SlideShare una empresa de Scribd logo
1 de 34
Descargar para leer sin conexión
CFM PURPOSE
Protect the integrity of service assets and Cis
Place IT assets and Cis under CfM controls
Establish a CMS to ensure integrity
Provide accurate information to support other processes through the Service Lifecycle


Content and CONTEXT
C         d
Utlization drives value
CFM SCOPE
Full lifecycle management of IT and service assets
Maintenance and status of asset inventory
Components are identified baselined and maintained
               identified, baselined,
Supports/is supported by Change controls


Service i
S i view – modeling whole services end-to-end and using that information f
                 d li h l     i      d      d d i        h i f       i for
    impact assessment
CFM – VALUE TO THE BUSINESS
Optimizing service value from our assets and Cis
 Better change planning and forecasting
 Better impact assessments and risk management
 Better resolution of incidents and problems
 Better measurement of service warranty
 Better adherence to legal/regulatory obligations
 Better controls and utilization of services and assets
 Better traceability of requirements for new and changed services
 Better awareness of service provisioning costs
BASIC CONCEPTS: CONTROL
CfM – Control my baseline (where am I?)
ChM – Control my future state planning (Where am I planning to go?)
RDM – Controlling my execution in moving new services and changes into future state
   (How do I get from current state to proposed future state?)


These three processes are fundamental to successful service transition and must
   work together to maintain meaningful controls.
LOGICAL MODELING
Service       Service
                              Customer
                                             level package    portfolio




                                                               Banking
                                               Contract
                                                             core service


                      Serviced by




E-banking      Supported by                      Hosted      Application               Uses                Technical
 supportt                      Application
                               A li ti                        hosting
                                                              h ti                                       infrastructure
 service                                                       service                                       service




                  User         Business                          Data         Web             Network                     Network
Availability                                  Messaging                                                  Authentication
               experience        logic                         services     services          topology                    service
CIS (CONFIGURATION ITEMS)
An asset, service component, or other item under CFM Controls
  Service Lifecycle Cis (Business Case, SDPs, Release Plans)
  Service Cis (systems, applications, information, data, infrastructure, facilities,
  people)
  Organization Cis (policies, legal/regulatory frameworks)
  Internal Cis (project mgmt software, SDLC software, etc.)
  External Cis (external customer requirements external services, etc.)
                                    requirements,          services etc )

  The big idea behind CFM Plans is fundamentally about “How Wide, How Deep” to go
  in establishing SACM controls
CMS OVERVIEW
CMSs and multiple CMDBs
Secure libraries and secure stores
Definitive Media Library (DML)
Definitive Spares
Configuration Baselines
Snapshots
S    h
Change and Release                Asset Management               Configuration Life               Technical Configuration         Quality Management            Service Desk View User
                                        View                             View                        Cycle View                             View                           View                          assets
Presentation                                                                                   Project configurations
                              Schedules/plans Change             Financial Asset Asset                                             Service Applications                 Asset and                 User configuration,
   Layer                                                                                         Service Strategy,
                 Portal        Request Status Change             Status Reports Asset                                                    Application                  Configuration              Changes, Releases,
                             Advisory Board agenda and           Statements and Bills           Design, Transition,                     Environment                   Management                       Asset and
                                                                 License Management           Operations configuration               Test Environment              Policies, Processes,         Configuration item and
                                                                  Asset performance                baselines and                       Infrastructure              Procedures, forms,              related incidents,
                                                                                                                                                                  templates, checklists                problems,


                                                                                 Search, Browse, Store, Retrieve, Update, Publish, Subscribe, Collaborate


Knowledge                                                                                                                                                                                             Monitoring
Processing                                                                                            Performance Management Forecasting,                                                       Scorecards, Dashboards
                               Query and Analysis                 Reporting                                                                                            Modelling
  Layer                                                                                                       Planning, Budgeting                                                                      Alerting




                                                                         Business/Customer/Supplier/User – Service – Application – Infrastructure mapping
  Information
   Integration
      Layer                               Service Portfolio               Service
                                         Service Catalogue                Model                         Integrated CMDB                         Service Release                     Service Change




                           Common Process,               Schema                       Meta Data                      Data                  Data synchronization           Extract, Transform,
                          Data and Information           Mapping                     Management                  reconciliation                                                  Load                     Mining




                                                                                                                Data Integration
                                  Project                     Definitive Media              Physical CMDBs
                              Documentation                        Library
                                                                                                                               Platform                  Software             Discovery,        Enterprise Applications
                                 Filestore
                                                                                                                         Configuration Tools           Configuration            asset            Access Management
 Data and                                                        Definitive
                                                                                             CMDB1                           Eg. Storage               Management            Management           Human Resources
Information                                                   Document Library
                                                                                                                               Database                                       and audit              Supply Chain
  Sources
                                 Structured                                                                              Middleware Network                                      tools              Management
 and Tools
                                                          Definitive Multimedia                                               Mainframe                                                         Customer Relationship
                                                                 Library 1                         CMDB2                 Distributed Desktop                                                        Management

                                   Project
                                  Software                Definitive Multimedia
                                                                 Library 2                   CMDB3
DML and CMDB




DML        Physical CIs                                         Information about the CIs




  Electronic                                                                     CMDB
  CIs
                                                                       Release
                                                                       Record



               Build new Release




      Test new Release

                                                                     Implement new Release


                                    Distribute new Release to
                                           live locations
Planning, management
                           resources, time
                        Management support
                        Working relationships
                      Resources, facilities, CMS
                              and tools
                       Training and Guidance




Policy, Standards,                                                                   Control
                           Management                                                                                             Configuration
     Strategy,             and Planning                                                                                     Management Plan,
 Service Portfolio,
                                                                                                                                       Contract
Customer Portfolio,
Contract Portfolio,
          Portfolio                                                                                                            CI Identification,,
     Contract             Requirements,                                                                                      naming, labelling,
                                                   Configuration                                                                       data and
  requirements               Design,
                                                   Identification                                                               documentation
                          Maintenance,
                            Release,                                                                                      Baseline and Release
                           Deployment,                                                                                                         Id
                         Operations plans                                                                                         Updated RFC,
                                                                                                                                   p          ,
                                                                     Configuration
                                                       RFC/                                                                          updated CI
                                                                       Control
                                                     change to
                                                        CI                                                                                Status
                                                                                                                                  record/Report
                                                                                                   Status                          Configuration
                                                                    Change and                 Accounting and                   information and
                                                                    Configuration
                                                                    C fi     ti                  Reporting                         Performance
                                                                    Records and
                                                                    Documentation
                                                                                                                Verification        Action items
                                                                                          Physical CIs,          and Audit        Confidence in
                                                                                           Test results                              service and
                                                                                         Audit/discovery                            f
                                                                                                                                  infrastructure
                       Feedback
                                                                                              tools
CONFIGURATION PLANNING
Plenty of perfectly good templates
Need a process first, then serves as a practical plan
Living document
Focus on USE, not content
CFM IDENTIFICATION
Configuration Structure and CI Selection
Naming Conventions
Labeling
CI attributes
CFM Documentation
Relationship mapping
R l i    hi      i
CI Types (service, HW, SW, documentation, staff)
Media libraries
Configuration Baselines
Release Units and Numbering schema
CONFIGURATION CONTROL
Establishing integrated controls with CHM and RDM to ensure
  License controls
  Change management process
  Version controls of assets, Cis, builds, and releases
  Access controls
  Build specifications
  Promotion and migration of data
  Configuration baselines
  Deployment controls (and touchpoints)
  Installation
  DML integrity
CFM STATUS ACCOUNTING
Insert example of asset/CI lifecycles
Define state changes (how does CI move from one status to another) as part of your
    CFM Plan
REPORTING
Maintaining and archiving records
Managing status of current configurations
Making status information visible and available
Recording changes in CI status
Ensuring changes to baselines are properly documented and “re-baselined” or
   reconciled after changes are implemented
TYPICAL REPORTS
CI information in a particular baseline
CI lists and baseline configurations
Current revision status and history
Status reports on deviations
Status of delivered/maintained products
Revision
R i i status
Reports on unauthorized usage/changes to HW/SW
Unauthorized CIs detected
Variations between CMS and physical audit activities
VERIFICATION AND AUDIT
Conformity between CMS and actuals
Verify physical existence of Cis
Confirm RDM information and baselines before executing Deployment of a release
Planned vs ad hoc
Use ChM and Incident Mgmt to address any unregistered or unauthorized Cis
Automation h
A      i here d i
              drives b
                     better performance across the service lif
                               f                h      i lifecycle
                                                                l
TRIGGERS, INPUTS/OUTPUTS, AND INTERFACES
Supporting processes
  Change Management
  Financial Management
  Service Continuity
  Incident Management
  Problem Management
  Availability Management
In truth is the fundamental basis for all process activities since provides accurate
     information to underpin all services and service changes
INFORMATION MANAGEMENT
CMS archiving/backup a fundamental part of your CFM Plan
CMS contains information on backups of Cis
How much archiving? Cost/benefit analysis
                                 analysis…
KPIS AND METRICS
% improvement in maintenance scheduling
Alignment between provided maintenance and business support (availability/windows)
Assets identified as causes of service failures
Improved diagnosis/MTRS for incidents
Impacts of incidents/errors by particular CI type (for availability improvements)
% reuse of unused/underused assets
Alignment of insurance premiums with business need
Ratio of used licenses vs paid licenses
Cost/user for licenses
Accuracy in budgets/charging for services
%reduction in business impact based on incorrect CI data
Improved audit compliance
CHALLENGES, CSFS, AND RISKS
 Challenges
Maintaining check-in/Check-out of DML
Funding
Data over use
Lack of management commitment (why do we need this?)
 CSFs
Valid justifications for what data is maintained
      j
Top-down approach – “enough” data
How accurate??
Using technology to automate CMS practices
 Risks
Focusing on technologies instead of services and outcomes
Movement of hardware assets by unauthorized staff
INITIAL PLANNING
Designate Configuration Manager
Define Mission
Determine project scope
Define overall project interfaces to other ST processes
Survey current capabilities and resources
Develop i i i l
D l initial tooling plan
                li   l
DEVELOP PROJECT PLAN
Launch/approve and charter formal project
Define Project Team
Plan Project Phases
  Feasibility
  Initiation
  Specification
  Process design
  Product selection
  Implementation
  Review
  Closure
Prepare operational mgmt
Conduct Feasability Study (Project Scope and constraints)
REQUIREMENTS
Identify and interview stakeholders
Capture (MOSCOW) and prioritize requirements
Validate and verify requirements
Establish requirements management strategy
Define purpose, scope, and objectives
Define li i
D fi policies, procedures
                    d
Define roles and responsibilities
Define metrics and reporting
Define Overall Plan
RELATIONSHIPS
Plan relationships
  Among infrastructure components
  Among functional teams
  Among processes
Align to business services and outcomes
PLAN DEPENDENT ACTIVITIES
Plan support tools
Plan support processes
Communicate benefits (mgmt)
Plan staff training (diff for diff roles)
DEFINE ROLES AND RESPONSIBILITIES
CfM Role specifications
Assignments
Role/billet decisions
Project roles
CRC team? Integrated processes, tools, and teams?
ROM of width of scope
     f id h f
Scope across operations and pipeline
Usable existing tools?
BASELINE CURRENT PRACTICES
CI Owners
People, process, technology
ChM
RDM
SVT
Asset mgmt
A
Roles/resources
PROCESS IMPLEMENTATION PLAN
Analyze existing practices (what do I already have?)
Analyze ST capabilities (who do I have?)
Define existing data and plan to move it into new CMS
Refine and re-validate requirements
Create vendor selection criteria
Evaluate and select tooling
Acquire and install tooling
  q                       g
Design process interfaces in detail
Plan structure and attributes of Cis
Align Business Processes
Establish DML
Train on roles/responsibilities
Manage Organizational Change needs
PLANNING PHASED IMPLEMENTATION
Coordination with other process/tool implementation activities
Planning CMS population and federation
Planning to take CfM control of Cis
Freeze
Managing Cis during the Freeze
Planning switchover
Pl   i     i h
PHASING CFM IN
Training (user and admin)
Plans, Procedures, and Work Instructions
Define and mature the CfM plan
Launch update roles
Plan CI registration processes
Plan
Pl ELS
Mature monitoring and metrics

Más contenido relacionado

La actualidad más candente

Itil v3 release and deployment management
Itil v3 release and deployment managementItil v3 release and deployment management
Itil v3 release and deployment managementkunaljoy11
 
Configuration Management Maturity
Configuration Management MaturityConfiguration Management Maturity
Configuration Management MaturityMichaël Danys
 
Introduction to ITIL 4 and IT service management
Introduction to ITIL 4 and IT service managementIntroduction to ITIL 4 and IT service management
Introduction to ITIL 4 and IT service managementChristian F. Nissen
 
Breaking the Monolith
Breaking the MonolithBreaking the Monolith
Breaking the MonolithVMware Tanzu
 
ITIL Practical Guide - Service Transition
ITIL Practical Guide - Service TransitionITIL Practical Guide - Service Transition
ITIL Practical Guide - Service TransitionAxios Systems
 
Introduction to Enterprise Architecture and TOGAF 9.1
Introduction to Enterprise Architecture and TOGAF 9.1Introduction to Enterprise Architecture and TOGAF 9.1
Introduction to Enterprise Architecture and TOGAF 9.1iasaglobal
 
[Konveyor] migrate and modernize your application portfolio to kubernetes wit...
[Konveyor] migrate and modernize your application portfolio to kubernetes wit...[Konveyor] migrate and modernize your application portfolio to kubernetes wit...
[Konveyor] migrate and modernize your application portfolio to kubernetes wit...Konveyor Community
 
Best practices for building network operations center
Best practices for building  network operations centerBest practices for building  network operations center
Best practices for building network operations centerSatish Chavan
 
Enterprise Architecture Governance
Enterprise Architecture GovernanceEnterprise Architecture Governance
Enterprise Architecture GovernanceRakesh Sharan
 
SAP Testing Services
SAP Testing ServicesSAP Testing Services
SAP Testing Servicesr_shanki
 
TOGAF 9.2 - Transforming Business
TOGAF 9.2  -  Transforming BusinessTOGAF 9.2  -  Transforming Business
TOGAF 9.2 - Transforming BusinessReal IRM
 
5 itil v3 service transition 5 v1.8
5 itil v3 service transition 5 v1.85 itil v3 service transition 5 v1.8
5 itil v3 service transition 5 v1.8Karthik Arumugham
 
Veeam back up and replication presentation
Veeam back up and replication presentation Veeam back up and replication presentation
Veeam back up and replication presentation BlueChipICT
 

La actualidad más candente (20)

166427325 sap-a udit-management
166427325 sap-a udit-management166427325 sap-a udit-management
166427325 sap-a udit-management
 
ITIL4 and ServiceNow
ITIL4 and ServiceNowITIL4 and ServiceNow
ITIL4 and ServiceNow
 
Itil v3 release and deployment management
Itil v3 release and deployment managementItil v3 release and deployment management
Itil v3 release and deployment management
 
Configuration Management Maturity
Configuration Management MaturityConfiguration Management Maturity
Configuration Management Maturity
 
Introduction to ITIL 4 and IT service management
Introduction to ITIL 4 and IT service managementIntroduction to ITIL 4 and IT service management
Introduction to ITIL 4 and IT service management
 
Breaking the Monolith
Breaking the MonolithBreaking the Monolith
Breaking the Monolith
 
ITIL Practical Guide - Service Transition
ITIL Practical Guide - Service TransitionITIL Practical Guide - Service Transition
ITIL Practical Guide - Service Transition
 
Introduction to Enterprise Architecture and TOGAF 9.1
Introduction to Enterprise Architecture and TOGAF 9.1Introduction to Enterprise Architecture and TOGAF 9.1
Introduction to Enterprise Architecture and TOGAF 9.1
 
[Konveyor] migrate and modernize your application portfolio to kubernetes wit...
[Konveyor] migrate and modernize your application portfolio to kubernetes wit...[Konveyor] migrate and modernize your application portfolio to kubernetes wit...
[Konveyor] migrate and modernize your application portfolio to kubernetes wit...
 
CMDB - Use Cases
CMDB - Use CasesCMDB - Use Cases
CMDB - Use Cases
 
Sap- An Overview
Sap- An OverviewSap- An Overview
Sap- An Overview
 
Best practices for building network operations center
Best practices for building  network operations centerBest practices for building  network operations center
Best practices for building network operations center
 
Enterprise Architecture Governance
Enterprise Architecture GovernanceEnterprise Architecture Governance
Enterprise Architecture Governance
 
Tcoe team
Tcoe teamTcoe team
Tcoe team
 
SAP Testing Services
SAP Testing ServicesSAP Testing Services
SAP Testing Services
 
TOGAF 9.2 - Transforming Business
TOGAF 9.2  -  Transforming BusinessTOGAF 9.2  -  Transforming Business
TOGAF 9.2 - Transforming Business
 
DevOps Presentation.pptx
DevOps Presentation.pptxDevOps Presentation.pptx
DevOps Presentation.pptx
 
5 itil v3 service transition 5 v1.8
5 itil v3 service transition 5 v1.85 itil v3 service transition 5 v1.8
5 itil v3 service transition 5 v1.8
 
Veeam back up and replication presentation
Veeam back up and replication presentation Veeam back up and replication presentation
Veeam back up and replication presentation
 
QBrainX - Webinar on ServiceNow CMDB Discovery
QBrainX - Webinar on ServiceNow CMDB DiscoveryQBrainX - Webinar on ServiceNow CMDB Discovery
QBrainX - Webinar on ServiceNow CMDB Discovery
 

Destacado

Puppet and AWS: Getting the best of both worlds
Puppet and AWS: Getting the best of both worldsPuppet and AWS: Getting the best of both worlds
Puppet and AWS: Getting the best of both worldsPuppet
 
Hardening Your Config Management - Security and Attack Vectors in Config Mana...
Hardening Your Config Management - Security and Attack Vectors in Config Mana...Hardening Your Config Management - Security and Attack Vectors in Config Mana...
Hardening Your Config Management - Security and Attack Vectors in Config Mana...Peter Souter
 
How to Design a Quality system that meets compliance requirements 2014
How to Design a Quality system that meets compliance requirements 2014How to Design a Quality system that meets compliance requirements 2014
How to Design a Quality system that meets compliance requirements 2014Gilead Sciences
 
Web Security
Web SecurityWeb Security
Web SecurityADIEFEH
 
Online Library Management
Online Library ManagementOnline Library Management
Online Library ManagementVarsha Sarkar
 

Destacado (7)

Puppet and AWS: Getting the best of both worlds
Puppet and AWS: Getting the best of both worldsPuppet and AWS: Getting the best of both worlds
Puppet and AWS: Getting the best of both worlds
 
Hardening Your Config Management - Security and Attack Vectors in Config Mana...
Hardening Your Config Management - Security and Attack Vectors in Config Mana...Hardening Your Config Management - Security and Attack Vectors in Config Mana...
Hardening Your Config Management - Security and Attack Vectors in Config Mana...
 
Quality manual
Quality manualQuality manual
Quality manual
 
How to Design a Quality system that meets compliance requirements 2014
How to Design a Quality system that meets compliance requirements 2014How to Design a Quality system that meets compliance requirements 2014
How to Design a Quality system that meets compliance requirements 2014
 
Web Security
Web SecurityWeb Security
Web Security
 
Online Library Management
Online Library ManagementOnline Library Management
Online Library Management
 
Web Security
Web SecurityWeb Security
Web Security
 

Similar a Configuration Management

TeleManagement Forum OSSera Case Study - AIS Thailand Service Manager Present...
TeleManagement Forum OSSera Case Study - AIS Thailand Service Manager Present...TeleManagement Forum OSSera Case Study - AIS Thailand Service Manager Present...
TeleManagement Forum OSSera Case Study - AIS Thailand Service Manager Present...Mingxia Zhang, Ph.D.
 
InfosysPublicServices - Member Switchover Solution | Analysis
InfosysPublicServices - Member Switchover Solution | AnalysisInfosysPublicServices - Member Switchover Solution | Analysis
InfosysPublicServices - Member Switchover Solution | AnalysisInfosys
 
Building a Hybrid Platform as a Service
Building a Hybrid Platform as a ServiceBuilding a Hybrid Platform as a Service
Building a Hybrid Platform as a ServiceWSO2
 
Veritas vision for cloud providers (screenshots)
Veritas vision for cloud providers (screenshots)Veritas vision for cloud providers (screenshots)
Veritas vision for cloud providers (screenshots)Alexschoone
 
Prime Dimensions Capabilities
Prime Dimensions CapabilitiesPrime Dimensions Capabilities
Prime Dimensions Capabilitiesdrowan
 
BAM CEP / Business Activity Monitoring , Complex Event Processingomplex
BAM CEP / Business Activity Monitoring , Complex Event Processingomplex BAM CEP / Business Activity Monitoring , Complex Event Processingomplex
BAM CEP / Business Activity Monitoring , Complex Event Processingomplex Liviu Claudiu Cismaru
 
Make Your Business More Flexible with Scalable Business Process Management So...
Make Your Business More Flexible with Scalable Business Process Management So...Make Your Business More Flexible with Scalable Business Process Management So...
Make Your Business More Flexible with Scalable Business Process Management So...Perficient, Inc.
 
Selecting BI Tool - Proof of Concept - Андрій Музичук
Selecting BI Tool - Proof of Concept - Андрій МузичукSelecting BI Tool - Proof of Concept - Андрій Музичук
Selecting BI Tool - Proof of Concept - Андрій МузичукIgor Bronovskyy
 
PCTY 2012, SmartCloud Control Desk v. Mikkel Koenig
PCTY 2012, SmartCloud Control Desk v. Mikkel KoenigPCTY 2012, SmartCloud Control Desk v. Mikkel Koenig
PCTY 2012, SmartCloud Control Desk v. Mikkel KoenigIBM Danmark
 
Aras Partner Solution by Minerva
Aras Partner Solution by MinervaAras Partner Solution by Minerva
Aras Partner Solution by MinervaAras
 
Luis lima v3
Luis lima v3Luis lima v3
Luis lima v3EuroCloud
 
Service Availability and Performance Management - PCTY 2011
Service Availability and Performance Management - PCTY 2011Service Availability and Performance Management - PCTY 2011
Service Availability and Performance Management - PCTY 2011IBM Sverige
 
Moving Beyond Project Level SOA
Moving Beyond Project Level SOAMoving Beyond Project Level SOA
Moving Beyond Project Level SOAguest0d8992
 
SaaS vs BPO: Operational Considerations of the SaaS Service Delivery Model
SaaS vs BPO: Operational Considerations of the SaaS Service Delivery ModelSaaS vs BPO: Operational Considerations of the SaaS Service Delivery Model
SaaS vs BPO: Operational Considerations of the SaaS Service Delivery ModelHROAssoc
 
Oracle SOA Suite Overview - Integration in a Service-Oriented World
Oracle SOA Suite Overview - Integration in a Service-Oriented WorldOracle SOA Suite Overview - Integration in a Service-Oriented World
Oracle SOA Suite Overview - Integration in a Service-Oriented WorldOracleContractors
 
Overseeing it process implementations with project managemen tv1.0
Overseeing it process implementations with project managemen tv1.0Overseeing it process implementations with project managemen tv1.0
Overseeing it process implementations with project managemen tv1.0anusharaju38
 
Aras Ptpl Plm
Aras Ptpl PlmAras Ptpl Plm
Aras Ptpl Plmjayrajvh
 

Similar a Configuration Management (20)

TeleManagement Forum OSSera Case Study - AIS Thailand Service Manager Present...
TeleManagement Forum OSSera Case Study - AIS Thailand Service Manager Present...TeleManagement Forum OSSera Case Study - AIS Thailand Service Manager Present...
TeleManagement Forum OSSera Case Study - AIS Thailand Service Manager Present...
 
InfosysPublicServices - Member Switchover Solution | Analysis
InfosysPublicServices - Member Switchover Solution | AnalysisInfosysPublicServices - Member Switchover Solution | Analysis
InfosysPublicServices - Member Switchover Solution | Analysis
 
Building a Hybrid Platform as a Service
Building a Hybrid Platform as a ServiceBuilding a Hybrid Platform as a Service
Building a Hybrid Platform as a Service
 
Veritas vision for cloud providers (screenshots)
Veritas vision for cloud providers (screenshots)Veritas vision for cloud providers (screenshots)
Veritas vision for cloud providers (screenshots)
 
Prime Dimensions Capabilities
Prime Dimensions CapabilitiesPrime Dimensions Capabilities
Prime Dimensions Capabilities
 
Dev ops intro
Dev ops  introDev ops  intro
Dev ops intro
 
BAM CEP / Business Activity Monitoring , Complex Event Processingomplex
BAM CEP / Business Activity Monitoring , Complex Event Processingomplex BAM CEP / Business Activity Monitoring , Complex Event Processingomplex
BAM CEP / Business Activity Monitoring , Complex Event Processingomplex
 
Make Your Business More Flexible with Scalable Business Process Management So...
Make Your Business More Flexible with Scalable Business Process Management So...Make Your Business More Flexible with Scalable Business Process Management So...
Make Your Business More Flexible with Scalable Business Process Management So...
 
Selecting BI Tool - Proof of Concept - Андрій Музичук
Selecting BI Tool - Proof of Concept - Андрій МузичукSelecting BI Tool - Proof of Concept - Андрій Музичук
Selecting BI Tool - Proof of Concept - Андрій Музичук
 
PCTY 2012, SmartCloud Control Desk v. Mikkel Koenig
PCTY 2012, SmartCloud Control Desk v. Mikkel KoenigPCTY 2012, SmartCloud Control Desk v. Mikkel Koenig
PCTY 2012, SmartCloud Control Desk v. Mikkel Koenig
 
Aras Partner Solution by Minerva
Aras Partner Solution by MinervaAras Partner Solution by Minerva
Aras Partner Solution by Minerva
 
Hp Sdp Evolution
Hp Sdp EvolutionHp Sdp Evolution
Hp Sdp Evolution
 
Luis lima v3
Luis lima v3Luis lima v3
Luis lima v3
 
9sept2009 iiruc
9sept2009 iiruc9sept2009 iiruc
9sept2009 iiruc
 
Service Availability and Performance Management - PCTY 2011
Service Availability and Performance Management - PCTY 2011Service Availability and Performance Management - PCTY 2011
Service Availability and Performance Management - PCTY 2011
 
Moving Beyond Project Level SOA
Moving Beyond Project Level SOAMoving Beyond Project Level SOA
Moving Beyond Project Level SOA
 
SaaS vs BPO: Operational Considerations of the SaaS Service Delivery Model
SaaS vs BPO: Operational Considerations of the SaaS Service Delivery ModelSaaS vs BPO: Operational Considerations of the SaaS Service Delivery Model
SaaS vs BPO: Operational Considerations of the SaaS Service Delivery Model
 
Oracle SOA Suite Overview - Integration in a Service-Oriented World
Oracle SOA Suite Overview - Integration in a Service-Oriented WorldOracle SOA Suite Overview - Integration in a Service-Oriented World
Oracle SOA Suite Overview - Integration in a Service-Oriented World
 
Overseeing it process implementations with project managemen tv1.0
Overseeing it process implementations with project managemen tv1.0Overseeing it process implementations with project managemen tv1.0
Overseeing it process implementations with project managemen tv1.0
 
Aras Ptpl Plm
Aras Ptpl PlmAras Ptpl Plm
Aras Ptpl Plm
 

Más de hdicapitalarea

ITIL 4 – the 4th Industrial Revolution and Intelligent Process Automation
ITIL 4 – the 4th Industrial Revolution and Intelligent Process AutomationITIL 4 – the 4th Industrial Revolution and Intelligent Process Automation
ITIL 4 – the 4th Industrial Revolution and Intelligent Process Automationhdicapitalarea
 
HDI Capital Area Awards 2019
HDI Capital Area Awards 2019HDI Capital Area Awards 2019
HDI Capital Area Awards 2019hdicapitalarea
 
The Bottom Line of Software Asset Management
The Bottom Line of Software Asset ManagementThe Bottom Line of Software Asset Management
The Bottom Line of Software Asset Managementhdicapitalarea
 
HDI Capital Area Meeting May 2019 Cybersecurity Planning for the Modern Techn...
HDI Capital Area Meeting May 2019 Cybersecurity Planning for the Modern Techn...HDI Capital Area Meeting May 2019 Cybersecurity Planning for the Modern Techn...
HDI Capital Area Meeting May 2019 Cybersecurity Planning for the Modern Techn...hdicapitalarea
 
HDI Capital Area Meeting March 2019 Next Step Quality: 5 Steps to Increasing ...
HDI Capital Area Meeting March 2019 Next Step Quality: 5 Steps to Increasing ...HDI Capital Area Meeting March 2019 Next Step Quality: 5 Steps to Increasing ...
HDI Capital Area Meeting March 2019 Next Step Quality: 5 Steps to Increasing ...hdicapitalarea
 
HDI Capital Area Meeting February 2019 What’s New and Changing with ITIL 4!
HDI Capital Area Meeting February 2019 What’s New and Changing with ITIL 4!HDI Capital Area Meeting February 2019 What’s New and Changing with ITIL 4!
HDI Capital Area Meeting February 2019 What’s New and Changing with ITIL 4!hdicapitalarea
 
HDI Capital Area One Day Leadership Conference and Vendor Expo 2018
HDI Capital Area One Day Leadership Conference and Vendor Expo 2018HDI Capital Area One Day Leadership Conference and Vendor Expo 2018
HDI Capital Area One Day Leadership Conference and Vendor Expo 2018hdicapitalarea
 
HDI Capital Area Slides August 17, 2018
HDI Capital Area Slides August 17, 2018HDI Capital Area Slides August 17, 2018
HDI Capital Area Slides August 17, 2018hdicapitalarea
 
Hdi Capital Area Program Slides May 18 2018
Hdi Capital Area Program Slides May 18 2018Hdi Capital Area Program Slides May 18 2018
Hdi Capital Area Program Slides May 18 2018hdicapitalarea
 
Hdi Capital Area Updates and Presentation April 20 2018
Hdi Capital Area Updates and Presentation April 20 2018Hdi Capital Area Updates and Presentation April 20 2018
Hdi Capital Area Updates and Presentation April 20 2018hdicapitalarea
 
HDI Capital Area One Day Leadership Conference and Vendor Expo 2017
HDI Capital Area One Day Leadership Conference and Vendor Expo 2017HDI Capital Area One Day Leadership Conference and Vendor Expo 2017
HDI Capital Area One Day Leadership Conference and Vendor Expo 2017hdicapitalarea
 
HDI Capital Area Announcements and Presentation August 18 2017
HDI Capital Area Announcements and Presentation August 18 2017HDI Capital Area Announcements and Presentation August 18 2017
HDI Capital Area Announcements and Presentation August 18 2017hdicapitalarea
 
HDI Capital Area July 21, 2017 Meeting Slides and Presentation
HDI Capital Area July 21, 2017 Meeting Slides and PresentationHDI Capital Area July 21, 2017 Meeting Slides and Presentation
HDI Capital Area July 21, 2017 Meeting Slides and Presentationhdicapitalarea
 
May 2017 HDI Capital Area Presentation & Meeting Slides 050917
May 2017 HDI Capital Area Presentation & Meeting Slides 050917May 2017 HDI Capital Area Presentation & Meeting Slides 050917
May 2017 HDI Capital Area Presentation & Meeting Slides 050917hdicapitalarea
 
HDI Capital Area March 17, 2017 Meeting Slides Presentation
HDI Capital Area March 17, 2017 Meeting Slides PresentationHDI Capital Area March 17, 2017 Meeting Slides Presentation
HDI Capital Area March 17, 2017 Meeting Slides Presentationhdicapitalarea
 
HDI Capital Area Updates and Presentation Slides December 9 2016
HDI Capital Area Updates and Presentation Slides December 9 2016HDI Capital Area Updates and Presentation Slides December 9 2016
HDI Capital Area Updates and Presentation Slides December 9 2016hdicapitalarea
 
HDI Capital Area Meeting Slides October 21 2016
HDI Capital Area Meeting Slides October 21 2016HDI Capital Area Meeting Slides October 21 2016
HDI Capital Area Meeting Slides October 21 2016hdicapitalarea
 
HDI Capital Are Meeting Slides September 16 2016
HDI Capital Are Meeting Slides September 16 2016HDI Capital Are Meeting Slides September 16 2016
HDI Capital Are Meeting Slides September 16 2016hdicapitalarea
 
HDI Capital Area Meeting Slides August, 19 2016
HDI Capital Area Meeting Slides August, 19 2016HDI Capital Area Meeting Slides August, 19 2016
HDI Capital Area Meeting Slides August, 19 2016hdicapitalarea
 
HDI Capital Area Meeting Slides December 4, 2015
HDI Capital Area Meeting Slides December 4,  2015HDI Capital Area Meeting Slides December 4,  2015
HDI Capital Area Meeting Slides December 4, 2015hdicapitalarea
 

Más de hdicapitalarea (20)

ITIL 4 – the 4th Industrial Revolution and Intelligent Process Automation
ITIL 4 – the 4th Industrial Revolution and Intelligent Process AutomationITIL 4 – the 4th Industrial Revolution and Intelligent Process Automation
ITIL 4 – the 4th Industrial Revolution and Intelligent Process Automation
 
HDI Capital Area Awards 2019
HDI Capital Area Awards 2019HDI Capital Area Awards 2019
HDI Capital Area Awards 2019
 
The Bottom Line of Software Asset Management
The Bottom Line of Software Asset ManagementThe Bottom Line of Software Asset Management
The Bottom Line of Software Asset Management
 
HDI Capital Area Meeting May 2019 Cybersecurity Planning for the Modern Techn...
HDI Capital Area Meeting May 2019 Cybersecurity Planning for the Modern Techn...HDI Capital Area Meeting May 2019 Cybersecurity Planning for the Modern Techn...
HDI Capital Area Meeting May 2019 Cybersecurity Planning for the Modern Techn...
 
HDI Capital Area Meeting March 2019 Next Step Quality: 5 Steps to Increasing ...
HDI Capital Area Meeting March 2019 Next Step Quality: 5 Steps to Increasing ...HDI Capital Area Meeting March 2019 Next Step Quality: 5 Steps to Increasing ...
HDI Capital Area Meeting March 2019 Next Step Quality: 5 Steps to Increasing ...
 
HDI Capital Area Meeting February 2019 What’s New and Changing with ITIL 4!
HDI Capital Area Meeting February 2019 What’s New and Changing with ITIL 4!HDI Capital Area Meeting February 2019 What’s New and Changing with ITIL 4!
HDI Capital Area Meeting February 2019 What’s New and Changing with ITIL 4!
 
HDI Capital Area One Day Leadership Conference and Vendor Expo 2018
HDI Capital Area One Day Leadership Conference and Vendor Expo 2018HDI Capital Area One Day Leadership Conference and Vendor Expo 2018
HDI Capital Area One Day Leadership Conference and Vendor Expo 2018
 
HDI Capital Area Slides August 17, 2018
HDI Capital Area Slides August 17, 2018HDI Capital Area Slides August 17, 2018
HDI Capital Area Slides August 17, 2018
 
Hdi Capital Area Program Slides May 18 2018
Hdi Capital Area Program Slides May 18 2018Hdi Capital Area Program Slides May 18 2018
Hdi Capital Area Program Slides May 18 2018
 
Hdi Capital Area Updates and Presentation April 20 2018
Hdi Capital Area Updates and Presentation April 20 2018Hdi Capital Area Updates and Presentation April 20 2018
Hdi Capital Area Updates and Presentation April 20 2018
 
HDI Capital Area One Day Leadership Conference and Vendor Expo 2017
HDI Capital Area One Day Leadership Conference and Vendor Expo 2017HDI Capital Area One Day Leadership Conference and Vendor Expo 2017
HDI Capital Area One Day Leadership Conference and Vendor Expo 2017
 
HDI Capital Area Announcements and Presentation August 18 2017
HDI Capital Area Announcements and Presentation August 18 2017HDI Capital Area Announcements and Presentation August 18 2017
HDI Capital Area Announcements and Presentation August 18 2017
 
HDI Capital Area July 21, 2017 Meeting Slides and Presentation
HDI Capital Area July 21, 2017 Meeting Slides and PresentationHDI Capital Area July 21, 2017 Meeting Slides and Presentation
HDI Capital Area July 21, 2017 Meeting Slides and Presentation
 
May 2017 HDI Capital Area Presentation & Meeting Slides 050917
May 2017 HDI Capital Area Presentation & Meeting Slides 050917May 2017 HDI Capital Area Presentation & Meeting Slides 050917
May 2017 HDI Capital Area Presentation & Meeting Slides 050917
 
HDI Capital Area March 17, 2017 Meeting Slides Presentation
HDI Capital Area March 17, 2017 Meeting Slides PresentationHDI Capital Area March 17, 2017 Meeting Slides Presentation
HDI Capital Area March 17, 2017 Meeting Slides Presentation
 
HDI Capital Area Updates and Presentation Slides December 9 2016
HDI Capital Area Updates and Presentation Slides December 9 2016HDI Capital Area Updates and Presentation Slides December 9 2016
HDI Capital Area Updates and Presentation Slides December 9 2016
 
HDI Capital Area Meeting Slides October 21 2016
HDI Capital Area Meeting Slides October 21 2016HDI Capital Area Meeting Slides October 21 2016
HDI Capital Area Meeting Slides October 21 2016
 
HDI Capital Are Meeting Slides September 16 2016
HDI Capital Are Meeting Slides September 16 2016HDI Capital Are Meeting Slides September 16 2016
HDI Capital Are Meeting Slides September 16 2016
 
HDI Capital Area Meeting Slides August, 19 2016
HDI Capital Area Meeting Slides August, 19 2016HDI Capital Area Meeting Slides August, 19 2016
HDI Capital Area Meeting Slides August, 19 2016
 
HDI Capital Area Meeting Slides December 4, 2015
HDI Capital Area Meeting Slides December 4,  2015HDI Capital Area Meeting Slides December 4,  2015
HDI Capital Area Meeting Slides December 4, 2015
 

Último

Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbuapidays
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusZilliz
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...apidays
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 

Último (20)

Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 

Configuration Management

  • 1.
  • 2. CFM PURPOSE Protect the integrity of service assets and Cis Place IT assets and Cis under CfM controls Establish a CMS to ensure integrity Provide accurate information to support other processes through the Service Lifecycle Content and CONTEXT C d Utlization drives value
  • 3. CFM SCOPE Full lifecycle management of IT and service assets Maintenance and status of asset inventory Components are identified baselined and maintained identified, baselined, Supports/is supported by Change controls Service i S i view – modeling whole services end-to-end and using that information f d li h l i d d d i h i f i for impact assessment
  • 4. CFM – VALUE TO THE BUSINESS Optimizing service value from our assets and Cis Better change planning and forecasting Better impact assessments and risk management Better resolution of incidents and problems Better measurement of service warranty Better adherence to legal/regulatory obligations Better controls and utilization of services and assets Better traceability of requirements for new and changed services Better awareness of service provisioning costs
  • 5. BASIC CONCEPTS: CONTROL CfM – Control my baseline (where am I?) ChM – Control my future state planning (Where am I planning to go?) RDM – Controlling my execution in moving new services and changes into future state (How do I get from current state to proposed future state?) These three processes are fundamental to successful service transition and must work together to maintain meaningful controls.
  • 7. Service Service Customer level package portfolio Banking Contract core service Serviced by E-banking Supported by Hosted Application Uses Technical supportt Application A li ti hosting h ti infrastructure service service service User Business Data Web Network Network Availability Messaging Authentication experience logic services services topology service
  • 8. CIS (CONFIGURATION ITEMS) An asset, service component, or other item under CFM Controls Service Lifecycle Cis (Business Case, SDPs, Release Plans) Service Cis (systems, applications, information, data, infrastructure, facilities, people) Organization Cis (policies, legal/regulatory frameworks) Internal Cis (project mgmt software, SDLC software, etc.) External Cis (external customer requirements external services, etc.) requirements, services etc ) The big idea behind CFM Plans is fundamentally about “How Wide, How Deep” to go in establishing SACM controls
  • 9. CMS OVERVIEW CMSs and multiple CMDBs Secure libraries and secure stores Definitive Media Library (DML) Definitive Spares Configuration Baselines Snapshots S h
  • 10. Change and Release Asset Management Configuration Life Technical Configuration Quality Management Service Desk View User View View Cycle View View View assets Presentation Project configurations Schedules/plans Change Financial Asset Asset Service Applications Asset and User configuration, Layer Service Strategy, Portal Request Status Change Status Reports Asset Application Configuration Changes, Releases, Advisory Board agenda and Statements and Bills Design, Transition, Environment Management Asset and License Management Operations configuration Test Environment Policies, Processes, Configuration item and Asset performance baselines and Infrastructure Procedures, forms, related incidents, templates, checklists problems, Search, Browse, Store, Retrieve, Update, Publish, Subscribe, Collaborate Knowledge Monitoring Processing Performance Management Forecasting, Scorecards, Dashboards Query and Analysis Reporting Modelling Layer Planning, Budgeting Alerting Business/Customer/Supplier/User – Service – Application – Infrastructure mapping Information Integration Layer Service Portfolio Service Service Catalogue Model Integrated CMDB Service Release Service Change Common Process, Schema Meta Data Data Data synchronization Extract, Transform, Data and Information Mapping Management reconciliation Load Mining Data Integration Project Definitive Media Physical CMDBs Documentation Library Platform Software Discovery, Enterprise Applications Filestore Configuration Tools Configuration asset Access Management Data and Definitive CMDB1 Eg. Storage Management Management Human Resources Information Document Library Database and audit Supply Chain Sources Structured Middleware Network tools Management and Tools Definitive Multimedia Mainframe Customer Relationship Library 1 CMDB2 Distributed Desktop Management Project Software Definitive Multimedia Library 2 CMDB3
  • 11. DML and CMDB DML Physical CIs Information about the CIs Electronic CMDB CIs Release Record Build new Release Test new Release Implement new Release Distribute new Release to live locations
  • 12. Planning, management resources, time Management support Working relationships Resources, facilities, CMS and tools Training and Guidance Policy, Standards, Control Management Configuration Strategy, and Planning Management Plan, Service Portfolio, Contract Customer Portfolio, Contract Portfolio, Portfolio CI Identification,, Contract Requirements, naming, labelling, Configuration data and requirements Design, Identification documentation Maintenance, Release, Baseline and Release Deployment, Id Operations plans Updated RFC, p , Configuration RFC/ updated CI Control change to CI Status record/Report Status Configuration Change and Accounting and information and Configuration C fi ti Reporting Performance Records and Documentation Verification Action items Physical CIs, and Audit Confidence in Test results service and Audit/discovery f infrastructure Feedback tools
  • 13. CONFIGURATION PLANNING Plenty of perfectly good templates Need a process first, then serves as a practical plan Living document Focus on USE, not content
  • 14. CFM IDENTIFICATION Configuration Structure and CI Selection Naming Conventions Labeling CI attributes CFM Documentation Relationship mapping R l i hi i CI Types (service, HW, SW, documentation, staff) Media libraries Configuration Baselines Release Units and Numbering schema
  • 15. CONFIGURATION CONTROL Establishing integrated controls with CHM and RDM to ensure License controls Change management process Version controls of assets, Cis, builds, and releases Access controls Build specifications Promotion and migration of data Configuration baselines Deployment controls (and touchpoints) Installation DML integrity
  • 16. CFM STATUS ACCOUNTING Insert example of asset/CI lifecycles Define state changes (how does CI move from one status to another) as part of your CFM Plan
  • 17. REPORTING Maintaining and archiving records Managing status of current configurations Making status information visible and available Recording changes in CI status Ensuring changes to baselines are properly documented and “re-baselined” or reconciled after changes are implemented
  • 18. TYPICAL REPORTS CI information in a particular baseline CI lists and baseline configurations Current revision status and history Status reports on deviations Status of delivered/maintained products Revision R i i status Reports on unauthorized usage/changes to HW/SW Unauthorized CIs detected Variations between CMS and physical audit activities
  • 19. VERIFICATION AND AUDIT Conformity between CMS and actuals Verify physical existence of Cis Confirm RDM information and baselines before executing Deployment of a release Planned vs ad hoc Use ChM and Incident Mgmt to address any unregistered or unauthorized Cis Automation h A i here d i drives b better performance across the service lif f h i lifecycle l
  • 20. TRIGGERS, INPUTS/OUTPUTS, AND INTERFACES Supporting processes Change Management Financial Management Service Continuity Incident Management Problem Management Availability Management In truth is the fundamental basis for all process activities since provides accurate information to underpin all services and service changes
  • 21. INFORMATION MANAGEMENT CMS archiving/backup a fundamental part of your CFM Plan CMS contains information on backups of Cis How much archiving? Cost/benefit analysis analysis…
  • 22. KPIS AND METRICS % improvement in maintenance scheduling Alignment between provided maintenance and business support (availability/windows) Assets identified as causes of service failures Improved diagnosis/MTRS for incidents Impacts of incidents/errors by particular CI type (for availability improvements) % reuse of unused/underused assets Alignment of insurance premiums with business need Ratio of used licenses vs paid licenses Cost/user for licenses Accuracy in budgets/charging for services %reduction in business impact based on incorrect CI data Improved audit compliance
  • 23. CHALLENGES, CSFS, AND RISKS Challenges Maintaining check-in/Check-out of DML Funding Data over use Lack of management commitment (why do we need this?) CSFs Valid justifications for what data is maintained j Top-down approach – “enough” data How accurate?? Using technology to automate CMS practices Risks Focusing on technologies instead of services and outcomes Movement of hardware assets by unauthorized staff
  • 24.
  • 25. INITIAL PLANNING Designate Configuration Manager Define Mission Determine project scope Define overall project interfaces to other ST processes Survey current capabilities and resources Develop i i i l D l initial tooling plan li l
  • 26. DEVELOP PROJECT PLAN Launch/approve and charter formal project Define Project Team Plan Project Phases Feasibility Initiation Specification Process design Product selection Implementation Review Closure Prepare operational mgmt Conduct Feasability Study (Project Scope and constraints)
  • 27. REQUIREMENTS Identify and interview stakeholders Capture (MOSCOW) and prioritize requirements Validate and verify requirements Establish requirements management strategy Define purpose, scope, and objectives Define li i D fi policies, procedures d Define roles and responsibilities Define metrics and reporting Define Overall Plan
  • 28. RELATIONSHIPS Plan relationships Among infrastructure components Among functional teams Among processes Align to business services and outcomes
  • 29. PLAN DEPENDENT ACTIVITIES Plan support tools Plan support processes Communicate benefits (mgmt) Plan staff training (diff for diff roles)
  • 30. DEFINE ROLES AND RESPONSIBILITIES CfM Role specifications Assignments Role/billet decisions Project roles CRC team? Integrated processes, tools, and teams? ROM of width of scope f id h f Scope across operations and pipeline Usable existing tools?
  • 31. BASELINE CURRENT PRACTICES CI Owners People, process, technology ChM RDM SVT Asset mgmt A Roles/resources
  • 32. PROCESS IMPLEMENTATION PLAN Analyze existing practices (what do I already have?) Analyze ST capabilities (who do I have?) Define existing data and plan to move it into new CMS Refine and re-validate requirements Create vendor selection criteria Evaluate and select tooling Acquire and install tooling q g Design process interfaces in detail Plan structure and attributes of Cis Align Business Processes Establish DML Train on roles/responsibilities Manage Organizational Change needs
  • 33. PLANNING PHASED IMPLEMENTATION Coordination with other process/tool implementation activities Planning CMS population and federation Planning to take CfM control of Cis Freeze Managing Cis during the Freeze Planning switchover Pl i i h
  • 34. PHASING CFM IN Training (user and admin) Plans, Procedures, and Work Instructions Define and mature the CfM plan Launch update roles Plan CI registration processes Plan Pl ELS Mature monitoring and metrics