HIGHWAY & RAILROAD CULVERT INSTALLATION &
     REPLACEMENT WITH PIPE RAMMING
             PRESENTER(S) NAMES
FACTS ABOUT THE U.S RAIL SYSTEM
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Critical part of US transportation
                                         infrastructure.
                                       • More than 150,000 miles of
                                         mainline rail routes.
                                       • Moves more freight than any
                                         other rail system in any other
                                         country.

                                       • SOURCE: American Association
                                         of Railroads
DRAINAGE PROBLEMS
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Lack of maintenance
                                       • Lack of inspection programs
                                       • Lack of capacity/flow, flooding
                                         and liability
                                       • Ponding of water causes
                                         pavement and sub grade
                                         deterioration and may lead to
                                         washout failures
CULVERT INSTALLATION AND REPLACEMENT

PIPE RAMMING
                                  WASHOUT
WASHOUT
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • The failure rate has the potential
                                         to cause property damage and
                                         loss of life.
                                       • Lack of maintenance and delays
                                         in repairs has translated into
                                         soaring construction
                                         expenditures.
CULVERT INSTALLATION AND REPLACEMENT

PIPE RAMMING
                                  PROBLEMS AREN’T LIMITED TO RAIL
What is Pipe Ramming?
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                       A pneumatic hammer installs an open ended steel casing that is cleaned out during and after completion of
                                       pipe installation.
PIPE RAMMING APPLICATIONS
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                       Steel casing
                                       installation for:
                                       • Water
                                       • Sewer
                                       • Gas
                                       • Drainage culverts
Advantages
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Trenchless
                                       • Able to swallow rock as large as the
                                         inside diameter of the casing
                                       • Method does not remove soil until
                                         casing is installed
                                       • Minimizes voids
                                         –Roads
                                         –Railroads
                                       • Reduced soil compaction
Preferred for Adverse Soil Conditions
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Free flowing sand
                                       • Cobble conditions
                                       • Large rock formations
                                       • Excessive ground water
SWALLOWS LARGE OBSTRUCTIONS
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT


                                       • Rock swallowed during ram
                                       • Spoil removed post ram




                                       54” Casing
CULVERT SWALLOWING
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                       An oversized casing is rammed over existing culvert. After installation is complete, old culvert and spoil is
                                       removed. Steel casing can serve as the drainage culvert or as a carrier pipe for another pipe inserted
                                       within.
TELESCOPING METHOD
PIPE RAMMING                           FOR LONGER DISTANCES
CULVERT INSTALLATION AND REPLACEMENT




                                       An oversized pipe is rammed over the existing culvert until production ceases and is cleaned out. Further
                                       progress is made with smaller casings installed within the oversized pipe in the same manner.
METHOD IMPLEMENTATION
Trenchless Culvert Replacement Under Railways with the Pipe Ramming Method
RAM SITE LAYOUT
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                               Note: Follow local regulations for sloping or shoring of pit.
SITE PREP: CASING PLACEMENT
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                        Rail system   I-beam   Pipe Mule™
                                                               Leveling System
STEEL CASING PREP
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       SOIL SHOE                                   LUBRICATION




                                         Steel Casing

                                                   Internal Shoe

                                                                   External Shoe

                                       Reinforces lead casing and provides an      Supplies lubricating fluid to OD and ID of
                                       annulus for lubrication.                    casing during installation.
COLLETS AND RAMMER
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT

                                       Install Pushing Collets/Collars                Install Rammer




                                       Collets and collars help to distribute the     The rammer is locked into the collets when
                                       ramming force to the face of the pipe.         the tool is started.
                                       The collets also lock the rammer into place.
SPOIL REMOVAL
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT

                                       Spoil removal for >30” and/or               Spoil removal <30” Casing
                                       large spoil/culverts




                                                                                                    Seal kit
                                       Manual excavation, HDD culvert cleaning     Air and/or water pressure. Seal kit for air
                                       tools, jet washing, auger boring wherever   pressure removal.
                                       applicable.
PIPE RAMMING CASE STUDIES
HIGHWAY & RAILROAD CULVERT INSTALLATION & REPLACEMENT WITH PIPE RAMMING
New Installations – Rockville, MN
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Project
                                        –2 – drainage culverts under
                                         railroad
                                       • Pipe sizes
                                        –1-60” Casing
                                        –1-32” Casing
                                       • Equipment
                                        –24” Rammer
                                       • Ram distance
                                        –1 @ 90’
                                        –1@ 195’
                                       • Free flowing sand
                                       • Holding grade
New Installations – Grand Island, NE
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Project
                                        –1 – drainage culvert under railroad
                                       • Pipe sizes
                                        –1-24” Casing
                                       • Equipment
                                        –24” Rammer
                                       • Ram distance
                                        –1 @ 250’
                                       • Free flowing sand with loose coal
                                         dust and other materials
                                       • Installed with 2% grade
New Installation - Coeur d'Alene, ID
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Project
                                        –2 – drainage culverts under RR
                                         and Highway
                                       • Pipe sizes
                                        –2 - 48” casings
                                       • Equipment
                                        –23” Rammer
                                       • Ram distance
                                        –1 @ 190’
                                        –1@ 195’
New Installations– Maricopa County, AZ
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • New culvert installation under rail
                                         bed.
                                       • 84” steel casing
                                       • 24” HammerHead Pipe Rammer
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           Collapsed 7’ casing, 164 feet long
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           First section of pipe installed.
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           Swallowing and removing sections.
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           Telescoping 60 feet down sized
                                                                           sections.
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           Trenchless telescoped pipe.
New Installation - Dalton Hwy, AK
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Drainage culvert
                                       • Glacial til/new road bed
                                       • Service hwy between Prudhoe
                                         Bay oil reserves & Fairbanks
New Installation - Dalton Hwy, AK
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Project
                                        –1 – drainage culvert under service
                                         highway
                                       • Pipe sizes
                                        –1 - 36” casing
                                       • Equipment
                                        –24” Rammer
                                       • Ram distance
                                        –1 @ 160’
New Installation - Dalton Hwy, AK
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Project
                                        –1 – drainage culvert under service
                                         highway
                                       • Pipe sizes
                                        –1 - 36” casing
                                       • Equipment
                                        –24” Rammer
                                       • Ram distance
                                        –1 @ 160’
THANK YOU

 FIRST NAME LAST NAME
 PRESENTER TITLE
 E: info@hammerheadmole.com
 P: 800.331.6653 | INT: +1.262.567.8833 | F: 262.567.5068
 W: www.hammerheadtrenchless.com

Más contenido relacionado

La actualidad más candente

Evaporite mode of formation, characteristics and economic potential
Evaporite mode of formation, characteristics and economic potentialEvaporite mode of formation, characteristics and economic potential
Evaporite mode of formation, characteristics and economic potential
Agbaje Mayowa
 
Metamorphismpptpntn.ppt2
Metamorphismpptpntn.ppt2Metamorphismpptpntn.ppt2
Metamorphismpptpntn.ppt2
angelabentley
 
Letter on The Bay Park Sewage Treatment Plant 12-11-13 via The Nature Conserv...
Letter on The Bay Park Sewage Treatment Plant 12-11-13 via The Nature Conserv...Letter on The Bay Park Sewage Treatment Plant 12-11-13 via The Nature Conserv...
Letter on The Bay Park Sewage Treatment Plant 12-11-13 via The Nature Conserv...
Save The Great South Bay
 

La actualidad más candente (20)

Paleoseismology of extensional tectonic environment
Paleoseismology of extensional tectonic environmentPaleoseismology of extensional tectonic environment
Paleoseismology of extensional tectonic environment
 
Road, Culvert & Bridge Training
Road, Culvert & Bridge TrainingRoad, Culvert & Bridge Training
Road, Culvert & Bridge Training
 
Geological work of natural agencies like rivers
Geological work of natural agencies like  riversGeological work of natural agencies like  rivers
Geological work of natural agencies like rivers
 
Application of Geology to Civil Engineering Works: Dam
Application of Geology to Civil Engineering Works: Dam Application of Geology to Civil Engineering Works: Dam
Application of Geology to Civil Engineering Works: Dam
 
Physical weathering chapter gtag gtu geology
Physical weathering chapter gtag gtu geologyPhysical weathering chapter gtag gtu geology
Physical weathering chapter gtag gtu geology
 
Evaporite mode of formation, characteristics and economic potential
Evaporite mode of formation, characteristics and economic potentialEvaporite mode of formation, characteristics and economic potential
Evaporite mode of formation, characteristics and economic potential
 
Hydrogeology of Kerala
Hydrogeology of KeralaHydrogeology of Kerala
Hydrogeology of Kerala
 
Fot 5839esgoto sanitybio_(pbincipal)_pdf
Fot 5839esgoto sanitybio_(pbincipal)_pdfFot 5839esgoto sanitybio_(pbincipal)_pdf
Fot 5839esgoto sanitybio_(pbincipal)_pdf
 
Deccan traps in stratigraphy
Deccan traps in stratigraphyDeccan traps in stratigraphy
Deccan traps in stratigraphy
 
Metamorphismpptpntn.ppt2
Metamorphismpptpntn.ppt2Metamorphismpptpntn.ppt2
Metamorphismpptpntn.ppt2
 
Letter on The Bay Park Sewage Treatment Plant 12-11-13 via The Nature Conserv...
Letter on The Bay Park Sewage Treatment Plant 12-11-13 via The Nature Conserv...Letter on The Bay Park Sewage Treatment Plant 12-11-13 via The Nature Conserv...
Letter on The Bay Park Sewage Treatment Plant 12-11-13 via The Nature Conserv...
 
Sequence Stratigraphy
Sequence StratigraphySequence Stratigraphy
Sequence Stratigraphy
 
Deltaic Systems
Deltaic SystemsDeltaic Systems
Deltaic Systems
 
Evaporites
EvaporitesEvaporites
Evaporites
 
presentation of industrial training irrigation (2).pptx
presentation of industrial training irrigation (2).pptxpresentation of industrial training irrigation (2).pptx
presentation of industrial training irrigation (2).pptx
 
Delta_Roy.ppsx
Delta_Roy.ppsxDelta_Roy.ppsx
Delta_Roy.ppsx
 
Geological factor for canal alignment
Geological factor for canal alignmentGeological factor for canal alignment
Geological factor for canal alignment
 
Dams, Types of dams
Dams, Types of damsDams, Types of dams
Dams, Types of dams
 
Vindhyan super group
Vindhyan super groupVindhyan super group
Vindhyan super group
 
Ground water
Ground waterGround water
Ground water
 

Destacado (7)

Access Engineering PLC - Training Presentation
Access Engineering PLC - Training PresentationAccess Engineering PLC - Training Presentation
Access Engineering PLC - Training Presentation
 
Group 5 1
Group 5 1Group 5 1
Group 5 1
 
Road drainage
Road drainageRoad drainage
Road drainage
 
The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)
 
Roads & Pavements
Roads & PavementsRoads & Pavements
Roads & Pavements
 
Drainage system
Drainage systemDrainage system
Drainage system
 
Drainage system
Drainage systemDrainage system
Drainage system
 

Similar a Trenchless Installation of Drainage Culverts with Pipe Ramming Method

Qcs Product Brochure
Qcs Product BrochureQcs Product Brochure
Qcs Product Brochure
calvinschmidt
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
HammerHead Trenchless Equipment
 
Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts -...
Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts -...Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts -...
Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts -...
Jensen Precast
 

Similar a Trenchless Installation of Drainage Culverts with Pipe Ramming Method (20)

The Pipe Ramming Method
The Pipe Ramming MethodThe Pipe Ramming Method
The Pipe Ramming Method
 
Alan sutton
Alan suttonAlan sutton
Alan sutton
 
Failures of an earthen dam
Failures of an earthen damFailures of an earthen dam
Failures of an earthen dam
 
Qcs Product Brochure
Qcs Product BrochureQcs Product Brochure
Qcs Product Brochure
 
Suspension bridges
Suspension bridgesSuspension bridges
Suspension bridges
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls
 
underwater construction
underwater constructionunderwater construction
underwater construction
 
Cable anchoring and grouting for cable tensioning
Cable anchoring and grouting for cable tensioningCable anchoring and grouting for cable tensioning
Cable anchoring and grouting for cable tensioning
 
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) ApplicationsCEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
 
Drainage
DrainageDrainage
Drainage
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
 
Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts -...
Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts -...Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts -...
Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts -...
 
Maintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural PlanningMaintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural Planning
 
pipes.pptx
pipes.pptxpipes.pptx
pipes.pptx
 
Presentation: AC Mitigation Case Histories
Presentation: AC Mitigation Case HistoriesPresentation: AC Mitigation Case Histories
Presentation: AC Mitigation Case Histories
 
LMCurbs Company Brochure
LMCurbs Company BrochureLMCurbs Company Brochure
LMCurbs Company Brochure
 
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptx
 
Sewrage
Sewrage Sewrage
Sewrage
 

Más de HammerHead Trenchless Equipment

Más de HammerHead Trenchless Equipment (12)

Pneumatic Pipe Bursting Case Studies
Pneumatic Pipe Bursting Case StudiesPneumatic Pipe Bursting Case Studies
Pneumatic Pipe Bursting Case Studies
 
Static Pipe Bursting Case Stidies
Static Pipe Bursting Case StidiesStatic Pipe Bursting Case Stidies
Static Pipe Bursting Case Stidies
 
Static Pipe Bursting Systems
Static Pipe Bursting SystemsStatic Pipe Bursting Systems
Static Pipe Bursting Systems
 
Pneumatic Pipe Bursting Systems
Pneumatic Pipe Bursting SystemsPneumatic Pipe Bursting Systems
Pneumatic Pipe Bursting Systems
 
HammerHead Mole Piercing Tools
HammerHead Mole Piercing ToolsHammerHead Mole Piercing Tools
HammerHead Mole Piercing Tools
 
Pipe Bursting Project Considerations
Pipe Bursting Project ConsiderationsPipe Bursting Project Considerations
Pipe Bursting Project Considerations
 
HDD Assist Methods
HDD Assist MethodsHDD Assist Methods
HDD Assist Methods
 
Comparing Rehabilitation and Replacement Applications
Comparing Rehabilitation and Replacement ApplicationsComparing Rehabilitation and Replacement Applications
Comparing Rehabilitation and Replacement Applications
 
HammerHead PP Template, No Logo. 4:3
HammerHead PP Template, No Logo. 4:3HammerHead PP Template, No Logo. 4:3
HammerHead PP Template, No Logo. 4:3
 
HammerHead PP Template, 16:9
HammerHead PP Template, 16:9HammerHead PP Template, 16:9
HammerHead PP Template, 16:9
 
HammerHead PP Template, 4:3
HammerHead PP Template, 4:3HammerHead PP Template, 4:3
HammerHead PP Template, 4:3
 
HammerHead PP Template, No Logo, 16:9
HammerHead PP Template, No Logo, 16:9HammerHead PP Template, No Logo, 16:9
HammerHead PP Template, No Logo, 16:9
 

Último

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Último (20)

Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answers
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 

Trenchless Installation of Drainage Culverts with Pipe Ramming Method

  • 1. HIGHWAY & RAILROAD CULVERT INSTALLATION & REPLACEMENT WITH PIPE RAMMING PRESENTER(S) NAMES
  • 2. FACTS ABOUT THE U.S RAIL SYSTEM PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Critical part of US transportation infrastructure. • More than 150,000 miles of mainline rail routes. • Moves more freight than any other rail system in any other country. • SOURCE: American Association of Railroads
  • 3. DRAINAGE PROBLEMS PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Lack of maintenance • Lack of inspection programs • Lack of capacity/flow, flooding and liability • Ponding of water causes pavement and sub grade deterioration and may lead to washout failures
  • 4. CULVERT INSTALLATION AND REPLACEMENT PIPE RAMMING WASHOUT
  • 5. WASHOUT PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • The failure rate has the potential to cause property damage and loss of life. • Lack of maintenance and delays in repairs has translated into soaring construction expenditures.
  • 6. CULVERT INSTALLATION AND REPLACEMENT PIPE RAMMING PROBLEMS AREN’T LIMITED TO RAIL
  • 7. What is Pipe Ramming? PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT A pneumatic hammer installs an open ended steel casing that is cleaned out during and after completion of pipe installation.
  • 8. PIPE RAMMING APPLICATIONS PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Steel casing installation for: • Water • Sewer • Gas • Drainage culverts
  • 9. Advantages PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Trenchless • Able to swallow rock as large as the inside diameter of the casing • Method does not remove soil until casing is installed • Minimizes voids –Roads –Railroads • Reduced soil compaction
  • 10. Preferred for Adverse Soil Conditions PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Free flowing sand • Cobble conditions • Large rock formations • Excessive ground water
  • 11. SWALLOWS LARGE OBSTRUCTIONS PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Rock swallowed during ram • Spoil removed post ram 54” Casing
  • 12. CULVERT SWALLOWING PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT An oversized casing is rammed over existing culvert. After installation is complete, old culvert and spoil is removed. Steel casing can serve as the drainage culvert or as a carrier pipe for another pipe inserted within.
  • 13. TELESCOPING METHOD PIPE RAMMING FOR LONGER DISTANCES CULVERT INSTALLATION AND REPLACEMENT An oversized pipe is rammed over the existing culvert until production ceases and is cleaned out. Further progress is made with smaller casings installed within the oversized pipe in the same manner.
  • 14. METHOD IMPLEMENTATION Trenchless Culvert Replacement Under Railways with the Pipe Ramming Method
  • 15. RAM SITE LAYOUT PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Note: Follow local regulations for sloping or shoring of pit.
  • 16. SITE PREP: CASING PLACEMENT PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Rail system I-beam Pipe Mule™ Leveling System
  • 17. STEEL CASING PREP PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT SOIL SHOE LUBRICATION Steel Casing Internal Shoe External Shoe Reinforces lead casing and provides an Supplies lubricating fluid to OD and ID of annulus for lubrication. casing during installation.
  • 18. COLLETS AND RAMMER PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Install Pushing Collets/Collars Install Rammer Collets and collars help to distribute the The rammer is locked into the collets when ramming force to the face of the pipe. the tool is started. The collets also lock the rammer into place.
  • 19. SPOIL REMOVAL PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Spoil removal for >30” and/or Spoil removal <30” Casing large spoil/culverts Seal kit Manual excavation, HDD culvert cleaning Air and/or water pressure. Seal kit for air tools, jet washing, auger boring wherever pressure removal. applicable.
  • 20. PIPE RAMMING CASE STUDIES HIGHWAY & RAILROAD CULVERT INSTALLATION & REPLACEMENT WITH PIPE RAMMING
  • 21. New Installations – Rockville, MN PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Project –2 – drainage culverts under railroad • Pipe sizes –1-60” Casing –1-32” Casing • Equipment –24” Rammer • Ram distance –1 @ 90’ –1@ 195’ • Free flowing sand • Holding grade
  • 22. New Installations – Grand Island, NE PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Project –1 – drainage culvert under railroad • Pipe sizes –1-24” Casing • Equipment –24” Rammer • Ram distance –1 @ 250’ • Free flowing sand with loose coal dust and other materials • Installed with 2% grade
  • 23. New Installation - Coeur d'Alene, ID PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Project –2 – drainage culverts under RR and Highway • Pipe sizes –2 - 48” casings • Equipment –23” Rammer • Ram distance –1 @ 190’ –1@ 195’
  • 24. New Installations– Maricopa County, AZ PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • New culvert installation under rail bed. • 84” steel casing • 24” HammerHead Pipe Rammer
  • 25. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer Collapsed 7’ casing, 164 feet long
  • 26. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer First section of pipe installed.
  • 27. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer Swallowing and removing sections.
  • 28. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer Telescoping 60 feet down sized sections.
  • 29. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer Trenchless telescoped pipe.
  • 30. New Installation - Dalton Hwy, AK PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Drainage culvert • Glacial til/new road bed • Service hwy between Prudhoe Bay oil reserves & Fairbanks
  • 31. New Installation - Dalton Hwy, AK PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Project –1 – drainage culvert under service highway • Pipe sizes –1 - 36” casing • Equipment –24” Rammer • Ram distance –1 @ 160’
  • 32. New Installation - Dalton Hwy, AK PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Project –1 – drainage culvert under service highway • Pipe sizes –1 - 36” casing • Equipment –24” Rammer • Ram distance –1 @ 160’
  • 33. THANK YOU FIRST NAME LAST NAME PRESENTER TITLE E: info@hammerheadmole.com P: 800.331.6653 | INT: +1.262.567.8833 | F: 262.567.5068 W: www.hammerheadtrenchless.com