SlideShare una empresa de Scribd logo
1 de 16
Solution Providing Methodology
              By
          Ganesh. S



  REDUCTION IN COST/
       CYCLE TIME
    COMPLEMENTED BY
QUALITY/SERVICE LEVEL
   IMPROVEMENTS
Solution Providing Methodology
By Ganesh. S


    Translating the same in terms of
     Your Benefits…
     ENERGY SAVINGS REALISED
     PLANT PRODUCTION / CAPACITY
     ENHANCEMENT
     REDUCED MAINTENANCE COST
     BETTER UTILIZATION OF PLANT &
     MACHINERY
     AND MUCH MORE…
Solution Providing Methodology
By Ganesh. S




                             OUR
               METHODOLOGY
                     &
                 APPROACH
Solution Providing Methodology
By Ganesh. S



                   PRE INCEPTION
        VISIT BY OUR SPECIALIST
        CONCEPTUAL UNDERSTANDING
        UNDERSTAND CRITICAL VARIABLES
        CONSTRAINTS/LIMITATIONS.
        SCOPE DETERMINATION
        DISCUSSION ON TECHNICAL DETAILING
        & VOLUME OF WORK.
        STRATEGISE THE METHODOLOGY
Solution Providing Methodology
By Ganesh. S


                       INCEPTION
        PROBLEM IDENTIFICATION
        SOLUTIONS SUGGESTED
        PROPOSAL BRIEFED
        SCOPE BOUNDARIES, LIMITATIONS
        DEFINED.
        VARIABLES, CONSTRAINTS
        ELABORATED.
        ASSUMPTIONS AGREED
        TECHNICAL & COMMERCIAL PROPOSAL
        OF WORK QUOTED.
Solution Providing Methodology
By Ganesh. S



               PRE ELABORATION
        TECHNICAL DISCUSSIONS ON INCEPTION
        MATTERS
        SOLUTIONS PROPOSED & SUGGESTED
        PROPOSAL OUTPUT BRIEFED
        SCOPE & BOUNDARIES ARE DEFINED
        AND AGREED
        CONSTRAINTS / LIMITATIONS MUTUALLY
        AGREED
Solution Providing Methodology
By Ganesh. S




          AWARD OF CONTRACT
                    &
           INITIATION OF WORK
Solution Providing Methodology
By Ganesh. S


                    ELABORATION
       DETAILED STUDY AT WORKS / SITE, BY
       CONCERNED EXPERTS
       IDENTIFYING THE KEY SUCCESS FACTORS.
       PROTO-TYPING / MODELING DONE TO ENSURE
       SUCCESS LEVEL & BUILD CONFIDENCE
       SPECIALIST / EXPERT STUDY
       VARIABLES,CONSTRAINTS/LIMITATIONS
       ACCOUNTED
       CONSTRUCTION OF IMPLEMENTATION
       STRATEGY
       DRAFT REPORT MADE AT SITE / WORKS &
       ELABORATED
       PRESENTATION OF STUDY
Solution Providing Methodology
By Ganesh. S



    ELABORATION STUDY LOOKS INTO THE
    FACTORS LIKE……

    ADEQUECY OF EQUIPMENTS       May REQUIRE
    W.R.T TO ITS FUNTION /       TECHNOLOGICAL
    SIZE / EFFICIENCY            IMPROVEMENT -

    INSUFFICIENT SIZING          REQUIRE
    W.R.T TO MEET ITS            IMPROVEMENT
    FUNTIONAL REQUIREMENT
Solution Providing Methodology
By Ganesh. S


         ELABORATION STUDY LOOKS INTO
         THE FACTORS LIKE……

   HARMFUL / UNDESIRED               REQUIRED
  ITEMS / COMPONANTS /               ELEMINATIONS
   FUNCTIONS                     (DE-BOTTLENECKING)
  ABSENCE OF APPROPRIATE            DESIRED
  EQUIPMENT                         INTODUCTION
  UNKNOWN/UNDESIRED                 REQUIRED
  FUNCTIONS                         REVEALING CAUSE

    ANALYSING FUNCTIONAL EFFECTIVENESS AND ARRIVING
         COST EFFECTIVENESS W.R.T. YOUR PLANT &
            ELEVATING ITS PRESENT LEVEL TO
                FUTURE ENHANCED STATUS
Solution Providing Methodology
By Ganesh. S

               STUDY SHALL COVER
         OBJECTIVES OF THE CUSTOMER
         FOCAL POINTS FIXED
         DATA SHALL BE COLLECTED
         CRITICAL OBSERVATION AND FINDINGS
        ARE HIGHLIGHTED
         PROPOSALS DETAILING
        * DESCRIPTION
        * APPROX. COST
        * TIME FOR IMPLEMENTATION
        IMPLEMENTATION STRATEGY & SEQUENCE
        WITH JUSTIFICATIONS & REASONS
        PAY BACK - ENERGY SAVED, MONEY SAVED,
        RETURN ON INVESTMENT
Solution Providing Methodology
By Ganesh. S

                   CONSTRUCTION
    MUTUALLY AGREED FINAL PROPOSAL
    BASED ON INVESTMENT CRITERIA
    RELEASED WITH DETAIL DRAWINGS,
    ALTERNATIVE SOLUTION (IF ANY)
    FINANCIAL/TECH. IMPLICATIONS
    SIMPLE PAY BACK INDICATED
    IMPLEMENTATION TIME FRAME
    IMPLEMENTATION STRATEGY
    TECHNO-ECONOMICAL VIABILITY
Solution Providing Methodology
By Ganesh. S


                      TRANSITION
         IMPLEMENTATION WORK STARTS

         SERVICES/TECH. SUPPORT EXTENDED

         QCP/QAP FOLLOWED

        MONITOR WORK PROGRESS AS PER
        AGREED PLAN
Solution Providing Methodology
By Ganesh. S


               PRE IMPLEMENTATION
        IMPLEMENTATION
        PLAN/STRATEGY & TIME ARRIVED


        TOOLS, MANPOWER FACILITIES
        ETC., PLANNED.
Solution Providing Methodology
By Ganesh. S



      MEETING STATED OBJECTIVES

         IMPLEMENTATION & COMMISSIONING

         POST FOLLOW UP AND SUPPORT

        CONTINUOUS MONITORING &
        SOLUTION BENEFIT REALISED.
Solution Providing Methodology
By Ganesh. S


                    CONCLUSION
      VARIOUS ASPECTS SUCH AS PLANT
      AVAILABILITY, SPARES INVENTORY,
      MAINTENANCE COST, PRODUCTION LOSS
      ETC., LEAD TO DIFFERENT STRATEGIES ARE
      CONSIDERED IN DEPTH…

      IT IS RECOMMENDED THAT THE
      MACRO PICTURE IS LOOKED AT IN
      TOTALITY AND IMPLEMENTATION DONE AT A
      MICRO LEVEL IN PHASED MANNER…

Más contenido relacionado

Similar a Solution methodology

Value addition value engineering presentation
Value addition value engineering presentationValue addition value engineering presentation
Value addition value engineering presentation
vedveersingh4
 

Similar a Solution methodology (20)

Cost Benefit AnalysisPDF
Cost Benefit AnalysisPDFCost Benefit AnalysisPDF
Cost Benefit AnalysisPDF
 
Final Presentation of Team E phase 1
Final Presentation of Team E phase 1Final Presentation of Team E phase 1
Final Presentation of Team E phase 1
 
Capacity enhancement cycle time_reduction
Capacity enhancement cycle time_reductionCapacity enhancement cycle time_reduction
Capacity enhancement cycle time_reduction
 
Detailed project report
Detailed project reportDetailed project report
Detailed project report
 
Materi metper introduction
Materi metper introductionMateri metper introduction
Materi metper introduction
 
Value Engineering.ppt
Value Engineering.pptValue Engineering.ppt
Value Engineering.ppt
 
Value addition value engineering presentation
Value addition value engineering presentationValue addition value engineering presentation
Value addition value engineering presentation
 
Value _Engineering_ by_ tejas _rajput___
Value _Engineering_ by_ tejas _rajput___Value _Engineering_ by_ tejas _rajput___
Value _Engineering_ by_ tejas _rajput___
 
Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
 
Architecture presentation 9
Architecture presentation 9Architecture presentation 9
Architecture presentation 9
 
Project Proposal for Development Training
Project Proposal for Development TrainingProject Proposal for Development Training
Project Proposal for Development Training
 
Ppx
PpxPpx
Ppx
 
Project organisation and erp implementation method
Project organisation and erp implementation methodProject organisation and erp implementation method
Project organisation and erp implementation method
 
PetroSync - Successful Project Cost Estimation & Control
PetroSync - Successful Project Cost Estimation & ControlPetroSync - Successful Project Cost Estimation & Control
PetroSync - Successful Project Cost Estimation & Control
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and Workover
 
CV-mfa-sept 16
CV-mfa-sept 16CV-mfa-sept 16
CV-mfa-sept 16
 
CV - Kelum Hemka Siriwardhena
CV - Kelum Hemka SiriwardhenaCV - Kelum Hemka Siriwardhena
CV - Kelum Hemka Siriwardhena
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
 

Solution methodology

  • 1. Solution Providing Methodology By Ganesh. S REDUCTION IN COST/ CYCLE TIME COMPLEMENTED BY QUALITY/SERVICE LEVEL IMPROVEMENTS
  • 2. Solution Providing Methodology By Ganesh. S Translating the same in terms of Your Benefits… ENERGY SAVINGS REALISED PLANT PRODUCTION / CAPACITY ENHANCEMENT REDUCED MAINTENANCE COST BETTER UTILIZATION OF PLANT & MACHINERY AND MUCH MORE…
  • 3. Solution Providing Methodology By Ganesh. S OUR METHODOLOGY & APPROACH
  • 4. Solution Providing Methodology By Ganesh. S PRE INCEPTION VISIT BY OUR SPECIALIST CONCEPTUAL UNDERSTANDING UNDERSTAND CRITICAL VARIABLES CONSTRAINTS/LIMITATIONS. SCOPE DETERMINATION DISCUSSION ON TECHNICAL DETAILING & VOLUME OF WORK. STRATEGISE THE METHODOLOGY
  • 5. Solution Providing Methodology By Ganesh. S INCEPTION PROBLEM IDENTIFICATION SOLUTIONS SUGGESTED PROPOSAL BRIEFED SCOPE BOUNDARIES, LIMITATIONS DEFINED. VARIABLES, CONSTRAINTS ELABORATED. ASSUMPTIONS AGREED TECHNICAL & COMMERCIAL PROPOSAL OF WORK QUOTED.
  • 6. Solution Providing Methodology By Ganesh. S PRE ELABORATION TECHNICAL DISCUSSIONS ON INCEPTION MATTERS SOLUTIONS PROPOSED & SUGGESTED PROPOSAL OUTPUT BRIEFED SCOPE & BOUNDARIES ARE DEFINED AND AGREED CONSTRAINTS / LIMITATIONS MUTUALLY AGREED
  • 7. Solution Providing Methodology By Ganesh. S AWARD OF CONTRACT & INITIATION OF WORK
  • 8. Solution Providing Methodology By Ganesh. S ELABORATION DETAILED STUDY AT WORKS / SITE, BY CONCERNED EXPERTS IDENTIFYING THE KEY SUCCESS FACTORS. PROTO-TYPING / MODELING DONE TO ENSURE SUCCESS LEVEL & BUILD CONFIDENCE SPECIALIST / EXPERT STUDY VARIABLES,CONSTRAINTS/LIMITATIONS ACCOUNTED CONSTRUCTION OF IMPLEMENTATION STRATEGY DRAFT REPORT MADE AT SITE / WORKS & ELABORATED PRESENTATION OF STUDY
  • 9. Solution Providing Methodology By Ganesh. S ELABORATION STUDY LOOKS INTO THE FACTORS LIKE…… ADEQUECY OF EQUIPMENTS May REQUIRE W.R.T TO ITS FUNTION / TECHNOLOGICAL SIZE / EFFICIENCY IMPROVEMENT - INSUFFICIENT SIZING REQUIRE W.R.T TO MEET ITS IMPROVEMENT FUNTIONAL REQUIREMENT
  • 10. Solution Providing Methodology By Ganesh. S ELABORATION STUDY LOOKS INTO THE FACTORS LIKE…… HARMFUL / UNDESIRED REQUIRED ITEMS / COMPONANTS / ELEMINATIONS FUNCTIONS (DE-BOTTLENECKING) ABSENCE OF APPROPRIATE DESIRED EQUIPMENT INTODUCTION UNKNOWN/UNDESIRED REQUIRED FUNCTIONS REVEALING CAUSE ANALYSING FUNCTIONAL EFFECTIVENESS AND ARRIVING COST EFFECTIVENESS W.R.T. YOUR PLANT & ELEVATING ITS PRESENT LEVEL TO FUTURE ENHANCED STATUS
  • 11. Solution Providing Methodology By Ganesh. S STUDY SHALL COVER OBJECTIVES OF THE CUSTOMER FOCAL POINTS FIXED DATA SHALL BE COLLECTED CRITICAL OBSERVATION AND FINDINGS ARE HIGHLIGHTED PROPOSALS DETAILING * DESCRIPTION * APPROX. COST * TIME FOR IMPLEMENTATION IMPLEMENTATION STRATEGY & SEQUENCE WITH JUSTIFICATIONS & REASONS PAY BACK - ENERGY SAVED, MONEY SAVED, RETURN ON INVESTMENT
  • 12. Solution Providing Methodology By Ganesh. S CONSTRUCTION MUTUALLY AGREED FINAL PROPOSAL BASED ON INVESTMENT CRITERIA RELEASED WITH DETAIL DRAWINGS, ALTERNATIVE SOLUTION (IF ANY) FINANCIAL/TECH. IMPLICATIONS SIMPLE PAY BACK INDICATED IMPLEMENTATION TIME FRAME IMPLEMENTATION STRATEGY TECHNO-ECONOMICAL VIABILITY
  • 13. Solution Providing Methodology By Ganesh. S TRANSITION IMPLEMENTATION WORK STARTS SERVICES/TECH. SUPPORT EXTENDED QCP/QAP FOLLOWED MONITOR WORK PROGRESS AS PER AGREED PLAN
  • 14. Solution Providing Methodology By Ganesh. S PRE IMPLEMENTATION IMPLEMENTATION PLAN/STRATEGY & TIME ARRIVED TOOLS, MANPOWER FACILITIES ETC., PLANNED.
  • 15. Solution Providing Methodology By Ganesh. S MEETING STATED OBJECTIVES IMPLEMENTATION & COMMISSIONING POST FOLLOW UP AND SUPPORT CONTINUOUS MONITORING & SOLUTION BENEFIT REALISED.
  • 16. Solution Providing Methodology By Ganesh. S CONCLUSION VARIOUS ASPECTS SUCH AS PLANT AVAILABILITY, SPARES INVENTORY, MAINTENANCE COST, PRODUCTION LOSS ETC., LEAD TO DIFFERENT STRATEGIES ARE CONSIDERED IN DEPTH… IT IS RECOMMENDED THAT THE MACRO PICTURE IS LOOKED AT IN TOTALITY AND IMPLEMENTATION DONE AT A MICRO LEVEL IN PHASED MANNER…