I am a dedicated individual who takes pride in achieving mutual growth along with tangible
productivity. With an accomplished record of Project completion and execution of more than 2 years,
i always endeavor to learn more and do more.
Education
Certifications
Jun 2005 - May 2006 Secondary School Certification
Amity International School, NOIDA
Graduated 1st Division. Percentage secured - 85.4 %
Captain of School-House Football Team.
Captain of School-House Cricket Team.
Winner of Inter-School BQC.
Secured 1st Position in Inter-School Art competition.
Jun 2007 - May 2008 Senior School Certification
Amity International School, NOIDA
Graduated with Distinction. Percentage secured - 73.2 %.
Captain of School Football Team and School-House Cricket Team.
Jul 2009 - Jun 2013 Bachelor of Technology in Chemical Engineering
National Institute of Technology
Graduated with distinction from Batch ' 09. Percentage secured - 71.33 %.
Captain of College Football team.
Winner of Poetry Competition, 'abhivyakti'.
Participant and Head of NIT Srinagar delegation to NIT conclave, 2012.
Winner of Virtual Placement Drive - 2012, conducted by Institution of Engineers.
Oct 2014 - Present Associate Member
IChemE
Elected associate member by IChemE
2. Work History
Training
1. Water Analyst (December, 2011- February, 2012)
Delhi Jal Board | Haider Pur, New Delhi
Water analysis to check the potability, transfer ability and properties of treated water.
2. Intern (July, 2011 – August, 2011)
Sholphin India Pvt. Ltd. | NIT, Faridabad
Research and development for alternate circuit design.
3. Process Intern (7thJanuary, 2013–1st March, 2013)
Trident Group | Dhaula, Punjab
Project - “Identification of Overall Recovery Efficiency Gaps in Recovery of NaOH
Projects
1. Reduction in Mill water consumption / WL production.
Successfully reduced mill water consumption from 21.0 MT/MT to 15.62 MT/MT
2. Reduction in Lime Loss from Mud Filter cake discharge
Successfully reduced Lime loss in Mud filter cake discharge from 2.39 w/w % to 2.2 w/w%.
3. Conversion of 6-Effect-FFFF evaporator to 7-Effect-FFFF
Running 6-Effect Evaporator as 7-effect evaporator by integrating bypass body into line.
4. Reduction in Steam consumption / WL production
Reduction in steam consumption by Erection of 3 " line from Main LP steam for CSP.
Skills
Jul 2013 - J Recovery Process Manager
TridentGroup
Supervision of production team for Evaporator, Boiler and NaOH production.
Estimation of Cost of Production on daily basis to track the plant financially .
Analysis of process bottlenecks with 7 QC tools and their continuous improvement.
Fuguai tracking and elimination with its week-to-week analysis.
Maintenance of stock and their balancing wrt SAP.
Production entry cataloging and punching in SAP ECC v6 and MS Excel.
Maintenance and sustenance of TPM pillars at Gemba and office.
Implementing 6-Sigma at Gemba and office.
Maintenance of chimney discharge SPM within limits set down as per govt. norms.
Maintenance of Liquid discharge COD within limits set down as per govt. norms.
Implementing and sustaining over 60 Kaizens in Gemba.
MS Office Suite
Maintenance of data in MS Excel and generating trends based on the data.
Matching data for Inventory in SAP, Gemba & Daily Production Reports.
Making PPT presentation to illustrate the need for action against
unfavorable trends.
Present
3. References
Sudhir Kumar Marya
FLE-Section Head
Recovery Operations
TridentGroup
Dhaula, Punjab
Sudhirmarya@tridentindia.com
Dr. Mohammad Noor Salam Khan Head Of Deptt.
Chemical Engineering,
NIT Srinagar
Contact Details :- dkhan3363@gmail.com
Dr. Neyaz Ahmed
Director of Physical Education (neyaznit@yahoo.co.in)
Department of Mathematics
NIT Srinagar
TPM (Total Production
Management) Designated OTPM champion in Recovery Plant.
Designated QM pillar representative from Recovery Plant.
Proficient in understanding of JH pillar, PM pillar, EHS pillar, E & T pillar, DM
pillar.
Communication
Proficient in English and Hindi.
Practiced in Socratic based communication.
Versatility in English.
Leadership
Currently managing a team of 28 individuals.
Captain in several sporting events before and after completing college level
education.
Completed 2 projects comprising of a 5 man team each
Planning and Execution
Part of team responsible for erection of SuperHeater panels at Recovery
Boiler -2 over a span of 18 days.
Part of Team Responsible for installation of 11 m agitator in a 1356 m3 tank.
Supervision of installation 4 x 12 m3 tanks in Recovery Plant.
Supervision of several Boiler shuts and planning of work to be carried out .