4. LAM Registration: SP/O 73
Address: Suite B-102, Perdana
Exclusive Condo., Jalan
PJU 8/1, Damansara
Perdana 47820
Petaling Jaya, Selangor D.E.
Registration: Professional Architect
LAM A/O 73, APAM M2245
Tel: +(603) 7725 8168
Fax: +(603) 7733 8169
Email: ohba@ohbarch.com.my/
hbo.arch@gmail.com
Principal Architect
Name: Ong Hun Boon
Registration: Professional Architect LAM
A/O 73, APAM M2245
Email: hunboon@ohbarch.com.my
Significant Professional Experience
-Proposed Taylor’s Lakeside Commercial with Hostel (951 rooms) at Bandar Sunway
-Proposed 55 Storey Condominium (Banyan Tree) at Jalan Conlay, Kuala Lumpur
-Proposed 2 ½ Storey Hypermarket at Kemuning Utama (Giant)
-7 Units of Setia Eco Park Show Houses (The Street of Dreams)
-227 Units of Setia Eco Park Phase 2A & 2B Residential Development (The Street Dreams)
-42 Units of Setia Eco Park Phase 3B Residential Development
-51 Units of Setia Eco Park Phase 7C Residential Development
-10850 Units of National Housing at Tajura, Libya
-20000 Units of National Housing at Benghazi, Libya
-406 Units of RP9 Apartments & Town Houses Development
-9acre Mixed Use Development- 6 Blocks of Condominium with Commercial Units at Damansara
Perdana( Perdana Exclusive Condomunium)
4
5. COMPANY PROFILE
HB ONG ARCHITECT is a professional
practice which encompasses:
•Architecture design
•Planning
•Project management
•Interiors
5
The film is determined to pursue excellence
in all services rendered to clients, and is
committed to provide clients satisfactory
end result.
The firm embraces good working
relationship with clients where the firm
acknowledges clients’ requirements of each
project of different nature; further interpret,
innovate and manage the projects to deliver
satisfactory end results.
6. What profession in the consultant team did an architect work with??
Land Surveyor
Land surveyor usually started earlier than an architect, they will define the condition of the land by
doing research, marking and survey and transfer the information into the drawing. They will produce a
survey plan for architect so the architect will know the condition of the land and the things that need to
be concern.
Planner
When design a bid scheme, a planner is needed to do the planner submission before come to the
architect part.
Civil & Structure Engineering
C&S Engineering is responsible to design the structure of the building.
Mechanical Engineering
Mechanical Engineering is responsible to design the electrical and mechanical part of the building.
Landscape Architect
Landscape Architect is responsible to create the landscape. They plan , design and manage open
spaces including both nature and built environment.
Quantity Survey
Quantity Survey is responsible to control and manage the budget and they need to provide advice on
contract issues.
Profile Context6
7. If the client want the specific design or low cost, how
architect deal with it??
An architect always needs to understand the design brief, all the
details of the requirement of the building and the budget. An
architect will give advice to the client whether the design that
the client wants and the budget given is possible or not. If the
design and the budget of the building already deal, then the
architect will engage by client.
What does an architect do ??
An architect mainly will design building. Some architect will
design bridge, some will crossover to design shoe too.
Architect is design or science??
An architect needs to know both in design and science.
Architect needs to design the building which is an art.
Meanwhile, an architect also needs to know the technology that
use to build a building, the building construction, thermal
comfort and the scientific things in building which is related to
science.
Project Taken
“Recently have done numbers of factories. Preciously, I have
done some renovation, bungalow building and did some master
plans for others.”
What is the client’s needs?
In architecture, the client presents their needs and wants to the
architect. The architect designs a building or space to satisfy
the client’s needs. The architect would discuss the services
required specific to the client’s needs for the project, cost and
budget. After understanding about the process of building
procurement, the architect will advise on alternative
methodologies and their advantages and disadvantages.
7
13. The main responsibility of
an architect is to design the
building. When the design of
building is confirmed by
client, an architect needs to
convince the message to the
consultant team. An
architect needs the input in
various item form the
consultant team, therefore,
the consultant team will
come out with their set of
drawings. For example,
manual drawing, structural
drawing and landscape
architecture design drawing.
The role of an architect is
not only needs to design the
building, he/she also need to
deliver the building to the
client. An architect is a
leader of the consultant
team.
An architect needs to
ensure the design of the
building be done in
construction and monitor all
the consultant deliver the
design of the building in
order to achieve the same
goal which is the final
building result.
When come to the
construction stage, an
architect needs to be liable
to ensure the contractor can
deliver the building on time.
There will be a lot of
meetings at this stage which
normally called as side
meeting to check the
progress, if any problem
found on the site, it is the
responsible of an architect
to find out the solution.
Therefore, the project can
keep going on and finish on
time.
Role and responsibility
13
14. 1. Schematic Design (SD)
The objective of this phase is to provide a
defined concept to the client. The architect
determine the set of needs that a building is
going to meet. The architect may provide
several drawings with many versions of the
design that include different options. At this
stage, the architect may provide the client
with concept sketches, sketched by hand or
by CAD.
2. Design Development (DD)
During this stage, the design is
refined into a set of drawings that encompass all
aspects. These drawings become the foundation
for the construction drawings that are submitted to
the government for approval. DD drawings are
similar to construction drawings, but may not
contain as many details, dimensions and notes.
3. Construction Drawings (CD)
As design issues surface, the
architectural team works to incorporate these
changes. CDs must include all details required by
the city, county and federal guidelines. These are
the documents to which a contractor is held
responsible. These are also the drawings from
which construction cost is calculated.
5 STAGES
14
15. 4. Bidding and Contract Negotiation (BID)
This is the bidding process, where the
architect is the manager of the bidding. Contractors are
invited to make a bid. This process is pretty self-
explanatory.
5. Construction Administration (CA)
This is the last phase of the architectural design process. There may be changes
to the CD. Construction administration refers to the questions or problems that will arise during
construction which an architect must address. When the project is complete, the architect will
receive a Certificate of Substantial Completion, certifying that the architect’s responsibility on
this project is complete.
15
16. Saujana Impian
Awarded the “Best Planned Township Design” by the Town Planning Institute of Malaysia,
Saujana Impian was developed in phases, and as such the township is geographically
separated by sub-township development as below:
Impian Jaya – Phase 1 (Double Storey Terrace Houses) & Phase 2 (Semi-Detached Houses)
Impian Gemilang – Phase 3A (Semi-D) & Phase 3B (Double Storey Terrace Houses)
Impian Indah – Phase 4 (Double Storey Terrace Houses)
Impian Murni – Phase 5 (Double Storey Terrace Houses)
Impian Kasih – Phase 5 (Double Storey Terrace Houses)
Impian Setia – Phase 5 (Double Storey Terrace Houses)
Impian Makmur – Phase 7 (Apartments)
Saujana Impian is a mature township in
Kajang, a town in the district capital of
Hulu Langat, Selangor. This 243
hectares resort-themed township is
located about 2 kilometres from Kajang
town. The Impian Golf & Country Club
is located within this township and
there are a number of residential
developments (townhouses and
bungalows) within the Golf & Country
Club as well.
16
17. Design concept:
Modern contemporary
Built-up area:
approx. 672sq. m.
Building cost: approx.
1.9 million
Construction
period:
12 months
Consultant team: C&S
engineer, M&E Engineer
SAUJANA IMPIAN
18. 1) drainage for sub-
basement level: to use pump
for drain out water from
basement level
2) relocation of existing
street light which is originally
located in front of the land
3) sub-basement works
caused some soil settlement
to neighbor fence and
contractor made good the
damage.
Things concern in the
project:
Generally not complicated
and minimum difficulties
SAUJANA IMPIAN
18
23. Things concern in the project:
Generally not complicated and not
much of difficulties.
1) strict and comprehensive
system by Majlis Perbandaran
Klang
2) active fire fighting system for
bigger units
Factories at Telok Gong
Design concept: Modern contemporary
Built-up area: range 450 sq.m. to 1278 sq.m.
Building cost: unknown (in design stage now) estimated around 45 mil.
Construction period: unknown (design stage only)
Consultant team involved: Civil Engineer, Structural Engineer, M&E
engineer
23
27. To be an architect should be tough enough
because an architect is working under a
pressure environment. Besides, you should
make sure that you have passion in this
career to give you motivation. Architect need
to work hard to minimum educational
requirement for qualification.
ADVICE TO
JUNIOR
ARCHITECT
ARCHITECT
“Architecture, harder to spell than you’d think”