switchgear
“ Establish maintenance practices and provide general guidelines for switch
gear maintenance”
PM - practices
 Establish maintenance practice
 from continuous online monitoring to “run-to-failure”
 Predictive and preventive maintenance programs—including most of
the NFPA and InterNational Electrical Testing Association (NETA)
recommendations—fall in the middle of this range.
 Most real-world maintenance programs are a combination of these
approaches. Eg replace indicating lamp when fail, but do predictive
for breaker.
 Decide maintenance frequency
 Finalize preventive & diagnostic maintenance practices & schedule
Maintenance check points
Panel / Feeder
– Inspection of components, terminations, hardware for any
abnormality
– Ensure Panel vermin proofing
– Site specific checklist
Support Insulators
– Inspection for tracking, condensation
– Inspection for damages caused by overheating
Breaker
– PM & overhauling as per standard practice and
manufacturer guidelines
Maintenance check points
Protection relay and protection schemes
 Cleaning / Functional test of individual relay
 Follow specific instructions from OEM
 Protection scheme check after PM
Bus maintenance
 Cleaning / tightness / Insulation test
Condition monitoring
 Load monitoring
 Thermography
ELECTRICAL PARAMETERS TO CHECK
a) Insulation resistance to be measured
b) If facility is available then measure opening and closing time of
breaker .This shall be once in a year even through outside agency .
c) Measurement of contact resistance .
d) Checking of control circuit
e) Taking trial in test position for closing
and tripping .
f) Checking of indicating devices .
g) Checking of closing and tripping coils .
h) Checking of contacts
i) Checking of operating mechanism
j) Checking of auxiliary switches
k)) Checking of tightness of bolts and nuts
During Periodic Maintenance
Simple maintenance tips that work
Few key considerations:
Visually inspect the external condition of the switchboard on a
regular basis for foreign matter, dust and hot spots, and when
planned the inside of the cable termination chambers and other
sections within the switchboard
Annually check using infrared detection for internal electrical hot
spots
Examine the main/arcing contacts for excessive burning/damage
and recondition or renew as requirede
Check and adjust the spring contact force and contact alignment
as required
Remove, examine and clean the arc chutes and renew if damaged
Inspect, adjust and lubricate mechanisms
Simple maintenance tips that work
On withdrawable equipment examine the primary isolating
contacts for damage, burning, corrosion and clean and refurb
where necessary.
Check the lubrication of the circuit-breaker isolating mechanism
Check that the position indicators and interlocks work properly
Examine and check the voltage transformer if applicable
Plan for frequent trip-testing of the circuit-breakers via the
protection relay system
Never work on live equipment. Or when absolutely necessary,
use properly insulated tools to prevent risk of flashover
Check operation of interlocks and safety shutters
Carry out ductor, megger and secondary injection tests and
Maintenance and CM schedule
SN Activity Frequency
1 Monitor and record load current and voltage Daily
2 Thermography survey 6 months
Maintenance
Condition monitoring / Diagnostic
1 PM of breaker and feeder 6 months
2 Overhauling of breaker 3 to 4 years / OEM
recommendation
3 PM of bus bars Opportunity
4 Relay testing As per criticality of service
1 year to 4 years
5 Functional testing of protection scheme After carrying out PM / relay
testing
reliability concerns
Reliability concerns to not only insulation but also to the
correct functioning of the operating mechanism, protective
devices, and control that are integral to the breaker.
switchgear breakers are active elements that can fail by acting
spuriously or by not functioning upon command
Failure modes for medium-voltage
circuit breakers
• Failure to close
• Failure to open
• Spurious opening
• Spurious closure
• Failure to operate as required
• Failure to recharge closing spring
• Slow operation
• Short circuit to ground
• Out of calibration
• Intermittent operation
failure symptom categories
The following failure symptom categories were identified as being
important:
• Movement of the breaker mechanism is impeded by insuffi cient or
inadequate lubrication
• Movement of the breaker mechanism is impeded by broken, bent,
or loose parts, friction, binding, resulting from excessive stress,
wear, or faulty installation
• Operation of the breaker is impeded by incorrect adjustment of set
points/limit switches
• Various electrical problems caused, e.g., by defective coils,
defective command circuits, wiring faults, loose wires, poor
contacts, and blown fuses
• Others (e.g., dirt, pollution, and corrosion)
MAINTENANCE OF POWER TRANSFORMER
 General maintenance of transformer requires …..
 HALF YEARLY CHECKS:
 Check & clean bushings.
 Check OLTC mechanism for smooth operation. Check
motor & its control.
 Check dielectric strength of oil.
 Check cooling system i.e. cooling fan working and its
operating controls.
 Service fans and replace if not working.
 Check earthing of transformer.
MAINTENANCE OF POWER TRANSFORMER
 General maintenance of transformer requires …..
 YEARLY CHECKS:
 Check & clean bushings.
 Check OLTC mechanism for smooth operation.
 Check OLTC motor & its control.
 Check dielectric strength of oil.
 Check water content in oil.
 Check earthing of transformer.
 Check control & protection system and Tighten all
connections.
 Take routine test on transformer.
 General maintenance of Distribution transformer
 HALF YEARLY CHECKS:
 Check proper size of DO fuse.
 Check colour of silica gel.
 Tight all incoming / out going connections.
 Check earthing of transformer.
 Check oil leakage & attend if any.
 Clean main tank, radiator & bushings.
 YEARLY CHECKS:
 Measure IR value.
 Measure dielectric strength of oil.
• AFTER SERVICE OF 5 – 7 YEARS:
 Preferably, the manufacturer’s engineer may
be called at site.
 Replace all ageing gaskets.
 The existing oil in the transformer should be
filtered continuously to attain dielectric
strength of 60 kV for 1 min. or more with
improvement in the IR value.
 The procedure could also be as per the
manufacturer’s manual.
• AFTER SERVICE OF 5 – 7 YEARS:
 Filtration would remove sludge, dirt, moisture,
etc. from the oil.
 If condition of existing oil is found extremely
deteriorated upon testing prior to
maintenance, fresh oil should be filled in the
transformer under vacuum.
 The values of IR and PI should be taken
again to ensure the healthiness of
transformer.
■ Transformer Body
 Main Tank
 Conservator tank
 Load Tap Changer
 Bushings
 Core
 Winding
■ Cooling Media / system
 Oil
 Radiator
 Radiator Fans
 Oil Pumps
Accessories
 Breather
 Buchholtz relay
 Oil and Winding Temp. indicator
 Explosion vent
 Pressure release valve
 MOG
 OSR
 Marshaling box
SD.pptx
SD.pptx

Más contenido relacionado

Similar a SD.pptx

Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankurAnkur Mishra
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.pptThien Phan Bản
 
NESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGANESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGAnestor alega
 
Hướng dẫn sử dụng Testo 760-1
Hướng dẫn sử dụng Testo 760-1Hướng dẫn sử dụng Testo 760-1
Hướng dẫn sử dụng Testo 760-1Tenmars Việt Nam
 
IRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET Journal
 
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdfvikram desai
 
Fluke 101 Basic Digital Multimeter User Manual
Fluke 101 Basic Digital Multimeter User ManualFluke 101 Basic Digital Multimeter User Manual
Fluke 101 Basic Digital Multimeter User ManualTim Miller
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................hiiarindam
 
Transformer asset management
Transformer asset managementTransformer asset management
Transformer asset managementMuthar Hussain
 
Site Inspections - Looking for Dangerous Installations or Incorrect Billing
Site Inspections - Looking for Dangerous Installations or Incorrect BillingSite Inspections - Looking for Dangerous Installations or Incorrect Billing
Site Inspections - Looking for Dangerous Installations or Incorrect BillingTESCO - The Eastern Specialty Company
 

Similar a SD.pptx (20)

Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
tcee-161003100321.pptx
tcee-161003100321.pptxtcee-161003100321.pptx
tcee-161003100321.pptx
 
Standards
StandardsStandards
Standards
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
Fusing Metering Voltages for High Capacity Circuits
Fusing Metering Voltages for High Capacity CircuitsFusing Metering Voltages for High Capacity Circuits
Fusing Metering Voltages for High Capacity Circuits
 
Transformer
TransformerTransformer
Transformer
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
 
NESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGANESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGA
 
Hướng dẫn sử dụng Testo 760-1
Hướng dẫn sử dụng Testo 760-1Hướng dẫn sử dụng Testo 760-1
Hướng dẫn sử dụng Testo 760-1
 
IRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a Transformer
 
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
Fluke 101 Basic Digital Multimeter User Manual
Fluke 101 Basic Digital Multimeter User ManualFluke 101 Basic Digital Multimeter User Manual
Fluke 101 Basic Digital Multimeter User Manual
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................
 
MSC SOW
MSC SOWMSC SOW
MSC SOW
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 
Transformer asset management
Transformer asset managementTransformer asset management
Transformer asset management
 
Site Inspections - Looking for Dangerous Installations or Incorrect Billing
Site Inspections - Looking for Dangerous Installations or Incorrect BillingSite Inspections - Looking for Dangerous Installations or Incorrect Billing
Site Inspections - Looking for Dangerous Installations or Incorrect Billing
 

Último

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Último (20)

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 

SD.pptx

  • 2. “ Establish maintenance practices and provide general guidelines for switch gear maintenance” PM - practices  Establish maintenance practice  from continuous online monitoring to “run-to-failure”  Predictive and preventive maintenance programs—including most of the NFPA and InterNational Electrical Testing Association (NETA) recommendations—fall in the middle of this range.  Most real-world maintenance programs are a combination of these approaches. Eg replace indicating lamp when fail, but do predictive for breaker.  Decide maintenance frequency  Finalize preventive & diagnostic maintenance practices & schedule
  • 3. Maintenance check points Panel / Feeder – Inspection of components, terminations, hardware for any abnormality – Ensure Panel vermin proofing – Site specific checklist Support Insulators – Inspection for tracking, condensation – Inspection for damages caused by overheating Breaker – PM & overhauling as per standard practice and manufacturer guidelines
  • 4. Maintenance check points Protection relay and protection schemes  Cleaning / Functional test of individual relay  Follow specific instructions from OEM  Protection scheme check after PM Bus maintenance  Cleaning / tightness / Insulation test Condition monitoring  Load monitoring  Thermography
  • 5. ELECTRICAL PARAMETERS TO CHECK a) Insulation resistance to be measured b) If facility is available then measure opening and closing time of breaker .This shall be once in a year even through outside agency . c) Measurement of contact resistance . d) Checking of control circuit e) Taking trial in test position for closing and tripping . f) Checking of indicating devices . g) Checking of closing and tripping coils . h) Checking of contacts i) Checking of operating mechanism j) Checking of auxiliary switches k)) Checking of tightness of bolts and nuts During Periodic Maintenance
  • 6. Simple maintenance tips that work Few key considerations: Visually inspect the external condition of the switchboard on a regular basis for foreign matter, dust and hot spots, and when planned the inside of the cable termination chambers and other sections within the switchboard Annually check using infrared detection for internal electrical hot spots Examine the main/arcing contacts for excessive burning/damage and recondition or renew as requirede Check and adjust the spring contact force and contact alignment as required Remove, examine and clean the arc chutes and renew if damaged Inspect, adjust and lubricate mechanisms
  • 7. Simple maintenance tips that work On withdrawable equipment examine the primary isolating contacts for damage, burning, corrosion and clean and refurb where necessary. Check the lubrication of the circuit-breaker isolating mechanism Check that the position indicators and interlocks work properly Examine and check the voltage transformer if applicable Plan for frequent trip-testing of the circuit-breakers via the protection relay system Never work on live equipment. Or when absolutely necessary, use properly insulated tools to prevent risk of flashover Check operation of interlocks and safety shutters Carry out ductor, megger and secondary injection tests and
  • 8. Maintenance and CM schedule SN Activity Frequency 1 Monitor and record load current and voltage Daily 2 Thermography survey 6 months Maintenance Condition monitoring / Diagnostic 1 PM of breaker and feeder 6 months 2 Overhauling of breaker 3 to 4 years / OEM recommendation 3 PM of bus bars Opportunity 4 Relay testing As per criticality of service 1 year to 4 years 5 Functional testing of protection scheme After carrying out PM / relay testing
  • 9. reliability concerns Reliability concerns to not only insulation but also to the correct functioning of the operating mechanism, protective devices, and control that are integral to the breaker. switchgear breakers are active elements that can fail by acting spuriously or by not functioning upon command
  • 10. Failure modes for medium-voltage circuit breakers • Failure to close • Failure to open • Spurious opening • Spurious closure • Failure to operate as required • Failure to recharge closing spring • Slow operation • Short circuit to ground • Out of calibration • Intermittent operation
  • 11. failure symptom categories The following failure symptom categories were identified as being important: • Movement of the breaker mechanism is impeded by insuffi cient or inadequate lubrication • Movement of the breaker mechanism is impeded by broken, bent, or loose parts, friction, binding, resulting from excessive stress, wear, or faulty installation • Operation of the breaker is impeded by incorrect adjustment of set points/limit switches • Various electrical problems caused, e.g., by defective coils, defective command circuits, wiring faults, loose wires, poor contacts, and blown fuses • Others (e.g., dirt, pollution, and corrosion)
  • 12.
  • 13. MAINTENANCE OF POWER TRANSFORMER  General maintenance of transformer requires …..  HALF YEARLY CHECKS:  Check & clean bushings.  Check OLTC mechanism for smooth operation. Check motor & its control.  Check dielectric strength of oil.  Check cooling system i.e. cooling fan working and its operating controls.  Service fans and replace if not working.  Check earthing of transformer.
  • 14. MAINTENANCE OF POWER TRANSFORMER  General maintenance of transformer requires …..  YEARLY CHECKS:  Check & clean bushings.  Check OLTC mechanism for smooth operation.  Check OLTC motor & its control.  Check dielectric strength of oil.  Check water content in oil.  Check earthing of transformer.  Check control & protection system and Tighten all connections.  Take routine test on transformer.
  • 15.  General maintenance of Distribution transformer  HALF YEARLY CHECKS:  Check proper size of DO fuse.  Check colour of silica gel.  Tight all incoming / out going connections.  Check earthing of transformer.  Check oil leakage & attend if any.  Clean main tank, radiator & bushings.  YEARLY CHECKS:  Measure IR value.  Measure dielectric strength of oil.
  • 16. • AFTER SERVICE OF 5 – 7 YEARS:  Preferably, the manufacturer’s engineer may be called at site.  Replace all ageing gaskets.  The existing oil in the transformer should be filtered continuously to attain dielectric strength of 60 kV for 1 min. or more with improvement in the IR value.  The procedure could also be as per the manufacturer’s manual.
  • 17. • AFTER SERVICE OF 5 – 7 YEARS:  Filtration would remove sludge, dirt, moisture, etc. from the oil.  If condition of existing oil is found extremely deteriorated upon testing prior to maintenance, fresh oil should be filled in the transformer under vacuum.  The values of IR and PI should be taken again to ensure the healthiness of transformer.
  • 18. ■ Transformer Body  Main Tank  Conservator tank  Load Tap Changer  Bushings  Core  Winding ■ Cooling Media / system  Oil  Radiator  Radiator Fans  Oil Pumps Accessories  Breather  Buchholtz relay  Oil and Winding Temp. indicator  Explosion vent  Pressure release valve  MOG  OSR  Marshaling box

Notas del editor

  1. Develop a maintenance program. The many approaches to switchgear maintenance range from continuous online monitoring to “do nothing” (also called “run-to-failure”). Predictive and preventive maintenance programs—including most of the National Fire Protection Association (NFPA) and InterNational Electrical Testing Association (NETA) recommendations—fall in the middle of this range. Most real-world maintenance programs are a combination of these approaches. For instance, replacing indication lights only when they’ve failed is an example of run-to-failure maintenance. On the other hand, maintaining disconnect switches on a periodic basis— cleaning, lubricating, and exercising them—is an example of preventive maintenance. Annual visual and thermographic inspections on bus connections and breakers are examples of predictive maintenance.
  2. reliability concerns to not only insulation but also to the correct functioning of the operating mechanism, protective devices, and control that are integral to the breaker. Unlike transformers that are a quiescent element, switchgear breakers are active elements that can fail by acting spuriously or by not functioning (either to open or close) upon command. These incorrect functions can create problems in the connected circuits that are quite different from those that result directly from any fire, explosion, or spread of possibly toxic insulating fluids. If a breaker fails to clear upon signal or becomes overloaded for any reason, then the circuit will be subjected to further damage until an upstream breaker (usually larger and set at a higher current rating) can sense and clear the overload.