1. Glynn Williams Dip.Arch (Hons) RIBA Chartered Architects FEASIBILITY STUDY Using Modern Methods of Construction (MMC) to improve the balance of CHP Housing Stock providing greater flexibility and diversity for tenant accommodation. Chelmer Housing Partnership 25th October 2007 Issue C 8th September 2007 Issue 1
32. For residents and general publicChelmer Housing Partnership 25th October 2007 Issue C 11th Septemer 207 Issue 1
33. Glynn William Dip.Arch (Hons) RIBA Chartered Architects a. Standard MMC pod forming bedroom with optional built in wardrobe unit b. Link section with roof drainage linked to existing guttering c. Small paved plant area allowing shelter and natural light into existing room a c b Light tube (natural light) Alternative pod location for end of terrace properties - Access through store from hallway Existing and proposed plans 3D Visualisations DESIGN STATEMENT Design is based on standardised MMC pod size of 4.0m x 3.3mbedroom (& poss. cup’d with “link” to existing property to retain daylight to existing rooms and providing small plant courtyard. Drainage from new roofs would run into existing gutter and downpipe. Potential to provide water-butt for garden watering Folio 56 – Typical Unit Chelmer Housing Partnership 25th October 2007 Issue C 11th September 2007 Issue 1
34. Glynn William Dip.Arch (Hons) RIBA Chartered Architects a. Standard MMC pod forming bedroom with optional built in wardrobe unit b. Link section with roof drainage linked to existing guttering c. Small paved plant area allowing shelter and natural light into existing room a c b splay at window Existing and proposed plans 3D Visualisations DESIGN STATEMENT Design is based on standardised MMC pod size of 4.0m x 3.3mbedroom (& poss. cup’d with “link” to existing property to retain daylight to existing rooms and providing small plant courtyard. Drainage from new roofs would run into existing gutter and downpipe. Potential to provide water-butt for garden watering Folio 57 – Typical Unit Chelmer Housing Partnership 25th October 2007 Issue C 11th September 2007 Issue 1
78. 2dPrepared in conjunction with Adroit Modular Building Systems £26,90810 weeks Excl. 17.5% VAT 25th October 2007 Issue C 11th September 2007 Issue 1