Runway Configuration
Misr Higher Institute for Engineering and Technology, Mansoura.
Runway Configurations
• Many runway configurations exist
• Most are combinations of these basic
configurations:
• Single runway
• Parallel Runways
• Two parallel runways
• Two parallel runways with staggered thresholds
• Four parallel runways
• Intersecting runways
• Open-V Runways
2
Misr Higher Institute for Engineering and Technology, Mansoura.
Flight Operation Rules
• Aircrafts operate under two basic types of flight rules:
• Visual Flight Rules (VFR)
• These rules apply when weather conditions are such that
aircrafts can maintain safe separation by visual means.
• Aircrafts are allowed to fly under “see and be seen principle”. Air
traffic controllers exercise minimum control under VFR.
Intervene only when there is need. (Passive Control)
• Instrument Flight Rules (IFR)
• These rules apply when visibility falls below the minimum level
fixed for VFR operations.
• In IFR conditions, safer separation is the responsibility of air
traffic control personnel.
• In other words air traffic controllers exercise positive control
when IFR apply.
Misr Higher Institute for Engineering and Technology, Mansoura.
Single Runway
• This is the simplest of the runway configurations.
• Suitable when winds predominantly blow along the runway and the
peak hour air traffic demand is less than 50 operations.
• When winds are light both ends can be used for both arrivals and
departures.
• When winds are strong only one end can be used for operations.
• The capacity of a single runway depends on air traffic mix and type
of control.
• VFR: 50 – 100 operations
• IFR: 50 – 70 operations
3
Misr Higher Institute for Engineering and Technology, Mansoura.
Single Runway Airport
Kai Tak International
Airport
Misr Higher Institute for Engineering and Technology, Mansoura.
Two Parallel Runways
• Suitable when winds predominantly blow along the parallel runways and
the peak hour air traffic demand is high (over 50 operations).
• The capacity of two parallel runways depends on the spacing between
them, runway usage strategy and air traffic mix.
• The centre line separation between two parallel runways is classified as:
• Close (210 m – 750 m),
• Intermediate (750 m – 1290 m) and
• Far (>1290 m).
• When the spacing is close, under IFR, operation of one runway is dependent upon the operations on the other
runway
• When the spacing is intermediate, under IFR, an arrival on one runway is independent of a departure on the other
runway.
• When the spacing is far, under IFR, the two runways can be operated independently.
4
Misr Higher Institute for Engineering and Technology, Mansoura.
Misr Higher Institute for Engineering and Technology, Mansoura.
Staggered Parallel Runways
When the terminal building is located in between the two
runways and when one runway is exclusively used for
take off and the other for landing, the taxiing distance for
arriving and departing aircrafts becomes minimum
5
Misr Higher Institute for Engineering and Technology, Mansoura.
Four Parallel Runways
• Four parallel runways are planned to take care of high
demand and when the winds are predominantly blowing
along the runways.
• In the case of four parallel runways, the runways are
paired. Within the pair the runways are spaced closely,
but the pair is spaced far apart.
• Terminal building is located between the pairs.
• The desirable mode of operation is to dedicate the outer
runways for arrivals and inner runways for departures.
Misr Higher Institute for Engineering and Technology, Mansoura.
6
Misr Higher Institute for Engineering and Technology, Mansoura.
Intersecting Runway
• It becomes necessary to use this configuration when
winds are blowing in more than one direction.
• Capacity depends on the location of the intersection
point and the runway-use-strategy.
• The farther the intersection is from the takeoff end of
the runway and the landing threshold, the lower is the
capacity.
• Highest capacity is achieved when the intersection is
close to the takeoff end and the landing threshold.
Misr Higher Institute for Engineering and Technology, Mansoura.
Intersecting
Runway Airport
7
Misr Higher Institute for Engineering and Technology, Mansoura.
Misr Higher Institute for Engineering and Technology, Mansoura.
Open-V Runway
• Runways in divergent directions which do not
intersect are referred to as open-V runways.
• When the winds are blowing in different directions, if the
layout of the land permits, this configuration is preferred to
intersecting runways.
• Both the runways can be operated only when the winds
are light.•
• The runway-use-strategy where in the operations
are away from the “V” yields highest capacity.
8
Misr Higher Institute for Engineering and Technology, Mansoura.
Misr Higher Institute for Engineering and Technology, Mansoura.
9
Misr Higher Institute for Engineering and Technology, Mansoura.
Misr Higher Institute for Engineering and Technology, Mansoura.
Runway Reference Code
10
Misr Higher Institute for Engineering and Technology, Mansoura.
Taxiway Design Criteria
Misr Higher Institute for Engineering and Technology, Mansoura.
Taxiway Design Criteria, Cont’d
11
Misr Higher Institute for Engineering and Technology, Mansoura.
Taxiway System
• The movement of aircrafts to and from the
runways and the terminal/cargo, and parking
areas is provided by a system of taxiways.
• This system of taxiways includes
• Entrance and exit taxiways
• Parallel taxiways
• Bypass taxiways
• Connecting or transverse taxiways
• Apron taxiways and taxi-lanes.
Misr Higher Institute for Engineering and Technology, Mansoura.
Exit Taxiways
• These are taxiways provided at appropriate locations
along the length of runway so that the landing aircrafts
can maneuver out of the runway minimising their runway
occupancy time.
• Right angled exit taxiways:
• These are exit taxiways placed at right angles to the runway.
When the design peak hour traffic is less than 30 operations
(landings and takeoffs), a properly located right- angled exit
taxiway will achieve an efficient flow of traffic.
• High speed exit taxiways:
• These exit taxiways are placed at acute angle to the runway and
are designed to provide high exit (turnoff) speeds. These high
speed exit taxiways when properly designed in terms of their
number, location and exit speed can enhance the capacity of the
runway.
12
Misr Higher Institute for Engineering and Technology, Mansoura.
Misr Higher Institute for Engineering and Technology, Mansoura.
13
Misr Higher Institute for Engineering and Technology, Mansoura.
Taxiways Intersection Design
Misr Higher Institute for Engineering and Technology, Mansoura.
Entrance & Parallel Taxiways
• Entrance Taxiway:
• Entrance taxiways provide access to the takeoff
end of the runway for the departing aircrafts and it
also serves as the final exit taxiway for landing
aircrafts on a bidirectional runway. It is normally in
the form of an “L” taxiway intersection with a right
angle connection to the runway.
• Parallel Taxiway:
• The taxiway running parallel to the runway
connecting all the exit and entrance taxiways is
called parallel taxiway.
14
Misr Higher Institute for Engineering and Technology, Mansoura.
Misr Higher Institute for Engineering and Technology, Mansoura.
Dual Parallel Taxiway Entrance
15
Misr Higher Institute for Engineering and Technology, Mansoura.
Cross overtaxiway
Misr Higher Institute for Engineering and Technology, Mansoura.
Bypass Taxiway
• As an alternative to holding bay a bypass
taxiway parallel to the entrance taxiway
leading to the runway end are generally
provided.
• When a preceding aircraft is not ready for
takeoff and blocks the entrance taxiway, other
aircrafts in the queue can use the bypass
taxiway.• Bypass taxiways provide flexibility in
runway use by permitting ground maneuvering
of steady streams of departing airplanes
16
Misr Higher Institute for Engineering and Technology, Mansoura.
Misr Higher Institute for Engineering and Technology, Mansoura.
Dual Parallel Taxiway Entrance with
Bypass
17
Misr Higher Institute for Engineering and Technology, Mansoura.
Holding Bay
• The designated place located adjacent to the ends of runways to
allow check of aircraft instruments and engine operation prior to
takeoff in the case of piston engine aircrafts and to enable all other
aircrafts to wait for takeoff clearance from ATC. These are also
referred to as run-up or warm-up pads.
• Due to adverse weather conditions enroute or at the destinations,
certain aircrafts may have to be delayed while others are allowed to
proceed with takeoff.
• Holding bays are useful in such situations for aircrafts to bypass one
another.
• As per FAA guidelines a holding bay should be provided when
runway operations reach a level of 30 per hour.
• A holding bay should be designed normally to accommodate two to
four aircrafts and with enough space for cleared aircrafts to bypass
the parked ones.
Misr Higher Institute for Engineering and Technology, Mansoura.
18
Misr Higher Institute for Engineering and Technology, Mansoura.
Taxiway Configuration
Misr Higher Institute for Engineering and Technology, Mansoura.
19
Misr Higher Institute for Engineering and Technology, Mansoura.
Transverse Slope
Misr Higher Institute for Engineering and Technology, Mansoura.
A slope at Runway and Taxiway
20
Misr Higher Institute for Engineering and Technology, Mansoura.
Airplane Bridge
Misr Higher Institute for Engineering and Technology, Mansoura.
Cross-section bridge and roadway
21
Misr Higher Institute for Engineering and Technology, Mansoura.
Jet Blast-Deflector
Misr Higher Institute for Engineering and Technology, Mansoura.
Parallel Taxiway Operation
22
Misr Higher Institute for Engineering and Technology, Mansoura.
Lane Width
Misr Higher Institute for Engineering and Technology, Mansoura.
Apron Taxiway and Taxilanes
• Taxiway located on the periphery of an apron
intended to provide a through taxi route across
apron is referred to as apron taxiway.
• Taxilanes provide access from apron taxiways
to airplane parking positions (gates). Taxilanes
are located outside the movement area.
23
Misr Higher Institute for Engineering and Technology, Mansoura.
Fillet Design

Más contenido relacionado

La actualidad más candente

Airport introduction
Airport introductionAirport introduction
Airport introduction
jagadish108
 
Airport master plan
Airport master planAirport master plan
Airport master plan
Aravind Raj
 

La actualidad más candente (20)

Airport presentation 5th unit
Airport presentation 5th unitAirport presentation 5th unit
Airport presentation 5th unit
 
Runway orientation
Runway orientationRunway orientation
Runway orientation
 
Taxiway design perfect ppt
Taxiway design perfect pptTaxiway design perfect ppt
Taxiway design perfect ppt
 
Airport engineering
Airport engineeringAirport engineering
Airport engineering
 
Airport Planning and Design
Airport Planning and Design Airport Planning and Design
Airport Planning and Design
 
Airport apron and holding bays
Airport apron and holding baysAirport apron and holding bays
Airport apron and holding bays
 
Airport Planning and Design
Airport Planning and DesignAirport Planning and Design
Airport Planning and Design
 
Air port presentation 6th unit
Air port presentation 6th unitAir port presentation 6th unit
Air port presentation 6th unit
 
Airport introduction
Airport introductionAirport introduction
Airport introduction
 
Airpot design
Airpot designAirpot design
Airpot design
 
Airport layout
Airport layoutAirport layout
Airport layout
 
Airport Layout
Airport LayoutAirport Layout
Airport Layout
 
Airport marking
Airport markingAirport marking
Airport marking
 
Layout of Airport Planning
Layout of Airport PlanningLayout of Airport Planning
Layout of Airport Planning
 
1.introduction
1.introduction1.introduction
1.introduction
 
10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
 
Design elements of airport taxiway
Design elements of airport taxiwayDesign elements of airport taxiway
Design elements of airport taxiway
 
Airport master plan
Airport master planAirport master plan
Airport master plan
 
Airport
AirportAirport
Airport
 
Airport engineering
Airport engineering Airport engineering
Airport engineering
 

Destacado

Trip attraction rate
Trip attraction rateTrip attraction rate
Trip attraction rate
S. M. Rahat Rahman
 

Destacado (20)

Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)
 
Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)
Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)
Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)
 
Traffic Concepts (Transportation Engineering)
Traffic Concepts (Transportation Engineering)Traffic Concepts (Transportation Engineering)
Traffic Concepts (Transportation Engineering)
 
Freeway LOS (Transportation Engineering)
Freeway LOS (Transportation Engineering)Freeway LOS (Transportation Engineering)
Freeway LOS (Transportation Engineering)
 
10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...
10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...
10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...
 
Trip attraction rate
Trip attraction rateTrip attraction rate
Trip attraction rate
 
Trip Generation & Mode Choice (Transportation Engineering)
Trip Generation & Mode Choice (Transportation Engineering)Trip Generation & Mode Choice (Transportation Engineering)
Trip Generation & Mode Choice (Transportation Engineering)
 
Lec 07 Intersection Design (Transportation Engineering Dr.Lina Shbeeb)
Lec 07 Intersection Design (Transportation Engineering Dr.Lina Shbeeb)Lec 07 Intersection Design (Transportation Engineering Dr.Lina Shbeeb)
Lec 07 Intersection Design (Transportation Engineering Dr.Lina Shbeeb)
 
Lecture 3: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
Lecture 3: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa GabrLecture 3: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
Lecture 3: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
 
Lecture 4: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
Lecture 4: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa GabrLecture 4: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
Lecture 4: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
Lecture 2: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
Lecture 2: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr Lecture 2: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
Lecture 2: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
 
Annex 14 ICAO ( Arabic Version ) الإصدار العربي
Annex 14 ICAO ( Arabic Version ) الإصدار العربيAnnex 14 ICAO ( Arabic Version ) الإصدار العربي
Annex 14 ICAO ( Arabic Version ) الإصدار العربي
 
Lecture05(control structure part ii)
Lecture05(control structure part ii)Lecture05(control structure part ii)
Lecture05(control structure part ii)
 
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
 
Traffic Detection Systems (Transportation Engineering)
Traffic Detection Systems (Transportation Engineering)Traffic Detection Systems (Transportation Engineering)
Traffic Detection Systems (Transportation Engineering)
 
28 pavement design
28 pavement design28 pavement design
28 pavement design
 
Traffic Forecasting (Transportation Engineering)
Traffic Forecasting (Transportation Engineering)Traffic Forecasting (Transportation Engineering)
Traffic Forecasting (Transportation Engineering)
 
07-Structural Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
07-Structural Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )07-Structural Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
07-Structural Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
 
Lecture 6: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
Lecture 6: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa GabrLecture 6: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
Lecture 6: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
 

Similar a 09-Runway Configuration ( Highway and Airport Engineering Dr. Sherif El-Badawy )

Airport runway By Nikhil Pakwanne
Airport runway By Nikhil PakwanneAirport runway By Nikhil Pakwanne
Airport runway By Nikhil Pakwanne
NIKHIL PAKWANNE
 
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
irjes
 
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptxAIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
Anujyadav514462
 

Similar a 09-Runway Configuration ( Highway and Airport Engineering Dr. Sherif El-Badawy ) (20)

airport - configuration-1 Dr.Sherif El badaway
 airport - configuration-1 Dr.Sherif El badaway airport - configuration-1 Dr.Sherif El badaway
airport - configuration-1 Dr.Sherif El badaway
 
08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...
08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...
08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
 
Batangas Airport Philippines.pdf
Batangas Airport Philippines.pdfBatangas Airport Philippines.pdf
Batangas Airport Philippines.pdf
 
Batangas Airport.pdf
Batangas Airport.pdfBatangas Airport.pdf
Batangas Airport.pdf
 
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Airport runway By Nikhil Pakwanne
Airport runway By Nikhil PakwanneAirport runway By Nikhil Pakwanne
Airport runway By Nikhil Pakwanne
 
Lecture 4.pdf
Lecture 4.pdfLecture 4.pdf
Lecture 4.pdf
 
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
 
Lecture 7 (1).pptx
Lecture 7 (1).pptxLecture 7 (1).pptx
Lecture 7 (1).pptx
 
Airport & railways engineering ce467 pdf
Airport & railways engineering   ce467 pdfAirport & railways engineering   ce467 pdf
Airport & railways engineering ce467 pdf
 
6-Cross Section Elements ( Transportation and Traffic Engineering Dr. Sheriff...
6-Cross Section Elements ( Transportation and Traffic Engineering Dr. Sheriff...6-Cross Section Elements ( Transportation and Traffic Engineering Dr. Sheriff...
6-Cross Section Elements ( Transportation and Traffic Engineering Dr. Sheriff...
 
runway orientation.pdf
runway orientation.pdfrunway orientation.pdf
runway orientation.pdf
 
Challenges to airport
Challenges to airportChallenges to airport
Challenges to airport
 
Atc unit 1
Atc unit 1Atc unit 1
Atc unit 1
 
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptxAIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
 
Acronyms 1
Acronyms 1Acronyms 1
Acronyms 1
 
Terminal Design
Terminal DesignTerminal Design
Terminal Design
 
Airport terminal planning and design
Airport terminal planning and designAirport terminal planning and design
Airport terminal planning and design
 

Más de Hossam Shafiq I

Más de Hossam Shafiq I (20)

14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
 
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
 
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
 
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
 
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
 
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
 
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
 
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
 
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
 
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
 
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
 
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
 
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
 
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
 
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
 
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
 
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
 
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
 
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
 
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
 

Último

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Último (20)

(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 

09-Runway Configuration ( Highway and Airport Engineering Dr. Sherif El-Badawy )

  • 1. 1 Misr Higher Institute for Engineering and Technology, Mansoura. Runway Configuration Misr Higher Institute for Engineering and Technology, Mansoura. Runway Configurations • Many runway configurations exist • Most are combinations of these basic configurations: • Single runway • Parallel Runways • Two parallel runways • Two parallel runways with staggered thresholds • Four parallel runways • Intersecting runways • Open-V Runways
  • 2. 2 Misr Higher Institute for Engineering and Technology, Mansoura. Flight Operation Rules • Aircrafts operate under two basic types of flight rules: • Visual Flight Rules (VFR) • These rules apply when weather conditions are such that aircrafts can maintain safe separation by visual means. • Aircrafts are allowed to fly under “see and be seen principle”. Air traffic controllers exercise minimum control under VFR. Intervene only when there is need. (Passive Control) • Instrument Flight Rules (IFR) • These rules apply when visibility falls below the minimum level fixed for VFR operations. • In IFR conditions, safer separation is the responsibility of air traffic control personnel. • In other words air traffic controllers exercise positive control when IFR apply. Misr Higher Institute for Engineering and Technology, Mansoura. Single Runway • This is the simplest of the runway configurations. • Suitable when winds predominantly blow along the runway and the peak hour air traffic demand is less than 50 operations. • When winds are light both ends can be used for both arrivals and departures. • When winds are strong only one end can be used for operations. • The capacity of a single runway depends on air traffic mix and type of control. • VFR: 50 – 100 operations • IFR: 50 – 70 operations
  • 3. 3 Misr Higher Institute for Engineering and Technology, Mansoura. Single Runway Airport Kai Tak International Airport Misr Higher Institute for Engineering and Technology, Mansoura. Two Parallel Runways • Suitable when winds predominantly blow along the parallel runways and the peak hour air traffic demand is high (over 50 operations). • The capacity of two parallel runways depends on the spacing between them, runway usage strategy and air traffic mix. • The centre line separation between two parallel runways is classified as: • Close (210 m – 750 m), • Intermediate (750 m – 1290 m) and • Far (>1290 m). • When the spacing is close, under IFR, operation of one runway is dependent upon the operations on the other runway • When the spacing is intermediate, under IFR, an arrival on one runway is independent of a departure on the other runway. • When the spacing is far, under IFR, the two runways can be operated independently.
  • 4. 4 Misr Higher Institute for Engineering and Technology, Mansoura. Misr Higher Institute for Engineering and Technology, Mansoura. Staggered Parallel Runways When the terminal building is located in between the two runways and when one runway is exclusively used for take off and the other for landing, the taxiing distance for arriving and departing aircrafts becomes minimum
  • 5. 5 Misr Higher Institute for Engineering and Technology, Mansoura. Four Parallel Runways • Four parallel runways are planned to take care of high demand and when the winds are predominantly blowing along the runways. • In the case of four parallel runways, the runways are paired. Within the pair the runways are spaced closely, but the pair is spaced far apart. • Terminal building is located between the pairs. • The desirable mode of operation is to dedicate the outer runways for arrivals and inner runways for departures. Misr Higher Institute for Engineering and Technology, Mansoura.
  • 6. 6 Misr Higher Institute for Engineering and Technology, Mansoura. Intersecting Runway • It becomes necessary to use this configuration when winds are blowing in more than one direction. • Capacity depends on the location of the intersection point and the runway-use-strategy. • The farther the intersection is from the takeoff end of the runway and the landing threshold, the lower is the capacity. • Highest capacity is achieved when the intersection is close to the takeoff end and the landing threshold. Misr Higher Institute for Engineering and Technology, Mansoura. Intersecting Runway Airport
  • 7. 7 Misr Higher Institute for Engineering and Technology, Mansoura. Misr Higher Institute for Engineering and Technology, Mansoura. Open-V Runway • Runways in divergent directions which do not intersect are referred to as open-V runways. • When the winds are blowing in different directions, if the layout of the land permits, this configuration is preferred to intersecting runways. • Both the runways can be operated only when the winds are light.• • The runway-use-strategy where in the operations are away from the “V” yields highest capacity.
  • 8. 8 Misr Higher Institute for Engineering and Technology, Mansoura. Misr Higher Institute for Engineering and Technology, Mansoura.
  • 9. 9 Misr Higher Institute for Engineering and Technology, Mansoura. Misr Higher Institute for Engineering and Technology, Mansoura. Runway Reference Code
  • 10. 10 Misr Higher Institute for Engineering and Technology, Mansoura. Taxiway Design Criteria Misr Higher Institute for Engineering and Technology, Mansoura. Taxiway Design Criteria, Cont’d
  • 11. 11 Misr Higher Institute for Engineering and Technology, Mansoura. Taxiway System • The movement of aircrafts to and from the runways and the terminal/cargo, and parking areas is provided by a system of taxiways. • This system of taxiways includes • Entrance and exit taxiways • Parallel taxiways • Bypass taxiways • Connecting or transverse taxiways • Apron taxiways and taxi-lanes. Misr Higher Institute for Engineering and Technology, Mansoura. Exit Taxiways • These are taxiways provided at appropriate locations along the length of runway so that the landing aircrafts can maneuver out of the runway minimising their runway occupancy time. • Right angled exit taxiways: • These are exit taxiways placed at right angles to the runway. When the design peak hour traffic is less than 30 operations (landings and takeoffs), a properly located right- angled exit taxiway will achieve an efficient flow of traffic. • High speed exit taxiways: • These exit taxiways are placed at acute angle to the runway and are designed to provide high exit (turnoff) speeds. These high speed exit taxiways when properly designed in terms of their number, location and exit speed can enhance the capacity of the runway.
  • 12. 12 Misr Higher Institute for Engineering and Technology, Mansoura. Misr Higher Institute for Engineering and Technology, Mansoura.
  • 13. 13 Misr Higher Institute for Engineering and Technology, Mansoura. Taxiways Intersection Design Misr Higher Institute for Engineering and Technology, Mansoura. Entrance & Parallel Taxiways • Entrance Taxiway: • Entrance taxiways provide access to the takeoff end of the runway for the departing aircrafts and it also serves as the final exit taxiway for landing aircrafts on a bidirectional runway. It is normally in the form of an “L” taxiway intersection with a right angle connection to the runway. • Parallel Taxiway: • The taxiway running parallel to the runway connecting all the exit and entrance taxiways is called parallel taxiway.
  • 14. 14 Misr Higher Institute for Engineering and Technology, Mansoura. Misr Higher Institute for Engineering and Technology, Mansoura. Dual Parallel Taxiway Entrance
  • 15. 15 Misr Higher Institute for Engineering and Technology, Mansoura. Cross overtaxiway Misr Higher Institute for Engineering and Technology, Mansoura. Bypass Taxiway • As an alternative to holding bay a bypass taxiway parallel to the entrance taxiway leading to the runway end are generally provided. • When a preceding aircraft is not ready for takeoff and blocks the entrance taxiway, other aircrafts in the queue can use the bypass taxiway.• Bypass taxiways provide flexibility in runway use by permitting ground maneuvering of steady streams of departing airplanes
  • 16. 16 Misr Higher Institute for Engineering and Technology, Mansoura. Misr Higher Institute for Engineering and Technology, Mansoura. Dual Parallel Taxiway Entrance with Bypass
  • 17. 17 Misr Higher Institute for Engineering and Technology, Mansoura. Holding Bay • The designated place located adjacent to the ends of runways to allow check of aircraft instruments and engine operation prior to takeoff in the case of piston engine aircrafts and to enable all other aircrafts to wait for takeoff clearance from ATC. These are also referred to as run-up or warm-up pads. • Due to adverse weather conditions enroute or at the destinations, certain aircrafts may have to be delayed while others are allowed to proceed with takeoff. • Holding bays are useful in such situations for aircrafts to bypass one another. • As per FAA guidelines a holding bay should be provided when runway operations reach a level of 30 per hour. • A holding bay should be designed normally to accommodate two to four aircrafts and with enough space for cleared aircrafts to bypass the parked ones. Misr Higher Institute for Engineering and Technology, Mansoura.
  • 18. 18 Misr Higher Institute for Engineering and Technology, Mansoura. Taxiway Configuration Misr Higher Institute for Engineering and Technology, Mansoura.
  • 19. 19 Misr Higher Institute for Engineering and Technology, Mansoura. Transverse Slope Misr Higher Institute for Engineering and Technology, Mansoura. A slope at Runway and Taxiway
  • 20. 20 Misr Higher Institute for Engineering and Technology, Mansoura. Airplane Bridge Misr Higher Institute for Engineering and Technology, Mansoura. Cross-section bridge and roadway
  • 21. 21 Misr Higher Institute for Engineering and Technology, Mansoura. Jet Blast-Deflector Misr Higher Institute for Engineering and Technology, Mansoura. Parallel Taxiway Operation
  • 22. 22 Misr Higher Institute for Engineering and Technology, Mansoura. Lane Width Misr Higher Institute for Engineering and Technology, Mansoura. Apron Taxiway and Taxilanes • Taxiway located on the periphery of an apron intended to provide a through taxi route across apron is referred to as apron taxiway. • Taxilanes provide access from apron taxiways to airplane parking positions (gates). Taxilanes are located outside the movement area.
  • 23. 23 Misr Higher Institute for Engineering and Technology, Mansoura. Fillet Design