TOTAL
QUALITY
MANAGEMENT
By: -
Hakeem–Ur–Rehman
PCBA–UCP
T MQCONTINUAL QUALITY IMPROVEMENT APPROACHES
 TQM, 3rd Edition, By: Besterfield (Chapter # 5 & 16)
 5–S Handouts
IMPROVEMENT STRATEGIES
REPAIR
REFINEMENT
RENOVATION
REINVENTION
IMPROVEMENT STRATEGIES
REPAIR:
 “Anything broken must be fixed so that it functions as
designed.”
 Strategies divided into two levels:
1. Temporary or Short- term measure
2. Permanent measure
REFINEMENT:
 “Activities that continually improve a process that is not
broken.”
 Refinement improves efficiency and effectiveness.
RENOVATION:
 “Strategy results in major or breakthrough improvement.”
 Innovation & technological advancement are key factors in this
approach.
REINVENTION (RE-ENGINEERING):
 “Reinvention begins by imagining that the previous condition
does not exist; A clean sheet of paper”
PROBLEM SOLVING
METHOD
“Also called the Scientific method”
“ Some People approach every
problem with an open mouth.”
(Adlai Stevenson)
PROBLEM SOLVING METHOD
Identity the
opportunities
Implement
Develop the
optimal Solution
Analyze the
Process
Standardize
the solution
Study Results
Plan for
The Future act
doStudy
plan
WHICH QUALITY APPROACH?
 Continuous (i.e., Non–Stop) or
Continual (i.e., Recurring often
improvement frameworks)
– KaiZen
– Six–Sigma
– Benchmarking
KaiZen
 “Kai”  Change; “Zen”  Better
 Kaizen  Make it Better (Improvement)
 KaiZen is a System of accumulated improvement.
 The main purpose of Kaizen is to evolve total employee participation and
it also helps in building capable work force for an organization
 The results of Kaizen are not very drastic but incremental that’s why
continuous improvement leads to accumulated improvement.
Kaizen is a process-oriented thinking and not result oriented thinking:
PROCESS ORIENTED RESULT ORIENTED
 Self discipline
 Time management
 Skill Management
 Participation & involvement
 Communication
 Morale
I don’t care, you get it done just
give me one result
10 Hints for doing successful KaiZen
1. No Excuses: Don’t make excuses… Don’t accept
excuses…Explanations are often still excuses (if you have
time to makeup excuses, you have time to think of
improvement ideas).
2. Don’t be a concrete head: Throughout traditional concepts…
Think how a new method can work, not how it won’t.
3. Do Kaizen by getting your hands dirty on the shop floor
4. Quick & Crude is better than slow and elegant: Don’t seek
perfection… 50% improvement rate is as long as it is done
on the spot.
5. Produce Actual Improvement
6. Implement Kaizen Newspaper items as committed: Don’t Put
of kaizen until tomorrow.
10 Hints for doing successful KaiZen
7. Do Kaizen by adopting ideas of workers: Put yourself in the
worker’s position … The idea of 10 people are better than
the knowledge of one.
8. Do Kaizen without spending lots of money: Many small
improvements add up to big results … Implement quickly
with less risk.
9. Don’t overlook even the smallest waste (Muda): Over
production, delay, transportation, processing, inventory, etc.
10. Document results on target progress report: Document and
report results at regular report outs. Fill in the condition
even if there has been no change.
DIFFERENT STYLES OF
CHANGES
KaiZen : 5S
 5S movement is a determination to
ORGANIZE WORK PLACE, To Keep It
Neat, TO CLEAN, TO MAINTAIN THE
DISCIPLINE to do a good job.
 Japanese concept for house keeping
– Sort (Seiri)
– Straighten (Seiton)
– Shine (Seiso)
– Standardize (Seiketsu)
– Sustain (Shitsuke)
Decide what is needed and what is not,
and dispose of all items that are not necessary
1 SORT / SIFTING
Car Parking Area
Should these barrels
be in car parking area?
5S PRINCIPLES
5 S PRINCIPLES
2 STRAIGHTEN
Provide orderly storage in the right place for
all necessary items so that they can be easily
found and used when needed.
EQUIPMENT
STORAGE AREA
Easy to determine
equipment location
5S PRINCIPLES
3 SHINE / SWEEPING
Maintain a clean worksite at all times in order
to make work easier, safer, healthier and more
satisfying
I am motivated to
work in this standards
Service Workshop
5 S PRINCIPLES
4 STANDARDIZE
Continuously keep work
area orderly and clean
5 SUSTAIN / SELF-DISCIPLINE
Make it habit to engaging 5S activities
daily basis by establishing standards.
3 Improve work efficiency
4 Increase employee moral & motivation
Eliminate various kind of Waste2
5 Contribute in work management
Create clean, healthy & safe working environment1
5 S PRINCIPLES MERIT
TOTAL PRODUCTIVE MAINTENANCE
 Total Productive Maintenance (TPM) is keeping the current
plant and equipment at its highest productive level through
cooperation of all areas of the organization.
 Generally, the first task is to break down the traditional
barriers between maintenance and production personnel so
they are working together.
 TOTAL: All encompassing by maintenance and production
individuals working together.
 PRODUCTIVE: Production of goods and services that
meet or exceed customers’ expectation.
 MAINTENANCE: Keeping equipment and plant in as good
as or better than the original condition at all times.
TOTAL PRODUCTIVE MAINTENANCE
 The Overall goals of TPM are:
1. Maintaining and improving equipment capacity
2. Maintaining equipment for life
3. Using support from all areas of the operation
4. Encouraging input from all employees
5. Using teams for continuous improvement
 Successful TPM results are:
1. Zero Unplanned downtime
2. Zero performance loss
3. Zero defects
4. Zero energy loss
5. Zero accidents
Overall Equipment Effectiveness (OEE)
 Overall Equipment Effectiveness (OEE) provides a metric or measure to
continually monitor how effectively the equipment is performing and
where the losses are with the potential for improvement.
 IMPROVEMENT NEEDS:
Six major loss areas need to be measured and tracked:
 DOWNTIME LOSSES:
1. PLANNED:
a. Start–Ups
b. Shift changes
c. Coffee & lunch breaks
2. UN-PLANNED DOWNTIME:
a. Equipment breakdown
b. Changeovers
c. Lack of material
 REDUCED SPEED LOSSES:
3. IDLING AND MAJOR STOPPAGES
4. SLOW DOWNS
 POOR QUALITY LOSSES:
5. IDLING AND MAJOR STOPPAGES
6. SLOW DOWNS
OEE … (Cont…)
 These losses can be quantified into three metrics and can be summarized into one
equipment effectiveness metric.
 Downtime losses are measured by EQUIPMENT AVAILABILITY using
the equation:
A = (T / P) X 100
Where:
 A = Availability
 T = Operating Time (P – D)
 P = Planned Operating Time
 D = Downtime
 Reduced Speed Losses are measured by tracking PERFORMANCE
EFFICIENCY using the equation:
E = (C X N/ T) X 100
Where:
 E = Performance Efficiency
 C = Theoretical Cycle Time
 N = Processes Amount (Quantity)
 Poor Quality Losses are measured by tracking the RATE OF QUALITY
PRODUCTS produced using the equation:
R = (N – Q/ N) X 100
Where:
 R = Rate of Quality Products
 N = Processed amount (Quantity)
 Q = Non–conformities
OEE … (Cont…)
 BENCHMARK:
 Some of the literature suggests that world – class
firms have AVAILABILITY greater than 90%,
PERFORMANCE EFFICIENCY greater than 95%,
and a RATE OF QUALITY PRODUCTS greater than
99%.
 Therefore, the OEE for world – class companies
should exceeds 85%.
OEE = A X E X R
OEE: EXAMPLE
Last week’s production numbers on machining center JL58 were as fellows:
 Scheduled operation = 10 hours/day; 5 days/week
 Manufacturing downtime due to meetings, material outages, trainings, breaks, and
so forth = 410 minutes / week
 Maintenance downtime scheduled and equipment breakdown = 227 minutes/week
 Theoretical (Standard) cycle time = 0.5 minutes/unit
 Production for the week = 4450 units
 Defective parts made = 15 units
 P = (10 hours/day) X (5 days/week ) X (60 minutes/hour) = 3000 minutes/week
 D = 410 minutes/week + 227 minutes/week = 637 minutes / week
 T = (P – D) = 3000 – 637 = 2363 minutes
A = (T / P) X 100
= (2363 / 3000) X 100
= 78.8%
E = (C X N / T) X 100
= (0.5 X 4450 / 2363) X 100
= 94.2%
R = (N – Q / N) X 100
= (4450 – 15 / 4450) X 100
= 99.7%
OEE = A X E X R = 0.778 X 0.942 X 0.997 = 0.740
(74%)
NOTE:
The equipment availability should be improved to reach the goal of 85%
equipment effectiveness.
Questions
& Answers
Questions
& Answers
QUESTIONS
&
ANSWERS

Más contenido relacionado

La actualidad más candente

Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over timeJulian Kalac P.Eng
 
Most (Maynard Operation Sequence Technique)
Most (Maynard Operation Sequence Technique)Most (Maynard Operation Sequence Technique)
Most (Maynard Operation Sequence Technique)Sohit Chauhan
 
10. measurement system analysis (msa)
10. measurement system analysis (msa)10. measurement system analysis (msa)
10. measurement system analysis (msa)Hakeem-Ur- Rehman
 
Continuous process improvement (4)
Continuous process improvement (4)Continuous process improvement (4)
Continuous process improvement (4)083805154
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3TKMG, Inc.
 
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...TKMG, Inc.
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 
Productivity
ProductivityProductivity
Productivityvijaynitd
 
Balanced Scorecard Presentation
Balanced Scorecard PresentationBalanced Scorecard Presentation
Balanced Scorecard Presentationtimadams2323
 
Quality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & ManufacturingQuality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & ManufacturingTimothy Wooi
 
Kaizen PDCA Cycle Process PowerPoint Presentation Slides
Kaizen PDCA Cycle Process PowerPoint Presentation Slides Kaizen PDCA Cycle Process PowerPoint Presentation Slides
Kaizen PDCA Cycle Process PowerPoint Presentation Slides SlideTeam
 

La actualidad más candente (20)

Capacity management
Capacity managementCapacity management
Capacity management
 
Productivity
ProductivityProductivity
Productivity
 
Problem solving preview
Problem solving previewProblem solving preview
Problem solving preview
 
Lean Management System Assessment
Lean Management System AssessmentLean Management System Assessment
Lean Management System Assessment
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over time
 
Most (Maynard Operation Sequence Technique)
Most (Maynard Operation Sequence Technique)Most (Maynard Operation Sequence Technique)
Most (Maynard Operation Sequence Technique)
 
10. measurement system analysis (msa)
10. measurement system analysis (msa)10. measurement system analysis (msa)
10. measurement system analysis (msa)
 
Continuous process improvement (4)
Continuous process improvement (4)Continuous process improvement (4)
Continuous process improvement (4)
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3
 
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
Productivity
ProductivityProductivity
Productivity
 
Balanced Scorecard Presentation
Balanced Scorecard PresentationBalanced Scorecard Presentation
Balanced Scorecard Presentation
 
Quality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & ManufacturingQuality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & Manufacturing
 
CTQ Matrix
CTQ MatrixCTQ Matrix
CTQ Matrix
 
Company Profile - Operational Excellence Consulting
Company Profile - Operational Excellence ConsultingCompany Profile - Operational Excellence Consulting
Company Profile - Operational Excellence Consulting
 
Kaizen PDCA Cycle Process PowerPoint Presentation Slides
Kaizen PDCA Cycle Process PowerPoint Presentation Slides Kaizen PDCA Cycle Process PowerPoint Presentation Slides
Kaizen PDCA Cycle Process PowerPoint Presentation Slides
 
Operations Management
Operations ManagementOperations Management
Operations Management
 

Destacado (18)

2. lp iterative methods
2. lp   iterative methods2. lp   iterative methods
2. lp iterative methods
 
M.c.a.(sem iii) operation research
M.c.a.(sem   iii) operation researchM.c.a.(sem   iii) operation research
M.c.a.(sem iii) operation research
 
The Passive
The PassiveThe Passive
The Passive
 
Operations research
Operations researchOperations research
Operations research
 
2. cost of quality
2. cost of quality2. cost of quality
2. cost of quality
 
Network analysis
Network analysisNetwork analysis
Network analysis
 
Operations Research - The Dual Simplex Method
Operations Research - The Dual Simplex MethodOperations Research - The Dual Simplex Method
Operations Research - The Dual Simplex Method
 
6. assignment problems
6. assignment problems6. assignment problems
6. assignment problems
 
Into to simulation
Into to simulationInto to simulation
Into to simulation
 
Queueing theory
Queueing theoryQueueing theory
Queueing theory
 
Goal programming
Goal programmingGoal programming
Goal programming
 
5. advance topics in lp
5. advance topics in lp5. advance topics in lp
5. advance topics in lp
 
PM using P6
PM using P6PM using P6
PM using P6
 
1. intro. to or & lp
1. intro. to or & lp1. intro. to or & lp
1. intro. to or & lp
 
5. transportation problems
5. transportation problems5. transportation problems
5. transportation problems
 
Integer programming
Integer programmingInteger programming
Integer programming
 
Linear Programming 1
Linear Programming 1Linear Programming 1
Linear Programming 1
 
Qfd house of quality
Qfd house of qualityQfd house of quality
Qfd house of quality
 

Similar a 7. cqia (kaizen, 5 s, tpm)

Similar a 7. cqia (kaizen, 5 s, tpm) (20)

Lean Smpl 1
Lean Smpl 1Lean Smpl 1
Lean Smpl 1
 
Total productive maintainence
Total productive maintainenceTotal productive maintainence
Total productive maintainence
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
Kaizen: The Art of Continuous Improvement"
Kaizen: The Art of Continuous Improvement"Kaizen: The Art of Continuous Improvement"
Kaizen: The Art of Continuous Improvement"
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptx
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 
Brandon.ppt
Brandon.pptBrandon.ppt
Brandon.ppt
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
Workplace management : 5S / Visual Control
Workplace management :  5S / Visual ControlWorkplace management :  5S / Visual Control
Workplace management : 5S / Visual Control
 
Total Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxTotal Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptx
 
Total Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfTotal Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdf
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
5's principles & 8'd methods
5's principles & 8'd methods5's principles & 8'd methods
5's principles & 8'd methods
 
20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity Maintenance
 
Quality and control Management
Quality and control Management Quality and control Management
Quality and control Management
 

Más de Hakeem-Ur- Rehman

1.introduction to quality & total quality management
1.introduction to quality & total quality management1.introduction to quality & total quality management
1.introduction to quality & total quality managementHakeem-Ur- Rehman
 
(Ntu talk) lean six sigma & scholarship info.
(Ntu talk) lean six sigma & scholarship info.(Ntu talk) lean six sigma & scholarship info.
(Ntu talk) lean six sigma & scholarship info.Hakeem-Ur- Rehman
 
Application of or for industrial engineers
Application of or for industrial engineersApplication of or for industrial engineers
Application of or for industrial engineersHakeem-Ur- Rehman
 
Lean six sigma (green belt)new
Lean six sigma (green belt)newLean six sigma (green belt)new
Lean six sigma (green belt)newHakeem-Ur- Rehman
 
Process improvement techniques
Process improvement techniquesProcess improvement techniques
Process improvement techniquesHakeem-Ur- Rehman
 
Production planning & control (PPC)
Production planning & control (PPC)Production planning & control (PPC)
Production planning & control (PPC)Hakeem-Ur- Rehman
 
4. linear programming using excel solver
4. linear programming using excel solver4. linear programming using excel solver
4. linear programming using excel solverHakeem-Ur- Rehman
 
3. linear programming senstivity analysis
3. linear programming senstivity analysis3. linear programming senstivity analysis
3. linear programming senstivity analysisHakeem-Ur- Rehman
 
12. seven management & planning tools
12. seven management & planning tools12. seven management & planning tools
12. seven management & planning toolsHakeem-Ur- Rehman
 
11. faliure mode & effect analysis
11. faliure mode & effect analysis11. faliure mode & effect analysis
11. faliure mode & effect analysisHakeem-Ur- Rehman
 
8. testing of hypothesis for variable & attribute data
8. testing of hypothesis for variable & attribute  data8. testing of hypothesis for variable & attribute  data
8. testing of hypothesis for variable & attribute dataHakeem-Ur- Rehman
 

Más de Hakeem-Ur- Rehman (16)

1.introduction to quality & total quality management
1.introduction to quality & total quality management1.introduction to quality & total quality management
1.introduction to quality & total quality management
 
Ilp modeling with excel
Ilp modeling with excelIlp modeling with excel
Ilp modeling with excel
 
Mendeley (new)
Mendeley (new)Mendeley (new)
Mendeley (new)
 
DEA
DEADEA
DEA
 
(Ntu talk) lean six sigma & scholarship info.
(Ntu talk) lean six sigma & scholarship info.(Ntu talk) lean six sigma & scholarship info.
(Ntu talk) lean six sigma & scholarship info.
 
Application of or for industrial engineers
Application of or for industrial engineersApplication of or for industrial engineers
Application of or for industrial engineers
 
Lean six sigma (green belt)new
Lean six sigma (green belt)newLean six sigma (green belt)new
Lean six sigma (green belt)new
 
Process improvement techniques
Process improvement techniquesProcess improvement techniques
Process improvement techniques
 
Production planning & control (PPC)
Production planning & control (PPC)Production planning & control (PPC)
Production planning & control (PPC)
 
4. linear programming using excel solver
4. linear programming using excel solver4. linear programming using excel solver
4. linear programming using excel solver
 
3. linear programming senstivity analysis
3. linear programming senstivity analysis3. linear programming senstivity analysis
3. linear programming senstivity analysis
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
12. seven management & planning tools
12. seven management & planning tools12. seven management & planning tools
12. seven management & planning tools
 
11. faliure mode & effect analysis
11. faliure mode & effect analysis11. faliure mode & effect analysis
11. faliure mode & effect analysis
 
9. design of experiment
9. design of experiment9. design of experiment
9. design of experiment
 
8. testing of hypothesis for variable & attribute data
8. testing of hypothesis for variable & attribute  data8. testing of hypothesis for variable & attribute  data
8. testing of hypothesis for variable & attribute data
 

Último

Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 

Último (20)

Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 

7. cqia (kaizen, 5 s, tpm)

  • 1. TOTAL QUALITY MANAGEMENT By: - Hakeem–Ur–Rehman PCBA–UCP T MQCONTINUAL QUALITY IMPROVEMENT APPROACHES  TQM, 3rd Edition, By: Besterfield (Chapter # 5 & 16)  5–S Handouts
  • 3. IMPROVEMENT STRATEGIES REPAIR:  “Anything broken must be fixed so that it functions as designed.”  Strategies divided into two levels: 1. Temporary or Short- term measure 2. Permanent measure REFINEMENT:  “Activities that continually improve a process that is not broken.”  Refinement improves efficiency and effectiveness. RENOVATION:  “Strategy results in major or breakthrough improvement.”  Innovation & technological advancement are key factors in this approach. REINVENTION (RE-ENGINEERING):  “Reinvention begins by imagining that the previous condition does not exist; A clean sheet of paper”
  • 4. PROBLEM SOLVING METHOD “Also called the Scientific method” “ Some People approach every problem with an open mouth.” (Adlai Stevenson)
  • 5. PROBLEM SOLVING METHOD Identity the opportunities Implement Develop the optimal Solution Analyze the Process Standardize the solution Study Results Plan for The Future act doStudy plan
  • 6. WHICH QUALITY APPROACH?  Continuous (i.e., Non–Stop) or Continual (i.e., Recurring often improvement frameworks) – KaiZen – Six–Sigma – Benchmarking
  • 7. KaiZen  “Kai”  Change; “Zen”  Better  Kaizen  Make it Better (Improvement)  KaiZen is a System of accumulated improvement.  The main purpose of Kaizen is to evolve total employee participation and it also helps in building capable work force for an organization  The results of Kaizen are not very drastic but incremental that’s why continuous improvement leads to accumulated improvement. Kaizen is a process-oriented thinking and not result oriented thinking: PROCESS ORIENTED RESULT ORIENTED  Self discipline  Time management  Skill Management  Participation & involvement  Communication  Morale I don’t care, you get it done just give me one result
  • 8.
  • 9. 10 Hints for doing successful KaiZen 1. No Excuses: Don’t make excuses… Don’t accept excuses…Explanations are often still excuses (if you have time to makeup excuses, you have time to think of improvement ideas). 2. Don’t be a concrete head: Throughout traditional concepts… Think how a new method can work, not how it won’t. 3. Do Kaizen by getting your hands dirty on the shop floor 4. Quick & Crude is better than slow and elegant: Don’t seek perfection… 50% improvement rate is as long as it is done on the spot. 5. Produce Actual Improvement 6. Implement Kaizen Newspaper items as committed: Don’t Put of kaizen until tomorrow.
  • 10. 10 Hints for doing successful KaiZen 7. Do Kaizen by adopting ideas of workers: Put yourself in the worker’s position … The idea of 10 people are better than the knowledge of one. 8. Do Kaizen without spending lots of money: Many small improvements add up to big results … Implement quickly with less risk. 9. Don’t overlook even the smallest waste (Muda): Over production, delay, transportation, processing, inventory, etc. 10. Document results on target progress report: Document and report results at regular report outs. Fill in the condition even if there has been no change.
  • 11.
  • 13. KaiZen : 5S  5S movement is a determination to ORGANIZE WORK PLACE, To Keep It Neat, TO CLEAN, TO MAINTAIN THE DISCIPLINE to do a good job.  Japanese concept for house keeping – Sort (Seiri) – Straighten (Seiton) – Shine (Seiso) – Standardize (Seiketsu) – Sustain (Shitsuke)
  • 14. Decide what is needed and what is not, and dispose of all items that are not necessary 1 SORT / SIFTING Car Parking Area Should these barrels be in car parking area? 5S PRINCIPLES
  • 15. 5 S PRINCIPLES 2 STRAIGHTEN Provide orderly storage in the right place for all necessary items so that they can be easily found and used when needed. EQUIPMENT STORAGE AREA Easy to determine equipment location
  • 16. 5S PRINCIPLES 3 SHINE / SWEEPING Maintain a clean worksite at all times in order to make work easier, safer, healthier and more satisfying I am motivated to work in this standards Service Workshop
  • 17. 5 S PRINCIPLES 4 STANDARDIZE Continuously keep work area orderly and clean 5 SUSTAIN / SELF-DISCIPLINE Make it habit to engaging 5S activities daily basis by establishing standards.
  • 18. 3 Improve work efficiency 4 Increase employee moral & motivation Eliminate various kind of Waste2 5 Contribute in work management Create clean, healthy & safe working environment1 5 S PRINCIPLES MERIT
  • 19. TOTAL PRODUCTIVE MAINTENANCE  Total Productive Maintenance (TPM) is keeping the current plant and equipment at its highest productive level through cooperation of all areas of the organization.  Generally, the first task is to break down the traditional barriers between maintenance and production personnel so they are working together.  TOTAL: All encompassing by maintenance and production individuals working together.  PRODUCTIVE: Production of goods and services that meet or exceed customers’ expectation.  MAINTENANCE: Keeping equipment and plant in as good as or better than the original condition at all times.
  • 20. TOTAL PRODUCTIVE MAINTENANCE  The Overall goals of TPM are: 1. Maintaining and improving equipment capacity 2. Maintaining equipment for life 3. Using support from all areas of the operation 4. Encouraging input from all employees 5. Using teams for continuous improvement  Successful TPM results are: 1. Zero Unplanned downtime 2. Zero performance loss 3. Zero defects 4. Zero energy loss 5. Zero accidents
  • 21. Overall Equipment Effectiveness (OEE)  Overall Equipment Effectiveness (OEE) provides a metric or measure to continually monitor how effectively the equipment is performing and where the losses are with the potential for improvement.  IMPROVEMENT NEEDS: Six major loss areas need to be measured and tracked:  DOWNTIME LOSSES: 1. PLANNED: a. Start–Ups b. Shift changes c. Coffee & lunch breaks 2. UN-PLANNED DOWNTIME: a. Equipment breakdown b. Changeovers c. Lack of material  REDUCED SPEED LOSSES: 3. IDLING AND MAJOR STOPPAGES 4. SLOW DOWNS  POOR QUALITY LOSSES: 5. IDLING AND MAJOR STOPPAGES 6. SLOW DOWNS
  • 22. OEE … (Cont…)  These losses can be quantified into three metrics and can be summarized into one equipment effectiveness metric.  Downtime losses are measured by EQUIPMENT AVAILABILITY using the equation: A = (T / P) X 100 Where:  A = Availability  T = Operating Time (P – D)  P = Planned Operating Time  D = Downtime  Reduced Speed Losses are measured by tracking PERFORMANCE EFFICIENCY using the equation: E = (C X N/ T) X 100 Where:  E = Performance Efficiency  C = Theoretical Cycle Time  N = Processes Amount (Quantity)  Poor Quality Losses are measured by tracking the RATE OF QUALITY PRODUCTS produced using the equation: R = (N – Q/ N) X 100 Where:  R = Rate of Quality Products  N = Processed amount (Quantity)  Q = Non–conformities
  • 23. OEE … (Cont…)  BENCHMARK:  Some of the literature suggests that world – class firms have AVAILABILITY greater than 90%, PERFORMANCE EFFICIENCY greater than 95%, and a RATE OF QUALITY PRODUCTS greater than 99%.  Therefore, the OEE for world – class companies should exceeds 85%. OEE = A X E X R
  • 24. OEE: EXAMPLE Last week’s production numbers on machining center JL58 were as fellows:  Scheduled operation = 10 hours/day; 5 days/week  Manufacturing downtime due to meetings, material outages, trainings, breaks, and so forth = 410 minutes / week  Maintenance downtime scheduled and equipment breakdown = 227 minutes/week  Theoretical (Standard) cycle time = 0.5 minutes/unit  Production for the week = 4450 units  Defective parts made = 15 units  P = (10 hours/day) X (5 days/week ) X (60 minutes/hour) = 3000 minutes/week  D = 410 minutes/week + 227 minutes/week = 637 minutes / week  T = (P – D) = 3000 – 637 = 2363 minutes A = (T / P) X 100 = (2363 / 3000) X 100 = 78.8% E = (C X N / T) X 100 = (0.5 X 4450 / 2363) X 100 = 94.2% R = (N – Q / N) X 100 = (4450 – 15 / 4450) X 100 = 99.7% OEE = A X E X R = 0.778 X 0.942 X 0.997 = 0.740 (74%) NOTE: The equipment availability should be improved to reach the goal of 85% equipment effectiveness.