SlideShare una empresa de Scribd logo
1 de 23
MENARID Fourth Learning Workshop
Presentation by Dr. Lamia Mansour
Independent Consultant
18 June 2014, Beirut
Objective of the presentation
 Present strategies to support Results Based
Management of M&E systems for Integrated
Natural Resources Management projects
 Identify modalities to maintain the
MENARID platform
Structure of the presentation
1. Key principles of Results Based Management
2. Key principles of M&E systems within RBM
3. Status of M&E systems of MENARID projects
4. Brief description of MENARID M&E platform
5. Modalities to maintain MENARID M&E
platform
Results-Based Management (RBM)
 RBM is a management strategy by which all actors,
contributing directly or indirectly to achieving a set
of results, ensure that their processes, products and
services contribute to the achievement of desired
results at the level of the outputs, outcomes and
higher level goals or impact.
(OECD, 2002).
Results-Based Management (RBM)
 In June 2007, the first year of GEF-4, the GEF
Council approved a RBM framework. The RBM
framework was built on the strategic programming
for GEF-4 focal area strategies and their associated
indicators
Results-Based Management (RBM)
Results Chain in the context of RBM
 A results chain links actions and activities
implemented by projects to the targets of projects,
i.e., their results. The results chain essentially tells us
what stakeholders want to achieve, why they want to
achieve it and how they will go about it.
The RBM results chain
Results-Based Management (RBM)
RBM life-cycle approach
 Planning, monitoring and evaluation come together
as RBM. RBM is defined as a broad management
strategy aimed at achieving improved performance
and demonstrable results. This ongoing process of
doing, learning and improving. RBM is concerned
with learning, risk management and accountability.
RBM life-cycle approach
Results-Based Management (RBM)
M&E within the RBM approach
 A monitoring and evaluation (M&E) system must be
in place that can assess how the project is
performing with respect to expected outputs,
outcomes and impact
M&E within the RBM : SMART indicators
 Specific: Is the indicator specific enough to measure
progress towards the results?
 Measurable: Is the indicator a reliable and clear
measure of results?
 Attainable: Are the results in which the indicator
seeks to chart progress realistic?
 Relevant: Is the indicator relevant to the intended
outputs and outcomes?
 Time-bound: Are data available at reasonable cost
and effort?
M&E within the RBM : An Example
Level of Result Indicator
Goal/Objective: Sustainable
Land Management in Region
X
Increased vegetation cover
Reduction in soil loss
Stabilization of groundwater
table
Outcome: Reduction of land
degradation in target
Agricultural Areas
Increased productivity of
agricultural land
Output: Good Agricultural
Practices are adopted
Surface area of land adopting
GAP (CA, IPM, drip
irrigation)
Status of M&E in MENARID projects
Brief overview of MENARID projects:
 10 Projects
 3 Agencies: IFAD, UNDP, UNEP, WB
 3 Countries: Algeria, Iran, Jordan, Morocco,
Tunisia, Yemen and one Regional project
Status of M&E in MENARID projects
Long Duration: August 2008 - December 2018
 Most MENARID projects have been initiated
between 2008 and 2010, with the exception of two
projects which were initiated in 2013
 The majority of the MENARID projects will be
completed by 2015 for the exception of the 2 late
starters which will be will continue till 2018-2019
Multitude of GEF Operational Programmes:
 LD, IW, BD1, BD2, ACC
Status of M&E in MENARID projects
Project planning, M&E and Reporting
1. Agencies requirements:
 AWP, Annual reports and quarterly reports, RIMS
(for IFAD)
2. GEF requirements:
 Project Implementation Report (PIR)
 Tracking Tool: LDTT, IWTT, METT ( BD1), BDTT(
BD2), ACCTT
Status of M&E in MENARID projects
 Most projects seem to respond to the agencies
requirements and are ready to share the agencies
annual reports for external review
 Most projects have not used the GEF PIRs and
Tracking Tools as a basis for M&E and accordingly
did not share PIRs and Tracking Tools for external
review
 In the case of IFAD/MENARID projects, special
support was deployed to respond to GEF
requirements through integrating Results Indicators
in the PIRs and establishing the Tracking Tools
(LDTT and IWTT)
Status of M&E in MENARID projects
3. Requirements of the ICARDA-MENARID
project for aligned M&E functions
 M&E Platform (MENARID GATEWAY)
 M&E Matrix developed by ICARDA in close
collaboration with the projects and include a list of
indicators
 On-line M&E platform based on the M&E Matrix
 Training activities were conducted to support the
use of the M&E platform
M&E Platform (MENARID GATEWAY)
Typology of indicators of the M&E Matrix/Platform:
 Goal: The economic and social well-being of the targeted communities
improved through the promotion of Integrated Natural Resources
Management in the MENA region and the restoration of ecosystem
functions and productivity
 Component 1: Approaches to INRM investments at national and local
levels- technical assistance and investments coordinated and harmonized
 Component 2.1: Enabling environments for INRM-technical assistance
and investments mainstreamed and promoted in climate change
 Component 2.2: Enabling environments for INRM-technical assistance
and investments mainstreamed and promoted in land degradation
 Component 2.3: Enabling environments for INRM-technical assistance
and investments mainstreamed and promoted in International Waters
 Component 2.4: Enabling environments for INRM-technical assistance
and investments mainstreamed and promoted in biodiversity
M&E Platform (MENARID GATEWAY)
 Typology of indicators of the M&E Matrix/Platform:
 Component 3.1: Investment in Land Degradation- Arid
and semi-arid ecosystems integrity restored and livelihoods
improved, including increased adaptation to climate change.
 Component 3.2: Investment in International Waters-
Arid and semi-arid ecosystems integrity restored and
livelihoods improved, including increased adaptation to
climate change.
 Component 3.3: Investment in Biodiversity Arid and
semi-arid ecosystems integrity restored and livelihoods
improved, including increased adaptation to climate change.
 Component 4: Knowledge Management, sharing and up-
scaling of best practices fostered
M&E Platform (MENARID GATEWAY)
Functions of the M&E Platform: As a project
manager
 Entering project’s indicators data
 Configuration of scheduled reports for a project
 Getting a sample report before it is sent off
 Adding/Editing dashboard for a project homepage
M&E Platform (MENARID GATEWAY)
Functions of the M&E Platform: As an
anonymous user
 Viewing/analyzing graphical and tabular data on
dashboards
 Filtering data in user reports where filters are
present
 Visiting all M&E project pages of related programme
where they are shared for public use
 Viewing shared M&E documents of related
programme where they are shared for public use
M&E Platform (MENARID GATEWAY)
How to make best use of the MENARID M&E
Platform
 Selecting/Adding relevant indicators as needed
 Establishing a baseline/target for the indicators
 Regular measurement of the indicators
 Responding to the Implementing Agencies
Requirements: AWP /Regular Reports/ RIMS
(IFAD)
 Responding to the GEF Requirements for
Operational Programmes: PIR / Tracking Tools:
LDTT, METT, BD2TT, ACCTT, IWTT
M&E Platform (MENARID GATEWAY)
How to make it sustainable??

Más contenido relacionado

La actualidad más candente

15. COSOP 2013-18 Recommendations
15. COSOP 2013-18 Recommendations15. COSOP 2013-18 Recommendations
15. COSOP 2013-18 Recommendationsifadseahub
 
Rijsberman srf action plan 2 nov 2012 punta de este
Rijsberman srf action plan 2 nov 2012 punta de esteRijsberman srf action plan 2 nov 2012 punta de este
Rijsberman srf action plan 2 nov 2012 punta de esteFrank Rijsberman
 
CCXG Forum, March 2021, Mary Awad
CCXG Forum, March 2021, Mary AwadCCXG Forum, March 2021, Mary Awad
CCXG Forum, March 2021, Mary AwadOECD Environment
 
CCCXG Global Forum March 2017 BGC What information would be needed and how co...
CCCXG Global Forum March 2017 BGC What information would be needed and how co...CCCXG Global Forum March 2017 BGC What information would be needed and how co...
CCCXG Global Forum March 2017 BGC What information would be needed and how co...OECD Environment
 
9.2.2 Regional TEM-A Part III
9.2.2 Regional TEM-A Part III9.2.2 Regional TEM-A Part III
9.2.2 Regional TEM-A Part IIINAP Events
 
22.0a opm managing finance nap ws manila june 2017 part 1
22.0a opm managing finance nap ws manila june 2017 part 122.0a opm managing finance nap ws manila june 2017 part 1
22.0a opm managing finance nap ws manila june 2017 part 1NAP Events
 
Cambodia's perspective on program/performance budgeting - Ratanak Hav - Cambodia
Cambodia's perspective on program/performance budgeting - Ratanak Hav - CambodiaCambodia's perspective on program/performance budgeting - Ratanak Hav - Cambodia
Cambodia's perspective on program/performance budgeting - Ratanak Hav - CambodiaOECD Governance
 
CCXG Forum, June 2020, Agripina Jenkins
CCXG Forum, June 2020, Agripina JenkinsCCXG Forum, June 2020, Agripina Jenkins
CCXG Forum, June 2020, Agripina JenkinsOECD Environment
 
CCXG Forum, June 2020, Alyssa Ng
CCXG Forum, June 2020, Alyssa NgCCXG Forum, June 2020, Alyssa Ng
CCXG Forum, June 2020, Alyssa NgOECD Environment
 
Paris Agreement and the NAP process Global Capacity Development
Paris Agreement and the NAP process Global Capacity Development Paris Agreement and the NAP process Global Capacity Development
Paris Agreement and the NAP process Global Capacity Development ExternalEvents
 
CCXG Forum, June 2020, Marcia Rocha
CCXG Forum, June 2020, Marcia RochaCCXG Forum, June 2020, Marcia Rocha
CCXG Forum, June 2020, Marcia RochaOECD Environment
 

La actualidad más candente (18)

PEG M&E Tool
PEG M&E ToolPEG M&E Tool
PEG M&E Tool
 
15. COSOP 2013-18 Recommendations
15. COSOP 2013-18 Recommendations15. COSOP 2013-18 Recommendations
15. COSOP 2013-18 Recommendations
 
Rijsberman srf action plan 2 nov 2012 punta de este
Rijsberman srf action plan 2 nov 2012 punta de esteRijsberman srf action plan 2 nov 2012 punta de este
Rijsberman srf action plan 2 nov 2012 punta de este
 
CCXG Forum, March 2021, Mary Awad
CCXG Forum, March 2021, Mary AwadCCXG Forum, March 2021, Mary Awad
CCXG Forum, March 2021, Mary Awad
 
CCCXG Global Forum March 2017 BGC What information would be needed and how co...
CCCXG Global Forum March 2017 BGC What information would be needed and how co...CCCXG Global Forum March 2017 BGC What information would be needed and how co...
CCCXG Global Forum March 2017 BGC What information would be needed and how co...
 
9.2.2 Regional TEM-A Part III
9.2.2 Regional TEM-A Part III9.2.2 Regional TEM-A Part III
9.2.2 Regional TEM-A Part III
 
22.0a opm managing finance nap ws manila june 2017 part 1
22.0a opm managing finance nap ws manila june 2017 part 122.0a opm managing finance nap ws manila june 2017 part 1
22.0a opm managing finance nap ws manila june 2017 part 1
 
Global Conference 2018 RRR+ Guyana
Global Conference 2018 RRR+ GuyanaGlobal Conference 2018 RRR+ Guyana
Global Conference 2018 RRR+ Guyana
 
RBM for climate change adaptation and mitigation
RBM for climate change adaptation and mitigationRBM for climate change adaptation and mitigation
RBM for climate change adaptation and mitigation
 
Evaluation community of practice workshop presentation
Evaluation community of practice   workshop presentationEvaluation community of practice   workshop presentation
Evaluation community of practice workshop presentation
 
RBM for climate change adaptation and mitigation
RBM for climate change adaptation and mitigationRBM for climate change adaptation and mitigation
RBM for climate change adaptation and mitigation
 
Cambodia's perspective on program/performance budgeting - Ratanak Hav - Cambodia
Cambodia's perspective on program/performance budgeting - Ratanak Hav - CambodiaCambodia's perspective on program/performance budgeting - Ratanak Hav - Cambodia
Cambodia's perspective on program/performance budgeting - Ratanak Hav - Cambodia
 
CCXG Forum, June 2020, Agripina Jenkins
CCXG Forum, June 2020, Agripina JenkinsCCXG Forum, June 2020, Agripina Jenkins
CCXG Forum, June 2020, Agripina Jenkins
 
CCXG Forum, June 2020, Alyssa Ng
CCXG Forum, June 2020, Alyssa NgCCXG Forum, June 2020, Alyssa Ng
CCXG Forum, June 2020, Alyssa Ng
 
Modelling
ModellingModelling
Modelling
 
Paris Agreement and the NAP process Global Capacity Development
Paris Agreement and the NAP process Global Capacity Development Paris Agreement and the NAP process Global Capacity Development
Paris Agreement and the NAP process Global Capacity Development
 
CCXG Forum, June 2020, Marcia Rocha
CCXG Forum, June 2020, Marcia RochaCCXG Forum, June 2020, Marcia Rocha
CCXG Forum, June 2020, Marcia Rocha
 
Agriculture Public Expenditure Workshop Module 5
Agriculture Public Expenditure Workshop Module 5Agriculture Public Expenditure Workshop Module 5
Agriculture Public Expenditure Workshop Module 5
 

Similar a Mansour l menarid-presentation-rbm-m&e

PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
 PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ... PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...NAP Events
 
Monitoring the process using the PEG M&E Tool
Monitoring the process using the PEG M&E ToolMonitoring the process using the PEG M&E Tool
Monitoring the process using the PEG M&E ToolNAP Events
 
M&e learning paper (24 october 2019)
M&e learning paper (24 october 2019)M&e learning paper (24 october 2019)
M&e learning paper (24 october 2019)MADE
 
Results Management System for IFAD supported country programmes
Results Management System for IFAD supported country programmesResults Management System for IFAD supported country programmes
Results Management System for IFAD supported country programmesIFAD Vietnam
 
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...FIDAfrique-IFADAfrica
 
Amazon Region Protected Areas Program (ARPA): Innovation in Protected Areas S...
Amazon Region Protected Areas Program (ARPA): Innovation in Protected Areas S...Amazon Region Protected Areas Program (ARPA): Innovation in Protected Areas S...
Amazon Region Protected Areas Program (ARPA): Innovation in Protected Areas S...Ronaldo Weigand Jr
 
1002 Cd Overview Presentation
1002 Cd Overview Presentation1002 Cd Overview Presentation
1002 Cd Overview Presentationguestf52670f
 
GF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project ProposalsGF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project ProposalsFAO
 
CEFIM Industry Indonesia.pdf
CEFIM Industry Indonesia.pdfCEFIM Industry Indonesia.pdf
CEFIM Industry Indonesia.pdfOECD Environment
 
CCXG Global Forum March 2018, Transparency of reporting in technology support...
CCXG Global Forum March 2018, Transparency of reporting in technology support...CCXG Global Forum March 2018, Transparency of reporting in technology support...
CCXG Global Forum March 2018, Transparency of reporting in technology support...OECD Environment
 
MEAL WORKSHOP ON ETH1224-draft.pptx
MEAL WORKSHOP ON ETH1224-draft.pptxMEAL WORKSHOP ON ETH1224-draft.pptx
MEAL WORKSHOP ON ETH1224-draft.pptxAbraham Lebeza
 
TRANSITIONS: Agroecological Transitions Program for Building Resilient and In...
TRANSITIONS: Agroecological Transitions Program for Building Resilient and In...TRANSITIONS: Agroecological Transitions Program for Building Resilient and In...
TRANSITIONS: Agroecological Transitions Program for Building Resilient and In...Sadie W Shelton
 
Monitoring & Evaluation
Monitoring & EvaluationMonitoring & Evaluation
Monitoring & Evaluationclimasouth
 

Similar a Mansour l menarid-presentation-rbm-m&e (20)

PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
 PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ... PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
 
Monitoring the process using the PEG M&E Tool
Monitoring the process using the PEG M&E ToolMonitoring the process using the PEG M&E Tool
Monitoring the process using the PEG M&E Tool
 
M&e learning paper (24 october 2019)
M&e learning paper (24 october 2019)M&e learning paper (24 october 2019)
M&e learning paper (24 october 2019)
 
PEG M&E Tool
PEG M&E ToolPEG M&E Tool
PEG M&E Tool
 
Results Management System for IFAD supported country programmes
Results Management System for IFAD supported country programmesResults Management System for IFAD supported country programmes
Results Management System for IFAD supported country programmes
 
Marie pdf13
Marie pdf13Marie pdf13
Marie pdf13
 
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
 
Amazon Region Protected Areas Program (ARPA): Innovation in Protected Areas S...
Amazon Region Protected Areas Program (ARPA): Innovation in Protected Areas S...Amazon Region Protected Areas Program (ARPA): Innovation in Protected Areas S...
Amazon Region Protected Areas Program (ARPA): Innovation in Protected Areas S...
 
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan PerezAPR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
 
APR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
APR Workshop 2010-Monitoring and Evaluation (2)- Susan PerezAPR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
APR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
 
Cbp Sem Inception Meeting May 09
Cbp   Sem Inception Meeting May 09Cbp   Sem Inception Meeting May 09
Cbp Sem Inception Meeting May 09
 
1002 Cd Overview Presentation
1002 Cd Overview Presentation1002 Cd Overview Presentation
1002 Cd Overview Presentation
 
GF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project ProposalsGF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project Proposals
 
IFPRI - Results and Impact Management System (RIMS)
IFPRI - Results and Impact Management System (RIMS)IFPRI - Results and Impact Management System (RIMS)
IFPRI - Results and Impact Management System (RIMS)
 
CEFIM Industry Indonesia.pdf
CEFIM Industry Indonesia.pdfCEFIM Industry Indonesia.pdf
CEFIM Industry Indonesia.pdf
 
CCXG Global Forum March 2018, Transparency of reporting in technology support...
CCXG Global Forum March 2018, Transparency of reporting in technology support...CCXG Global Forum March 2018, Transparency of reporting in technology support...
CCXG Global Forum March 2018, Transparency of reporting in technology support...
 
PM&E Guideline
PM&E GuidelinePM&E Guideline
PM&E Guideline
 
MEAL WORKSHOP ON ETH1224-draft.pptx
MEAL WORKSHOP ON ETH1224-draft.pptxMEAL WORKSHOP ON ETH1224-draft.pptx
MEAL WORKSHOP ON ETH1224-draft.pptx
 
TRANSITIONS: Agroecological Transitions Program for Building Resilient and In...
TRANSITIONS: Agroecological Transitions Program for Building Resilient and In...TRANSITIONS: Agroecological Transitions Program for Building Resilient and In...
TRANSITIONS: Agroecological Transitions Program for Building Resilient and In...
 
Monitoring & Evaluation
Monitoring & EvaluationMonitoring & Evaluation
Monitoring & Evaluation
 

Más de groundwatercop

Day 2 valentina salybekova hydrogeology - kazakhstan
Day 2 valentina salybekova   hydrogeology - kazakhstanDay 2 valentina salybekova   hydrogeology - kazakhstan
Day 2 valentina salybekova hydrogeology - kazakhstangroundwatercop
 
Day 2 oleg podolny national coordinator kazakhstan - indicators
Day 2 oleg podolny   national coordinator kazakhstan - indicatorsDay 2 oleg podolny   national coordinator kazakhstan - indicators
Day 2 oleg podolny national coordinator kazakhstan - indicatorsgroundwatercop
 
Day 2 neno kukluric igrac- ims
Day 2 neno kukluric   igrac- imsDay 2 neno kukluric   igrac- ims
Day 2 neno kukluric igrac- imsgroundwatercop
 
Day 2 neno kukluric igrac- data processing
Day 2 neno kukluric   igrac- data processingDay 2 neno kukluric   igrac- data processing
Day 2 neno kukluric igrac- data processinggroundwatercop
 
Day 2 irina skoritseva socio-economic & environent - kazakhstan
Day 2 irina skoritseva   socio-economic & environent - kazakhstanDay 2 irina skoritseva   socio-economic & environent - kazakhstan
Day 2 irina skoritseva socio-economic & environent - kazakhstangroundwatercop
 
Day 2 igor petrakov legal - kazakhstan
Day 2 igor petrakov  legal - kazakhstanDay 2 igor petrakov  legal - kazakhstan
Day 2 igor petrakov legal - kazakhstangroundwatercop
 
Day 1 oleg podolny national coordinator - kazakhstan - workplan
Day 1 oleg podolny   national coordinator - kazakhstan - workplanDay 1 oleg podolny   national coordinator - kazakhstan - workplan
Day 1 oleg podolny national coordinator - kazakhstan - workplangroundwatercop
 
Day 1 oleg podolny natinal coordinator - kazakhstan
Day 1 oleg podolny   natinal coordinator - kazakhstanDay 1 oleg podolny   natinal coordinator - kazakhstan
Day 1 oleg podolny natinal coordinator - kazakhstangroundwatercop
 
Day 1 neno kukuric igrac- ggreta project
Day 1 neno kukuric   igrac- ggreta projectDay 1 neno kukuric   igrac- ggreta project
Day 1 neno kukuric igrac- ggreta projectgroundwatercop
 
Day 1 neno kukuric igrac - methodology
Day 1 neno kukuric   igrac - methodologyDay 1 neno kukuric   igrac - methodology
Day 1 neno kukuric igrac - methodologygroundwatercop
 
Pretashkent organigramme
Pretashkent organigrammePretashkent organigramme
Pretashkent organigrammegroundwatercop
 
Agenda almaty 2014 final
Agenda almaty 2014 finalAgenda almaty 2014 final
Agenda almaty 2014 finalgroundwatercop
 
Participants list technical meeting - july 2014
Participants list   technical meeting - july 2014Participants list   technical meeting - july 2014
Participants list technical meeting - july 2014groundwatercop
 
7 neno kukuric- igrac - assessment and ims-sdc
7 neno kukuric- igrac - assessment and ims-sdc7 neno kukuric- igrac - assessment and ims-sdc
7 neno kukuric- igrac - assessment and ims-sdcgroundwatercop
 
6 akmal karimov - uzbekistan
6 akmal karimov - uzbekistan6 akmal karimov - uzbekistan
6 akmal karimov - uzbekistangroundwatercop
 
5 batyr hajiyev -unece - convention&groundwater
5 batyr hajiyev -unece - convention&groundwater5 batyr hajiyev -unece - convention&groundwater
5 batyr hajiyev -unece - convention&groundwatergroundwatercop
 
4 oleg podolny - kazakhstan
4 oleg podolny - kazakhstan4 oleg podolny - kazakhstan
4 oleg podolny - kazakhstangroundwatercop
 
3 neno kukuric- igrac - global tba activities twap
3  neno kukuric- igrac - global tba activities twap3  neno kukuric- igrac - global tba activities twap
3 neno kukuric- igrac - global tba activities twapgroundwatercop
 
2 aureli-objective of the workshop aa
2 aureli-objective of the workshop aa2 aureli-objective of the workshop aa
2 aureli-objective of the workshop aagroundwatercop
 
Report national exprt workshop- july 2013
Report  national exprt workshop- july 2013Report  national exprt workshop- july 2013
Report national exprt workshop- july 2013groundwatercop
 

Más de groundwatercop (20)

Day 2 valentina salybekova hydrogeology - kazakhstan
Day 2 valentina salybekova   hydrogeology - kazakhstanDay 2 valentina salybekova   hydrogeology - kazakhstan
Day 2 valentina salybekova hydrogeology - kazakhstan
 
Day 2 oleg podolny national coordinator kazakhstan - indicators
Day 2 oleg podolny   national coordinator kazakhstan - indicatorsDay 2 oleg podolny   national coordinator kazakhstan - indicators
Day 2 oleg podolny national coordinator kazakhstan - indicators
 
Day 2 neno kukluric igrac- ims
Day 2 neno kukluric   igrac- imsDay 2 neno kukluric   igrac- ims
Day 2 neno kukluric igrac- ims
 
Day 2 neno kukluric igrac- data processing
Day 2 neno kukluric   igrac- data processingDay 2 neno kukluric   igrac- data processing
Day 2 neno kukluric igrac- data processing
 
Day 2 irina skoritseva socio-economic & environent - kazakhstan
Day 2 irina skoritseva   socio-economic & environent - kazakhstanDay 2 irina skoritseva   socio-economic & environent - kazakhstan
Day 2 irina skoritseva socio-economic & environent - kazakhstan
 
Day 2 igor petrakov legal - kazakhstan
Day 2 igor petrakov  legal - kazakhstanDay 2 igor petrakov  legal - kazakhstan
Day 2 igor petrakov legal - kazakhstan
 
Day 1 oleg podolny national coordinator - kazakhstan - workplan
Day 1 oleg podolny   national coordinator - kazakhstan - workplanDay 1 oleg podolny   national coordinator - kazakhstan - workplan
Day 1 oleg podolny national coordinator - kazakhstan - workplan
 
Day 1 oleg podolny natinal coordinator - kazakhstan
Day 1 oleg podolny   natinal coordinator - kazakhstanDay 1 oleg podolny   natinal coordinator - kazakhstan
Day 1 oleg podolny natinal coordinator - kazakhstan
 
Day 1 neno kukuric igrac- ggreta project
Day 1 neno kukuric   igrac- ggreta projectDay 1 neno kukuric   igrac- ggreta project
Day 1 neno kukuric igrac- ggreta project
 
Day 1 neno kukuric igrac - methodology
Day 1 neno kukuric   igrac - methodologyDay 1 neno kukuric   igrac - methodology
Day 1 neno kukuric igrac - methodology
 
Pretashkent organigramme
Pretashkent organigrammePretashkent organigramme
Pretashkent organigramme
 
Agenda almaty 2014 final
Agenda almaty 2014 finalAgenda almaty 2014 final
Agenda almaty 2014 final
 
Participants list technical meeting - july 2014
Participants list   technical meeting - july 2014Participants list   technical meeting - july 2014
Participants list technical meeting - july 2014
 
7 neno kukuric- igrac - assessment and ims-sdc
7 neno kukuric- igrac - assessment and ims-sdc7 neno kukuric- igrac - assessment and ims-sdc
7 neno kukuric- igrac - assessment and ims-sdc
 
6 akmal karimov - uzbekistan
6 akmal karimov - uzbekistan6 akmal karimov - uzbekistan
6 akmal karimov - uzbekistan
 
5 batyr hajiyev -unece - convention&groundwater
5 batyr hajiyev -unece - convention&groundwater5 batyr hajiyev -unece - convention&groundwater
5 batyr hajiyev -unece - convention&groundwater
 
4 oleg podolny - kazakhstan
4 oleg podolny - kazakhstan4 oleg podolny - kazakhstan
4 oleg podolny - kazakhstan
 
3 neno kukuric- igrac - global tba activities twap
3  neno kukuric- igrac - global tba activities twap3  neno kukuric- igrac - global tba activities twap
3 neno kukuric- igrac - global tba activities twap
 
2 aureli-objective of the workshop aa
2 aureli-objective of the workshop aa2 aureli-objective of the workshop aa
2 aureli-objective of the workshop aa
 
Report national exprt workshop- july 2013
Report  national exprt workshop- july 2013Report  national exprt workshop- july 2013
Report national exprt workshop- july 2013
 

Último

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 

Último (20)

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 

Mansour l menarid-presentation-rbm-m&e

  • 1. MENARID Fourth Learning Workshop Presentation by Dr. Lamia Mansour Independent Consultant 18 June 2014, Beirut
  • 2. Objective of the presentation  Present strategies to support Results Based Management of M&E systems for Integrated Natural Resources Management projects  Identify modalities to maintain the MENARID platform
  • 3. Structure of the presentation 1. Key principles of Results Based Management 2. Key principles of M&E systems within RBM 3. Status of M&E systems of MENARID projects 4. Brief description of MENARID M&E platform 5. Modalities to maintain MENARID M&E platform
  • 4. Results-Based Management (RBM)  RBM is a management strategy by which all actors, contributing directly or indirectly to achieving a set of results, ensure that their processes, products and services contribute to the achievement of desired results at the level of the outputs, outcomes and higher level goals or impact. (OECD, 2002).
  • 5. Results-Based Management (RBM)  In June 2007, the first year of GEF-4, the GEF Council approved a RBM framework. The RBM framework was built on the strategic programming for GEF-4 focal area strategies and their associated indicators
  • 6. Results-Based Management (RBM) Results Chain in the context of RBM  A results chain links actions and activities implemented by projects to the targets of projects, i.e., their results. The results chain essentially tells us what stakeholders want to achieve, why they want to achieve it and how they will go about it.
  • 8. Results-Based Management (RBM) RBM life-cycle approach  Planning, monitoring and evaluation come together as RBM. RBM is defined as a broad management strategy aimed at achieving improved performance and demonstrable results. This ongoing process of doing, learning and improving. RBM is concerned with learning, risk management and accountability.
  • 10. Results-Based Management (RBM) M&E within the RBM approach  A monitoring and evaluation (M&E) system must be in place that can assess how the project is performing with respect to expected outputs, outcomes and impact
  • 11. M&E within the RBM : SMART indicators  Specific: Is the indicator specific enough to measure progress towards the results?  Measurable: Is the indicator a reliable and clear measure of results?  Attainable: Are the results in which the indicator seeks to chart progress realistic?  Relevant: Is the indicator relevant to the intended outputs and outcomes?  Time-bound: Are data available at reasonable cost and effort?
  • 12. M&E within the RBM : An Example Level of Result Indicator Goal/Objective: Sustainable Land Management in Region X Increased vegetation cover Reduction in soil loss Stabilization of groundwater table Outcome: Reduction of land degradation in target Agricultural Areas Increased productivity of agricultural land Output: Good Agricultural Practices are adopted Surface area of land adopting GAP (CA, IPM, drip irrigation)
  • 13. Status of M&E in MENARID projects Brief overview of MENARID projects:  10 Projects  3 Agencies: IFAD, UNDP, UNEP, WB  3 Countries: Algeria, Iran, Jordan, Morocco, Tunisia, Yemen and one Regional project
  • 14. Status of M&E in MENARID projects Long Duration: August 2008 - December 2018  Most MENARID projects have been initiated between 2008 and 2010, with the exception of two projects which were initiated in 2013  The majority of the MENARID projects will be completed by 2015 for the exception of the 2 late starters which will be will continue till 2018-2019 Multitude of GEF Operational Programmes:  LD, IW, BD1, BD2, ACC
  • 15. Status of M&E in MENARID projects Project planning, M&E and Reporting 1. Agencies requirements:  AWP, Annual reports and quarterly reports, RIMS (for IFAD) 2. GEF requirements:  Project Implementation Report (PIR)  Tracking Tool: LDTT, IWTT, METT ( BD1), BDTT( BD2), ACCTT
  • 16. Status of M&E in MENARID projects  Most projects seem to respond to the agencies requirements and are ready to share the agencies annual reports for external review  Most projects have not used the GEF PIRs and Tracking Tools as a basis for M&E and accordingly did not share PIRs and Tracking Tools for external review  In the case of IFAD/MENARID projects, special support was deployed to respond to GEF requirements through integrating Results Indicators in the PIRs and establishing the Tracking Tools (LDTT and IWTT)
  • 17. Status of M&E in MENARID projects 3. Requirements of the ICARDA-MENARID project for aligned M&E functions  M&E Platform (MENARID GATEWAY)  M&E Matrix developed by ICARDA in close collaboration with the projects and include a list of indicators  On-line M&E platform based on the M&E Matrix  Training activities were conducted to support the use of the M&E platform
  • 18. M&E Platform (MENARID GATEWAY) Typology of indicators of the M&E Matrix/Platform:  Goal: The economic and social well-being of the targeted communities improved through the promotion of Integrated Natural Resources Management in the MENA region and the restoration of ecosystem functions and productivity  Component 1: Approaches to INRM investments at national and local levels- technical assistance and investments coordinated and harmonized  Component 2.1: Enabling environments for INRM-technical assistance and investments mainstreamed and promoted in climate change  Component 2.2: Enabling environments for INRM-technical assistance and investments mainstreamed and promoted in land degradation  Component 2.3: Enabling environments for INRM-technical assistance and investments mainstreamed and promoted in International Waters  Component 2.4: Enabling environments for INRM-technical assistance and investments mainstreamed and promoted in biodiversity
  • 19. M&E Platform (MENARID GATEWAY)  Typology of indicators of the M&E Matrix/Platform:  Component 3.1: Investment in Land Degradation- Arid and semi-arid ecosystems integrity restored and livelihoods improved, including increased adaptation to climate change.  Component 3.2: Investment in International Waters- Arid and semi-arid ecosystems integrity restored and livelihoods improved, including increased adaptation to climate change.  Component 3.3: Investment in Biodiversity Arid and semi-arid ecosystems integrity restored and livelihoods improved, including increased adaptation to climate change.  Component 4: Knowledge Management, sharing and up- scaling of best practices fostered
  • 20. M&E Platform (MENARID GATEWAY) Functions of the M&E Platform: As a project manager  Entering project’s indicators data  Configuration of scheduled reports for a project  Getting a sample report before it is sent off  Adding/Editing dashboard for a project homepage
  • 21. M&E Platform (MENARID GATEWAY) Functions of the M&E Platform: As an anonymous user  Viewing/analyzing graphical and tabular data on dashboards  Filtering data in user reports where filters are present  Visiting all M&E project pages of related programme where they are shared for public use  Viewing shared M&E documents of related programme where they are shared for public use
  • 22. M&E Platform (MENARID GATEWAY) How to make best use of the MENARID M&E Platform  Selecting/Adding relevant indicators as needed  Establishing a baseline/target for the indicators  Regular measurement of the indicators  Responding to the Implementing Agencies Requirements: AWP /Regular Reports/ RIMS (IFAD)  Responding to the GEF Requirements for Operational Programmes: PIR / Tracking Tools: LDTT, METT, BD2TT, ACCTT, IWTT
  • 23. M&E Platform (MENARID GATEWAY) How to make it sustainable??