GOVERNMENT OF KHYBER PAKHTUNKHWA
Sports, Youth Affairs, Tourism, Archaeology & Museum Department
13-A, Khyber Road, Peshawar Cantt., Phone: 9212086, 9212535
No.PO(TSYA&M)/ADP-REV/2013-14
Dated Peshawar the 5th November, 2014
To,
1. The Secretary to Government of Khyber Pakhtunkhwa,
P&D Department, Peshawar
2. The Secretary to Government of Khyber Pakhtunkhwa,
Finance Department, Peshawar
3. The Managing Director Tourism Corporation Khyber Pakhtunkhwa.
4. The Director General Sports, Khyber Pakhtunkhwa, Peshawar.
5. The Director Archaeology and Museums Peshawar.
6. The Executive Engineer, C&W Division Mardan.
7. The Executive Engineer, Building Division #II, C&W Department
Peshawar
Subject: MINUTES OF THE DDWP MEETING HELD AT 1100 HOURS ON 5/11/2014
Dear Sir,
I am directed to enclose herewith minutes of the meeting held under the
Chairmanship of the Additional Secretary Sports & Tourism Department for favour of
information and further necessary action, please.
Yours faithfully
(Hayat Ali)
Chief Planning Officer
Endst. No. & Date even.
Copy forwarded to:-
1. The Director (P&M) Communication and works Department.
2. The Engineering Wing, Sports Department, Sports Complex Hayatabad.
3. The Private Secretary to Government of Khyber Pakhtunkhwa Sports, Tourism,
Archaeology, Museums and Youth Affairs Department.
Chief Planning Officer
SUBJECT: DDWP MEETING HELD AT 1100 HOURS ON 5/11/2014.
A meeting was held under the chairman ship of the Additional Secretary Sports & Tourism
Department. The following attended:
1. Mr. Humayun Khan Additional Secretary In-chair.
2. Mr. Hayat Ali, CPO
3. Mian Adil Iqbal Director General Sports
4. Mr. Khizar Hayat Budget Examiner, Finance Department
5. Mr. Shoaib Gilani RO Sports & Tourism P&D Department
6. Syed Noor Ehsan Shah Section Officer/Planning Officer Archaeology, Sports Deptt.
7. Mr. Khalid Khan Section Officer (G) Sports & Tourism Deptt.
8. Mr. Tariq Mehmood Director Training, Sports
9. Mr. Niamat ullah AD (Dev) Sports Department
10.Mr. Amjad Khalil Incharge Engineering wing
11.Mr. Ahmad Ali SDO, Engineering wing
ITEM NO.1:
ADP NO. 1040-140717 PURCHASE OF SPORTS EQUIPMENT.
Discussion:
The Scheme was discussed in detail and the Directorate of Sports was directed to
incorporate the details and total cost to question no. 7 of the PC-1 by indicating the share
of equipments for male and female separately.
Decision:
1. The scheme stands approved conditionally and PC-I may be submitted to Finance
and P&D Department within 7 days positively and report back to sports
department vetted copy of PC-I within 10 days.
2. The purchase of equipments shall be made in accordance to the KPPRA rules.
3. Scheme shall be completed within the estimated cost and allocation
4. Scheme shall be completed before 30/6/2015
ITEM NO. 2:
ADP NO. 1039-140049 TALENT HUNT PROGRAM FOR ALL SPORTS IN KHYBER
PAKHTUNKHWA:
Discussion:
Talent hunt PC-I has been discussed in detail. The male and female talent hunt
activities are not incorporated in PC-I. The PC-I format must be followed in later spirit.
Decision:
1. Detail of all activities for talent hunt for male/female must be prepared with in 7 days
with proper justification, cost estimate, phasing and proper work plan.
2. The scheme stands approved conditionally and PC-I may be submitted to Finance and
P&D Department within 7 days positively and report back to sports department vetted
copy of PC-I within 10 days.
3. Scheme shall be completed within the estimated cost and allocation.
Meeting ended with a vote thanks from and to the Chair

Más contenido relacionado

La actualidad más candente

Po dg sports 3 leters
Po dg sports 3 letersPo dg sports 3 leters
Po dg sports 3 letershayat alishah
 
Engineering wing cs notes 9 12-14
Engineering wing cs notes 9 12-14Engineering wing cs notes 9 12-14
Engineering wing cs notes 9 12-14hayat alishah
 
Po notice ddwp 31 12-2014
Po notice ddwp 31 12-2014Po notice ddwp 31 12-2014
Po notice ddwp 31 12-2014hayat alishah
 
Po dg sports cnw100215sodev2
Po dg sports cnw100215sodev2Po dg sports cnw100215sodev2
Po dg sports cnw100215sodev2hayat alishah
 
Po dg sports chl tank
Po dg sports chl tankPo dg sports chl tank
Po dg sports chl tankhayat alishah
 
Baikonur Exclusive Program: Landing of Spaceship
Baikonur Exclusive Program: Landing of SpaceshipBaikonur Exclusive Program: Landing of Spaceship
Baikonur Exclusive Program: Landing of SpaceshipTsar Events DMC & PCO
 

La actualidad más candente (6)

Po dg sports 3 leters
Po dg sports 3 letersPo dg sports 3 leters
Po dg sports 3 leters
 
Engineering wing cs notes 9 12-14
Engineering wing cs notes 9 12-14Engineering wing cs notes 9 12-14
Engineering wing cs notes 9 12-14
 
Po notice ddwp 31 12-2014
Po notice ddwp 31 12-2014Po notice ddwp 31 12-2014
Po notice ddwp 31 12-2014
 
Po dg sports cnw100215sodev2
Po dg sports cnw100215sodev2Po dg sports cnw100215sodev2
Po dg sports cnw100215sodev2
 
Po dg sports chl tank
Po dg sports chl tankPo dg sports chl tank
Po dg sports chl tank
 
Baikonur Exclusive Program: Landing of Spaceship
Baikonur Exclusive Program: Landing of SpaceshipBaikonur Exclusive Program: Landing of Spaceship
Baikonur Exclusive Program: Landing of Spaceship
 

Destacado

Контекстная реклама. Основы AdWords
Контекстная реклама. Основы AdWordsКонтекстная реклама. Основы AdWords
Контекстная реклама. Основы AdWordsVladyslava Rykova
 
元氣社區‧在地好活力
元氣社區‧在地好活力元氣社區‧在地好活力
元氣社區‧在地好活力中心 雲
 
Central women committee 1
Central women committee 1Central women committee 1
Central women committee 1hayat alishah
 
Этнографическая поездка Москва–Ростов–Каргополь–о.Кижи (2006 год)
Этнографическая поездка Москва–Ростов–Каргополь–о.Кижи (2006 год)Этнографическая поездка Москва–Ростов–Каргополь–о.Кижи (2006 год)
Этнографическая поездка Москва–Ростов–Каргополь–о.Кижи (2006 год)Балтийская Муза
 
Digital Shopping Statistics 2012
Digital Shopping Statistics 2012Digital Shopping Statistics 2012
Digital Shopping Statistics 2012Harsh Wardhan Dave
 
サービスと共に成長するチームとアーキテクチャ
サービスと共に成長するチームとアーキテクチャサービスと共に成長するチームとアーキテクチャ
サービスと共に成長するチームとアーキテクチャShinichiro Suzuki
 
Session 4-1-suer-suryadi-strengthening-legal-frameworks-in-indonesia-1472
Session 4-1-suer-suryadi-strengthening-legal-frameworks-in-indonesia-1472Session 4-1-suer-suryadi-strengthening-legal-frameworks-in-indonesia-1472
Session 4-1-suer-suryadi-strengthening-legal-frameworks-in-indonesia-1472ZSL Biodiversity & Palm Oil Platform
 
Session 4-3-chea-garley-the-outlook-for-large-scale-oil-palm-expansion-in-lib...
Session 4-3-chea-garley-the-outlook-for-large-scale-oil-palm-expansion-in-lib...Session 4-3-chea-garley-the-outlook-for-large-scale-oil-palm-expansion-in-lib...
Session 4-3-chea-garley-the-outlook-for-large-scale-oil-palm-expansion-in-lib...ZSL Biodiversity & Palm Oil Platform
 
Reclaiming prosperity in khyber pakhtunkhwahas
Reclaiming prosperity in khyber pakhtunkhwahasReclaiming prosperity in khyber pakhtunkhwahas
Reclaiming prosperity in khyber pakhtunkhwahashayat alishah
 
Продвижение интернет-магазина
Продвижение интернет-магазинаПродвижение интернет-магазина
Продвижение интернет-магазинаVladyslava Rykova
 
103社區營造經營入門班課程規劃 報名表0226
103社區營造經營入門班課程規劃   報名表0226103社區營造經營入門班課程規劃   報名表0226
103社區營造經營入門班課程規劃 報名表0226中心 雲
 
Лид скоринг или Цикл принятия решения о покупке в b2b-сегменте
Лид скоринг или Цикл принятия решения о покупке в b2b-сегментеЛид скоринг или Цикл принятия решения о покупке в b2b-сегменте
Лид скоринг или Цикл принятия решения о покупке в b2b-сегментеVladyslava Rykova
 
Kona\'s CV
Kona\'s CVKona\'s CV
Kona\'s CVKona Ke
 
Q2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportsQ2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportshayat alishah
 
Session 3-3-simon-siburat-the-challenges-costs-benefits-of-maintaining-hcvs-i...
Session 3-3-simon-siburat-the-challenges-costs-benefits-of-maintaining-hcvs-i...Session 3-3-simon-siburat-the-challenges-costs-benefits-of-maintaining-hcvs-i...
Session 3-3-simon-siburat-the-challenges-costs-benefits-of-maintaining-hcvs-i...ZSL Biodiversity & Palm Oil Platform
 

Destacado (20)

Контекстная реклама. Основы AdWords
Контекстная реклама. Основы AdWordsКонтекстная реклама. Основы AdWords
Контекстная реклама. Основы AdWords
 
נוגע בקיר
נוגע בקירנוגע בקיר
נוגע בקיר
 
元氣社區‧在地好活力
元氣社區‧在地好活力元氣社區‧在地好活力
元氣社區‧在地好活力
 
Detector movemento cdm 180
Detector movemento cdm 180Detector movemento cdm 180
Detector movemento cdm 180
 
Central women committee 1
Central women committee 1Central women committee 1
Central women committee 1
 
Этнографическая поездка Москва–Ростов–Каргополь–о.Кижи (2006 год)
Этнографическая поездка Москва–Ростов–Каргополь–о.Кижи (2006 год)Этнографическая поездка Москва–Ростов–Каргополь–о.Кижи (2006 год)
Этнографическая поездка Москва–Ростов–Каргополь–о.Кижи (2006 год)
 
Digital Shopping Statistics 2012
Digital Shopping Statistics 2012Digital Shopping Statistics 2012
Digital Shopping Statistics 2012
 
Bl fam 239011
Bl fam 239011Bl fam 239011
Bl fam 239011
 
サービスと共に成長するチームとアーキテクチャ
サービスと共に成長するチームとアーキテクチャサービスと共に成長するチームとアーキテクチャ
サービスと共に成長するチームとアーキテクチャ
 
Ped brochure
Ped brochurePed brochure
Ped brochure
 
Session 4-1-suer-suryadi-strengthening-legal-frameworks-in-indonesia-1472
Session 4-1-suer-suryadi-strengthening-legal-frameworks-in-indonesia-1472Session 4-1-suer-suryadi-strengthening-legal-frameworks-in-indonesia-1472
Session 4-1-suer-suryadi-strengthening-legal-frameworks-in-indonesia-1472
 
Session 4-3-chea-garley-the-outlook-for-large-scale-oil-palm-expansion-in-lib...
Session 4-3-chea-garley-the-outlook-for-large-scale-oil-palm-expansion-in-lib...Session 4-3-chea-garley-the-outlook-for-large-scale-oil-palm-expansion-in-lib...
Session 4-3-chea-garley-the-outlook-for-large-scale-oil-palm-expansion-in-lib...
 
Reclaiming prosperity in khyber pakhtunkhwahas
Reclaiming prosperity in khyber pakhtunkhwahasReclaiming prosperity in khyber pakhtunkhwahas
Reclaiming prosperity in khyber pakhtunkhwahas
 
Продвижение интернет-магазина
Продвижение интернет-магазинаПродвижение интернет-магазина
Продвижение интернет-магазина
 
Galyat slids
Galyat slidsGalyat slids
Galyat slids
 
103社區營造經營入門班課程規劃 報名表0226
103社區營造經營入門班課程規劃   報名表0226103社區營造經營入門班課程規劃   報名表0226
103社區營造經營入門班課程規劃 報名表0226
 
Лид скоринг или Цикл принятия решения о покупке в b2b-сегменте
Лид скоринг или Цикл принятия решения о покупке в b2b-сегментеЛид скоринг или Цикл принятия решения о покупке в b2b-сегменте
Лид скоринг или Цикл принятия решения о покупке в b2b-сегменте
 
Kona\'s CV
Kona\'s CVKona\'s CV
Kona\'s CV
 
Q2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportsQ2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sports
 
Session 3-3-simon-siburat-the-challenges-costs-benefits-of-maintaining-hcvs-i...
Session 3-3-simon-siburat-the-challenges-costs-benefits-of-maintaining-hcvs-i...Session 3-3-simon-siburat-the-challenges-costs-benefits-of-maintaining-hcvs-i...
Session 3-3-simon-siburat-the-challenges-costs-benefits-of-maintaining-hcvs-i...
 

Similar a Minutes of DDWP meeting held on 5/11/2014

Po ddwp p&d fd playfacilities 4 pc 1s initiatives 2 minutes
Po ddwp p&d fd playfacilities 4 pc 1s initiatives 2 minutesPo ddwp p&d fd playfacilities 4 pc 1s initiatives 2 minutes
Po ddwp p&d fd playfacilities 4 pc 1s initiatives 2 minuteshayat alishah
 
Po dg m&e key indicators
Po dg m&e key indicatorsPo dg m&e key indicators
Po dg m&e key indicatorshayat alishah
 
Po dg sports cnw100215sodev2tckpcnwtourisminitiatives
Po dg sports cnw100215sodev2tckpcnwtourisminitiativesPo dg sports cnw100215sodev2tckpcnwtourisminitiatives
Po dg sports cnw100215sodev2tckpcnwtourisminitiativeshayat alishah
 
Po dg sports cnw100215sodev2fd
Po dg sports cnw100215sodev2fdPo dg sports cnw100215sodev2fd
Po dg sports cnw100215sodev2fdhayat alishah
 
Po dg sports cnw100215sodev2tckpcnwtourisminitiativesg
Po dg sports cnw100215sodev2tckpcnwtourisminitiativesgPo dg sports cnw100215sodev2tckpcnwtourisminitiativesg
Po dg sports cnw100215sodev2tckpcnwtourisminitiativesghayat alishah
 
Presentation to cs on implementation hamayunkhan dated 22-4-2014
Presentation to cs on implementation hamayunkhan dated 22-4-2014Presentation to cs on implementation hamayunkhan dated 22-4-2014
Presentation to cs on implementation hamayunkhan dated 22-4-2014hayat alishah
 
Audit copy picnic spot tckp
Audit copy picnic spot tckpAudit copy picnic spot tckp
Audit copy picnic spot tckphayat alishah
 
New programme (corrected)
New programme (corrected)New programme (corrected)
New programme (corrected)hayat alishah
 
Minutes of the meeting held on 20th october 2014
Minutes of the meeting held on 20th october 2014Minutes of the meeting held on 20th october 2014
Minutes of the meeting held on 20th october 2014hayat alishah
 
Bod 21st meeting revised 1 2-2016 letter (1)
Bod 21st meeting revised 1 2-2016 letter (1)Bod 21st meeting revised 1 2-2016 letter (1)
Bod 21st meeting revised 1 2-2016 letter (1)hayat alishah
 
Working paper picnic spots gabeen jabba sulatan
Working paper picnic spots gabeen jabba sulatanWorking paper picnic spots gabeen jabba sulatan
Working paper picnic spots gabeen jabba sulatanhayat alishah
 
2017 china international karate open
2017 china international karate open2017 china international karate open
2017 china international karate openemiliomerayo
 
bp-png-general-guidelines-aug-19.pdf for batang pinoy
bp-png-general-guidelines-aug-19.pdf for batang pinoybp-png-general-guidelines-aug-19.pdf for batang pinoy
bp-png-general-guidelines-aug-19.pdf for batang pinoyArnelIbanez1
 
Minutes issued by the secretary meeting held on 5 aug, 2014
Minutes issued by the secretary meeting held on 5 aug, 2014Minutes issued by the secretary meeting held on 5 aug, 2014
Minutes issued by the secretary meeting held on 5 aug, 2014hayat alishah
 
Pc i 2011-12 15m wing
Pc i  2011-12 15m wingPc i  2011-12 15m wing
Pc i 2011-12 15m winghayat alishah
 
Pc i 2011-12 15m wing (2)
Pc i  2011-12 15m wing (2)Pc i  2011-12 15m wing (2)
Pc i 2011-12 15m wing (2)hayat alishah
 

Similar a Minutes of DDWP meeting held on 5/11/2014 (17)

Po dg sports cnw
Po dg sports cnwPo dg sports cnw
Po dg sports cnw
 
Po ddwp p&d fd playfacilities 4 pc 1s initiatives 2 minutes
Po ddwp p&d fd playfacilities 4 pc 1s initiatives 2 minutesPo ddwp p&d fd playfacilities 4 pc 1s initiatives 2 minutes
Po ddwp p&d fd playfacilities 4 pc 1s initiatives 2 minutes
 
Po dg m&e key indicators
Po dg m&e key indicatorsPo dg m&e key indicators
Po dg m&e key indicators
 
Po dg sports cnw100215sodev2tckpcnwtourisminitiatives
Po dg sports cnw100215sodev2tckpcnwtourisminitiativesPo dg sports cnw100215sodev2tckpcnwtourisminitiatives
Po dg sports cnw100215sodev2tckpcnwtourisminitiatives
 
Po dg sports cnw100215sodev2fd
Po dg sports cnw100215sodev2fdPo dg sports cnw100215sodev2fd
Po dg sports cnw100215sodev2fd
 
Po dg sports cnw100215sodev2tckpcnwtourisminitiativesg
Po dg sports cnw100215sodev2tckpcnwtourisminitiativesgPo dg sports cnw100215sodev2tckpcnwtourisminitiativesg
Po dg sports cnw100215sodev2tckpcnwtourisminitiativesg
 
Presentation to cs on implementation hamayunkhan dated 22-4-2014
Presentation to cs on implementation hamayunkhan dated 22-4-2014Presentation to cs on implementation hamayunkhan dated 22-4-2014
Presentation to cs on implementation hamayunkhan dated 22-4-2014
 
Audit copy picnic spot tckp
Audit copy picnic spot tckpAudit copy picnic spot tckp
Audit copy picnic spot tckp
 
New programme (corrected)
New programme (corrected)New programme (corrected)
New programme (corrected)
 
Minutes of the meeting held on 20th october 2014
Minutes of the meeting held on 20th october 2014Minutes of the meeting held on 20th october 2014
Minutes of the meeting held on 20th october 2014
 
Bod 21st meeting revised 1 2-2016 letter (1)
Bod 21st meeting revised 1 2-2016 letter (1)Bod 21st meeting revised 1 2-2016 letter (1)
Bod 21st meeting revised 1 2-2016 letter (1)
 
Working paper picnic spots gabeen jabba sulatan
Working paper picnic spots gabeen jabba sulatanWorking paper picnic spots gabeen jabba sulatan
Working paper picnic spots gabeen jabba sulatan
 
2017 china international karate open
2017 china international karate open2017 china international karate open
2017 china international karate open
 
bp-png-general-guidelines-aug-19.pdf for batang pinoy
bp-png-general-guidelines-aug-19.pdf for batang pinoybp-png-general-guidelines-aug-19.pdf for batang pinoy
bp-png-general-guidelines-aug-19.pdf for batang pinoy
 
Minutes issued by the secretary meeting held on 5 aug, 2014
Minutes issued by the secretary meeting held on 5 aug, 2014Minutes issued by the secretary meeting held on 5 aug, 2014
Minutes issued by the secretary meeting held on 5 aug, 2014
 
Pc i 2011-12 15m wing
Pc i  2011-12 15m wingPc i  2011-12 15m wing
Pc i 2011-12 15m wing
 
Pc i 2011-12 15m wing (2)
Pc i  2011-12 15m wing (2)Pc i  2011-12 15m wing (2)
Pc i 2011-12 15m wing (2)
 

Más de hayat alishah

1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)hayat alishah
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019hayat alishah
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copyhayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021hayat alishah
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updatedhayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021hayat alishah
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucathayat alishah
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreporthayat alishah
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism departmenthayat alishah
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021hayat alishah
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525hayat alishah
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdfhayat alishah
 

Más de hayat alishah (20)

Tourism policy
Tourism policyTourism policy
Tourism policy
 
Tourism policy 2015
Tourism policy 2015Tourism policy 2015
Tourism policy 2015
 
1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copy
 
Tourism wing sdu
Tourism wing sduTourism wing sdu
Tourism wing sdu
 
Aip tourism
Aip tourismAip tourism
Aip tourism
 
Aip dev
Aip devAip dev
Aip dev
 
Progress report
Progress reportProgress report
Progress report
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updated
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucat
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
 
Member list
Member listMember list
Member list
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism department
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525
 
Document 26
Document 26Document 26
Document 26
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf
 

Minutes of DDWP meeting held on 5/11/2014

  • 1. GOVERNMENT OF KHYBER PAKHTUNKHWA Sports, Youth Affairs, Tourism, Archaeology & Museum Department 13-A, Khyber Road, Peshawar Cantt., Phone: 9212086, 9212535 No.PO(TSYA&M)/ADP-REV/2013-14 Dated Peshawar the 5th November, 2014 To, 1. The Secretary to Government of Khyber Pakhtunkhwa, P&D Department, Peshawar 2. The Secretary to Government of Khyber Pakhtunkhwa, Finance Department, Peshawar 3. The Managing Director Tourism Corporation Khyber Pakhtunkhwa. 4. The Director General Sports, Khyber Pakhtunkhwa, Peshawar. 5. The Director Archaeology and Museums Peshawar. 6. The Executive Engineer, C&W Division Mardan. 7. The Executive Engineer, Building Division #II, C&W Department Peshawar Subject: MINUTES OF THE DDWP MEETING HELD AT 1100 HOURS ON 5/11/2014 Dear Sir, I am directed to enclose herewith minutes of the meeting held under the Chairmanship of the Additional Secretary Sports & Tourism Department for favour of information and further necessary action, please. Yours faithfully (Hayat Ali) Chief Planning Officer Endst. No. & Date even. Copy forwarded to:- 1. The Director (P&M) Communication and works Department. 2. The Engineering Wing, Sports Department, Sports Complex Hayatabad. 3. The Private Secretary to Government of Khyber Pakhtunkhwa Sports, Tourism, Archaeology, Museums and Youth Affairs Department. Chief Planning Officer
  • 2. SUBJECT: DDWP MEETING HELD AT 1100 HOURS ON 5/11/2014. A meeting was held under the chairman ship of the Additional Secretary Sports & Tourism Department. The following attended: 1. Mr. Humayun Khan Additional Secretary In-chair. 2. Mr. Hayat Ali, CPO 3. Mian Adil Iqbal Director General Sports 4. Mr. Khizar Hayat Budget Examiner, Finance Department 5. Mr. Shoaib Gilani RO Sports & Tourism P&D Department 6. Syed Noor Ehsan Shah Section Officer/Planning Officer Archaeology, Sports Deptt. 7. Mr. Khalid Khan Section Officer (G) Sports & Tourism Deptt. 8. Mr. Tariq Mehmood Director Training, Sports 9. Mr. Niamat ullah AD (Dev) Sports Department 10.Mr. Amjad Khalil Incharge Engineering wing 11.Mr. Ahmad Ali SDO, Engineering wing ITEM NO.1: ADP NO. 1040-140717 PURCHASE OF SPORTS EQUIPMENT. Discussion: The Scheme was discussed in detail and the Directorate of Sports was directed to incorporate the details and total cost to question no. 7 of the PC-1 by indicating the share of equipments for male and female separately. Decision: 1. The scheme stands approved conditionally and PC-I may be submitted to Finance and P&D Department within 7 days positively and report back to sports department vetted copy of PC-I within 10 days. 2. The purchase of equipments shall be made in accordance to the KPPRA rules. 3. Scheme shall be completed within the estimated cost and allocation 4. Scheme shall be completed before 30/6/2015 ITEM NO. 2: ADP NO. 1039-140049 TALENT HUNT PROGRAM FOR ALL SPORTS IN KHYBER PAKHTUNKHWA: Discussion: Talent hunt PC-I has been discussed in detail. The male and female talent hunt activities are not incorporated in PC-I. The PC-I format must be followed in later spirit. Decision: 1. Detail of all activities for talent hunt for male/female must be prepared with in 7 days with proper justification, cost estimate, phasing and proper work plan. 2. The scheme stands approved conditionally and PC-I may be submitted to Finance and P&D Department within 7 days positively and report back to sports department vetted copy of PC-I within 10 days. 3. Scheme shall be completed within the estimated cost and allocation.
  • 3. Meeting ended with a vote thanks from and to the Chair