SlideShare una empresa de Scribd logo
1 de 18
Where Does The Time Go? Using Production Downtime to Improve the Success Rate of Continuous Improvement Initiatives Jerry Stevick
Purpose of this Presentation Many Continuous Improvement initiatives fail to reach their expected goals - often estimated at an 80% - 90% failure rate. Getting better results requires better definition of targets – targets that provide tangible benefits to the overall business. This presentation shows how improving production uptime drives dollars to the bottom line. This presentation also provides a method to easily set targets and track progress.
Many CI Programs Fail to Achieve Expected Gains Many CI programs (quality improvement, employee involvement, lean manufacturing, etc) fail to achieve expectations or struggle and sputter as they try to gain and sustain momentum.  Some firms are paralyzed or don’t start because the target is not clear or they are not convinced the CI method will solve the business problem Some firms have false starts because the early results don’t appear to have significant business impact Some firms wander chasing symptoms such as inventory or labor efficiency because the underlying issues are not identified Some firms select an improvement program without really understanding where the improvements will come or their impact on the business Some firms struggle because they fail to create metrics to drive the improvements How can we improve the early results of these initiatives?
Solving the “Where Do We Start?” Problem One barrier to successful continuous improvement is defining a targets that generate visible gains for the business.  Two good options are: Where does the money go? Where does the time go? All production or operating systems have downtime.  Maximizing uptime maximizes the productive output of the system. Employees at all levels tend to understand and support business improvements that are clear and productive. Identifying and fixing causes of production downtime generates buy-in and quick returns because it immediately addresses the core purpose of the organization – providing products and services to customers What exactly do we mean by production uptime?
What is Lost Production Time? The following chart shows the impact of downtime on actual production Planned Production Time Quality losses Actual Productive Uptime Equipment  losses Speed losses The actual productive output of a complex system is often much less than its managers realize and its traditional metrics show
Why Focus on Lost Production Time? The Six Major Losses in Manufacturing -  these six losses address all reasons for lost production, not just equipment Equipment losses Maintenance - breakdowns and planned maintenance Changeover - model changes and adjustments Speed losses Speed - equipment does not run at designed rate Idle time - time lost to behaviors, training, meetings, etc. Quality losses Defects - production defects that is not useable or requires rework Yield - production losses inherent to process Time sets a high standard - it is the one resource we cannot rework or reuse - when it is lost, it is lost forever
Why is it difficult to track lost production time? Traditional accounting and production measurement systems rarely  capture the lost time categories Downtime causes are fragmented and often overlooked Responsibility for addressing downtime categories is split Downtime is often understated – limited to maintenance activities Fire-fighting to eliminate the current downtime issue takes precedence over understanding the overall downtime problem
Why is it difficult to track lost production time? Lean Manufacturing uses Overall Equipment Effectiveness (OEE) to track and manage the Six Losses definition of downtime. However, most firms struggle to get good data for measuring OEE.  Let’s look for an easier way: Goal: to provide a good estimate of the distribution of work activities that is relatively accurate and easy to implement The Work Sampling Study from Industrial Engineering provides a method for generating a quick snapshot of production downtime.
How can we track lost production time? The Work Sampling approach: Based on a number of random observations Categories can be tailored to the processes being studied Large sample size leads to statistical validity Good for documenting non-repetitive activities Basic steps of a Work Sampling Study: Define the objective and how data will be collected Classify activity into categories appropriate for the process Prepare data sheets, sample method, random times Develop procedure for analyzing the data Collect data by random observations Let’s look at two examples:
1st Example: Using Downtime to Target Improvements The objective of this study was to find out where the time goes to gain a better understanding of which improvement methods would add the most value Production facility with rubber molding shop (55 tool locations): Management focus on labor efficiency Difficulty scheduling rush orders No target-based improvement program in place Building ahead for large customers hurt remaining customers Capacity “constraints” prevented 100% satisfaction Utilize sampling study of mold shop downtime: Set up data collection sheets unique to this operation Collect data randomly over 4 week period – 2230+ data points Utilize time estimates to demonstrate impact on the number of pieces built and the capacity constraints
1st Example: Using Downtime to Target Improvements HoursEquivalent Pieces Available hours		15,120			5,670,000 Production hours (85%)	12,852			 Std Hours Earned (92%)	11,834			4,437,750 Downtime Loss (15%)	  2,268			   850,500 Maintenance (5.3%)					    300,510 Set-up  (5.7%)						    323,190 Not scheduled (1.5%)					      85,050 Cleaning (1.0%)						      56,700 Miscellaneous (1.5%)					      85,370 Efficiency Loss (8.0%)			    	   453,375 Scrap / Quality loss (6.3%)				   355,020 	Plant Effectiveness		72% Early Production loss (15%)				   665,662 	Actual Plant Effectiveness		59%
1st Example: Using Downtime to Target Improvements Lessons from this study: Management’s singular focus on labor efficiency is unlikely to solve their production and capacity problems Significant downtime from scrap, changeover time, and maintenance point to the need for a more well rounded improvement program Scheduling improvements were needed to capture scheduling conflicts around tools and unique models The “old school” practice of dropping in orders for big customers robbed a large chunk of capacity from the current month While management worried about it’s 92% labor problem, it was unaware that the production effectiveness of the facility was at 72% When early orders were considered, the shop was only 59% effective at producing current orders
2nd Example: Comparing Two Similar Plants The objective of this study was to show how to plants with similar products, in the same organization, might have different profiles Comparison of two similar facilities Two automotive control plants compared (similar products) Large plastic molding operations Define targeted and random data collection Data collected over 3 – 4 week period How did the two plants compare? Set up data collection sheets unique to each operation Collect data randomly over 3 week period  Utilize time estimates to demonstrate how different processes, people, and business pressures created different improvement opportunities
2nd Example: Comparing Two Similar Plants Plant ABC   	Uptime = 80.1% Based on 1619 observations Plant XYZ	Uptime = 74.6% Based on 4460 observations
2nd Example: What did this Downtime Study show? Lessons from this study: The two plants, despite common division management and similar products and processes, had different downtime profiles Plant ABC displayed a significant need to focus on equipment downtime, primarily time lost to maintenance Plant XYZ displayed a large loss of time to changeover, another form of equipment downtime, that was double the same downtime category in their sister plant Both management teams seriously underestimated the time lost to the non-maintenance downtime categories.  In both cases, there was no significant attack on maintenance and changeover prior to this study.  Losses of close to 20%, if cut in half, would add significant profit dollars to the business
Lessons Learned from Downtime Studies This approach for documenting lost production time works and it is relatively quick and easy to implement The results of most downtime studies “surprise” the managers of the operations being studied. Downtime reduction (greater productive uptime) represents a significant improvement opportunity Every production system is different The production system and its offline support systems (tooling, changeover, maintenance, etc) are closely linked and interdependent Continuous improvement plans can be linked to production system downtime to target improvements with significant payback
How Can We Use Downtime Information to Improve? Improve how we manage the production system Balancing offline support systems to maximize production Increasing capacity by reducing lost production time Targeting the most effective improvements Justify new equipment by considering indirect costs Specify equipment to reduce downtime impact Justify upgrades for monitoring and controlling the process Target continuous Improvement efforts Directly monitor and quantify Continuous Improvement  program benefits to create and sustain improvement momentum
Summary Understanding production time lost to equipment, speed, and quality downtime is crucial to achieving higher performance levels Collecting data and monitoring downtime periodically can be relatively easy – a quarterly or monthly snapshot can overcome barriers to measurement Downtime data can help us focus our improvement efforts Downtime represents a significant improvement opportunity in most production systems Improvements in uptime flow directly to the bottom line

Más contenido relacionado

La actualidad más candente

Lean Implementation-An Overview
Lean Implementation-An OverviewLean Implementation-An Overview
Lean Implementation-An OverviewJim McElroy
 
Jvh Lean Presentation For 2009
Jvh Lean Presentation For 2009Jvh Lean Presentation For 2009
Jvh Lean Presentation For 2009guest88801083
 
What Is Lean Manufacturing
What Is Lean ManufacturingWhat Is Lean Manufacturing
What Is Lean Manufacturingahmad bassiouny
 
Intro to Quality Control with Tutorial on using Statgraphics
Intro to Quality Control with Tutorial on using StatgraphicsIntro to Quality Control with Tutorial on using Statgraphics
Intro to Quality Control with Tutorial on using StatgraphicsHany G. Amer
 
A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)OEEsystems International
 
5 ways to increase manufacturing productivity with an mes
5 ways to increase manufacturing productivity with an mes5 ways to increase manufacturing productivity with an mes
5 ways to increase manufacturing productivity with an mesMetis Automation Ltd
 
Statistical Quality Control & SQC Tools
Statistical Quality Control & SQC ToolsStatistical Quality Control & SQC Tools
Statistical Quality Control & SQC ToolsAFAQAHMED JAMADAR
 
Quality Management and Statistical Process Control
Quality Management and Statistical Process ControlQuality Management and Statistical Process Control
Quality Management and Statistical Process ControlMahmudul Hasan
 
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997Ricky Smith CMRP, CMRT
 
Explain how quality management can be measured
Explain how quality management can be measuredExplain how quality management can be measured
Explain how quality management can be measuredselinasimpson2801
 
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...Dave Watkins
 
Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process planning SMED and VSM: Single minute exchange of die and Value stream...Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process planning SMED and VSM: Single minute exchange of die and Value stream...Yatinkumar Patel
 
Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)Anand Subramaniam
 

La actualidad más candente (20)

[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
Lean Management System Assessment
Lean Management System AssessmentLean Management System Assessment
Lean Management System Assessment
 
Lean Implementation-An Overview
Lean Implementation-An OverviewLean Implementation-An Overview
Lean Implementation-An Overview
 
Jvh Lean Presentation For 2009
Jvh Lean Presentation For 2009Jvh Lean Presentation For 2009
Jvh Lean Presentation For 2009
 
5s smpl 1
5s smpl 15s smpl 1
5s smpl 1
 
What Is Lean Manufacturing
What Is Lean ManufacturingWhat Is Lean Manufacturing
What Is Lean Manufacturing
 
Intro to Quality Control with Tutorial on using Statgraphics
Intro to Quality Control with Tutorial on using StatgraphicsIntro to Quality Control with Tutorial on using Statgraphics
Intro to Quality Control with Tutorial on using Statgraphics
 
A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)
 
5 ways to increase manufacturing productivity with an mes
5 ways to increase manufacturing productivity with an mes5 ways to increase manufacturing productivity with an mes
5 ways to increase manufacturing productivity with an mes
 
Lean vs six sigma -jk
Lean vs six sigma  -jkLean vs six sigma  -jk
Lean vs six sigma -jk
 
Statistical Quality Control & SQC Tools
Statistical Quality Control & SQC ToolsStatistical Quality Control & SQC Tools
Statistical Quality Control & SQC Tools
 
Process Control
Process ControlProcess Control
Process Control
 
Lean production
Lean production Lean production
Lean production
 
Quality Management and Statistical Process Control
Quality Management and Statistical Process ControlQuality Management and Statistical Process Control
Quality Management and Statistical Process Control
 
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
 
Explain how quality management can be measured
Explain how quality management can be measuredExplain how quality management can be measured
Explain how quality management can be measured
 
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
 
Tqm 1
Tqm 1Tqm 1
Tqm 1
 
Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process planning SMED and VSM: Single minute exchange of die and Value stream...Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process planning SMED and VSM: Single minute exchange of die and Value stream...
 
Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)
 

Similar a Where Does The Time Go?

Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceTri Dung Nguyen
 
Lean production vs mass production
Lean production vs mass productionLean production vs mass production
Lean production vs mass productionSophie Michelot
 
Just in-timeby stevespangler[1]
Just in-timeby stevespangler[1]Just in-timeby stevespangler[1]
Just in-timeby stevespangler[1]Sunder Ram. M
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectivenessgrubinm
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Managementshrinivas kulkarni
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutionssashi prabhu
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutionssashi prabhu
 
Decision Optimization for Manufacturing
Decision Optimization for ManufacturingDecision Optimization for Manufacturing
Decision Optimization for ManufacturingOptimiser.com
 
Lean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsLean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsNon Stop Portals
 
Quality in operations management
Quality in operations managementQuality in operations management
Quality in operations managementselinasimpson1301
 
Process Reengineering vs Continuous Improvement: What’s the Right Choice for ...
Process Reengineering vs Continuous Improvement: What’s the Right Choice for ...Process Reengineering vs Continuous Improvement: What’s the Right Choice for ...
Process Reengineering vs Continuous Improvement: What’s the Right Choice for ...Kashish Trivedi
 
Instructions· This is a group assignment with only 4 .docx
Instructions· This is a group assignment with only 4 .docxInstructions· This is a group assignment with only 4 .docx
Instructions· This is a group assignment with only 4 .docxnormanibarber20063
 
Ways on how to improve manufacturing operations
Ways on how to improve manufacturing operationsWays on how to improve manufacturing operations
Ways on how to improve manufacturing operationsSameerShaik43
 
Zero Defects and Concept of Six Sigma in TQM
Zero Defects and Concept of Six Sigma  in TQMZero Defects and Concept of Six Sigma  in TQM
Zero Defects and Concept of Six Sigma in TQMDrJayantaKumarMahato1
 

Similar a Where Does The Time Go? (20)

What is six sigma
What is six sigmaWhat is six sigma
What is six sigma
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Lean production vs mass production
Lean production vs mass productionLean production vs mass production
Lean production vs mass production
 
Just in-timeby stevespangler[1]
Just in-timeby stevespangler[1]Just in-timeby stevespangler[1]
Just in-timeby stevespangler[1]
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
lean & agile
lean & agilelean & agile
lean & agile
 
C12 quality
C12 qualityC12 quality
C12 quality
 
C12 quality
C12 qualityC12 quality
C12 quality
 
S3 p2 lee_kong_hui
S3 p2 lee_kong_huiS3 p2 lee_kong_hui
S3 p2 lee_kong_hui
 
Decision Optimization for Manufacturing
Decision Optimization for ManufacturingDecision Optimization for Manufacturing
Decision Optimization for Manufacturing
 
Lean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsLean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry Helms
 
Quality in operations management
Quality in operations managementQuality in operations management
Quality in operations management
 
Process Reengineering vs Continuous Improvement: What’s the Right Choice for ...
Process Reengineering vs Continuous Improvement: What’s the Right Choice for ...Process Reengineering vs Continuous Improvement: What’s the Right Choice for ...
Process Reengineering vs Continuous Improvement: What’s the Right Choice for ...
 
Instructions· This is a group assignment with only 4 .docx
Instructions· This is a group assignment with only 4 .docxInstructions· This is a group assignment with only 4 .docx
Instructions· This is a group assignment with only 4 .docx
 
Ways on how to improve manufacturing operations
Ways on how to improve manufacturing operationsWays on how to improve manufacturing operations
Ways on how to improve manufacturing operations
 
Zero Defects and Concept of Six Sigma in TQM
Zero Defects and Concept of Six Sigma  in TQMZero Defects and Concept of Six Sigma  in TQM
Zero Defects and Concept of Six Sigma in TQM
 

Where Does The Time Go?

  • 1. Where Does The Time Go? Using Production Downtime to Improve the Success Rate of Continuous Improvement Initiatives Jerry Stevick
  • 2. Purpose of this Presentation Many Continuous Improvement initiatives fail to reach their expected goals - often estimated at an 80% - 90% failure rate. Getting better results requires better definition of targets – targets that provide tangible benefits to the overall business. This presentation shows how improving production uptime drives dollars to the bottom line. This presentation also provides a method to easily set targets and track progress.
  • 3. Many CI Programs Fail to Achieve Expected Gains Many CI programs (quality improvement, employee involvement, lean manufacturing, etc) fail to achieve expectations or struggle and sputter as they try to gain and sustain momentum. Some firms are paralyzed or don’t start because the target is not clear or they are not convinced the CI method will solve the business problem Some firms have false starts because the early results don’t appear to have significant business impact Some firms wander chasing symptoms such as inventory or labor efficiency because the underlying issues are not identified Some firms select an improvement program without really understanding where the improvements will come or their impact on the business Some firms struggle because they fail to create metrics to drive the improvements How can we improve the early results of these initiatives?
  • 4. Solving the “Where Do We Start?” Problem One barrier to successful continuous improvement is defining a targets that generate visible gains for the business. Two good options are: Where does the money go? Where does the time go? All production or operating systems have downtime. Maximizing uptime maximizes the productive output of the system. Employees at all levels tend to understand and support business improvements that are clear and productive. Identifying and fixing causes of production downtime generates buy-in and quick returns because it immediately addresses the core purpose of the organization – providing products and services to customers What exactly do we mean by production uptime?
  • 5. What is Lost Production Time? The following chart shows the impact of downtime on actual production Planned Production Time Quality losses Actual Productive Uptime Equipment losses Speed losses The actual productive output of a complex system is often much less than its managers realize and its traditional metrics show
  • 6. Why Focus on Lost Production Time? The Six Major Losses in Manufacturing - these six losses address all reasons for lost production, not just equipment Equipment losses Maintenance - breakdowns and planned maintenance Changeover - model changes and adjustments Speed losses Speed - equipment does not run at designed rate Idle time - time lost to behaviors, training, meetings, etc. Quality losses Defects - production defects that is not useable or requires rework Yield - production losses inherent to process Time sets a high standard - it is the one resource we cannot rework or reuse - when it is lost, it is lost forever
  • 7. Why is it difficult to track lost production time? Traditional accounting and production measurement systems rarely capture the lost time categories Downtime causes are fragmented and often overlooked Responsibility for addressing downtime categories is split Downtime is often understated – limited to maintenance activities Fire-fighting to eliminate the current downtime issue takes precedence over understanding the overall downtime problem
  • 8. Why is it difficult to track lost production time? Lean Manufacturing uses Overall Equipment Effectiveness (OEE) to track and manage the Six Losses definition of downtime. However, most firms struggle to get good data for measuring OEE. Let’s look for an easier way: Goal: to provide a good estimate of the distribution of work activities that is relatively accurate and easy to implement The Work Sampling Study from Industrial Engineering provides a method for generating a quick snapshot of production downtime.
  • 9. How can we track lost production time? The Work Sampling approach: Based on a number of random observations Categories can be tailored to the processes being studied Large sample size leads to statistical validity Good for documenting non-repetitive activities Basic steps of a Work Sampling Study: Define the objective and how data will be collected Classify activity into categories appropriate for the process Prepare data sheets, sample method, random times Develop procedure for analyzing the data Collect data by random observations Let’s look at two examples:
  • 10. 1st Example: Using Downtime to Target Improvements The objective of this study was to find out where the time goes to gain a better understanding of which improvement methods would add the most value Production facility with rubber molding shop (55 tool locations): Management focus on labor efficiency Difficulty scheduling rush orders No target-based improvement program in place Building ahead for large customers hurt remaining customers Capacity “constraints” prevented 100% satisfaction Utilize sampling study of mold shop downtime: Set up data collection sheets unique to this operation Collect data randomly over 4 week period – 2230+ data points Utilize time estimates to demonstrate impact on the number of pieces built and the capacity constraints
  • 11. 1st Example: Using Downtime to Target Improvements HoursEquivalent Pieces Available hours 15,120 5,670,000 Production hours (85%) 12,852 Std Hours Earned (92%) 11,834 4,437,750 Downtime Loss (15%) 2,268 850,500 Maintenance (5.3%) 300,510 Set-up (5.7%) 323,190 Not scheduled (1.5%) 85,050 Cleaning (1.0%) 56,700 Miscellaneous (1.5%) 85,370 Efficiency Loss (8.0%) 453,375 Scrap / Quality loss (6.3%) 355,020 Plant Effectiveness 72% Early Production loss (15%) 665,662 Actual Plant Effectiveness 59%
  • 12. 1st Example: Using Downtime to Target Improvements Lessons from this study: Management’s singular focus on labor efficiency is unlikely to solve their production and capacity problems Significant downtime from scrap, changeover time, and maintenance point to the need for a more well rounded improvement program Scheduling improvements were needed to capture scheduling conflicts around tools and unique models The “old school” practice of dropping in orders for big customers robbed a large chunk of capacity from the current month While management worried about it’s 92% labor problem, it was unaware that the production effectiveness of the facility was at 72% When early orders were considered, the shop was only 59% effective at producing current orders
  • 13. 2nd Example: Comparing Two Similar Plants The objective of this study was to show how to plants with similar products, in the same organization, might have different profiles Comparison of two similar facilities Two automotive control plants compared (similar products) Large plastic molding operations Define targeted and random data collection Data collected over 3 – 4 week period How did the two plants compare? Set up data collection sheets unique to each operation Collect data randomly over 3 week period Utilize time estimates to demonstrate how different processes, people, and business pressures created different improvement opportunities
  • 14. 2nd Example: Comparing Two Similar Plants Plant ABC Uptime = 80.1% Based on 1619 observations Plant XYZ Uptime = 74.6% Based on 4460 observations
  • 15. 2nd Example: What did this Downtime Study show? Lessons from this study: The two plants, despite common division management and similar products and processes, had different downtime profiles Plant ABC displayed a significant need to focus on equipment downtime, primarily time lost to maintenance Plant XYZ displayed a large loss of time to changeover, another form of equipment downtime, that was double the same downtime category in their sister plant Both management teams seriously underestimated the time lost to the non-maintenance downtime categories. In both cases, there was no significant attack on maintenance and changeover prior to this study. Losses of close to 20%, if cut in half, would add significant profit dollars to the business
  • 16. Lessons Learned from Downtime Studies This approach for documenting lost production time works and it is relatively quick and easy to implement The results of most downtime studies “surprise” the managers of the operations being studied. Downtime reduction (greater productive uptime) represents a significant improvement opportunity Every production system is different The production system and its offline support systems (tooling, changeover, maintenance, etc) are closely linked and interdependent Continuous improvement plans can be linked to production system downtime to target improvements with significant payback
  • 17. How Can We Use Downtime Information to Improve? Improve how we manage the production system Balancing offline support systems to maximize production Increasing capacity by reducing lost production time Targeting the most effective improvements Justify new equipment by considering indirect costs Specify equipment to reduce downtime impact Justify upgrades for monitoring and controlling the process Target continuous Improvement efforts Directly monitor and quantify Continuous Improvement program benefits to create and sustain improvement momentum
  • 18. Summary Understanding production time lost to equipment, speed, and quality downtime is crucial to achieving higher performance levels Collecting data and monitoring downtime periodically can be relatively easy – a quarterly or monthly snapshot can overcome barriers to measurement Downtime data can help us focus our improvement efforts Downtime represents a significant improvement opportunity in most production systems Improvements in uptime flow directly to the bottom line