1. Husam Ibrahim, P.Eng, PMP. 11821, 167B Ave.
Bsc. Electrical Engineering Edmonton, AB, T5X 0B3
Mobile No. (780) 906-0565 hkaibrahim@gmail.com
HIGHLIGHTS OF QUALIFICATIONS:
Over 15 years of electrical engineering design, construction procurement and project
management experience in oil & gas, industrial, commercial, high rise, housing, LV & HV
power and utility projects
Have attained ability to lead and work well with others as part of a team
Good oral and written communication skills
Managed and lead electrical design team over 5 years
Prepared electrical specifications for electrical designs and equipment
Volunteered in mentoring of new electrical engineering graduates
PROFESSIONAL EXPERIENCE:
ATCO Electric Ltd. - Canada Oct 2009- Present
PMO Process Team Lead
Responsibilities
Lead the Project Management Office (PMO) team to achieve deadlines and scope
deliverables
Participated in the management of the development of Project management process,
procedures and templates of HV Transmission and Distribution Projects
Managed the Implementation of a new collaboration tool (Microsoft Office Project Server)
to be used as a standard Program and Project Management System in all Electrical HV
Projects of ATCO Electric
Prepared Project Management plan including, Microsoft Project Schedule, of the PMO
Prepared new templates and modified existing ones following PMI standards
Communicated with all groups of ATCO Electric and gathered information and feedback
Reviewed and modified the new ATCO Electric Work Breakdown Structure (WBS)
Sinai Engineering Corporation - Canada May 2007- May 2009
Procurement Lead Engineer
Responsibilities
Managed procurement for the 260KV facilities of Suncor Voyageur Upgrader Project and
North Steepbank Extension Project at Fort McMurray
Managed team members to achieve deadlines and scope deliverables
Managed the approval process of manufacturing design drawings
Prepared and issued bid documents ( RFQ ) for electrical HV 260 KV equipment like
CT’s, CVT’s, CB’s, Disconnect Switches and Transmission Lines
Communicated with vendors and bidders, clarified and answered their (RFI’s)
Managed and coordinated Pre-Bid meetings for different Bids.
Coordinated technical and commercial documents with project schedule activities
Managed evaluation of proposals process and issued award recommendations
Prepared and issued purchase orders for 260 KV and other HV equipment
Prepared and issued construction contracts of Substations 29EDD1 (Millennium),
29EDD94 (Voyageur), 29EDD34 and 260 KV Transmission Lines 29PL 9-16/17
Managed Kick Off meetings
Issued weekly, bi-weekly and monthly progress reports
Managed production of Sinai Procurement Procedures & Standards
PCL Intracon Power Inc. - Canada Oct 2006- May 2007
Electrical Estimator/ Coordinator
Page 1 of 4
2. Husam Ibrahim, P.Eng, PMP. 11821, 167B Ave.
Bsc. Electrical Engineering Edmonton, AB, T5X 0B3
Mobile No. (780) 906-0565 hkaibrahim@gmail.com
Responsibilities
Reviewed and coordinated the EHT As-Built drawings for the CNRL Heat Integration
Modules
Estimated Electrical bids for different projects using the Accubid software:
Praxair, H2 Storage Salt Cavern
CNRL Secondary Upgrading
Association of Professional Engineers, Geologists, Geophysicists Dec 2003 - Oct 2006
of Alberta (APEGGA) - Canada
Qualified my degree and experience through the Association of Professional Engineers of Alberta
which was a long process that included technical assessment and process and finally the
Engineering National Exam which I passed and accordingly awarded the Diploma of Professional
Engineering
Gulf Engineering Company - Kuwait July 2002- Dec 2003
Senior Electrical Engineer
Responsibilities
Managed and supervised electrical construction of west central plant MEP project in the
new campus of the Public Authority for applied Education and Training in Kuwait. This
plant includes 9 numbers cooling towers and 9 numbers of 1000 cooling tons chillers;
these chillers were powered by 11KV/0.415KV of 9 numbers 1000 KVA transformers.
Reviewed electrical drawings, coordinated workshop drawings with other trades drawings
and activities
Supervised site electrical activities and directed electrical crews on a daily basis schedule
Conducted out-of-country short circuit test for a switchgear panel at the British Short
Circuit Testing Station Limited (BSTS) certified by ASTA in the UK.
Conducted out-of-country technical inspections and tests for two 1250KVA emergency
diesel generators manufactured for the project at Cummins Diesel Generators Factory in
the UK.
Participated in out-of-country presentation about Automation Systems Technology’s
latest update in the UK
Conducted out-of-country technical inspection for the Gent Fire Alarm factory, the fire
alarm system provider in the UK.
Commissioned and handed over electrical systems to the consultant and the client.
Accomplishments
Completed electrical construction and power supply to the project 30 days ahead of
scheduled time
Reduced material cost by 15% and manpower cost by 25%
AL-Sager General Trading & Cont. Company - Kuwait Jan 1997- July 2002
Senior Electrical Engineer
Responsibilities
Managed new electrical design and construction division
Reviewed and quoted government and private tenders including design drawings,
technical specifications and bill of quantities
Communicated with electrical material suppliers and equipment manufacturers
Negotiated subcontract agreements and purchase orders for electrical materials
Accomplishments
Established, organized and managed new electrical construction division of 2 electrical
engineers, 4 supervisors and 30 electricians
Reduced cost of procurement of electrical materials by 20%
Saved 15% of the cost of electrical systems
Page 2 of 4
3. Husam Ibrahim, P.Eng, PMP. 11821, 167B Ave.
Bsc. Electrical Engineering Edmonton, AB, T5X 0B3
Mobile No. (780) 906-0565 hkaibrahim@gmail.com
ALNuhoodh Establishment. - Kuwait Oct 1988- Dec 1996
Senior Electrical Engineer
Responsibilities
Designed electrical drawings for oil & gas, industrial, commercial and residential projects:
Al-Shuaiba petrochemical refinery expansion
Petrochemical Industry Complex integration
Construction of 10 numbers petrol stations at Mina-Abdulla oil industrial area
Americana meat processing factory expansion
Ebomac, switchgear manufacturer extension
The power distribution of new warehouses in Sabhan industrial area
Chemical detergents and cleaning products factory
Shamia and Shuwaikh Co-op Society new supermarket
Commercial high rise building at Kuwait city
Managed construction and procurement of electrical works for a variety of projects
Coordinated workshop electrical drawings with other construction trades
Inspected and approved diverse range of projects by signing the MEW (ministry of
electricity & water) inspection report as per the MEW standards:
Rawda & Hawalli cooperation society supermarket
Kuwait Hilton Resort Hotel at Mangaf area
East Hadia area major sewage stations power distribution system
Kuwait Coast Guard Headquarters at Salmia area
Conducted electrical insulation, short circuit and earthing conductivity tests
Consulted for different engineering firms, as a certified MEW electrical engineer for
different projects:
The new shrimp factory and cold stores at Shuwaikh
Shamia and Shuwaikh Co-op Society new supermarket
Power distribution of Hadia housing infrastructure
Americana meat processing factory expansion
A.H.AL-Sagar &Bros. - Kuwait Aug 1985- Sept 1988
Electrical Project Engineer
Responsibilities
Managed the construction of the power distribution network of the new 300 KV,
132 KV and 33 KV substations of new developed housing project including over-head
transmission lines and high-voltage underground cables
Surveyed the new overhead-transmission lines and underground cable routes and
coordinated them with the other services routes to avoid any overlap of services
Coordinated the design drawings with international suppliers of switch-gear,
cables and overhead-transmission lines like Hitachi, Alsthome, Siemens, Mitsubishi,
ABB, NKF, Fujicura…, and modified the design drawings as per MEW standards
Commissioned, energized and tested the power distribution network and handed
over the network to the client.
Accomplishments
Completed and handed over my first contract # MEW 1379/83-84 on time on
budget
Saved 25 days of my second contract # MEW 1501/84 and managed to save the man-
hours cost by approximately10% after modifying the work breakdown structure
Fawaz Refr. & A/C CO. - Kuwait Sept 1984- Aug 1985
Trainee Electrical Engineer
Responsibilities
Page 3 of 4
4. Husam Ibrahim, P.Eng, PMP. 11821, 167B Ave.
Bsc. Electrical Engineering Edmonton, AB, T5X 0B3
Mobile No. (780) 906-0565 hkaibrahim@gmail.com
Reviewed the design drawings of a high rise building of two towers (Fintas
Towers MEP project) each of which powered by 11KV/0.415KV substation of 7numbers
750 KVA transformers
Prepared the As-Built drawings and followed up with the Ministry of Electricity
&Water (MEW) for final approval and inspection
Conducted the MEW inspection of the electrical installations to permit energizing
the two substations
Commissioned the electrical substations, switch-gears, bus-duct and all electrical
systems
PROFESSIONAL AFFILIATIONS
Association of Professional Engineers, Geologists and Geophysicists of Alberta
(APEGGA), Canada, P.Eng # M 94835
Project Management Professional – PMP NO. 1325785
Ministry of Electricity & Water ( Kuwait) License of Certified Electrical Engineer
Kuwait Society of Engineers
Jordan Syndicate of Engineers
EDUCATION
Bachelor of Electrical Engineering
Kuwait University 1984
Page 4 of 4