FACILITIES SERVICES &
                                    DISTRICT and SCHOOL SECURITY


                           SIX SIGMA INITIATIVE

            Work System Owner
                Ed Curry

      Work System Enabling Leader
       Dane Theodore, Director

         Six Sigma Black Belt
     Robert J. Wiebel, CM, CSSBB




3/25/2009                                                          1
INITIATIVE CATEGORIES

            • Facilities Key Priority and Work Processes
            • Facilities and Student Performance Relationship
            • Facilities Balanced Scorecard
            •Key Priority Process Owners
            • Facilities Key Priority Processes Relationship To
            District Work Systems
            • District Strategic Plan and Key Priority Indicator
            Relationships
            • Facilities / District Strategic Plan and District Key
            Performance Indicator Direct Relationship Matrix.



3/25/2009                                                             2
The Facilities and Student Performance
                                             Relationship


     BPS Facilities recognizes the impact
     that high quality learning spaces have
     on the performance of students.
     The Facilities Wheel explains the
     relationship between high quality
     learning spaces, funding and the
     increased student performance as a
     result of high quality facilities.
     Since the start of the ten-year new
     construction, renovation and
     remodeling and maintenance program
     in FY 2006, BPS is on tract to invest
     over $$750,000,000 to improve over
     11,000,000 square feet of school and
     ancillary infrastructure.




3/25/2009                                                               3
Facilities Balanced Approach


       Continuous improvements are
  realized through the deployment of
          Six Sigma (DMAIC) process
               improvement tools and
                     methodologies.




                           BPS Facilities utilizes a Balanced approach to sustain the
                            results of the 10-Year Facilities Improvement Program.
3/25/2009                                                                               4
Facilities & Security Key Priority
                    & Work Processes




3/25/2009                                        5
Facilities & Security Key
                                      Priority Process Owners


            Planning – Mike Gaffney, Manager
            Design – Anibal Caussade, Project Manager
            Construction – Dennis Bonny, Project Manager
            Plant Maintenance & Operations – Walt Petters, Director
            Environmental, Health, Safety and Code Compliance – Jim Powers, Env. Engr.
            Resource Conservation – Art Johnson, Project Manager
            District and School Security - Andrea Alford, Director




3/25/2009                                                                                6
District Key Priority Processes Relationship
                                    To District Work Systems


        The Enabling Work
         System 5 Facilities
          priority processes
        provide the Student
         Achievement Work
     System with adequate
  and appropriate facilities
       that are 1st in Nation
  Schools. District facilities
    provides the backbone
          for which all other
     District Work Systems
     can achieve the goals
   and objectives set forth
    in the District Strategic
               Plan and Key
   Performance Indicators.

3/25/2009                                                                7
District Strategic Plan and District Key
                            Performance Indicator Relationships

  The BPS Strategic Plan contains eighty (80) objectives in four goal categories,
  with 16 of these objectives being Key Performance Indicators (KPIs).


            Objective Categories:
            • Goal 1 Student Achievement (38 Objectives / 11 KPIs)‫‏‬

            • Goal 2 Safe and Healthy Learning and Work Environment (17
            Objectives / 1 KPI)‫‏‬

            • Goal 3 Capable and Engaged Workforce (11 Objectives / 2 KPIs)‫‏‬

            • Goal 4 Fiscal Responsibility and Financial and Organizational
            Effectiveness (14 Objectives / 2 KPI)


3/25/2009                                                                           8
District Strategic Plan and District Key
                                     Performance Indicator Relationships
   Out of the BPS Strategic Plan eighty (80) objectives and sixteen (16) KPIs in four goal categories,
   the Facilities Key Priority Processes have eleven (11) direct and Sixty-nine (69) indirect
   relationships. There is one Facilities direct relationships involving a KPI.

Direct Relationships:

• Goal 2.1.1 Finalize and implement and annual comprehensive safety and security audit in every school by 2009-2010.

• Goal 2.1.2 Review and update school safety and security plans in accordance with Safe School Standards by June 30,2009.

• Goal 2.1.3 Conduct training using federal guidelines for emergency response and crisis management preparation, mitigation,
response and recovery for all district personnel and administrators at leadership team meetings by June 30, 2009.

• Goal 2.1.4 Develop a timeline for implementation of appropriate Review for Safety and Security Committee
recommendations by June 2009.

• Goal 2.1.5 Develop and implement a 5 Star Comprehensive Review for Safety and Security by June 2009.


• Goal 2.2.1 Create adequate classroom space including relocatable classrooms to meet the requirements imposed by Class
Size Reduction (CSR), Growth Management (SB360) Legislation, and Secondary Schools of National Prominence (SSNP)
with redistricting, new permanent and/or relocatable space by 2011 – 2012.


3/25/2009                                                                                                                      9
District Strategic Plan and District Key
                                     Performance Indicator Relationships
                                                                     (Continued)‫‏‬


Direct Relationships:

• Goal 2.2.2 Provide facility improvements to support the new Secondary Schools of National Prominence (SSNP) by 2012 –
2013.

• Goal 2.2.3 Develop a plan to achieve 100% level of service by 2011-2012.

• Goal 2.3.1 Create and implement a scheduled Maintenance Improvement Plan by January 2009 to provide adequate
teaching/learning environments for all schools to complement the 10-Year Facility improvement Plan initiative.

• Goal 2.3.2 Implement a plan by January 2009 to improve the exterior appearance of all schools / district support sites as
part of the implementation of the 10-Year Facilities Improvement Plan.

• Goal 2.3.3 Develop and implement a district-wide energy reduction plan by October 1, 2008 to deal with rising statewide
energy costs.

• Goal 4.3.1 (KPI) Brevard Public Schools will attain Malcolm Baldrige Award by June 2010.




3/25/2009                                                                                                                     10
Facilities / District Strategic Plan and District Key
                                                 Performance Indicator Direct Relationship Matrix

                                                                   GOAL 2: SAFE AND HEALTHY LEARNING AND WORK ENVIRONMENT
      Strategic Plan References >     SP 2.1.1   SP 2.1.2   SP 2.1.3    SP 2.1.4   SP 2.1.5   SP 2.2.1   SP 2.2.2   SP 2.2.3   SP 2.3.1   SP 2.3.2   SP 2.3.3
  Facilities Key Priority Processes
                         Planning                                                                X          X          X
                           Design                                                                X          X                                X
                     Construction                                                                X          X                                X
 Plant Operation and Maintenance                                                                            X                     X          X
 Environmental Health, Safety and
                Code Compliance
                                         X          X
           Resource Conservation                                                                                                  X                     X
      District and School Security       X          X          X           X          X


The indirect relationship between the seven (7) Facilities Key Priority Processes
and the sixty-nine (69) strategic plan goals and objectives lies the fact that high
quality facility learning spaces contribute to accomplishment of all District goals
and objectives.




3/25/2009                                                                                                                                                   11
Facilities & Security Flow Chart

OUTPUT MEASURES
Q1 - FISH Data Accuracy
Q2 -Facility Design Capacity Utilization (%)t
Q3 - Construction Critical Path Milestones (%
Variance from Construction Schedule)‫‏‬
Q4 - Construction Budget vs. Actual Construction
Costs (% Variance)‫‏‬
Q5 - Operations Cost Per GSF
Q6 - Maintenance Cost Per GSF
Q7 - Regulatory And Code Compliance Inspection
Milestones
Q8 - Regulatory And Code Compliance Annual
Reports Milestones
Q9 - Reduce Electrical Usage 10% By End Of FY
08/09
Q10 - Reduce Water Usage By 10% By End Of FY
09/10
Q11 - Reduce Gas / Heating Oil Usage By 10% By
End Of FY 09/10
Q12 - Reduce The Volume Of Trash Hauled 10%By
End Of FY 09/10
Q13 - Compliance With Federal, State, Local And
School Board Requirements
Q14 - Prevent School Violence ( SESIR Incident
Ratio - # Criminal Incidents / Student Population)‫‏‬
Q15 - Reduce Security Risks And Liability
(# Planned Security Training Session / # Actual
Security Training Sessions)‫‏‬
Q16 - Improve School - Community Relations On
School Security (# Site Or Community Visits
Conducted / # Site Or Community Visits Planned)‫‏‬




3/25/2009                                                                                12
Work
                               System 5                 MANAGE FACILITIES &
                               Process:                     SECURITY                                           Process Owner:                    E. Curry


    W                                                                    BREVARD PUBLIC SCHOOLS
     HO
                        CUSTOMERS                                                                                                                OTHER
 STEP                    & MARKET                LEADERSHIP            COMMUNITY               WORKFORCE               FACILITIES            STAKEHOLDERS

                                            NEED TO PROVIDE FIRST IN NATION FACILITIES AND LEARNING SPACES THROUGH
                                              EFFICIENT AND EFFECTIVE FACILITIES PLANNING, DESIGN, CONSTRUCTION,
      NEED                                              PLANT OPERATIONS & MAINTENANCE AND SECURITY.




   IDENTIFY            IDENTIFY CURRENT AND EMERGING FACILITES & SECURITY NEEDS RELATIVE TO EXISTING POLICIES, STANDARDS AND PROGRAMS



                                                    FACILITIES & SECURITY POLICIES               NO
  QUESTION
                                                               STANDARDS AND / OR
                                                                    PROGRAMS OK?           ?
                                                                                YES


  ESTABLISH                                        ESTABLISH / REVISE POLICIES, STANDARDS, AND PROGRAMS TO ADDRESS / MEET CUSTOMER NEEDS
   REVISW


    ASSESS                  ASSESS FACILITIES & SECURITY CAPABILITY TO MEET NEEDS AND FULFILL POLICIES TO BECOME FIRST IN THE NATION IN FACILITIES




  QUESTION                                                               NO
                              ABLE TO IMPROVE CAPABILITY?          ?
                                                             YES                                FACILITIES & SECURITY SYSTEMS CAPABLE?

                                                                                                  NO
  QUESTION
                                                                                           ?
                                                                                     YES

    CREATE                                           CREATE STRATEGIC GOALS AND OBJECTIVES TO IMPROVE FACILITIES & SECURITY SYSTEM CAPABILITY




                                                    DEVELOP, ALIGN, COORDINATE AND DEPLOY STRATEGIC FACILITIES PLANNING STRATEGIES, TACTICS,
  APPROVE                                           AND PROJECTS TO ENSURE FACILITIES & SECURITY SYSTEM CAPABILITY.




   DELIVER
                                  DELIVER FACILITIES & SECURITY SYSTEMS THROUGH EXECUTED STRATEGIC PLANS & KEY PRIORITY PROCESSES



   MONITOR                                        MONITOR (ONGOING) FACILITY & SECURITY DELIVERY PERFORMANCE AND STRATEGIC PLAN PROGRESS.


                                       PERFORMANCE AND / OR PROGRESS OK?

                                       NO
  QUESTION
                                  ?
                            YES


   DEVELOP                                                 DEVELOP PERFORMANCE IMPROVEMENT PLANS / PROVIDE TECHNICAL ASSISTANCE.




                                             EVALUATE OVERALL FACILITIES & SECURITY SYSTEM EFFECTIVENESS AND DOCUMENT LESSONS
   EVALUATE                                                          LEARNED / REPLICATE BEST PRACTICES




                                  FIRST IN NATION FACILITIES PLANNING, DESIGN, CONSTRUCTION, PLANT OPERATIONS & MAINTNENACE
      NEED                        AND SAFETY / SECURITY ACHIEVED.
      MET


  Q1 - FISH Data Accuracy                                                                  Q13 - Reduce The Volume Of Trash Hauled 10%By End Of FY 09/10
  Q2 -Facility Design Capacity Utilization (%)                                             Q14 - Compliance With Federal, State, Local And School Board
                                                                                           Requirements
  Q3 - Cost of Errors & Omissions as a % of Total Construction Cost
                                                                                           Q15 - Prevent School Violence ( Sesir Incident Ratio - # Criminal
  Q4 - Construction Critical Path Milestones (% Variance from Construction
                                                                                           Incidents / Student Population)
  Schedule)
  Q5 - Construction Budget vs. Actual Construction Costs (% Variance)                      Q16 - Reduce Security Risks And Liability
  Q6 - Operations Cost Per GSF                                                             (# Planned Security Training Session / # Actual Security Training
                                                                                           Sessions)
  Q7 - Maintenance Cost Per GSF
                                                                                           Q17 - Improve School - Community Relations On School Security (#
  Q8 - Regulatory And Code Compliance Inspection Milestones
                                                                                           Site Or Community Visits Conducted / # Site Or Community Visits
  Q9 - Regulatory And Code Compliance Annual Reports Milestones                            Planned)
  Q10 - Reduce Electrical Usage 10% By End Of FY 08/09
  Q11 - Reduce Water Usage By 10% By End Of FY 09/10
  Q12 - Reduce Gas / Heating Oil Usage By 10% By End Of FY 09/10




Facilities Services / Robert J. Wiebel / Ed Curry                                                                                                         3/7/09
Work                  DELIVER FACILITIES & SECURITY
                                                   SYSTEMS THROUGH EXECUTED
                             System 5                 STRATEGIC PLANS & KEY
                             Process:                  PRIORITY PROCESSES                                             Process Owner:          E. CURRY


    W                          BPS
     HO                      SCHOOL                                                                                        EXTERNAL STAKEHOLDERS,
                             BOARD                                  BPS FACILITIES                                         COMMUNITY, CONTRACTORS
 STEP
                                              NEED IS TO DELIVER FACILITIES SYSTEMS THROUGH EXECUTED
      NEED                                           STRATEGIC PLANS & KEY PRIORITY PROCESSES


                                                                KPP1                              PLANNING DELIVERABLES:
                                                                                                  D1. FISH Certification
                                                                SP 2.2.1 / 2.2.2 / 2.2.3
                                                                                                  D2. Growth Management Projections
    MANAGE                                                           FACILITIES                   D3. 5-Year Facility Plan
   FACILITIES                                                        PLANNING
                                                                                                  D4. School Concurrency Application
                                                                                                  D5. Educational Plant Survey
   PLANNING                                                                                       D6. Student Accommodation Plan
                                                                                                  D7. Boundary Change Recommendations
                                                                KPP2                              DESIGN DELIVERABLES:
    MANAGE                                                      SP 2.2.1 / 2.2.2 / 2.3.2          D1. Construction Scope of Work
                                                                                                  D2. Bid Documents
   FACILITIES                                                       FACILITIES                    D3. Design Criteria Package
    DESIGN                                                           DESIGN                       D4. Project Plans
                                                                                                  D5. Project Specifications
                                                                                                  D6. Approved Plans and Specifications

                                                            KPP3                                CONSTRUCTION DELIVERABLES:
                                                                SP 2.2.1 / 2.2.2 / 2.3.2        D1. Certificate of Occupancy (CO)
    MANAGE                                                                                      D2. Projects Constructed per BPS Design
   FACILITIES                                                     FACILITIES                    Specifications, Florida Building Code, and State
 CONSTRUCTION                                                   CONSTRUCTION                    Requirements for Educational Facilities
                                                                                                D3. Certificate of Final Inspection (CFI)
                                                                                                D4. As-Built Project Plans




                                                                              KPP4
                                                                               SP 2.2.2 / 2.3.1 / 2.3.2
    MANAGE                     PO&M DELIVERABLES:
   FACILITIES                  D1- Monthly Work Order Report
                                                                                    PLANT
                               D2 - Annual Facility Condition                    OPERATIONS &
     PO&M                                                                        MAINTENANCE
                               Assessment Report

                                                                              KPP5
                                                                                                                            EHSCC DELIVERABLES:
                                                                                  SP 2.1.1 / 2.1.2 / 2.1.4 / 2.1.5          D1 - School Inspection Findings
                                                                                                                            Report
    MANAGE                                                                            FACILITIES                            D2 - Annual Comprehensive
   FACILITIES                                                                       ENVIRONMENTAL                           Fire,Safety, Casualty, &
     EHSCC                                                                          HEALTH, SAFETY                          Sanitation Report
                                                                                 AND CODE COMPLIANCE                        D3 - Annual Custodial Assessment
                                                                                                                            Report
                                                                                                                            D4 - Annual Building & Code
                             RC DELIVERABLES:
                             D1 - Monthly Facility Audit &                    KPP6
    MANAGE                   Inspection Reports                                        SP 2.3.3
   FACILITIES                D2 - Cost Benefit Analysis Reports
                             D3 - Monthly Facility And                            FACILITIES
   RESOURCE                  Behavioral Modification                              RESOURCE
 CONSERVATION                Improvement Recommendations List
                                                                                CONSERVATION
                             D4 - Monthly Senior Staff Resource
                             Conservation Box Score
                             D5 - Monthly District And School
                             Resource Conservation Box Score
                                                                              KPP7                                          SECURITY DELIVERABLES:
                                                                                                                            D1 - OPPAGA REPORT
                                                                                SP 2.1.1 / 2.1.2 / 2.1.3 / 2.1.4 / 2.1.5    D2 - SCIRM
    MANAGE                                                                                                                  D3 - SESIR
                                                                                     DISTRICT & SCHOOL
   DISTRICT &                                                                            SECURITY
                                                                                                                            D4 - EVACUATION PLAN
    SCHOOL                                                                                                                  D5 - SAFETY PLAN
                                                                                                                            D6 - DISTRICT HOMELAND SECURITY
   SECURITY                                                                                                                      DIRECTIVE




                                    ARE THE NEWLY CONSTRUCTED,
                                 RENOVATED, REMODELED AND / OR
                              MAINTAINED FACILITIES AND LEARNING                   NO
    QUESTION                  SPACES PERFORMING IN ACCORDANCE
                                   WITH STRATEGIC PLANS AND THE
                                                                          ?
                                               CUSTOMER NEEDS?

                                                                    YES


                                                                   NEED IS MET
   MANAGED




   Q1 - FISH Data Accuracy                                                                   Q13 - Reduce The Volume Of Trash Hauled 10%By End Of FY 09/10
   Q2 - Facility Design Capacity Utilization (%)                                             Q14 - Compliance With Federal, State, Local And School Board
                                                                                             Requirements
   Q3 - Cost of Errors & Omissions as a % of Total Construction Cost
                                                                                             Q15 - Prevent School Violence ( Sesir Incident Ratio - # Criminal
   Q4 - Construction Critical Path Milestones (% Variance from Construction
                                                                                             Incidents / Student Population)
   Schedule)
   Q5 - Construction Budget vs. Actual Construction Costs (% Variance)                       Q16 - Reduce Security Risks And Liability
   Q6 - Operations Cost Per GSF                                                              (# Planned Security Training Session / # Actual Security Training
                                                                                             Sessions)
   Q7 - Maintenance Cost Per GSF
                                                                                             Q17 - Improve School - Community Relations On School Security (#
   Q8 - Regulatory And Code Compliance Inspection Milestones
                                                                                             Site Or Community Visits Conducted / # Site Or Community Visits
   Q9 - Regulatory And Code Compliance Annual Reports Milestones                             Planned)
   Q10 - Reduce Electrical Usage 10% By End Of FY 08/09
   Q11 - Reduce Water Usage By 10% By End Of FY 09/10
   Q12 - Reduce Gas / Heating Oil Usage By 10% By End Of FY 09/10



FACILITIES SERVICES / Robert J. Wiebel & Ed Curry                                                                                                             3/7/09
Key Priority                       MANAGE
              Process (1):                 FACILITIES PLANNING                               Process Owner: D. THEODORE

    W           BPS                                                                                                          BPS
     HO                              STATE AND                                          BPS
              SCHOOL                   LOCAL                                         FACILITIES                          DEPARTMENTS
 STEP         BOARD                 GOVERNMENT                                       PLANNING                             & SCHOOLS

                                To ensure adequate and appropriate educational
              NEED FACILITY     facilities to accommodate projected student
   NEED         PLANNING        membership and program offerings
                                                                                               INVOLVES STATE &
                                                                                               LOCAL GOV’T?
                                                                                                NO
 QUESTION     DELIVERABLES:                                                              ?
              D1. FISH Certification                                   YES
              D2. Growth Management
                  Projections                     STATUTORY        NO
  QUESTION    D3. 5-Year Facility Plan       REQUIREMENTS?     ?
              D4. School Concurrency                     YES
                  Application                         BA              D1
              D5. Educational Plant Survey
 MAINTAIN &   D6. Student Accommodation Plan KWP1         MAINTAIN &                             MAINTAIN OTHER
                                                            CERTIFY                              PLANNING DATA
  CERTIFY     D7. Boundary Change                        BPS FISH DATA
                  Recommendations
                                          P1 - Data Accuracy
                                                                                  D2
  DEVELOP,                                                                                   OBTAIN DISTRICT / FINANCE
  PUBLISH &                          KWP2              DEVELOP & PUBLISH                      STUDENT PROJECTIONS
                                                 GROWTH MANAGEMENT PROJECTIONS
   OBTAIN
                              P2 - Growth Management Projections
                                   Schedule Milestones                                                                        D6
                                                                                                  BA
 DEVELOP &
                                                                                        KWP6              DEVELOP & PUBLISH
  PUBLISH                                                                                            STUDENT ACCOMMODATION PLAN

                                                                                                          P6 - Student Accommodation
                                                                BA                D3                           Plan Schedule Milestones

 DEVELOP &
  PUBLISH                                             KWP3        DEVELOP & PUBLISH
                                                                 5-YEAR FACILITY PLAN

                                           P3 - 5-Year Facility Plan
                                                Schedule Milestones                               BA                          D7
 BOUNDARY
                                                                                                         DEVELOP & PUBLISH
  CHANGES                                                                               KWP7             BOUNDARY CHANGES

                                                                                  D4                         P7 - Boundary Changes
                                                                                                                  Schedule Milestones
                                     KWP4                 PERFORM SCHOOL
                                                       CONCURRENCY ACTIVITIES
  PERFORM
                          P4 - # School Concurrency Applications
                          P5- Application Review Cycle Time
                                                                BA               D5
                                                                 DEVELOP & PUBLISH
 DEVELOP &                                           KWP5          EDUCATIONAL
                                                                   PLANT SURVEY
  PUBLISH
                                   P8 - Educational Plant Survey
                                        Schedule Milestones

                                              KWP8
  MANAGE
                                                      MANAGE IMPACT
                                                      FEE ACTIVITIES

                                                                    P9 - Impact Fee Activity
                                                                         Schedule Milestone




                                                         Legend:
  MANAGED                                                  BA - Board Approval Required for Submittals
               NEED IS
                MET                                      FISH - Florida Inventory of School Houses
                                                          SAP - School Accommodation Plan
                                                          SCA - School Concurrency Activities
                                                          EPS - Educational Plant Survey




  Q1 - FISH Data Accuracy                                           Q3 - BPS Submittals On Time

  Q2 - State and Local Submittals On Time                           Q4 - Facility Design Capacity Utilization (%)



FACILITIES SERVICES / Robert J. Wiebel & Mike Gaffney                                                                              2/11/09
Key Priority             MANAGE
              Process (2):         FACILITIES DESIGN                                            Process Owner: D. THEODORE

    W                        BPS
     HO        BPS       EDUCATIONAL                                              BPS
                                                                                                                                         CONTRACT
             SCHOOL                                                                                                                      ARCHITECT
                         DEPARTMENTS                                           FACILITIES
 STEP        BOARD                                                                                                                       & ENGINEER
                         AND SCHOOLS                                           SERVICES

                NEED
              PROJECT
   NEED        DESIGN
                                                                                                           DELIVERABLES:
                                                                                                           D1. Construction Scope of Work
                                                                                                           D2. Bid Documents
  PERFORM               KWP 1                   PERFORM PROGRAM DEVELOPMENT
                                                                                                           D3. Design Criteria Package
                                                                                                           D4. Project Plans
                           P1 - Pre-Design Schedule Milestones                                             D5. Project Specifications
                                                                                                           D6. Approved Plans and
  DEVELOP                                         KWP 2            DEVELOP BUDGET                             Specifications

                                            M/E/P Construction <$50,000
                                               or Placement / Hookup of
 QUESTION                                             Relocatable Units?
                                                                             ?       NO
                                                                       YES



  DEVELOP                                                          D1
                                     KWP 3          DEVELOP
                                                                                                         Design / Build
                                                BID DOCUMENTS      D2                                    (D/B) Project?

  QUESTION
                                                                                              ?
                                                                             Design / Bid /
                                                                             Build Project?

  APPROVE                                                                                            KWP 4
                                                                           PROGRAM                                              PROGRAM
                                                                            BUDGET        APPROVAL BY            APPROVAL BY    BUDGET
                                                                               A&E           BOARD                  BOARD       DCP
                                           BOARD
                                                            NO
 QUESTION                               APPROVAL
                                                      ?
                                       REQUIRED?
                                                YES
                                                                                                                                             KWP 5
  DEVELOP                                                                                          D3             DEVELOP DESIGN CRITERIA PACKAGE



 APPROVE                             KWP 4       APPROVAL BY
                                                    BOARD
                                                                                          SELECT A & E           SELECT DESIGN / BUILD
  SELECT                                                                                                             CONTRACTOR




  APPROVE                           GO TO
                                  FACILITIES                                                        APPROVAL BY
                                CONSTRUCTION                                                           BOARD
                                 FLOW CHART
                                                                    KWP 6
   DESIGN                                                    D4
                                                                                                  DESIGN PROJECT
                                                             D5
                                                                     P2 - Project Design Schedule Milestones
                                                                                                                                                NO
                                                                     P3 - Cost Variance @ Design Deliverable
 QUESTION                                                                 Milestones                                                     ?
                                                                                                                                             PROJECT DESIGN
                                                                                                                                  YES        COMPLETE?
                                                                   KWP 7
  SUPPORT                                                    D6                      SUPPORT BID & PERMIT ACTIVITIES

                                                                    P4 - Bid & Permit Support Schedule Milestones
                                                        KWP 8
  SUPPORT                                                 SUPPORT CONSTRUCTION & CONSTRUCTION CLOSEOUT ACTIVITIES

                                                               P5 - Construction & Construction Closeout Support
                                                                    Schedule Milestones
                                                                                                                                                     NO
 QUESTION                                                      P6 - Cost of Errors & Omissions as % of Construction
                                                                                                                                         ?
                                                                    Costs at Schedule Milestones                                             CONSTRUCTION &
                                                                                                                                YES          CLOSEOUT
                                                                                                                                             COMPLETE?


 CLOSEOUT                                              KWP 9                         CLOSEOUT A&E CONTRACT

                                                               P7 - A&E Contract Closeout Schedule Milestones
                                                                                                                                                 NO

 QUESTION                                                                                                                                ?     A&E CONTRACT
                                                                                                                                               CLOSEOUT
                                                                                                                                   YES         COMPLETE?


 MANAGED     NEED IS
              MET



   Q1 - Cost of Errors & Omissions                                  Q3 - % Variance from Design Budget
   as a % of Total Construction Cost

   Q2 - % Variance from Design Schedule



FACILITIES SERVICES / Robert J. Wiebel & Anibal Caussade                                                                                       2/11/09
Key Priority                     MANAGE
                  Process (3):            FACILITIES CONSTRUCTION                                          Process Owner: D. THEODORE

    W
     HO
                         BPS                                                BPS
 STEP                SCHOOL BOARD                                   FACILITIES SERVICES                                                    CONTRACTOR

                            NEED PROJECT
    NEED                    CONSTRUCTED                                                                                               DELIVERABLES:

                                                                                             KWP1                                     D1. Certificate of Occupancy (CO)
                                                                                                                                      D2. Projects Constructed per BPS
   SELECT                                                                            SELECT                                           Design Specifications, Florida
                                                                                   CONTRACTOR                                         Building Code, and State
                                                                                                                                      Requirements for Educational
                                                                            BOARD                                                     Facilities
                                                                                              NO
                                                                         APPROVAL
  QUESTION                                                              REQUIRED?        ?                                            D3. Certificate of Final Inspection
                                                                                                                                      (CFI)
                                   KWP2                                            YES                                                D4. As-Built Project Plans

   APPROVE                                                      APPROVE CONTRACTOR BY BOARD


                                                                              NO
                                                            BOARD
  QUESTION                                              APPROVED?       ?                                                                             KWP3
                                                                  YES

  PERFORM                                                                                              PERFORM PRE-CONSTRUCTION ACTIVITIES


                   Manage Project P Indicators                              P1 - Pre-Construction Activity Milestones
                   P2 - Construction Critical Path Milestones                                    PRE-CONSTRUCTION                 NO
  QUESTION                                                                                      REQUIREMENTS MET?            ?
                   P3 - Cumulative Use of Estimated Contingency
                       Funds as a Percent (%) of Cumulative                                                         YES
                       Construction Costs                                                            ISSUE
    ISSUE                                                                                          NOTICE TO
                   P4 - Cumulative Sales Tax Savings as a                                          PROCEED
                        % of Construction Cost
                                                                                         KWP4
   MANAGE          P5 - Monthly Construction Budget vs. Actual Construction
                        Cost Variance                                                                        MANAGE PROJECT

                   P6 - Construction-Related School Environmental
                        Number of Safety Incident Report (SESIR) Incidents                    HAS THE CONTRACTOR                  NO
  QUESTION              Involving Students and School Staff                                       MET SUBSTANTIAL
                                                                                         COMPLETION REQUIREMENTS?            ?
                   P7 - Number of Construction Worker Safety Incidents                                                 YES
                                                                                          KWP5
                   P8 - Number of Jessica Lundsford Act (JLA) Incidents
  PERFORM
                                                                                                   PERFORM SUBSTANTIAL COMPLETION ACTIVITIES


                                                                    P9 - Substantial Completion                CAN A
                                                                                                                                  NO
  QUESTION                                                               Activity Milestones            CERTIFICATE
                                                                                                      OF OCCUPANCY
                                                                                                     (CO) BE ISSUED?
                                                                                                                             ?
                                                                                                                       YES

   START                                                                                                         START WARRANTY



                                                                                                                        ISSUE
                                                                                                                          CO      D1
    ISSUE                                                                                KWP6
                                                 P10 - Construction Closeout
                                                     Activity Milestones                           PERFORM CONSTRUCTION CLOSEOUT ACTIVITIES

  PERFORM
                                                                                                                                 NO
                                                                                                   CONSTRUCTION
                                                                                             CLOSEOUT COMPLETE?              ?
  QUESTION
                                                                                                               D2      YES

                                                                                                          PROJECT                NO

  QUESTION
                                                                                                     VALUE <$200K?           ?
                                                                                                                                       OBTAIN      D3
                                                                                                                       YES              CFI


   OBTAIN                                                                                           KWP7
                                                   P11 - Administrative Closeout
                                                        Activity Milestones                          PERFORM ADMINISTRATIVE CLOSEOUT ACTIVITIES
  PERFORM                                          P12 - Number Warranty Requests
                                                                                                                                  NO
                                                                                                      ADMINISTRATIVE
                                                                                                CLOSEOUT COMPLETE?           ?
  QUESTION                                                                                                          YES
                                                                                                                                 D4

  MANAGED                       NEED IS
                                 MET




  Q1 - Actual Sales Tax Savings /                                             Q4 - Construction-Related SESIR Incidents
      Possible Sales Tax Savings
      (%)                                                                     Q5 - Construction Safety JLA Security Incidents

  Q2 - Construction Critical Path Milestones                                  Q6 - Warranty Actions
      (% Variance from Construction Schedule)

  Q3 - Construction Budget vs. Actual
       Construction Costs (% Variance)

FACILITIES SERVICES / Robert J. Wiebel & Dennis Bonny                                                                                                            2/11/09
MANAGE FACILITIES
                  Key Priority                      OPERATIONS AND
                  Process (4):                     MAINTENANCE( 9562)                               Process Owner: WALT PETTERS

    W               BPS                                                                                                      BPS
     HO                                                FACILITIES OPERATIONS                                             SCHOOLS AND
                  SCHOOL                                 AND MAINTENANCE
 STEP             BOARD                                                                                                  DEPARTMENTS

                                  PROVIDE WELL MAINTAINED, SAFE AND COMFORTABLE FACILITIES
    NEED            NEED          TO SUPPORT THE BPS EDUCATIONAL PROCESS.




                   Note:
    OPEN           This chart represents a typical daily operation process. The                                                           OPEN
                                                                                                                                         FACILITY
                   school principal operates the facility in conjunction with PO&M.



  OPERATE
                                                                   OPERATE FACILITY


                                                               KWP1
                                                                                             P1 - Operational Systems
  MONITOR                                                                                         Monitoring Hours
                                                                  MONITOR FACILITY
                                                                                                  of Operation
                                                                OPERATIONAL SYSTEMS
                  DELIVERABLES:
                  D1- MONTHLY WORK
  QUESTION        ORDER REPORT
                                                                                                                         NO
                                                                                                IS THE FACILITY
                  D2 - ANNUAL FACILITY
                                                                                       OPERATING AS PLANNED?        ?
                  CONDITION ASSESSMENT
                                                                                                              YES
                  REPORT
 QUESTION

                                                       PREVENTATIVE
                                                   MAINTENANCE (PM)              NO
                                                     WORK NEEDED?           ?
  QUESTION
                                                                                                           CAN PROBLEM BE FIXED
                                                                      YES                          BY FACILITY’S CUSTODIAL STAFF?              NO
                                                                                                                                         ?
                                                             KWP2
  PERFORM                                                                                                                          YES


                               P2 - PM Work Per Month                 PERFORM                                                        FIX
                                                                      PM WORK                                                      PROBLEM
    FIX


  QUESTION
                                                                                                                        PROBLEM               NO
                                                                                                                          FIXED?         ?
  QUESTION                                                                                                                      YES
                   P3   -   School-Generated W/O Per Month
                   P4   -   Service W/O Per Month                           KWP3
                   P5   -   PO&M-Generated W/O Per Month
                   P6   -   # W/O Opened / Closed Per Month
                                                                                             PROCESS WORK ORDER(S)
  PROCESS          P7   -   # Backlogged W/O Per Month
                   P8   -   Aging W/O Per Month
                   P9   -   Operations Cost Per Month
                  P10   -   Maintenance Cost Per Month


                                                                                       WORK ORDER
  QUESTION                                                                                                     NO
                                                                                          CLOSED?
                                                                                                          ?
                                                                                                    YES




                                                    END OF NORMAL               NO
  QUESTION                                      FACILITY OPERATION?
                                                                            ?
                                                                     YES


                                                    END OF EXTENDED              NO
                                                 FACILITY OPERATION?
  QUESTION
                                                                            ?
                                                                     YES




                                                                                                                              CLOSE FACILITY
   CLOSE


                     NEED IS
  MANAGED             MET




Q1 - Operations Cost Per GSF                                           Q6 - PM / Service W/O Ratio
Q2 - Maintenance Cost Per GSF                                          Q7 - PO&M / Facility-Generated W/O Ratio
Q3 - Total (Operations + Maintenance) Cost Per GSF                     Q8 - PM Work Order Backlog Per Year
Q4 - PM and W/O Activity Per Year
Q5 - W/O Backlog Per Year



FACILITIES SERVICES / Robert J. Wiebel & Walt Petters                                                                                          2/11/09
MANAGE ENVIRONMENTAL,
             Key Priority                        SAFETY & CODE
             Process (5):                         COMPLIANCE                           Process Owner:                         J. POWERS

   W                                                            BPS
    HO
                      BPS SCHOOL                          ENVIRONMENTAL &                                 BPS
STEP                    BOARD                             CODE COMPLIANCE                                PO&M                          OTHER

   NEED                       MANAGE
                          ENVIRONMENTAL &
                          CODE COMPLIANCE




                                                                       KWP1
 PREPARE                                                                        P1 - # POLICIES, PROCEDURES, PLANS, TRAINING
  UPDATE                                                 PREPARE ENV/ SAFETY    COURSES, CHECKLISTS, MANUALS, SURVEYS,
                                                          & CODE COMPLIANCE
                                                              DOCUMENTS         HANDBOOKS AND PAMPHLETS DEVELOPED,
                                                                                REVIEWED & UPDATED

 QUESTION                                        Regulatory
                                                 Compliance           NO

                P2 # OF COMPREHENSIVE FIRE
                                                  Activity?      ?
                SAFETY CASUALTY SANITATION               YES
                INSPECTIONS PERFORMED                                           KWP2
                P3 SERVICE RESPONSE TIME TO
  INSPECT       COMPLETE BUILDING FIELD
                INSPECTIONS.                                    INSPECT FACILITIES &
                                                                  INFRASTRUCTURE
                P4 - TIME TO ISSUED TEMP CO
                (OEF 110B)

                P5 - TIME TO COMPLETE FINAL
  ISSUE         INSPECTIONS.
                                                        ISSUE INSPECTION
                                                            REPORTS
                P6 - TIME TO ISSUE CERTIFICATE OF
                FINAL INSPECTION (OEF 209)

 QUESTION       P7 - # ENVIRONMENTAL
                INSPECTIONS PERFORMED           Facilities in          NO
                                               Compliance?       ?               KWP3
 MONITOR                                                   YES
                                                                                       MONITOR &
                       P8 # OF CUSTODIANS TRAINED                                     COMMUNICATE
                                                                                    REGULATORY / CODE
                       P9 # OF FACILITY CUSTODIAL ANNUAL &                           NON-COMPLIANCE
                       BI-ANNUAL ASSESSMENTS CONDUCTED
                                                                       KWP4
                       P10 # OF CLEAN CAMPUS REPORTS                                         P16 # Meetings Held
                       RECEIVED
 PERFORM                                                                 PERFORM             P17 #work Orders Issued
                       P11 CLEAN CAMPUS REPORT RECEIVED,                CUSTODIAL
                       REVIEWED, AND ACTIONS TAKEN                                           P18 # Reinspections Completed
                                                                         SUPPORT
                                                                                             P19 Capital Deficiency Report Schedule
                                                                                             Milestones

                                                     KWP5                                    P20 Comprehensive Environmental, Safety
                                                                                             Casulty And Code Compliance Report
                                                                                             Report Schedule Milestones
                 P12 # Of Unplanned Incidents
                 Responses
                                                            MONITOR &
 MONITOR                                                  COMMUNICATE
                 P13 Unplanned Incident                 REGULATORY / CODE
                 Response Time                             COMPLIANCE
                 P14 # Of Training Classes
                 Conducted

                 P15 # Unplanned Life Safety
                 Evaluations Requested




                                                                Deliverables:
                                                                 D1 - School Inspection Findings Report
                                                                 D2 - Annual Comprehensive Fire, Safety, Casualty, &
                                                                      Sanitation Report
 MANAGED                      NEED IS                            D3 - Annual Custodial Assessment Report
                               MET
                                                                 D4 - Annual Building & Code Compliance Activity
                                                                      Report



  Q1 - ALL SCHOOLS CUSTODIAL ASSESSMENT                                 Q3 - REGULATORY AND CODE COMPLIANCE INSPECTION
  RATING OF 90%                                                         MILESTONES

  Q2 - 75% SCHOOL CUSTODIANS CERTIFIED                                  Q4 - REGULATORY AND CODE COMPLIANCE ANNUAL
  LEVEL 1 & 50% SCHOOL CUSTODIANS                                       REPORTS MILESTONES
  CERTIFIED LEVEL 2




FACILITIES SERVICES: ROBERT J. WIEBEL / JIM POWERS                                                                                      2/11/09
MANAGE DISTRICT
               Key Priority                      RESOURCE
                                               CONSERVATION
               Process (6):                                                                                       Process Owner: A. JOHNSON

    W
     HO
                     BPS SCHOOL                                            FACILITIES RESOURCE
 STEP                  BOARD                                                  CONSERVATION                                                                      SCHOOL


     NEED                MANAGE DISTRICT & SCHOOL      Identify district wide resource conservation
                          RESOURCE CONSERVATION        initiatives to reduce facility operation costs related to
                                                       electrical, water, and gas usage, trash disposal and facility
                                                                                                                                 KWP = Key Work Process
                                                       efficiencies.




                                                                                                                            P1 - # POLICIES, PROCEDURES, PLANS, TRAINING
   PREPARE                                                                     PREPARE RESOURCE                             COURSES, CHECKLISTS, MANUALS, SURVEYS,
                                                            KWP1            CONSERVATION DOCUMENTS                          HANDBOOKS AND PAMPHLETS DEVELOPED,
                                                                                                                            REVIEWED & UPDATED



                                                                                                                                P2 - # OF UTILITY CONSUMPTION
                                                                                                                                REPORTS / BILLS COLLECTED
                                                                           IDENTIFICATION OF FACILITY                           P3 - # OF MONTHLY FACILITY INSPECTIONS AND QUARTERLY
                                                                           & BEHAVIORAL MODIFICATION
   IDENTIFY                                             KWP2                    IMPROVEMENTS &
                                                                                                                                AUDITS PERFORMED
  RECOMMEND                                                                                                                     P4 - # OF MONTHLY INSPECTION REPORTS AND
                                                                               RECOMMENDATIONS                                  QUARTERLY AUDIT REPORTS PUBLISHED
                                                                                                                                P5 - # OF MONTHLY CONSUMPTION DATA ANALYSIS
                                                                                                                                 PERFORMED
                                                                                                                                P6 - # OF MONTHLY FACILITY INSPECTION AND QUARTERLY
                                                                                                                                AUDIT DATA ANALYSIS PERFORMED
                                                                                                                                P7 - # FACILITY RECOMMENDATIONS ISSUED
                                                                                                                                P8 -# OF BEHAVIORAL MODIFICATION IMPROVEMENTS
  QUESTION                                                                                                                      ISSUED
                                             IS THE RECOMMENDATION                                          NO
                                            A FACILITY IMPROVEMENT?                              ?
                                                                                          YES
                                                                                                             KWP3                     PERFORM BEHAVIORAL
  PERFORM                                                                                                                             MODIFICATION TRAINING
                                                                                                                           P9 - # OF SCHOOL RECEIVING A BEHAVIORAL MODIFICATION
                                                           IS THE FACILITY                                  NO             RATING SCORE EQUAL TO OR GREATER THAN 90%

  QUESTION
                                                        RECOMMENDATION
                                                                COMPLEX?
                                                                                                 ?
                                                                                          YES
                                                                                                             KWP4                    IMPLEMENT NON-COMPLEX
  IMPLEMENT                                                                                                                            FACILITY IMPROVEMENT
                                                                                 KWP5                                          P10 - # NON-COMPLEX FACILITY IMPROVEMENTS
                                                                                                                               COMPLETED.
                                                    Note: CBC Includes
                                                       5-Year Pay Back                  CREATE COST
   CREATE                                                      Analysis                   BENEFIT                         P11 - # OF COST BENEFIT ANALYSIS COMPLETED
                                                                                         ANALYSIS


                                                                                                                                       P12 - # COMPLEX FACILITY PROJECTS ADDED
                                                                       IS FUNDING                              NO                      TO DEFERRED MAINTENANCE LIST
  QUESTION                                                            AVAILABLE?                 ?                                     P13 - # OF COMPLEX FACILITY DEFERRED
                                                                                                                                       MAINTENANCE
                                                                                                                                       PROJECTS THAT WERE COMPLETED
                                                                                          YES
     ADD                                                                                                               ADD TO UNFUNDED RC
                                                                                                                          PROJECT LIST


                                                                           CAPITAL                          NO
  QUESTION
                                                                         PROJECT?                ?
                                                                                           YES
                                  P14 - # COMPLEX FACILITY PROJECTS
    ADD                                                                               ADD TO CAPITAL
                                  ADDED TO THE CAPITAL PROJECT LIST
                                  P15 - # OF COMPLEX FACILITY PROJECTS                 PROJECT LIST
                                  THAT WERE COMPLETED.
   SUBMIT                                                                                                                     SUBMIT
                                                                                 KWP6                                       WORK ORDER

                                   P17 - # FACILITY IMPROVEMENT AND                                                                   P16 - # OF WORK ORDERS
                                                                                  MONITOR & ANALYZE
   MONITOR                         BEHAVIOR MODIFICATION TRAINING
                                                                                   FAC IMP PROJECTS
                                                                                                                                      SUBMITTED
   ANALYZE                         ANALYSIS AFTER ACTION
                                                                                     & BM TRAINING
                                   REPORTS PUBLISHED.
                                                                                        RESULTS

                                NEED IS
  MANAGED                        MET




                            Deliverables:
                             D1 - MONTHLY FACILITY AUDIT & INSPECTION REPORTS
                             D2 - COST BENEFIT ANALYSIS REPORTS
                             D3 - MONTHLY FACILITY AND BEHAVIORAL MODIFICATION IMPROVEMENT
                                  RECOMMENDATIONS LIST
                             D4 - MONTHLY SENIOR STAFF RESOURCE CONSERVATION BOX SCORE
                             D5 - MONTHLY DISTRICT AND SCHOOL RESOURCE CONSERVATION
                                  BOX SCORE




  Q1 - REDUCE ELECTRICAL USAGE 10% BY END OF FY 08/09                                               Q4 - REDUCE THE VOLUME OF TRASH HAULED 10%
                                                                                                    BY END OF FY 09/10
  Q2 - REDUCE WATER USAGE BY 10% BY END OF FY 09/10

  Q3 - REDUCE GAS / HEATING OIL USAGE BY 10% BY END OF FY 09/10




FACILITIES SERVICES: ROBERT J. WIEBEL / ART JOHNSON                                                                                                                    2/11/09
Macro             MANAGE DISTRICT &
                   Process:            SCHOOL SECURITY                              Process Owner:                    A. ALFORD

   W
    HO
                     BPS SCHOOL                  DISTRICT & SCHOOL
STEP                   BOARD                          SECURITY                                   SCHOOL                      OTHER

                        MANAGE DISTRICT
   NEED                & SCHOOL SECURITY




 DEVELOP         KWP 1      DEVELOP DISTRICT AND SCHOOL SECURITY DOCUMENTATION
                                                               P1 - # POLICIES, PROCEDURES, PLANS, TRAINING COURSES,
                                                               CHECKLISTS, MANUALS, SURVEYS, HANDBOOKS AND PAMPHLETS
                                                               DEVELOPED, REVIEWED & UPDATED
 PERFORM
                 KWP 2                      PERFORM SECURITY INVESTIGATIONS
                                                                   P2 - # INVESTIGATIONS PERFORMED PER DISTRICT & SCHOOL SITE
                                                                   P3 - # EXPULSIONS PER MONTH

 MANAGE          KWP 3                         MANAGE SECURITY EQUIPMENT
                                                                   P4 - # EQUIPMENT REQUIREMENTS DEVELOPED,
                                                                   REVIEWED & UPDATED
                                                                   P5 - EQUIPMENT REQUIREMENTS MET (% OF FACILITIES)

 CONDUCT                                              CONDUCT TRAINING
                 KWP 4
                                                                   P6 - # TRAINING COURSES CONDUCTED
                                                                   P7 - # TRAINED PERSONNEL PER COURSE
 MONITOR &
COORDINATE       KWP 5        MONITOR & COORDINATE DISTRICT &SCHOOL SITE SECURITY
                                                                   P8 - SCHOOLS WITH SRO (%)
                                                                   P9 - # SECURITY ASSESSMENTS REQUESTED


 CONDUCT         KWP 6                                  CONDUCT BACKGROUND SCREENING
                                                                   P10 - # BACKGROUND CHECKS COMPLETED
                                                                   P11 - # ID BADGES ISSUED
                                                                   P12 - LEVEL II BACKGROUND CHECK CYCLE TIME (Planned vs. Actual)

BROADCAST
                 KWP 7                         BROADCAST INCIDENT CODES
                                                                   P13 - # CODES BROADCAST


 INTERFACE       KWP 8                 INTERFACE WITH LAW ENFORCEMENT AGENCIES
                                                                   P14 - # MEETINGS HELD


 MONITOR         KWP 9                             MONITOR SESIR REPORTS
                                                                   P15 - # OF Criminal SESIR REPORTS RECEIVED IN WRITING



 PERFORM        KWP 10                 PERFORM 5 STAR SECURITY SELF-ASSESSMENT
                                                                    P16 - SECURITY BEST PRACTICES (OPPOGA) SELF-ASSESSMENT
                                                                          MILESTONES (Milestones Planned vs. Actual Accomplished)
                                                                    P17 - # 5 STAR SELF- ASSESSMENT FINDINGS

 MANAGED                     NEED IS
                              MET          Legend:
                                              KWP -   Key Work Process
                                           OPPAGA -   Office of Program Policy Analysis and Government Accountability
                                            SCIRM -   School Critical Incident Response Manual
                                            SESIR -   School Environmental Safety Incident Report

                                           Safety & Security Deliverables:
                                            D1 - School Safety Plan
                                            D2 - School Safety Reports
                                            D3 - School Critical Incident Response Manual
                                            D4 - Employee, Volunteer, and Contractor Level II Background Checks
                                            D5 - Employee, Volunteer, and Contractor ID Badges


 Q1 - COMPLIANCE WITH FEDERAL, STATE,                       Q4 - IMPROVE SCHOOL - COMMUNITY RELATIONS ON SCHOOL
 LOCAL AND SCHOOL BOARD REQUIREMENTS                        SECURITY (# SITE OR COMMUNITY VISITS CONDUCTED / # SITE OR
                                                            COMMUNITY VISITS PLANNED)
 Q2 - PREVENT SCHOOL VIOLENCE
 ( SESIR INCIDENT RATIO - # CRIMINAL INCIDENTS /
 STUDENT POPULATION)

 Q3 - REDUCE SECURITY RISKS AND LIABILITY
 (# PLANNED SECURITY TRAINING SESSSIONS / # ACTUAL
 SECUIRYT TRAINING SESSIONS)


FACILITIES SERVICES: ROBERT J. WIEBEL / ANDREA ALFORD                                                                          11/13/08

Más contenido relacionado

Similar a Facilities Baldrige Initiative Mbb 3 25 09

Narendra Singh_Resume
Narendra Singh_ResumeNarendra Singh_Resume
Narendra Singh_Resume
Narendra Rana
 
Technology Action Plan-Coleman
Technology Action Plan-ColemanTechnology Action Plan-Coleman
Technology Action Plan-Coleman
ccoleman8
 
Edld 5352 Week 4 Assignment
Edld 5352 Week 4 AssignmentEdld 5352 Week 4 Assignment
Edld 5352 Week 4 Assignment
Lamar University
 
C. Babilya resume 4-2011
C. Babilya resume 4-2011C. Babilya resume 4-2011
C. Babilya resume 4-2011
chuckbab
 
ICT50715 – Assignment 01 – Task 2 – Process for Procurement Policy – SSDM (AP...
ICT50715 – Assignment 01 – Task 2 – Process for Procurement Policy – SSDM (AP...ICT50715 – Assignment 01 – Task 2 – Process for Procurement Policy – SSDM (AP...
ICT50715 – Assignment 01 – Task 2 – Process for Procurement Policy – SSDM (AP...
Billy Kid
 
William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016
Randy Kent
 

Similar a Facilities Baldrige Initiative Mbb 3 25 09 (20)

Software Mangineeringment
Software MangineeringmentSoftware Mangineeringment
Software Mangineeringment
 
Sigma sdlc
Sigma sdlcSigma sdlc
Sigma sdlc
 
Narendra Singh_Resume
Narendra Singh_ResumeNarendra Singh_Resume
Narendra Singh_Resume
 
project dev't cycle
project dev't cycleproject dev't cycle
project dev't cycle
 
Breeam
BreeamBreeam
Breeam
 
Amit_Kumar
Amit_KumarAmit_Kumar
Amit_Kumar
 
Using CMMI Process Management Practices to Build and Maintain a QMS
Using CMMI Process Management Practices to Build and Maintain a QMSUsing CMMI Process Management Practices to Build and Maintain a QMS
Using CMMI Process Management Practices to Build and Maintain a QMS
 
Anubhav Agarwal
Anubhav AgarwalAnubhav Agarwal
Anubhav Agarwal
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial Buildings
 
Sustainable housing development
Sustainable housing developmentSustainable housing development
Sustainable housing development
 
S10 Organisations Software and Methodologies
S10 Organisations Software and MethodologiesS10 Organisations Software and Methodologies
S10 Organisations Software and Methodologies
 
Technology Action Plan-Coleman
Technology Action Plan-ColemanTechnology Action Plan-Coleman
Technology Action Plan-Coleman
 
055 KPI'S Success Factor
055 KPI'S Success Factor 055 KPI'S Success Factor
055 KPI'S Success Factor
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factor
 
Edld 5352 Week 4 Assignment
Edld 5352 Week 4 AssignmentEdld 5352 Week 4 Assignment
Edld 5352 Week 4 Assignment
 
C. Babilya resume 4-2011
C. Babilya resume 4-2011C. Babilya resume 4-2011
C. Babilya resume 4-2011
 
ICT50715 – Assignment 01 – Task 2 – Process for Procurement Policy – SSDM (AP...
ICT50715 – Assignment 01 – Task 2 – Process for Procurement Policy – SSDM (AP...ICT50715 – Assignment 01 – Task 2 – Process for Procurement Policy – SSDM (AP...
ICT50715 – Assignment 01 – Task 2 – Process for Procurement Policy – SSDM (AP...
 
Getting to Done (PMI Denver)
Getting to Done (PMI Denver)Getting to Done (PMI Denver)
Getting to Done (PMI Denver)
 
William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016
 
2075-05-14 Appraising result framework.pdf
2075-05-14 Appraising result framework.pdf2075-05-14 Appraising result framework.pdf
2075-05-14 Appraising result framework.pdf
 

Más de Work Control Supervisor at Brevard Public Schools (7)

Road to cpi #2
Road to cpi #2Road to cpi #2
Road to cpi #2
 
Military pay raise history & projections 1976 2017
Military pay raise history & projections 1976   2017Military pay raise history & projections 1976   2017
Military pay raise history & projections 1976 2017
 
Visio risk assessment & capa diagram
Visio risk assessment & capa diagramVisio risk assessment & capa diagram
Visio risk assessment & capa diagram
 
S&s kwp 6 sipoc 8 15-09
S&s kwp 6 sipoc 8 15-09S&s kwp 6 sipoc 8 15-09
S&s kwp 6 sipoc 8 15-09
 
Sipoc Block Diagram 9 3 09
Sipoc Block Diagram 9 3 09Sipoc Block Diagram 9 3 09
Sipoc Block Diagram 9 3 09
 
10th Mountain Reunion
10th Mountain Reunion10th Mountain Reunion
10th Mountain Reunion
 
Yellow School Bus 6 Sigma Project
Yellow School Bus 6 Sigma ProjectYellow School Bus 6 Sigma Project
Yellow School Bus 6 Sigma Project
 

Último

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 

Último (20)

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 

Facilities Baldrige Initiative Mbb 3 25 09

  • 1. FACILITIES SERVICES & DISTRICT and SCHOOL SECURITY SIX SIGMA INITIATIVE Work System Owner Ed Curry Work System Enabling Leader Dane Theodore, Director Six Sigma Black Belt Robert J. Wiebel, CM, CSSBB 3/25/2009 1
  • 2. INITIATIVE CATEGORIES • Facilities Key Priority and Work Processes • Facilities and Student Performance Relationship • Facilities Balanced Scorecard •Key Priority Process Owners • Facilities Key Priority Processes Relationship To District Work Systems • District Strategic Plan and Key Priority Indicator Relationships • Facilities / District Strategic Plan and District Key Performance Indicator Direct Relationship Matrix. 3/25/2009 2
  • 3. The Facilities and Student Performance Relationship BPS Facilities recognizes the impact that high quality learning spaces have on the performance of students. The Facilities Wheel explains the relationship between high quality learning spaces, funding and the increased student performance as a result of high quality facilities. Since the start of the ten-year new construction, renovation and remodeling and maintenance program in FY 2006, BPS is on tract to invest over $$750,000,000 to improve over 11,000,000 square feet of school and ancillary infrastructure. 3/25/2009 3
  • 4. Facilities Balanced Approach Continuous improvements are realized through the deployment of Six Sigma (DMAIC) process improvement tools and methodologies. BPS Facilities utilizes a Balanced approach to sustain the results of the 10-Year Facilities Improvement Program. 3/25/2009 4
  • 5. Facilities & Security Key Priority & Work Processes 3/25/2009 5
  • 6. Facilities & Security Key Priority Process Owners Planning – Mike Gaffney, Manager Design – Anibal Caussade, Project Manager Construction – Dennis Bonny, Project Manager Plant Maintenance & Operations – Walt Petters, Director Environmental, Health, Safety and Code Compliance – Jim Powers, Env. Engr. Resource Conservation – Art Johnson, Project Manager District and School Security - Andrea Alford, Director 3/25/2009 6
  • 7. District Key Priority Processes Relationship To District Work Systems The Enabling Work System 5 Facilities priority processes provide the Student Achievement Work System with adequate and appropriate facilities that are 1st in Nation Schools. District facilities provides the backbone for which all other District Work Systems can achieve the goals and objectives set forth in the District Strategic Plan and Key Performance Indicators. 3/25/2009 7
  • 8. District Strategic Plan and District Key Performance Indicator Relationships The BPS Strategic Plan contains eighty (80) objectives in four goal categories, with 16 of these objectives being Key Performance Indicators (KPIs). Objective Categories: • Goal 1 Student Achievement (38 Objectives / 11 KPIs)‫‏‬ • Goal 2 Safe and Healthy Learning and Work Environment (17 Objectives / 1 KPI)‫‏‬ • Goal 3 Capable and Engaged Workforce (11 Objectives / 2 KPIs)‫‏‬ • Goal 4 Fiscal Responsibility and Financial and Organizational Effectiveness (14 Objectives / 2 KPI) 3/25/2009 8
  • 9. District Strategic Plan and District Key Performance Indicator Relationships Out of the BPS Strategic Plan eighty (80) objectives and sixteen (16) KPIs in four goal categories, the Facilities Key Priority Processes have eleven (11) direct and Sixty-nine (69) indirect relationships. There is one Facilities direct relationships involving a KPI. Direct Relationships: • Goal 2.1.1 Finalize and implement and annual comprehensive safety and security audit in every school by 2009-2010. • Goal 2.1.2 Review and update school safety and security plans in accordance with Safe School Standards by June 30,2009. • Goal 2.1.3 Conduct training using federal guidelines for emergency response and crisis management preparation, mitigation, response and recovery for all district personnel and administrators at leadership team meetings by June 30, 2009. • Goal 2.1.4 Develop a timeline for implementation of appropriate Review for Safety and Security Committee recommendations by June 2009. • Goal 2.1.5 Develop and implement a 5 Star Comprehensive Review for Safety and Security by June 2009. • Goal 2.2.1 Create adequate classroom space including relocatable classrooms to meet the requirements imposed by Class Size Reduction (CSR), Growth Management (SB360) Legislation, and Secondary Schools of National Prominence (SSNP) with redistricting, new permanent and/or relocatable space by 2011 – 2012. 3/25/2009 9
  • 10. District Strategic Plan and District Key Performance Indicator Relationships (Continued)‫‏‬ Direct Relationships: • Goal 2.2.2 Provide facility improvements to support the new Secondary Schools of National Prominence (SSNP) by 2012 – 2013. • Goal 2.2.3 Develop a plan to achieve 100% level of service by 2011-2012. • Goal 2.3.1 Create and implement a scheduled Maintenance Improvement Plan by January 2009 to provide adequate teaching/learning environments for all schools to complement the 10-Year Facility improvement Plan initiative. • Goal 2.3.2 Implement a plan by January 2009 to improve the exterior appearance of all schools / district support sites as part of the implementation of the 10-Year Facilities Improvement Plan. • Goal 2.3.3 Develop and implement a district-wide energy reduction plan by October 1, 2008 to deal with rising statewide energy costs. • Goal 4.3.1 (KPI) Brevard Public Schools will attain Malcolm Baldrige Award by June 2010. 3/25/2009 10
  • 11. Facilities / District Strategic Plan and District Key Performance Indicator Direct Relationship Matrix GOAL 2: SAFE AND HEALTHY LEARNING AND WORK ENVIRONMENT Strategic Plan References > SP 2.1.1 SP 2.1.2 SP 2.1.3 SP 2.1.4 SP 2.1.5 SP 2.2.1 SP 2.2.2 SP 2.2.3 SP 2.3.1 SP 2.3.2 SP 2.3.3 Facilities Key Priority Processes Planning X X X Design X X X Construction X X X Plant Operation and Maintenance X X X Environmental Health, Safety and Code Compliance X X Resource Conservation X X District and School Security X X X X X The indirect relationship between the seven (7) Facilities Key Priority Processes and the sixty-nine (69) strategic plan goals and objectives lies the fact that high quality facility learning spaces contribute to accomplishment of all District goals and objectives. 3/25/2009 11
  • 12. Facilities & Security Flow Chart OUTPUT MEASURES Q1 - FISH Data Accuracy Q2 -Facility Design Capacity Utilization (%)t Q3 - Construction Critical Path Milestones (% Variance from Construction Schedule)‫‏‬ Q4 - Construction Budget vs. Actual Construction Costs (% Variance)‫‏‬ Q5 - Operations Cost Per GSF Q6 - Maintenance Cost Per GSF Q7 - Regulatory And Code Compliance Inspection Milestones Q8 - Regulatory And Code Compliance Annual Reports Milestones Q9 - Reduce Electrical Usage 10% By End Of FY 08/09 Q10 - Reduce Water Usage By 10% By End Of FY 09/10 Q11 - Reduce Gas / Heating Oil Usage By 10% By End Of FY 09/10 Q12 - Reduce The Volume Of Trash Hauled 10%By End Of FY 09/10 Q13 - Compliance With Federal, State, Local And School Board Requirements Q14 - Prevent School Violence ( SESIR Incident Ratio - # Criminal Incidents / Student Population)‫‏‬ Q15 - Reduce Security Risks And Liability (# Planned Security Training Session / # Actual Security Training Sessions)‫‏‬ Q16 - Improve School - Community Relations On School Security (# Site Or Community Visits Conducted / # Site Or Community Visits Planned)‫‏‬ 3/25/2009 12
  • 13. Work System 5 MANAGE FACILITIES & Process: SECURITY Process Owner: E. Curry W BREVARD PUBLIC SCHOOLS HO CUSTOMERS OTHER STEP & MARKET LEADERSHIP COMMUNITY WORKFORCE FACILITIES STAKEHOLDERS NEED TO PROVIDE FIRST IN NATION FACILITIES AND LEARNING SPACES THROUGH EFFICIENT AND EFFECTIVE FACILITIES PLANNING, DESIGN, CONSTRUCTION, NEED PLANT OPERATIONS & MAINTENANCE AND SECURITY. IDENTIFY IDENTIFY CURRENT AND EMERGING FACILITES & SECURITY NEEDS RELATIVE TO EXISTING POLICIES, STANDARDS AND PROGRAMS FACILITIES & SECURITY POLICIES NO QUESTION STANDARDS AND / OR PROGRAMS OK? ? YES ESTABLISH ESTABLISH / REVISE POLICIES, STANDARDS, AND PROGRAMS TO ADDRESS / MEET CUSTOMER NEEDS REVISW ASSESS ASSESS FACILITIES & SECURITY CAPABILITY TO MEET NEEDS AND FULFILL POLICIES TO BECOME FIRST IN THE NATION IN FACILITIES QUESTION NO ABLE TO IMPROVE CAPABILITY? ? YES FACILITIES & SECURITY SYSTEMS CAPABLE? NO QUESTION ? YES CREATE CREATE STRATEGIC GOALS AND OBJECTIVES TO IMPROVE FACILITIES & SECURITY SYSTEM CAPABILITY DEVELOP, ALIGN, COORDINATE AND DEPLOY STRATEGIC FACILITIES PLANNING STRATEGIES, TACTICS, APPROVE AND PROJECTS TO ENSURE FACILITIES & SECURITY SYSTEM CAPABILITY. DELIVER DELIVER FACILITIES & SECURITY SYSTEMS THROUGH EXECUTED STRATEGIC PLANS & KEY PRIORITY PROCESSES MONITOR MONITOR (ONGOING) FACILITY & SECURITY DELIVERY PERFORMANCE AND STRATEGIC PLAN PROGRESS. PERFORMANCE AND / OR PROGRESS OK? NO QUESTION ? YES DEVELOP DEVELOP PERFORMANCE IMPROVEMENT PLANS / PROVIDE TECHNICAL ASSISTANCE. EVALUATE OVERALL FACILITIES & SECURITY SYSTEM EFFECTIVENESS AND DOCUMENT LESSONS EVALUATE LEARNED / REPLICATE BEST PRACTICES FIRST IN NATION FACILITIES PLANNING, DESIGN, CONSTRUCTION, PLANT OPERATIONS & MAINTNENACE NEED AND SAFETY / SECURITY ACHIEVED. MET Q1 - FISH Data Accuracy Q13 - Reduce The Volume Of Trash Hauled 10%By End Of FY 09/10 Q2 -Facility Design Capacity Utilization (%) Q14 - Compliance With Federal, State, Local And School Board Requirements Q3 - Cost of Errors & Omissions as a % of Total Construction Cost Q15 - Prevent School Violence ( Sesir Incident Ratio - # Criminal Q4 - Construction Critical Path Milestones (% Variance from Construction Incidents / Student Population) Schedule) Q5 - Construction Budget vs. Actual Construction Costs (% Variance) Q16 - Reduce Security Risks And Liability Q6 - Operations Cost Per GSF (# Planned Security Training Session / # Actual Security Training Sessions) Q7 - Maintenance Cost Per GSF Q17 - Improve School - Community Relations On School Security (# Q8 - Regulatory And Code Compliance Inspection Milestones Site Or Community Visits Conducted / # Site Or Community Visits Q9 - Regulatory And Code Compliance Annual Reports Milestones Planned) Q10 - Reduce Electrical Usage 10% By End Of FY 08/09 Q11 - Reduce Water Usage By 10% By End Of FY 09/10 Q12 - Reduce Gas / Heating Oil Usage By 10% By End Of FY 09/10 Facilities Services / Robert J. Wiebel / Ed Curry 3/7/09
  • 14. Work DELIVER FACILITIES & SECURITY SYSTEMS THROUGH EXECUTED System 5 STRATEGIC PLANS & KEY Process: PRIORITY PROCESSES Process Owner: E. CURRY W BPS HO SCHOOL EXTERNAL STAKEHOLDERS, BOARD BPS FACILITIES COMMUNITY, CONTRACTORS STEP NEED IS TO DELIVER FACILITIES SYSTEMS THROUGH EXECUTED NEED STRATEGIC PLANS & KEY PRIORITY PROCESSES KPP1 PLANNING DELIVERABLES: D1. FISH Certification SP 2.2.1 / 2.2.2 / 2.2.3 D2. Growth Management Projections MANAGE FACILITIES D3. 5-Year Facility Plan FACILITIES PLANNING D4. School Concurrency Application D5. Educational Plant Survey PLANNING D6. Student Accommodation Plan D7. Boundary Change Recommendations KPP2 DESIGN DELIVERABLES: MANAGE SP 2.2.1 / 2.2.2 / 2.3.2 D1. Construction Scope of Work D2. Bid Documents FACILITIES FACILITIES D3. Design Criteria Package DESIGN DESIGN D4. Project Plans D5. Project Specifications D6. Approved Plans and Specifications KPP3 CONSTRUCTION DELIVERABLES: SP 2.2.1 / 2.2.2 / 2.3.2 D1. Certificate of Occupancy (CO) MANAGE D2. Projects Constructed per BPS Design FACILITIES FACILITIES Specifications, Florida Building Code, and State CONSTRUCTION CONSTRUCTION Requirements for Educational Facilities D3. Certificate of Final Inspection (CFI) D4. As-Built Project Plans KPP4 SP 2.2.2 / 2.3.1 / 2.3.2 MANAGE PO&M DELIVERABLES: FACILITIES D1- Monthly Work Order Report PLANT D2 - Annual Facility Condition OPERATIONS & PO&M MAINTENANCE Assessment Report KPP5 EHSCC DELIVERABLES: SP 2.1.1 / 2.1.2 / 2.1.4 / 2.1.5 D1 - School Inspection Findings Report MANAGE FACILITIES D2 - Annual Comprehensive FACILITIES ENVIRONMENTAL Fire,Safety, Casualty, & EHSCC HEALTH, SAFETY Sanitation Report AND CODE COMPLIANCE D3 - Annual Custodial Assessment Report D4 - Annual Building & Code RC DELIVERABLES: D1 - Monthly Facility Audit & KPP6 MANAGE Inspection Reports SP 2.3.3 FACILITIES D2 - Cost Benefit Analysis Reports D3 - Monthly Facility And FACILITIES RESOURCE Behavioral Modification RESOURCE CONSERVATION Improvement Recommendations List CONSERVATION D4 - Monthly Senior Staff Resource Conservation Box Score D5 - Monthly District And School Resource Conservation Box Score KPP7 SECURITY DELIVERABLES: D1 - OPPAGA REPORT SP 2.1.1 / 2.1.2 / 2.1.3 / 2.1.4 / 2.1.5 D2 - SCIRM MANAGE D3 - SESIR DISTRICT & SCHOOL DISTRICT & SECURITY D4 - EVACUATION PLAN SCHOOL D5 - SAFETY PLAN D6 - DISTRICT HOMELAND SECURITY SECURITY DIRECTIVE ARE THE NEWLY CONSTRUCTED, RENOVATED, REMODELED AND / OR MAINTAINED FACILITIES AND LEARNING NO QUESTION SPACES PERFORMING IN ACCORDANCE WITH STRATEGIC PLANS AND THE ? CUSTOMER NEEDS? YES NEED IS MET MANAGED Q1 - FISH Data Accuracy Q13 - Reduce The Volume Of Trash Hauled 10%By End Of FY 09/10 Q2 - Facility Design Capacity Utilization (%) Q14 - Compliance With Federal, State, Local And School Board Requirements Q3 - Cost of Errors & Omissions as a % of Total Construction Cost Q15 - Prevent School Violence ( Sesir Incident Ratio - # Criminal Q4 - Construction Critical Path Milestones (% Variance from Construction Incidents / Student Population) Schedule) Q5 - Construction Budget vs. Actual Construction Costs (% Variance) Q16 - Reduce Security Risks And Liability Q6 - Operations Cost Per GSF (# Planned Security Training Session / # Actual Security Training Sessions) Q7 - Maintenance Cost Per GSF Q17 - Improve School - Community Relations On School Security (# Q8 - Regulatory And Code Compliance Inspection Milestones Site Or Community Visits Conducted / # Site Or Community Visits Q9 - Regulatory And Code Compliance Annual Reports Milestones Planned) Q10 - Reduce Electrical Usage 10% By End Of FY 08/09 Q11 - Reduce Water Usage By 10% By End Of FY 09/10 Q12 - Reduce Gas / Heating Oil Usage By 10% By End Of FY 09/10 FACILITIES SERVICES / Robert J. Wiebel & Ed Curry 3/7/09
  • 15. Key Priority MANAGE Process (1): FACILITIES PLANNING Process Owner: D. THEODORE W BPS BPS HO STATE AND BPS SCHOOL LOCAL FACILITIES DEPARTMENTS STEP BOARD GOVERNMENT PLANNING & SCHOOLS To ensure adequate and appropriate educational NEED FACILITY facilities to accommodate projected student NEED PLANNING membership and program offerings INVOLVES STATE & LOCAL GOV’T? NO QUESTION DELIVERABLES: ? D1. FISH Certification YES D2. Growth Management Projections STATUTORY NO QUESTION D3. 5-Year Facility Plan REQUIREMENTS? ? D4. School Concurrency YES Application BA D1 D5. Educational Plant Survey MAINTAIN & D6. Student Accommodation Plan KWP1 MAINTAIN & MAINTAIN OTHER CERTIFY PLANNING DATA CERTIFY D7. Boundary Change BPS FISH DATA Recommendations P1 - Data Accuracy D2 DEVELOP, OBTAIN DISTRICT / FINANCE PUBLISH & KWP2 DEVELOP & PUBLISH STUDENT PROJECTIONS GROWTH MANAGEMENT PROJECTIONS OBTAIN P2 - Growth Management Projections Schedule Milestones D6 BA DEVELOP & KWP6 DEVELOP & PUBLISH PUBLISH STUDENT ACCOMMODATION PLAN P6 - Student Accommodation BA D3 Plan Schedule Milestones DEVELOP & PUBLISH KWP3 DEVELOP & PUBLISH 5-YEAR FACILITY PLAN P3 - 5-Year Facility Plan Schedule Milestones BA D7 BOUNDARY DEVELOP & PUBLISH CHANGES KWP7 BOUNDARY CHANGES D4 P7 - Boundary Changes Schedule Milestones KWP4 PERFORM SCHOOL CONCURRENCY ACTIVITIES PERFORM P4 - # School Concurrency Applications P5- Application Review Cycle Time BA D5 DEVELOP & PUBLISH DEVELOP & KWP5 EDUCATIONAL PLANT SURVEY PUBLISH P8 - Educational Plant Survey Schedule Milestones KWP8 MANAGE MANAGE IMPACT FEE ACTIVITIES P9 - Impact Fee Activity Schedule Milestone Legend: MANAGED BA - Board Approval Required for Submittals NEED IS MET FISH - Florida Inventory of School Houses SAP - School Accommodation Plan SCA - School Concurrency Activities EPS - Educational Plant Survey Q1 - FISH Data Accuracy Q3 - BPS Submittals On Time Q2 - State and Local Submittals On Time Q4 - Facility Design Capacity Utilization (%) FACILITIES SERVICES / Robert J. Wiebel & Mike Gaffney 2/11/09
  • 16. Key Priority MANAGE Process (2): FACILITIES DESIGN Process Owner: D. THEODORE W BPS HO BPS EDUCATIONAL BPS CONTRACT SCHOOL ARCHITECT DEPARTMENTS FACILITIES STEP BOARD & ENGINEER AND SCHOOLS SERVICES NEED PROJECT NEED DESIGN DELIVERABLES: D1. Construction Scope of Work D2. Bid Documents PERFORM KWP 1 PERFORM PROGRAM DEVELOPMENT D3. Design Criteria Package D4. Project Plans P1 - Pre-Design Schedule Milestones D5. Project Specifications D6. Approved Plans and DEVELOP KWP 2 DEVELOP BUDGET Specifications M/E/P Construction <$50,000 or Placement / Hookup of QUESTION Relocatable Units? ? NO YES DEVELOP D1 KWP 3 DEVELOP Design / Build BID DOCUMENTS D2 (D/B) Project? QUESTION ? Design / Bid / Build Project? APPROVE KWP 4 PROGRAM PROGRAM BUDGET APPROVAL BY APPROVAL BY BUDGET A&E BOARD BOARD DCP BOARD NO QUESTION APPROVAL ? REQUIRED? YES KWP 5 DEVELOP D3 DEVELOP DESIGN CRITERIA PACKAGE APPROVE KWP 4 APPROVAL BY BOARD SELECT A & E SELECT DESIGN / BUILD SELECT CONTRACTOR APPROVE GO TO FACILITIES APPROVAL BY CONSTRUCTION BOARD FLOW CHART KWP 6 DESIGN D4 DESIGN PROJECT D5 P2 - Project Design Schedule Milestones NO P3 - Cost Variance @ Design Deliverable QUESTION Milestones ? PROJECT DESIGN YES COMPLETE? KWP 7 SUPPORT D6 SUPPORT BID & PERMIT ACTIVITIES P4 - Bid & Permit Support Schedule Milestones KWP 8 SUPPORT SUPPORT CONSTRUCTION & CONSTRUCTION CLOSEOUT ACTIVITIES P5 - Construction & Construction Closeout Support Schedule Milestones NO QUESTION P6 - Cost of Errors & Omissions as % of Construction ? Costs at Schedule Milestones CONSTRUCTION & YES CLOSEOUT COMPLETE? CLOSEOUT KWP 9 CLOSEOUT A&E CONTRACT P7 - A&E Contract Closeout Schedule Milestones NO QUESTION ? A&E CONTRACT CLOSEOUT YES COMPLETE? MANAGED NEED IS MET Q1 - Cost of Errors & Omissions Q3 - % Variance from Design Budget as a % of Total Construction Cost Q2 - % Variance from Design Schedule FACILITIES SERVICES / Robert J. Wiebel & Anibal Caussade 2/11/09
  • 17. Key Priority MANAGE Process (3): FACILITIES CONSTRUCTION Process Owner: D. THEODORE W HO BPS BPS STEP SCHOOL BOARD FACILITIES SERVICES CONTRACTOR NEED PROJECT NEED CONSTRUCTED DELIVERABLES: KWP1 D1. Certificate of Occupancy (CO) D2. Projects Constructed per BPS SELECT SELECT Design Specifications, Florida CONTRACTOR Building Code, and State Requirements for Educational BOARD Facilities NO APPROVAL QUESTION REQUIRED? ? D3. Certificate of Final Inspection (CFI) KWP2 YES D4. As-Built Project Plans APPROVE APPROVE CONTRACTOR BY BOARD NO BOARD QUESTION APPROVED? ? KWP3 YES PERFORM PERFORM PRE-CONSTRUCTION ACTIVITIES Manage Project P Indicators P1 - Pre-Construction Activity Milestones P2 - Construction Critical Path Milestones PRE-CONSTRUCTION NO QUESTION REQUIREMENTS MET? ? P3 - Cumulative Use of Estimated Contingency Funds as a Percent (%) of Cumulative YES Construction Costs ISSUE ISSUE NOTICE TO P4 - Cumulative Sales Tax Savings as a PROCEED % of Construction Cost KWP4 MANAGE P5 - Monthly Construction Budget vs. Actual Construction Cost Variance MANAGE PROJECT P6 - Construction-Related School Environmental Number of Safety Incident Report (SESIR) Incidents HAS THE CONTRACTOR NO QUESTION Involving Students and School Staff MET SUBSTANTIAL COMPLETION REQUIREMENTS? ? P7 - Number of Construction Worker Safety Incidents YES KWP5 P8 - Number of Jessica Lundsford Act (JLA) Incidents PERFORM PERFORM SUBSTANTIAL COMPLETION ACTIVITIES P9 - Substantial Completion CAN A NO QUESTION Activity Milestones CERTIFICATE OF OCCUPANCY (CO) BE ISSUED? ? YES START START WARRANTY ISSUE CO D1 ISSUE KWP6 P10 - Construction Closeout Activity Milestones PERFORM CONSTRUCTION CLOSEOUT ACTIVITIES PERFORM NO CONSTRUCTION CLOSEOUT COMPLETE? ? QUESTION D2 YES PROJECT NO QUESTION VALUE <$200K? ? OBTAIN D3 YES CFI OBTAIN KWP7 P11 - Administrative Closeout Activity Milestones PERFORM ADMINISTRATIVE CLOSEOUT ACTIVITIES PERFORM P12 - Number Warranty Requests NO ADMINISTRATIVE CLOSEOUT COMPLETE? ? QUESTION YES D4 MANAGED NEED IS MET Q1 - Actual Sales Tax Savings / Q4 - Construction-Related SESIR Incidents Possible Sales Tax Savings (%) Q5 - Construction Safety JLA Security Incidents Q2 - Construction Critical Path Milestones Q6 - Warranty Actions (% Variance from Construction Schedule) Q3 - Construction Budget vs. Actual Construction Costs (% Variance) FACILITIES SERVICES / Robert J. Wiebel & Dennis Bonny 2/11/09
  • 18. MANAGE FACILITIES Key Priority OPERATIONS AND Process (4): MAINTENANCE( 9562) Process Owner: WALT PETTERS W BPS BPS HO FACILITIES OPERATIONS SCHOOLS AND SCHOOL AND MAINTENANCE STEP BOARD DEPARTMENTS PROVIDE WELL MAINTAINED, SAFE AND COMFORTABLE FACILITIES NEED NEED TO SUPPORT THE BPS EDUCATIONAL PROCESS. Note: OPEN This chart represents a typical daily operation process. The OPEN FACILITY school principal operates the facility in conjunction with PO&M. OPERATE OPERATE FACILITY KWP1 P1 - Operational Systems MONITOR Monitoring Hours MONITOR FACILITY of Operation OPERATIONAL SYSTEMS DELIVERABLES: D1- MONTHLY WORK QUESTION ORDER REPORT NO IS THE FACILITY D2 - ANNUAL FACILITY OPERATING AS PLANNED? ? CONDITION ASSESSMENT YES REPORT QUESTION PREVENTATIVE MAINTENANCE (PM) NO WORK NEEDED? ? QUESTION CAN PROBLEM BE FIXED YES BY FACILITY’S CUSTODIAL STAFF? NO ? KWP2 PERFORM YES P2 - PM Work Per Month PERFORM FIX PM WORK PROBLEM FIX QUESTION PROBLEM NO FIXED? ? QUESTION YES P3 - School-Generated W/O Per Month P4 - Service W/O Per Month KWP3 P5 - PO&M-Generated W/O Per Month P6 - # W/O Opened / Closed Per Month PROCESS WORK ORDER(S) PROCESS P7 - # Backlogged W/O Per Month P8 - Aging W/O Per Month P9 - Operations Cost Per Month P10 - Maintenance Cost Per Month WORK ORDER QUESTION NO CLOSED? ? YES END OF NORMAL NO QUESTION FACILITY OPERATION? ? YES END OF EXTENDED NO FACILITY OPERATION? QUESTION ? YES CLOSE FACILITY CLOSE NEED IS MANAGED MET Q1 - Operations Cost Per GSF Q6 - PM / Service W/O Ratio Q2 - Maintenance Cost Per GSF Q7 - PO&M / Facility-Generated W/O Ratio Q3 - Total (Operations + Maintenance) Cost Per GSF Q8 - PM Work Order Backlog Per Year Q4 - PM and W/O Activity Per Year Q5 - W/O Backlog Per Year FACILITIES SERVICES / Robert J. Wiebel & Walt Petters 2/11/09
  • 19. MANAGE ENVIRONMENTAL, Key Priority SAFETY & CODE Process (5): COMPLIANCE Process Owner: J. POWERS W BPS HO BPS SCHOOL ENVIRONMENTAL & BPS STEP BOARD CODE COMPLIANCE PO&M OTHER NEED MANAGE ENVIRONMENTAL & CODE COMPLIANCE KWP1 PREPARE P1 - # POLICIES, PROCEDURES, PLANS, TRAINING UPDATE PREPARE ENV/ SAFETY COURSES, CHECKLISTS, MANUALS, SURVEYS, & CODE COMPLIANCE DOCUMENTS HANDBOOKS AND PAMPHLETS DEVELOPED, REVIEWED & UPDATED QUESTION Regulatory Compliance NO P2 # OF COMPREHENSIVE FIRE Activity? ? SAFETY CASUALTY SANITATION YES INSPECTIONS PERFORMED KWP2 P3 SERVICE RESPONSE TIME TO INSPECT COMPLETE BUILDING FIELD INSPECTIONS. INSPECT FACILITIES & INFRASTRUCTURE P4 - TIME TO ISSUED TEMP CO (OEF 110B) P5 - TIME TO COMPLETE FINAL ISSUE INSPECTIONS. ISSUE INSPECTION REPORTS P6 - TIME TO ISSUE CERTIFICATE OF FINAL INSPECTION (OEF 209) QUESTION P7 - # ENVIRONMENTAL INSPECTIONS PERFORMED Facilities in NO Compliance? ? KWP3 MONITOR YES MONITOR & P8 # OF CUSTODIANS TRAINED COMMUNICATE REGULATORY / CODE P9 # OF FACILITY CUSTODIAL ANNUAL & NON-COMPLIANCE BI-ANNUAL ASSESSMENTS CONDUCTED KWP4 P10 # OF CLEAN CAMPUS REPORTS P16 # Meetings Held RECEIVED PERFORM PERFORM P17 #work Orders Issued P11 CLEAN CAMPUS REPORT RECEIVED, CUSTODIAL REVIEWED, AND ACTIONS TAKEN P18 # Reinspections Completed SUPPORT P19 Capital Deficiency Report Schedule Milestones KWP5 P20 Comprehensive Environmental, Safety Casulty And Code Compliance Report Report Schedule Milestones P12 # Of Unplanned Incidents Responses MONITOR & MONITOR COMMUNICATE P13 Unplanned Incident REGULATORY / CODE Response Time COMPLIANCE P14 # Of Training Classes Conducted P15 # Unplanned Life Safety Evaluations Requested Deliverables: D1 - School Inspection Findings Report D2 - Annual Comprehensive Fire, Safety, Casualty, & Sanitation Report MANAGED NEED IS D3 - Annual Custodial Assessment Report MET D4 - Annual Building & Code Compliance Activity Report Q1 - ALL SCHOOLS CUSTODIAL ASSESSMENT Q3 - REGULATORY AND CODE COMPLIANCE INSPECTION RATING OF 90% MILESTONES Q2 - 75% SCHOOL CUSTODIANS CERTIFIED Q4 - REGULATORY AND CODE COMPLIANCE ANNUAL LEVEL 1 & 50% SCHOOL CUSTODIANS REPORTS MILESTONES CERTIFIED LEVEL 2 FACILITIES SERVICES: ROBERT J. WIEBEL / JIM POWERS 2/11/09
  • 20. MANAGE DISTRICT Key Priority RESOURCE CONSERVATION Process (6): Process Owner: A. JOHNSON W HO BPS SCHOOL FACILITIES RESOURCE STEP BOARD CONSERVATION SCHOOL NEED MANAGE DISTRICT & SCHOOL Identify district wide resource conservation RESOURCE CONSERVATION initiatives to reduce facility operation costs related to electrical, water, and gas usage, trash disposal and facility KWP = Key Work Process efficiencies. P1 - # POLICIES, PROCEDURES, PLANS, TRAINING PREPARE PREPARE RESOURCE COURSES, CHECKLISTS, MANUALS, SURVEYS, KWP1 CONSERVATION DOCUMENTS HANDBOOKS AND PAMPHLETS DEVELOPED, REVIEWED & UPDATED P2 - # OF UTILITY CONSUMPTION REPORTS / BILLS COLLECTED IDENTIFICATION OF FACILITY P3 - # OF MONTHLY FACILITY INSPECTIONS AND QUARTERLY & BEHAVIORAL MODIFICATION IDENTIFY KWP2 IMPROVEMENTS & AUDITS PERFORMED RECOMMEND P4 - # OF MONTHLY INSPECTION REPORTS AND RECOMMENDATIONS QUARTERLY AUDIT REPORTS PUBLISHED P5 - # OF MONTHLY CONSUMPTION DATA ANALYSIS PERFORMED P6 - # OF MONTHLY FACILITY INSPECTION AND QUARTERLY AUDIT DATA ANALYSIS PERFORMED P7 - # FACILITY RECOMMENDATIONS ISSUED P8 -# OF BEHAVIORAL MODIFICATION IMPROVEMENTS QUESTION ISSUED IS THE RECOMMENDATION NO A FACILITY IMPROVEMENT? ? YES KWP3 PERFORM BEHAVIORAL PERFORM MODIFICATION TRAINING P9 - # OF SCHOOL RECEIVING A BEHAVIORAL MODIFICATION IS THE FACILITY NO RATING SCORE EQUAL TO OR GREATER THAN 90% QUESTION RECOMMENDATION COMPLEX? ? YES KWP4 IMPLEMENT NON-COMPLEX IMPLEMENT FACILITY IMPROVEMENT KWP5 P10 - # NON-COMPLEX FACILITY IMPROVEMENTS COMPLETED. Note: CBC Includes 5-Year Pay Back CREATE COST CREATE Analysis BENEFIT P11 - # OF COST BENEFIT ANALYSIS COMPLETED ANALYSIS P12 - # COMPLEX FACILITY PROJECTS ADDED IS FUNDING NO TO DEFERRED MAINTENANCE LIST QUESTION AVAILABLE? ? P13 - # OF COMPLEX FACILITY DEFERRED MAINTENANCE PROJECTS THAT WERE COMPLETED YES ADD ADD TO UNFUNDED RC PROJECT LIST CAPITAL NO QUESTION PROJECT? ? YES P14 - # COMPLEX FACILITY PROJECTS ADD ADD TO CAPITAL ADDED TO THE CAPITAL PROJECT LIST P15 - # OF COMPLEX FACILITY PROJECTS PROJECT LIST THAT WERE COMPLETED. SUBMIT SUBMIT KWP6 WORK ORDER P17 - # FACILITY IMPROVEMENT AND P16 - # OF WORK ORDERS MONITOR & ANALYZE MONITOR BEHAVIOR MODIFICATION TRAINING FAC IMP PROJECTS SUBMITTED ANALYZE ANALYSIS AFTER ACTION & BM TRAINING REPORTS PUBLISHED. RESULTS NEED IS MANAGED MET Deliverables: D1 - MONTHLY FACILITY AUDIT & INSPECTION REPORTS D2 - COST BENEFIT ANALYSIS REPORTS D3 - MONTHLY FACILITY AND BEHAVIORAL MODIFICATION IMPROVEMENT RECOMMENDATIONS LIST D4 - MONTHLY SENIOR STAFF RESOURCE CONSERVATION BOX SCORE D5 - MONTHLY DISTRICT AND SCHOOL RESOURCE CONSERVATION BOX SCORE Q1 - REDUCE ELECTRICAL USAGE 10% BY END OF FY 08/09 Q4 - REDUCE THE VOLUME OF TRASH HAULED 10% BY END OF FY 09/10 Q2 - REDUCE WATER USAGE BY 10% BY END OF FY 09/10 Q3 - REDUCE GAS / HEATING OIL USAGE BY 10% BY END OF FY 09/10 FACILITIES SERVICES: ROBERT J. WIEBEL / ART JOHNSON 2/11/09
  • 21. Macro MANAGE DISTRICT & Process: SCHOOL SECURITY Process Owner: A. ALFORD W HO BPS SCHOOL DISTRICT & SCHOOL STEP BOARD SECURITY SCHOOL OTHER MANAGE DISTRICT NEED & SCHOOL SECURITY DEVELOP KWP 1 DEVELOP DISTRICT AND SCHOOL SECURITY DOCUMENTATION P1 - # POLICIES, PROCEDURES, PLANS, TRAINING COURSES, CHECKLISTS, MANUALS, SURVEYS, HANDBOOKS AND PAMPHLETS DEVELOPED, REVIEWED & UPDATED PERFORM KWP 2 PERFORM SECURITY INVESTIGATIONS P2 - # INVESTIGATIONS PERFORMED PER DISTRICT & SCHOOL SITE P3 - # EXPULSIONS PER MONTH MANAGE KWP 3 MANAGE SECURITY EQUIPMENT P4 - # EQUIPMENT REQUIREMENTS DEVELOPED, REVIEWED & UPDATED P5 - EQUIPMENT REQUIREMENTS MET (% OF FACILITIES) CONDUCT CONDUCT TRAINING KWP 4 P6 - # TRAINING COURSES CONDUCTED P7 - # TRAINED PERSONNEL PER COURSE MONITOR & COORDINATE KWP 5 MONITOR & COORDINATE DISTRICT &SCHOOL SITE SECURITY P8 - SCHOOLS WITH SRO (%) P9 - # SECURITY ASSESSMENTS REQUESTED CONDUCT KWP 6 CONDUCT BACKGROUND SCREENING P10 - # BACKGROUND CHECKS COMPLETED P11 - # ID BADGES ISSUED P12 - LEVEL II BACKGROUND CHECK CYCLE TIME (Planned vs. Actual) BROADCAST KWP 7 BROADCAST INCIDENT CODES P13 - # CODES BROADCAST INTERFACE KWP 8 INTERFACE WITH LAW ENFORCEMENT AGENCIES P14 - # MEETINGS HELD MONITOR KWP 9 MONITOR SESIR REPORTS P15 - # OF Criminal SESIR REPORTS RECEIVED IN WRITING PERFORM KWP 10 PERFORM 5 STAR SECURITY SELF-ASSESSMENT P16 - SECURITY BEST PRACTICES (OPPOGA) SELF-ASSESSMENT MILESTONES (Milestones Planned vs. Actual Accomplished) P17 - # 5 STAR SELF- ASSESSMENT FINDINGS MANAGED NEED IS MET Legend: KWP - Key Work Process OPPAGA - Office of Program Policy Analysis and Government Accountability SCIRM - School Critical Incident Response Manual SESIR - School Environmental Safety Incident Report Safety & Security Deliverables: D1 - School Safety Plan D2 - School Safety Reports D3 - School Critical Incident Response Manual D4 - Employee, Volunteer, and Contractor Level II Background Checks D5 - Employee, Volunteer, and Contractor ID Badges Q1 - COMPLIANCE WITH FEDERAL, STATE, Q4 - IMPROVE SCHOOL - COMMUNITY RELATIONS ON SCHOOL LOCAL AND SCHOOL BOARD REQUIREMENTS SECURITY (# SITE OR COMMUNITY VISITS CONDUCTED / # SITE OR COMMUNITY VISITS PLANNED) Q2 - PREVENT SCHOOL VIOLENCE ( SESIR INCIDENT RATIO - # CRIMINAL INCIDENTS / STUDENT POPULATION) Q3 - REDUCE SECURITY RISKS AND LIABILITY (# PLANNED SECURITY TRAINING SESSSIONS / # ACTUAL SECUIRYT TRAINING SESSIONS) FACILITIES SERVICES: ROBERT J. WIEBEL / ANDREA ALFORD 11/13/08