Strategic Capacity
Planning for Products
and Services
Gerlyn Bonus
Agnes Regala
Roselyn Pudao
Mary Grace Ibanez
Matex Carillo
BSBA. Management
Prof. Joey Acuῆa
Capacity
 Capacity is the upper limit or ceiling on the
load that an operating unit can handle.
 Capacity also includes:
Equipment
Space
Employee skill
• The basic questions in capacity handling are:
– What kind of capacity is needed?
– How much is needed?
– When is it needed?
Design capacity
 maximum output rate or service capacity an
operation, process, or facility is designed for.
Effective capacity
 Design capacity minus allowances such as
personal time, maintenance, and scrap.
Actual output
 rate of output actually achieved--cannot
exceed effective capacity.
Efficiency and Utilization
Design capacity = 50 trucks/day
Effective capacity = 40 trucks/day
Actual output = 36 units/day
Actual output = 36 units/day
Efficiency = = 90%
Effective capacity 40 units/ day
Utilization = Actual output = 36 units/day
= 72%
Design capacity 50 units/day
Determinants of Effective Capacity
FACILITIES
 The design of facilities, including size and provision
for expansion, is key.
 Locational factors, such as transportation costs,
distance to market, labor supply, energy sources and
room for expansion are also important.
 Likewise, layout of the work area and environmental
factors also play a significant role.
PRODUCT AND SERVICE FACTORS
 Product and service design can have a tremendous
influence on capacity.
 The more uniform the output, the more
opportunities there are for standardization of
methods and materials.
PROCESS FACTORS
 The quantity capability of a process is an obvious
determinant of capacity but subtle determinant is
the influence of output quality.
 Process improvement that increase quality and
productivity can result in increased capacity.
HUMAN FACTORS
 The tasks that make up a job, the variety of activities
involved, also the training, skill and experience
required to perform a job all have an impact on the
potential and actual output.
 Employee motivation has a very basic relationship to
capacity , as do absenteeism.
POLICY FACTORS
 Management policy can affect capacity by allowing
or not allowing capacity options such as overtime or
second or third shifts.
OPERATIONAL FACTORS
 Inventory stocking decisions, late deliveries,
purchasing requirements, acceptability of purchased
materials, quality inspection and control procedures
also have an impact on effective capacity.
SUPPLY CHAIN FACTORS
 It must be taken into account in capacity planning if
substantial capacity changes are involved.
EXTERNAL FACTORS
 Product standards , especially minimum quality and
performance standards, can restrict management’s
options for increasing capacity.
Strategy Formulation
• An organization typically its base its capacity
strategy on assumption and predictions about
long term demand patterns, technological
changes , and the behavior of its competitors.
Key decisions of capacity planning
• The amount of capacity needed
• The timing of changes
• The need to maintain balance throughout the system
• The extent of flexibility of facilities and the
workforce.
• Deciding on the amount capacity
involves consideration of expected
demand and capacity cost.
• Capacity cushion which is an amount
capacity in excess of expected demand
when there is some uncertainty about
demand.
 the greater the degree of demand uncertainty , the greater
the amount cushion used.
Steps in the Capacity Planning Process
• Estimate future capacity requirement
• Evaluate existing capacity and facilities and identify
gaps.
• Identify alternative for meeting requirements
• Conduct financial analyses of each alternative
• Assess key qualitative issues for each alternative
• Select the alternative to pursue that will be bests in
long term
• Implement the selected alternative
• Monitor results
Forecasting Capacity Requirements
• Long-term vs. Short-term capacity needs
• Long-term relates to overall level of capacity such as
facility size, trends, and cycles.
• Short-term relates to variations from seasonal,
random, and irregular fluctuations in demand
Calculating Processing Requirements
• A department works one 8-hour shift, 250
days a year , and has these figures for usage of
a machine that is currently being considered:
Working one 8 hour shift 250 days a year provides an
annual capacity of 8×250=2000 hours per year.
5800 hours/2000 hours/machine=2.90 Machines
Product Annual
demand
Standard
Processing
time per unit
Processing
time needed
1 400 5 2000
2 300 8 2400
3 700 2 1400
5800
The Challenge of Planning Service
Capacity
Three Important Factors in planning service capacity
The need to be near customers
• Convenience for customers is often an
important aspects of services. Generally, a
service must be located near customer.
The inability to store service
• Speed of the delivery, or customers waiting time
become a major concern in a service capacity
planning .
The degree of volatility
• Demand volatility presents problem for capacity
planners. Demand volatility tend to be higher for
services than goods, not only in timing of demand,
But also in amount of time required to the service
individual customers.
Make Or Buy
• Once capacity requirements have been determined ,
the organization must decide whether to produce a
good or provide a service itself. or outsource (buy)
from another organization.
Factors:
Available Capacity
• If an organization has available the equipment,
necessary skills, and time, if often makes sense to
produce an item of perform a service in-house, The
additional cost would be relatively small compared
with those required to buy items or subcontract
services.
Expertise
• If a firm lacks the expertise to do the job satisfactory
buying might be reasonable alternative.
Quality Considerations
• Firm that specialize can usually offer higher quality
than an organization can attain itself. Conversely
unique quality requirements or the desire to closely
monitor quality may cause an organization to
perform a job itself.
The nature of Demand
• When demand for an items is high and steady, the
organization is often better off doing the work itself.
Cost
• Any cost savings achieved from buying of making
must weighed against the preceding factors. Cost
savings might come from the item itself or from
transportation cost savings. If there are fixed cost
associated with making an item that cannot be
reallocated if the service or product outsourced, that
has to recognized in the analysis.
Risk
• Outsourcing may involved certain risks. One is loss of
control over operations. Another is the need to
disclosed proprietary information.
Developing Capacity Alternatives
Design Flexibility into system.
o Provisions for Future Expansion in the original
design.
Take Stage of life cycle into account
o Capacity requirements are often closely linked to the
stage of the life cycle that a product or service is in.
Take a “Big Picture” approach to capacity
changes
o When developing capacity alternatives, it is important
to consider how parts of the system interrelate.
o Bottleneck Operation
Bottleneck
Operation
Machine #1
Machine #3
Machine #4
10/hr
10/hr
10/hr
10/hr
30/hr
Machine #2
Prepare to deal with capacity “chunks.”
o no machine comes in continuous capacities.
Attempt to smooth out capacity requirements.
o Unevenness in capacity requirements also can create
certain problems.
Identify the optimal operating level.
o Production units typically have an ideal or optimal
level of operation in terms of unit cost of output.
Economies of Scale
o If the output rate is less than the optimal level,
increasing the output rate results in decreasing
average unit costs.
Diseconomies of scale
o If the output rate is more than the optimal level,
increasing the output rate results in increasing
average unit costs.
Choose a strategy if expansion is involved.
o Consider whether incremental expansion or single
step is more appropriate.
Cost-Volume Analysis
o Focuses on relationships between cost, revenue and
volume of output.
FC= Fixed Cost
VC= Total variable cost
v= variable cost per unit
TC= Total Cost
TR= Total revenue
R= Revenue per unit
Q= Quantity or Volume of output
QBEP= Break even quantity P=Profit
• Fixed Costs (FC)
– tend to remain constant regardless of output
volume
• Variable Costs (VC)
– vary directly with volume of output
– VC = Quantity(Q) x variable cost per unit (v)
• Total Cost
– TC = Q x v
• Total Revenue (TR)
– TR = revenue per unit (R) x Q
Profit (P) = TR – TC = R x Q – (FC +v x Q)
= Q(R – v) – FC
Q=P+FC/R-v ; QBEP=FC/R-V
Examples:
• The owner of Old-Fashioned Berry Pies, Simon Chen, is
contemplating adding a new line of pies, which will
require leasing new equipment for a monthly payment
of $6000. Variable costs would be $ 2.00 per pie, and
pies would retail for $7.00.
a) How many pies must be sold in order to break-even?
b) What would the profit be if 1000 pies are made and
sold in a month?
c) How many pies must be sold to realize a profit of
$4000?
d) If 2000 can be sold, and a profit target is $5000,
what price should be charged per pie?
Solution:
FC=$6000 VC=$2 per pie REV=$7 per pie
a) QBEP= FC/R-V =$6000/$7-$2 =1200 pies/month
b)For Q=1000; P=Q(R-V)-FC =1000($7-$2)-$6000= $1000
c) P=$4000; SOLVE for Q using Q=P+FC/R-V
Q=$4000+$6000/$7-$2 = 2000 pies
d) Profit=Q(R-V)-FC
$5000=$2000(R-$2)-$6000
R=$7.50
• A manager has the option of purchasing one, two, or
three machines. Fixed costs and potential volumes
are as follows:
VC is $10 per unit and R is $40 per unit.
a) Determine the break-even point for each range.
b) If projected annual demand is between 580 and 660
units, how many machines should the manager
purchase?
Number of
Machines
Total annual
Fixed Costs
Corresponding
range of output
1 $9 600 0-300
2 15000 301-600
3 20000 601-900
I. Solution:
a) For one machine:
QBEP= $9600/$40 per unit-$10 per unit
= 320 units( not in range, so there is no BEP)
b) For two machines:
QBEP= $15000/$40 per unit- $10 per unit
=500 units
c) For three machines:
QBEP= $20000/$40 per unit- $10 per unit
=666.67 units
B. Comparing the projected range of demand to the
two ranges for which a break-even point occurs,
you can see that the break-even point is 500,
which is in the range 301-600. this means that
even if demand is at the low end of the range, it
would be above the break-even point and thus
yield a profit. At the top end of projected
demand, the volume would still be less than the
break-even point for that range, so there would
be no profit.
Assumptions of Cost-Volume Analysis
• One product is involved.
• Everything produced can be sold.
• The variable cost per unit is the same regardless of
the volume.
• Fixed costs do not change with volume changes, or
they are step changes.
• The revenue per unit is the same regardless of
volume.
• Revenue per unit exceeds variable cost per unit.
Financial Analysis
• Cash flow
– The difference between cash received from
sales and other sources, and cash outflow
for labor, material, overhead, and taxes
• Present value
– The sum, in current value, of all future cash
flow of an investment proposal
Decision Theory
• represents a general approach to decision making
which is suitable for a wide range of operations
management decisions, including:
capacity
planning
product and
service design
product and
service design
equipment
selection
location
planning

Más contenido relacionado

La actualidad más candente

Product and service design
Product and service designProduct and service design
Product and service designsafaataamsah
 
location planning and analysis
location planning and analysislocation planning and analysis
location planning and analysisjanyne aguilar
 
Operation Management
Operation ManagementOperation Management
Operation ManagementMAJU
 
Strategic management
Strategic managementStrategic management
Strategic managementHasnaa Hassan
 
Operations management location strategies (lecture)
Operations management location strategies  (lecture)Operations management location strategies  (lecture)
Operations management location strategies (lecture)Jun Gonzales
 
Chapter 02 - Competitiveness, Strategy, and Productivity.ppt
Chapter 02 - Competitiveness, Strategy, and Productivity.pptChapter 02 - Competitiveness, Strategy, and Productivity.ppt
Chapter 02 - Competitiveness, Strategy, and Productivity.pptAbdurRoufRasel
 
2. scope of operations management
2.  scope of operations management2.  scope of operations management
2. scope of operations managementAkash Bakshi
 
Operation management intro
Operation management  introOperation management  intro
Operation management introStudsPlanet.com
 
Process selection, design & analysis
Process selection, design & analysisProcess selection, design & analysis
Process selection, design & analysisNoopur Koli
 
location strategy, operation management
location strategy, operation managementlocation strategy, operation management
location strategy, operation managementFAST NUCES
 
Chapter-3 External Assessment in Strategic Management
Chapter-3 External Assessment in Strategic ManagementChapter-3 External Assessment in Strategic Management
Chapter-3 External Assessment in Strategic ManagementCabdulaahi Sulayman
 
Operations management forecasting
Operations management   forecastingOperations management   forecasting
Operations management forecastingTwinkle Constantino
 
187153232 obligations-and-contracts
187153232 obligations-and-contracts187153232 obligations-and-contracts
187153232 obligations-and-contractsisraelmercadoramos
 

La actualidad más candente (20)

CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
Product and service design
Product and service designProduct and service design
Product and service design
 
location planning and analysis
location planning and analysislocation planning and analysis
location planning and analysis
 
PRODUCT AND SERVICE DESIGN
 PRODUCT AND SERVICE DESIGN  PRODUCT AND SERVICE DESIGN
PRODUCT AND SERVICE DESIGN
 
Operation Management
Operation ManagementOperation Management
Operation Management
 
Strategic management
Strategic managementStrategic management
Strategic management
 
Production and Operation Management
Production and Operation ManagementProduction and Operation Management
Production and Operation Management
 
Operations management location strategies (lecture)
Operations management location strategies  (lecture)Operations management location strategies  (lecture)
Operations management location strategies (lecture)
 
Capacity management
Capacity managementCapacity management
Capacity management
 
Chapter 02 - Competitiveness, Strategy, and Productivity.ppt
Chapter 02 - Competitiveness, Strategy, and Productivity.pptChapter 02 - Competitiveness, Strategy, and Productivity.ppt
Chapter 02 - Competitiveness, Strategy, and Productivity.ppt
 
2. scope of operations management
2.  scope of operations management2.  scope of operations management
2. scope of operations management
 
Operation management intro
Operation management  introOperation management  intro
Operation management intro
 
Capacity Management
Capacity ManagementCapacity Management
Capacity Management
 
Process selection, design & analysis
Process selection, design & analysisProcess selection, design & analysis
Process selection, design & analysis
 
location strategy, operation management
location strategy, operation managementlocation strategy, operation management
location strategy, operation management
 
Chapter-3 External Assessment in Strategic Management
Chapter-3 External Assessment in Strategic ManagementChapter-3 External Assessment in Strategic Management
Chapter-3 External Assessment in Strategic Management
 
Process design
Process designProcess design
Process design
 
Operations management
Operations managementOperations management
Operations management
 
Operations management forecasting
Operations management   forecastingOperations management   forecasting
Operations management forecasting
 
187153232 obligations-and-contracts
187153232 obligations-and-contracts187153232 obligations-and-contracts
187153232 obligations-and-contracts
 

Destacado

Process Strategies and Capacity Planning
Process Strategies and Capacity PlanningProcess Strategies and Capacity Planning
Process Strategies and Capacity PlanningJaisa Gapuz
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planningsenthil.G
 
Basic of work study, work measurement & job design om
Basic of work study, work measurement & job design    om Basic of work study, work measurement & job design    om
Basic of work study, work measurement & job design om swapnil23488
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningMOHD ARISH
 
CAPACITY PLANNING
CAPACITY PLANNING CAPACITY PLANNING
CAPACITY PLANNING 889222
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout pptAnju Rana
 
Mps vs aggregate planning
Mps vs aggregate planningMps vs aggregate planning
Mps vs aggregate planningUmar Yazdani
 
Job Design and Work Measurement
Job Design and Work Measurement Job Design and Work Measurement
Job Design and Work Measurement Joshua Miranda
 
MES - Manufacturing Execution System Explained
MES - Manufacturing Execution System ExplainedMES - Manufacturing Execution System Explained
MES - Manufacturing Execution System ExplainedMRPeasy
 
Manufacturing Execution Systems
Manufacturing Execution SystemsManufacturing Execution Systems
Manufacturing Execution Systemsvinodpandeyaxcend
 
Manufacturing Execution System
Manufacturing Execution SystemManufacturing Execution System
Manufacturing Execution SystemAnand Subramaniam
 
Unit 1 Service Operations Management
Unit 1 Service Operations ManagementUnit 1 Service Operations Management
Unit 1 Service Operations ManagementGopinath Guru
 
Legacy Software Maintenance And Management
Legacy Software Maintenance And ManagementLegacy Software Maintenance And Management
Legacy Software Maintenance And ManagementValueCoders
 
Measurement System Analysis
Measurement System AnalysisMeasurement System Analysis
Measurement System AnalysisRonald Shewchuk
 
Software reverse engineering
Software reverse engineeringSoftware reverse engineering
Software reverse engineeringParminder Singh
 
Reverse Engineering of Software Architecture
Reverse Engineering of Software ArchitectureReverse Engineering of Software Architecture
Reverse Engineering of Software ArchitectureDharmalingam Ganesan
 
Tools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processTools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processRohan Monis
 
Reverse Engineering
Reverse EngineeringReverse Engineering
Reverse Engineeringsiddu019
 

Destacado (20)

Process Strategies and Capacity Planning
Process Strategies and Capacity PlanningProcess Strategies and Capacity Planning
Process Strategies and Capacity Planning
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planning
 
Basic of work study, work measurement & job design om
Basic of work study, work measurement & job design    om Basic of work study, work measurement & job design    om
Basic of work study, work measurement & job design om
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
CAPACITY PLANNING
CAPACITY PLANNING CAPACITY PLANNING
CAPACITY PLANNING
 
Facility Layout
Facility LayoutFacility Layout
Facility Layout
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
 
Mps vs aggregate planning
Mps vs aggregate planningMps vs aggregate planning
Mps vs aggregate planning
 
Job Design and Work Measurement
Job Design and Work Measurement Job Design and Work Measurement
Job Design and Work Measurement
 
MES - Manufacturing Execution System Explained
MES - Manufacturing Execution System ExplainedMES - Manufacturing Execution System Explained
MES - Manufacturing Execution System Explained
 
Manufacturing Execution Systems
Manufacturing Execution SystemsManufacturing Execution Systems
Manufacturing Execution Systems
 
Manufacturing Execution System
Manufacturing Execution SystemManufacturing Execution System
Manufacturing Execution System
 
Unit 1 Service Operations Management
Unit 1 Service Operations ManagementUnit 1 Service Operations Management
Unit 1 Service Operations Management
 
Legacy Software Maintenance And Management
Legacy Software Maintenance And ManagementLegacy Software Maintenance And Management
Legacy Software Maintenance And Management
 
Measurement System Analysis
Measurement System AnalysisMeasurement System Analysis
Measurement System Analysis
 
Software reverse engineering
Software reverse engineeringSoftware reverse engineering
Software reverse engineering
 
Reverse Engineering of Software Architecture
Reverse Engineering of Software ArchitectureReverse Engineering of Software Architecture
Reverse Engineering of Software Architecture
 
Tools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processTools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning process
 
Line balancing
Line balancing Line balancing
Line balancing
 
Reverse Engineering
Reverse EngineeringReverse Engineering
Reverse Engineering
 

Similar a Strategic capacity planning for products and services

capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptxhafidhisaidi
 
Capacity Managment
Capacity ManagmentCapacity Managment
Capacity ManagmentNadia Sahar
 
Mba ii pmom_unit-2.1 capacity a
Mba ii pmom_unit-2.1 capacity aMba ii pmom_unit-2.1 capacity a
Mba ii pmom_unit-2.1 capacity aRai University
 
3. capacity planning
3. capacity planning3. capacity planning
3. capacity planningSudipta Saha
 
CHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxCHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxPeriMinstrel
 
Aggregate Planning for industrial engineering
Aggregate Planning for industrial engineeringAggregate Planning for industrial engineering
Aggregate Planning for industrial engineeringashaby
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGVijit Gajbhiye
 
Introduction to operations management
Introduction to operations managementIntroduction to operations management
Introduction to operations managementpavani valiveti
 
Process selection and capacity planning
Process selection and capacity planningProcess selection and capacity planning
Process selection and capacity planningShankarjyoti Hazarika
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going leanbwu.nl
 
operation Performance & Operation stategy
operation Performance & Operation stategyoperation Performance & Operation stategy
operation Performance & Operation stategyQamar Farooq
 
Operation management
Operation managementOperation management
Operation managementMamta Karanji
 
Process of Operation management
Process of Operation management Process of Operation management
Process of Operation management Nevedida
 
A-INTRODUCTION to operations management.ppt
A-INTRODUCTION to operations management.pptA-INTRODUCTION to operations management.ppt
A-INTRODUCTION to operations management.pptaviatordevendra
 
Chapter Seven - Process selection and Analysis.ppt
Chapter Seven - Process selection and Analysis.pptChapter Seven - Process selection and Analysis.ppt
Chapter Seven - Process selection and Analysis.pptAmman8
 
HOW TO PERFORM A MANUFACTURING CAPACITY ANALYSIS.pptx
HOW TO PERFORM A MANUFACTURING CAPACITY ANALYSIS.pptxHOW TO PERFORM A MANUFACTURING CAPACITY ANALYSIS.pptx
HOW TO PERFORM A MANUFACTURING CAPACITY ANALYSIS.pptxRiady Oetomo
 
03. 333333333333333333333Capacity Planning.ppt
03. 333333333333333333333Capacity Planning.ppt03. 333333333333333333333Capacity Planning.ppt
03. 333333333333333333333Capacity Planning.pptDarrajBrahim1
 

Similar a Strategic capacity planning for products and services (20)

capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptx
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Capacity Managment
Capacity ManagmentCapacity Managment
Capacity Managment
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Mba ii pmom_unit-2.1 capacity a
Mba ii pmom_unit-2.1 capacity aMba ii pmom_unit-2.1 capacity a
Mba ii pmom_unit-2.1 capacity a
 
3. capacity planning
3. capacity planning3. capacity planning
3. capacity planning
 
CHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxCHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptx
 
Aggregate Planning for industrial engineering
Aggregate Planning for industrial engineeringAggregate Planning for industrial engineering
Aggregate Planning for industrial engineering
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNING
 
Introduction to operations management
Introduction to operations managementIntroduction to operations management
Introduction to operations management
 
Process selection and capacity planning
Process selection and capacity planningProcess selection and capacity planning
Process selection and capacity planning
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going lean
 
operation Performance & Operation stategy
operation Performance & Operation stategyoperation Performance & Operation stategy
operation Performance & Operation stategy
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Operation management
Operation managementOperation management
Operation management
 
Process of Operation management
Process of Operation management Process of Operation management
Process of Operation management
 
A-INTRODUCTION to operations management.ppt
A-INTRODUCTION to operations management.pptA-INTRODUCTION to operations management.ppt
A-INTRODUCTION to operations management.ppt
 
Chapter Seven - Process selection and Analysis.ppt
Chapter Seven - Process selection and Analysis.pptChapter Seven - Process selection and Analysis.ppt
Chapter Seven - Process selection and Analysis.ppt
 
HOW TO PERFORM A MANUFACTURING CAPACITY ANALYSIS.pptx
HOW TO PERFORM A MANUFACTURING CAPACITY ANALYSIS.pptxHOW TO PERFORM A MANUFACTURING CAPACITY ANALYSIS.pptx
HOW TO PERFORM A MANUFACTURING CAPACITY ANALYSIS.pptx
 
03. 333333333333333333333Capacity Planning.ppt
03. 333333333333333333333Capacity Planning.ppt03. 333333333333333333333Capacity Planning.ppt
03. 333333333333333333333Capacity Planning.ppt
 

Último

Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...pujan9679
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowranineha57744
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 

Último (20)

Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 

Strategic capacity planning for products and services

  • 1. Strategic Capacity Planning for Products and Services Gerlyn Bonus Agnes Regala Roselyn Pudao Mary Grace Ibanez Matex Carillo BSBA. Management Prof. Joey Acuῆa
  • 2. Capacity  Capacity is the upper limit or ceiling on the load that an operating unit can handle.  Capacity also includes: Equipment Space Employee skill • The basic questions in capacity handling are: – What kind of capacity is needed? – How much is needed? – When is it needed?
  • 3. Design capacity  maximum output rate or service capacity an operation, process, or facility is designed for. Effective capacity  Design capacity minus allowances such as personal time, maintenance, and scrap. Actual output  rate of output actually achieved--cannot exceed effective capacity.
  • 5. Design capacity = 50 trucks/day Effective capacity = 40 trucks/day Actual output = 36 units/day Actual output = 36 units/day Efficiency = = 90% Effective capacity 40 units/ day Utilization = Actual output = 36 units/day = 72% Design capacity 50 units/day
  • 6. Determinants of Effective Capacity FACILITIES  The design of facilities, including size and provision for expansion, is key.  Locational factors, such as transportation costs, distance to market, labor supply, energy sources and room for expansion are also important.  Likewise, layout of the work area and environmental factors also play a significant role.
  • 7. PRODUCT AND SERVICE FACTORS  Product and service design can have a tremendous influence on capacity.  The more uniform the output, the more opportunities there are for standardization of methods and materials. PROCESS FACTORS  The quantity capability of a process is an obvious determinant of capacity but subtle determinant is the influence of output quality.  Process improvement that increase quality and productivity can result in increased capacity.
  • 8. HUMAN FACTORS  The tasks that make up a job, the variety of activities involved, also the training, skill and experience required to perform a job all have an impact on the potential and actual output.  Employee motivation has a very basic relationship to capacity , as do absenteeism. POLICY FACTORS  Management policy can affect capacity by allowing or not allowing capacity options such as overtime or second or third shifts.
  • 9. OPERATIONAL FACTORS  Inventory stocking decisions, late deliveries, purchasing requirements, acceptability of purchased materials, quality inspection and control procedures also have an impact on effective capacity. SUPPLY CHAIN FACTORS  It must be taken into account in capacity planning if substantial capacity changes are involved. EXTERNAL FACTORS  Product standards , especially minimum quality and performance standards, can restrict management’s options for increasing capacity.
  • 10. Strategy Formulation • An organization typically its base its capacity strategy on assumption and predictions about long term demand patterns, technological changes , and the behavior of its competitors. Key decisions of capacity planning • The amount of capacity needed • The timing of changes • The need to maintain balance throughout the system • The extent of flexibility of facilities and the workforce.
  • 11. • Deciding on the amount capacity involves consideration of expected demand and capacity cost. • Capacity cushion which is an amount capacity in excess of expected demand when there is some uncertainty about demand.  the greater the degree of demand uncertainty , the greater the amount cushion used.
  • 12. Steps in the Capacity Planning Process • Estimate future capacity requirement • Evaluate existing capacity and facilities and identify gaps. • Identify alternative for meeting requirements • Conduct financial analyses of each alternative • Assess key qualitative issues for each alternative • Select the alternative to pursue that will be bests in long term • Implement the selected alternative • Monitor results
  • 13. Forecasting Capacity Requirements • Long-term vs. Short-term capacity needs • Long-term relates to overall level of capacity such as facility size, trends, and cycles. • Short-term relates to variations from seasonal, random, and irregular fluctuations in demand Calculating Processing Requirements • A department works one 8-hour shift, 250 days a year , and has these figures for usage of a machine that is currently being considered:
  • 14. Working one 8 hour shift 250 days a year provides an annual capacity of 8×250=2000 hours per year. 5800 hours/2000 hours/machine=2.90 Machines Product Annual demand Standard Processing time per unit Processing time needed 1 400 5 2000 2 300 8 2400 3 700 2 1400 5800
  • 15. The Challenge of Planning Service Capacity Three Important Factors in planning service capacity The need to be near customers • Convenience for customers is often an important aspects of services. Generally, a service must be located near customer. The inability to store service • Speed of the delivery, or customers waiting time become a major concern in a service capacity planning .
  • 16. The degree of volatility • Demand volatility presents problem for capacity planners. Demand volatility tend to be higher for services than goods, not only in timing of demand, But also in amount of time required to the service individual customers. Make Or Buy • Once capacity requirements have been determined , the organization must decide whether to produce a good or provide a service itself. or outsource (buy) from another organization.
  • 17. Factors: Available Capacity • If an organization has available the equipment, necessary skills, and time, if often makes sense to produce an item of perform a service in-house, The additional cost would be relatively small compared with those required to buy items or subcontract services. Expertise • If a firm lacks the expertise to do the job satisfactory buying might be reasonable alternative.
  • 18. Quality Considerations • Firm that specialize can usually offer higher quality than an organization can attain itself. Conversely unique quality requirements or the desire to closely monitor quality may cause an organization to perform a job itself. The nature of Demand • When demand for an items is high and steady, the organization is often better off doing the work itself.
  • 19. Cost • Any cost savings achieved from buying of making must weighed against the preceding factors. Cost savings might come from the item itself or from transportation cost savings. If there are fixed cost associated with making an item that cannot be reallocated if the service or product outsourced, that has to recognized in the analysis. Risk • Outsourcing may involved certain risks. One is loss of control over operations. Another is the need to disclosed proprietary information.
  • 20. Developing Capacity Alternatives Design Flexibility into system. o Provisions for Future Expansion in the original design. Take Stage of life cycle into account o Capacity requirements are often closely linked to the stage of the life cycle that a product or service is in.
  • 21. Take a “Big Picture” approach to capacity changes o When developing capacity alternatives, it is important to consider how parts of the system interrelate. o Bottleneck Operation Bottleneck Operation Machine #1 Machine #3 Machine #4 10/hr 10/hr 10/hr 10/hr 30/hr Machine #2
  • 22. Prepare to deal with capacity “chunks.” o no machine comes in continuous capacities. Attempt to smooth out capacity requirements. o Unevenness in capacity requirements also can create certain problems. Identify the optimal operating level. o Production units typically have an ideal or optimal level of operation in terms of unit cost of output. Economies of Scale o If the output rate is less than the optimal level, increasing the output rate results in decreasing average unit costs.
  • 23. Diseconomies of scale o If the output rate is more than the optimal level, increasing the output rate results in increasing average unit costs. Choose a strategy if expansion is involved. o Consider whether incremental expansion or single step is more appropriate.
  • 24. Cost-Volume Analysis o Focuses on relationships between cost, revenue and volume of output. FC= Fixed Cost VC= Total variable cost v= variable cost per unit TC= Total Cost TR= Total revenue R= Revenue per unit Q= Quantity or Volume of output QBEP= Break even quantity P=Profit
  • 25. • Fixed Costs (FC) – tend to remain constant regardless of output volume • Variable Costs (VC) – vary directly with volume of output – VC = Quantity(Q) x variable cost per unit (v) • Total Cost – TC = Q x v • Total Revenue (TR) – TR = revenue per unit (R) x Q Profit (P) = TR – TC = R x Q – (FC +v x Q) = Q(R – v) – FC Q=P+FC/R-v ; QBEP=FC/R-V
  • 26. Examples: • The owner of Old-Fashioned Berry Pies, Simon Chen, is contemplating adding a new line of pies, which will require leasing new equipment for a monthly payment of $6000. Variable costs would be $ 2.00 per pie, and pies would retail for $7.00. a) How many pies must be sold in order to break-even? b) What would the profit be if 1000 pies are made and sold in a month? c) How many pies must be sold to realize a profit of $4000? d) If 2000 can be sold, and a profit target is $5000, what price should be charged per pie?
  • 27. Solution: FC=$6000 VC=$2 per pie REV=$7 per pie a) QBEP= FC/R-V =$6000/$7-$2 =1200 pies/month b)For Q=1000; P=Q(R-V)-FC =1000($7-$2)-$6000= $1000 c) P=$4000; SOLVE for Q using Q=P+FC/R-V Q=$4000+$6000/$7-$2 = 2000 pies d) Profit=Q(R-V)-FC $5000=$2000(R-$2)-$6000 R=$7.50
  • 28. • A manager has the option of purchasing one, two, or three machines. Fixed costs and potential volumes are as follows: VC is $10 per unit and R is $40 per unit. a) Determine the break-even point for each range. b) If projected annual demand is between 580 and 660 units, how many machines should the manager purchase? Number of Machines Total annual Fixed Costs Corresponding range of output 1 $9 600 0-300 2 15000 301-600 3 20000 601-900
  • 29. I. Solution: a) For one machine: QBEP= $9600/$40 per unit-$10 per unit = 320 units( not in range, so there is no BEP) b) For two machines: QBEP= $15000/$40 per unit- $10 per unit =500 units c) For three machines: QBEP= $20000/$40 per unit- $10 per unit =666.67 units
  • 30. B. Comparing the projected range of demand to the two ranges for which a break-even point occurs, you can see that the break-even point is 500, which is in the range 301-600. this means that even if demand is at the low end of the range, it would be above the break-even point and thus yield a profit. At the top end of projected demand, the volume would still be less than the break-even point for that range, so there would be no profit.
  • 31. Assumptions of Cost-Volume Analysis • One product is involved. • Everything produced can be sold. • The variable cost per unit is the same regardless of the volume. • Fixed costs do not change with volume changes, or they are step changes. • The revenue per unit is the same regardless of volume. • Revenue per unit exceeds variable cost per unit.
  • 32. Financial Analysis • Cash flow – The difference between cash received from sales and other sources, and cash outflow for labor, material, overhead, and taxes • Present value – The sum, in current value, of all future cash flow of an investment proposal
  • 33. Decision Theory • represents a general approach to decision making which is suitable for a wide range of operations management decisions, including: capacity planning product and service design product and service design equipment selection location planning