Hydrology Project Phase-II
World Bank Mission May 5-6, 2014
Expenditure Status of Central Implementing
Agencies Under Hydrology Project-II
Sl. No. IAs Allocation as
per revised Cost
Tables 2013
Cumulative
exp. up to
March 31,
2013
Exp. up to
March31, in FY
2013-14
Cum. Exp up
to March31,
2014
1 BBMB 39.24 19.02 5.02 24.04
2 CWC 24.71 15.43 1.95 17.38
3 CGWB 66.33 26.80 11.65 38.45
4 CPCB 10.11 6.18 0.31 6.49
5 CWPRS 4.64 2.79 1.37 4.16
6 IMD 0.09 0.09 0.00 0.09
7 NIH 48.15 34.55 11.88 46.43
8 PCS 42.99 26.51 5.90 32.41
Total of Central IAs 236.26 131.37 38.08 169.45
Expenditure Status of State Implementing
Agencies Under Hydrology Project-II
Sl. No. IAs Allocation as
per revised
Cost Tables
2013
Cumulative
exp. up to
March 31,
2013
Exp. up to
March31, in FY
2013-14
Cum. Exp up
to March31,
2014
9 AP- SW 8.92 4.78 0.22 5.00
10 AP - GW 23.69 9.69 4.73 14.42
11 Chh- SW 4.12 3.64 0.30 3.94
12 Chh- GW 5.82 4.55 0.68 5.23
13 Guj- SW 7.83 5.58 1.96 7.54
14 Guj- GW 17.63 15.36 1.55 16.91
15 KN- SW 11.40 6.97 2.65 9.62
16 KN- GW 10.90 7.07 0.76 7.83
17 Kerala - SW 14.04 7.57 2.89 10.46
18 Kerala - GW 16.71 10.30 3.60 13.90
Sl. No. IAs Allocation as
per revised Cost
Tables 2013
Cumulative
exp. up to
March 31,
2013
Exp. up to
March31, in FY
2013-14
Cum. Exp up
to March31,
2014
19 Mah- SW 40.38 23.08 7.42 30.50
20 Mah- GW 12.73 12.55 0.15 12.70
21 MP- SW 11.37 6.28 0.98 7.26
22 MP- GW 4.32 3.08 0.27 3.35
23 Orissa - SW 13.46 8.45 0.45 8.90
24 Orissa -GW 9.22 7.46 1.23 8.69
25 Tamil Nadu 36.82 23.35 6.11 29.46
26 HP 58.33 42.10 12.14 54.24
27 Goa 22.50 16.25 2.46 18.71
28 Pondicherry 14.69 9.25 2.45 11.70
29 Punjab 46.65 22.36 5.21 27.57
Total of State IAs 391.53 249.72 58.21 307.93
Total of All IAs 627.79 381.09 96.29 477.38
Rs. in crore
Loan Utilization Projection
Disbursement
Category
Amount of
loan
allocated
Disbursed
amount
(upto 31st
March,
2014)
Likely
Utilization and
Proposed
reallocation of
Loan Amount
Likely
Unutilized
Loan
Amount
Civil Works 22,526,000 15,293,107 19,768,913 2,757,087
Goods 31,753,000 21,336,597 27,920,468 3,832,532
Consultancy
Services 22,115,000 14,847,782 18,433,266 3,681,734
Training 4,161,100 3,232,821 3,555,402 605,698
Operating Costs 23,900,000 21,664,689 23,900,000 00
Front End Fee 524,900 524,900 524,900 00
Total 104,980,000 76,899,896 94,102,949 10,877,051
BBMB Rs. in crore
Total allocation under HP-II 39.60
Exp. incurred upto March 31, 2014 24.05 (62%)
Expenditure to be incurred April to May 31, 2014
Ongoing contracts 10.54
Contracts for which bids to be floated 2.77
Recurrent cost 0.01
Trainings, workshops, study tour 0.01
Total 13.33
Total expenditure under the project 37.38
Likely saving 2.22
CGWB Rs. in crore
Total allocation under HP-II 66.32
Exp. incurred upto August 31, 2013 38.46 (58%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 10.53
Contracts for which bids to be floated 3.04
Recurrent cost 0.0
Trainings, workshops, study tour 0.08
Total 13.65
Total expenditure under the project 52.11
Likely saving 14.21
CPCB Rs. in crore
Total allocation under HP-II 15.03
Exp. incurred upto August 31, 2013 6.48 (43%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 2.59
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.06
Trainings, workshops, study tour 0.06
Total 2.71
Total expenditure under the project 9.19
Likely saving 5.84
CWC Rs. in crore
Total allocation under HP-II 26.72
Exp. incurred upto August 31, 2013 17.39 (65%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 1.59
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.05
Trainings, workshops, study tour 0.04
total 1.68
Total expenditure under the project 19.07
Likely saving 7.65
CWPRS Rs. in crore
Total allocation under HP-II 5.33
Exp. incurred upto August 31, 2013 4.16 (78%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.14
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.02
Recurrent cost 0.06
Trainings, workshops, study tour 0.02
Total 0.24
Total expenditure under the project 4.40
Likely saving 0.93
NIH Rs. in crore
Total allocation under HP-II 44.70
Exp. incurred upto August 31, 2013 46.84
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.00
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.49
Trainings, workshops, study tour 0.00
Total 0.49
Total expenditure under the project 47.33
Likely saving -2.63
PCS Rs. in crore
Total allocation under HP-II 37.90
Exp. incurred upto August 31, 2013 32.41 (86%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 4.50
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.70
Trainings, workshops, study tour 0.00
Total 5.20
Total expenditure under the project 37.61
Likely saving 0.29
Andhra Pradesh-SW Rs. in crore
Total allocation under HP-II 8.83
Exp. incurred upto August 31, 2013 5.06 (57%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.30
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.09
Trainings, workshops, study tour 0.04
Total 0.43
Total expenditure under the project 5.49
Likely saving 3.34
Chhattisgarh-SW Rs. in crore
Total allocation under HP-II 4.12
Exp. incurred upto August 31, 2013 3.94 (96%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.17
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.03
Trainings, workshops, study tour 0.00
Total 0.20
Total expenditure under the project 4.14
Likely saving -0.02
Chhattisgarh-GW Rs. in crore
Total allocation under HP-II 6.16
Exp. incurred upto August 31, 2013 5.23 (85%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.00
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.05
Trainings, workshops, study tour 0.00
Total 0.05
Total expenditure under the project 5.28
Likely saving 0.88
Gujarat-SW Rs. in crore
Total allocation under HP-II 5.59
Exp. incurred upto August 31, 2013 7.59 (136%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.00
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.00
Trainings, workshops, study tour 0.00
Total 0.00
Total expenditure under the project 7.59
Likely saving -2.00
Gujarat-GW Rs. in crore
Total allocation under HP-II 17.22
Exp. incurred upto August 31, 2013 16.91 (98%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.20
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.03
Trainings, workshops, study tour 0.00
Total 0.23
Total expenditure under the project 17.14
Likely saving 0.08
Karnataka-SW Rs. in crore
Total allocation under HP-II 11.13
Exp. incurred upto August 31, 2013 9.61 (86%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.33
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.20
Trainings, workshops, study tour 0.00
Total 0.53
Total expenditure under the project 10.14
Likely saving 0.99
Karnataka-GW Rs. in crore
Total allocation under HP-II 13.78
Exp. incurred upto August 31, 2013 7.84 (57%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.50
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.99
Recurrent cost 0.01
Trainings, workshops, study tour 0.00
Total 1.50
Total expenditure under the project 9.34
Likely saving 4.44
Kerala-SW Rs. in crore
Total allocation under HP-II 13.09
Exp. incurred upto August 31, 2013 10.46 (80%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.33
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.26
Recurrent cost 0.33
Trainings, workshops, study tour 0.02
Total 0.92
Total expenditure under the project 11.38
Likely saving 1.71
Kerala-GW Rs. in crore
Total allocation under HP-II 16.52
Exp. incurred upto August 31, 2013 13.72 (83%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 1.58
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.03
Recurrent cost 0.30
Trainings, workshops, study tour 0.01
Total 1.92
Total expenditure under the project 15.64
Likely saving 0.88
Maharashtra-SW Rs. in crore
Total allocation under HP-II 37.48
Exp. incurred upto August 31, 2013 30.50 (81%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 7.44
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.07
Trainings, workshops, study tour 0.23
Total 7.74
Total expenditure under the project 38.24
Likely saving -0.76
Maharashtra-GW Rs. in crore
Total allocation under HP-II 13.11
Exp. incurred upto August 31, 2013 12.70 (97%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.00
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.00
Trainings, workshops, study tour 0.00
Total 0.00
Total expenditure under the project 12.70
Likely saving 0.41
Madhya Pradesh-SW Rs. in crore
Total allocation under HP-II 10.58
Exp. incurred upto August 31, 2013 7.29 (69%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 2.05
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.13
Trainings, workshops, study tour 0.00
Total 2.18
Total expenditure under the project 9.47
Likely saving 1.11
Madhya Pradesh-GW Rs. in crore
Total allocation under HP-II 4.32
Exp. incurred upto August 31, 2013 3.33 (77%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.49
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.10
Recurrent cost 0.00
Trainings, workshops, study tour 0.00
Total 0.59
Total expenditure under the project 3.92
Likely saving 0.40
Orissa-SW Rs. in crore
Total allocation under HP-II 13.46
Exp. incurred upto August 31, 2013 8.90 (66%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.00
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.95
Recurrent cost 0.02
Trainings, workshops, study tour 0.01
Total 0.98
Total expenditure under the project 9.88
Likely saving 3.58
Orissa-GW Rs. in crore
Total allocation under HP-II 9.20
Exp. incurred upto August 31, 2013 8.69 (94%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.12
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.05
Trainings, workshops, study tour 0.03
Total 0.20
Total expenditure under the project 8.89
Likely saving 0.31
Tamilnadu Rs. in crore
Total allocation under HP-II 32.81
Exp. incurred upto August 31, 2013 24.38 (74%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.35
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 1.74
Recurrent cost 1.07
Trainings, workshops, study tour 0.20
Total 3.36
Total expenditure under the project 32.55
Likely saving ???
Himachal Pradesh Rs. in crore
Total allocation under HP-II 59.49
Exp. incurred upto August 31, 2013 54.20 (91%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 0.98
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.34
Recurrent cost 0.95
Trainings, workshops, study tour 0.01
Total 2.28
Total expenditure under the project 56.48
Likely saving 3.01
Goa Rs. in crore
Total allocation under HP-II 22.19
Exp. incurred upto August 31, 2013 18.71 (84%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 2.66
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 1.18
Recurrent cost 0.12
Trainings, workshops, study tour 0.00
Total 3.96
Total expenditure under the project 22.67
Likely saving -0.48
Pondicherry Rs. in crore
Total allocation under HP-II 14.61
Exp. incurred upto August 31, 2013 11.70 (80%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 1.13
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.38
Recurrent cost 0.15
Trainings, workshops, study tour 0.01
Total 1.67
Total expenditure under the project 13.37
Likely saving 1.24
Punjab Rs. in crore
Total allocation under HP-II 44.62
Exp. incurred upto August 31, 2013 27.55 (62%)
Expenditure to be incurred during April to May 31, 2014
Ongoing contracts 20.53
Contracts for which bids have been floated 0.00
Contracts for which bids to be floated 0.00
Recurrent cost 0.03
Trainings, workshops, study tour 0.00
Total 20.56
Total expenditure under the project 48.11
Likely saving -3.49
THANKS

Más contenido relacionado

Similar a World bank mission may 5 6, 2014

Managerial Accounting Presentation, v.3
Managerial Accounting Presentation, v.3Managerial Accounting Presentation, v.3
Managerial Accounting Presentation, v.3
Thana Kittisathanon
 
Firstcall irb infrastructure_developers_ltd_15_june15
Firstcall irb infrastructure_developers_ltd_15_june15Firstcall irb infrastructure_developers_ltd_15_june15
Firstcall irb infrastructure_developers_ltd_15_june15
IndiaNotes.com
 
Criterion 10.pptx
Criterion 10.pptxCriterion 10.pptx
Criterion 10.pptx
MBAHOD2
 
Presentation Data Depts
Presentation Data DeptsPresentation Data Depts
Presentation Data Depts
glnarasi
 

Similar a World bank mission may 5 6, 2014 (20)

Managerial Accounting Presentation, v.3
Managerial Accounting Presentation, v.3Managerial Accounting Presentation, v.3
Managerial Accounting Presentation, v.3
 
Technofab Eng: Q4FY15 net profits up 129.55% y/y to INR37.44m; Buy
Technofab Eng: Q4FY15 net profits up 129.55% y/y to INR37.44m; BuyTechnofab Eng: Q4FY15 net profits up 129.55% y/y to INR37.44m; Buy
Technofab Eng: Q4FY15 net profits up 129.55% y/y to INR37.44m; Buy
 
Balance Sheet Analysis of Tata Motors.pptx
Balance Sheet Analysis of Tata Motors.pptxBalance Sheet Analysis of Tata Motors.pptx
Balance Sheet Analysis of Tata Motors.pptx
 
ATS Company Reports: Gvk
ATS Company Reports: GvkATS Company Reports: Gvk
ATS Company Reports: Gvk
 
Six Sigma - Enhancement availability of UBH Furnace
Six Sigma -  Enhancement availability of UBH FurnaceSix Sigma -  Enhancement availability of UBH Furnace
Six Sigma - Enhancement availability of UBH Furnace
 
Review reports 2 q2016 en
Review reports 2 q2016 enReview reports 2 q2016 en
Review reports 2 q2016 en
 
Arrow Coated Products: Q4FY15 net profit up 161.19% y/y; 'Buy' says Firstcall
Arrow Coated Products: Q4FY15 net profit up 161.19% y/y; 'Buy' says FirstcallArrow Coated Products: Q4FY15 net profit up 161.19% y/y; 'Buy' says Firstcall
Arrow Coated Products: Q4FY15 net profit up 161.19% y/y; 'Buy' says Firstcall
 
Swachh Bharat Abhiyan
Swachh Bharat AbhiyanSwachh Bharat Abhiyan
Swachh Bharat Abhiyan
 
Firstcall irb infrastructure_developers_ltd_15_june15
Firstcall irb infrastructure_developers_ltd_15_june15Firstcall irb infrastructure_developers_ltd_15_june15
Firstcall irb infrastructure_developers_ltd_15_june15
 
MathGeAr Evaluation Results, Management and Financial Issues
MathGeAr Evaluation Results, Management and Financial IssuesMathGeAr Evaluation Results, Management and Financial Issues
MathGeAr Evaluation Results, Management and Financial Issues
 
Daily equity report
Daily equity reportDaily equity report
Daily equity report
 
Criterion 10.pptx
Criterion 10.pptxCriterion 10.pptx
Criterion 10.pptx
 
Q2 2015 16
Q2 2015 16Q2 2015 16
Q2 2015 16
 
Weekly market report
Weekly market reportWeekly market report
Weekly market report
 
Cost sheet analysis
Cost sheet analysisCost sheet analysis
Cost sheet analysis
 
Firstcall recommends Shilp Gravures for the mid- to long-term
Firstcall recommends Shilp Gravures for the mid- to long-termFirstcall recommends Shilp Gravures for the mid- to long-term
Firstcall recommends Shilp Gravures for the mid- to long-term
 
Presentation Data Depts
Presentation Data DeptsPresentation Data Depts
Presentation Data Depts
 
Orbit Exports Q4FY15: Growth story to continue in coming quarters also
Orbit Exports Q4FY15: Growth story to continue in coming quarters alsoOrbit Exports Q4FY15: Growth story to continue in coming quarters also
Orbit Exports Q4FY15: Growth story to continue in coming quarters also
 
Sabawon presentation final
Sabawon presentation finalSabawon presentation final
Sabawon presentation final
 
Fara progress and performance monitoring report (jan sept 2016) 19-bod
Fara progress and performance monitoring report (jan sept 2016) 19-bodFara progress and performance monitoring report (jan sept 2016) 19-bod
Fara progress and performance monitoring report (jan sept 2016) 19-bod
 

Más de hydrologyproject0 (20)

Specification purewater
Specification purewaterSpecification purewater
Specification purewater
 
Water purifier ion exchange resin column
Water purifier ion exchange resin columnWater purifier ion exchange resin column
Water purifier ion exchange resin column
 
Water purifier, double distillation unit
Water purifier, double distillation unitWater purifier, double distillation unit
Water purifier, double distillation unit
 
Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)
 
Water geyser (heater)
Water geyser (heater)Water geyser (heater)
Water geyser (heater)
 
Water bath, general purpose
Water bath, general purposeWater bath, general purpose
Water bath, general purpose
 
Water bath, bacteriological
Water bath, bacteriologicalWater bath, bacteriological
Water bath, bacteriological
 
Wash bottle
Wash bottleWash bottle
Wash bottle
 
Volumetric flask
Volumetric flaskVolumetric flask
Volumetric flask
 
Visual accumulation tube
Visual accumulation tubeVisual accumulation tube
Visual accumulation tube
 
Vacuum pump
Vacuum pumpVacuum pump
Vacuum pump
 
Turbidity meter (nephelometer)
Turbidity meter (nephelometer)Turbidity meter (nephelometer)
Turbidity meter (nephelometer)
 
Tool kit
Tool kitTool kit
Tool kit
 
Toc analyser, microprocessor controlled
Toc analyser, microprocessor controlledToc analyser, microprocessor controlled
Toc analyser, microprocessor controlled
 
Tissue grinder
Tissue grinderTissue grinder
Tissue grinder
 
Thermometers, set of
Thermometers, set ofThermometers, set of
Thermometers, set of
 
Test tubes
Test tubesTest tubes
Test tubes
 
Test sieves with shaker
Test sieves with shakerTest sieves with shaker
Test sieves with shaker
 
Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)
 
Sterliser, autoclave
Sterliser, autoclaveSterliser, autoclave
Sterliser, autoclave
 

Último

Último (20)

Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 

World bank mission may 5 6, 2014

  • 1. Hydrology Project Phase-II World Bank Mission May 5-6, 2014
  • 2. Expenditure Status of Central Implementing Agencies Under Hydrology Project-II Sl. No. IAs Allocation as per revised Cost Tables 2013 Cumulative exp. up to March 31, 2013 Exp. up to March31, in FY 2013-14 Cum. Exp up to March31, 2014 1 BBMB 39.24 19.02 5.02 24.04 2 CWC 24.71 15.43 1.95 17.38 3 CGWB 66.33 26.80 11.65 38.45 4 CPCB 10.11 6.18 0.31 6.49 5 CWPRS 4.64 2.79 1.37 4.16 6 IMD 0.09 0.09 0.00 0.09 7 NIH 48.15 34.55 11.88 46.43 8 PCS 42.99 26.51 5.90 32.41 Total of Central IAs 236.26 131.37 38.08 169.45
  • 3. Expenditure Status of State Implementing Agencies Under Hydrology Project-II Sl. No. IAs Allocation as per revised Cost Tables 2013 Cumulative exp. up to March 31, 2013 Exp. up to March31, in FY 2013-14 Cum. Exp up to March31, 2014 9 AP- SW 8.92 4.78 0.22 5.00 10 AP - GW 23.69 9.69 4.73 14.42 11 Chh- SW 4.12 3.64 0.30 3.94 12 Chh- GW 5.82 4.55 0.68 5.23 13 Guj- SW 7.83 5.58 1.96 7.54 14 Guj- GW 17.63 15.36 1.55 16.91 15 KN- SW 11.40 6.97 2.65 9.62 16 KN- GW 10.90 7.07 0.76 7.83 17 Kerala - SW 14.04 7.57 2.89 10.46 18 Kerala - GW 16.71 10.30 3.60 13.90
  • 4. Sl. No. IAs Allocation as per revised Cost Tables 2013 Cumulative exp. up to March 31, 2013 Exp. up to March31, in FY 2013-14 Cum. Exp up to March31, 2014 19 Mah- SW 40.38 23.08 7.42 30.50 20 Mah- GW 12.73 12.55 0.15 12.70 21 MP- SW 11.37 6.28 0.98 7.26 22 MP- GW 4.32 3.08 0.27 3.35 23 Orissa - SW 13.46 8.45 0.45 8.90 24 Orissa -GW 9.22 7.46 1.23 8.69 25 Tamil Nadu 36.82 23.35 6.11 29.46 26 HP 58.33 42.10 12.14 54.24 27 Goa 22.50 16.25 2.46 18.71 28 Pondicherry 14.69 9.25 2.45 11.70 29 Punjab 46.65 22.36 5.21 27.57 Total of State IAs 391.53 249.72 58.21 307.93 Total of All IAs 627.79 381.09 96.29 477.38
  • 5. Rs. in crore Loan Utilization Projection Disbursement Category Amount of loan allocated Disbursed amount (upto 31st March, 2014) Likely Utilization and Proposed reallocation of Loan Amount Likely Unutilized Loan Amount Civil Works 22,526,000 15,293,107 19,768,913 2,757,087 Goods 31,753,000 21,336,597 27,920,468 3,832,532 Consultancy Services 22,115,000 14,847,782 18,433,266 3,681,734 Training 4,161,100 3,232,821 3,555,402 605,698 Operating Costs 23,900,000 21,664,689 23,900,000 00 Front End Fee 524,900 524,900 524,900 00 Total 104,980,000 76,899,896 94,102,949 10,877,051
  • 6. BBMB Rs. in crore Total allocation under HP-II 39.60 Exp. incurred upto March 31, 2014 24.05 (62%) Expenditure to be incurred April to May 31, 2014 Ongoing contracts 10.54 Contracts for which bids to be floated 2.77 Recurrent cost 0.01 Trainings, workshops, study tour 0.01 Total 13.33 Total expenditure under the project 37.38 Likely saving 2.22
  • 7. CGWB Rs. in crore Total allocation under HP-II 66.32 Exp. incurred upto August 31, 2013 38.46 (58%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 10.53 Contracts for which bids to be floated 3.04 Recurrent cost 0.0 Trainings, workshops, study tour 0.08 Total 13.65 Total expenditure under the project 52.11 Likely saving 14.21
  • 8. CPCB Rs. in crore Total allocation under HP-II 15.03 Exp. incurred upto August 31, 2013 6.48 (43%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 2.59 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.06 Trainings, workshops, study tour 0.06 Total 2.71 Total expenditure under the project 9.19 Likely saving 5.84
  • 9. CWC Rs. in crore Total allocation under HP-II 26.72 Exp. incurred upto August 31, 2013 17.39 (65%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 1.59 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.05 Trainings, workshops, study tour 0.04 total 1.68 Total expenditure under the project 19.07 Likely saving 7.65
  • 10. CWPRS Rs. in crore Total allocation under HP-II 5.33 Exp. incurred upto August 31, 2013 4.16 (78%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.14 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.02 Recurrent cost 0.06 Trainings, workshops, study tour 0.02 Total 0.24 Total expenditure under the project 4.40 Likely saving 0.93
  • 11. NIH Rs. in crore Total allocation under HP-II 44.70 Exp. incurred upto August 31, 2013 46.84 Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.00 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.49 Trainings, workshops, study tour 0.00 Total 0.49 Total expenditure under the project 47.33 Likely saving -2.63
  • 12. PCS Rs. in crore Total allocation under HP-II 37.90 Exp. incurred upto August 31, 2013 32.41 (86%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 4.50 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.70 Trainings, workshops, study tour 0.00 Total 5.20 Total expenditure under the project 37.61 Likely saving 0.29
  • 13. Andhra Pradesh-SW Rs. in crore Total allocation under HP-II 8.83 Exp. incurred upto August 31, 2013 5.06 (57%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.30 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.09 Trainings, workshops, study tour 0.04 Total 0.43 Total expenditure under the project 5.49 Likely saving 3.34
  • 14. Chhattisgarh-SW Rs. in crore Total allocation under HP-II 4.12 Exp. incurred upto August 31, 2013 3.94 (96%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.17 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.03 Trainings, workshops, study tour 0.00 Total 0.20 Total expenditure under the project 4.14 Likely saving -0.02
  • 15. Chhattisgarh-GW Rs. in crore Total allocation under HP-II 6.16 Exp. incurred upto August 31, 2013 5.23 (85%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.00 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.05 Trainings, workshops, study tour 0.00 Total 0.05 Total expenditure under the project 5.28 Likely saving 0.88
  • 16. Gujarat-SW Rs. in crore Total allocation under HP-II 5.59 Exp. incurred upto August 31, 2013 7.59 (136%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.00 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.00 Trainings, workshops, study tour 0.00 Total 0.00 Total expenditure under the project 7.59 Likely saving -2.00
  • 17. Gujarat-GW Rs. in crore Total allocation under HP-II 17.22 Exp. incurred upto August 31, 2013 16.91 (98%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.20 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.03 Trainings, workshops, study tour 0.00 Total 0.23 Total expenditure under the project 17.14 Likely saving 0.08
  • 18. Karnataka-SW Rs. in crore Total allocation under HP-II 11.13 Exp. incurred upto August 31, 2013 9.61 (86%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.33 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.20 Trainings, workshops, study tour 0.00 Total 0.53 Total expenditure under the project 10.14 Likely saving 0.99
  • 19. Karnataka-GW Rs. in crore Total allocation under HP-II 13.78 Exp. incurred upto August 31, 2013 7.84 (57%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.50 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.99 Recurrent cost 0.01 Trainings, workshops, study tour 0.00 Total 1.50 Total expenditure under the project 9.34 Likely saving 4.44
  • 20. Kerala-SW Rs. in crore Total allocation under HP-II 13.09 Exp. incurred upto August 31, 2013 10.46 (80%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.33 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.26 Recurrent cost 0.33 Trainings, workshops, study tour 0.02 Total 0.92 Total expenditure under the project 11.38 Likely saving 1.71
  • 21. Kerala-GW Rs. in crore Total allocation under HP-II 16.52 Exp. incurred upto August 31, 2013 13.72 (83%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 1.58 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.03 Recurrent cost 0.30 Trainings, workshops, study tour 0.01 Total 1.92 Total expenditure under the project 15.64 Likely saving 0.88
  • 22. Maharashtra-SW Rs. in crore Total allocation under HP-II 37.48 Exp. incurred upto August 31, 2013 30.50 (81%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 7.44 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.07 Trainings, workshops, study tour 0.23 Total 7.74 Total expenditure under the project 38.24 Likely saving -0.76
  • 23. Maharashtra-GW Rs. in crore Total allocation under HP-II 13.11 Exp. incurred upto August 31, 2013 12.70 (97%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.00 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.00 Trainings, workshops, study tour 0.00 Total 0.00 Total expenditure under the project 12.70 Likely saving 0.41
  • 24. Madhya Pradesh-SW Rs. in crore Total allocation under HP-II 10.58 Exp. incurred upto August 31, 2013 7.29 (69%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 2.05 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.13 Trainings, workshops, study tour 0.00 Total 2.18 Total expenditure under the project 9.47 Likely saving 1.11
  • 25. Madhya Pradesh-GW Rs. in crore Total allocation under HP-II 4.32 Exp. incurred upto August 31, 2013 3.33 (77%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.49 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.10 Recurrent cost 0.00 Trainings, workshops, study tour 0.00 Total 0.59 Total expenditure under the project 3.92 Likely saving 0.40
  • 26. Orissa-SW Rs. in crore Total allocation under HP-II 13.46 Exp. incurred upto August 31, 2013 8.90 (66%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.00 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.95 Recurrent cost 0.02 Trainings, workshops, study tour 0.01 Total 0.98 Total expenditure under the project 9.88 Likely saving 3.58
  • 27. Orissa-GW Rs. in crore Total allocation under HP-II 9.20 Exp. incurred upto August 31, 2013 8.69 (94%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.12 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.05 Trainings, workshops, study tour 0.03 Total 0.20 Total expenditure under the project 8.89 Likely saving 0.31
  • 28. Tamilnadu Rs. in crore Total allocation under HP-II 32.81 Exp. incurred upto August 31, 2013 24.38 (74%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.35 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 1.74 Recurrent cost 1.07 Trainings, workshops, study tour 0.20 Total 3.36 Total expenditure under the project 32.55 Likely saving ???
  • 29. Himachal Pradesh Rs. in crore Total allocation under HP-II 59.49 Exp. incurred upto August 31, 2013 54.20 (91%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 0.98 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.34 Recurrent cost 0.95 Trainings, workshops, study tour 0.01 Total 2.28 Total expenditure under the project 56.48 Likely saving 3.01
  • 30. Goa Rs. in crore Total allocation under HP-II 22.19 Exp. incurred upto August 31, 2013 18.71 (84%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 2.66 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 1.18 Recurrent cost 0.12 Trainings, workshops, study tour 0.00 Total 3.96 Total expenditure under the project 22.67 Likely saving -0.48
  • 31. Pondicherry Rs. in crore Total allocation under HP-II 14.61 Exp. incurred upto August 31, 2013 11.70 (80%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 1.13 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.38 Recurrent cost 0.15 Trainings, workshops, study tour 0.01 Total 1.67 Total expenditure under the project 13.37 Likely saving 1.24
  • 32. Punjab Rs. in crore Total allocation under HP-II 44.62 Exp. incurred upto August 31, 2013 27.55 (62%) Expenditure to be incurred during April to May 31, 2014 Ongoing contracts 20.53 Contracts for which bids have been floated 0.00 Contracts for which bids to be floated 0.00 Recurrent cost 0.03 Trainings, workshops, study tour 0.00 Total 20.56 Total expenditure under the project 48.11 Likely saving -3.49