	
  risks,	
  and	
  within	
  program	
  constraints.	
  	
  
!  Risks	
  assesses,	
  understood,	
  documented,	
  accepted	
  and	
  understood	
  by	
  team.	
  
!  Program	
  schedule	
  reviewed	
  	
  
–  Cri&cal	
  path	
  drivers	
  iden&fied	
  	
  
–  IMS	
  Updated	
  and	
  reflects	
  cri&cal	
  paths	
  
21	
  
9.0	
  Framework	
  
One	
  More	
  IMP	
  Sample	
  
!  (SA)	
  System	
  &	
  Segment	
  
Requirements	
  Updated	
  &	
  Allocated	
  
–  (AC)	
  SRR	
  /	
  SDR	
  Update	
  Review	
  
Conducted	
  
–  (AC)	
  Preliminary	
  System	
  
Specifica&on	
  Documents	
  (A011)	
  
Baselined	
  
–  (AC)	
  Preliminary	
  Spacecrag	
  
Segment	
  Specifica&on	
  Baselined	
  
–  (AC)	
  Preliminary	
  Ground	
  Segment	
  
Specifica&on	
  Baselined	
  
–  (AC)	
  Preliminary	
  Specifica&on	
  Tree	
  
Baselined	
  
!  (SA)	
  Preliminary	
  ICDs	
  Baselined	
  For	
  
Customer	
  Review	
  
–  (AC)	
  Preliminary	
  Space-­‐Ground	
  
ICD	
  Baselined	
  	
  
!  (SA)	
  PDR	
  System	
  Design	
  Completed	
  
–  (AC)	
  Top	
  Level	
  System	
  
Architecture	
  Updated	
  
–  (AC)	
  PDR	
  Level	
  System	
  Analyses	
  
Completed	
  
–  (AC)	
  PDR	
  Level	
  Reliability	
  /	
  
Availability	
  Analysis	
  Completed	
  
–  (AC)	
  Preliminary	
  System	
  Level	
  Risk	
  
Assessment	
  Completed	
  
–  (AC)	
  System	
  Level	
  Plans	
  Updated	
  
For	
  PDR	
  
–  (AC)	
  Flight	
  Long	
  Lead	
  Review	
  
Conducted	
  
22	
  
Preliminary	
  Design	
  Review	
  
9.0	
  Framework	
  
The	
  “But”	
  for	
  this	
  Guidance	
  
!  With	
  these	
  samples	
  and	
  the	
  SETR	
  guidance	
  
we’ve	
  just	
  started	
  
!  The	
  program	
  needs	
  to	
  define	
  program	
  specific	
  
events	
  to	
  assure	
  the	
  actual	
  maturity	
  measures	
  
are	
  captured	
  
– The	
  IMP	
  provides	
  sufficient	
  definiDon	
  to	
  track	
  the	
  
step-­‐by-­‐step	
  compleDon	
  of	
  the	
  required	
  
accomplishments	
  for	
  each	
  event	
  and	
  to	
  
demonstrate	
  saDsfacDon	
  of	
  the	
  compleDon	
  
criteria	
  for	
  each	
  accomplishment.	
  [AFMC	
  
PAMPHLET	
  63-­‐5]	
   23	
  
9.0	
  Framework	
  
IMP	
  Verbs	
  for	
  Significant	
  
Accomplishments	
  
24	
  
Integrated	
  Master	
  Plan	
  Allowable	
  Verbs	
  
Allocated:	
  Segment	
  requirement	
  is	
  flowed	
  down	
  
from	
  the	
  System	
  Specifica&on	
  
Released:	
  Approved	
  item	
  for	
  delivery	
  for	
  
intended	
  customer	
  or	
  supplier;	
  all	
  internal	
  
distribu&on	
  and	
  sign	
  offs	
  complete.	
  An	
  
electronic	
  version	
  is	
  made	
  accessible	
  on	
  the	
  IDE	
  
Completed:	
  The	
  subject	
  item,	
  data,	
  document,	
  
or	
  process	
  is	
  prepared	
  or	
  concluded,	
  and	
  
reviewed	
  and	
  accepted	
  by	
  the	
  responsible	
  IPT.	
  
Suppor&ng	
  documenta&on	
  is	
  available	
  through	
  
IDE	
  
Reviewed:	
  The	
  subject	
  item,	
  data,	
  document,	
  or	
  
process	
  is	
  prepared	
  or	
  concluded,	
  and	
  
documented	
  for	
  comple&on.	
  Suppor&ng	
  
documenta&on	
  is	
  available	
  through	
  IDE	
  
Conducted:	
  The	
  subject	
  mee&ng	
  or	
  review	
  has	
  
been	
  held	
  with	
  all	
  required	
  par&cipants.	
  The	
  
charts	
  or	
  minutes	
  are	
  available	
  through	
  the	
  IDE	
  
Updated:	
  The	
  subject	
  process,	
  data,	
  or	
  
document	
  has	
  been	
  reevaluated	
  using	
  later	
  
informa&on,	
  and	
  adjustments	
  incorporated.	
  
Defined:	
  The	
  subject	
  configura&on	
  items,	
  data,	
  
or	
  document	
  was	
  submided	
  to	
  the	
  customer	
  
Validated:	
  Requirements	
  are	
  validated,	
  received	
  
contractor	
  approvals,	
  were	
  distributed,	
  and	
  are	
  
available	
  through	
  the	
  IDE	
  
Established:	
  The	
  subject	
  items	
  is	
  created	
  and	
  set	
  
in	
  place	
  in	
  a	
  manner	
  consistent	
  with	
  its	
  intended	
  
use	
  ager	
  review	
  and	
  accepted	
  by	
  the	
  IPT	
  
Verified:	
  Requirements	
  are	
  verified	
  or	
  processed	
  
in	
  accordance	
  with	
  established	
  prac&ce.	
  
9.0	
  Framework	
  
The	
  IMP	
  Process	
  Narra&ve	
  
!  ObjecFve:	
  a	
  brief	
  statement	
  explaining	
  why	
  this	
  
process	
  set	
  is	
  applied	
  for	
  this	
  program	
  
!  Governing	
  DocumentaFon:	
  lists	
  of	
  the	
  guidance	
  
or	
  compliance	
  documents;	
  e.g.,	
  specifica&ons,	
  
manuals,	
  and	
  procedures	
  including	
  company,	
  
government,	
  and	
  industry	
  references	
  
!  Approach:	
  concise	
  descrip&on	
  as	
  to	
  who	
  owns	
  
each	
  process;	
  what	
  are	
  the	
  roles	
  and	
  
responsibili&es;	
  and	
  the	
  overall	
  process	
  including	
  
a	
  process	
  flow	
  diagram.	
  
25	
  
9.0	
  Framework	
  
Generic	
  IMP	
  Evalua&on	
  Criteria	
  
!  Do	
  the	
  Program	
  Events	
  and	
  Accomplishments	
  
reflect	
  the	
  logical	
  evolu&on	
  and	
  progress	
  of	
  the	
  
overall	
  Program?	
  
–  Do	
  program	
  events	
  and	
  their	
  defini&ons	
  clearly	
  
demonstrate	
  the	
  maturity	
  of	
  the	
  program	
  over	
  
its	
  life?	
  
–  Do	
  the	
  selected	
  Accomplishments	
  and	
  
associated	
  Criteria	
  iden&fy	
  meaningful	
  and	
  
measurable	
  progress	
  toward	
  the	
  key	
  goals	
  of	
  
the	
  Program?	
  
!  Do	
  the	
  Accomplishments	
  for	
  each	
  event	
  
demonstrate	
  a	
  meaningful	
  understanding	
  of	
  the	
  
program	
  requirements	
  or	
  are	
  they	
  tasks	
  that	
  
anyone	
  could	
  do	
  for	
  any	
  contract?	
  
–  Do	
  they	
  reflect	
  your	
  SOW	
  requirements?	
  	
  
!  Does	
  the	
  IMP	
  structure	
  readily	
  map	
  to	
  the	
  IPT	
  
structure	
  such	
  that	
  each	
  IPT	
  can	
  easily	
  visualize	
  
the	
  scope	
  of	
  their	
  responsibility?	
  	
  
!  When	
  awarded,	
  could	
  the	
  contractor	
  use	
  the	
  
Accomplishments	
  as	
  discrete	
  ac&vity	
  cost	
  accounts	
  
in	
  their	
  earned	
  value	
  system?	
  Or	
  are	
  they	
  level	
  of	
  
effort	
  in	
  nature?	
  	
  
!  Is	
  sufficient	
  visibility	
  provided	
  to	
  iden&fy	
  and	
  track	
  
the	
  Program	
  Risk	
  Plan	
  and	
  associated	
  risk	
  
mi&ga&on	
  accomplishments	
  and/or	
  
con&ngencies?	
  
–  Does	
  criteria	
  suppor&ng	
  the	
  accomplishments	
  
include	
  key	
  performance	
  requirements?	
  
!  Are	
  IPT	
  cross-­‐dependencies	
  and	
  dependencies	
  
external	
  to	
  the	
  Program	
  appropriately	
  reflected	
  if	
  
they	
  reflect	
  poten&al	
  schedule	
  or	
  performance	
  
risks	
  to	
  the	
  success	
  of	
  the	
  Program?	
  
!  Is	
  the	
  submided	
  "Contract	
  IMP"	
  (the	
  Product	
  IMP	
  
that	
  is	
  to	
  be	
  included	
  as	
  part	
  of	
  the	
  Program	
  
Contract)	
  defined	
  to	
  the	
  appropriate	
  level:	
  
–  Do	
  the	
  Accomplishments	
  and	
  associated	
  
Criteria	
  go	
  down	
  to	
  a	
  level	
  sufficient	
  to	
  provide	
  
visibility	
  into	
  key	
  subcontractor	
  ac&vi&es	
  upon	
  
which	
  the	
  success	
  of	
  the	
  Program	
  may	
  be	
  
dependent?	
  
–  Are	
  the	
  Events	
  and	
  Accomplishments	
  included	
  
in	
  the	
  IMP	
  at	
  such	
  a	
  level	
  as	
  to	
  make	
  the	
  
maintenance	
  of	
  the	
  'Contractual	
  IMP'	
  prac&cal	
  
or	
  does	
  it	
  include	
  an	
  unnecessary	
  level	
  of	
  
detail?	
  
26	
  
9.0	
  Framework	
  
Program	
  Management	
  Levels	
  
Program Levels" IMP/IMS Elements" CWBS"
Tier 1!
Program Manager!
Technical Leads!
IPT Manager!
Technical performance goals!
Major Program Events
(PE)!
!
!
!
Significant
Accomplishments (SA)!
Level 1 & 2!
Links to CLINs!
Level 3 & 4!
Control Packages!
Link to PBS!
Integrated EVMS!
Tier 2!
Control Account Managers !
Product Work Plan!
Responsible organization
elements!
!
Accomplishment
Criteria (AC)!
!
!
!
!
Tasks (NA)!
Level 5!
Cost Account
Package!
Cost Collection Level!
Links to WBS by OBS!
Resource summaries!
Early warning EVMS
analysis!
Tier 3!
Work Package Manager!
Detailed plans! Work package!
Earned value
calculations!
27	
  
9.0	
  Framework	
  
Connec&ng	
  the	
  Components	
  	
  
of	
  the	
  IMP/IMS	
  
!  The	
  assembled	
  IMP/IMS	
  links	
  all	
  work	
  
ac&vi&es	
  ver&cally	
  to	
  the	
  ACs,	
  SAs,	
  and	
  PEs	
  
28	
  
IMS	
  
Customer	
  
Requirements	
   IMP	
  
ORG	
  
IPTs	
  
ORG	
  
IPTs	
  
Performance	
  
Analysis/	
  
Management 	
  
Review	
  
Events (E)	
  Events (E)	
  
Accomplishments	
  
Process	
  
Narratives	
  
Criteria	
  
Integrated Master	
  
Schedule (IMS)	
  
Integrated Master	
  
Schedule (IMS)	
  
Control Account	
  Control Account	
  
Work Package	
  Work Package	
  
Work Package Tasks	
  Work Package Tasks	
  
WBS	
  
Program 	
  
Performance	
  
Management 	
  
System	
  
Supplemental Schedules	
  
Risk and 	
  
opportunity	
  
Risk and 	
  
opportunity	
  
9.0	
  Framework	
  

Más contenido relacionado

La actualidad más candente

WBS presentation
WBS presentationWBS presentation
WBS presentationjpstewar
 
Integrated Risk Management 101
Integrated Risk Management 101Integrated Risk Management 101
Integrated Risk Management 101Resolver Inc.
 
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011Pedram Danesh-Mand
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation TafseerKishan Solankimbaccepmp
 
Project Risk Management PMBOK
Project Risk Management PMBOKProject Risk Management PMBOK
Project Risk Management PMBOKGeoDiga
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by StepGlen Alleman
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk managementIQPC
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideGlen Alleman
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMIChris Carson
 
Project Time Management
Project Time ManagementProject Time Management
Project Time ManagementSerdar Temiz
 
Kuala Lumpur - PMI Global Congress 2009 - Risk Management
Kuala Lumpur - PMI Global Congress 2009 - Risk ManagementKuala Lumpur - PMI Global Congress 2009 - Risk Management
Kuala Lumpur - PMI Global Congress 2009 - Risk ManagementTorsten Koerting
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)Anand Subramaniam
 
Managing Project Execution
Managing Project ExecutionManaging Project Execution
Managing Project Executionpajames36
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..pptPedadaSaikumar
 
11.6 Implement Risk Responses
11.6 Implement Risk Responses11.6 Implement Risk Responses
11.6 Implement Risk ResponsesDavidMcLachlan1
 
A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)Glen Alleman
 
11.3 Perform Qualitative Risk Analysis
11.3 Perform Qualitative Risk Analysis11.3 Perform Qualitative Risk Analysis
11.3 Perform Qualitative Risk AnalysisDavidMcLachlan1
 

La actualidad más candente (20)

WBS presentation
WBS presentationWBS presentation
WBS presentation
 
Integrated Risk Management 101
Integrated Risk Management 101Integrated Risk Management 101
Integrated Risk Management 101
 
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 
Project Risk Management PMBOK
Project Risk Management PMBOKProject Risk Management PMBOK
Project Risk Management PMBOK
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk management
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guide
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMI
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
Kuala Lumpur - PMI Global Congress 2009 - Risk Management
Kuala Lumpur - PMI Global Congress 2009 - Risk ManagementKuala Lumpur - PMI Global Congress 2009 - Risk Management
Kuala Lumpur - PMI Global Congress 2009 - Risk Management
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
Managing Project Execution
Managing Project ExecutionManaging Project Execution
Managing Project Execution
 
Project portfolio management
Project portfolio managementProject portfolio management
Project portfolio management
 
project management
project managementproject management
project management
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
11.6 Implement Risk Responses
11.6 Implement Risk Responses11.6 Implement Risk Responses
11.6 Implement Risk Responses
 
A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)
 
11.3 Perform Qualitative Risk Analysis
11.3 Perform Qualitative Risk Analysis11.3 Perform Qualitative Risk Analysis
11.3 Perform Qualitative Risk Analysis
 

Destacado

The simple problem of schedule performance indices
The simple problem of schedule performance indicesThe simple problem of schedule performance indices
The simple problem of schedule performance indicesGlen Alleman
 
Nine Best Practices
Nine Best PracticesNine Best Practices
Nine Best PracticesGlen Alleman
 
Risk management using risk+ (v5)
Risk management using risk+ (v5)Risk management using risk+ (v5)
Risk management using risk+ (v5)Glen Alleman
 
Deliverables Based Planning
Deliverables Based PlanningDeliverables Based Planning
Deliverables Based PlanningGlen Alleman
 
Paradigm of agile project management
Paradigm of agile project managementParadigm of agile project management
Paradigm of agile project managementGlen Alleman
 
Building the perfect schedule (v6)
Building the perfect schedule (v6)Building the perfect schedule (v6)
Building the perfect schedule (v6)Glen Alleman
 
Principles and Practices of Performance-Based Project Management®
Principles and Practices of Performance-Based Project Management®Principles and Practices of Performance-Based Project Management®
Principles and Practices of Performance-Based Project Management®Glen Alleman
 

Destacado (10)

The simple problem of schedule performance indices
The simple problem of schedule performance indicesThe simple problem of schedule performance indices
The simple problem of schedule performance indices
 
Del
DelDel
Del
 
Lifecycle
LifecycleLifecycle
Lifecycle
 
Nine Best Practices
Nine Best PracticesNine Best Practices
Nine Best Practices
 
Risk management using risk+ (v5)
Risk management using risk+ (v5)Risk management using risk+ (v5)
Risk management using risk+ (v5)
 
Deliverables Based Planning
Deliverables Based PlanningDeliverables Based Planning
Deliverables Based Planning
 
Paradigm of agile project management
Paradigm of agile project managementParadigm of agile project management
Paradigm of agile project management
 
Building the perfect schedule (v6)
Building the perfect schedule (v6)Building the perfect schedule (v6)
Building the perfect schedule (v6)
 
Principles and Practices of Performance-Based Project Management®
Principles and Practices of Performance-Based Project Management®Principles and Practices of Performance-Based Project Management®
Principles and Practices of Performance-Based Project Management®
 
Control systems
Control systemsControl systems
Control systems
 

Similar a The integrated master plan and integrated master schedule

Integrated Master Plan and Integrated Master Schedule
Integrated Master Plan and Integrated Master ScheduleIntegrated Master Plan and Integrated Master Schedule
Integrated Master Plan and Integrated Master ScheduleGlen Alleman
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineGlen Alleman
 
Beyond CPI and SPI
Beyond CPI and SPIBeyond CPI and SPI
Beyond CPI and SPIGlen Alleman
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Glen Alleman
 
Building A Credible Measurement Baseline
Building A Credible Measurement BaselineBuilding A Credible Measurement Baseline
Building A Credible Measurement BaselineGlen Alleman
 
Earning Value from Earned Value Management
Earning Value from Earned Value ManagementEarning Value from Earned Value Management
Earning Value from Earned Value ManagementGlen Alleman
 
Building a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysBuilding a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysGlen Alleman
 
Building a Credible Performance Measurement Baseline (v3)
Building a Credible Performance Measurement Baseline (v3)Building a Credible Performance Measurement Baseline (v3)
Building a Credible Performance Measurement Baseline (v3)Glen Alleman
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineGlen Alleman
 
Focus on the nine I's (v9)
Focus on the nine I's (v9)Focus on the nine I's (v9)
Focus on the nine I's (v9)Glen Alleman
 
Assessing Project Performance Beyond CPI/SPI
Assessing Project Performance Beyond CPI/SPIAssessing Project Performance Beyond CPI/SPI
Assessing Project Performance Beyond CPI/SPIGlen Alleman
 
Project cost management a simplified approach white paper - Oracle Primaver...
Project cost management   a simplified approach white paper - Oracle Primaver...Project cost management   a simplified approach white paper - Oracle Primaver...
Project cost management a simplified approach white paper - Oracle Primaver...p6academy
 
Agile in an ANSI-748-C environment
Agile in an ANSI-748-C environmentAgile in an ANSI-748-C environment
Agile in an ANSI-748-C environmentGlen Alleman
 
Integrated Agile Software Development with Earned Value Management
Integrated Agile Software Development with Earned Value ManagementIntegrated Agile Software Development with Earned Value Management
Integrated Agile Software Development with Earned Value ManagementGlen Alleman
 
How should we estimates agile projects (CAST)
How should we estimates agile projects (CAST)How should we estimates agile projects (CAST)
How should we estimates agile projects (CAST)Glen Alleman
 
From Needed Capabilities to Project Deliverables - On Time, On Budget, On Spe...
From Needed Capabilities to Project Deliverables - On Time, On Budget, On Spe...From Needed Capabilities to Project Deliverables - On Time, On Budget, On Spe...
From Needed Capabilities to Project Deliverables - On Time, On Budget, On Spe...Glen Alleman
 
Deliverables based planning handbook
Deliverables based planning handbookDeliverables based planning handbook
Deliverables based planning handbookGlen Alleman
 

Similar a The integrated master plan and integrated master schedule (20)

Integrated Master Plan and Integrated Master Schedule
Integrated Master Plan and Integrated Master ScheduleIntegrated Master Plan and Integrated Master Schedule
Integrated Master Plan and Integrated Master Schedule
 
T24 Temenos Earned Value Management &amp; Project Planning Presentation
T24 Temenos Earned Value Management &amp; Project Planning PresentationT24 Temenos Earned Value Management &amp; Project Planning Presentation
T24 Temenos Earned Value Management &amp; Project Planning Presentation
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
 
Beyond CPI and SPI
Beyond CPI and SPIBeyond CPI and SPI
Beyond CPI and SPI
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
 
Building A Credible Measurement Baseline
Building A Credible Measurement BaselineBuilding A Credible Measurement Baseline
Building A Credible Measurement Baseline
 
Earning Value from Earned Value Management
Earning Value from Earned Value ManagementEarning Value from Earned Value Management
Earning Value from Earned Value Management
 
Building a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysBuilding a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two Days
 
Building a Credible Performance Measurement Baseline (v3)
Building a Credible Performance Measurement Baseline (v3)Building a Credible Performance Measurement Baseline (v3)
Building a Credible Performance Measurement Baseline (v3)
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
 
Ev+agile=success
Ev+agile=successEv+agile=success
Ev+agile=success
 
Focus on the nine I's (v9)
Focus on the nine I's (v9)Focus on the nine I's (v9)
Focus on the nine I's (v9)
 
Assessing Project Performance Beyond CPI/SPI
Assessing Project Performance Beyond CPI/SPIAssessing Project Performance Beyond CPI/SPI
Assessing Project Performance Beyond CPI/SPI
 
Project cost management a simplified approach white paper - Oracle Primaver...
Project cost management   a simplified approach white paper - Oracle Primaver...Project cost management   a simplified approach white paper - Oracle Primaver...
Project cost management a simplified approach white paper - Oracle Primaver...
 
IMP IMS overview
IMP IMS overviewIMP IMS overview
IMP IMS overview
 
Agile in an ANSI-748-C environment
Agile in an ANSI-748-C environmentAgile in an ANSI-748-C environment
Agile in an ANSI-748-C environment
 
Integrated Agile Software Development with Earned Value Management
Integrated Agile Software Development with Earned Value ManagementIntegrated Agile Software Development with Earned Value Management
Integrated Agile Software Development with Earned Value Management
 
How should we estimates agile projects (CAST)
How should we estimates agile projects (CAST)How should we estimates agile projects (CAST)
How should we estimates agile projects (CAST)
 
From Needed Capabilities to Project Deliverables - On Time, On Budget, On Spe...
From Needed Capabilities to Project Deliverables - On Time, On Budget, On Spe...From Needed Capabilities to Project Deliverables - On Time, On Budget, On Spe...
From Needed Capabilities to Project Deliverables - On Time, On Budget, On Spe...
 
Deliverables based planning handbook
Deliverables based planning handbookDeliverables based planning handbook
Deliverables based planning handbook
 

Más de Glen Alleman

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planningGlen Alleman
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSGlen Alleman
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project SuccessGlen Alleman
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMGlen Alleman
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk managementGlen Alleman
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk ManagementGlen Alleman
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Glen Alleman
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringGlen Alleman
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)Glen Alleman
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possibleGlen Alleman
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic AbundanceGlen Alleman
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planningGlen Alleman
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for AgileGlen Alleman
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement BaselineGlen Alleman
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaGlen Alleman
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure RolloutGlen Alleman
 
Project Management Theory
Project Management TheoryProject Management Theory
Project Management TheoryGlen Alleman
 
Increasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and PracticesIncreasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and PracticesGlen Alleman
 
Seven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project managerSeven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project managerGlen Alleman
 
Paradigm of agile project management (update)
Paradigm of agile project management (update)Paradigm of agile project management (update)
Paradigm of agile project management (update)Glen Alleman
 

Más de Glen Alleman (20)

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPM
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk management
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk Management
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planning
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement Baseline
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six Sigma
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure Rollout
 
Project Management Theory
Project Management TheoryProject Management Theory
Project Management Theory
 
Increasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and PracticesIncreasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and Practices
 
Seven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project managerSeven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project manager
 
Paradigm of agile project management (update)
Paradigm of agile project management (update)Paradigm of agile project management (update)
Paradigm of agile project management (update)
 

Último

"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesZilliz
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 

Último (20)

E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector Databases
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 

The integrated master plan and integrated master schedule

  • 1. The  Integrated  Master  Plan  And   Integrated  Master  Schedule   The  Integrated  Master  Plan  and  Integrated  Master  Schedule  are  one  of  the   six  elements  of  a  Credible  Performance  Measurement  Baseline  (PMB).   The  PMB  is  the  source  of  data  for  the  Program  Manager.  Some  of  this  data  is   used  in  the  Integrated  Program  Measurement  Report  (IPMR).  Some  is  used   in  the  assessment  of  the  Program’s  risk.  Some  define  the  deliverables  and   their  Technical  Performance  Measures.     1   5 V8.5  
  • 2. The  IMP  tells  us  where  is  the  program  going?   The  Plan  describes  where  we  are  going,  the  various  paths  we  can  take  to  reach  our   desLnaLon,  and  the  progress  or  performance  assessment  points  along  the  way  to   assure  we  are  on  the  right  path.   These  assessment  points  measures  the  “maturity”  of  the  product  or  service  against   the  planned  maturity.  This  is  the  only  real  measure  of  progress  –  not  the  passage   of  Lme  or  consumpLon  of  money.   The  Integrated  Master  Plan  (IMP)  Is  A  Strategy  For   The  Successful  Comple=on  Of  The  Project   2   5.0  Start  with  the  IMP  
  • 3. 3   5.0  Start  with  the  IMP  
  • 4. Quick  View  to  IMP/IMS   !  VerLcal  traceability  defines  the  increasing  maturity  of   key  deliverables   !  Horizontal  traceability  defines  the  work  acLviLes   needed  to  produce  this  increasing  maturity   !  Both  are  needed,  but  the  verLcal  traceability  is  the   starLng  point   !  Program  Events,  Significant  Accomplishments,  and   Accomplishment  Criteria  must  be  defined  before  the   horizontal  work  acLviLes  can  be  idenLfied   !  For  all  IMP  elements,  Key  Risks  must  be  idenLfied  and   assigned  from  Day  One,  even  without  miLgaLons   4   5.0  Start  with  the  IMP  
  • 5. The  IMP/IMS  is  Needed  on     Both  Sides  of  the  Contract   !  Ver%cal  traceability  defines  the  increasing  maturity  of   the  program’s  deliverables  measures  in  EffecLveness   (MoE)  and  Performance  (MoP)  for  the  Government.   !  Horizontal  traceability  defines  the  progress  to  plan  for   MoE’s  and  MoP’s  with  tangible  evidence  for  both  the   Government  and  the  Contractor.   !  Ver%cal  traceability  provides  the  Government  with   insight  into  the  progress  of  the  MoE’s  and  MoP’s  and   Technical  Performance  Measures.   !  Horizontal  traceability  provides  insight  into  Cost  and   Schedule  performance  for  the  Contractor,  reportable   through  the  IPMR  to  the  Government.   5   5.0  Start  with  the  IMP  
  • 6. MisconcepLons  of     the  IMP  /  IMS   Why  we  don’t  need/want  an  IMP/IMS     !  Only  required  for  ACAT  I  programs   !  Too  big  and  burdensome  for  our  small  dollar  value  program   !  Contractor  spends  B&P  and  program  budget  generaLng  and   maintaining  the  IMP,  without  measurable  benefit   !  Doesn’t  apply  on  a  services  contractors   !  Management  tool,  not  a  technical  tool   !  Doesn’t  apply  to  technology  programs   !  Doesn’t  apply  to  R&D  efforts   !  Doesn’t  apply  to  the  government   !  Help  me  get  a  waiver  so  I  don’t  have  to  use  an  IMP/IMS   6   5.0  Start  with  the  IMP  
  • 7. Aeributes  of  IMP   !  Traceability   –  Expands  and  complies  with  the  SOO,  Performance   Requirements,  CWBS,  and  CSOW   –  Based  on  the  customers  WBS   –  Is  the  basis  of  the  IMS,  cost  reports,  and  award  fees   !  Implements  a  measurable  and  trackable  program   –  Accomplishes  integrated  product  development   –  Integrates  the  funcLonal  acLviLes  of  the  program   –  Incorporates  funcLonal,  lower  level  and  S/C  IMPs   !  Provides  for  evaluaLon  of  Program  Maturity   –  Provides  insight  into  the  overall  effort   –  Level  of  detail  is  consistent  with  risk  and  complexity  per  §L   –  Decomposes  events  into  a  logical  series  of  accomplishments   –  Measurable  criteria  demonstrate  compleLon  /  quality  of   accomplishments   7   5.0  Start  with  the  IMP  
  • 8. Aeributes  of  the  IMS   !  Integrated,  networked,  mulL-­‐layered  schedule  of   efforts  required  to  achieve  each  IMP   accomplishment   –  Detailed  tasks  and  work  to  be  completed   –  Calendar  schedule  shows  work  compleLon  dates   –  Network  schedule  shows  interrelaLonships  and   criLcal  path   –  Expanded  granularity,  frequency,  and  depth  of  risk   areas   !  Resource  loading   !  Correlates  IMS  work  with  IMP  events   8   5.0  Start  with  the  IMP  
  • 9. The  Importance  of  the  IMP   !  The  IMP/IMS  is  the  single  most  important  document  to   a  program’s  success   –  It  clearly  demonstrates  the  providers  understanding  of  the   program  requirements  and  the  soundness  of  the  approach   a  represented  by  the  plan   !  The  program  uses  the  IMP/IMS  to  provide:   –  Up  Front  Planning  and  commitment  from  all  parLcipants   –  A  balanced  design  discipline  with  risk  miLgaLon  acLviLes   –  Integrated  requirements  including  producLon  and  support   –  Management  with  an  incremental  verificaLon  for   informed  program  decisions   9   5.0  Start  with  the  IMP  
  • 10. Just  A  Reminder,  before  moving  on   10   Page  47,  Defense  AcquisiLon  Guide,  January  10,  2012   Page  317,  Defense  AcquisiLon  Guide,  January  10,  2012   5.0  Start  with  the  IMP  
  • 11. Our  Goal  is  simple  …     How  can  we  recognize  the  Reality  of  the  Program’s   current  status  and  its  future  performance?   The  top  spins  conLnuous  while  in  a  dream  –  stops   spinning  in  the  real  world  –  Cobb’s  totem,  Incep=on   11   5.0  Start  with  the  IMP  
  • 12. 12  
  • 13. Principles  of  Building  a  Credible   Integrated  Master  Plan   Building  the  IMP  is  a  Systems  Engineering  ac<vity.  The  Integrated  Master  Plan  is   the  Program  Architecture  in  the  same  way  the  hardware  and  soBware  are  the   Product  Architecture.   Poor,  a  weak,  or  unstructured  Programma<c  Architecture  reduces  visibility  to   the  Product  Architecture’s  performance  measures  of  cost  and  schedule   connected  with  Technical  Performance  Measures.     1   6 V8.5  
  • 14. Quick  View  of  Building  the  IMP   !  Start  with  each  Program  Event  and  define  the   Significant  Accomplishments  their  entry  and   exit  criteria  to  assess  the  needed  maturity  of   the  key  deliverables   !  Arrange  the  Significant  Accomplishments  in   the  proper  dependency  order     !  Segregate  these  Significant  Accomplishments   into  swim  lanes  for  IPTs   !  Define  the  dependencies  between  each  SA   2   6.0  Build  IMP  
  • 15. A  Cri<cal  Understanding  of  the  IMP   3   The  IMP  defines  the  connec<ons  between  the  Product  maturity  –  Ver<cal  –  and  the   implementa<on  of  this  Product  maturity  through  the  Func<onal  ac<vi<es  –  the  Horizontal     6.0  Build  IMP  
  • 16. Benefits  of  this  Formality   4   Objec&ve   Implementa&on   Event  Driven  Plan  versus  Schedule   Driven  Plan  is  based  on  comple<on  of   tasks  not  passage  of  <me   Separate  the  plan  (IMP)  from  the   schedule  (IMS)  but  link  elements  with   numbering  system   Condensed,  easy  to  read  “Plan”  showing   the  “Events”  rather  than  the  work  effort   Indentured,  outline  format  –  not  text   Pre-­‐defined  entry  and  exit  criteria  for   major  Program  Events   Significant  Accomplishments  for  each   key  Program  Event   Objec<ve  measures  of  progress  and   comple<on  for  each  Accomplishment   Pre-­‐defined  Accomplishment  Criteria   (AC)  for  each  Significant   Accomplishment  (SA)   Stable,  contracture  plan,  flexible  enough   to  portray  program  status   IMP  part  of  the  contract,  IMS  is  a  data   item   Capture  essence  of  the  func<onal   progress  without  manda<ng  a  par<cular   process  for  performing  the  work   Split  IMP  into  Product  and  Process   6.0  Build  IMP  
  • 17. Risk  Management   Building  the  IMP  Starts  at  the  RFP   5   SOW   SOO   ConOps   WBS   Techncial  and  Opera<onal   Requirements   CWBS  &   CWBS  Dic<onary   Integrated  Master  Plan   (IMP)   Integrated  Master  Schedule   (IMS)     Earned  Value  Management   System   Objec<ve  Status  and  Essen<al  Views  to  support  the  proac<ve  management   processes  needed  to  keep  the  program  GREEN   Performance  Measurement  Baseline   Measures  of   Effec<veness   Measures  of   Performance   Measures  of   Progress   JROC     Key  Performance  Parameters   Program    Specific   Key  Performance  Parameters   Technical  Performance   Measures   1.0  Introduc<on  
  • 18. The  IMP  /  IMS  Structure   6   IMS IMP Describes how program capabilities will be delivered and how these capabilities will be recognized as ready for delivery Supplemental Schedules Work Packages and Tasks Criteria Accomplishment Events or Milestones 1   6.0  Build  IMP  
  • 19. The  IMP/IMS  provides  Horizontal  and   Ver<cal  Traceability  of     progress  to  plan   !  Ver<cal  traceability  AC  "  SA  "  PE   !  Horizontal  traceability  WP  "  WP  "  AC   7   Program Events Define the maturity of a Capability at a point in time. Significant Accomplishments Represent requirements that enable Capabilities. Accomplishment Criteria Exit Criteria for the Work Packages that fulfill Requirements. Work   Package   Work   Package   Work   Package   Work   Package   Work   Package   Work   Package   Work   package   6.0  Build  IMP  
  • 20. The  IMP’s  role  during  Execu<on   8   Program ExecutionPMB for IBRProposal SubmittalDRFP & RFP Performance Measurement Baseline Tasks (T) BOE % Complete Statement of Work Program Deliverables IMP Accomplishments (A) Criteria (C) EVMS Events (E) Budget Spreads by CA & WPCAIV Capabilities Based Requirements X BCWS = Probabilistic Risk Analysis = Time keeping and ODC = Technical Performance Measure BCWP ACWP Cost & Schedule Risk Model BCWS Decreasing technical and programmatic risk using Risk Management Methods IMS Physical % Complete Continuity and consistency from DRFP through Program Execution WBS 6.0  Build  IMP  
  • 21. 1st,  Principle  –     IMP  Building  is  a  Full  Contact  Sport   9   6.0  Build  IMP  
  • 22. Our  First  Approach  to  the     IMP  /  IMS  Paradigm   !  The  1st  approach  defines  Program  Events  (PE),   Significant  Accomplishments  (SA),  and   Accomplishment  Criteria  (AC),  derived  from  the   Work  Breakdown  Structure  or  the  SOW   !  This  1st  approach  can  be  done  in  6  easy  steps   10   6.0  Build  IMP   1.  Iden<fy  the  Program  Events  (PE)   (as  the  ACQ  Guide  tells  us)   2.  Iden<fy  the  Significant   Accomplishments  (SA)  from  the   WBS  deliverables     3.  Iden<fy  the  Accomplishment   Criteria  (AC)  needed  to  produce   these  deliverables   4.  Iden<fy  the  Work  Packages  for   each  Accomplishment  Criteria   5.  Sequence  the  Work  Packages   6.  Assemble  the  IMP/IMS  
  • 23. This  approach  doesn’t  give  us   visibility  into  what  “done”  looks  like   !  We  must  measure  increasing  product  maturity  in   units  meaningful  to  the  decision  makers   !  We  must  see  the  risks  before  they  arrive  so  we   can  take  correc<ve  ac<on   11   6.0  Build  IMP  
  • 24. First  Look  at  a  Significant   Accomplishment  (SA)   !  SAs  are  interim  and  final  steps  to  define,  design,  develop,   verify,  produce,  and  deploy  the  product  or  system.     !  SAs  must  occur  in  a  manner  that  ensures  a  logical  path  is   maintained  throughout  the  development  effort.     !  SAs  are  event  related  and  not  just  <me  coincidental.     !  SAs  should  have  one  or  more  of  the  following   characteris<cs:     –  Consists  of  a  discrete  step  in  the  process  of  planned   development  that  must  be  complete  prior  to  an  event   –  Produces  a  desired  result  at  a  specified  event  that  indicates  a   level  of  design  maturity  (or  progress)  directly  related  to  each   product  and  process   –  Defines  interrela<onships,  interdependencies,  or  “hand-­‐off”   points  of  different  func<onal  disciplines  applied  to  the  program     12   6.0  Build  IMP  
  • 25. First  look  at  an  Accomplishment   Criteria  (AC)   !  ACs  are  defini<ve  measures  directly  suppor<ng  successful   comple<on  of  a  significant  accomplishment.     !  ACs  show  objec<ve  evidence  of  work  progress  (maturity  of   a  product);  i.e.,  be  seen,  read,  demonstrated,  or  quan<fied.   These  results  are  usually  incorporated  into  a  report  or   document  as  evidence  of  accomplishment.     !  ACs  are  prerequisites  for  comple<on  of  an  SA  (i.e.,  exit   criteria).     !  The  ques<ons  that  need  to  be  repeatedly  asked  when   developing  ACs  are:   –  How  do  I  know  when  an  accomplishment  has  been  completed?   –  Is  the  criteria  directly  related  to  the  accomplishment?     –  Is  it  proof?     –  What  is  the  work  product?”   13   6.0  Build  IMP  
  • 26. The  IMP  speaks  to  Measures  of  Effec<veness   (MoE)  and  Measures  of  Performance  (MoP)   14   6.0  Build  IMP   !  This  is  where  TPMs     are  connected  with   the  MoE’s  and   MoP’s   !  For  each   deliverable  from   the  program,  all   the  “measures”   must  be  defined  in   units  meaningful   to  the  decision   makers.   !  Here’s  some  “real”   examples.   1.  Provide  Precision   Approach  for  a  200   FT/0.5  NM  DH   2.  Provide  bearing  and   range  to  AC  plaporm   3.  Provide  AC   surveillance  to  GRND   plaporm     Measures  of   Effec<veness  (MoE)   1.  Net  Ready   2.  Guidance  Quality   3.  Land  Interoperability   4.  Manpower   5.  Availability   JROC  Key  Performance   Parameters  (KPP)   1.  Net  Ready   ! IPv4/6  compliance   ! 1Gb  Ethernet   2.  Guidance  quality   ! Accuracy  threshold  p70   @  6M   !   Integrity  threshold  4M   @  10-­‐6  /approach   3.  Land  interoperability   ! Processing  capability   meets  LB  growth  matrix   4.  Manpower   ! MTBC  >1000  hrs   ! MCM  <  2  hrs   5.  Availability   ! Clear  threshold  >99%   ! Jam  threshold  >90%   Measures  of  Performance   (MoP)   1.  Net  Ready   ! Standard  message  packets   2.  Guidance  Quality   ! Mul<path  alloca<on  budget   ! Mul<path  bias  protec<on   3.  Land  Interoperability   ! MOSA  compliant   ! Civil  compliant   4.  Manpower   ! Opera<ng  elapsed  <me   meters   ! Standby  elapsed  <me   indicators   5.  Availability   ! Phase  center  varia<ons     Technical  Performance   Measures  (TPM)   Mission  Capabili<es  and  Opera<onal  Need   Technical  Insight  –  Risk  adjusted  performance  to  plan    
  • 27. The  1st  Problem  with  the  Ini<al   IMP/IMS  Paradigm   !  There  is  no  single  source  of  guidance  for   construc<ng  a  credible  IMP  and  IMS   – A  DOD  Guidebook,  but  s<ll  in  Version  0.9   – A  few  DOD  service  pamphlets   – A  commercial  guidebook   – Many  contractor  guidelines   !  No  defini<ve  guidance  from  DoD  on  what   makes  a  good  IMP   !  No  defini<ve  DID  requiring  an  IMP  on  specific   programs   15   6.0  Build  IMP  
  • 28. The  IMP  is  a  good  start,  but  we’re   really  aBer  the  IMP  Narra<ves   !  The  IMP  Narra<ves  start  with  the  Statement   of  Objec<ves  (SOO)  or  Concept  of  Opera<ons   (ConOps)   – These  iden<fy  the  top  level  program  objec<ves   – They  define  the  big  picture  and  provide  pre-­‐award   trade  space   – They  provide  the  framework  for  the  Contractor  to   develop  the  proposal  through  the  IMP   !  With  the  Government’s  Execu<ve  summary,   provides  the  contractor  an  understanding  of   what  is  needed  and  what  is  important   16   6.0  Build  IMP  
  • 29. The  IMP  Process  Narra<ve   The  IMP  Process  Narra<ve  describes  how  the   technical  and  business  elements  of  the  program   will  be  conducted,  monitored,  and  controlled.     Narra<ves  provide  the  customer  visibility  into   the  contractor’s  key  func<onal  processes  and   procedures,  the  rela<onship  of  these  processes   and  procedures,  and  an  overview  of  the  effort   required  to  implement  them.   17   6.0  Build  IMP  
  • 30. IMP  Narra<ve  for  PDR   Program   Event   Event  Descrip&on   PE  Maturity  Assessment   shown  in  SAs   PDR   PDR  establishes  the  “design-­‐  to”  allocated   baseline  to  the  subsystem  level,  assures  this   design  meets  the  func<onal  baseline,  assures   system  requirements  have  been  properly   allocated  to  the  proper  subsystem.   PDR  establishes  the  feasibility  of  the  design   approach  to  meet  the  technical  requirements  and   provide  acceptable  interface  rela<onships   between  the  hardware  and  other  interfacing   items.     Any  changes  to  the  requirements  that  have   occurred  since  the  System  Requirements  Review   (SRR2)  will  be  verified  at  the  PDR.     PDR  assures  the  design  is  verifiable,  does  not  pose   major  IMS  or  Cost  risk,  and  is  mature  enough  to   advance  to  the  detailed  design  phase  –  CDR   !  Subsystem  level   opera<onal  concepts   defined   !  System  level  interfaces   baselined   !  Supportability  plans   established   !  SoBware  requirements   finalized   !  Subsystem  requirements   finalized  &  allocated   !  System  verifica<on,   valida<on  &  cer<fica<on   plans  updated   !  PDR  subsystem  design   completed   18   6.0  Build  IMP  
  • 31. What  the  IMP  Narra<ve  Tells  Us?   !  States  the  objec<ve  of  the  processes  used  to  build  the   products   !  Provides  the  governing  documents,  compliance,  and   reference  for  the  process  ac<vi<es   !  Explains  the  process  approach   –  Portrays  the  key  ac<vi<es  of  the  approach   –  Illustrates  the  processes  tailored  for  the  specific  program   19   Inputs   Ac<vity   3   Ac<vity   5   Ac<vity   4   Tools   Ac<vity   1   Ac<vity   2   Outputs   Metrics   6.0  Build  IMP  
  • 32. Some  Guidance     20   6.0  Build  IMP  
  • 33. The  Defense  Acquisi<on  Guide   (DAG)  Tells  Us  About  the  IMP   21   6.0  Build  IMP  
  • 34. The  DAG  Also  Tells  Us   22   6.0  Build  IMP  
  • 35. 5000.01  Part  2.B.3  Acquisi<on  Strategies,   Exit  Criteria,  and  Risk  Management   “Event  driven  acquisi<on  strategies  and  program  plans   must  be  based  on  rigorous,  objec<ve  assessments  of  a   program’s  status  and  the  plans  for  managing  risk  during   the  next  phase  and  the  remainder  of  the  program.     The  acquisi<on  strategy  and  associated  contrac<ng   ac<vi<es  must  explicitly  link  milestone  decision  reviews   to  events  and  demonstrated  accomplishments  in   development,  tes<ng,  and  ini<al  produc<on.     The  acquisi<on  strategy  must  reflect  the   interrela<onships  and  schedule  of  acquisi<on  phases  and   events  based  on  logical  sequence  of  demonstrated   accomplishments  not  on  fiscal  or  calendar  expediency.”   23   6.0  Build  IMP  
  • 36. What  makes  a  good     Program  Event  (PE)?   !  Events  are  the  conclusion  of  an  interval  of  major   program  accomplishments  (SA)  with  their  criteria  (AC)     !  IMP  events  represent  key  decision  transi<on  points   between  major  ac<vi<es  distributed  over  the  contract   period   –  The  IMP  is  a  Mini  Authoriza;on’s  to  Proceed  (ATP)  to  the   next  Program  Event  (PE)   !  Some  guidance  for  establishing  program/product   events:   –  Customer  Given  Events.     –  Key  Decisions  Needed   –  Risk  Mi<ga<on  Event   –  DOD  Systems  Engineering  Technology  Review  (SETR)   Guidance   24   6.0  Build  IMP  
  • 37. What  makes  a  good   Significant  Accomplishment  (SA)?   !  IPT  can  manage  it  at  a  working  level   !  Shows  comple<on  and  result  s  of  discrete  steps  in  the   development  process   !  Indicates  maturity  of  the  product  through  MoEs  and  MoPs   !  Its  “significance”  measures  program  event  status   !  Relevant  and  logically  linked  to  the  proper  PE   –  Just  because  the  work  occurs  during  the  <me-­‐frame  for  PE  A   doesn’t  mean  it’s  logically  linked  to  PE  A   !  Uses  consistent  language,  style,  format  through  verb   dic<onary,  for  example:   –  Segment  build  4  detailed  design  completed   –  Analysis  of  structural  integrity  completed   –  Structural  integrity  verified   25   6.0  Build  IMP  
  • 38. IMP  Significant  Accomplishments   !  SAs  are  NOT  just  a  list  of  “things”  to  do  before   the  Program  Event  (PE)   !  They  are  sequenced  accomplishments,  each  of   which  leads  to  the  PE,  e.g.  Cri<cal  Design  Review   (CDR)   –  SA  #  1  =  CDR  mee<ng  conducted   –  SA  #  2  =  CDR  ac<on  item  work-­‐off  plan  established   –  SA  #  3  =  85%  drawings  completed   –  SA  #  4  =  CDR  CDRLs  delivered   –  SA  #  5  =  Development  environment  opera<onal   –  SA  #  6  =  Cri<cal  methods  analyses  completed   –  SA  #  7  =  RVTM  approved   26   6.0  Build  IMP  
  • 39. What  makes  a  good   Accomplishment  Criteria  (AC)?   !  Provides  objec<ve,  measureable  and,  explicit   proof  of  comple<on  and  closure  of  the  work   ac<vi<es   !  Defines  condi<ons  for  closing  the  Significant   Accomplishment  (SA)   !  Answers  the  ques<on  how  do  we  know  when   a  Significant  Accomplishment  has  been   completed?   27   6.0  Build  IMP  
  • 40. !  Not  Significant   –  Too  small  to  significantly  contribute  to  successful  event  comple<on   –  Would  lead  to  trivial  tasks  (e.g.,  1  day  dura<on)   !  Ambiguous   –  Read  can’t  tell  what  Done  looks  like   !  Wrong  verb   –  Uses  a  verb  that’s  not  on  the  list  (Dic<onary)   –  Uses  a  listed  verb  incorrectly   –  Doesn’t  have  a  verb  at  all   !  Not  measurable   –  Can’t  tell  when  we’re  done   !  Too  Many  SAs  or  ACs   –  Confuses  the  reader  and  confuses  the  execu<on  process  of  the   program   –  Dilutes  the  MoE  and  MoP   –  Reduces  visibility  into  increasing  maturity   28   What  makes  a  Not  So  Good     SA  or  AC?   6.0  Build  IMP  
  • 41. !  Program  Event  (PE)   –  A  PE  assess  the  readiness  or  comple<on  as  a  measure   of  progress   –  First  Flight  Complete   !  Significant  Accomplishment  (SA)   –  The  desired  result(s)  prior  to  or  at  comple<on  of  an   event  demonstrate  the  level  of  the  program’s   progress   –  Flight  Test  Readiness  Review  Complete   !  Accomplishment  Criteria  (AC)   –  Defini<ve  evidence  (measures  or  indicators)  that   verify  a  specific  accomplishment  has  been  completed   –  SEEK  EAGLE  Flight  Clearance  Obtained   29   F-­‐22  Example   6.0  Build  IMP  
  • 42. !  PE’s  are  easy,  they  are  in  the  SETR  and  Integrated   Logis<cs  Lifecycle  Management  System   !  The  SA’s  can  be  defined  from  the  program’s   deliverables  –  these  may  not  be  obvious  but  can   be  discovered  with  a  Product  Development   Kaizen  process  (more  later)   !  It’s  the  AC’s  that  are  hard  part  –  the  ACs  must   represent  the  exit  criteria  for  the  series  of  Work   Packages  that  do  the  work  to  produce  the   product   30   Now  the  Hard  Part   6.0  Build  IMP  
  • 43. 6  Steps  to  IMP  Development   Let’s  start  to  build  the  IMP.     This  step-­‐by-­‐step  process  needs  to  be  followed  carefully.   The  IMP  is  constructed  one  Program  Event  at  a  Cme  –  LeE  to  Right  in  Cme.     To  do  otherwise  allows  confusion  and  disconnecCon  between  Program  Events  to   occur  and  dilutes  our  focus  on  defining  what  Done  looks  like  for  each  Program   Event.       1   7 V8.5  
  • 44. 2   7.0  6  Steps  
  • 45. Quick  View  of  Step-­‐By-­‐Step  IMP   IdenCfy  Program  Events   IdenCfy  Significant  Accomplishments   IdenCfy  Accomplishment  Criteria   IdenCfy  Work  Packages  needed  to  complete   the  Accomplishment  Criteria   Sequence  the  Work  Packages  (WP),  Planning   Packages  (PP),  Summary  Level  Planning   Packages  (SLPP)    in  a  logical  network.   Adjust  the  sequence  of  WPs,  PPs,  &  SLPPs  to   miCgate  major  risks.   3   7.0  6  Steps   1 2 3 4 5 6
  • 46. IdenCfy  the  Program  Events   Actors   Processes   Outcomes   Systems  Engineer   Define  the  process  flow  for   product  producCon  from   contract  award  to  end  of   contract   !  Confirm  Program  Events  represent  the   logical  process  flow  for  program   maturity   Program  Manager   Confirm  customer  is  willing  to   accept  the  process  flows   developed  by  the  IMP   !  Engage  with  contracts  and  customer   for  PE  definiCon   Project  Engineer   IdenCfy  interdependencies   between  program  event  work   streams   !  IdenCfy  Value  Stream  components  at   the  PE  level  before  flowing  them  down   to  the  SA  level   IMP/IMS  Architect   Capture  Program  Event   contents  for  each  IPT  or  work   stream   !  Establish  foundaCon  for  a  structure  to   support  the  descripCon  of  the   increasing  mature  as  well  as  the  flow   to  needed  work.   Copyright  ©  2012,  Glen  B.  Alleman,  Niwot  Ridge,  LLC   4   1 7.0  6  Steps  
  • 47. Outcomes  of  Step   !  Confirm  the  end  to  end  descripCon  of  the   increasing  maturity  of  the  program’s   deliverables   !  Establish  of  RFP  or  Contract  target  dates  for   each  Event.     !  Socialize  the  language  of  speaking  in  “Events”   rather  than  Cme  and  efforts   5   1 7.0  6  Steps  
  • 48. Events  Define  the  Assessment     of  the  Program’s  Maturity   6   ! Program  Events  are  maturity   assessment  points  in  the  program   ! They  define  what  levels  of  maturity   for  the  products  and  services  are   needed  before  proceeding  to  the  next   maturity  assessment  point   ! The  entry  criteria  for  each  Event   defines  the  units  of  measure  for  the   successful  compleCon  of  the  Event   ! The  example  below  is  typical  of  the   purpose  of  a  Program  Event   The  Cri+cal  Design  Review  (CDR)  is  a  mul+-­‐disciplined  product  and  process  assessment  to  ensure   that  the  system  under  review  can  proceed  into  system  fabrica+on,  demonstra+on,  and  test,  and   can  meet  the  stated  performance  requirements  within  cost  (program  budget),  schedule  (program   schedule),  risk,  and  other  system  constraints.     1 7.0  6  Steps  
  • 49. IdenCfy  the  Significant  Accomplishments   (SA)  for  Each  Program  Event  (PE)   7   Actors   Processes   Outcomes   System  Engineer   IdenCfy  Integrated  Product  Teams   (IPT)  responsible  for  the  SA’s     !  Define  the  boundaries  of  these   programmaCc  interfaces   !  Define  technical  and  process  risk   categories  and  their  bounds   Technical  Lead   Confirm  the  sequence  of  SA’s  has   the  proper  dependency   relaConships   !  Define  the  product  development   flow  process  improves  maturity   !  Define  technical  risk  drivers   Project  Engineer   Confirm  logic  of  SA’s  for  project   sequence  integrity   !  Define  the  program  flows   improves  maturity     Control  Account   Manager   Validate  SA  outcomes  in  support  of   PE  entry  condiCons   !  Confirm  budget  and  resources   adequate  for  defined  work  effort   IMP/IMS  Architect   Assure  the  assessment  points   provide  a  logical  flow  of  maturity  at   the  proper  intervals  for  the   program   !  Maintain  the  integrity  of  the  IMP,   WBS,  and  IMS   2 7.0  6  Steps  
  • 50. Outcomes  of  Step   !  The  Significant  Accomplishments  are  the   “road  map”  to  the  increasing  maturity  of  the   program   !  The  “Value  Stream  Map”  resulCng  from  the   flow  of  SA’s  describes  how  the  products  or   services  move  through  the  maturaCon  process   while  reducing  risk   !  The  SA  map  is  the  path  to  “done”     8   2 7.0  6  Steps  
  • 51. SAs  define  the  entry  criteria  for   each  Program  Event   9   Preliminary  Design  Review  Complete   3 7.0  6  Steps  
  • 52. IdenCfy  Accomplishment  Criteria  (AC)  for  each   Significant  Accomplishment  (SA)   Actors   Processes   Outcomes   CAM   Define  and  sequence  the  contents   of  each  Work  Package  and  select   the  EV  criteria  for  each  Task   needed  to  roll  up  the  BCWP   measurement   !  Establish  ownership  for  the   content  of  each  Work  Package   and  the  Exit  Criteria  –  the   Accomplishment  Criteria  (AC)   Project  Engineer   IdenCfy  the  logical  process  flow  of   the  Work  Package  to  assure  the   least  effort,  maximum  value  and   lowest  risk  path  to  the  Program   Event   !  Establish  ownership  for  the   process  flow  of  the  product  or   service   Technical  Lead   Assure  all  technical  processes  are   covered  in  each  Work  Package   !  Establish  ownership  for  the   technical  outcome  of  each  Work   Package   IMP/IMS  Architect   Confirm  the  process  flow  of  the  ACs   can  follow  the  DID  81650   structuring  and  Risk  Assessment   processes   !  Guide  the  development  of   outcomes  for  each  Work  Package   to  assure  increasing  maturity  of   the  program   10   3 7.0  6  Steps  
  • 53. Outcomes  of  Step   !  The  definiCon  of  “done”  emerges  in  the  form   of  deliverables  rather  than  measures  of  cost   and  passage  of  Cme.   !  At  each  Program  Event,  the  increasing   maturity  of  the  deliverables  is  defined  through   the  Measures  of  EffecCveness  (MoE)  and   Measures  of  Performance  (MoP)   11   3 7.0  6  Steps  
  • 54. ACs  are  higher  fidelity   descripCons  of  “Done”  than  SAs   12  Cri9cal  Design  Review  Complete   4 7.0  6  Steps  
  • 55. IdenCfy  the  Work  for  Each  Accomplishment   Criteria  in  Work  Packages   Actors   Processes   Outcomes   Control  Account   Manager   IdenCfy  or  confirm  the  work   acCviCes  in  the  Work  Package   represent  the  allocated  work   !  Define  bounded  work  effort   defined  “inside”  each  Work   Package   Technical  Lead   Confirm  this  work  covers  the  SOW   and  CDRLs   !  Define  all  work  effort  for  100%   compleCon  of  deliverable  visible  in   a  single  locaCon  –  the  Work   Package   !  Confirm  risk  drivers  and  duraCon   variances   IMP/IMS  Architect   Assist  in  the  sequencing  the  work   efforts  in  a  logical  manner   !  Develop  foundaCon  of  the   maturity  flow  starCng  to  emerge   from  the  contents  of  the  Work   Packages   Earned  Value   Analyst   Assign  iniCal  BCWS  from  BOE  to   Work  Package   !  ConfirmaCon  of  work  effort   against  BOEs   !  Define  EVT  for  measures  progress   to  plan   13   4 7.0  6  Steps  
  • 56. Outcomes  of  Step   !  The  work  idenCfied  that  produces  a   measurable  outcome.   !  This  work  defined  in  each  Work  Package   !  The  Accomplishment  Criteria  (AC)  state   explicitly  what  “done”  looks  like  for  this  effort   !  With  “done”  stated,  measures  of  Performance   and  measures  of  EffecCveness  can  be  defined   14   4 7.0  6  Steps  
  • 57. Work  is  done  in  “packages”  that   produce  measureable  outcomes   15   Launch  Readiness  Review  Complete   5 7.0  6  Steps  
  • 58. Sequence  Work  Packages  (ACs)  for  each   Significant  Accomplishment  (SA)   16   Actors   Processes   Outcomes   Control  Account   Manager   Define  the  order  of  the  Work   Packages  needed  to  meet  the   Significant  Accomplishments  for   each  Program  Event   !  Define  the  process  flow  of  work   and  the  resulCng   accomplishments.   !  Assure  value  is  being  produced  at   each  SA  and  the  AC’s  that  drive   them   IMP/IMS  Architect   Assure  that  the  sequence  of  Work   Packages  adheres  to  the  guidance   provided  by  DCMA  and  the  EVMS   System  descripCon   !  Begin  the  structuring  of  the  IMS   for  compliance  and  loading  into   the  cost  system   Program  Controls   Staff   Baseline  the  sequence  of  Work   Packages  using  Earned  Value   Techniques  (EVT)  with  measures  of   Physical  Percent  Complete   !  Develop  insight  to  progress  to   plan  with  measures  of  physical   progress  for  each  Work  Packages   (EVT)   5 7.0  6  Steps  
  • 59. Outcomes  of  Step   !  Work  Packages  parCCon  work  efforts  into   “bounded”  scope   !  Interdependencies  constrained  to  Work   Package  boundaries  prevents  “spaghek  code”   style  schedule  flow   !  Visibility  of  the  Increasing  Flow  of  Maturity   starCng  to  emerge  from  the  flow  of   Accomplishment  Criteria  (AC)   17   5 7.0  6  Steps  
  • 60. Sequence  Work  Packages  (AC’s)  into   an  IMS  for  each  Program  Event   18   6 7.0  6  Steps  
  • 61. Assemble  Final  IMP/IMS   Actors   Processes   Outcomes   IMP/IMS  Architect   StarCng  with  the  AC’s  under  each   SA’s  connect  Work  Packages  in  the   proper  order  for  each  Program   Event   !  Establish  the  Performance   Measurement  Baseline   framework.   !  IdenCfy  MoE  and  MoP  points  in   the  IMP   Program  Manager   Confirm  the  work  efforts  represent   the  commiled  acCviCes  for  the   contract   !  Review  and  approval  of  the  IMS  –   ready  for  baseline.   !  Review  and  approve  risk  drivers   and  duraCon  variance  models   Project  Engineer   Assess  the  product  development   flow  for  opCmizaCons   !  Review  and  approval  of  the  IMS  –   ready  for  baseline.   !  IdenCfy  risk  drivers  and  their   miCgaCons   Systems  Engineer   Confirm  the  work  process  flows   result  in  the  proper  products  being   built  in  the  right  order   !  Confirm  risk  drivers  and  duraCon   variances.   !  Review  and  approval  of  the  IMS  –   ready  for  baseline   19   6 7.0  6  Steps  
  • 62. Outcomes  of  Step   !  Both  the  maturity  assessment  criteria  and  the   work  needed  to  reach  that  level  of  maturity  are   described  in  a  single  locaCon   !  Risks  are  integrated  with  the  IMP  and  IMS  at   their  appropriate  levels   –  Risks  to  EffecCveness  –  risk  to  JROC  KPPs   –  Risks  to  Performance  –  risk  to  program  KPPs  and   TPMs   !  Leading  and  Lagging  indicator  data  provide   through  each  measure  to  forecast  future   performance     20   6 7.0  6  Steps  
  • 63. The  Previous  6  Steps  Result  In  A   Credible  IMP/IMS   21   !  The  IMP  is  the  “Outer  Mold   Line”,  the  Framework,  the   “Going  Forward”  Strategy  for   the  Program.   !  The  IMP  describes  the  path   to  increasing  maturity  and   the  Events  measuring  that   maturity.   !  The  IMP  tells  us  “How”  the   program  will  flow  with  the   least  risk,  the  maximum   value,  and  the  clearest   visibility  to  progress.   !  The  IMS  tells  us  what  work  is   needed  to  produce  the   product  or  service  at  the   Work  Package  level.   Our  Plan  Tells  Us  “How”  We   are  Going  to  Proceed   The  Schedule  Tells  Us   “What”  Work  is  Needed  to   Proceed   7.0  6  Steps  
  • 64. Significant  Accomplishments  for  an  actual   Program  Event   Flight  Test  Ascent  Aerodynamics  Confirmed   22   7.0  6  Steps  
  • 65. Horizontal  and  VerCcal  Traceability   of  the  IMP/IMS   Integrated  Master  Schedule   Work  sequenced  to   produce  outcomes   for  each  WP.   !  VerCcal  traceability  AC  "  SA  "  PE   !  Horizontal  traceability  WP  "  WP  "AC   Program Events Define the maturity of a Capability at a point in time. Significant Accomplishments Represent requirements that enable Capabilities. Accomplishment Criteria Exit Criteria for the Work Packages that fulfill Requirements. Work   Package   Work   Package   Work   Package   Work   Package   Work   Package   Work   package   Work   Package   Work   Package   23   7.0  6  Steps  
  • 66. The  IMP’s  connecCon  to  the  WBS   !  Start  with  the  Significant  Accomplishments  and  sequence   them  to  the  maturity  flow  for  each  Program  Event   !  The  WBS  connecCons  then  become  orthogonal  to  this  flow   24   7.0  6  Steps   Program  Event   SRR   SDR   PDR   CDR   TRR   ATLO   Work  Breakdown   Structure   4.920-­‐SDAI   A01,  A02   B01   C01,  C02   D01   E01   F01   4.200-­‐Sys  Test   A05   B03,  B04   D02,  D03   E02   F02   4.300-­‐Radar   A03   B02   C03   E03   4.330-­‐O&C  Sys   A06,  A07   B05   C04   D04   E04   F03,  F04   4.400-­‐  I&T   A08   C05   E05,  E06   F05   4.500-­‐Support   A09   D05   E07   F06,  F07  
  • 67. 25   7.0  6  Steps  
  • 68. 26   7.0  6  Steps  
  • 69. 27   7.0  6  Steps  
  • 70. 28   7.0  6  Steps  
  • 71. 29   7.0  6  Steps  
  • 72. 30   7.0  6  Steps  
  • 73. Nuances  Of  These  6  Steps   Building  the  Program  Event,  to  Significant  Accomplishment,  to  Accomplishment   decomposi?on  is  straight  forward.   For  each  Program  Event,  simply  iden?fy  what  are  the  needed  Significant   Accomplishment  for  the  entry  and  exit  criteria,  and  the  Accomplishment  Criteria   for  the  Work  Packages  that  produce  the  AC.   Yea  Right,  no  problem   1   8 V8.5  
  • 75. Quick  View  of  the  Nuances   !  Unfortunately  building  a  credible  IMP/IMS  is  a   nuanced  process,  subject  to  many  opportuni?es   for  diversions,  blind  alleys,  and  false  starts     !  It  is  slightly  counter  intui?ve  from  the  tradi?onal   scheduling  approach  to  start  with  the  ver?cal   integra?on  –  but  it  is  cri?cal  to  start  ver?cally   !  Success  requires  the  full  par?cipa?on  of  Systems   Engineering,  CAMs,  and  the  Program  Manager   !  Success  requires  everyone  to  understand  the   nuances  of  the  IMP  building  efforts   3   8.0  Nuances  
  • 76. The  1st  Nuance   We  need  to  change  the  Planning  Paradigm   Beginner     Intermediate   Advanced   ! Take  the  program  events   and  use  the  WBS  to  define   the  SAs  and  ACs.   ! Iden?fy  the  tasks  to  produce   the  ACs  and  SAs   ! Collect  them  into  Program   Events   ! Organize  the  tasks  by  Work   Package   ! Sequence  the  work  packages   (AC’s)     ! Examine  the  exit  criteria  for   the  Program  Events  –  what   does  Done  look  like?   ! Ask  what  the  entry  criteria   are  for  each  Program  Event   ! Build  the  AC’s  to  support   these  entry  criteria   ! Pull  these  together  under   each  SA   ! Determine  the  Technical  and   Programma?c  maturity  for   each  Program  Event  from   the  Concept  of  Opera?ons   ! Assess  the  SA’s  for  each   Integrated  Product  Team  in   terms  of  their  streams   maturity  at  that  point  in  the   program   ! Sequence  the  SA’s  for  each   PE  and  assess  the  units  of   measure  of  “maturity”   ! Build  the  AC’s  to  support   each  SA’s  level  of  maturity   Copyright  ©  2012,  Glen  B.  Alleman,  Niwot  Ridge,  LLC   4   8.0  Nuances  
  • 77. The  2nd  Nuance   We  need  to  speak  about  Increasing  Maturity   Beginner   Intermediate   Advanced   ! The  sequence  of  work   closely  matches  the   horizontal  schedules  of  the   past   ! Align  this  work  with  the  WBS   elements   ! Focus  on  the  WBS  Dic?onary   of  the  delivered  products  or   services   ! No  explicit  TPM,  MOE,  and   MOP  elements     ! The  sequence  of  work  is   related  to  the  Program   Events,  but  essen?ally   “hangs”  from  the  PE  to  the   SA’s  and  then  the  AC’s   ! All  deliverables  are  visible   but  their  TPMs  and  other   system  measures  are  not   stated  in  the  IMP  or  its   narra?ve.   ! There  is  a  narra?ve  in  the   form  of  SA’s  and  AC’s  that   describes  how  the  program   moves  from  lef  to  right   alone  its  maturity  path   ! Risk  buy  down  and   re?rement  are  visible   ! Intermediate  Technical   Performance  Measures,   Measures  of  Effec?veness,   and  Measures  of   Performance  are  visible  in   the  IMP   Copyright  ©  2012,  Glen  B.  Alleman,  Niwot  Ridge,  LLC   5   8.0  Nuances  
  • 78. The  3rd  Nuance   Everything  Foot  and  Ties  to  the  IMP  &  IMS   Beginner   Intermediate   Advanced   ! The  IMS  contains  all  the   proper  fields  in  columns  and   is  horizontally  linked   ! The  WBS  elements  can  be   found  for  all  work  elements   ! CDRL’s  are  visible  and  their   mul?ple  delivery  dates   connected  to  each  Program   Event   ! WBS  is  structured  in  a   product  manner  or  possibly   a  func?onal  manner  with   some  deliverables  defined  in   the  terminal  nodes   ! The  WBS  is  properly  formed   inside  each  AC  with   incremental  deliverables   ! WBS  numbers  form  a  “well   structured”  tree,  but  s?ll  is   not  “pure”  in  the  sense  of   deliverables  only,  no   func?onal   ! Each  column  and  each  field   can  be  “pivoted”  to  form  a   proper  “tree”  of  value  flow.   ! The  WBS  is  a  “pure”  Product   Breakdown  Structure  (PBS)   and  the  services  needed  to   produce  those  products   ! The  WBS  defines  the   structure  of  the  delivered   product  or  service   ! The  Ver?cal  trace  of  the  IPM   describes  the  flow  of   increasing  maturity  of  these   products  or  services   ! The  Horizontal  trace  of  the   IMP  describes  to  work  to  be   done  to  produce  this   maturity   6   8.0  Nuances  
  • 79. The  4th  Nuance   IMP/IMS  is  Programma?c  Architecture   Beginner   Intermediate   Advanced   ! The  IMP  is  built  from  the   WBS  for  each  Program   Event.   ! The  IMP  is  seen  as  a   compliance  document  that   lists  the  Program  Events  and   a  “bunch  of  stuff”   underneath.     ! The  IMP  is  structured   around  separate  Program   Events,  but  below  the  SA’s   looks  like  a  “shop  floor”   schedule  with  lijle  ver?cal   connec?vity.   ! The  IMP  is  built  as  a  “value   stream”  flow  for  the   program  but  the  Systems   Engineers   ! This  programma?c   architecture  is  built  in  the   same  way  the  technical   system  architecture  is  built   ! It  is  derived  from  the   ConOps  and  Tier  1  System   Requirements   ! The  IMP  shows  explicitly   how  these  are  supported  in   the  flow  of  the  SA’s   7   8.0  Nuances  
  • 80. The  5th  Nuance   The  IMP/IMS  connects  all  the  dots   8   8.0  Nuances   Measure  of   Effec?veness   Measure  of   Performance   Technical   Performance   Measure   Risk   Aleatory   Uncertainty   Epistemic   Uncertainty   Reference   Classes   Past   Performance   SME   Past   Performance   System   Architecture   AHP  
  • 81. Connec&ng  The  IMP  To  Program   Performance  Measures   Assembling  the  IMS  from  the  IMP  appears  to  be  a  straight  forward  process  –   details  the  tasks  that  support  the  Accomplishment  Criteria.  But  there  are  some   cri&cal  steps  that  must  be  done  in  the  right  order  to  end  up  with  a  risk  tolerant   IMS.   Let’s  do  this  for  TSAS   1   9 V8.5  
  • 82. The  Primary  Role  for  the  IMP  is  to  describe   what  done  looks  like  in  MoE’s  and  MoP’s   2  19  October  1899  Robert  Goddard  decided  that  he  wanted  to  "fly  without  wings"  to  Moon.   9.0  Framework  
  • 83. Quick  View  to  IMP/IMS  Framework   !  Measures  of  increasing  maturity  for  the  key   deliverables  is  the  founda&on  for  increasing   the  Probability  of  Program  Success   !  Measures  of  Effec&veness  (MoE)  and   Measures  of  Performance  (MoP)  are  defined   in  the  Integrated  Master  Plan  (IMP)  Narra&ve   !  Key  Performance  Parameters  (KPP)  –  both   JROC  and  program  specific  are  needed   !  Technical  Performance  Measures  (TPM)  are   needed  for  all  key  deliverables   3   9.0  Framework  
  • 84. Star&ng  out  on  the  Right  Foot  …   !  Most  IMP/IMS  literature  states  how  to  build  an  IMP  from  the  RFP  and   contractual  elements,  in  simple  and  maybe  simple  minded  terms   –  Decompose  the  events  into  SAs,  ACs,  and  their  Tasks  –  sounds  easy   !  This  approach  fails  to  provide  advice  for  several  things:   –  How  to  minimize  the  topological  connec&ons  between  Events   –  How  to  increase  the  concurrency  between  IPTs   –  How  to  increase  the  tolerance  of  the  IMS  to  disrup&ve  events   •  Known  and  knowable  risk   •  Unknown  and  possibly  unknowable  risk   !  The  construc&on  of  the  IMS  needs  to  take  place  in  what  seems  to  be  a   reverse  order   –  Build  the  IMP  as  a  Value  Stream  Map  describing  the  increasing  maturity  –  and   therefore  the  increasing  VALUE  of  the  deliverables  to  the  customer.   –  It’s  the  delivery  of  Customer  Value  that  inverts  the  management  process,  and   focuses  on  Keeping  the  Program  GREEN  as  planned  that  maximizes  value  to   the  customer  (the  Government)     4   9.0  Framework  
  • 85. SETR  Program  Events   5  hdps://acc.dau.mil/docs/technicalreviews/dod_tech_reviews.htm   9.0  Framework  
  • 86. Build  PEs  Leg  to  Right   Start  with  SRR  (or  something  on  the  leA)  and  completely   define  its  compleDon,  before  moving  to  the  next  PE   !  Define  the  SAs  for  an  Event  and  construct  a  work  flow   of  the  ac&vi&es  needed  to  sa&sfy  the  SA   –  These  ac&vi&es  are  yet  tasks,  so  don’t  commit  too  soon  to   defining  the  detailed  work   –  Isolate  the  SAs  by  event  first  –  only  work  on  one  event  at  a   &me   !  Iden&fy  the  par&cipants  in  the  work   –  What  IPTs  par&cipate  in  this  work?   –  What  swim  lanes  are  needed  to  isolate  the  IPTs?   !  Define  the  elements     –  Ac&vi&es  performed  to  sa&sfy  the  SA   –  Deliverables  that  result  from  these  ac&vi&es   !  There  are  s&ll  not  Accomplishment  Criteria  (AC),  but   that  comes  next   6   9.0  Framework  
  • 87. The  Accomplishment  Criteria  (AC)   !  A  defini&ve  measure  or  indicator  that  verifies   comple&on  of  work  for  the  accomplishment   – Completed  work  effort     •  Manufacturing  Plan  Completed   – Confirma&on  of  performance  compliance     •  Flight  Test  Report  Approved   – Incremental  verifica&on     •  Maintenance  Demonstra&on  Completed   – Completed  cri&cal  process  ac&vi&es   •  Risk  Management  Plan  Approved   7   9.0  Framework  
  • 88. The  Accomplishment  Criteria  (AC)   !  Defines  the  measure  by  which  an  Accomplishment  (SA)  is   considered  “done”   !  Terms  like  complete,  delivered,  closed  have  no  “units  of   measure”  in  the  context  of  a  Significant  Accomplishment   (SA)  and  are  open  to  interpreta&on   !  Terms  like  …   –  Measures  of  comple&on  –  80%  of  drawings  approved  for  release   –  Counts  of  available  items  –  75%  of  pin-­‐outs  assigned  voltage   –  Fidelity  of  a  design  –  outer  mold  line  defined  within  90%  of   target   –  Error  bounds  –  spacecraA  mass  known  to  ±20%   –  Performance  parameters  –  disconnect  force  within  allowed   limits   –  Maturity  parameters  –  flight  arDcle  successful  in  last  3  tests   …  are  used  to  define  the  “exit  criteria”   8   9.0  Framework  
  • 89. 2  Types  of  Accomplishment     Criteria:  Entry  and  Exit   !  Entry  Criteria  –  Substan&ates  readiness  for  the   review   !  Exit  Criteria  –  Substan&ates  successful   comple&on  of  the  review   !  Cri&cal  Design  Review  (CDR)  example   – Are  we  ready  for  the  Flight  Test  Readiness   Review?   – How  do  we  know  the  FTRR  a  success?   – What  did  we  learn  from  the  FTRR  that  increases   the  maturity  of  the  program’s  deliverables.   9   9.0  Framework  
  • 90. The  IMP  Focuses  us  on  Measures   of  Effec&veness  and  Performance   10   MoE   KPP   MoP   TPM   Mission   Need   Acquirer  Defines  the  Needs  and  Capabili&es   in  terms  of  Opera&onal  Scenarios   Supplier  Defines  Physical  Solu&ons  that   meet  the  needs  of  the  Stakeholders   Opera3onal   measures  of  success   related  to  the   achievement  of  the   mission  or   opera3onal   objec3ve  being   evaluated.   Measures  that   characterize   physical  or   func3onal  aAributes   rela3ng  to  the   system  opera3on.   Measures  used  to   assess  design   progress,   compliance  to   performance   requirements,  and   technical  risks.   9.0  Framework  
  • 91. Measure  of  Effec&veness  (MoE)   !  Measures  of  Effec&veness  …   !  Are  stated  in  units  meaningful  to  the  buyer,   !  Focus  on  capabili&es  independent  of  any   technical  implementa&on,   !  Are  connected  to  the  mission  success.   The  opera&onal  measures  of  success  that  are  closely  related  to  the   achievements  of  the  mission  or  opera&onal  objec&ves  evaluated  in   the  opera&onal  environment,  under  a  specific  set  of  condi&ons.   “Technical  Measurement,”  INCOSE–TP–2003–020–01   MoE’s  Belong  to  the  End  User   11   9.0  Framework  
  • 92. Measure  of  Performance  (MoP)   !  Measures  of  Performance  are  …   !  Adributes  that  assure  the  system  has  the   capability  to  perform,   !  Assessment  of  the  system  to  assure  it  meets   design  requirements  to  sa&sfy  the  MoE.   Measures  that  characterize  physical  or  func&onal  adributes   rela&ng  to  the  system  opera&on,  measured  or  es&mated   under  specific  condi&ons.   “Technical  Measurement,”  INCOSE–TP–2003–020–01   MoP’s  belong  to  the  Program  –  Developed  by  the  Systems   Engineer,  Measured  By  CAMs,  and  Analyzed  by  PP&C     12   9.0  Framework  
  • 93. Key  Performance  Parameters  (KPP)   Both  JROC  and  Program  Specific   !  Key  Performance  Parameters  …   !  Have  a  threshold  or  objec&ve  value,   !  Characterize  the  major  drivers  of   performance,   !  Are  considered  Cri&cal  to  Customer  (CTC).   Represent  the  capabili&es  and  characteris&cs  so   significant  that  failure  to  meet  them  can  be  cause  for   reevalua&on,  reassessing,  or  termina&on  of  the  program   “Technical  Measurement,”  INCOSE–TP–2003–020–01   The  acquirer  defines  the  KPPs  during  the  opera&onal   concept  development  –  KPPs  say  what  DONE  looks  like   13   9.0  Framework  
  • 94.   Technical  Performance  Measures   (TPM)  for  key  deliverables     !  Technical  Performance  Measures  …   !  Assess  design  progress,   !  Define  compliance  to  performance   requirements,   !  Iden&fy  technical  risk,   !  Are  limited  to  cri&cal  thresholds,   !  Include  projected  performance.  “Technical  Measurement,”  INCOSE–TP–2003–020–01   Adributes  that  determine  how  well  a  system  or  system   element  is  sa&sfying  or  expected  to  sa&sfy  a  technical   requirement  or  goal   14   9.0  Framework  
  • 95. What  are  Technical  Performance   Measures  Really?   !  TPMs  are  measures  of  the  system   technical  performance  that  have   been  chosen  because  they  are   indicators  of  system  success.  They   are  based  on  the  driving   requirements  or  technical   parameters  of  high  risk  or   significance  -­‐  e.g.,  mass,  power  or   data  rate.   !  TPMs  are  analogous  to  the   programma&c  measures  of   expected  total  cost  or  es&mated   &me-­‐to-­‐comple&on.  There  is  a   required  performance,  a  current   best  es&mate,  and  a  trend  line.   !  Actual  versus  planned  progress  of   TPMs  are  tracked  so  the  systems   engineer  or  project  manager  can   assess  progress  and  the  risk   associated  with  each  TPM.     !  The  final,  delivered  system  value   can  be  es&mated  by  extending  the   TPM  trend  line  and  using  the   recommended  con&ngency  values   for  each  project  phase.   !  The  project  life  trend-­‐to-­‐date,   current  value,  and  forecast  of  all   TPMs  are  reviewed  periodically   (typically  monthly)  and  at  all  major   milestone  reviews.   15   9.0  Framework  
  • 96. !  Tracking  TPMs  and  comparing  them  to  the  resource  growth   provides  an  early  warning  system  to  detect  deficiencies  or   excesses   !  Reserve  alloca&ons  narrow  as  design  proceeds   !  TPMs  that  violate  reserve  alloca&ons  or  have  trends  that   do  not  meet  the  final  performance  trigger  correc&ve   ac&ons   16   Tracking  the  Technical     Performance  Measures   9.0  Framework  
  • 97. No&onal  TPM  Design  Margin   Guidelines   17   9.0  Framework  
  • 98. Sample  IMP:   A  Flight  Avionics  System  (Con&nued)   Hardware  PDR  –  Purpose     !  Ensure  system  hardware  ini&al  design  has  been  updated,  and  meets   func&onal  and  allocated  performance  requirements  within  program   constraints.     !  Opera&onal  security  concept  assessed.     !  Ensure  training  requirements  have  been  analyzed  and  their  objec&ves   have  been  defined  for  training  missions.     !  Confirma&on  training  objec&ves  and  MTC  design  and  integra&on  conform   to  the  Air  Force  syllabus  and  Ready  Aircrew  Program  (RAP).     !  Training  plan  will  be  updated.   !  Hardware  PDR  –  Expecta&ons   !  Team  agrees  system  hardware  ini&al  design  has  been  updated  and  can   proceed  to  the  detailed  design  phase.     !  Team  agrees  training  plans  and  objec&ves  correlate  with  the  Air  Force   syllabus,  RAP  and  training  planning,  development  can  con&nue.     !  System  Specifica&on  and  TTL  requirements  are  traceable  to  the  allocated   hardware  design.     18   9.0  Framework  
  • 99. Sample  IMP:   A  Flight  Avionics  System  (Con&nued)   !  Hardware  PDR  –  Entry  Criteria   !  Func&onal  Baseline  Authen&cated  (FBA)   !  Ini&ate  system  hardware  ini&al  design  and   allocate  func&ons  to  the  appropriate   Configura&on  Items   !  All  specifica&ons  updated  and  required   documenta&on  is  made  available  including   an&cipated  lower  level  design  documenta&on   !  All  SRR/SFR  ac&on  items  closed  or   disposi&oned     19   9.0  Framework  
  • 100. Sample  IMP:   A  Flight  Avionics  System  (Con&nued)   Hardware  PDR  –  Accomplishments   !  System  hardware  ini&al  design  complete.     –  Func&ons  allocated  to  one  or  more  hardware  configura&on  items  and   are  traceable  to  the  MTC  SSS  and  TSSC  SSS.     –  Human,  safety,  R&M,  EMI,  opera&onal  security,  instructor  and   operator  interfaces,  etc,  design  factors  have  been  reviewed.     !  Drag  instructor  and  operator  manuals  reviewed     !  Program  risks  updated,  assessed,  and  reviewed.     –  Mi&ga&on  plans  in  place.   !  Program  schedule  and  constraints  updated  and  reviewed.     –  Cri&cal  schedule  path  drivers  reviewed.     !  Design  criteria  for  the  simula&on  and  database  development   reviewed  and  updated.   !  Program  processes  and  metrics  reviewed.   !  Test  Planning  ac&vi&es  and  relevant  documenta&on  reviewed  by   test  team.   20   9.0  Framework  
  • 101. Sample  IMP:   A  Flight  Avionics  System  (Concluded)   Hardware  PDR  –  Exit  Criteria     !  Hardware  (ownership,  visual,  IOS,  brief/debrief)  design  reviewed,  allocated  to  a   hardware  configura&on  item  and  updated  to  include  instructor  and  operators   interfaces,  malfunc&on  and  control  requirements,  etc.     !  RTM  updated,  MTC  SSS,  TSSC  SSS  and  TTL  traceable  to  allocated  hardware  design   to  include  ESOH  requirements.     !  Human,  safety,  R&M,  EMI,  opera&onal  security,  instructor  and  operator  interfaces,   etc,  design  factors  reviewed.     !  MTC  and  TSSC  allocated  baselines  established  and  controlled  by  appropriate  level   documenta&on  for  PDR.   !  Drag  instructor  and  operator  manuals  reviewed  with  user  concurrence  and   incorporate  sa&sfactory  human  factor  design  factors  into  the  operator  interfaces.     !  Risk  management  and  mi&ga&on  plans  updated,  in  place,  addresses  ESOH  plans   and  risks,  and  within  program  constraints.     !  Risks  assesses,  understood,  documented,  accepted  and  understood  by  team.   !  Program  schedule  reviewed     –  Cri&cal  path  drivers  iden&fied     –  IMS  Updated  and  reflects  cri&cal  paths   21   9.0  Framework  
  • 102. One  More  IMP  Sample   !  (SA)  System  &  Segment   Requirements  Updated  &  Allocated   –  (AC)  SRR  /  SDR  Update  Review   Conducted   –  (AC)  Preliminary  System   Specifica&on  Documents  (A011)   Baselined   –  (AC)  Preliminary  Spacecrag   Segment  Specifica&on  Baselined   –  (AC)  Preliminary  Ground  Segment   Specifica&on  Baselined   –  (AC)  Preliminary  Specifica&on  Tree   Baselined   !  (SA)  Preliminary  ICDs  Baselined  For   Customer  Review   –  (AC)  Preliminary  Space-­‐Ground   ICD  Baselined     !  (SA)  PDR  System  Design  Completed   –  (AC)  Top  Level  System   Architecture  Updated   –  (AC)  PDR  Level  System  Analyses   Completed   –  (AC)  PDR  Level  Reliability  /   Availability  Analysis  Completed   –  (AC)  Preliminary  System  Level  Risk   Assessment  Completed   –  (AC)  System  Level  Plans  Updated   For  PDR   –  (AC)  Flight  Long  Lead  Review   Conducted   22   Preliminary  Design  Review   9.0  Framework  
  • 103. The  “But”  for  this  Guidance   !  With  these  samples  and  the  SETR  guidance   we’ve  just  started   !  The  program  needs  to  define  program  specific   events  to  assure  the  actual  maturity  measures   are  captured   – The  IMP  provides  sufficient  definiDon  to  track  the   step-­‐by-­‐step  compleDon  of  the  required   accomplishments  for  each  event  and  to   demonstrate  saDsfacDon  of  the  compleDon   criteria  for  each  accomplishment.  [AFMC   PAMPHLET  63-­‐5]   23   9.0  Framework  
  • 104. IMP  Verbs  for  Significant   Accomplishments   24   Integrated  Master  Plan  Allowable  Verbs   Allocated:  Segment  requirement  is  flowed  down   from  the  System  Specifica&on   Released:  Approved  item  for  delivery  for   intended  customer  or  supplier;  all  internal   distribu&on  and  sign  offs  complete.  An   electronic  version  is  made  accessible  on  the  IDE   Completed:  The  subject  item,  data,  document,   or  process  is  prepared  or  concluded,  and   reviewed  and  accepted  by  the  responsible  IPT.   Suppor&ng  documenta&on  is  available  through   IDE   Reviewed:  The  subject  item,  data,  document,  or   process  is  prepared  or  concluded,  and   documented  for  comple&on.  Suppor&ng   documenta&on  is  available  through  IDE   Conducted:  The  subject  mee&ng  or  review  has   been  held  with  all  required  par&cipants.  The   charts  or  minutes  are  available  through  the  IDE   Updated:  The  subject  process,  data,  or   document  has  been  reevaluated  using  later   informa&on,  and  adjustments  incorporated.   Defined:  The  subject  configura&on  items,  data,   or  document  was  submided  to  the  customer   Validated:  Requirements  are  validated,  received   contractor  approvals,  were  distributed,  and  are   available  through  the  IDE   Established:  The  subject  items  is  created  and  set   in  place  in  a  manner  consistent  with  its  intended   use  ager  review  and  accepted  by  the  IPT   Verified:  Requirements  are  verified  or  processed   in  accordance  with  established  prac&ce.   9.0  Framework  
  • 105. The  IMP  Process  Narra&ve   !  ObjecFve:  a  brief  statement  explaining  why  this   process  set  is  applied  for  this  program   !  Governing  DocumentaFon:  lists  of  the  guidance   or  compliance  documents;  e.g.,  specifica&ons,   manuals,  and  procedures  including  company,   government,  and  industry  references   !  Approach:  concise  descrip&on  as  to  who  owns   each  process;  what  are  the  roles  and   responsibili&es;  and  the  overall  process  including   a  process  flow  diagram.   25   9.0  Framework  
  • 106. Generic  IMP  Evalua&on  Criteria   !  Do  the  Program  Events  and  Accomplishments   reflect  the  logical  evolu&on  and  progress  of  the   overall  Program?   –  Do  program  events  and  their  defini&ons  clearly   demonstrate  the  maturity  of  the  program  over   its  life?   –  Do  the  selected  Accomplishments  and   associated  Criteria  iden&fy  meaningful  and   measurable  progress  toward  the  key  goals  of   the  Program?   !  Do  the  Accomplishments  for  each  event   demonstrate  a  meaningful  understanding  of  the   program  requirements  or  are  they  tasks  that   anyone  could  do  for  any  contract?   –  Do  they  reflect  your  SOW  requirements?     !  Does  the  IMP  structure  readily  map  to  the  IPT   structure  such  that  each  IPT  can  easily  visualize   the  scope  of  their  responsibility?     !  When  awarded,  could  the  contractor  use  the   Accomplishments  as  discrete  ac&vity  cost  accounts   in  their  earned  value  system?  Or  are  they  level  of   effort  in  nature?     !  Is  sufficient  visibility  provided  to  iden&fy  and  track   the  Program  Risk  Plan  and  associated  risk   mi&ga&on  accomplishments  and/or   con&ngencies?   –  Does  criteria  suppor&ng  the  accomplishments   include  key  performance  requirements?   !  Are  IPT  cross-­‐dependencies  and  dependencies   external  to  the  Program  appropriately  reflected  if   they  reflect  poten&al  schedule  or  performance   risks  to  the  success  of  the  Program?   !  Is  the  submided  "Contract  IMP"  (the  Product  IMP   that  is  to  be  included  as  part  of  the  Program   Contract)  defined  to  the  appropriate  level:   –  Do  the  Accomplishments  and  associated   Criteria  go  down  to  a  level  sufficient  to  provide   visibility  into  key  subcontractor  ac&vi&es  upon   which  the  success  of  the  Program  may  be   dependent?   –  Are  the  Events  and  Accomplishments  included   in  the  IMP  at  such  a  level  as  to  make  the   maintenance  of  the  'Contractual  IMP'  prac&cal   or  does  it  include  an  unnecessary  level  of   detail?   26   9.0  Framework  
  • 107. Program  Management  Levels   Program Levels" IMP/IMS Elements" CWBS" Tier 1! Program Manager! Technical Leads! IPT Manager! Technical performance goals! Major Program Events (PE)! ! ! ! Significant Accomplishments (SA)! Level 1 & 2! Links to CLINs! Level 3 & 4! Control Packages! Link to PBS! Integrated EVMS! Tier 2! Control Account Managers ! Product Work Plan! Responsible organization elements! ! Accomplishment Criteria (AC)! ! ! ! ! Tasks (NA)! Level 5! Cost Account Package! Cost Collection Level! Links to WBS by OBS! Resource summaries! Early warning EVMS analysis! Tier 3! Work Package Manager! Detailed plans! Work package! Earned value calculations! 27   9.0  Framework  
  • 108. Connec&ng  the  Components     of  the  IMP/IMS   !  The  assembled  IMP/IMS  links  all  work   ac&vi&es  ver&cally  to  the  ACs,  SAs,  and  PEs   28   IMS   Customer   Requirements   IMP   ORG   IPTs   ORG   IPTs   Performance   Analysis/   Management   Review   Events (E)  Events (E)   Accomplishments   Process   Narratives   Criteria   Integrated Master   Schedule (IMS)   Integrated Master   Schedule (IMS)   Control Account  Control Account   Work Package  Work Package   Work Package Tasks  Work Package Tasks   WBS   Program   Performance   Management   System   Supplemental Schedules   Risk and   opportunity   Risk and   opportunity   9.0  Framework