SlideShare una empresa de Scribd logo
1 de 55
Descargar para leer sin conexión
BIM in offshore structures

Mick Hodgson
Oil and Gas Technology Forum
Tekla for offshore structures
Model and detail offshore steel structures including jackets, decks and flares
Ideal for engineers, detailers and fabricators involved in the design, fabrication
and management of offshore projects

Collaborate and share design and detailing data, material requirements and
project status through the model from design to erection phase

[Date]

2
Tekla Structures
offshore modeling
Tekla Structures software can
handle large and complex
projects
Modelling tools cover all kinds of
standard profiles and materials
including tubular and elliptical
sections all the way individual
welds and bolts
Tekla Structures can easily
integrate to all offshore industry
standard packages, such as
PDS, PDMS, providing error-free
design and detailing

[Date]
[Subject / Author, edit by clicking Insert > Header & Footer]

3
Tekla Structures offshore modelling

[Date]

4
Tekla Structures offshore modelling

[Date]

5
Tekla Structures offshore modelling
Work simultaneously
–

Engineers, project managers, detailers or any other
party who wishes to view or control the model

–

Window to reliable project information during the
fabrication process

Quality control assured
–

Information such as engineering drawings easy to
access and always up to-date

Model the whole project
–

from initial concept studies including 4D
visualisation to the design of structures, safety
systems and sustainability

–

all the way from commissioning, modifications to
eventual decommissioning

[Date]

6
Tekla Structures offshore modelling

[Date]

7
Offshore Weld tools

8
Tekla Structures
offshore workshop drawings

[Date]

9
Tekla Structures offshore engineering drawings

[Date]

10
Tekla Structures offshore listings

[Date]

11
Integrate Tekla Structures
Other trades

ArchiCad
Autocad, ADT,
Microstation
Intergraph PDS
Aveva PDMS
SmartPlant
Catia

Structural

Standards:
IFC, CIS/2, SDNF, DSTV,

Proprietary formats:
DWG, DXF, DGN, …

[Date]

12
[Date]
[Subject / Author, edit by clicking Insert > Header & Footer]

13
IMPORT

EXPORT:

DWG/DXF

DWG/DXF

3D DXF

3D DXF

DSTV

DSTV

SDNF

SDNF

PDMS

PDMS

CIMsteel (CIS/2)

CIMsteel (CIS/2)

Staad

Staad

SACS

PML (ModelDraft)

Monorail

PML (Frameworks)

HLI

HLI

Calma

Calma

Plantview

MicroSAS

MicasPlus

3D DGN

Eureka LPM

KISS
[Date]

Import/Export Samples

14
Organization - A

Organization - B

Organization - C

[Date]

Scheduling and planning

BIM Consultant

Fabrication and logistics

15
Import/Export Samples

Import/Export Samples

[Date]
[Subject / Author, edit by clicking Insert > Header & Footer]

16
[Date]

Import/Export Samples
Import/Export Samples
[Subject / Author, edit by clicking Insert > Header & Footer]

17
Import/Export Samples
Import/Export Samples
[Date]
[Subject / Author, edit by clicking Insert > Header & Footer]

18
Construction Management
Module for Offshore Projects
Mick Hodgson
Construction Management Module
MODEL ORGANISER:
Organize and manage your model.
Structure model and objects to
suitable purchase & work etc.
packages. Make reports & plans.
Create delivery lots

CLASH CHECK MANAGER:
Manage quality of design and
plans. Coordinate clashes and
utilize you detailing capacity
effectively

TASK MANAGER:
Manage your detailing, fabrication and
erection schedules and sequences.
Coordinate schedules with customers
CM flow between the Companies
BIM Estimation model created, material preliminary order and schedule created using
Task Manager and then exported to Primavera, Basic Clash check with Clash Check
Manager.
Clash Check Manager example

[Date]
[Subject / Author, edit by clicking Insert > Header & Footer]

22
CM flow between the Companies
Contract won Primavera edited schedule imported back to Task Manager, detailing
progresses.
Task Manager link to Primavera or
MS Project
CM flow between the Companies
Shipping packages created using Model Organiser and Steel projects data passed
back through Task Manager to schedule and also model objects
Task Manager Sequencing
Order of the individual
objects inside task
– By properties
– By location
– By dragging
– By picking

Automated date/time
calculation of the
individual objects

23.4.2012
Model Organiser Example Material
Model Organiser Example Welds
CM flow between the Companies
Final As-Built BIM model Clash Check using Clash Check Manager
Tekla Structures Integration To
ERP/MIS and CNC Systems

[Date]
[Subject / Author, edit by clicking Insert > Header & Footer]

30
Steel Projects PLM CNC Production / Planning
Steel Projects PLM Bar Nesting
Steel Projects PLM Plate Nesting
Steel Projects PLM CNC Planning and Time
Calculation
New range of specialised HGG tube to
tube components in Tekla
Links direct to all HGG profiling CNC machines
Final product

[Date]

37
BIM for the Jobsite
Tekla Structures > Trimble LM80 Integration
Special Industry Session for Contractors
Tools in Tekla to integrate with Trimble

Create Layout
Points

Create Layout
Files
Create DWG / DXF

[Date]

39
Pass files over to Nomad
DXF DWG
Point data

Layout Files

[Date]

40
Selectable Point Data and Background Data
• Work together to help with orientation on the job site

With points alone it is difficult to
visualize where you are

Adding the Background data
helps to clarify where you are
Increasing productivity with model-based layout
Accurate model data

Used directly in the field
Also used for fabrication set out applications

[Date]

43
Tekla Open API™
Integrating & Enhancing Tekla Structures

Eric Beyer - Product Manager / Steel
Some examples
Radial Grid
Mini Toolbar
Task Manager
…
Tekla for offshore structures

• Some 120 offshore construction projects
completed
• including modular deck drilling and
production platforms, integrated deck
platforms, wellhead platforms and
accommodation platforms
• Offshore Division has used Tekla
Structures to design its platforms for two
years
[Date]

46
Tekla for offshore structures

Halfdan BB
Tekla model was used successfully for various
purposes:

Halfdan BB is an unmanned
platform situated in the North
Sea at a location where the
depth reaches 50 m

- Continuous monitoring of the weight of the
structure and the position of the deck
structure’s centre of gravity during the
design phase
- Creation of drawings for the client and
authorities for certification purposes
- Output of lists of materials purchasing
- Identifying and correcting any conflicts with
equipment, piping, cables, access routes,
etc.
- Drawings for developing the workshop
designs used on the construction site

[Date]

47
Tekla for offshore structures
With Tekla Open API, Saipem
was able to generate added
value by exploiting its own
design organization
Saipem have further customised
Tekla Structures to integrate
into overall project work
processes, both at
engineering level and
material procurement and
fabrication activities
[Date]

48
Tekla for offshore structures
Saipem have been able to design,
detail and manage a range of
projects using Tekla Structures
with their customised tools

Creation of internal macros for:
- offshore joints & nodes
- material properties & class for
MMS codification
- engineering breakdown & fabrication
sequences
Integration with Material Management
System

[Date]

49
Tekla for offshore structures
Integration to Material Management System

[Date]

50
Tekla for offshore structures
Structural breakdown

[Date]

51
Tekla for offshore structures
Assembly breakdown structure

[Date]

52
Tekla for offshore structures
“The greatest benefit of using Tekla lies in the ability to
oversee the whole project since all of the
information is encompassed in the model. This is
also true of the execution of feasibility studies and
initial steps, assessment and evaluation of weights
and centres of gravity and the speed of verification
of project variations over the course of the work.”

[Date]

53
Tekla for offshore structures
“We believe that in the future, Tekla will
contribute to further boosting the efficiency of our work
processes as well as the quality of the results that can be
derived from the model.”

[Date]

54
Thank You
More about Tekla
solutions, references
and contacts at
www.tekla.com

Más contenido relacionado

La actualidad más candente

Ts training eng_drawings_170_enu
Ts training eng_drawings_170_enuTs training eng_drawings_170_enu
Ts training eng_drawings_170_enu
imaduddin91
 
Ts training eng_modeling_170_enu
Ts training eng_modeling_170_enuTs training eng_modeling_170_enu
Ts training eng_modeling_170_enu
imaduddin91
 
Structural engineer drawings
Structural engineer drawingsStructural engineer drawings
Structural engineer drawings
czlun
 

La actualidad más candente (20)

Plannerly and Dalux for construction system engineering
Plannerly and Dalux for construction system engineeringPlannerly and Dalux for construction system engineering
Plannerly and Dalux for construction system engineering
 
Staad Pro Intro
Staad Pro IntroStaad Pro Intro
Staad Pro Intro
 
steel detailer
steel detailersteel detailer
steel detailer
 
etabs ppt.pptx
etabs ppt.pptxetabs ppt.pptx
etabs ppt.pptx
 
Revit Structure Training
Revit Structure TrainingRevit Structure Training
Revit Structure Training
 
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
BIM in Project Management: Keynote Speech by Mr. Kevin POOLEBIM in Project Management: Keynote Speech by Mr. Kevin POOLE
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 
The basics of structural engineering
The basics of structural engineeringThe basics of structural engineering
The basics of structural engineering
 
3D Modeling with Revit Structure
3D Modeling with Revit Structure3D Modeling with Revit Structure
3D Modeling with Revit Structure
 
Intro to BIM and Revit Structure
Intro to BIM and Revit StructureIntro to BIM and Revit Structure
Intro to BIM and Revit Structure
 
BIM training
BIM training BIM training
BIM training
 
Steel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_edSteel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_ed
 
Ts training eng_drawings_170_enu
Ts training eng_drawings_170_enuTs training eng_drawings_170_enu
Ts training eng_drawings_170_enu
 
Ts training eng_modeling_170_enu
Ts training eng_modeling_170_enuTs training eng_modeling_170_enu
Ts training eng_modeling_170_enu
 
Revit introduction class
Revit  introduction classRevit  introduction class
Revit introduction class
 
Structural engineer drawings
Structural engineer drawingsStructural engineer drawings
Structural engineer drawings
 
Presentation on Revit Architecture
Presentation  on Revit ArchitecturePresentation  on Revit Architecture
Presentation on Revit Architecture
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
 
Revit presentation
Revit presentationRevit presentation
Revit presentation
 

Similar a Presentation 5-tekla

Shivaraj_Kumar_2016 (1)
Shivaraj_Kumar_2016 (1)Shivaraj_Kumar_2016 (1)
Shivaraj_Kumar_2016 (1)
SHIVARAJ KUMAR
 
ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3
Elbert Speed III
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDF
Sandy .
 
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
CCT International
 

Similar a Presentation 5-tekla (20)

Leveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsLeveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution Teams
 
Shivaraj_Kumar_2016 (1)
Shivaraj_Kumar_2016 (1)Shivaraj_Kumar_2016 (1)
Shivaraj_Kumar_2016 (1)
 
Место развития BIM в реальности и на стройке.
Место развития BIM в реальности и на стройке. Место развития BIM в реальности и на стройке.
Место развития BIM в реальности и на стройке.
 
ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3
 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction Industry
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDF
 
Resume
ResumeResume
Resume
 
Timothy Jaeger Resume
Timothy Jaeger ResumeTimothy Jaeger Resume
Timothy Jaeger Resume
 
Gary h resume 111014d
Gary h resume 111014dGary h resume 111014d
Gary h resume 111014d
 
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
 
ENR467723
ENR467723ENR467723
ENR467723
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
 
How Tekla BIM Modeling saving time for top structural engineering firms? | Te...
How Tekla BIM Modeling saving time for top structural engineering firms? | Te...How Tekla BIM Modeling saving time for top structural engineering firms? | Te...
How Tekla BIM Modeling saving time for top structural engineering firms? | Te...
 
Derek Pattison CV1
Derek Pattison CV1Derek Pattison CV1
Derek Pattison CV1
 
SOLIDWORKS Simulation and technical.
SOLIDWORKS Simulation and technical.SOLIDWORKS Simulation and technical.
SOLIDWORKS Simulation and technical.
 
Resume 4md
Resume 4mdResume 4md
Resume 4md
 
DansResume 12-02-16
DansResume 12-02-16DansResume 12-02-16
DansResume 12-02-16
 
6.0 CURT CII - Digital Transformation of Construction Industry
6.0 CURT CII  - Digital Transformation of Construction Industry6.0 CURT CII  - Digital Transformation of Construction Industry
6.0 CURT CII - Digital Transformation of Construction Industry
 
Trimble connect
Trimble connectTrimble connect
Trimble connect
 

Último

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 

Último (20)

UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 

Presentation 5-tekla

  • 1. BIM in offshore structures Mick Hodgson Oil and Gas Technology Forum
  • 2. Tekla for offshore structures Model and detail offshore steel structures including jackets, decks and flares Ideal for engineers, detailers and fabricators involved in the design, fabrication and management of offshore projects Collaborate and share design and detailing data, material requirements and project status through the model from design to erection phase [Date] 2
  • 3. Tekla Structures offshore modeling Tekla Structures software can handle large and complex projects Modelling tools cover all kinds of standard profiles and materials including tubular and elliptical sections all the way individual welds and bolts Tekla Structures can easily integrate to all offshore industry standard packages, such as PDS, PDMS, providing error-free design and detailing [Date] [Subject / Author, edit by clicking Insert > Header & Footer] 3
  • 4. Tekla Structures offshore modelling [Date] 4
  • 5. Tekla Structures offshore modelling [Date] 5
  • 6. Tekla Structures offshore modelling Work simultaneously – Engineers, project managers, detailers or any other party who wishes to view or control the model – Window to reliable project information during the fabrication process Quality control assured – Information such as engineering drawings easy to access and always up to-date Model the whole project – from initial concept studies including 4D visualisation to the design of structures, safety systems and sustainability – all the way from commissioning, modifications to eventual decommissioning [Date] 6
  • 7. Tekla Structures offshore modelling [Date] 7
  • 10. Tekla Structures offshore engineering drawings [Date] 10
  • 11. Tekla Structures offshore listings [Date] 11
  • 12. Integrate Tekla Structures Other trades ArchiCad Autocad, ADT, Microstation Intergraph PDS Aveva PDMS SmartPlant Catia Structural Standards: IFC, CIS/2, SDNF, DSTV, Proprietary formats: DWG, DXF, DGN, … [Date] 12
  • 13. [Date] [Subject / Author, edit by clicking Insert > Header & Footer] 13
  • 14. IMPORT EXPORT: DWG/DXF DWG/DXF 3D DXF 3D DXF DSTV DSTV SDNF SDNF PDMS PDMS CIMsteel (CIS/2) CIMsteel (CIS/2) Staad Staad SACS PML (ModelDraft) Monorail PML (Frameworks) HLI HLI Calma Calma Plantview MicroSAS MicasPlus 3D DGN Eureka LPM KISS [Date] Import/Export Samples 14
  • 15. Organization - A Organization - B Organization - C [Date] Scheduling and planning BIM Consultant Fabrication and logistics 15
  • 16. Import/Export Samples Import/Export Samples [Date] [Subject / Author, edit by clicking Insert > Header & Footer] 16
  • 17. [Date] Import/Export Samples Import/Export Samples [Subject / Author, edit by clicking Insert > Header & Footer] 17
  • 18. Import/Export Samples Import/Export Samples [Date] [Subject / Author, edit by clicking Insert > Header & Footer] 18
  • 19. Construction Management Module for Offshore Projects Mick Hodgson
  • 20. Construction Management Module MODEL ORGANISER: Organize and manage your model. Structure model and objects to suitable purchase & work etc. packages. Make reports & plans. Create delivery lots CLASH CHECK MANAGER: Manage quality of design and plans. Coordinate clashes and utilize you detailing capacity effectively TASK MANAGER: Manage your detailing, fabrication and erection schedules and sequences. Coordinate schedules with customers
  • 21. CM flow between the Companies BIM Estimation model created, material preliminary order and schedule created using Task Manager and then exported to Primavera, Basic Clash check with Clash Check Manager.
  • 22. Clash Check Manager example [Date] [Subject / Author, edit by clicking Insert > Header & Footer] 22
  • 23. CM flow between the Companies Contract won Primavera edited schedule imported back to Task Manager, detailing progresses.
  • 24. Task Manager link to Primavera or MS Project
  • 25. CM flow between the Companies Shipping packages created using Model Organiser and Steel projects data passed back through Task Manager to schedule and also model objects
  • 26. Task Manager Sequencing Order of the individual objects inside task – By properties – By location – By dragging – By picking Automated date/time calculation of the individual objects 23.4.2012
  • 29. CM flow between the Companies Final As-Built BIM model Clash Check using Clash Check Manager
  • 30. Tekla Structures Integration To ERP/MIS and CNC Systems [Date] [Subject / Author, edit by clicking Insert > Header & Footer] 30
  • 31. Steel Projects PLM CNC Production / Planning
  • 32. Steel Projects PLM Bar Nesting
  • 33. Steel Projects PLM Plate Nesting
  • 34. Steel Projects PLM CNC Planning and Time Calculation
  • 35. New range of specialised HGG tube to tube components in Tekla
  • 36. Links direct to all HGG profiling CNC machines
  • 38. BIM for the Jobsite Tekla Structures > Trimble LM80 Integration Special Industry Session for Contractors
  • 39. Tools in Tekla to integrate with Trimble Create Layout Points Create Layout Files Create DWG / DXF [Date] 39
  • 40. Pass files over to Nomad DXF DWG Point data Layout Files [Date] 40
  • 41. Selectable Point Data and Background Data • Work together to help with orientation on the job site With points alone it is difficult to visualize where you are Adding the Background data helps to clarify where you are
  • 42. Increasing productivity with model-based layout Accurate model data Used directly in the field
  • 43. Also used for fabrication set out applications [Date] 43
  • 44. Tekla Open API™ Integrating & Enhancing Tekla Structures Eric Beyer - Product Manager / Steel
  • 45. Some examples Radial Grid Mini Toolbar Task Manager …
  • 46. Tekla for offshore structures • Some 120 offshore construction projects completed • including modular deck drilling and production platforms, integrated deck platforms, wellhead platforms and accommodation platforms • Offshore Division has used Tekla Structures to design its platforms for two years [Date] 46
  • 47. Tekla for offshore structures Halfdan BB Tekla model was used successfully for various purposes: Halfdan BB is an unmanned platform situated in the North Sea at a location where the depth reaches 50 m - Continuous monitoring of the weight of the structure and the position of the deck structure’s centre of gravity during the design phase - Creation of drawings for the client and authorities for certification purposes - Output of lists of materials purchasing - Identifying and correcting any conflicts with equipment, piping, cables, access routes, etc. - Drawings for developing the workshop designs used on the construction site [Date] 47
  • 48. Tekla for offshore structures With Tekla Open API, Saipem was able to generate added value by exploiting its own design organization Saipem have further customised Tekla Structures to integrate into overall project work processes, both at engineering level and material procurement and fabrication activities [Date] 48
  • 49. Tekla for offshore structures Saipem have been able to design, detail and manage a range of projects using Tekla Structures with their customised tools Creation of internal macros for: - offshore joints & nodes - material properties & class for MMS codification - engineering breakdown & fabrication sequences Integration with Material Management System [Date] 49
  • 50. Tekla for offshore structures Integration to Material Management System [Date] 50
  • 51. Tekla for offshore structures Structural breakdown [Date] 51
  • 52. Tekla for offshore structures Assembly breakdown structure [Date] 52
  • 53. Tekla for offshore structures “The greatest benefit of using Tekla lies in the ability to oversee the whole project since all of the information is encompassed in the model. This is also true of the execution of feasibility studies and initial steps, assessment and evaluation of weights and centres of gravity and the speed of verification of project variations over the course of the work.” [Date] 53
  • 54. Tekla for offshore structures “We believe that in the future, Tekla will contribute to further boosting the efficiency of our work processes as well as the quality of the results that can be derived from the model.” [Date] 54
  • 55. Thank You More about Tekla solutions, references and contacts at www.tekla.com