SlideShare una empresa de Scribd logo
1 de 15
PEILBESLUIT JACOBAPOLDER

Niels Groot
Jolien Scholten
Maurice de Wit

PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014
INHOUDSOPGAVE
1.
2.
3.
4.
5.
6.
7.
8.
9.

Inleiding
Eisen
Watersysteem
Waterstand binnen en buitendijks
Relatie waterstand en grondwaterstand,
relatie gewasopbrengst en grondwatertrap
STOWA buien
Beheer en onderhoud
Conclusie
Discussie

PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014

2/15
1. INLEIDING
Wat is een Peilbesluit?
Probleemstelling:
- Droogte en wateroverlast
- Klimaatverandering
--> Nieuw peilbesluit is nodig
Doelstelling:
- Voldoende berging en afvoer van water
- Optimale landbouwgrond

PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014

3/15
2. EISEN
-

Stroomsnelheid
Droogtelegging 10%
Opstuwing 25 cm
T100 bui

PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014

4
3. WATER
SYSTEEM

5
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

CROSS SECTIES
0.91 + NAP

0,66+ NAP
1:2

Cross section 2

1:2

0.5

1.0

1.0

1.0

-0.54 + NAP
1.2
-1,04 + NAP

1.0

1.0
-0.54 + NAP
-1,04 + NAP

1.0

2.4

1:2

0.5

-0.29 1.0
+ NAP
0.2 NAP
-0,79 +

1.0

2.4

1:2

1.0

2.4

0.5

2.4

Cross section 1

1.0

-0.29 + NAP
-0,79 + NAP

2.4

2.4

0.2
0.60+ NAP

1.3
1:2

Cross section 3

1:2

Cross section 3

2.6

1.0

1:2

1.0
-0.71 + NAP
-1.21 + NAP
2.6

Cross section 4

1.0

1.0

3.5

3.5

-0.71 + NAP
-1.21 + NAP
2.6

To

0.99 + NAP

1:2

-0.71+ NAP
-1.21 + NAP

1.0
-0.71+ NAP
-1.21 + NAP
1.0

ge

5.8

0.99 + NAP

1:2

Cross section 4

3.4

3.4

2.7

2.7

1:2
0.5

0.5

1:2

1.0

1.0

1.7

1:2

0.60+ NAP

0.5

2.6

1.7

1:2

3.4

3.4

6

0.50 m

1.3

Cross section 2

2.4

2.4

0.91 + NAP

0,66+ NAP

0.5

1:2

0.00 m
0.25 m

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

0.5

Cross section 1

1: 2

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

1.2

1.2

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

1.2

1:2
4. WATERSTAND BINNEN
EN BUITENDIJKS

Pomp:
• Visvriendelijk
• Afsluiter
• Katterug
:
PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014

7
5. RELATIE WATERSTAND EN
GRONDWATERSTAND

waterstand

PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014

8
RELATIE GEWASOPBRENGST EN
GRONDWATERTRAP
- Grondwatertrap
-In alle Peilgebieden heerst een grondwatertrap van IV of VI
- verschil GLG IV en GHG VI is 40 cm
- verschil GLG VI en GHG IV is 60 cm

PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014

9
6. STOWA BUIEN

PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014

10
OVERSTROMING OP SOMMIGE GEBIEDEN
7. BEHEER EN ONDERHOUD
- Onderhoud werkzaamheden

-

Stuw
Duiker
Gemaal
Hoofdwatergang

PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014

12
8. CONCLUSIE
- 9 Peilgebieden
- 4 doorsneden, 2 stuwen, 7 duikers
- Waterpeil stijgt niet meer dan 25 cm

- Geen directe overstromingen
- Wateroverlast en droogte
kan zo worden voorkomen

PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014

13
9. DISCUSSIE
- Gewassen
- Watersysteem
- STOWA bui
- Verhard oppervlakte
- Dijken huizen en wegen

PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014

14
VRAGEN ?
Bedankt voor de aandacht!

Projectgroep 2:
Maurice de Wit
Niels Groot
Jolien Scholten

PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014

Más contenido relacionado

Similar a Jacobapolder

DSD-NL 2015, Simona Gebruikersmiddag, 1 Simona in de Praktijk
DSD-NL 2015, Simona Gebruikersmiddag, 1 Simona in de PraktijkDSD-NL 2015, Simona Gebruikersmiddag, 1 Simona in de Praktijk
DSD-NL 2015, Simona Gebruikersmiddag, 1 Simona in de PraktijkDeltares
 
Mehmandoostkotlar et al.pptx
Mehmandoostkotlar et al.pptxMehmandoostkotlar et al.pptx
Mehmandoostkotlar et al.pptxSBO TURQUOISE
 
IMARES en offshore windenergie
IMARES en offshore windenergieIMARES en offshore windenergie
IMARES en offshore windenergieChris Westra
 
Detailmonitoring in de praktijk locatie Schellebelle
Detailmonitoring in de praktijk locatie SchellebelleDetailmonitoring in de praktijk locatie Schellebelle
Detailmonitoring in de praktijk locatie SchellebelleWaterbouwkundig Laboratorium
 
20151002 waterforum ciw de watergroep-v3
20151002 waterforum ciw de watergroep-v320151002 waterforum ciw de watergroep-v3
20151002 waterforum ciw de watergroep-v3Bruno Jeurissen
 
Hefitge regen versus extreme droogte
Hefitge regen versus extreme droogteHefitge regen versus extreme droogte
Hefitge regen versus extreme droogteKim Noach
 

Similar a Jacobapolder (6)

DSD-NL 2015, Simona Gebruikersmiddag, 1 Simona in de Praktijk
DSD-NL 2015, Simona Gebruikersmiddag, 1 Simona in de PraktijkDSD-NL 2015, Simona Gebruikersmiddag, 1 Simona in de Praktijk
DSD-NL 2015, Simona Gebruikersmiddag, 1 Simona in de Praktijk
 
Mehmandoostkotlar et al.pptx
Mehmandoostkotlar et al.pptxMehmandoostkotlar et al.pptx
Mehmandoostkotlar et al.pptx
 
IMARES en offshore windenergie
IMARES en offshore windenergieIMARES en offshore windenergie
IMARES en offshore windenergie
 
Detailmonitoring in de praktijk locatie Schellebelle
Detailmonitoring in de praktijk locatie SchellebelleDetailmonitoring in de praktijk locatie Schellebelle
Detailmonitoring in de praktijk locatie Schellebelle
 
20151002 waterforum ciw de watergroep-v3
20151002 waterforum ciw de watergroep-v320151002 waterforum ciw de watergroep-v3
20151002 waterforum ciw de watergroep-v3
 
Hefitge regen versus extreme droogte
Hefitge regen versus extreme droogteHefitge regen versus extreme droogte
Hefitge regen versus extreme droogte
 

Más de Henk Massink

Cu07821 ppt9 recapitulation
Cu07821 ppt9 recapitulationCu07821 ppt9 recapitulation
Cu07821 ppt9 recapitulationHenk Massink
 
Cu07821 10management and maintenance2015
Cu07821 10management and maintenance2015Cu07821 10management and maintenance2015
Cu07821 10management and maintenance2015Henk Massink
 
Cu07821 9 zoning plan2015
Cu07821 9 zoning plan2015Cu07821 9 zoning plan2015
Cu07821 9 zoning plan2015Henk Massink
 
Cu07821 7 culverts new
Cu07821 7 culverts newCu07821 7 culverts new
Cu07821 7 culverts newHenk Massink
 
Cu07821 6 pumping stations_update
Cu07821 6 pumping stations_updateCu07821 6 pumping stations_update
Cu07821 6 pumping stations_updateHenk Massink
 
Cu07821 5 drainage
Cu07821 5 drainageCu07821 5 drainage
Cu07821 5 drainageHenk Massink
 
Cu07821 3 precipitation and evapotranspiration
Cu07821 3  precipitation and evapotranspirationCu07821 3  precipitation and evapotranspiration
Cu07821 3 precipitation and evapotranspirationHenk Massink
 
Cu07821 1 intro_1415
Cu07821 1 intro_1415Cu07821 1 intro_1415
Cu07821 1 intro_1415Henk Massink
 
Research portfolio delta_academy_s2_2014_2015
Research portfolio delta_academy_s2_2014_2015Research portfolio delta_academy_s2_2014_2015
Research portfolio delta_academy_s2_2014_2015Henk Massink
 
Research portfolio da arc 2014-2015 s1
Research portfolio da arc  2014-2015 s1Research portfolio da arc  2014-2015 s1
Research portfolio da arc 2014-2015 s1Henk Massink
 
Cu06997 assignment 6 2014_answer
Cu06997 assignment 6 2014_answerCu06997 assignment 6 2014_answer
Cu06997 assignment 6 2014_answerHenk Massink
 
Research portfolios1 2013_2014 jan july 2014
Research portfolios1 2013_2014 jan july 2014Research portfolios1 2013_2014 jan july 2014
Research portfolios1 2013_2014 jan july 2014Henk Massink
 
Final presentation spain quattro
Final presentation spain quattroFinal presentation spain quattro
Final presentation spain quattroHenk Massink
 
Final presentation group 3
Final presentation group 3Final presentation group 3
Final presentation group 3Henk Massink
 

Más de Henk Massink (20)

Cu07821 ppt9 recapitulation
Cu07821 ppt9 recapitulationCu07821 ppt9 recapitulation
Cu07821 ppt9 recapitulation
 
Gastcollege mli
Gastcollege mliGastcollege mli
Gastcollege mli
 
Cu07821 10management and maintenance2015
Cu07821 10management and maintenance2015Cu07821 10management and maintenance2015
Cu07821 10management and maintenance2015
 
Cu07821 9 zoning plan2015
Cu07821 9 zoning plan2015Cu07821 9 zoning plan2015
Cu07821 9 zoning plan2015
 
Cu07821 8 weirs
Cu07821 8 weirsCu07821 8 weirs
Cu07821 8 weirs
 
Cu07821 7 culverts new
Cu07821 7 culverts newCu07821 7 culverts new
Cu07821 7 culverts new
 
Cu07821 6 pumping stations_update
Cu07821 6 pumping stations_updateCu07821 6 pumping stations_update
Cu07821 6 pumping stations_update
 
Cu07821 5 drainage
Cu07821 5 drainageCu07821 5 drainage
Cu07821 5 drainage
 
Cu07821 4 soil
Cu07821 4 soilCu07821 4 soil
Cu07821 4 soil
 
Cu07821 3 precipitation and evapotranspiration
Cu07821 3  precipitation and evapotranspirationCu07821 3  precipitation and evapotranspiration
Cu07821 3 precipitation and evapotranspiration
 
Cu07821 2 help
Cu07821 2 helpCu07821 2 help
Cu07821 2 help
 
Cu07821 1 intro_1415
Cu07821 1 intro_1415Cu07821 1 intro_1415
Cu07821 1 intro_1415
 
Research portfolio delta_academy_s2_2014_2015
Research portfolio delta_academy_s2_2014_2015Research portfolio delta_academy_s2_2014_2015
Research portfolio delta_academy_s2_2014_2015
 
Research portfolio da arc 2014-2015 s1
Research portfolio da arc  2014-2015 s1Research portfolio da arc  2014-2015 s1
Research portfolio da arc 2014-2015 s1
 
Cu06997 assignment 6 2014_answer
Cu06997 assignment 6 2014_answerCu06997 assignment 6 2014_answer
Cu06997 assignment 6 2014_answer
 
Research portfolios1 2013_2014 jan july 2014
Research portfolios1 2013_2014 jan july 2014Research portfolios1 2013_2014 jan july 2014
Research portfolios1 2013_2014 jan july 2014
 
Vision group1(5)
Vision group1(5)Vision group1(5)
Vision group1(5)
 
Final presentation spain quattro
Final presentation spain quattroFinal presentation spain quattro
Final presentation spain quattro
 
Final presentation group 3
Final presentation group 3Final presentation group 3
Final presentation group 3
 
Chocolate river
Chocolate riverChocolate river
Chocolate river
 

Jacobapolder

  • 1. PEILBESLUIT JACOBAPOLDER Niels Groot Jolien Scholten Maurice de Wit PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014
  • 2. INHOUDSOPGAVE 1. 2. 3. 4. 5. 6. 7. 8. 9. Inleiding Eisen Watersysteem Waterstand binnen en buitendijks Relatie waterstand en grondwaterstand, relatie gewasopbrengst en grondwatertrap STOWA buien Beheer en onderhoud Conclusie Discussie PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014 2/15
  • 3. 1. INLEIDING Wat is een Peilbesluit? Probleemstelling: - Droogte en wateroverlast - Klimaatverandering --> Nieuw peilbesluit is nodig Doelstelling: - Voldoende berging en afvoer van water - Optimale landbouwgrond PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014 3/15
  • 4. 2. EISEN - Stroomsnelheid Droogtelegging 10% Opstuwing 25 cm T100 bui PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014 4
  • 6. PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT CROSS SECTIES 0.91 + NAP 0,66+ NAP 1:2 Cross section 2 1:2 0.5 1.0 1.0 1.0 -0.54 + NAP 1.2 -1,04 + NAP 1.0 1.0 -0.54 + NAP -1,04 + NAP 1.0 2.4 1:2 0.5 -0.29 1.0 + NAP 0.2 NAP -0,79 + 1.0 2.4 1:2 1.0 2.4 0.5 2.4 Cross section 1 1.0 -0.29 + NAP -0,79 + NAP 2.4 2.4 0.2 0.60+ NAP 1.3 1:2 Cross section 3 1:2 Cross section 3 2.6 1.0 1:2 1.0 -0.71 + NAP -1.21 + NAP 2.6 Cross section 4 1.0 1.0 3.5 3.5 -0.71 + NAP -1.21 + NAP 2.6 To 0.99 + NAP 1:2 -0.71+ NAP -1.21 + NAP 1.0 -0.71+ NAP -1.21 + NAP 1.0 ge 5.8 0.99 + NAP 1:2 Cross section 4 3.4 3.4 2.7 2.7 1:2 0.5 0.5 1:2 1.0 1.0 1.7 1:2 0.60+ NAP 0.5 2.6 1.7 1:2 3.4 3.4 6 0.50 m 1.3 Cross section 2 2.4 2.4 0.91 + NAP 0,66+ NAP 0.5 1:2 0.00 m 0.25 m PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 0.5 Cross section 1 1: 2 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 1.2 1.2 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 1.2 1:2
  • 7. 4. WATERSTAND BINNEN EN BUITENDIJKS Pomp: • Visvriendelijk • Afsluiter • Katterug : PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014 7
  • 8. 5. RELATIE WATERSTAND EN GRONDWATERSTAND waterstand PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014 8
  • 9. RELATIE GEWASOPBRENGST EN GRONDWATERTRAP - Grondwatertrap -In alle Peilgebieden heerst een grondwatertrap van IV of VI - verschil GLG IV en GHG VI is 40 cm - verschil GLG VI en GHG IV is 60 cm PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014 9
  • 10. 6. STOWA BUIEN PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014 10
  • 12. 7. BEHEER EN ONDERHOUD - Onderhoud werkzaamheden - Stuw Duiker Gemaal Hoofdwatergang PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014 12
  • 13. 8. CONCLUSIE - 9 Peilgebieden - 4 doorsneden, 2 stuwen, 7 duikers - Waterpeil stijgt niet meer dan 25 cm - Geen directe overstromingen - Wateroverlast en droogte kan zo worden voorkomen PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014 13
  • 14. 9. DISCUSSIE - Gewassen - Watersysteem - STOWA bui - Verhard oppervlakte - Dijken huizen en wegen PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014 14
  • 15. VRAGEN ? Bedankt voor de aandacht! Projectgroep 2: Maurice de Wit Niels Groot Jolien Scholten PEILBESLUIT JACOBAPOLDER PROJECT | 13 JANUARI 2014