SlideShare una empresa de Scribd logo
1 de 3
Descargar para leer sin conexión
HIMANSHU SINGH
Barnala Punjab • 9878999878 • newhimanshusy@gmail.com
Chemical Process Engineer / Process manager
Summary
I am a dedicated individual who takes pride in achieving mutual growth along with tangible
productivity. With an accomplished record of Project completion and execution of more than 2 years,
i always endeavor to learn more and do more.
Education
Certifications
Jun 2005 - May 2006 Secondary School Certification
Amity International School, NOIDA
Graduated 1st Division. Percentage secured - 85.4 %
Captain of School-House Football Team.
Captain of School-House Cricket Team.
Winner of Inter-School BQC.
Secured 1st Position in Inter-School Art competition.
Jun 2007 - May 2008 Senior School Certification
Amity International School, NOIDA
Graduated with Distinction. Percentage secured - 73.2 %.
Captain of School Football Team and School-House Cricket Team.
Jul 2009 - Jun 2013 Bachelor of Technology in Chemical Engineering
National Institute of Technology
Graduated with distinction from Batch ' 09. Percentage secured - 71.33 %.
Captain of College Football team.
Winner of Poetry Competition, 'abhivyakti'.
Participant and Head of NIT Srinagar delegation to NIT conclave, 2012.
Winner of Virtual Placement Drive - 2012, conducted by Institution of Engineers.
Oct 2014 - Present Associate Member
IChemE
Elected associate member by IChemE
Work History
Training
1. Water Analyst (December, 2011- February, 2012)
Delhi Jal Board | Haider Pur, New Delhi
Water analysis to check the potability, transfer ability and properties of treated water.
2. Intern (July, 2011 – August, 2011)
Sholphin India Pvt. Ltd. | NIT, Faridabad
Research and development for alternate circuit design.
3. Process Intern (7thJanuary, 2013–1st March, 2013)
Trident Group | Dhaula, Punjab
Project - “Identification of Overall Recovery Efficiency Gaps in Recovery of NaOH
Projects
1. Reduction in Mill water consumption / WL production.
Successfully reduced mill water consumption from 21.0 MT/MT to 15.62 MT/MT
2. Reduction in Lime Loss from Mud Filter cake discharge
Successfully reduced Lime loss in Mud filter cake discharge from 2.39 w/w % to 2.2 w/w%.
3. Conversion of 6-Effect-FFFF evaporator to 7-Effect-FFFF
Running 6-Effect Evaporator as 7-effect evaporator by integrating bypass body into line.
4. Reduction in Steam consumption / WL production
Reduction in steam consumption by Erection of 3 " line from Main LP steam for CSP.
Skills
Jul 2013 - J Recovery Process Manager
TridentGroup
Supervision of production team for Evaporator, Boiler and NaOH production.
Estimation of Cost of Production on daily basis to track the plant financially .
Analysis of process bottlenecks with 7 QC tools and their continuous improvement.
Fuguai tracking and elimination with its week-to-week analysis.
Maintenance of stock and their balancing wrt SAP.
Production entry cataloging and punching in SAP ECC v6 and MS Excel.
Maintenance and sustenance of TPM pillars at Gemba and office.
Implementing 6-Sigma at Gemba and office.
Maintenance of chimney discharge SPM within limits set down as per govt. norms.
Maintenance of Liquid discharge COD within limits set down as per govt. norms.
Implementing and sustaining over 60 Kaizens in Gemba.
MS Office Suite
Maintenance of data in MS Excel and generating trends based on the data.
Matching data for Inventory in SAP, Gemba & Daily Production Reports.
Making PPT presentation to illustrate the need for action against
unfavorable trends.
Present
References
Sudhir Kumar Marya
FLE-Section Head
Recovery Operations
TridentGroup
Dhaula, Punjab
Sudhirmarya@tridentindia.com
Dr. Mohammad Noor Salam Khan Head Of Deptt.
Chemical Engineering,
NIT Srinagar
Contact Details :- dkhan3363@gmail.com
Dr. Neyaz Ahmed
Director of Physical Education (neyaznit@yahoo.co.in)
Department of Mathematics
NIT Srinagar
TPM (Total Production
Management) Designated OTPM champion in Recovery Plant.
Designated QM pillar representative from Recovery Plant.
Proficient in understanding of JH pillar, PM pillar, EHS pillar, E & T pillar, DM
pillar.
Communication
Proficient in English and Hindi.
Practiced in Socratic based communication.
Versatility in English.
Leadership
Currently managing a team of 28 individuals.
Captain in several sporting events before and after completing college level
education.
Completed 2 projects comprising of a 5 man team each
Planning and Execution
Part of team responsible for erection of SuperHeater panels at Recovery
Boiler -2 over a span of 18 days.
Part of Team Responsible for installation of 11 m agitator in a 1356 m3 tank.
Supervision of installation 4 x 12 m3 tanks in Recovery Plant.
Supervision of several Boiler shuts and planning of work to be carried out .

Más contenido relacionado

La actualidad más candente (18)

RESUME GAURAV DIXIT
RESUME GAURAV DIXITRESUME GAURAV DIXIT
RESUME GAURAV DIXIT
 
Resume b
Resume bResume b
Resume b
 
Resume(mubisher)
Resume(mubisher)Resume(mubisher)
Resume(mubisher)
 
sivakanth_cv .doc
sivakanth_cv  .docsivakanth_cv  .doc
sivakanth_cv .doc
 
wasim resume
wasim resumewasim resume
wasim resume
 
Cv sandip doifode.1docx
Cv sandip doifode.1docxCv sandip doifode.1docx
Cv sandip doifode.1docx
 
Rajan kumar singh-cv-roustabout
Rajan kumar singh-cv-roustaboutRajan kumar singh-cv-roustabout
Rajan kumar singh-cv-roustabout
 
Kiran_NDC_Roustabout_cv
Kiran_NDC_Roustabout_cvKiran_NDC_Roustabout_cv
Kiran_NDC_Roustabout_cv
 
Resume_Pratik Yadav
Resume_Pratik YadavResume_Pratik Yadav
Resume_Pratik Yadav
 
NARAYAN
NARAYANNARAYAN
NARAYAN
 
Hari Prakash
Hari PrakashHari Prakash
Hari Prakash
 
Rahul CV PDF
Rahul CV PDFRahul CV PDF
Rahul CV PDF
 
naveen cv
naveen cvnaveen cv
naveen cv
 
GANESH (10)
GANESH (10)GANESH (10)
GANESH (10)
 
RESUME
RESUMERESUME
RESUME
 
Thulasilatha
Thulasilatha Thulasilatha
Thulasilatha
 
NANIBABU_GOLLA_2017OP
NANIBABU_GOLLA_2017OPNANIBABU_GOLLA_2017OP
NANIBABU_GOLLA_2017OP
 
new resume for dubeyjee
new resume for dubeyjeenew resume for dubeyjee
new resume for dubeyjee
 

Similar a himanshu-singh-experinced-chemical-engineer

Similar a himanshu-singh-experinced-chemical-engineer (20)

cv-praveen
cv-praveencv-praveen
cv-praveen
 
Resume for production Enng
Resume for production EnngResume for production Enng
Resume for production Enng
 
Resume_Sachin.pdf
Resume_Sachin.pdfResume_Sachin.pdf
Resume_Sachin.pdf
 
RESUME_J K Saraff
RESUME_J K SaraffRESUME_J K Saraff
RESUME_J K Saraff
 
Kalpesh bendale qa qc exp. 6.7 yrs
Kalpesh bendale qa qc exp. 6.7 yrsKalpesh bendale qa qc exp. 6.7 yrs
Kalpesh bendale qa qc exp. 6.7 yrs
 
kalpesh bendale MECH ENGG QA,QC SQA
kalpesh bendale MECH ENGG QA,QC SQAkalpesh bendale MECH ENGG QA,QC SQA
kalpesh bendale MECH ENGG QA,QC SQA
 
Resume_Balaji R
Resume_Balaji RResume_Balaji R
Resume_Balaji R
 
Curriculam Vitae Ani
Curriculam Vitae AniCurriculam Vitae Ani
Curriculam Vitae Ani
 
Prashanth.n_CV (1)
Prashanth.n_CV (1)Prashanth.n_CV (1)
Prashanth.n_CV (1)
 
Resume...
Resume...Resume...
Resume...
 
MUHAMMAD SHUMAIL CV.compressed
MUHAMMAD SHUMAIL CV.compressedMUHAMMAD SHUMAIL CV.compressed
MUHAMMAD SHUMAIL CV.compressed
 
Sagar Mahadik
Sagar MahadikSagar Mahadik
Sagar Mahadik
 
debasish_das_ resume maaden
debasish_das_ resume maadendebasish_das_ resume maaden
debasish_das_ resume maaden
 
Surendra Singh--BUSINESS ANALYST RESUME
Surendra Singh--BUSINESS ANALYST RESUMESurendra Singh--BUSINESS ANALYST RESUME
Surendra Singh--BUSINESS ANALYST RESUME
 
Resume dipen 10-2015
Resume dipen 10-2015Resume dipen 10-2015
Resume dipen 10-2015
 
Details
DetailsDetails
Details
 
CURRICULUM VITAE-Vikas
CURRICULUM VITAE-VikasCURRICULUM VITAE-Vikas
CURRICULUM VITAE-Vikas
 
VeeraModifiedCV
VeeraModifiedCVVeeraModifiedCV
VeeraModifiedCV
 
Avinash kumar
Avinash kumarAvinash kumar
Avinash kumar
 
resume updated
resume updatedresume updated
resume updated
 

himanshu-singh-experinced-chemical-engineer

  • 1. HIMANSHU SINGH Barnala Punjab • 9878999878 • newhimanshusy@gmail.com Chemical Process Engineer / Process manager Summary I am a dedicated individual who takes pride in achieving mutual growth along with tangible productivity. With an accomplished record of Project completion and execution of more than 2 years, i always endeavor to learn more and do more. Education Certifications Jun 2005 - May 2006 Secondary School Certification Amity International School, NOIDA Graduated 1st Division. Percentage secured - 85.4 % Captain of School-House Football Team. Captain of School-House Cricket Team. Winner of Inter-School BQC. Secured 1st Position in Inter-School Art competition. Jun 2007 - May 2008 Senior School Certification Amity International School, NOIDA Graduated with Distinction. Percentage secured - 73.2 %. Captain of School Football Team and School-House Cricket Team. Jul 2009 - Jun 2013 Bachelor of Technology in Chemical Engineering National Institute of Technology Graduated with distinction from Batch ' 09. Percentage secured - 71.33 %. Captain of College Football team. Winner of Poetry Competition, 'abhivyakti'. Participant and Head of NIT Srinagar delegation to NIT conclave, 2012. Winner of Virtual Placement Drive - 2012, conducted by Institution of Engineers. Oct 2014 - Present Associate Member IChemE Elected associate member by IChemE
  • 2. Work History Training 1. Water Analyst (December, 2011- February, 2012) Delhi Jal Board | Haider Pur, New Delhi Water analysis to check the potability, transfer ability and properties of treated water. 2. Intern (July, 2011 – August, 2011) Sholphin India Pvt. Ltd. | NIT, Faridabad Research and development for alternate circuit design. 3. Process Intern (7thJanuary, 2013–1st March, 2013) Trident Group | Dhaula, Punjab Project - “Identification of Overall Recovery Efficiency Gaps in Recovery of NaOH Projects 1. Reduction in Mill water consumption / WL production. Successfully reduced mill water consumption from 21.0 MT/MT to 15.62 MT/MT 2. Reduction in Lime Loss from Mud Filter cake discharge Successfully reduced Lime loss in Mud filter cake discharge from 2.39 w/w % to 2.2 w/w%. 3. Conversion of 6-Effect-FFFF evaporator to 7-Effect-FFFF Running 6-Effect Evaporator as 7-effect evaporator by integrating bypass body into line. 4. Reduction in Steam consumption / WL production Reduction in steam consumption by Erection of 3 " line from Main LP steam for CSP. Skills Jul 2013 - J Recovery Process Manager TridentGroup Supervision of production team for Evaporator, Boiler and NaOH production. Estimation of Cost of Production on daily basis to track the plant financially . Analysis of process bottlenecks with 7 QC tools and their continuous improvement. Fuguai tracking and elimination with its week-to-week analysis. Maintenance of stock and their balancing wrt SAP. Production entry cataloging and punching in SAP ECC v6 and MS Excel. Maintenance and sustenance of TPM pillars at Gemba and office. Implementing 6-Sigma at Gemba and office. Maintenance of chimney discharge SPM within limits set down as per govt. norms. Maintenance of Liquid discharge COD within limits set down as per govt. norms. Implementing and sustaining over 60 Kaizens in Gemba. MS Office Suite Maintenance of data in MS Excel and generating trends based on the data. Matching data for Inventory in SAP, Gemba & Daily Production Reports. Making PPT presentation to illustrate the need for action against unfavorable trends. Present
  • 3. References Sudhir Kumar Marya FLE-Section Head Recovery Operations TridentGroup Dhaula, Punjab Sudhirmarya@tridentindia.com Dr. Mohammad Noor Salam Khan Head Of Deptt. Chemical Engineering, NIT Srinagar Contact Details :- dkhan3363@gmail.com Dr. Neyaz Ahmed Director of Physical Education (neyaznit@yahoo.co.in) Department of Mathematics NIT Srinagar TPM (Total Production Management) Designated OTPM champion in Recovery Plant. Designated QM pillar representative from Recovery Plant. Proficient in understanding of JH pillar, PM pillar, EHS pillar, E & T pillar, DM pillar. Communication Proficient in English and Hindi. Practiced in Socratic based communication. Versatility in English. Leadership Currently managing a team of 28 individuals. Captain in several sporting events before and after completing college level education. Completed 2 projects comprising of a 5 man team each Planning and Execution Part of team responsible for erection of SuperHeater panels at Recovery Boiler -2 over a span of 18 days. Part of Team Responsible for installation of 11 m agitator in a 1356 m3 tank. Supervision of installation 4 x 12 m3 tanks in Recovery Plant. Supervision of several Boiler shuts and planning of work to be carried out .