SlideShare una empresa de Scribd logo
1 de 8
Descargar para leer sin conexión
K. Ramya et al Int. Journal of Engineering Research and Applications
ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230

RESEARCH ARTICLE

www.ijera.com

OPEN ACCESS

A Study on Two-Phase Service Queueing System with Server
Vacations
S.Palaniammal1, C. Vijayalakshmi2 and K. Ramya3
1

Department of Mathematics, Sri Krishna College of Engineering, Coimbatore, India
Department of Mathematics, VIT University, Chennai India
3
Department of Mathematics, Kingston Engineering College, Vellore
2

Abstract
This paper mainly deals with the analysis of queueing system in which customers require services in two stages
are common. Two-phase queueing systems are gaining importance due to their wide variety of applications.
Batch mode service in the first phase followed by individual service in the second phase. Because of the mixed
mode of services, these kinds of two phase queues do not fit into the usual network of queues as a particular
case. The need for this kind of modeling has been greatly discussed in this paper
Keywords: Sojourn time, busy cycle, service cycle, idle time, service time, system size

I.

Introduction

Krishna and Lee (1990) have studied a two phase Markovian queueing system. Customers arrive
according to poisson process and service times are exponentially distributed. Doshi (1991) has generalized the
model studied in Krishna and Lee (1990). In this, the service times in both the first and second phases are
assumed to follow general distributions. Madan(2001 ) studied two similar types of vacation models for
M/G/1 Queueing system. Shahkar and Badamchi (2008) have studied the two phase queueing system with
Bernoulli server vacation .Gautam Choudhury (2011) has generalized the model with delaying repair . JauChuan Ke and Wen Lea Pearn (2011) have studied the analysis of the multi-server system with a modified
Bernoulli vacation schedule.

II.

Methodology

A queueing system with two phase service, customers arrive at the system according to a poisson
process with arrival rate . In the first phase, the server operates on an exhaustive batch mod service in waiting
customers and the arrivals which occur during the batch service. Thus, this batch consists of the waiting
customers at the commencement of the batch service and also those customers who arrive at the system during
the batch service on completion of the batch mode service, the same server takes the entire batch of customers to
the second phase for individual service following. First in first out queue discipline. The customers who arrive
while the server is busy in the second phase, wait in a queue at the first phase for the next batch mode service.
After completing the second phase of individual services exhaustively to the batch, the server returns to the first
phase to start the next batch mode service. If some customers are present at the first phase, he/she starts the
batch mode service immediately. On the other hand if the queue is empty, he/she immediately leaves for a
vacation of random duration and returns to the system at the end of the vacation. If there is at least one
customer waiting in the first phase, he/she immediately starts a batch service, but if the system is empty, he
takes the next vacation and so on.

III.

Model Description

Batch service times are independent and identically distributed random variables following an arbitrary
function B(t), t > 0 and the individual service times are i.i.d. with an arbitrary distribution function F(t), t > 0
and vacation times are i.i.d. according to an arbitrary distribution function V(t), t > 0.
Let the random variables B, S and V denoted batch service times, individual service times and vacation
times respectively. Assume that the system is in steady state and
 =  E(S) < 1
 =  E(B)

www.ijera.com

223 | P a g e
K. Ramya et al Int. Journal of Engineering Research and Applications
ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230

www.ijera.com

3.1 Busy Cycle
The time interval from the commencement of the batch service at the end of a vacation to the
commencement of the next batch service after availing at least one vacation is a busy cycle.
3.2 Service Cycle
The time interval between two consecutive batch services without any vacation is a service cycle.
Notations
N
 system size at the beginning of a batch service
N1
 system size at the end of the batch service
N2
 system size at the end of individual services to the customers of the batch service
X
 number of customers arrivals during a batch service
Y
 number of customers arrivals  1 during a vacation
P20
 P (the system is empty at the end of the second phase
The random variables N, N1, N2, X and Y are interrelated.
N1 = N + X
N2 = number of customers arrivals during the N1 individual services

N if N 2  0
N 2
Y if N 2  0
Probability generating function of B(t), F(t) and V(t)


B( θ)   e θ t dB(t)
0


F( θ)   e θ t dF(t)
0



V( θ)   e θ t dV(t)
0

aK = P{K poisson arrivals during a time interval having a function A(t)}


e  λ t (λ t) K
dA(t)
K!
0





e  λ t (λ t) K
E(z )   z 
dA(t)
K!
k 0
0


K

K





(λ zt) K
dA(t)
K!
k 0

  e λ t 
0



  e λ t e λ tz dA(t)
0


  e λ t  λ tz dA(t)
0


  e  t(λ λ z) dA(t)
0

 A(λ  λ z)

(1)

where A(0) is the LST of A(t).

www.ijera.com

224 | P a g e
K. Ramya et al Int. Journal of Engineering Research and Applications
ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230

www.ijera.com

a 0  P (No arrival)
 A(λ )
*
1

*
2

P*(z), P (z) and P (z) denote the PGF’s of N, N1 and N2 respectively.

P1* (z)  E(z N1 )
 E(z NX )
 E(z N .zX )
 E(z N ).E(zX ).
arrival and service are independent

 P* (z) B(λ  λ z)

(2)

Let Xi denote the number of arrivals during the i-th individual service for i = 1, 2, 3, …, N.
*
P2 (z)  E(z N2 )

 E[E(z N2 /N1  K)]


  E(z X1 X2 XK )P(N1  K)
k 1


  (E(zX1 ))K P(N1  K)
k 1

since X i are independent



  (F(λ  λ z))K P(N1  K)
k 1

 P (F(λ  λ z))
*
1

(3)

Since Y denote the number of customer arrivals  1 during a vacation.


P(Y  k)   {(P(Y  k / k customersarrive during the i th vacation)}
i 1


  b i01b k
i 1



bk
1  b0



bk
1  V(λ)
P* (z)  E(z N )


  z k P(N  k)
k 1

But P(N = k) = P(N2 = k) with proba 1 when N 2 > 0
= P(Y = k) with proba P20 when N2 = 0




k 1

k 1

P* (z)   z k P(N2  k)  P20  z k P(Y  k)
 (P(z)  P20 ) 
www.ijera.com

P20 (V(λ  λ z)  V(λ)
1  V(λ)
225 | P a g e
K. Ramya et al Int. Journal of Engineering Research and Applications
ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230

1  V(λ  λ z)  V(λ) 
*
 P2 (z)  P20 

1  V(λ)



www.ijera.com

(4)

Combine (2), (3) and (4) we get

 (V(λ  λ z)  V(λ) 
P* (z)  P* (F(λ  λ z)B(λ  λF(λ  λ z))  P20 1 

1  V(λ)



(5)

Let

g (0) (z)  z
g (1) (z)  g(z)
 F(λ  λ z)

g n (z)  g(gn 1 (z))
 g n 1 (g(z))

n 1

h (z)  h(z)
(1)

 B(λ  λ z)
(V(λ  λ z)  V(λ ))
L(z)  1 
1  V(λ )
For  < 1, z = 1 is the unique solution of the equation z  F(λ  λ z) inside the region |z|  1. g(n)(z)
approaches
z
=
1
as
n


and
L(g(n)(z))
approaches
L(1)
=
0
using

V(λ  λ z)  V(0) = 1.
The quantity P20 can be obtained from the equation (5).

P (z)  P * (g (1) (z))h(g (1) (z))  P20 L(z)
*



 k

P* (z)   h(g(1) (z))  P20   h(g(1) (z))L(g(k) (z))
k 0  i 1
i 1


Since the number of customers at the beginning of a batch service is strictly positive.

P* (0)  P(N  0)  0
P * (F(λ ) B(λ  λ F(λ ))  P20  0
Since g(0)  F( λ)

P20  P* (F(λ) B(λ  λ F(λ))
 P* (g(0) B(λ  λF(λ))
 h(g(0))P* (g(0))



 k

 h(g(0)) h(gi1 (0))  P20   h(gi1 (0) L(gk 1 (0))
k 0  i 1

 i1


www.ijera.com

226 | P a g e
K. Ramya et al Int. Journal of Engineering Research and Applications
ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230

www.ijera.com



P20 

h(g(0)) h(gi1 (0))
i 1



1  h(g(0))  h(gi1 (0) L(g k 1 (0))
k 0  i 1



k

 h(g

(i)





i 1



(0))
k 1

1   L(g k 1 (0)) h(gk 1 (0)
k 0

i 1

3.3 The Probability Generating Function of System Size
Let M denote the system size when a random customer leaves the system after his service completion
and M*(z) be the PGF of M.
Let N1 = n1 and K = k where n1 is the size of the batch to which the random customer belongs and k is
his position in that batch, then by using length biased sampling technique

1
P(K  k/N1  n1 )    n1P(N1  n1 )/E(N1 )
n 
 1
 P(N1  n1 )/E(N1 )
The number of customers in the system when a random customer departs is the sum of (n1  k)
customers in the batch and the number of new arrivals that occur during the K service completions.

E(N 1 )  [γ (1  V(λ )  P20 λ E(V)]/(1  ρ)(1  V(λ )]
V(t) = 1, t > 0 when the server does not take any vacation.
B(t) = 1, t > 0 there is no batch service.
Mean and Variance

P20 E(V2 )
λ E(s2 ) E(B2 ) E 2 (B) E(B)
E(w s )  E(S) 



1 ρ 2
2E(N1 ) E(N1 )
λ 2(1  V(λ)E(N1 )
2
2
Var(w s )  E(w s )  (E(w s )) .
3.4 Server Utilization
Let T1 and T2 denote the durations of time the server is busy in the system. Let T1 (θ ) and T2 (θ )
denote the LSTs of T1 and T2 respectively.


T1 (θ)   [B(θ)P1* (F(θ))] r (1  P20 ) r 1 P20
r 1



T2 (θ)   (V(θ)) r (V(λ )) r (1  V(λ ))
r 1

[E(B)  E(N 1 )E(s)]
P20
E(V)
E(T 2 ) 
1  V(λ )

E(T1 ) 

The long run proportion is given by

u

www.ijera.com

E(T1 )
E(T1 )  E(T 2 )

227 | P a g e
K. Ramya et al Int. Journal of Engineering Research and Applications
ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230

www.ijera.com

 E(B)  E(N1 )E(s) 




P20


u
E(B)  E(N1 )E(s)
E(V)

P20
1  V(λ)


P20 (1  V(λ))
E(B)  E(N1 )E(s)

(1  V(λ))  P20 E(V)
P20
(E(B)  E(N1 )E(s))
(E(B)  E(N 1 )E(s))(1  V(λ ))
u
(E(B)  E(N 1 )E(s))(1  V(λ ))  P20 E (V )
IV.

Table

Case (i)  = 5, E(B) = 1/15

1
E(V)

E(ws)

5
4
3
2
1

0.56
0.58
0.6
0.71
1.18

Case (ii)  = 5, E(B) = 1/10

1
E(V)

E(ws)

5
4
3
2
1

0.58
0.59
0.61
0.72
1.18

Case (iii)  = 5, E(B) = 1/2

1
E(V)

E(ws)

5
4
3
2
1

1.41
1.4
1.31
1.3
1.3

Graph
=5

www.ijera.com

228 | P a g e
K. Ramya et al Int. Journal of Engineering Research and Applications
ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230

www.ijera.com

4
3.5
3

E(ws)

2.5

Series3

2

Series2
Series1

1.5
1
0.5
0
1

2

3

4

5

1/E(V)

From the above graph indicates the mean system time decreases with the decrease in the mean vacation time .

V.

Conclusion

In this paper we studied the vacation model of a queuing system in which customers are served in two
phases. Server vacations are introduced to utilize the idle time of the server so that idle times are used to
perform some useful jobs other than the service to the customers in the system . In fact , such jobs may even
include a simple break for taking some rest in serving in some other queue. The study of vacation models of
queuing systems help the effects of server vacations on the system performance .

References
[1]
[2]

[3]
[4]

[5]

[6]
[7]

[8]
[9]
[10]
[11]

Choudhury, Gautam / Deka, Kandarpa. : A batch arrival retrial queue with two phases of service and
Bernoulli vacation schedule. Acta Mathematicae Applicatae Sinica, English Series, Nov 2009
Choudhury, Gautam / Deka, Mitali,: A single server queuing system with two phases of service subject
to server breakdown and Bernoulli vacation: Applied Mathematical Modelling, In Press, Corrected
Proof,Feb 2012
Choudhury, Gautam / Madan, Kailash C.: A two phase batch arrival queueing system with a vacation
time under Bernoulli schedule. Applied Mathematics and Computation, 149 (2), p.337-349, Feb 200
Choudhury, Gautam / Tadj, Lotfi / Deka, Kandarpa,: A batch arrival retrial queueing system with two
phases of service and service interruption. Computers & Mathematics with Applications, 59 (1), p.437450,Jan 2010
Choudhury, Gautam / Tadj, Lotfi,: An M / G /1 queue with two phases of service subject to
the serverbreakdown and delayed repair. Applied Mathematical Modelling, 33 (6), p.2699-2709, Jun
2009
Choudhury, Gautam,: A two phase batch arrival retrial queuing system with Bernoulli vacation
schedule. Applied Mathematics and Computation, 188 (2), p.1455-1466, May 2007
Choudhury, Gautam,: Steady state analysis of an M / G /1 queue with linear retrial policy
andtwo phase service under Bernoulli vacation schedule. Applied Mathematical Modelling, 32 (12),
p.2480-2489, Dec 2008
Cooper, Robert B.: Chapter 10 Queueing theory. Handbooks in Operations Research and Management
Science, 2, p.469-518, Jan 1990
Dimitriou, Ioannis / Langaris, Christos.: Analaysis of a retrial queue with two-phase service ad server
vacations. Queueing Systems, 60 (1-2), p.111-129, Oct 2008
Doshi, Bharat,: Analysis of a two phase queueing system with general service times. Operations
Research Letters, 10 (5), p.265-272,Jul 1991
Fiems, Dieter / Maertens, Tom / Bruneel, Herwig,: Queueing systems with different types
of server interruptions. European Journal of Operational Research, 188 (3), p.838-845, Aug 2008

www.ijera.com

229 | P a g e
K. Ramya et al Int. Journal of Engineering Research and Applications
ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230
[12]
[13]
[14]
[15]
[16]
[17]
[18]

[19]

www.ijera.com

Frigui, Imed / Alfa, Attalhiru-Sule,: Analysis of a time-limited polling system. Computer
Communications, 21 (6), p.558-571, May 1998
Krishna, C.M. / Lee, Y.-H.: A study of two-phase service. Operations Research Letters, 9 (2), p.9197, Mar 1990
Leung, Kin K. / Lucantoni, David M.: Two vacation models for token-ring networks where service is
controlled by timers. Performance Evaluation, 20 (1-3), p.165-184, May 1994
Moreno, P.: An M / G /1 retrial queue with recurrent customers and general retrial times. Applied
Mathematics and Computation, 159 (3), p.651-666, Dec 2004
Nadarajan, R. / Jayaraman, D.: Series queue with general bulk service, random breakdown and
vacation. Microelectronics Reliability, 31 (5), p.861-863, Jan 1991
Park, Hyun-Min / Kim, Tae-Sung / Chae, Kyung C.: Analysis of a two-phase queuing system with a
fixed-size batch policy. European Journal of Operational Research, 206 (1), p.118-122, Oct 2010
Takine, Tetsuya / Matsumoto, Yutaka / Suda, Tatsuya / Hasegawa, Toshiharu,: Mean waiting times in
nonpreemptive priority queues with Markovian Arrival and i.i.d. service Processes. Performance
Evaluation, 20 (1-3), p.131-149,May 1994
Wang, Jinting,: An M/G/ 1 queue with second optional service and server breakdowns. Computers &
Mathematics
with
Applications,
47
(10-11),
p.1713-1723, May
2004

www.ijera.com

230 | P a g e

Más contenido relacionado

La actualidad más candente

Bin packing problem two approximation
Bin packing problem two approximationBin packing problem two approximation
Bin packing problem two approximationijfcstjournal
 
Box-fitting algorithm presentation
Box-fitting algorithm presentationBox-fitting algorithm presentation
Box-fitting algorithm presentationRidlo Wibowo
 
0006.scheduling not-ilp-not-force
0006.scheduling not-ilp-not-force0006.scheduling not-ilp-not-force
0006.scheduling not-ilp-not-forcesean chen
 
Finite Element Solution On Effects Of Viscous Dissipation & Diffusion Thermo ...
Finite Element Solution On Effects Of Viscous Dissipation & Diffusion Thermo ...Finite Element Solution On Effects Of Viscous Dissipation & Diffusion Thermo ...
Finite Element Solution On Effects Of Viscous Dissipation & Diffusion Thermo ...IRJET Journal
 
Dealinggreensfncsolft sqrdb
Dealinggreensfncsolft sqrdbDealinggreensfncsolft sqrdb
Dealinggreensfncsolft sqrdbfoxtrot jp R
 
Radiation effects on heat and mass transfer of a mhd
Radiation effects on heat and mass transfer of a mhdRadiation effects on heat and mass transfer of a mhd
Radiation effects on heat and mass transfer of a mhdeSAT Publishing House
 
Hankel Determinent for Certain Classes of Analytic Functions
Hankel Determinent for Certain Classes of Analytic FunctionsHankel Determinent for Certain Classes of Analytic Functions
Hankel Determinent for Certain Classes of Analytic FunctionsIJERA Editor
 
Design of FFT Processor
Design of FFT ProcessorDesign of FFT Processor
Design of FFT ProcessorRohit Singh
 
A New Enhanced Method of Non Parametric power spectrum Estimation.
A New Enhanced Method of Non Parametric power spectrum Estimation.A New Enhanced Method of Non Parametric power spectrum Estimation.
A New Enhanced Method of Non Parametric power spectrum Estimation.CSCJournals
 
Frequency analyis i - sqrd1062016
Frequency analyis i - sqrd1062016Frequency analyis i - sqrd1062016
Frequency analyis i - sqrd1062016foxtrot jp R
 
Modern Control - Lec 05 - Analysis and Design of Control Systems using Freque...
Modern Control - Lec 05 - Analysis and Design of Control Systems using Freque...Modern Control - Lec 05 - Analysis and Design of Control Systems using Freque...
Modern Control - Lec 05 - Analysis and Design of Control Systems using Freque...Amr E. Mohamed
 
Paolo Creminelli "Dark Energy after GW170817"
Paolo Creminelli "Dark Energy after GW170817"Paolo Creminelli "Dark Energy after GW170817"
Paolo Creminelli "Dark Energy after GW170817"SEENET-MTP
 
Code_Saturne流体解析入門講習会 講習会資料
Code_Saturne流体解析入門講習会 講習会資料Code_Saturne流体解析入門講習会 講習会資料
Code_Saturne流体解析入門講習会 講習会資料mmer547
 

La actualidad más candente (20)

Bin packing problem two approximation
Bin packing problem two approximationBin packing problem two approximation
Bin packing problem two approximation
 
Fortran induction project. DGTSV DGESV
Fortran induction project. DGTSV DGESVFortran induction project. DGTSV DGESV
Fortran induction project. DGTSV DGESV
 
Box-fitting algorithm presentation
Box-fitting algorithm presentationBox-fitting algorithm presentation
Box-fitting algorithm presentation
 
Merge sort-algorithm for computer science engineering students
Merge sort-algorithm for computer science engineering studentsMerge sort-algorithm for computer science engineering students
Merge sort-algorithm for computer science engineering students
 
Merge sort algorithm power point presentation
Merge sort algorithm power point presentationMerge sort algorithm power point presentation
Merge sort algorithm power point presentation
 
D044042432
D044042432D044042432
D044042432
 
0006.scheduling not-ilp-not-force
0006.scheduling not-ilp-not-force0006.scheduling not-ilp-not-force
0006.scheduling not-ilp-not-force
 
report
reportreport
report
 
Finite Element Solution On Effects Of Viscous Dissipation & Diffusion Thermo ...
Finite Element Solution On Effects Of Viscous Dissipation & Diffusion Thermo ...Finite Element Solution On Effects Of Viscous Dissipation & Diffusion Thermo ...
Finite Element Solution On Effects Of Viscous Dissipation & Diffusion Thermo ...
 
Sw2gr1 sqrd
Sw2gr1   sqrdSw2gr1   sqrd
Sw2gr1 sqrd
 
Dealinggreensfncsolft sqrdb
Dealinggreensfncsolft sqrdbDealinggreensfncsolft sqrdb
Dealinggreensfncsolft sqrdb
 
Radiation effects on heat and mass transfer of a mhd
Radiation effects on heat and mass transfer of a mhdRadiation effects on heat and mass transfer of a mhd
Radiation effects on heat and mass transfer of a mhd
 
Hankel Determinent for Certain Classes of Analytic Functions
Hankel Determinent for Certain Classes of Analytic FunctionsHankel Determinent for Certain Classes of Analytic Functions
Hankel Determinent for Certain Classes of Analytic Functions
 
Avinash_PPT
Avinash_PPTAvinash_PPT
Avinash_PPT
 
Design of FFT Processor
Design of FFT ProcessorDesign of FFT Processor
Design of FFT Processor
 
A New Enhanced Method of Non Parametric power spectrum Estimation.
A New Enhanced Method of Non Parametric power spectrum Estimation.A New Enhanced Method of Non Parametric power spectrum Estimation.
A New Enhanced Method of Non Parametric power spectrum Estimation.
 
Frequency analyis i - sqrd1062016
Frequency analyis i - sqrd1062016Frequency analyis i - sqrd1062016
Frequency analyis i - sqrd1062016
 
Modern Control - Lec 05 - Analysis and Design of Control Systems using Freque...
Modern Control - Lec 05 - Analysis and Design of Control Systems using Freque...Modern Control - Lec 05 - Analysis and Design of Control Systems using Freque...
Modern Control - Lec 05 - Analysis and Design of Control Systems using Freque...
 
Paolo Creminelli "Dark Energy after GW170817"
Paolo Creminelli "Dark Energy after GW170817"Paolo Creminelli "Dark Energy after GW170817"
Paolo Creminelli "Dark Energy after GW170817"
 
Code_Saturne流体解析入門講習会 講習会資料
Code_Saturne流体解析入門講習会 講習会資料Code_Saturne流体解析入門講習会 講習会資料
Code_Saturne流体解析入門講習会 講習会資料
 

Destacado (20)

Af4201214217
Af4201214217Af4201214217
Af4201214217
 
R4103111114
R4103111114R4103111114
R4103111114
 
Ay4103315317
Ay4103315317Ay4103315317
Ay4103315317
 
E41033336
E41033336E41033336
E41033336
 
Ap4103260265
Ap4103260265Ap4103260265
Ap4103260265
 
I41035057
I41035057I41035057
I41035057
 
D41032632
D41032632D41032632
D41032632
 
At4103280291
At4103280291At4103280291
At4103280291
 
Ai4103203205
Ai4103203205Ai4103203205
Ai4103203205
 
Bi4103375380
Bi4103375380Bi4103375380
Bi4103375380
 
Ib3514141422
Ib3514141422Ib3514141422
Ib3514141422
 
Hx3513811385
Hx3513811385Hx3513811385
Hx3513811385
 
Apresentacao Beatthelift
Apresentacao BeattheliftApresentacao Beatthelift
Apresentacao Beatthelift
 
Maple Ta 40
Maple Ta 40Maple Ta 40
Maple Ta 40
 
Caperucita roja
Caperucita rojaCaperucita roja
Caperucita roja
 
Powert point La plaza de mi pueblo terminado 2003
Powert point La plaza de mi pueblo terminado 2003Powert point La plaza de mi pueblo terminado 2003
Powert point La plaza de mi pueblo terminado 2003
 
De Pesca
De PescaDe Pesca
De Pesca
 
Noticias día 2
Noticias día 2Noticias día 2
Noticias día 2
 
A Casa Dos Bicos
A Casa Dos BicosA Casa Dos Bicos
A Casa Dos Bicos
 
Figuras
FigurasFiguras
Figuras
 

Similar a Ah4201223230

Time dependent solution of batch arrival queue
Time dependent solution of batch arrival queueTime dependent solution of batch arrival queue
Time dependent solution of batch arrival queueAlexander Decker
 
Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...
Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...
Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...IRJET Journal
 
Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...
Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...
Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...IRJET Journal
 
Convolution of an Fractional integral equation with the I-function as its kernel
Convolution of an Fractional integral equation with the I-function as its kernelConvolution of an Fractional integral equation with the I-function as its kernel
Convolution of an Fractional integral equation with the I-function as its kernelIRJET Journal
 
IRJET- A Generalized Delta Shock Maintenance Model
IRJET-  	  A Generalized Delta Shock Maintenance ModelIRJET-  	  A Generalized Delta Shock Maintenance Model
IRJET- A Generalized Delta Shock Maintenance ModelIRJET Journal
 
Analysis of single server queueing system with batch service
Analysis of single server queueing system with batch serviceAnalysis of single server queueing system with batch service
Analysis of single server queueing system with batch serviceAlexander Decker
 
Analysis of single server queueing system with batch service
Analysis of single server queueing system with batch serviceAnalysis of single server queueing system with batch service
Analysis of single server queueing system with batch serviceAlexander Decker
 
DSP unit1,2,3 VSQs-vrc.pdf important question
DSP unit1,2,3 VSQs-vrc.pdf important questionDSP unit1,2,3 VSQs-vrc.pdf important question
DSP unit1,2,3 VSQs-vrc.pdf important questionSahithikairamkonda
 
IRJET- Low Complexity Pipelined FFT Design for High Throughput and Low Densit...
IRJET- Low Complexity Pipelined FFT Design for High Throughput and Low Densit...IRJET- Low Complexity Pipelined FFT Design for High Throughput and Low Densit...
IRJET- Low Complexity Pipelined FFT Design for High Throughput and Low Densit...IRJET Journal
 
Performance Analysis of OFDM Transceiver with Folded FFT and LMS Filter
Performance Analysis of OFDM Transceiver with Folded FFT and LMS FilterPerformance Analysis of OFDM Transceiver with Folded FFT and LMS Filter
Performance Analysis of OFDM Transceiver with Folded FFT and LMS Filteridescitation
 
Transpose Form Fir Filter Design for Fixed and Reconfigurable Coefficients
Transpose Form Fir Filter Design for Fixed and Reconfigurable CoefficientsTranspose Form Fir Filter Design for Fixed and Reconfigurable Coefficients
Transpose Form Fir Filter Design for Fixed and Reconfigurable CoefficientsIRJET Journal
 
IRJET- A Brief Study on Fourier Transform and its Applications
IRJET- A Brief Study on Fourier Transform and its ApplicationsIRJET- A Brief Study on Fourier Transform and its Applications
IRJET- A Brief Study on Fourier Transform and its ApplicationsIRJET Journal
 
Degradation of ICI in OFDM Communication System by Analyzing I/Q Imbalance an...
Degradation of ICI in OFDM Communication System by Analyzing I/Q Imbalance an...Degradation of ICI in OFDM Communication System by Analyzing I/Q Imbalance an...
Degradation of ICI in OFDM Communication System by Analyzing I/Q Imbalance an...IRJET Journal
 
A comprehensive study on Applications of Vedic Multipliers in signal processing
A comprehensive study on Applications of Vedic Multipliers in signal processingA comprehensive study on Applications of Vedic Multipliers in signal processing
A comprehensive study on Applications of Vedic Multipliers in signal processingIRJET Journal
 
Probabilistic Analysis of an Evaporator of a Desalination Plant with Priority...
Probabilistic Analysis of an Evaporator of a Desalination Plant with Priority...Probabilistic Analysis of an Evaporator of a Desalination Plant with Priority...
Probabilistic Analysis of an Evaporator of a Desalination Plant with Priority...Waqas Tariq
 
Behavioural analysis of a complex manufacturing system having queue in the ma...
Behavioural analysis of a complex manufacturing system having queue in the ma...Behavioural analysis of a complex manufacturing system having queue in the ma...
Behavioural analysis of a complex manufacturing system having queue in the ma...Alexander Decker
 
Applications Of One Type Of Euler-Lagrange Fractional Differential Equation
Applications Of One Type Of Euler-Lagrange Fractional Differential EquationApplications Of One Type Of Euler-Lagrange Fractional Differential Equation
Applications Of One Type Of Euler-Lagrange Fractional Differential EquationIRJET Journal
 

Similar a Ah4201223230 (20)

Time dependent solution of batch arrival queue
Time dependent solution of batch arrival queueTime dependent solution of batch arrival queue
Time dependent solution of batch arrival queue
 
Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...
Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...
Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...
 
Aw4102359364
Aw4102359364Aw4102359364
Aw4102359364
 
Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...
Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...
Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...
 
Convolution of an Fractional integral equation with the I-function as its kernel
Convolution of an Fractional integral equation with the I-function as its kernelConvolution of an Fractional integral equation with the I-function as its kernel
Convolution of an Fractional integral equation with the I-function as its kernel
 
IRJET- A Generalized Delta Shock Maintenance Model
IRJET-  	  A Generalized Delta Shock Maintenance ModelIRJET-  	  A Generalized Delta Shock Maintenance Model
IRJET- A Generalized Delta Shock Maintenance Model
 
Analysis of single server queueing system with batch service
Analysis of single server queueing system with batch serviceAnalysis of single server queueing system with batch service
Analysis of single server queueing system with batch service
 
Analysis of single server queueing system with batch service
Analysis of single server queueing system with batch serviceAnalysis of single server queueing system with batch service
Analysis of single server queueing system with batch service
 
DSP unit1,2,3 VSQs-vrc.pdf important question
DSP unit1,2,3 VSQs-vrc.pdf important questionDSP unit1,2,3 VSQs-vrc.pdf important question
DSP unit1,2,3 VSQs-vrc.pdf important question
 
Sub1539
Sub1539Sub1539
Sub1539
 
IRJET- Low Complexity Pipelined FFT Design for High Throughput and Low Densit...
IRJET- Low Complexity Pipelined FFT Design for High Throughput and Low Densit...IRJET- Low Complexity Pipelined FFT Design for High Throughput and Low Densit...
IRJET- Low Complexity Pipelined FFT Design for High Throughput and Low Densit...
 
Performance Analysis of OFDM Transceiver with Folded FFT and LMS Filter
Performance Analysis of OFDM Transceiver with Folded FFT and LMS FilterPerformance Analysis of OFDM Transceiver with Folded FFT and LMS Filter
Performance Analysis of OFDM Transceiver with Folded FFT and LMS Filter
 
Transpose Form Fir Filter Design for Fixed and Reconfigurable Coefficients
Transpose Form Fir Filter Design for Fixed and Reconfigurable CoefficientsTranspose Form Fir Filter Design for Fixed and Reconfigurable Coefficients
Transpose Form Fir Filter Design for Fixed and Reconfigurable Coefficients
 
IRJET- A Brief Study on Fourier Transform and its Applications
IRJET- A Brief Study on Fourier Transform and its ApplicationsIRJET- A Brief Study on Fourier Transform and its Applications
IRJET- A Brief Study on Fourier Transform and its Applications
 
Degradation of ICI in OFDM Communication System by Analyzing I/Q Imbalance an...
Degradation of ICI in OFDM Communication System by Analyzing I/Q Imbalance an...Degradation of ICI in OFDM Communication System by Analyzing I/Q Imbalance an...
Degradation of ICI in OFDM Communication System by Analyzing I/Q Imbalance an...
 
Ae04605217226
Ae04605217226Ae04605217226
Ae04605217226
 
A comprehensive study on Applications of Vedic Multipliers in signal processing
A comprehensive study on Applications of Vedic Multipliers in signal processingA comprehensive study on Applications of Vedic Multipliers in signal processing
A comprehensive study on Applications of Vedic Multipliers in signal processing
 
Probabilistic Analysis of an Evaporator of a Desalination Plant with Priority...
Probabilistic Analysis of an Evaporator of a Desalination Plant with Priority...Probabilistic Analysis of an Evaporator of a Desalination Plant with Priority...
Probabilistic Analysis of an Evaporator of a Desalination Plant with Priority...
 
Behavioural analysis of a complex manufacturing system having queue in the ma...
Behavioural analysis of a complex manufacturing system having queue in the ma...Behavioural analysis of a complex manufacturing system having queue in the ma...
Behavioural analysis of a complex manufacturing system having queue in the ma...
 
Applications Of One Type Of Euler-Lagrange Fractional Differential Equation
Applications Of One Type Of Euler-Lagrange Fractional Differential EquationApplications Of One Type Of Euler-Lagrange Fractional Differential Equation
Applications Of One Type Of Euler-Lagrange Fractional Differential Equation
 

Último

Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 

Último (20)

Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 

Ah4201223230

  • 1. K. Ramya et al Int. Journal of Engineering Research and Applications ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230 RESEARCH ARTICLE www.ijera.com OPEN ACCESS A Study on Two-Phase Service Queueing System with Server Vacations S.Palaniammal1, C. Vijayalakshmi2 and K. Ramya3 1 Department of Mathematics, Sri Krishna College of Engineering, Coimbatore, India Department of Mathematics, VIT University, Chennai India 3 Department of Mathematics, Kingston Engineering College, Vellore 2 Abstract This paper mainly deals with the analysis of queueing system in which customers require services in two stages are common. Two-phase queueing systems are gaining importance due to their wide variety of applications. Batch mode service in the first phase followed by individual service in the second phase. Because of the mixed mode of services, these kinds of two phase queues do not fit into the usual network of queues as a particular case. The need for this kind of modeling has been greatly discussed in this paper Keywords: Sojourn time, busy cycle, service cycle, idle time, service time, system size I. Introduction Krishna and Lee (1990) have studied a two phase Markovian queueing system. Customers arrive according to poisson process and service times are exponentially distributed. Doshi (1991) has generalized the model studied in Krishna and Lee (1990). In this, the service times in both the first and second phases are assumed to follow general distributions. Madan(2001 ) studied two similar types of vacation models for M/G/1 Queueing system. Shahkar and Badamchi (2008) have studied the two phase queueing system with Bernoulli server vacation .Gautam Choudhury (2011) has generalized the model with delaying repair . JauChuan Ke and Wen Lea Pearn (2011) have studied the analysis of the multi-server system with a modified Bernoulli vacation schedule. II. Methodology A queueing system with two phase service, customers arrive at the system according to a poisson process with arrival rate . In the first phase, the server operates on an exhaustive batch mod service in waiting customers and the arrivals which occur during the batch service. Thus, this batch consists of the waiting customers at the commencement of the batch service and also those customers who arrive at the system during the batch service on completion of the batch mode service, the same server takes the entire batch of customers to the second phase for individual service following. First in first out queue discipline. The customers who arrive while the server is busy in the second phase, wait in a queue at the first phase for the next batch mode service. After completing the second phase of individual services exhaustively to the batch, the server returns to the first phase to start the next batch mode service. If some customers are present at the first phase, he/she starts the batch mode service immediately. On the other hand if the queue is empty, he/she immediately leaves for a vacation of random duration and returns to the system at the end of the vacation. If there is at least one customer waiting in the first phase, he/she immediately starts a batch service, but if the system is empty, he takes the next vacation and so on. III. Model Description Batch service times are independent and identically distributed random variables following an arbitrary function B(t), t > 0 and the individual service times are i.i.d. with an arbitrary distribution function F(t), t > 0 and vacation times are i.i.d. according to an arbitrary distribution function V(t), t > 0. Let the random variables B, S and V denoted batch service times, individual service times and vacation times respectively. Assume that the system is in steady state and  =  E(S) < 1  =  E(B) www.ijera.com 223 | P a g e
  • 2. K. Ramya et al Int. Journal of Engineering Research and Applications ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230 www.ijera.com 3.1 Busy Cycle The time interval from the commencement of the batch service at the end of a vacation to the commencement of the next batch service after availing at least one vacation is a busy cycle. 3.2 Service Cycle The time interval between two consecutive batch services without any vacation is a service cycle. Notations N  system size at the beginning of a batch service N1  system size at the end of the batch service N2  system size at the end of individual services to the customers of the batch service X  number of customers arrivals during a batch service Y  number of customers arrivals  1 during a vacation P20  P (the system is empty at the end of the second phase The random variables N, N1, N2, X and Y are interrelated. N1 = N + X N2 = number of customers arrivals during the N1 individual services N if N 2  0 N 2 Y if N 2  0 Probability generating function of B(t), F(t) and V(t)  B( θ)   e θ t dB(t) 0  F( θ)   e θ t dF(t) 0  V( θ)   e θ t dV(t) 0 aK = P{K poisson arrivals during a time interval having a function A(t)}  e  λ t (λ t) K dA(t) K! 0   e  λ t (λ t) K E(z )   z  dA(t) K! k 0 0  K K   (λ zt) K dA(t) K! k 0   e λ t  0    e λ t e λ tz dA(t) 0    e λ t  λ tz dA(t) 0    e  t(λ λ z) dA(t) 0  A(λ  λ z) (1) where A(0) is the LST of A(t). www.ijera.com 224 | P a g e
  • 3. K. Ramya et al Int. Journal of Engineering Research and Applications ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230 www.ijera.com a 0  P (No arrival)  A(λ ) * 1 * 2 P*(z), P (z) and P (z) denote the PGF’s of N, N1 and N2 respectively. P1* (z)  E(z N1 )  E(z NX )  E(z N .zX )  E(z N ).E(zX ). arrival and service are independent  P* (z) B(λ  λ z) (2) Let Xi denote the number of arrivals during the i-th individual service for i = 1, 2, 3, …, N. * P2 (z)  E(z N2 )  E[E(z N2 /N1  K)]    E(z X1 X2 XK )P(N1  K) k 1    (E(zX1 ))K P(N1  K) k 1 since X i are independent    (F(λ  λ z))K P(N1  K) k 1  P (F(λ  λ z)) * 1 (3) Since Y denote the number of customer arrivals  1 during a vacation.  P(Y  k)   {(P(Y  k / k customersarrive during the i th vacation)} i 1    b i01b k i 1  bk 1  b0  bk 1  V(λ) P* (z)  E(z N )    z k P(N  k) k 1 But P(N = k) = P(N2 = k) with proba 1 when N 2 > 0 = P(Y = k) with proba P20 when N2 = 0   k 1 k 1 P* (z)   z k P(N2  k)  P20  z k P(Y  k)  (P(z)  P20 )  www.ijera.com P20 (V(λ  λ z)  V(λ) 1  V(λ) 225 | P a g e
  • 4. K. Ramya et al Int. Journal of Engineering Research and Applications ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230 1  V(λ  λ z)  V(λ)  *  P2 (z)  P20   1  V(λ)   www.ijera.com (4) Combine (2), (3) and (4) we get  (V(λ  λ z)  V(λ)  P* (z)  P* (F(λ  λ z)B(λ  λF(λ  λ z))  P20 1   1  V(λ)   (5) Let g (0) (z)  z g (1) (z)  g(z)  F(λ  λ z)  g n (z)  g(gn 1 (z))  g n 1 (g(z)) n 1 h (z)  h(z) (1)  B(λ  λ z) (V(λ  λ z)  V(λ )) L(z)  1  1  V(λ ) For  < 1, z = 1 is the unique solution of the equation z  F(λ  λ z) inside the region |z|  1. g(n)(z) approaches z = 1 as n   and L(g(n)(z)) approaches L(1) = 0 using V(λ  λ z)  V(0) = 1. The quantity P20 can be obtained from the equation (5). P (z)  P * (g (1) (z))h(g (1) (z))  P20 L(z) *    k  P* (z)   h(g(1) (z))  P20   h(g(1) (z))L(g(k) (z)) k 0  i 1 i 1  Since the number of customers at the beginning of a batch service is strictly positive. P* (0)  P(N  0)  0 P * (F(λ ) B(λ  λ F(λ ))  P20  0 Since g(0)  F( λ) P20  P* (F(λ) B(λ  λ F(λ))  P* (g(0) B(λ  λF(λ))  h(g(0))P* (g(0))     k   h(g(0)) h(gi1 (0))  P20   h(gi1 (0) L(gk 1 (0)) k 0  i 1   i1  www.ijera.com 226 | P a g e
  • 5. K. Ramya et al Int. Journal of Engineering Research and Applications ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230 www.ijera.com  P20  h(g(0)) h(gi1 (0)) i 1   1  h(g(0))  h(gi1 (0) L(g k 1 (0)) k 0  i 1   k  h(g (i)   i 1  (0)) k 1 1   L(g k 1 (0)) h(gk 1 (0) k 0 i 1 3.3 The Probability Generating Function of System Size Let M denote the system size when a random customer leaves the system after his service completion and M*(z) be the PGF of M. Let N1 = n1 and K = k where n1 is the size of the batch to which the random customer belongs and k is his position in that batch, then by using length biased sampling technique 1 P(K  k/N1  n1 )    n1P(N1  n1 )/E(N1 ) n   1  P(N1  n1 )/E(N1 ) The number of customers in the system when a random customer departs is the sum of (n1  k) customers in the batch and the number of new arrivals that occur during the K service completions. E(N 1 )  [γ (1  V(λ )  P20 λ E(V)]/(1  ρ)(1  V(λ )] V(t) = 1, t > 0 when the server does not take any vacation. B(t) = 1, t > 0 there is no batch service. Mean and Variance P20 E(V2 ) λ E(s2 ) E(B2 ) E 2 (B) E(B) E(w s )  E(S)     1 ρ 2 2E(N1 ) E(N1 ) λ 2(1  V(λ)E(N1 ) 2 2 Var(w s )  E(w s )  (E(w s )) . 3.4 Server Utilization Let T1 and T2 denote the durations of time the server is busy in the system. Let T1 (θ ) and T2 (θ ) denote the LSTs of T1 and T2 respectively.  T1 (θ)   [B(θ)P1* (F(θ))] r (1  P20 ) r 1 P20 r 1  T2 (θ)   (V(θ)) r (V(λ )) r (1  V(λ )) r 1 [E(B)  E(N 1 )E(s)] P20 E(V) E(T 2 )  1  V(λ ) E(T1 )  The long run proportion is given by u www.ijera.com E(T1 ) E(T1 )  E(T 2 ) 227 | P a g e
  • 6. K. Ramya et al Int. Journal of Engineering Research and Applications ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230 www.ijera.com  E(B)  E(N1 )E(s)      P20   u E(B)  E(N1 )E(s) E(V)  P20 1  V(λ)  P20 (1  V(λ)) E(B)  E(N1 )E(s)  (1  V(λ))  P20 E(V) P20 (E(B)  E(N1 )E(s)) (E(B)  E(N 1 )E(s))(1  V(λ )) u (E(B)  E(N 1 )E(s))(1  V(λ ))  P20 E (V ) IV. Table Case (i)  = 5, E(B) = 1/15 1 E(V) E(ws) 5 4 3 2 1 0.56 0.58 0.6 0.71 1.18 Case (ii)  = 5, E(B) = 1/10 1 E(V) E(ws) 5 4 3 2 1 0.58 0.59 0.61 0.72 1.18 Case (iii)  = 5, E(B) = 1/2 1 E(V) E(ws) 5 4 3 2 1 1.41 1.4 1.31 1.3 1.3 Graph =5 www.ijera.com 228 | P a g e
  • 7. K. Ramya et al Int. Journal of Engineering Research and Applications ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230 www.ijera.com 4 3.5 3 E(ws) 2.5 Series3 2 Series2 Series1 1.5 1 0.5 0 1 2 3 4 5 1/E(V) From the above graph indicates the mean system time decreases with the decrease in the mean vacation time . V. Conclusion In this paper we studied the vacation model of a queuing system in which customers are served in two phases. Server vacations are introduced to utilize the idle time of the server so that idle times are used to perform some useful jobs other than the service to the customers in the system . In fact , such jobs may even include a simple break for taking some rest in serving in some other queue. The study of vacation models of queuing systems help the effects of server vacations on the system performance . References [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] Choudhury, Gautam / Deka, Kandarpa. : A batch arrival retrial queue with two phases of service and Bernoulli vacation schedule. Acta Mathematicae Applicatae Sinica, English Series, Nov 2009 Choudhury, Gautam / Deka, Mitali,: A single server queuing system with two phases of service subject to server breakdown and Bernoulli vacation: Applied Mathematical Modelling, In Press, Corrected Proof,Feb 2012 Choudhury, Gautam / Madan, Kailash C.: A two phase batch arrival queueing system with a vacation time under Bernoulli schedule. Applied Mathematics and Computation, 149 (2), p.337-349, Feb 200 Choudhury, Gautam / Tadj, Lotfi / Deka, Kandarpa,: A batch arrival retrial queueing system with two phases of service and service interruption. Computers & Mathematics with Applications, 59 (1), p.437450,Jan 2010 Choudhury, Gautam / Tadj, Lotfi,: An M / G /1 queue with two phases of service subject to the serverbreakdown and delayed repair. Applied Mathematical Modelling, 33 (6), p.2699-2709, Jun 2009 Choudhury, Gautam,: A two phase batch arrival retrial queuing system with Bernoulli vacation schedule. Applied Mathematics and Computation, 188 (2), p.1455-1466, May 2007 Choudhury, Gautam,: Steady state analysis of an M / G /1 queue with linear retrial policy andtwo phase service under Bernoulli vacation schedule. Applied Mathematical Modelling, 32 (12), p.2480-2489, Dec 2008 Cooper, Robert B.: Chapter 10 Queueing theory. Handbooks in Operations Research and Management Science, 2, p.469-518, Jan 1990 Dimitriou, Ioannis / Langaris, Christos.: Analaysis of a retrial queue with two-phase service ad server vacations. Queueing Systems, 60 (1-2), p.111-129, Oct 2008 Doshi, Bharat,: Analysis of a two phase queueing system with general service times. Operations Research Letters, 10 (5), p.265-272,Jul 1991 Fiems, Dieter / Maertens, Tom / Bruneel, Herwig,: Queueing systems with different types of server interruptions. European Journal of Operational Research, 188 (3), p.838-845, Aug 2008 www.ijera.com 229 | P a g e
  • 8. K. Ramya et al Int. Journal of Engineering Research and Applications ISSN : 2248-9622, Vol. 4, Issue 2( Version 1), February 2014, pp.223-230 [12] [13] [14] [15] [16] [17] [18] [19] www.ijera.com Frigui, Imed / Alfa, Attalhiru-Sule,: Analysis of a time-limited polling system. Computer Communications, 21 (6), p.558-571, May 1998 Krishna, C.M. / Lee, Y.-H.: A study of two-phase service. Operations Research Letters, 9 (2), p.9197, Mar 1990 Leung, Kin K. / Lucantoni, David M.: Two vacation models for token-ring networks where service is controlled by timers. Performance Evaluation, 20 (1-3), p.165-184, May 1994 Moreno, P.: An M / G /1 retrial queue with recurrent customers and general retrial times. Applied Mathematics and Computation, 159 (3), p.651-666, Dec 2004 Nadarajan, R. / Jayaraman, D.: Series queue with general bulk service, random breakdown and vacation. Microelectronics Reliability, 31 (5), p.861-863, Jan 1991 Park, Hyun-Min / Kim, Tae-Sung / Chae, Kyung C.: Analysis of a two-phase queuing system with a fixed-size batch policy. European Journal of Operational Research, 206 (1), p.118-122, Oct 2010 Takine, Tetsuya / Matsumoto, Yutaka / Suda, Tatsuya / Hasegawa, Toshiharu,: Mean waiting times in nonpreemptive priority queues with Markovian Arrival and i.i.d. service Processes. Performance Evaluation, 20 (1-3), p.131-149,May 1994 Wang, Jinting,: An M/G/ 1 queue with second optional service and server breakdowns. Computers & Mathematics with Applications, 47 (10-11), p.1713-1723, May 2004 www.ijera.com 230 | P a g e