SlideShare una empresa de Scribd logo
1 de 28
Prepared by : Hossam Abdel-samea
Work force optimization through Multi-Skilled
workers
2/29
Introduction
Definition of
Multi-Skilling
The Skills Demand
of the toyota
Production System
Relation between
JIT and Multi-
skilled Workers
Who needs to get
Multi-Skilled?
The Need for
Multi-Skilling
Types of Multi-
Skilling
Techniques of
Multi-Skilling
Skill MatrixCase study
Advantages of
Multi-skilling
Disadvantages of
Multi Skilling
Research Reports Conclusion
• In the late 1930s, hostilities with china have developed into a full-
scale war. Expanding heavy industries badly need additional
workforce ,while military conscription took many experienced
operatives and engineers out of their factories
• Tadashi seike went on to define a skilled worker “as a person with
skills sufficient to provide him with enough income to support
his family under piece rate system”
• kan ichi yamaguchi , an engineer with the ministry of railways
,many from July 1936 of training of skilled labor in the west .he
toured Europe and north America around the summer of 1935 and
then stayed in Germany from July 1936 through the start of march
in the following year for observing worker training. (study of the
skilled worker issue)
3/29
• Multiskilling is a workforce strategy that has been shown to
reduce indirect labor costs, improve productivity, and reduce
turnover.
• A multi-skilled workforce is one in which the workers possess a range
of skills that allow them to participate in more than one work process
• The success of multiskilling greatly relies on the foreman’s
ability to assign workers to appropriate tasks and to compose
crews effectively. The foreman assigns tasks to workers
according to their knowledge, capabilities, and experience on
former projects.
• Multi Skilling= Core Skill + Other Trained Skill(s)
4/29
5/29
• According to Toyota, the TPS requires ‘multi-skilling’ because
workers have to rotate jobs and undertake various
responsibilities.
• An individual worker may be required to operate and master
different kinds of machines, to be responsible for the quality of
his own work,
• Further, the flexible use of the workforce makes ‘multi-skilling’
even more important.
6/29
1. Just in Time system (JIT)
• JIT is a Japanese management philosophy which has been
applied in practice since the early 1970s in many Japanese
manufacturing organizations.
• It was first developed and perfected within the Toyota
manufacturing plants by Taiichi Ohno as a means of meeting
consumer demands with minimum delays (1986)
• In a JIT environment materials are purchased and produced as
and when it is needed. The whole idea is based on the phrase
provide the goods just in time as promised when the order is
placed by the customer
7/29
• The opposite of the JIT production is known as JIC (Just in case)
system where it produces goods for inventory with the intention
of having goods just in case a customer places an immediate
order.
2. Work Culture for JIT organization
• JIT not only appreciates quality improvement concepts; but also
concentrates on existing culture, habits, norms and values of
employees because people commitments, involvement and
promotion of open decision-making are essential for quality
improvement
8/29
• Some essential elements of work culture under JIT are briefly
outlined as follows:
1)Flexible workforce
2)Cross training
3)Long-term employment
9/29
• Multi-skilling is not so-much about a particular level or category
of employees. It is about a mind-set. It is about skill sets and you
would agree therefore that it is fairly level agnostic.
• most experts do believe that being multi-skilled is level-agnostic.
• The non-technical staff can be trained in support functions to
save an organization considerable cost.
10/29
• In an effort to retrenchment, reduce hiring and increase efficiency,
organizations are seeking a multi-skilled workforce, which can
directly impact the company’s bottom line.
• from the perspective of the company , company need not depend on
a particular person for doing a specialized job in which he is an
expert.
• From the perspective of the employee, multi-tasking would allow
them to become diversified and maintain high levels of motivation
and enthusiasm
11/29
12/29
Cordery (1995) classified multi-skilling into 4 types
1- Vertical Multi-skilling:
• The extent to which supervisory or administrative support tasks are
learned by individuals.
2- Horizontal Multi-skilling:
• This is learning skills from another discipline or function within an
organization.
3- Depth Multi-skilling:
• This is the acquisition and application of more complex, specific
skills within the same trade or discipline.
4- Multi-skilled Teams:
• A multi-skilled team is a group of individuals who collectively have
a range of skills. The intent being to have a team, which is
competent in all of the skills required to complete a job.
• There are two main types of Multi-Skilled team:-
A. Traditional single skilled individuals:- collected into one team
and managed by one supervisor
B. A team of multi-skilled individuals:-
The intent is to have a team where the strengths and specialties
are combined, which increases the range of skills available to
tackle certain issues
13/29
14/29
1. Coaching
2. Job-Shadowing
3. Job-Rotation
4. Mentoring
5. Temping
6. Learning by doing
7. Self-Learning
1- Coaching
• Coaching is a corrective measure for inadequate performance. Survey
by the International Coach Federation shows that more than 4,000
companies use a coach for their executives.
• Procedure of Coaching
1) Understand the participant’s job, the knowledge, skills, and attitudes,
and resources required to meet the desired expectation
2) Meet the participant and mutually agree on the objective that has to
be achieved
3) Mutually arrive at a plan and schedule
4) At the job, show the participant how to achieve the objectives,
observe the performance and then provide feedback
5) Repeat step 4 until performance improves
15/29
2- Job Shadowing
• Job shadowing is actually one of the most common of all training
techniques for new employees.
• Job shadowing is a career exploration activity that offers an
opportunity to spend time with a professional currently working in a
person’s career field of interest.
• Job shadowing can commence at one of two points in the job
training process.
A. Assign the new hire to an established employee on the first day.
B. Implement the job shadowing after a period of orientation in a
classroom setting has taken place. With this application,
the job shadowing allows the new hire to already have some
background into the workings of the company.
16/29
17/29
3- Job Rotation
• Rotation involves a series of assignments to different positions or
departments for a specified period. At the end of the cycle the
accumulated evaluations will be used.
• This approach allows the manger to operate in diverse roles and
understand the different issues that crop up. If someone is to be a
corporate leader, they must have this type of training .
• A recent study indicated that the single most significant factor that
leads to leader’s achievement was the variety of experiences in
different departments, business units, cities, and countries.
• It is the process of preparing employees at a lower level to replace
someone at the next higher level.
18/29
Benefits of Job Rotation
1)Identification of Knowledge, skills, and attitudes required.
2)It determines the areas where improvement is required.
3)It provides the employees with opportunities to increase knowledge,
skills, and abilities by working in different departments, business
units and functions.
4)Assessment of the employees who have the ability and efficiency for
filling the position.
What is Skill Matrix?
• Skill matrix is a table that shows skills of individuals in a team and
any gaps between the skills of employees and the job roles they have.
Why Skill Matrix
1) It is a simple visual tool to aid in the management, control &
monitoring of skill levels
2) It displays all tasks & skills required to work in an area or
team.
3) It displays all current team members. For each team member it
displays current competency/ability levels for each task
19/29
20/29
3- Practitioner
• Can carry out the skill/task/work instruction/package
safely.
• To the correct quality standards at first
time
• To 1.5 times the standard cycle time i.e. is still not up to speed.
2- Learner:- Being taught the skill, task and work instruction
4- Developer
• Can improve the skill, task and work instruction
• To the correct quality standards at first time.
• Work to the standard cycle time.
1- Untrained:- no experience of skill, task and work instruction
Skill Description
5- Coach
 Someone who has the skill level of a Developer, but can train & develop
others in carrying out
• Can improve the skill, task and work instruction
• To the correct quality standards at first time.
• Work to the standard cycle time.
21/29
• This particular study to ARMA factories groups, especially in
ARMA filling industries factory (AFI)
• It's on implementation of job-rotation technique in order to
achieve multi-skilled workers
• In this study, data were collected for 5 operation technician for
tinplate plant
22/29
1- The performance of employees on the tinplate machines
23/34
Code Name presses
square cans
manufacturing
circular cans
manufacturing
1305
Muhamed Abo
El-fetoh
2455 Mahmoud Saad
2530
Abdel-baset
mohamed
3395 Mansor Mohey
3110 Yasser Zaky
2. Personnel training plan on the tinplate machines
24/32
Code Name presses
square cans
manufacturing
circular cans
manufacturing
1305
Muhamed Abo
El-fetoh
1 Month Zero Zero
2455 Mahmoud Saad 1 Year 3 Months Zero
2530
Abdel-baset
mohamed
Zero 3 Months 1 Year
3395 Mansor Mohey Zero 3 Months 1 Year
3110 Yasser Zaky 1 Year 1 Month Zero
1)Flexibility
2)Communication
3)Positive effects on innovation
4)Employment security
5)Competitive market
25/32
1)Possible reduction in productivity during the training period.
2)Increased supervisory time is required until the employee is up to
speed.
3)Competence assessments may be more detailed than in traditional
systems.
4)New jobs, environment and learning can unnerve employees.
5)Employees fear not living up to expectations.
27/32
• Multi-skilling is particularly suited to the cost-reduction strategy
because it operates a continuous production system, within which it
is very difficult to divide jobs into individual units. The more
knowledgeable workers are about the whole process, the more
proficient they become.
• from the perspective of the company , company need not depend on
a particular person for doing a specialized job in which he is an
expert.
• From the perspective of the employee, multi-tasking would allow
them to become diversified and maintain high levels of motivation
and enthusiasm
• One of the most important elements required for success JIT are
multi-skilled workers
28/32
29/29

Más contenido relacionado

La actualidad más candente

8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And SchedulingRicky Smith CMRP, CMRT
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementVijay325
 
KEY TO PROFITABILITY: SPARE PART MANAGEMENT
KEY TO PROFITABILITY: SPARE PART MANAGEMENTKEY TO PROFITABILITY: SPARE PART MANAGEMENT
KEY TO PROFITABILITY: SPARE PART MANAGEMENTDr. V.N. Tikku
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basicssarah bridge
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation pptbwu.nl
 
Productivity improvement slide share
Productivity improvement slide shareProductivity improvement slide share
Productivity improvement slide shareK. M. Hasan Ripon
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Pramod A
 
Manufacturing excellence
Manufacturing excellenceManufacturing excellence
Manufacturing excellence營松 林
 
Total Productive Maintenance
Total Productive Maintenance Total Productive Maintenance
Total Productive Maintenance Ashik Takvir
 

La actualidad más candente (20)

8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
TPM 8 Pillars
TPM 8 PillarsTPM 8 Pillars
TPM 8 Pillars
 
PPT ON PREVENTIVE MAINTENANCE
PPT ON PREVENTIVE MAINTENANCE PPT ON PREVENTIVE MAINTENANCE
PPT ON PREVENTIVE MAINTENANCE
 
KEY TO PROFITABILITY: SPARE PART MANAGEMENT
KEY TO PROFITABILITY: SPARE PART MANAGEMENTKEY TO PROFITABILITY: SPARE PART MANAGEMENT
KEY TO PROFITABILITY: SPARE PART MANAGEMENT
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
What is Productivity by Operational Excellence Consulting
What is Productivity by Operational Excellence ConsultingWhat is Productivity by Operational Excellence Consulting
What is Productivity by Operational Excellence Consulting
 
Cycle time reduction
Cycle time reductionCycle time reduction
Cycle time reduction
 
Productivity improvement slide share
Productivity improvement slide shareProductivity improvement slide share
Productivity improvement slide share
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
 
Manufacturing excellence
Manufacturing excellenceManufacturing excellence
Manufacturing excellence
 
Tpm training
Tpm trainingTpm training
Tpm training
 
Tpm ppt
Tpm pptTpm ppt
Tpm ppt
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
Total Productive Maintenance
Total Productive Maintenance Total Productive Maintenance
Total Productive Maintenance
 

Destacado

Multitasking: How brain works on different tasks
Multitasking: How brain works on different tasksMultitasking: How brain works on different tasks
Multitasking: How brain works on different tasksMujahid Hussain
 
Peter Lane - Collaborative leadership
Peter Lane - Collaborative  leadershipPeter Lane - Collaborative  leadership
Peter Lane - Collaborative leadershipSELPConference
 
Chapter 6 Decision Making The Essence Of The Managers Job Ppt06
Chapter 6 Decision Making The Essence Of The Managers Job Ppt06Chapter 6 Decision Making The Essence Of The Managers Job Ppt06
Chapter 6 Decision Making The Essence Of The Managers Job Ppt06D
 
Discovering Values: The Key to Unlocking Employee Engagement
Discovering Values: The Key to Unlocking Employee EngagementDiscovering Values: The Key to Unlocking Employee Engagement
Discovering Values: The Key to Unlocking Employee EngagementCynthia Scott
 
Multi –skilled workforce slide (2)
Multi –skilled workforce slide (2)Multi –skilled workforce slide (2)
Multi –skilled workforce slide (2)Anil Kumar
 
Multitasking: Maximum Effectiveness, Minimum Errors.
Multitasking: Maximum Effectiveness, Minimum Errors.Multitasking: Maximum Effectiveness, Minimum Errors.
Multitasking: Maximum Effectiveness, Minimum Errors.Rommie Duckworth
 
Personal Mindset To Change
Personal Mindset To ChangePersonal Mindset To Change
Personal Mindset To Changenick_lim
 
Blue Ocean Strategy
Blue Ocean StrategyBlue Ocean Strategy
Blue Ocean Strategyspankaj_27
 
Multitasking presentation
Multitasking presentationMultitasking presentation
Multitasking presentationjunjunjnd
 
Multitasking - The Good The Bad and The Ugly
Multitasking - The Good The Bad and The UglyMultitasking - The Good The Bad and The Ugly
Multitasking - The Good The Bad and The UglyTal Aviv
 
Blue Ocean Strategy Summary
Blue Ocean Strategy SummaryBlue Ocean Strategy Summary
Blue Ocean Strategy Summary1128808
 
Positive change = mindset x tools
Positive change = mindset x toolsPositive change = mindset x tools
Positive change = mindset x toolssrprs.me
 

Destacado (20)

Intro to Multitasking
Intro to MultitaskingIntro to Multitasking
Intro to Multitasking
 
Multitasking
MultitaskingMultitasking
Multitasking
 
Multitasking: How brain works on different tasks
Multitasking: How brain works on different tasksMultitasking: How brain works on different tasks
Multitasking: How brain works on different tasks
 
Multitasking
MultitaskingMultitasking
Multitasking
 
Peter Lane - Collaborative leadership
Peter Lane - Collaborative  leadershipPeter Lane - Collaborative  leadership
Peter Lane - Collaborative leadership
 
The Value Firm
The Value FirmThe Value Firm
The Value Firm
 
Chapter 6 Decision Making The Essence Of The Managers Job Ppt06
Chapter 6 Decision Making The Essence Of The Managers Job Ppt06Chapter 6 Decision Making The Essence Of The Managers Job Ppt06
Chapter 6 Decision Making The Essence Of The Managers Job Ppt06
 
Discovering Values: The Key to Unlocking Employee Engagement
Discovering Values: The Key to Unlocking Employee EngagementDiscovering Values: The Key to Unlocking Employee Engagement
Discovering Values: The Key to Unlocking Employee Engagement
 
Multi –skilled workforce slide (2)
Multi –skilled workforce slide (2)Multi –skilled workforce slide (2)
Multi –skilled workforce slide (2)
 
Multitasking: Maximum Effectiveness, Minimum Errors.
Multitasking: Maximum Effectiveness, Minimum Errors.Multitasking: Maximum Effectiveness, Minimum Errors.
Multitasking: Maximum Effectiveness, Minimum Errors.
 
Personal Mindset To Change
Personal Mindset To ChangePersonal Mindset To Change
Personal Mindset To Change
 
Blue Ocean Strategy
Blue Ocean StrategyBlue Ocean Strategy
Blue Ocean Strategy
 
Multitasking presentation
Multitasking presentationMultitasking presentation
Multitasking presentation
 
Multitasking - The Good The Bad and The Ugly
Multitasking - The Good The Bad and The UglyMultitasking - The Good The Bad and The Ugly
Multitasking - The Good The Bad and The Ugly
 
Blue Ocean Strategy Summary
Blue Ocean Strategy SummaryBlue Ocean Strategy Summary
Blue Ocean Strategy Summary
 
Positive change = mindset x tools
Positive change = mindset x toolsPositive change = mindset x tools
Positive change = mindset x tools
 
Mindset change
Mindset changeMindset change
Mindset change
 
Multi tasking ppt
Multi tasking pptMulti tasking ppt
Multi tasking ppt
 
Change Your Mindset in 6 Steps
Change Your Mindset in 6 StepsChange Your Mindset in 6 Steps
Change Your Mindset in 6 Steps
 
Multitasking group ppt
Multitasking group pptMultitasking group ppt
Multitasking group ppt
 

Similar a Work force-optimization-through-multi-skilled-workers

Training Methods, Techniques & Pedagogy, Training aids & Tools, Facilities fo...
Training Methods, Techniques & Pedagogy, Training aids & Tools, Facilities fo...Training Methods, Techniques & Pedagogy, Training aids & Tools, Facilities fo...
Training Methods, Techniques & Pedagogy, Training aids & Tools, Facilities fo...Ashish Hande
 
Training & development
Training & developmentTraining & development
Training & developmentLata Bhatta
 
Training And Development Of Employees.
Training And Development Of Employees.Training And Development Of Employees.
Training And Development Of Employees.Tahira Gh. Muhammad
 
Training and Development, Career Management
Training and Development, Career ManagementTraining and Development, Career Management
Training and Development, Career ManagementDr. Jerry John
 
Training & Development_Parakramesh Jaroli_MBA_Human Resource Management
Training & Development_Parakramesh Jaroli_MBA_Human Resource ManagementTraining & Development_Parakramesh Jaroli_MBA_Human Resource Management
Training & Development_Parakramesh Jaroli_MBA_Human Resource ManagementParakramesh Jaroli
 
Advantages of the training and development for the employees
Advantages of the training and development for the employeesAdvantages of the training and development for the employees
Advantages of the training and development for the employeesIJLT EMAS
 
Staffing
StaffingStaffing
StaffingGigantz
 
Semester ii unit4[1]
Semester ii unit4[1]Semester ii unit4[1]
Semester ii unit4[1]IT
 
Human resource management even semester.pptx
Human resource management even semester.pptxHuman resource management even semester.pptx
Human resource management even semester.pptxMervinPaul1
 

Similar a Work force-optimization-through-multi-skilled-workers (20)

Training Methods, Techniques & Pedagogy, Training aids & Tools, Facilities fo...
Training Methods, Techniques & Pedagogy, Training aids & Tools, Facilities fo...Training Methods, Techniques & Pedagogy, Training aids & Tools, Facilities fo...
Training Methods, Techniques & Pedagogy, Training aids & Tools, Facilities fo...
 
TRAINING
TRAINING TRAINING
TRAINING
 
Training & development
Training & developmentTraining & development
Training & development
 
Presentazione HIO
Presentazione HIOPresentazione HIO
Presentazione HIO
 
Unit 6 updated
Unit 6 updatedUnit 6 updated
Unit 6 updated
 
Unit 6 updated
Unit 6 updatedUnit 6 updated
Unit 6 updated
 
Training And Development Of Employees.
Training And Development Of Employees.Training And Development Of Employees.
Training And Development Of Employees.
 
Human Resources Management
Human Resources Management Human Resources Management
Human Resources Management
 
Training and Development, Career Management
Training and Development, Career ManagementTraining and Development, Career Management
Training and Development, Career Management
 
Training
TrainingTraining
Training
 
Training development
Training developmentTraining development
Training development
 
Training & Development_Parakramesh Jaroli_MBA_Human Resource Management
Training & Development_Parakramesh Jaroli_MBA_Human Resource ManagementTraining & Development_Parakramesh Jaroli_MBA_Human Resource Management
Training & Development_Parakramesh Jaroli_MBA_Human Resource Management
 
Training and development
Training and developmentTraining and development
Training and development
 
Advantages of the training and development for the employees
Advantages of the training and development for the employeesAdvantages of the training and development for the employees
Advantages of the training and development for the employees
 
Unit 4 ppt business management
Unit 4 ppt business managementUnit 4 ppt business management
Unit 4 ppt business management
 
Staffing
StaffingStaffing
Staffing
 
Semester ii unit4[1]
Semester ii unit4[1]Semester ii unit4[1]
Semester ii unit4[1]
 
Training
TrainingTraining
Training
 
Human resource management even semester.pptx
Human resource management even semester.pptxHuman resource management even semester.pptx
Human resource management even semester.pptx
 
CORPORATE WISDOM
CORPORATE WISDOMCORPORATE WISDOM
CORPORATE WISDOM
 

Último

MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Último (20)

MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 

Work force-optimization-through-multi-skilled-workers

  • 1. Prepared by : Hossam Abdel-samea Work force optimization through Multi-Skilled workers
  • 2. 2/29 Introduction Definition of Multi-Skilling The Skills Demand of the toyota Production System Relation between JIT and Multi- skilled Workers Who needs to get Multi-Skilled? The Need for Multi-Skilling Types of Multi- Skilling Techniques of Multi-Skilling Skill MatrixCase study Advantages of Multi-skilling Disadvantages of Multi Skilling Research Reports Conclusion
  • 3. • In the late 1930s, hostilities with china have developed into a full- scale war. Expanding heavy industries badly need additional workforce ,while military conscription took many experienced operatives and engineers out of their factories • Tadashi seike went on to define a skilled worker “as a person with skills sufficient to provide him with enough income to support his family under piece rate system” • kan ichi yamaguchi , an engineer with the ministry of railways ,many from July 1936 of training of skilled labor in the west .he toured Europe and north America around the summer of 1935 and then stayed in Germany from July 1936 through the start of march in the following year for observing worker training. (study of the skilled worker issue) 3/29
  • 4. • Multiskilling is a workforce strategy that has been shown to reduce indirect labor costs, improve productivity, and reduce turnover. • A multi-skilled workforce is one in which the workers possess a range of skills that allow them to participate in more than one work process • The success of multiskilling greatly relies on the foreman’s ability to assign workers to appropriate tasks and to compose crews effectively. The foreman assigns tasks to workers according to their knowledge, capabilities, and experience on former projects. • Multi Skilling= Core Skill + Other Trained Skill(s) 4/29
  • 6. • According to Toyota, the TPS requires ‘multi-skilling’ because workers have to rotate jobs and undertake various responsibilities. • An individual worker may be required to operate and master different kinds of machines, to be responsible for the quality of his own work, • Further, the flexible use of the workforce makes ‘multi-skilling’ even more important. 6/29
  • 7. 1. Just in Time system (JIT) • JIT is a Japanese management philosophy which has been applied in practice since the early 1970s in many Japanese manufacturing organizations. • It was first developed and perfected within the Toyota manufacturing plants by Taiichi Ohno as a means of meeting consumer demands with minimum delays (1986) • In a JIT environment materials are purchased and produced as and when it is needed. The whole idea is based on the phrase provide the goods just in time as promised when the order is placed by the customer 7/29
  • 8. • The opposite of the JIT production is known as JIC (Just in case) system where it produces goods for inventory with the intention of having goods just in case a customer places an immediate order. 2. Work Culture for JIT organization • JIT not only appreciates quality improvement concepts; but also concentrates on existing culture, habits, norms and values of employees because people commitments, involvement and promotion of open decision-making are essential for quality improvement 8/29
  • 9. • Some essential elements of work culture under JIT are briefly outlined as follows: 1)Flexible workforce 2)Cross training 3)Long-term employment 9/29
  • 10. • Multi-skilling is not so-much about a particular level or category of employees. It is about a mind-set. It is about skill sets and you would agree therefore that it is fairly level agnostic. • most experts do believe that being multi-skilled is level-agnostic. • The non-technical staff can be trained in support functions to save an organization considerable cost. 10/29
  • 11. • In an effort to retrenchment, reduce hiring and increase efficiency, organizations are seeking a multi-skilled workforce, which can directly impact the company’s bottom line. • from the perspective of the company , company need not depend on a particular person for doing a specialized job in which he is an expert. • From the perspective of the employee, multi-tasking would allow them to become diversified and maintain high levels of motivation and enthusiasm 11/29
  • 12. 12/29 Cordery (1995) classified multi-skilling into 4 types 1- Vertical Multi-skilling: • The extent to which supervisory or administrative support tasks are learned by individuals. 2- Horizontal Multi-skilling: • This is learning skills from another discipline or function within an organization. 3- Depth Multi-skilling: • This is the acquisition and application of more complex, specific skills within the same trade or discipline.
  • 13. 4- Multi-skilled Teams: • A multi-skilled team is a group of individuals who collectively have a range of skills. The intent being to have a team, which is competent in all of the skills required to complete a job. • There are two main types of Multi-Skilled team:- A. Traditional single skilled individuals:- collected into one team and managed by one supervisor B. A team of multi-skilled individuals:- The intent is to have a team where the strengths and specialties are combined, which increases the range of skills available to tackle certain issues 13/29
  • 14. 14/29 1. Coaching 2. Job-Shadowing 3. Job-Rotation 4. Mentoring 5. Temping 6. Learning by doing 7. Self-Learning
  • 15. 1- Coaching • Coaching is a corrective measure for inadequate performance. Survey by the International Coach Federation shows that more than 4,000 companies use a coach for their executives. • Procedure of Coaching 1) Understand the participant’s job, the knowledge, skills, and attitudes, and resources required to meet the desired expectation 2) Meet the participant and mutually agree on the objective that has to be achieved 3) Mutually arrive at a plan and schedule 4) At the job, show the participant how to achieve the objectives, observe the performance and then provide feedback 5) Repeat step 4 until performance improves 15/29
  • 16. 2- Job Shadowing • Job shadowing is actually one of the most common of all training techniques for new employees. • Job shadowing is a career exploration activity that offers an opportunity to spend time with a professional currently working in a person’s career field of interest. • Job shadowing can commence at one of two points in the job training process. A. Assign the new hire to an established employee on the first day. B. Implement the job shadowing after a period of orientation in a classroom setting has taken place. With this application, the job shadowing allows the new hire to already have some background into the workings of the company. 16/29
  • 17. 17/29 3- Job Rotation • Rotation involves a series of assignments to different positions or departments for a specified period. At the end of the cycle the accumulated evaluations will be used. • This approach allows the manger to operate in diverse roles and understand the different issues that crop up. If someone is to be a corporate leader, they must have this type of training . • A recent study indicated that the single most significant factor that leads to leader’s achievement was the variety of experiences in different departments, business units, cities, and countries. • It is the process of preparing employees at a lower level to replace someone at the next higher level.
  • 18. 18/29 Benefits of Job Rotation 1)Identification of Knowledge, skills, and attitudes required. 2)It determines the areas where improvement is required. 3)It provides the employees with opportunities to increase knowledge, skills, and abilities by working in different departments, business units and functions. 4)Assessment of the employees who have the ability and efficiency for filling the position.
  • 19. What is Skill Matrix? • Skill matrix is a table that shows skills of individuals in a team and any gaps between the skills of employees and the job roles they have. Why Skill Matrix 1) It is a simple visual tool to aid in the management, control & monitoring of skill levels 2) It displays all tasks & skills required to work in an area or team. 3) It displays all current team members. For each team member it displays current competency/ability levels for each task 19/29
  • 20. 20/29 3- Practitioner • Can carry out the skill/task/work instruction/package safely. • To the correct quality standards at first time • To 1.5 times the standard cycle time i.e. is still not up to speed. 2- Learner:- Being taught the skill, task and work instruction 4- Developer • Can improve the skill, task and work instruction • To the correct quality standards at first time. • Work to the standard cycle time. 1- Untrained:- no experience of skill, task and work instruction Skill Description
  • 21. 5- Coach  Someone who has the skill level of a Developer, but can train & develop others in carrying out • Can improve the skill, task and work instruction • To the correct quality standards at first time. • Work to the standard cycle time. 21/29
  • 22. • This particular study to ARMA factories groups, especially in ARMA filling industries factory (AFI) • It's on implementation of job-rotation technique in order to achieve multi-skilled workers • In this study, data were collected for 5 operation technician for tinplate plant 22/29
  • 23. 1- The performance of employees on the tinplate machines 23/34 Code Name presses square cans manufacturing circular cans manufacturing 1305 Muhamed Abo El-fetoh 2455 Mahmoud Saad 2530 Abdel-baset mohamed 3395 Mansor Mohey 3110 Yasser Zaky
  • 24. 2. Personnel training plan on the tinplate machines 24/32 Code Name presses square cans manufacturing circular cans manufacturing 1305 Muhamed Abo El-fetoh 1 Month Zero Zero 2455 Mahmoud Saad 1 Year 3 Months Zero 2530 Abdel-baset mohamed Zero 3 Months 1 Year 3395 Mansor Mohey Zero 3 Months 1 Year 3110 Yasser Zaky 1 Year 1 Month Zero
  • 25. 1)Flexibility 2)Communication 3)Positive effects on innovation 4)Employment security 5)Competitive market 25/32 1)Possible reduction in productivity during the training period. 2)Increased supervisory time is required until the employee is up to speed. 3)Competence assessments may be more detailed than in traditional systems. 4)New jobs, environment and learning can unnerve employees. 5)Employees fear not living up to expectations.
  • 26. 27/32 • Multi-skilling is particularly suited to the cost-reduction strategy because it operates a continuous production system, within which it is very difficult to divide jobs into individual units. The more knowledgeable workers are about the whole process, the more proficient they become. • from the perspective of the company , company need not depend on a particular person for doing a specialized job in which he is an expert. • From the perspective of the employee, multi-tasking would allow them to become diversified and maintain high levels of motivation and enthusiasm • One of the most important elements required for success JIT are multi-skilled workers
  • 27. 28/32
  • 28. 29/29