SEMINAR ON
INDUSTRIAL TRAINING
AT D.M.W. PATIALA
GURU NANAK INSTITUTE OF
TECHNOLOGY
By lakhvinder singh
6312507
INTRODUCTION
 Railways serve the people of India since 1853.
Indian Railways are the biggest organization in
our country, which is engaged in
transportation.
 First train moved on: April 16, 1853
 First train run between: Bombay to Thane
 First locomotive named: Lord Falkland
D.M.W. ,PATIALA
 Diesel Loco Modernization Works.
 Earlier Name- Diesel Cargo
Works(D.C.W.)
 First Stone was laid on 24th
October,1981 by the minister of
Railways Shri Kedarnath Pandey.
OBJECTIVES
 Modernization of LOCO.
 Remanufacture of ALCO LOCO.
 Manufacture of Engine components.
 Upgradation of LOCO.
Locomotive
 A locomotive or engine is a railway vehicle that provides the motive power for
a train. The word originates from the Latin loco – "from a place", ablative
of locus, "place" + Medieval Latin motivus, "causing motion", and is a
shortened form of the term locomotive engine.
 The first successful locomotives were built by Cornish inventor Richard
Trevithick in 1804.
WORKSHOP LAYOUT
Various Shops in DMW Are: -
 P.M.S Plant Maintenance Shop
 T.R Tool Room
 L.M.S Light Machine Shop
 C.B.S Carbon Brush Shop
 H.T.S Heat Treatment Shop
 V.M.S Vehicle Maintenance Shop
 T.M.S Traction Machine Shop
 M.R.S Main Receiving Shop
 H.M.S Heavy Machine Shop
 C.L.S Cylinder Linear Shop
 P.P.S Power Pack Shop
 B.S Bogie Shop
 S.S.S Super Structure Shop
 L.R.S Locomotive Rebuilding Shop
NOMENCLATURE OF
LOCOMOTIVE
The code is of the form [gauge][power][load][series][suffix]
GUAGE- W(BROAD) Y (METRE)
Z (NARROW,2.6’) N (NARROW,2’)
POWER- D = Diesel C = DC traction
A = AC traction CA = Dual-power AC/DC
B = Battery electric (rare)
LOAD- M = Multipurpose P = Passenger
G = Goods S = Shunting
L = Light Duty (Light Passenger) R = Railcar
SERIES- 1 –over 1000 hp less than 2000hp 2-over 2000 less than 3000
3--over 3000hp less than 4000hp 4-over 4000 less than 5000
SUFFIX-A-100HP B-200HP C-300HP D-400HP
WDM3A MEANS “Broad gauge diesel powered multipurpose 3100hp loco”
 Heat Treatment Shop
Requisite heat treatment that is induction hardening, case carburizing etc. is
carried out in the Heat Treatment Shop to develop optimum properties in the
finished components.
 Heavy Machine Shop
Engine Blocks of diesel locomotives and Traction Motor Magnet Frames are
machined in this shop. Precision machining of the Blocks is carried out on
CNC Horizontal Boring & Milling Machine of PAMA, Italy make CNC
machine.
Engine block
 Traction Machine Shop
A wide variety of Traction Motors, Traction Generators and Alternators are
rewound / remanufactured in this shop. Facilities include 500 T Hydraulic
Press for shafting/deshafting, Glass Bead Blasting Machine, Vacuum
Impregnation Plant, HYT Lathe, Dynamic Balancing Machine, etc.
The main functions of this shop are-
 Dismantling, Reconditioning and assembly of power pack.
 Load testing, specific fuel consumption testing and other types.
WDG2 LOCO WDP2 LOCO
WDG4 LOCO WDP4 LOCO
BOGIE SHOP This shop is concerned with the manufacturing,
remanufacturing and testing of bogie. Bogie is the lower
part of the loco, which supports the engine. It is a unit
where the main power of the Locomotive is utilized.
Parts of a Diesel-Electric Locomotive
Another view
Diesel Engine
 This is the main power source for the locomotive.
 A diesel engine (also known as a compression-ignition engine) is an internal
combustion engine that uses the heat of compression to initiate ignition to burn
the fuel that has been injected into the combustion chamber.
 It comprises a large cylinder block, with the cylinders arranged in a straight
line or in a V.
Engine view
ENGINE DATA
 CYCLE: 4 STROKE CYCLE
 MODEL: ALCO, V –SHAPED, 16 CYL
 BORE: 9 INCHES (228 mm)
 STROKE: 10.5 inches (267 mm)
 Compression Ratio : 12.5 : 1
 HORSEPOWER (GROSS): 3300 BHP
 ENGINE SPEED: 1000 RPM (FULL LOAD)
400 RPM (IDLE)
 PISTON SPEED (MEAN): 9.89 m/sec
 Air Fuel Ratio: 13:1.
 WEIGHT (DRY ENGINE): 19026 kg
Main Alternator
 The diesel engine drives the main
alternator which provides the power to
move the train.
 The alternator generates AC electricity
which is used to provide power for the
traction motors mounted on the trucks
(bogies).
 In older locomotives, the alternator was a
DC machine, called a generator. .
Auxiliary Alternator
 Locomotives used to operate passenger trains are equipped with an auxiliary
alternator.
 This provides AC power for lighting, heating, air conditioning, dining facilities
etc. on the train.
 The output is transmitted along the train through an auxiliary power line.
Motor Blower
 The diesel engine also drives a motor blower.
 As its name suggests, the motor blower
provides air which is blown over the traction
motors to keep them cool during periods of
heavy work.
 The blower is mounted inside the locomotive
body but the motors are on the trucks, so the
blower output is connected to each of the
motors through flexible ducting.
 The blower output also cools the alternators.
Traction Motor
 Since the diesel-electric locomotive
uses electric transmission, traction
motors are provided on the axles to
give the final drive.
 These motors were traditionally DC
but the development of modern power
and control electronics has led to the
introduction of 3-phase AC motors.
Pinion/Gear
• The traction motor drives the axle
through a reduction gear of a
range between 3 to 1 (freight) and
4 to 1 (passenger).
Fuel Tank
 A diesel locomotive has to carry its own fuel around with
it.
 The fuel tank is normally under the loco frame and This
huge tank in the underbelly of the locomotive holds 2,200
gallons (8,328 L) of diesel fuel.
Sand Box
• Locomotives always carry sand to assist adhesion in bad
rail conditions.
• Sand is not often provided on multiple unit trains because
the adhesion requirements are lower and there are
normally more driven axles.
Air Reservoirs
 Air reservoirs containing compressed air
at high pressure are required for the train
braking and some other systems on the
locomotive.
 These are often mounted next to the fuel
tank under the floor of the locomotive.
Air Compressor
• The air compressor is required
to provide a constant supply of
compressed air for the
locomotive and train brakes.
Radiator and Radiator Fan
 The radiator works the same way as in an automobile.
 Water is distributed around the engine block to keep the temperature within the
most efficient range for the engine.
 The water is cooled by passing it through a radiator blown by a fan driven by
the diesel engine.
Turbo Charging
 The amount of power obtained from a
cylinder in a diesel engine depends on how
much fuel can be burnt in it.
 The amount of fuel which can be burnt
depends on the amount of air available in the
cylinder. So, if you can get more air into the
cylinder, more fuel will be burnt and you
will get more power out of your ignition.
 Turbo charging is used to increase the
amount of air pushed into each cylinder.
 Turbocharging gives a 50% increase in
engine power.
Locomotive Data
General Data Of Locomotive:-
 Model No. : WDM2
 Specification : 16 cylinder V-type 4 stroke
Diesel Engine
 Type : Co-Co
 Power : 700hp, 1400hp, 2400hp
 Maximum Speed : 120 kph
 Gear Ratio : 68/18
 Compression Ratio : 16:1
 Cylinder Bore : 230mm
 Cylinder Stroke : 279mm
Maximum Overall Dimension :-
Height : 4185mm
Width : 3010mm
Length : 17120mm
Capacity:-
Fuel : 5000 lt
Cooling Water : 1210 lt
Lube Oil : 910 lt
Water Expansion : 155 lt
Sand : 0.4 m3
Wheel Base:-
 Wheel Dia : 1092mm
 Wheel Base : 12834mm
 Traction Motor : Bhel 165
 Track Gauge : 1676mm
 Brake Equipment : Vaccun/Air
Auxiliary Horse Power Requirement:-
Auxiliary Generator Maximum : 17HP
Exciter Maximum : 12HP
Traction Motor : 400HP
Blower at full speed : 62HP
Radiator Fan : 80HP
Expresser Unloaded at 1000 rpm : 13 HP
BOGI ASSEMBLY
SHOP
bogie assembly shop
 A bogie is a wheeled wagon or trolley. In
mechanics terms, a bogie is a chassis or
framework carrying wheels, attached to a
vehicle.
 Usually the train floor is at a level above the
bogies, but the floor of the car may be lower
between bogies.
Parts Of Bogi
Axle, Wheel & Axle Box assembly
These wheels are having wear adapted profile to RDSO drawing.
Journal bearings & adaptor
 The bogie frame is supported on axles through “soft primary”
suspension consisting of twelve single helical coil springs, two springs
mounted on each bearing adapter (axle box), to provide ride quality
and equalization of wheel-set loads.
 Bearing adapter are fitted with tapered roller pre-lubricated, pre
adjusted & sealed bearings.
Bearing adapter
single helical coil springs
Sealed bearings
TPU shims
ASSEMBLY PROCESS:
 PRESS BULL GEAR ON AXLE.
 SHIFT ABOVE ASSEMBLY AT BEARING HOUSING FITTING
STAND.
 FIT THE BEARING HOUSING AND BOLTING .
 ASSEMBLE SEAL , CAP AND TAPER ROLLER BEARING
 BOLTING .
 NOW, SHIFT THIS ASSEMBLY ON WHEEL & AXLE PRESS
MACHINE.
 Bogie Shop
The locomotive bogies are rebuilt with new wheel sets, suspension bearings
and remanufactured traction motors. Separate shop has been set up for
machining of wheel sets and assembly of locomotive bogies.
SAW Features
•High Productivity, high
amperages may be used
•Easy to de-slag
•High Quality
•Deep penetration
•Excellent mechanical
properties
•Environment friendly
•Very little fume
•No radiation
•Easy operation
LOCO & ENGINE TEST SHOP
water testing
 Water acts as a coolant for moving part of the
engine because constant movement or rotation
causes various parts to heat up and water working
as coolant cooled down the concerned part.
Load testing
For load testing electrical load is provided to the
engine. If there is any abnormal sound then the
engine is again tested for lubrication so that any
flaw which is there can be removed.
Engine test operation sequence
 Base inspection under screen and fitting over screen.
 Water circulation.
 Lube oil filling and check deflection crank shaft.
 Lube oil circulation.
 Pre run on no load 3 to 5 times of duration 10 to 30
min each 400 rpm.
 Intermediate runs 12 runs of 30 min duration each
from 400 to 1000 rpm.
Diesel electric locomotive
 In a diesel-electric locomotive, the diesel engine drives an electrical generator or
alternator whose output provides power to the traction motors. There is no
mechanical connection between the engine and the wheels.
Development in Diesel Locomotive
 Increase in power per Cylinder.
 Increase in overall efficiency.
 Fuel Efficient & Lube efficient Engine.
 High Adhesion Loco.
 160 Kmph Speed Of WDP2 Loco.
Parts in power pack shop
Some components
Stripping section in LRD shop

Más contenido relacionado

La actualidad más candente

Indian railway ajmer
Indian railway ajmerIndian railway ajmer
Indian railway ajmerANKIT SHARMA
 
Diesel locomotive works - Truck Machine Shop
Diesel locomotive works - Truck Machine ShopDiesel locomotive works - Truck Machine Shop
Diesel locomotive works - Truck Machine ShopGaurav Mishra
 
Diesel locomotive work
Diesel locomotive workDiesel locomotive work
Diesel locomotive workvipin rai
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSHAILESH SHUKLA
 
central Railway project report
central Railway project report central Railway project report
central Railway project report akshay ghanwat
 
training report of locomotive diesel shed
training report of locomotive diesel  shed training report of locomotive diesel  shed
training report of locomotive diesel shed Govind kumawat
 
Loco diesel shed, pulera
Loco diesel shed, puleraLoco diesel shed, pulera
Loco diesel shed, puleraashjm
 
DLW varanasi summer training report
DLW varanasi summer training reportDLW varanasi summer training report
DLW varanasi summer training reportshubham chaurasiya
 
Indian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportIndian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportaman1312
 
Diesel locomotive works, varanasi
Diesel locomotive works, varanasiDiesel locomotive works, varanasi
Diesel locomotive works, varanasiShubham​ Yadav
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~ihaxxo24
 
6 weeks vocational traning report about dlw varanasi
6 weeks vocational traning report about dlw varanasi6 weeks vocational traning report about dlw varanasi
6 weeks vocational traning report about dlw varanasiABHISHEK PRIYADARSHI
 
Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)
Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)
Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)Shikhar Gupta
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPTSahil arora
 
Diesel locomotive workshop
Diesel locomotive workshopDiesel locomotive workshop
Diesel locomotive workshopHome
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentationTURENDARSAHU
 
Dlw summer training presentation
Dlw summer training presentationDlw summer training presentation
Dlw summer training presentationVarun Mishra
 

La actualidad más candente (20)

Indian railway ajmer
Indian railway ajmerIndian railway ajmer
Indian railway ajmer
 
Diesel locomotive works - Truck Machine Shop
Diesel locomotive works - Truck Machine ShopDiesel locomotive works - Truck Machine Shop
Diesel locomotive works - Truck Machine Shop
 
Training report
Training reportTraining report
Training report
 
Diesel locomotive work
Diesel locomotive workDiesel locomotive work
Diesel locomotive work
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
 
central Railway project report
central Railway project report central Railway project report
central Railway project report
 
training report of locomotive diesel shed
training report of locomotive diesel  shed training report of locomotive diesel  shed
training report of locomotive diesel shed
 
DLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSIDLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSI
 
Loco diesel shed, pulera
Loco diesel shed, puleraLoco diesel shed, pulera
Loco diesel shed, pulera
 
DLW varanasi summer training report
DLW varanasi summer training reportDLW varanasi summer training report
DLW varanasi summer training report
 
RAILWAY PPT
RAILWAY PPTRAILWAY PPT
RAILWAY PPT
 
Indian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportIndian Railway Diesel shed Training report
Indian Railway Diesel shed Training report
 
Diesel locomotive works, varanasi
Diesel locomotive works, varanasiDiesel locomotive works, varanasi
Diesel locomotive works, varanasi
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~i
 
6 weeks vocational traning report about dlw varanasi
6 weeks vocational traning report about dlw varanasi6 weeks vocational traning report about dlw varanasi
6 weeks vocational traning report about dlw varanasi
 
Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)
Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)
Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPT
 
Diesel locomotive workshop
Diesel locomotive workshopDiesel locomotive workshop
Diesel locomotive workshop
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentation
 
Dlw summer training presentation
Dlw summer training presentationDlw summer training presentation
Dlw summer training presentation
 

Destacado

Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaArjun Gaur
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)Neha Gethe
 
presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)shubham vishwakarma
 
diesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedidiesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedisomesh dwivedi
 
Types of locomotives in indian railways
Types of locomotives in indian railwaysTypes of locomotives in indian railways
Types of locomotives in indian railwaysSrinivasaRao Guduru
 
Doordarshan ppt ck gnit.
Doordarshan ppt ck gnit.Doordarshan ppt ck gnit.
Doordarshan ppt ck gnit.chandanrajgnit
 
Doordarshan (dd) edited
Doordarshan (dd) editedDoordarshan (dd) edited
Doordarshan (dd) editedJay Parekh
 
Doordarshan summer Training report
Doordarshan summer Training reportDoordarshan summer Training report
Doordarshan summer Training reportSushant Shankar
 
Engine block manufacturing process
Engine block manufacturing processEngine block manufacturing process
Engine block manufacturing processRöhît Âñåñd
 
Presentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotivePresentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotiveAbhishek Agarwal
 
Six weeks training report
Six weeks training reportSix weeks training report
Six weeks training reportManhar Singh
 
Doordarshan kendra raipur report ppt
Doordarshan kendra raipur report pptDoordarshan kendra raipur report ppt
Doordarshan kendra raipur report pptBIPUL KUMAR GUPTA
 
Case study on doordharshan
Case study on doordharshanCase study on doordharshan
Case study on doordharshanDeepti Andrade
 
Digital Earth Station
Digital Earth Station  Digital Earth Station
Digital Earth Station Susmita Pandey
 
DOORDARSHAN RAIPUR PROJECT PRESENTATION/REPORT PPT ppt
DOORDARSHAN RAIPUR PROJECT PRESENTATION/REPORT PPT pptDOORDARSHAN RAIPUR PROJECT PRESENTATION/REPORT PPT ppt
DOORDARSHAN RAIPUR PROJECT PRESENTATION/REPORT PPT pptyateendrasahu
 
Doordarshan Presentation
Doordarshan Presentation  Doordarshan Presentation
Doordarshan Presentation Yash Verma
 

Destacado (20)

Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)
 
presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)
 
diesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedidiesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedi
 
Types of locomotives in indian railways
Types of locomotives in indian railwaysTypes of locomotives in indian railways
Types of locomotives in indian railways
 
Doordarshan
DoordarshanDoordarshan
Doordarshan
 
Doordarshan ppt ck gnit.
Doordarshan ppt ck gnit.Doordarshan ppt ck gnit.
Doordarshan ppt ck gnit.
 
Doordarshan (dd) edited
Doordarshan (dd) editedDoordarshan (dd) edited
Doordarshan (dd) edited
 
Doordarshan summer Training report
Doordarshan summer Training reportDoordarshan summer Training report
Doordarshan summer Training report
 
Engine block manufacturing process
Engine block manufacturing processEngine block manufacturing process
Engine block manufacturing process
 
Presentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotivePresentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel Locomotive
 
Six weeks training report
Six weeks training reportSix weeks training report
Six weeks training report
 
Doordarshan
DoordarshanDoordarshan
Doordarshan
 
Doordarshan kendra raipur report ppt
Doordarshan kendra raipur report pptDoordarshan kendra raipur report ppt
Doordarshan kendra raipur report ppt
 
Missing days
Missing daysMissing days
Missing days
 
Case study on doordharshan
Case study on doordharshanCase study on doordharshan
Case study on doordharshan
 
Bogie assembly alco
Bogie assembly alcoBogie assembly alco
Bogie assembly alco
 
Digital Earth Station
Digital Earth Station  Digital Earth Station
Digital Earth Station
 
DOORDARSHAN RAIPUR PROJECT PRESENTATION/REPORT PPT ppt
DOORDARSHAN RAIPUR PROJECT PRESENTATION/REPORT PPT pptDOORDARSHAN RAIPUR PROJECT PRESENTATION/REPORT PPT ppt
DOORDARSHAN RAIPUR PROJECT PRESENTATION/REPORT PPT ppt
 
Doordarshan Presentation
Doordarshan Presentation  Doordarshan Presentation
Doordarshan Presentation
 

Similar a D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)

Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02Mohamed Riaz
 
Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02Abhimanyu Jayakanth
 
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPTBHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPTRavindra Rawat
 
Presentaion on Diesel Loco WDG4
Presentaion on Diesel Loco WDG4Presentaion on Diesel Loco WDG4
Presentaion on Diesel Loco WDG4Abhishek dayal
 
Shivam pajpati pptx presebntation
Shivam  pajpati pptx presebntationShivam  pajpati pptx presebntation
Shivam pajpati pptx presebntationShivam Prajapati
 
DLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indoreDLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indoreSANJEET KUMAR
 
NOTHERN RAILWAY DIESEL SHED KALKA
NOTHERN RAILWAY DIESEL SHED KALKANOTHERN RAILWAY DIESEL SHED KALKA
NOTHERN RAILWAY DIESEL SHED KALKADeepak kango
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaArjun Gaur
 
Ind training ppt
Ind training pptInd training ppt
Ind training pptyamipatel
 
RAILWAYS MANAGMENT
RAILWAYS MANAGMENTRAILWAYS MANAGMENT
RAILWAYS MANAGMENTSai Teja
 
Dlw varanasi training ppt
Dlw varanasi training pptDlw varanasi training ppt
Dlw varanasi training pptPraveen Tiwari
 
2-stroke cycle gasoline engine
2-stroke cycle gasoline engine2-stroke cycle gasoline engine
2-stroke cycle gasoline engineMaureen Vela
 
DLW SUMMER TRAINING REPORT FOR ECE BRANCH
DLW SUMMER TRAINING REPORT FOR ECE BRANCH DLW SUMMER TRAINING REPORT FOR ECE BRANCH
DLW SUMMER TRAINING REPORT FOR ECE BRANCH SUBHAM SINGH
 
presentation industrial trainning at Locomotive workshop lucknow
presentation industrial trainning at Locomotive workshop lucknowpresentation industrial trainning at Locomotive workshop lucknow
presentation industrial trainning at Locomotive workshop lucknowTushar Seth
 

Similar a D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT) (20)

Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02
 
Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02
 
INTRODUCTION
INTRODUCTIONINTRODUCTION
INTRODUCTION
 
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPTBHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
 
Presentaion on Diesel Loco WDG4
Presentaion on Diesel Loco WDG4Presentaion on Diesel Loco WDG4
Presentaion on Diesel Loco WDG4
 
Shivam pajpati pptx presebntation
Shivam  pajpati pptx presebntationShivam  pajpati pptx presebntation
Shivam pajpati pptx presebntation
 
Shashank1
Shashank1Shashank1
Shashank1
 
DLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indoreDLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indore
 
NOTHERN RAILWAY DIESEL SHED KALKA
NOTHERN RAILWAY DIESEL SHED KALKANOTHERN RAILWAY DIESEL SHED KALKA
NOTHERN RAILWAY DIESEL SHED KALKA
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
 
Sanjeev inds
Sanjeev indsSanjeev inds
Sanjeev inds
 
Sanjeev inds
Sanjeev indsSanjeev inds
Sanjeev inds
 
Ind training ppt
Ind training pptInd training ppt
Ind training ppt
 
CTC PPT
CTC PPTCTC PPT
CTC PPT
 
RAILWAYS MANAGMENT
RAILWAYS MANAGMENTRAILWAYS MANAGMENT
RAILWAYS MANAGMENT
 
Dlw varanasi training ppt
Dlw varanasi training pptDlw varanasi training ppt
Dlw varanasi training ppt
 
2-stroke cycle gasoline engine
2-stroke cycle gasoline engine2-stroke cycle gasoline engine
2-stroke cycle gasoline engine
 
DLW SUMMER TRAINING REPORT FOR ECE BRANCH
DLW SUMMER TRAINING REPORT FOR ECE BRANCH DLW SUMMER TRAINING REPORT FOR ECE BRANCH
DLW SUMMER TRAINING REPORT FOR ECE BRANCH
 
presentation industrial trainning at Locomotive workshop lucknow
presentation industrial trainning at Locomotive workshop lucknowpresentation industrial trainning at Locomotive workshop lucknow
presentation industrial trainning at Locomotive workshop lucknow
 
Basic of engine
Basic of engineBasic of engine
Basic of engine
 

Último

Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 

Último (20)

Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)

  • 1. SEMINAR ON INDUSTRIAL TRAINING AT D.M.W. PATIALA GURU NANAK INSTITUTE OF TECHNOLOGY By lakhvinder singh 6312507
  • 2. INTRODUCTION  Railways serve the people of India since 1853. Indian Railways are the biggest organization in our country, which is engaged in transportation.  First train moved on: April 16, 1853  First train run between: Bombay to Thane  First locomotive named: Lord Falkland
  • 3. D.M.W. ,PATIALA  Diesel Loco Modernization Works.  Earlier Name- Diesel Cargo Works(D.C.W.)  First Stone was laid on 24th October,1981 by the minister of Railways Shri Kedarnath Pandey.
  • 4. OBJECTIVES  Modernization of LOCO.  Remanufacture of ALCO LOCO.  Manufacture of Engine components.  Upgradation of LOCO.
  • 5. Locomotive  A locomotive or engine is a railway vehicle that provides the motive power for a train. The word originates from the Latin loco – "from a place", ablative of locus, "place" + Medieval Latin motivus, "causing motion", and is a shortened form of the term locomotive engine.  The first successful locomotives were built by Cornish inventor Richard Trevithick in 1804.
  • 7. Various Shops in DMW Are: -  P.M.S Plant Maintenance Shop  T.R Tool Room  L.M.S Light Machine Shop  C.B.S Carbon Brush Shop  H.T.S Heat Treatment Shop  V.M.S Vehicle Maintenance Shop  T.M.S Traction Machine Shop  M.R.S Main Receiving Shop
  • 8.  H.M.S Heavy Machine Shop  C.L.S Cylinder Linear Shop  P.P.S Power Pack Shop  B.S Bogie Shop  S.S.S Super Structure Shop  L.R.S Locomotive Rebuilding Shop
  • 9. NOMENCLATURE OF LOCOMOTIVE The code is of the form [gauge][power][load][series][suffix] GUAGE- W(BROAD) Y (METRE) Z (NARROW,2.6’) N (NARROW,2’) POWER- D = Diesel C = DC traction A = AC traction CA = Dual-power AC/DC B = Battery electric (rare) LOAD- M = Multipurpose P = Passenger G = Goods S = Shunting L = Light Duty (Light Passenger) R = Railcar SERIES- 1 –over 1000 hp less than 2000hp 2-over 2000 less than 3000 3--over 3000hp less than 4000hp 4-over 4000 less than 5000 SUFFIX-A-100HP B-200HP C-300HP D-400HP WDM3A MEANS “Broad gauge diesel powered multipurpose 3100hp loco”
  • 10.  Heat Treatment Shop Requisite heat treatment that is induction hardening, case carburizing etc. is carried out in the Heat Treatment Shop to develop optimum properties in the finished components.
  • 11.  Heavy Machine Shop Engine Blocks of diesel locomotives and Traction Motor Magnet Frames are machined in this shop. Precision machining of the Blocks is carried out on CNC Horizontal Boring & Milling Machine of PAMA, Italy make CNC machine.
  • 13.  Traction Machine Shop A wide variety of Traction Motors, Traction Generators and Alternators are rewound / remanufactured in this shop. Facilities include 500 T Hydraulic Press for shafting/deshafting, Glass Bead Blasting Machine, Vacuum Impregnation Plant, HYT Lathe, Dynamic Balancing Machine, etc.
  • 14. The main functions of this shop are-  Dismantling, Reconditioning and assembly of power pack.  Load testing, specific fuel consumption testing and other types.
  • 15. WDG2 LOCO WDP2 LOCO WDG4 LOCO WDP4 LOCO
  • 16. BOGIE SHOP This shop is concerned with the manufacturing, remanufacturing and testing of bogie. Bogie is the lower part of the loco, which supports the engine. It is a unit where the main power of the Locomotive is utilized.
  • 17. Parts of a Diesel-Electric Locomotive
  • 19. Diesel Engine  This is the main power source for the locomotive.  A diesel engine (also known as a compression-ignition engine) is an internal combustion engine that uses the heat of compression to initiate ignition to burn the fuel that has been injected into the combustion chamber.  It comprises a large cylinder block, with the cylinders arranged in a straight line or in a V.
  • 21. ENGINE DATA  CYCLE: 4 STROKE CYCLE  MODEL: ALCO, V –SHAPED, 16 CYL  BORE: 9 INCHES (228 mm)  STROKE: 10.5 inches (267 mm)  Compression Ratio : 12.5 : 1  HORSEPOWER (GROSS): 3300 BHP  ENGINE SPEED: 1000 RPM (FULL LOAD) 400 RPM (IDLE)  PISTON SPEED (MEAN): 9.89 m/sec  Air Fuel Ratio: 13:1.  WEIGHT (DRY ENGINE): 19026 kg
  • 22. Main Alternator  The diesel engine drives the main alternator which provides the power to move the train.  The alternator generates AC electricity which is used to provide power for the traction motors mounted on the trucks (bogies).  In older locomotives, the alternator was a DC machine, called a generator. .
  • 23. Auxiliary Alternator  Locomotives used to operate passenger trains are equipped with an auxiliary alternator.  This provides AC power for lighting, heating, air conditioning, dining facilities etc. on the train.  The output is transmitted along the train through an auxiliary power line.
  • 24. Motor Blower  The diesel engine also drives a motor blower.  As its name suggests, the motor blower provides air which is blown over the traction motors to keep them cool during periods of heavy work.  The blower is mounted inside the locomotive body but the motors are on the trucks, so the blower output is connected to each of the motors through flexible ducting.  The blower output also cools the alternators.
  • 25. Traction Motor  Since the diesel-electric locomotive uses electric transmission, traction motors are provided on the axles to give the final drive.  These motors were traditionally DC but the development of modern power and control electronics has led to the introduction of 3-phase AC motors. Pinion/Gear • The traction motor drives the axle through a reduction gear of a range between 3 to 1 (freight) and 4 to 1 (passenger).
  • 26. Fuel Tank  A diesel locomotive has to carry its own fuel around with it.  The fuel tank is normally under the loco frame and This huge tank in the underbelly of the locomotive holds 2,200 gallons (8,328 L) of diesel fuel. Sand Box • Locomotives always carry sand to assist adhesion in bad rail conditions. • Sand is not often provided on multiple unit trains because the adhesion requirements are lower and there are normally more driven axles.
  • 27. Air Reservoirs  Air reservoirs containing compressed air at high pressure are required for the train braking and some other systems on the locomotive.  These are often mounted next to the fuel tank under the floor of the locomotive. Air Compressor • The air compressor is required to provide a constant supply of compressed air for the locomotive and train brakes.
  • 28. Radiator and Radiator Fan  The radiator works the same way as in an automobile.  Water is distributed around the engine block to keep the temperature within the most efficient range for the engine.  The water is cooled by passing it through a radiator blown by a fan driven by the diesel engine.
  • 29. Turbo Charging  The amount of power obtained from a cylinder in a diesel engine depends on how much fuel can be burnt in it.  The amount of fuel which can be burnt depends on the amount of air available in the cylinder. So, if you can get more air into the cylinder, more fuel will be burnt and you will get more power out of your ignition.  Turbo charging is used to increase the amount of air pushed into each cylinder.  Turbocharging gives a 50% increase in engine power.
  • 30. Locomotive Data General Data Of Locomotive:-  Model No. : WDM2  Specification : 16 cylinder V-type 4 stroke Diesel Engine  Type : Co-Co  Power : 700hp, 1400hp, 2400hp  Maximum Speed : 120 kph  Gear Ratio : 68/18  Compression Ratio : 16:1  Cylinder Bore : 230mm  Cylinder Stroke : 279mm
  • 31. Maximum Overall Dimension :- Height : 4185mm Width : 3010mm Length : 17120mm Capacity:- Fuel : 5000 lt Cooling Water : 1210 lt Lube Oil : 910 lt Water Expansion : 155 lt Sand : 0.4 m3
  • 32. Wheel Base:-  Wheel Dia : 1092mm  Wheel Base : 12834mm  Traction Motor : Bhel 165  Track Gauge : 1676mm  Brake Equipment : Vaccun/Air
  • 33. Auxiliary Horse Power Requirement:- Auxiliary Generator Maximum : 17HP Exciter Maximum : 12HP Traction Motor : 400HP Blower at full speed : 62HP Radiator Fan : 80HP Expresser Unloaded at 1000 rpm : 13 HP
  • 35. bogie assembly shop  A bogie is a wheeled wagon or trolley. In mechanics terms, a bogie is a chassis or framework carrying wheels, attached to a vehicle.  Usually the train floor is at a level above the bogies, but the floor of the car may be lower between bogies.
  • 36.
  • 38. Axle, Wheel & Axle Box assembly These wheels are having wear adapted profile to RDSO drawing.
  • 39. Journal bearings & adaptor  The bogie frame is supported on axles through “soft primary” suspension consisting of twelve single helical coil springs, two springs mounted on each bearing adapter (axle box), to provide ride quality and equalization of wheel-set loads.  Bearing adapter are fitted with tapered roller pre-lubricated, pre adjusted & sealed bearings. Bearing adapter single helical coil springs Sealed bearings TPU shims
  • 40. ASSEMBLY PROCESS:  PRESS BULL GEAR ON AXLE.  SHIFT ABOVE ASSEMBLY AT BEARING HOUSING FITTING STAND.  FIT THE BEARING HOUSING AND BOLTING .  ASSEMBLE SEAL , CAP AND TAPER ROLLER BEARING  BOLTING .  NOW, SHIFT THIS ASSEMBLY ON WHEEL & AXLE PRESS MACHINE.
  • 41.  Bogie Shop The locomotive bogies are rebuilt with new wheel sets, suspension bearings and remanufactured traction motors. Separate shop has been set up for machining of wheel sets and assembly of locomotive bogies.
  • 42. SAW Features •High Productivity, high amperages may be used •Easy to de-slag •High Quality •Deep penetration •Excellent mechanical properties •Environment friendly •Very little fume •No radiation •Easy operation
  • 43.
  • 44. LOCO & ENGINE TEST SHOP
  • 45. water testing  Water acts as a coolant for moving part of the engine because constant movement or rotation causes various parts to heat up and water working as coolant cooled down the concerned part. Load testing For load testing electrical load is provided to the engine. If there is any abnormal sound then the engine is again tested for lubrication so that any flaw which is there can be removed.
  • 46. Engine test operation sequence  Base inspection under screen and fitting over screen.  Water circulation.  Lube oil filling and check deflection crank shaft.  Lube oil circulation.  Pre run on no load 3 to 5 times of duration 10 to 30 min each 400 rpm.  Intermediate runs 12 runs of 30 min duration each from 400 to 1000 rpm.
  • 47. Diesel electric locomotive  In a diesel-electric locomotive, the diesel engine drives an electrical generator or alternator whose output provides power to the traction motors. There is no mechanical connection between the engine and the wheels.
  • 48. Development in Diesel Locomotive  Increase in power per Cylinder.  Increase in overall efficiency.  Fuel Efficient & Lube efficient Engine.  High Adhesion Loco.  160 Kmph Speed Of WDP2 Loco.
  • 49. Parts in power pack shop