CMD AMG Lithium Presentations.pdf

G
LITHIUM HYDROXIDE BATTERY-GRADE REFINERY
BITTERFELD, GERMANY
AMG LITHIUM’S VALUE CHAIN
2
Lithium
concentrate
(Spodumene)
Convert
Spodumene
to tg LiOH /
Carbonate
Convert tg
LiOH to bg
LiOH
Solid State
Batteries
(pilot)
AMG operates a value chain from mining all the way down to
hydroxide bg for batteries
Lithium
Concentrate
Technical
Grade (tg)
LiOH /
Carbonate
Battery
Grade (bg)
LiOH
Lithium
LiOH
Batteries
LiOH = Lithium Hydroxide
THE MIBRA MINE, BRAZIL
3
THE BITTERFELD REFINERY, GERMANY, MODULE 1
End Markets
China Tolling
Cathode
Producers
Mibra Mine
(spodumene)
German
Refinery
Carbonate
Brazil
Solid-State
Pilot
Tolling until 2026 Startup 2026
External
FEL3
Existing
4
LITHIUM HYDROXIDE BG REFINERY IN GERMANY – STATUS
5
MODULE 2-5
Cathode
Producers
Tolling
Partner
German
Refinery
Solid-State
Pilot
TG lithium
products
Tolling
Partner
Medium/Long Term
Short Term
AMG
Resource
Projects
Carbonate
Brazil (FEL3),
Spodumene,
LiOH
End Markets
External
AMG Future Projects
Existing
China Tolling
Third Party
Spodumene
6
DEVELOPING ADDITIONAL (AFFILIATED) RESOURCES
7
AMG Resource Development Support
Spodumene production know how
Engineering / Project Management
Offtake contracts (with or without KfW)
Project Financing / Equity
Equity participation
PROJECTED GLOBAL ELECTRIC VEHICLE GROWTH
8
CAGR
2022-2035
17%
16%
9%
15%
Source: Lithium-Forecast-Benchmark-Mineral-Intelligence Q4-2022
THE LIVA ORIGIN
9
LITHIUM: UPSTREAM
GROWTH STRATEGY
BRAZIL OPERATIONS
11
Crushing
Tantalum
Separation
Lithium Carbonate
Chemical Plant
Grinding Expanded Spodumene
Concentration Plant
Lithium Carbonate
Packaging
Spodumene Filtering
and Storage Expansion
Spodumene Calcination
and Leaching
Existing Operations &
Ongoing Expansion
Lithium Carbonate
Future Expansion
SPODUMENE EXPANSION
12
• Increase production capacity 45% to 130k mt per year
• Focus on process optimization to improve lithium metallurgical recovery
• Enhanced robustness to address naturally occurring mine variations
• Reduce material handling downtime
AMG IS A LOW-COST SPODUMENE PRODUCER
13
$461/mt cost per ton
delivered to China,
net of tantalum,
feldspar and tin by-
product credits
• The Mibra mine is a long-term tantalum concentrate
producer and is the largest conflict-free producer of
tantalum in the world
• Mibra’s tantalum production is the key reason for
the mine’s low-cost spodumene position
• Mibra’s tantalum production will expand to 370K
pounds per year. This expansion will occur in
combination with the spodumene expansion
• AMG Brazil entered into a life-of-mine strategic
partnership with JX Nippon Mining & Metals
Corporation that sells 100% of Mibra’s tantalum
concentrate production to their subsidiary, Taniobis
• This life of mine strategic partnership ensures long-
term stability in tantalum sales and corresponding
by-product credits to lithium production costs
14
TECHNICAL GRADE LITHIUM CHEMICAL PLANT
Preliminary Estimates:
• Investment: $250M
• Commissioning: End of 2025
• Capacity: 16.5 mt Technical Grade Lithium per annum
• Delivered cost to Germany less than $10,000 /mt;
assuming spodumene at cost for conversion in Brazil
• TG Carbonate from Brazil vs Upgrading in China results in
substantial freight savings and ~90k mt reduction in CO2e
• Across all Brazil sites, Lost Time Rate of 0.14 and
Recordable Rate of 0.42 compare favorably to Bureau of
Labor Statistics Industry Benchmarks: 1.2 Lost Time Rate
and 4.1 Recordable Rate (88% and 90% better, respectively).
• In 2021, AMG Brazil was awarded a Recognition on Good
Suppliers Practices Prize from Novelis, which recognizes
initiatives from partners of Novelis contributing to a more
sustainable world.
SUSTAINABILITY
15
• In 2022, AMG’s owned hydroelectricity plant
produced electricity to cover 48% of our total
power needs (produced 65.67 TJ and consumed
135.96 TJ across all of our Brazil operations).
• Above all, preserving the environment is part of
the essence of AMG Brazil which, with its
production, contributes globally to the reduction
of CO2 emissions.
LOCAL COMMUNITY
16
• The company prioritizes local culture and building
a relationship of trust and mutual respect and
prioritizes hiring locally.
➢ More than 70% of employees are local hires
➢ The Young Apprentice Program, a partnership
with SENAI, Nacional Service of Industrial
Learning, is an internship based on the
commitment of local labor development and
professional possibilities.
➢ AMG Brazil partners with local universities
focusing on personal and professional
development of young people and adults
entering the job market. Since 2015, AMG
Brazil has prepared more than 70 individuals
for the job market, directly hiring almost 40%.
17
MIBRA RESOURCE – 2021
Resource Category
Measured
Indicated
Inferred
Category Ore (Mt) Li2O Grade Li2O (mt) LCE (mt)
Measured 2.186 0.94% 20,237 50,046
Indicated 15.304 1.13% 171,330 423,698
Measured & Indicated 17.490 1.10% 191,566 473,744
Inferred 3.744 1.12% 41,914 103,654
18
STRATEGIC EXPLORATION PROJECTS
BRAZIL
Ceará
9 Mineral Rights. Geochemical results show
presence of Lithium, Tantalum and Tin.
Ongoing drilling campaign
Paraíba
8 Mineral Rights. Geochemical results show
presence of Lithium, Tantalum and Tin
Minas
Gerais
New exploration project to delineate
subsurface pegmatite occurrences in areas
near existing Mibra mine
LITHIUM HYDROXIDE BG REFINERY IN GERMANY - STATUS
19
CMD AMG Lithium Presentations.pdf
LITHIUM HYDROXIDE BG REFINERY – TIMELINE
21
• Production of highly-refined, battery-grade Lithium hydroxide.
• Module 1 with 20,000 MT/yr capacity, further modules up to
100,000 MT/yr in total.
• Located in Bitterfeld/Germany: access to all required energies and
infrastructure.
• Start up in Q4
• Expected Capex of $140 million for module 1.
MODULE 1: LITHIUM SUPPLY CHAIN
22
China Tolling
(until 2026)
Cathode Producers
Mibra Mine (Spodumene)
Lithium Hydroxide BG Module 1
Spodumene to Carbonate Brazil
Carbonate to Hydroxide Germany
Start up 2026
LITHIUM FEEDSTOCK SOURCES MODULE 1
23
• AMG Brazil: only volumes not covered by Spodumene contracts.
• LiOH BG qualification during 1st half of 2024.
0
5
10
15
20
25
2023 2024 2025
LiOH
Feedstock
in
‚000
mT
AMG Brazil Purchase of LiOH TG / Li2CO3 Strategic Offtake Partners
• AMG has signed a binding supply
agreement with Korean EcoPro for an
initial three-year term to deliver a
binding 5,000 MT/yr plus an optional
5,000 MT/yr to EcoPro BM’s CAM-
facility in Debrecen-Hungary.
• AMG executed a MoU with FREYR for
an off-take of up to 5,000 MT/yr.
• AMG executed further MoUs with
different customers.
• AMG has an agreement in place with
General Lithium for an offtake of up to
2,000 MT/yr for their EU needs.
24
MODULE 1: LITHIUM HYDROXIDE OFFTAKE
5,000
5,000
5,000
3,000
2,000
0
5,000
10,000
15,000
20,000
MT/year
EcoPro - Fix EcoPro - Variabel
FREYR Customers (Europe)
GLC for EU
Existing offtakes at runrate 2025
INDICATIVE MARGIN DEVELOPMENT TO A FULLY BACKWARD
INTEGRATED LITHIUM COMPANY
25
HYDROX IDE TG
P URCHA S E
TOLLING B RA S IL
S P ODUM E NE
FULL B A CK W A RD
INTE GRA TION
$/MT
Cost Margin
Technical Grade Purchase:
Represents the margin of the
Bitterfeld plant assuming the open
market purchase of technical grade
hydroxide.
Tolling Brazil Spodumene:
Represents the margin available to
Bitterfeld via tolling Brazil spodumene
in China and delivering technical
grade hydroxide to Germany.
Full Integration:
Represents the delivery of technical
grade carbonate to Germany direct
from the Brazilian Technical Grade
plant.
GAME CHANGER: NEW AMG SUPPLY CHAIN CONCEPT
26
AMG Brazil
• Available Spodumene concentrate (SC) conversion via tolling arrangement (in place)
• 2026: SC to Lithium Carbonate TG (LC) conversion in Brazil, LC to LiOH TG in Germany
Purchase LiOH TG / off grade
3rd Party Spodumene Concentrate (SC) Offtakes
• Convert SC via tolling arrangement to LiOH TG
Purchase Li2CO3 TG
• Toll conversion into LiOH TG; feed LC to LiOH TG converter in Germany
• Materials from Lithium-Ion-Battery-Recycling
Strategic Offtake Partners – Toll Model
• AMG converts technical lithium salts provided by partners
• Offtake agreements for LiOH BG with same partners
Strategic Offtake Partners – Enabling Project Execution
• Develop a Lithium greenfield resource and produce precursor
• Strategic partnerships
GROWTH: AMG LITHIUM SOURCING STRATEGY
Six Pillar
Feedstock
Supply
Strategy
1
2
3
4
5
6
27
LITHIUM SUPPLY CHAIN – MODULE 2-5
Lithium
Carbonate
TG
3rd Party
Spodumene
Lithium
Carbonate
from
Recycling
Lithium
Hydroxide
TG
Lithium Carbonate TG to Hydroxide TG
Lithium Hydroxide BG Modules
Tolling China
Lithium
Hydroxide TG
Solid State Battery
Materials
Cathode Producers Tolling Partner
Tolling Partner
AMG Resource
Projects
Lithium
Carbonate
TG
Medium/Long Term
Short Term
28
WHY EUROPE ? –
EU REQUIRES LARGE VOLUMES LITHIUM HYDROXIDE BG
29
600,000
0
200,000
400,000
600,000
Demand Supply
Recycling
Existing &
Announced EU
Li Projects
Estimated 2030 EU
Lithium Market
Balance (kMT LCE)
>300,000 MT
annual
shortfall
2025: already announced European demand
of ~300 ktpa LCEs for Cathodes
Source: AMG Lithium internal Q1 2023, Lithium-Forecast-Benchmark-Mineral-Intelligence Q4-2022.
WHY LIOH ? - GROWING DEMAND FOR LITHIUM HYDROXIDE BG
DRIVEN BY HIGH NICKEL BATTERY CATHODES
30
Source: Lithium-Forecast-Benchmark-Mineral-Intelligence Q4-2022. Note: High Nickel includes NCM712, NCM811, NMX, NCA, NCMA, LNMO and other nickel chemistries.
Lithium Demand in Rechargeable
Batteries
EV Demand for Lithium
by Type
CURRENT LITHIUM SALT PRICE TREND IN CHINA
31
30,000
40,000
50,000
60,000
70,000
80,000
90,000
Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23
$/mt
Fastmarkets LiOH / Li2CO3 BG spot prices
Li2CO3 BG CIF Asia LiOH BG CIF Asia Li2CO3 BG EXW China VAT incl. LiOH BG EXW China VAT incl.
NEXT GENERATION AUTOMOTIVE BATTERY TECHNOLOGY:
ALL-SOLID-STATE-BATTERIES (ASSB)
32
Application & Market:
▪ All-Solid-State Batteries are next step in automotive battery technology
▪ Forecasts estimate 5-7 % market penetration in 2030 (total market of ~2.000 GWh)
▪ EV market forecast indicates large growth potential on long-term view 2030+
Technology:
▪ Solid electrolytes are critical performance components to reach energy density and safety targets.
▪ Solid electrolytes and precursors are key compounds regarding quality and product availability of ASSBs.
Sources: SolidPower (2023); Avicenne (2021); Roland Berger (2022); HSBC (2021)
0
1,000
2,000
3,000
4,000
2022 2023 2024 2025 2026 2027 2028 2029 2030
Battery
demand
/
automotive
[GWh]
Conservative Case Optimistic scenario
0%
1%
2%
3%
4%
5%
6%
7%
0
10,000
20,000
30,000
40,000
50,000
60,000
2023 2024 2025 2026 2027 2028 2029 2030
Market
penetration
Solid
electrolyte
market
[MT]
Forecast Solid Electrolyte
Conservative Market penetration
MARKET TREND: ALL-SOLID-STATE-BATTERIES (ASSB)
OUR PORTFOLIO: SOLID ELECTROLYTES AND LITHIUM SULFIDE
33
Standard product for solid electrolyte production
Premium product for electrode production
Lithium sulfide
Standard Grade SG
Lithium sulfide Ultrafine
Grade UG
Precursors (Lithium Sulfide) Sulfidic Solid Electrolytes
▪ Broad portfolio of sulfide-based solid electrolytes
▪ Scalable production process
▪ Proprietary process filed for patent
GLOBAL CUSTOMER ACTIVITIES
34
Current status:
Projects with customers in:
▪ Europe (3x): development
projects & evaluation
▪ USA (1x): qualification
▪ Japan (4x): qualification &
evaluation projects
▪ Korea (2x): sampling &
evaluation
▪ Addressable AMG
customer potential:
6.000+ MT/a in 2028
Our position:
▪ Development partner and
prospective material supplier
▪ Backward integrated
technology leader for solid
electrolyte production
LiOH Precursor
Lithium sulfide
Solid
Electrolyte
Battery
Cell
1x 3x 2x
4x
LITHIUM SULFIDE & SOLID ELECTROLYTE ROADMAP
35
Market
2023 2024 2025 2026 2028 2030
Products
Precursors
(lithium sulfide)
Solid electrolyte
Sales / commercial
Sales / commercial.
Sales / qualification
Construction
Sales / qualification
Construction
Market Commitment:
Technical & Design-in projects | MoUs | Supply agreements
Market Feedback
Sample results
Sales / comm.
qualification
Construction
Commercialization
Demo Plant 100MT/yr
Commercial Plant 10.000MT/yr
LIVA Power Management Systems
Project IPS7000,
location: AMG Graphite,
Hauzenberg, Germany
LIVA APPROACH: CONCEPT OF A HYBRID BATTERY
37
Hybrid Energy Storage System
Technical approach:
► High power unit (Li-ion battery)
► Energy storage unit (Vanadium Redox
Flow battery)
► Software solution with artificial
intelligence (AI)
► Control system for multiple energy
assets including power production,
hydrogen, and process heat and cooling
Environmentally friendly battery:
► Low CO2 footprint of the energy storage
system
► Green mining strategy
► No problematic raw materials
► Fully closed recycling
local
power
supply
local
power
demand
High
Power Unit
Energy
Storage Unit
AI software-based
Virtual Battery
Energy Control
Lithium-ion
battery
Vanadium Redox
Flow Battery
Large scale energy storage systems:
Managing the fluctuating power demand
and power supply, integrating and shifting
unsteady renewable energies (solar & wind)
VRFB
TECHNICAL ADVANTAGE & BENEFITS OF A HYBRID ENERGY
STORAGE SYSTEM (‘HESS’)
38
Advantage & Benefits
► Broad Range of industrial and grid
scale applications
► Optimal use of the KPI´s
► Increased overall system efficiency
to power supply and energy storage
► Improved safety & increased
reliability (availability >99,9%)
► Long lifetime of the batteries:
15-20 years, +20,000 cycles
► Lowest Total Cost of Ownership/
Levelized Cost of Storage (LCOS)
► Custom tailored system with flexible
up-grade capabilities for power
and energy
► Low CO2 footprint at life-cycle
Performance profile virtual HESS
LIVA´s battery technology approach: use respective
KPI advantages (key performance indictors)
TCO
energy
Cycle stability & lifetime
TCO
power
Safety &
reliability
Spectrum of
applications
APPLICATIONS LIVA HYBRID ENERGY STORAGE SYSTEMS
39
Energy applications
▪ Prosumer: Optimized self consumption and
self-sufficiency with solar & wind
▪ Efficient off-grid & island solutions
▪ Reducing CO2 emission up to -80% vs. Diesel
gensets. Reduce electricity costs up to -55%*
Power applications
▪ Reduce power peaks (peak shaving) and
power grid cost up to -80%**
▪ Grid stabilization & power quality
improvement: frequency containment reserve,
grid peak load management
▪ Emergency/uninterrupted power supply with
black starting capabilities
New applications
▪ Electric vehicle infrastructure: Integrate
renewable energies & high-power charging
▪ Opportunity charging & discharging: Arbitrage
spot market of electricity
*Island grid with diesel driven gensets
**avg. Central European market
Shifting
Island
off-grid
Peak
shaving
Grid service
HP charging
energy storage
VRFB
power unit AI software
energy control
HESS
MARKET OF THE APPLICATIONS
40
energy storage
VRFB
HESS
Behind the meter Grid side
Demand-side
markets
Supply-side
markets
Electricity & infrastructure:
▪ Utilities (electricity producer)
▪ Transmission grid operators
▪ Local electricity suppliers
▪ Cities & communities
Industries:
▪ Heavy industries
▪ Metallurgical sector
▪ Metalworking
▪ Chemicals
▪ Automotive & Aerospace
▪ Glass, ceramics, paper
Investors:
▪ Private equity infrastructure
▪ PPP Investors
Industries:
▪ Energy intensive
industries
▪ Metalworking industry
▪ Chemicals
▪ Mining & exploration
Island
off-grid
Peak
shaving
Grid service HP charging
Shifting
Power supply
Island
off-grid
HP charging
Power supply
Arbitrage
VALUE CHAIN: INTEGRATION WITH AMG ACCELERATES
LIVA’S GROWTH
41
~/=
Power
Electronic
Equipment
Power
battery
Li-Ion
Software
Control
Engineering
EPC
Software
Simulation
Software
Monitoring
Grid apps
LIVA
Worldwide sourcing of
standard parts & components
AMG Group
Sourcing key
components:
battery racks
& modules
AMG-V
GfE
V2O5
Electrolyte
LIVA/AMG
Engineering
VRFB
Assembly
Installation
Close strategic
partnerships with
global suppliers of
key relevant
components
VRFB
▪ Full-service engineering,
procurement and construction
(“EPC”) of a Hybrid Energy
Storage System (“HESS”)
▪ Automated operations and
energy balancing with self-
learning algorithms
▪ Remote monitoring with analytics
and monthly reporting
▪ Utilizing AMG Engineering to
accelerate our EPC offering
▪ Backward integrated to
vanadium electrolyte production
in Nuremberg
LIVA delivers a customized,
turnkey facility
Power Management as a Service
LIVA IS PLANNING A RAPID EXPANSION OF HYBRID ENERGY
STORAGE SYSTEMS (“HESS”)
42
1. AMG Graphite
Hauzenberg, Germany
Current Use:
▪ Peak Shaving
▪ Emergency Power
Future Expansion:
▪ Solar Energy
Integration
▪ Grid Service
Size 3,5 MWh
3. AMG Titanium
Nuremberg, Germany
4. AMG Chrome
Rotherham, UK
5. AMG Vanadium
Cambridge, Ohio
Planned Uses
▪ Peak Shaving
▪ Solar Integration /
Energy shifting
▪ Grid Services
▪ Emergency Power
Total size: 15 MWh
2. Wipotec
Kaiserslautern,
Germany
Planned Uses
▪ Renewable
Integration:
‒ Solar
‒ Wind
‒ Geothermal
▪ Energy Shifting
▪ Peak Shaving
▪ Grid Service
Size: 4 MWh
6. Large Scale
Industrial Customer
(Electro Steel)
Planned Uses
▪ Integrated Energy
Management
▪ Replace diesel
generators
▪ Peak Shaving
▪ Grid Service
▪ Renewable
Integration
Lithium-ion Battery:
28 MWh
Vanadium Redox Flow
Battery: 80 MWh
THANK YOU!
43
Hybrid Energy Storage System (HESS)
▪ 1.5-Level design, underground tank system with passive
& active thermal management
▪ VRFB energy storage: 3.75 MWh (385 kW power)
▪ Li-ion-battery (BESS): 0,35 MWh (1.0 MW power)
Modular 16-stack
cabinet units
Li-ion High power
battery racks
Power electronics
DC-DC converters
DC-AC inverters
Vanadium
Catholyte & Anolyte
44
VANADIUM, MOLYBDENUM AND NICKEL – ZANESVILLE, OHIO
LIVA BATTERY
LITHIUM LAB LITHIUM HYDROXIDE – BITTERFELD, GERMANY
VANADIUM, MOLYBDENUM AND NICKEL – CAMBRIDGE, OHIO
ENGINEERING – HANAU, GERMANY
MELTSHOP – ZANESVILLE, OHIO
1 de 44

Recomendados

AMG Investor Presentation por
AMG Investor PresentationAMG Investor Presentation
AMG Investor Presentationgstubel
2.3K vistas29 diapositivas
Offer and acceptance por
Offer and acceptanceOffer and acceptance
Offer and acceptanceRenu Verma
633 vistas17 diapositivas
Merger of ExxonMobil Corporation v2 por
Merger of ExxonMobil Corporation v2Merger of ExxonMobil Corporation v2
Merger of ExxonMobil Corporation v2Alfred Rodrigues
4.4K vistas11 diapositivas
INTERNATIONAL MANUFACTURING AGREEMENT TEMPLATE por
INTERNATIONAL MANUFACTURING AGREEMENT TEMPLATEINTERNATIONAL MANUFACTURING AGREEMENT TEMPLATE
INTERNATIONAL MANUFACTURING AGREEMENT TEMPLATEGlobal Negotiator
4.3K vistas11 diapositivas
Offer and acceptance/Law of Contract/Business Law por
Offer and acceptance/Law of Contract/Business LawOffer and acceptance/Law of Contract/Business Law
Offer and acceptance/Law of Contract/Business Lawshrinivas kulkarni
37.9K vistas55 diapositivas
Open access ppt por
Open access pptOpen access ppt
Open access pptVinay Yaduka
1.8K vistas10 diapositivas

Más contenido relacionado

La actualidad más candente

Vodafone Company Presentation por
Vodafone Company PresentationVodafone Company Presentation
Vodafone Company PresentationAshutosh Pandey
19.4K vistas13 diapositivas
Arcelor and mittal deal por
Arcelor and mittal dealArcelor and mittal deal
Arcelor and mittal dealniranjan k
234 vistas16 diapositivas
MPERS 13 Inventories por
MPERS 13 InventoriesMPERS 13 Inventories
MPERS 13 InventoriesEugene Lee
1.3K vistas21 diapositivas
Acceptance and legal rules for acceptance por
Acceptance and legal rules for acceptanceAcceptance and legal rules for acceptance
Acceptance and legal rules for acceptanceJignesh Kalathiya
6.9K vistas14 diapositivas
Sales of Goods Act 1930 por
Sales of Goods Act 1930Sales of Goods Act 1930
Sales of Goods Act 1930Abbas Miyajiwala
1.9K vistas37 diapositivas
Indian telecom industry-economics por
Indian telecom industry-economicsIndian telecom industry-economics
Indian telecom industry-economicsAjit Kumar
6.7K vistas55 diapositivas

La actualidad más candente(20)

Vodafone Company Presentation por Ashutosh Pandey
Vodafone Company PresentationVodafone Company Presentation
Vodafone Company Presentation
Ashutosh Pandey19.4K vistas
Arcelor and mittal deal por niranjan k
Arcelor and mittal dealArcelor and mittal deal
Arcelor and mittal deal
niranjan k234 vistas
MPERS 13 Inventories por Eugene Lee
MPERS 13 InventoriesMPERS 13 Inventories
MPERS 13 Inventories
Eugene Lee1.3K vistas
Acceptance and legal rules for acceptance por Jignesh Kalathiya
Acceptance and legal rules for acceptanceAcceptance and legal rules for acceptance
Acceptance and legal rules for acceptance
Jignesh Kalathiya6.9K vistas
Indian telecom industry-economics por Ajit Kumar
Indian telecom industry-economicsIndian telecom industry-economics
Indian telecom industry-economics
Ajit Kumar6.7K vistas
Agreement in Contract: Objective Principle por Preeti Sikder
Agreement in Contract: Objective PrincipleAgreement in Contract: Objective Principle
Agreement in Contract: Objective Principle
Preeti Sikder408 vistas
Capacity to contract por Rahul Todur
Capacity to contractCapacity to contract
Capacity to contract
Rahul Todur3.4K vistas
Parties to the negotiable instruments por Nayan Vaghela
Parties to the negotiable instrumentsParties to the negotiable instruments
Parties to the negotiable instruments
Nayan Vaghela32.1K vistas
Major research project Alstom T&D India ltd por asha meena
Major research project Alstom T&D India ltdMajor research project Alstom T&D India ltd
Major research project Alstom T&D India ltd
asha meena3.5K vistas
Offer and acceptance por Gurjit
Offer and acceptanceOffer and acceptance
Offer and acceptance
Gurjit22.3K vistas
Strategic Management por Anes Barbush
Strategic ManagementStrategic Management
Strategic Management
Anes Barbush1.1K vistas
Impact of reliance jio on telecom sector por Adil Hussain
Impact of reliance jio on telecom sectorImpact of reliance jio on telecom sector
Impact of reliance jio on telecom sector
Adil Hussain14.4K vistas
Offer por asadch
OfferOffer
Offer
asadch11.2K vistas
Six elements of a contract por nikkisinatra94
Six elements of a contractSix elements of a contract
Six elements of a contract
nikkisinatra9426.8K vistas

Similar a CMD AMG Lithium Presentations.pdf

AMG Investor Deck October 2022.pdf por
AMG Investor Deck October 2022.pdfAMG Investor Deck October 2022.pdf
AMG Investor Deck October 2022.pdfgstubel
1.2K vistas28 diapositivas
Berenberg SDG Presentation por
Berenberg SDG PresentationBerenberg SDG Presentation
Berenberg SDG Presentationgstubel
2.4K vistas25 diapositivas
Joining the Global Battery Supply Chain por
Joining the Global Battery Supply ChainJoining the Global Battery Supply Chain
Joining the Global Battery Supply ChainGreat Lakes Graphite Inc.
1.9K vistas26 diapositivas
THE RACE FOR END-OF-LIFE BATTERIES AND EFFECTS OF NEW EU BATTERY REGULATIONS por
THE RACE FOR END-OF-LIFE BATTERIES AND EFFECTS OF NEW EU BATTERY REGULATIONSTHE RACE FOR END-OF-LIFE BATTERIES AND EFFECTS OF NEW EU BATTERY REGULATIONS
THE RACE FOR END-OF-LIFE BATTERIES AND EFFECTS OF NEW EU BATTERY REGULATIONSiQHub
390 vistas15 diapositivas
2 co making the business case for ccs por
2 co   making the business case for ccs2 co   making the business case for ccs
2 co making the business case for ccsGlobal CCS Institute
743 vistas21 diapositivas
Snam 2019 - 2023 strategic plan por
Snam 2019 - 2023 strategic planSnam 2019 - 2023 strategic plan
Snam 2019 - 2023 strategic planSnam
625 vistas33 diapositivas

Similar a CMD AMG Lithium Presentations.pdf(20)

AMG Investor Deck October 2022.pdf por gstubel
AMG Investor Deck October 2022.pdfAMG Investor Deck October 2022.pdf
AMG Investor Deck October 2022.pdf
gstubel1.2K vistas
Berenberg SDG Presentation por gstubel
Berenberg SDG PresentationBerenberg SDG Presentation
Berenberg SDG Presentation
gstubel2.4K vistas
THE RACE FOR END-OF-LIFE BATTERIES AND EFFECTS OF NEW EU BATTERY REGULATIONS por iQHub
THE RACE FOR END-OF-LIFE BATTERIES AND EFFECTS OF NEW EU BATTERY REGULATIONSTHE RACE FOR END-OF-LIFE BATTERIES AND EFFECTS OF NEW EU BATTERY REGULATIONS
THE RACE FOR END-OF-LIFE BATTERIES AND EFFECTS OF NEW EU BATTERY REGULATIONS
iQHub390 vistas
Snam 2019 - 2023 strategic plan por Snam
Snam 2019 - 2023 strategic planSnam 2019 - 2023 strategic plan
Snam 2019 - 2023 strategic plan
Snam625 vistas
Biofabrik WASTX Plastic solution por Walter Davidson
Biofabrik WASTX Plastic solutionBiofabrik WASTX Plastic solution
Biofabrik WASTX Plastic solution
Walter Davidson191 vistas
Apres padrao mrsa_2_q10_eng por Magnesita_ri
Apres padrao mrsa_2_q10_engApres padrao mrsa_2_q10_eng
Apres padrao mrsa_2_q10_eng
Magnesita_ri843 vistas
Easme rmsummit PLATIRUS & CEBRA por Jokin Hidalgo
Easme rmsummit PLATIRUS & CEBRAEasme rmsummit PLATIRUS & CEBRA
Easme rmsummit PLATIRUS & CEBRA
Jokin Hidalgo78 vistas
Ricardo aea comm vehs por Roger Atkins
Ricardo   aea comm vehsRicardo   aea comm vehs
Ricardo aea comm vehs
Roger Atkins823 vistas
BATTERY MATERIAL TRENDS 2030 – RAW MATERIAL SUPPLY CHAIN AND COST PERSPECTIVE por iQHub
BATTERY MATERIAL TRENDS 2030 – RAW MATERIAL SUPPLY CHAIN AND COST PERSPECTIVEBATTERY MATERIAL TRENDS 2030 – RAW MATERIAL SUPPLY CHAIN AND COST PERSPECTIVE
BATTERY MATERIAL TRENDS 2030 – RAW MATERIAL SUPPLY CHAIN AND COST PERSPECTIVE
iQHub345 vistas
Understanding Carbon Credits Business por Amit Chauhan
Understanding Carbon Credits BusinessUnderstanding Carbon Credits Business
Understanding Carbon Credits Business
Amit Chauhan696 vistas
The Future of Hydrogen & RNG in Canada, Part 2: The Role of Utilities in Acce... por Pembina Institute
The Future of Hydrogen & RNG in Canada, Part 2: The Role of Utilities in Acce...The Future of Hydrogen & RNG in Canada, Part 2: The Role of Utilities in Acce...
The Future of Hydrogen & RNG in Canada, Part 2: The Role of Utilities in Acce...
Pembina Institute2.2K vistas
Graphene heating for wearable devices por Justin Hayward
Graphene heating for wearable devicesGraphene heating for wearable devices
Graphene heating for wearable devices
Justin Hayward55 vistas
Carbon Markets Update 17.10.2010 por Juha Ruokonen
Carbon Markets Update  17.10.2010Carbon Markets Update  17.10.2010
Carbon Markets Update 17.10.2010
Juha Ruokonen445 vistas
Faraday Battery Challenge webinar series: An update on the UK Battery Industr... por KTN
Faraday Battery Challenge webinar series: An update on the UK Battery Industr...Faraday Battery Challenge webinar series: An update on the UK Battery Industr...
Faraday Battery Challenge webinar series: An update on the UK Battery Industr...
KTN390 vistas
Cleaning up british industry por Brian Worrall
Cleaning up british industryCleaning up british industry
Cleaning up british industry
Brian Worrall582 vistas

Más de gstubel

AMG Quarterly Slides_November 2023.pdf por
AMG Quarterly Slides_November 2023.pdfAMG Quarterly Slides_November 2023.pdf
AMG Quarterly Slides_November 2023.pdfgstubel
1.2K vistas15 diapositivas
AMG Quarterly Slides_July 2023.pdf por
AMG Quarterly Slides_July 2023.pdfAMG Quarterly Slides_July 2023.pdf
AMG Quarterly Slides_July 2023.pdfgstubel
5.4K vistas15 diapositivas
AMG Quarterly Slides May 2023 por
AMG Quarterly Slides May 2023AMG Quarterly Slides May 2023
AMG Quarterly Slides May 2023gstubel
4.7K vistas15 diapositivas
Investor Deck March 2023.pdf por
Investor Deck March 2023.pdfInvestor Deck March 2023.pdf
Investor Deck March 2023.pdfgstubel
1.1K vistas29 diapositivas
Quarterly Slides February 22 2023 por
Quarterly Slides February 22 2023Quarterly Slides February 22 2023
Quarterly Slides February 22 2023gstubel
1.4K vistas16 diapositivas
Qtr Slides_November 2 2022.pdf por
Qtr Slides_November 2 2022.pdfQtr Slides_November 2 2022.pdf
Qtr Slides_November 2 2022.pdfgstubel
3.2K vistas15 diapositivas

Más de gstubel(20)

AMG Quarterly Slides_November 2023.pdf por gstubel
AMG Quarterly Slides_November 2023.pdfAMG Quarterly Slides_November 2023.pdf
AMG Quarterly Slides_November 2023.pdf
gstubel1.2K vistas
AMG Quarterly Slides_July 2023.pdf por gstubel
AMG Quarterly Slides_July 2023.pdfAMG Quarterly Slides_July 2023.pdf
AMG Quarterly Slides_July 2023.pdf
gstubel5.4K vistas
AMG Quarterly Slides May 2023 por gstubel
AMG Quarterly Slides May 2023AMG Quarterly Slides May 2023
AMG Quarterly Slides May 2023
gstubel4.7K vistas
Investor Deck March 2023.pdf por gstubel
Investor Deck March 2023.pdfInvestor Deck March 2023.pdf
Investor Deck March 2023.pdf
gstubel1.1K vistas
Quarterly Slides February 22 2023 por gstubel
Quarterly Slides February 22 2023Quarterly Slides February 22 2023
Quarterly Slides February 22 2023
gstubel1.4K vistas
Qtr Slides_November 2 2022.pdf por gstubel
Qtr Slides_November 2 2022.pdfQtr Slides_November 2 2022.pdf
Qtr Slides_November 2 2022.pdf
gstubel3.2K vistas
Quarterly Slides_July 2022.pdf por gstubel
Quarterly Slides_July 2022.pdfQuarterly Slides_July 2022.pdf
Quarterly Slides_July 2022.pdf
gstubel2.3K vistas
AMG Saudi Arabia Project Update July 2022.pdf por gstubel
AMG Saudi Arabia Project Update July 2022.pdfAMG Saudi Arabia Project Update July 2022.pdf
AMG Saudi Arabia Project Update July 2022.pdf
gstubel1.1K vistas
Equity Capital Market Presentation May 2022.pdf por gstubel
Equity Capital Market Presentation May 2022.pdfEquity Capital Market Presentation May 2022.pdf
Equity Capital Market Presentation May 2022.pdf
gstubel4.2K vistas
Quarterly Slides_May 2022.pdf por gstubel
Quarterly Slides_May 2022.pdfQuarterly Slides_May 2022.pdf
Quarterly Slides_May 2022.pdf
gstubel1.9K vistas
Quarterly slides February 2022 por gstubel
Quarterly slides February 2022Quarterly slides February 2022
Quarterly slides February 2022
gstubel7.9K vistas
Capital Markets Day AMG Lithium Presentation por gstubel
Capital Markets Day AMG Lithium PresentationCapital Markets Day AMG Lithium Presentation
Capital Markets Day AMG Lithium Presentation
gstubel2.7K vistas
Quarterly Slides October 2021 por gstubel
Quarterly Slides October 2021Quarterly Slides October 2021
Quarterly Slides October 2021
gstubel4.8K vistas
Quarterly Slides July 2021 por gstubel
Quarterly Slides July 2021Quarterly Slides July 2021
Quarterly Slides July 2021
gstubel3.7K vistas
Quarterly Slides May 2021 por gstubel
Quarterly Slides May 2021Quarterly Slides May 2021
Quarterly Slides May 2021
gstubel1.9K vistas
Quarterly slides February 2021 por gstubel
Quarterly slides February 2021Quarterly slides February 2021
Quarterly slides February 2021
gstubel3K vistas
Quarterly Slides October 2020 por gstubel
Quarterly Slides October 2020Quarterly Slides October 2020
Quarterly Slides October 2020
gstubel422 vistas
September 2020 ECO2RP presentation por gstubel
September 2020 ECO2RP presentationSeptember 2020 ECO2RP presentation
September 2020 ECO2RP presentation
gstubel4.3K vistas
Quarterly Slides July 2020 por gstubel
Quarterly Slides July 2020Quarterly Slides July 2020
Quarterly Slides July 2020
gstubel1.9K vistas
Q1 2020 Investor Presentation por gstubel
Q1 2020 Investor PresentationQ1 2020 Investor Presentation
Q1 2020 Investor Presentation
gstubel4.2K vistas

Último

morgan-stanley-global-consumer-and-retail-conference.pdf por
morgan-stanley-global-consumer-and-retail-conference.pdfmorgan-stanley-global-consumer-and-retail-conference.pdf
morgan-stanley-global-consumer-and-retail-conference.pdfAmanKaurKahlon
1K vistas35 diapositivas
WRN_Corporate_Presentation_Dec_2023.pdf por
WRN_Corporate_Presentation_Dec_2023.pdfWRN_Corporate_Presentation_Dec_2023.pdf
WRN_Corporate_Presentation_Dec_2023.pdfSandyNoyes
113 vistas57 diapositivas
Results Summary for the 3rd quarter of 2023 por
Results Summary for the 3rd quarter of 2023Results Summary for the 3rd quarter of 2023
Results Summary for the 3rd quarter of 2023TIM SA
5 vistas17 diapositivas
2311_presentation materials_en_slideshare.pdf por
2311_presentation materials_en_slideshare.pdf2311_presentation materials_en_slideshare.pdf
2311_presentation materials_en_slideshare.pdfsansanir
21 vistas56 diapositivas
December 2023 MND IR PPT_final.pdf por
December 2023 MND IR PPT_final.pdfDecember 2023 MND IR PPT_final.pdf
December 2023 MND IR PPT_final.pdfMandalayResources
24 vistas20 diapositivas
Ucas Application.pptx por
Ucas Application.pptxUcas Application.pptx
Ucas Application.pptxHenrydanielb
5 vistas3 diapositivas

Último(7)

morgan-stanley-global-consumer-and-retail-conference.pdf por AmanKaurKahlon
morgan-stanley-global-consumer-and-retail-conference.pdfmorgan-stanley-global-consumer-and-retail-conference.pdf
morgan-stanley-global-consumer-and-retail-conference.pdf
AmanKaurKahlon1K vistas
WRN_Corporate_Presentation_Dec_2023.pdf por SandyNoyes
WRN_Corporate_Presentation_Dec_2023.pdfWRN_Corporate_Presentation_Dec_2023.pdf
WRN_Corporate_Presentation_Dec_2023.pdf
SandyNoyes113 vistas
Results Summary for the 3rd quarter of 2023 por TIM SA
Results Summary for the 3rd quarter of 2023Results Summary for the 3rd quarter of 2023
Results Summary for the 3rd quarter of 2023
TIM SA5 vistas
2311_presentation materials_en_slideshare.pdf por sansanir
2311_presentation materials_en_slideshare.pdf2311_presentation materials_en_slideshare.pdf
2311_presentation materials_en_slideshare.pdf
sansanir21 vistas
Corporate Presentation Probe Gold Dec 2023.pdf por Probe Gold
Corporate Presentation Probe Gold Dec 2023.pdfCorporate Presentation Probe Gold Dec 2023.pdf
Corporate Presentation Probe Gold Dec 2023.pdf
Probe Gold93 vistas

CMD AMG Lithium Presentations.pdf

  • 1. LITHIUM HYDROXIDE BATTERY-GRADE REFINERY BITTERFELD, GERMANY
  • 2. AMG LITHIUM’S VALUE CHAIN 2 Lithium concentrate (Spodumene) Convert Spodumene to tg LiOH / Carbonate Convert tg LiOH to bg LiOH Solid State Batteries (pilot) AMG operates a value chain from mining all the way down to hydroxide bg for batteries Lithium Concentrate Technical Grade (tg) LiOH / Carbonate Battery Grade (bg) LiOH Lithium LiOH Batteries LiOH = Lithium Hydroxide
  • 3. THE MIBRA MINE, BRAZIL 3
  • 4. THE BITTERFELD REFINERY, GERMANY, MODULE 1 End Markets China Tolling Cathode Producers Mibra Mine (spodumene) German Refinery Carbonate Brazil Solid-State Pilot Tolling until 2026 Startup 2026 External FEL3 Existing 4
  • 5. LITHIUM HYDROXIDE BG REFINERY IN GERMANY – STATUS 5
  • 6. MODULE 2-5 Cathode Producers Tolling Partner German Refinery Solid-State Pilot TG lithium products Tolling Partner Medium/Long Term Short Term AMG Resource Projects Carbonate Brazil (FEL3), Spodumene, LiOH End Markets External AMG Future Projects Existing China Tolling Third Party Spodumene 6
  • 7. DEVELOPING ADDITIONAL (AFFILIATED) RESOURCES 7 AMG Resource Development Support Spodumene production know how Engineering / Project Management Offtake contracts (with or without KfW) Project Financing / Equity Equity participation
  • 8. PROJECTED GLOBAL ELECTRIC VEHICLE GROWTH 8 CAGR 2022-2035 17% 16% 9% 15% Source: Lithium-Forecast-Benchmark-Mineral-Intelligence Q4-2022
  • 11. BRAZIL OPERATIONS 11 Crushing Tantalum Separation Lithium Carbonate Chemical Plant Grinding Expanded Spodumene Concentration Plant Lithium Carbonate Packaging Spodumene Filtering and Storage Expansion Spodumene Calcination and Leaching Existing Operations & Ongoing Expansion Lithium Carbonate Future Expansion
  • 12. SPODUMENE EXPANSION 12 • Increase production capacity 45% to 130k mt per year • Focus on process optimization to improve lithium metallurgical recovery • Enhanced robustness to address naturally occurring mine variations • Reduce material handling downtime
  • 13. AMG IS A LOW-COST SPODUMENE PRODUCER 13 $461/mt cost per ton delivered to China, net of tantalum, feldspar and tin by- product credits • The Mibra mine is a long-term tantalum concentrate producer and is the largest conflict-free producer of tantalum in the world • Mibra’s tantalum production is the key reason for the mine’s low-cost spodumene position • Mibra’s tantalum production will expand to 370K pounds per year. This expansion will occur in combination with the spodumene expansion • AMG Brazil entered into a life-of-mine strategic partnership with JX Nippon Mining & Metals Corporation that sells 100% of Mibra’s tantalum concentrate production to their subsidiary, Taniobis • This life of mine strategic partnership ensures long- term stability in tantalum sales and corresponding by-product credits to lithium production costs
  • 14. 14 TECHNICAL GRADE LITHIUM CHEMICAL PLANT Preliminary Estimates: • Investment: $250M • Commissioning: End of 2025 • Capacity: 16.5 mt Technical Grade Lithium per annum • Delivered cost to Germany less than $10,000 /mt; assuming spodumene at cost for conversion in Brazil • TG Carbonate from Brazil vs Upgrading in China results in substantial freight savings and ~90k mt reduction in CO2e
  • 15. • Across all Brazil sites, Lost Time Rate of 0.14 and Recordable Rate of 0.42 compare favorably to Bureau of Labor Statistics Industry Benchmarks: 1.2 Lost Time Rate and 4.1 Recordable Rate (88% and 90% better, respectively). • In 2021, AMG Brazil was awarded a Recognition on Good Suppliers Practices Prize from Novelis, which recognizes initiatives from partners of Novelis contributing to a more sustainable world. SUSTAINABILITY 15 • In 2022, AMG’s owned hydroelectricity plant produced electricity to cover 48% of our total power needs (produced 65.67 TJ and consumed 135.96 TJ across all of our Brazil operations). • Above all, preserving the environment is part of the essence of AMG Brazil which, with its production, contributes globally to the reduction of CO2 emissions.
  • 16. LOCAL COMMUNITY 16 • The company prioritizes local culture and building a relationship of trust and mutual respect and prioritizes hiring locally. ➢ More than 70% of employees are local hires ➢ The Young Apprentice Program, a partnership with SENAI, Nacional Service of Industrial Learning, is an internship based on the commitment of local labor development and professional possibilities. ➢ AMG Brazil partners with local universities focusing on personal and professional development of young people and adults entering the job market. Since 2015, AMG Brazil has prepared more than 70 individuals for the job market, directly hiring almost 40%.
  • 17. 17 MIBRA RESOURCE – 2021 Resource Category Measured Indicated Inferred Category Ore (Mt) Li2O Grade Li2O (mt) LCE (mt) Measured 2.186 0.94% 20,237 50,046 Indicated 15.304 1.13% 171,330 423,698 Measured & Indicated 17.490 1.10% 191,566 473,744 Inferred 3.744 1.12% 41,914 103,654
  • 18. 18 STRATEGIC EXPLORATION PROJECTS BRAZIL Ceará 9 Mineral Rights. Geochemical results show presence of Lithium, Tantalum and Tin. Ongoing drilling campaign Paraíba 8 Mineral Rights. Geochemical results show presence of Lithium, Tantalum and Tin Minas Gerais New exploration project to delineate subsurface pegmatite occurrences in areas near existing Mibra mine
  • 19. LITHIUM HYDROXIDE BG REFINERY IN GERMANY - STATUS 19
  • 21. LITHIUM HYDROXIDE BG REFINERY – TIMELINE 21 • Production of highly-refined, battery-grade Lithium hydroxide. • Module 1 with 20,000 MT/yr capacity, further modules up to 100,000 MT/yr in total. • Located in Bitterfeld/Germany: access to all required energies and infrastructure. • Start up in Q4 • Expected Capex of $140 million for module 1.
  • 22. MODULE 1: LITHIUM SUPPLY CHAIN 22 China Tolling (until 2026) Cathode Producers Mibra Mine (Spodumene) Lithium Hydroxide BG Module 1 Spodumene to Carbonate Brazil Carbonate to Hydroxide Germany Start up 2026
  • 23. LITHIUM FEEDSTOCK SOURCES MODULE 1 23 • AMG Brazil: only volumes not covered by Spodumene contracts. • LiOH BG qualification during 1st half of 2024. 0 5 10 15 20 25 2023 2024 2025 LiOH Feedstock in ‚000 mT AMG Brazil Purchase of LiOH TG / Li2CO3 Strategic Offtake Partners
  • 24. • AMG has signed a binding supply agreement with Korean EcoPro for an initial three-year term to deliver a binding 5,000 MT/yr plus an optional 5,000 MT/yr to EcoPro BM’s CAM- facility in Debrecen-Hungary. • AMG executed a MoU with FREYR for an off-take of up to 5,000 MT/yr. • AMG executed further MoUs with different customers. • AMG has an agreement in place with General Lithium for an offtake of up to 2,000 MT/yr for their EU needs. 24 MODULE 1: LITHIUM HYDROXIDE OFFTAKE 5,000 5,000 5,000 3,000 2,000 0 5,000 10,000 15,000 20,000 MT/year EcoPro - Fix EcoPro - Variabel FREYR Customers (Europe) GLC for EU Existing offtakes at runrate 2025
  • 25. INDICATIVE MARGIN DEVELOPMENT TO A FULLY BACKWARD INTEGRATED LITHIUM COMPANY 25 HYDROX IDE TG P URCHA S E TOLLING B RA S IL S P ODUM E NE FULL B A CK W A RD INTE GRA TION $/MT Cost Margin Technical Grade Purchase: Represents the margin of the Bitterfeld plant assuming the open market purchase of technical grade hydroxide. Tolling Brazil Spodumene: Represents the margin available to Bitterfeld via tolling Brazil spodumene in China and delivering technical grade hydroxide to Germany. Full Integration: Represents the delivery of technical grade carbonate to Germany direct from the Brazilian Technical Grade plant.
  • 26. GAME CHANGER: NEW AMG SUPPLY CHAIN CONCEPT 26
  • 27. AMG Brazil • Available Spodumene concentrate (SC) conversion via tolling arrangement (in place) • 2026: SC to Lithium Carbonate TG (LC) conversion in Brazil, LC to LiOH TG in Germany Purchase LiOH TG / off grade 3rd Party Spodumene Concentrate (SC) Offtakes • Convert SC via tolling arrangement to LiOH TG Purchase Li2CO3 TG • Toll conversion into LiOH TG; feed LC to LiOH TG converter in Germany • Materials from Lithium-Ion-Battery-Recycling Strategic Offtake Partners – Toll Model • AMG converts technical lithium salts provided by partners • Offtake agreements for LiOH BG with same partners Strategic Offtake Partners – Enabling Project Execution • Develop a Lithium greenfield resource and produce precursor • Strategic partnerships GROWTH: AMG LITHIUM SOURCING STRATEGY Six Pillar Feedstock Supply Strategy 1 2 3 4 5 6 27
  • 28. LITHIUM SUPPLY CHAIN – MODULE 2-5 Lithium Carbonate TG 3rd Party Spodumene Lithium Carbonate from Recycling Lithium Hydroxide TG Lithium Carbonate TG to Hydroxide TG Lithium Hydroxide BG Modules Tolling China Lithium Hydroxide TG Solid State Battery Materials Cathode Producers Tolling Partner Tolling Partner AMG Resource Projects Lithium Carbonate TG Medium/Long Term Short Term 28
  • 29. WHY EUROPE ? – EU REQUIRES LARGE VOLUMES LITHIUM HYDROXIDE BG 29 600,000 0 200,000 400,000 600,000 Demand Supply Recycling Existing & Announced EU Li Projects Estimated 2030 EU Lithium Market Balance (kMT LCE) >300,000 MT annual shortfall 2025: already announced European demand of ~300 ktpa LCEs for Cathodes Source: AMG Lithium internal Q1 2023, Lithium-Forecast-Benchmark-Mineral-Intelligence Q4-2022.
  • 30. WHY LIOH ? - GROWING DEMAND FOR LITHIUM HYDROXIDE BG DRIVEN BY HIGH NICKEL BATTERY CATHODES 30 Source: Lithium-Forecast-Benchmark-Mineral-Intelligence Q4-2022. Note: High Nickel includes NCM712, NCM811, NMX, NCA, NCMA, LNMO and other nickel chemistries. Lithium Demand in Rechargeable Batteries EV Demand for Lithium by Type
  • 31. CURRENT LITHIUM SALT PRICE TREND IN CHINA 31 30,000 40,000 50,000 60,000 70,000 80,000 90,000 Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 $/mt Fastmarkets LiOH / Li2CO3 BG spot prices Li2CO3 BG CIF Asia LiOH BG CIF Asia Li2CO3 BG EXW China VAT incl. LiOH BG EXW China VAT incl.
  • 32. NEXT GENERATION AUTOMOTIVE BATTERY TECHNOLOGY: ALL-SOLID-STATE-BATTERIES (ASSB) 32 Application & Market: ▪ All-Solid-State Batteries are next step in automotive battery technology ▪ Forecasts estimate 5-7 % market penetration in 2030 (total market of ~2.000 GWh) ▪ EV market forecast indicates large growth potential on long-term view 2030+ Technology: ▪ Solid electrolytes are critical performance components to reach energy density and safety targets. ▪ Solid electrolytes and precursors are key compounds regarding quality and product availability of ASSBs. Sources: SolidPower (2023); Avicenne (2021); Roland Berger (2022); HSBC (2021) 0 1,000 2,000 3,000 4,000 2022 2023 2024 2025 2026 2027 2028 2029 2030 Battery demand / automotive [GWh] Conservative Case Optimistic scenario 0% 1% 2% 3% 4% 5% 6% 7% 0 10,000 20,000 30,000 40,000 50,000 60,000 2023 2024 2025 2026 2027 2028 2029 2030 Market penetration Solid electrolyte market [MT] Forecast Solid Electrolyte Conservative Market penetration
  • 33. MARKET TREND: ALL-SOLID-STATE-BATTERIES (ASSB) OUR PORTFOLIO: SOLID ELECTROLYTES AND LITHIUM SULFIDE 33 Standard product for solid electrolyte production Premium product for electrode production Lithium sulfide Standard Grade SG Lithium sulfide Ultrafine Grade UG Precursors (Lithium Sulfide) Sulfidic Solid Electrolytes ▪ Broad portfolio of sulfide-based solid electrolytes ▪ Scalable production process ▪ Proprietary process filed for patent
  • 34. GLOBAL CUSTOMER ACTIVITIES 34 Current status: Projects with customers in: ▪ Europe (3x): development projects & evaluation ▪ USA (1x): qualification ▪ Japan (4x): qualification & evaluation projects ▪ Korea (2x): sampling & evaluation ▪ Addressable AMG customer potential: 6.000+ MT/a in 2028 Our position: ▪ Development partner and prospective material supplier ▪ Backward integrated technology leader for solid electrolyte production LiOH Precursor Lithium sulfide Solid Electrolyte Battery Cell 1x 3x 2x 4x
  • 35. LITHIUM SULFIDE & SOLID ELECTROLYTE ROADMAP 35 Market 2023 2024 2025 2026 2028 2030 Products Precursors (lithium sulfide) Solid electrolyte Sales / commercial Sales / commercial. Sales / qualification Construction Sales / qualification Construction Market Commitment: Technical & Design-in projects | MoUs | Supply agreements Market Feedback Sample results Sales / comm. qualification Construction Commercialization Demo Plant 100MT/yr Commercial Plant 10.000MT/yr
  • 36. LIVA Power Management Systems Project IPS7000, location: AMG Graphite, Hauzenberg, Germany
  • 37. LIVA APPROACH: CONCEPT OF A HYBRID BATTERY 37 Hybrid Energy Storage System Technical approach: ► High power unit (Li-ion battery) ► Energy storage unit (Vanadium Redox Flow battery) ► Software solution with artificial intelligence (AI) ► Control system for multiple energy assets including power production, hydrogen, and process heat and cooling Environmentally friendly battery: ► Low CO2 footprint of the energy storage system ► Green mining strategy ► No problematic raw materials ► Fully closed recycling local power supply local power demand High Power Unit Energy Storage Unit AI software-based Virtual Battery Energy Control Lithium-ion battery Vanadium Redox Flow Battery Large scale energy storage systems: Managing the fluctuating power demand and power supply, integrating and shifting unsteady renewable energies (solar & wind) VRFB
  • 38. TECHNICAL ADVANTAGE & BENEFITS OF A HYBRID ENERGY STORAGE SYSTEM (‘HESS’) 38 Advantage & Benefits ► Broad Range of industrial and grid scale applications ► Optimal use of the KPI´s ► Increased overall system efficiency to power supply and energy storage ► Improved safety & increased reliability (availability >99,9%) ► Long lifetime of the batteries: 15-20 years, +20,000 cycles ► Lowest Total Cost of Ownership/ Levelized Cost of Storage (LCOS) ► Custom tailored system with flexible up-grade capabilities for power and energy ► Low CO2 footprint at life-cycle Performance profile virtual HESS LIVA´s battery technology approach: use respective KPI advantages (key performance indictors) TCO energy Cycle stability & lifetime TCO power Safety & reliability Spectrum of applications
  • 39. APPLICATIONS LIVA HYBRID ENERGY STORAGE SYSTEMS 39 Energy applications ▪ Prosumer: Optimized self consumption and self-sufficiency with solar & wind ▪ Efficient off-grid & island solutions ▪ Reducing CO2 emission up to -80% vs. Diesel gensets. Reduce electricity costs up to -55%* Power applications ▪ Reduce power peaks (peak shaving) and power grid cost up to -80%** ▪ Grid stabilization & power quality improvement: frequency containment reserve, grid peak load management ▪ Emergency/uninterrupted power supply with black starting capabilities New applications ▪ Electric vehicle infrastructure: Integrate renewable energies & high-power charging ▪ Opportunity charging & discharging: Arbitrage spot market of electricity *Island grid with diesel driven gensets **avg. Central European market Shifting Island off-grid Peak shaving Grid service HP charging energy storage VRFB power unit AI software energy control HESS
  • 40. MARKET OF THE APPLICATIONS 40 energy storage VRFB HESS Behind the meter Grid side Demand-side markets Supply-side markets Electricity & infrastructure: ▪ Utilities (electricity producer) ▪ Transmission grid operators ▪ Local electricity suppliers ▪ Cities & communities Industries: ▪ Heavy industries ▪ Metallurgical sector ▪ Metalworking ▪ Chemicals ▪ Automotive & Aerospace ▪ Glass, ceramics, paper Investors: ▪ Private equity infrastructure ▪ PPP Investors Industries: ▪ Energy intensive industries ▪ Metalworking industry ▪ Chemicals ▪ Mining & exploration Island off-grid Peak shaving Grid service HP charging Shifting Power supply Island off-grid HP charging Power supply Arbitrage
  • 41. VALUE CHAIN: INTEGRATION WITH AMG ACCELERATES LIVA’S GROWTH 41 ~/= Power Electronic Equipment Power battery Li-Ion Software Control Engineering EPC Software Simulation Software Monitoring Grid apps LIVA Worldwide sourcing of standard parts & components AMG Group Sourcing key components: battery racks & modules AMG-V GfE V2O5 Electrolyte LIVA/AMG Engineering VRFB Assembly Installation Close strategic partnerships with global suppliers of key relevant components VRFB ▪ Full-service engineering, procurement and construction (“EPC”) of a Hybrid Energy Storage System (“HESS”) ▪ Automated operations and energy balancing with self- learning algorithms ▪ Remote monitoring with analytics and monthly reporting ▪ Utilizing AMG Engineering to accelerate our EPC offering ▪ Backward integrated to vanadium electrolyte production in Nuremberg LIVA delivers a customized, turnkey facility Power Management as a Service
  • 42. LIVA IS PLANNING A RAPID EXPANSION OF HYBRID ENERGY STORAGE SYSTEMS (“HESS”) 42 1. AMG Graphite Hauzenberg, Germany Current Use: ▪ Peak Shaving ▪ Emergency Power Future Expansion: ▪ Solar Energy Integration ▪ Grid Service Size 3,5 MWh 3. AMG Titanium Nuremberg, Germany 4. AMG Chrome Rotherham, UK 5. AMG Vanadium Cambridge, Ohio Planned Uses ▪ Peak Shaving ▪ Solar Integration / Energy shifting ▪ Grid Services ▪ Emergency Power Total size: 15 MWh 2. Wipotec Kaiserslautern, Germany Planned Uses ▪ Renewable Integration: ‒ Solar ‒ Wind ‒ Geothermal ▪ Energy Shifting ▪ Peak Shaving ▪ Grid Service Size: 4 MWh 6. Large Scale Industrial Customer (Electro Steel) Planned Uses ▪ Integrated Energy Management ▪ Replace diesel generators ▪ Peak Shaving ▪ Grid Service ▪ Renewable Integration Lithium-ion Battery: 28 MWh Vanadium Redox Flow Battery: 80 MWh
  • 43. THANK YOU! 43 Hybrid Energy Storage System (HESS) ▪ 1.5-Level design, underground tank system with passive & active thermal management ▪ VRFB energy storage: 3.75 MWh (385 kW power) ▪ Li-ion-battery (BESS): 0,35 MWh (1.0 MW power) Modular 16-stack cabinet units Li-ion High power battery racks Power electronics DC-DC converters DC-AC inverters Vanadium Catholyte & Anolyte
  • 44. 44 VANADIUM, MOLYBDENUM AND NICKEL – ZANESVILLE, OHIO LIVA BATTERY LITHIUM LAB LITHIUM HYDROXIDE – BITTERFELD, GERMANY VANADIUM, MOLYBDENUM AND NICKEL – CAMBRIDGE, OHIO ENGINEERING – HANAU, GERMANY MELTSHOP – ZANESVILLE, OHIO