SLINGING AND RIGGING
Prepared By: OC HSE Dept.
1
GROUND RULES
 Course Duration: 2 Days
 Emergency Procedures
 No Smoking
 Mobiles Off/ Silent
 Breaks
2
COURSE OBJECTIVES
By the end of this course the participant will be able to
undertake/understand:
 Rigging principles and load control
 Load on rigging and the rigging triangle
 Application of hoist hooks, shackles and links
 Application of eye bolts, hoist rings and turnbuckles
 Application of wire rope terminations
 Inspection of Cranes and hardware
 Sling hitches and application
 Inspection of slings
 Working with blocks 3
‫مقدمة‬

‫وحيوي‬ ‫ضروري‬ ‫المختلفة‬ ‫والخامات‬ ‫المواد‬ ‫وتحريك‬ ‫نقل‬ ‫على‬ ‫القدرة‬
‫في‬
‫المختلفة‬ ‫العمل‬ ‫مراحل‬ ‫جميع‬ ‫في‬ ‫والصناعات‬ ‫اإلنشاءات‬ ‫مواقع‬
,
‫أن‬ ‫كما‬
‫بصور‬ ‫المواد‬ ‫وتحريك‬ ‫نقل‬ ‫عملية‬ ‫في‬ ‫دور‬ ‫لهم‬ ‫يكون‬ ‫العاملين‬ ‫جميع‬
‫أو‬ ‫ة‬
‫أحيانا‬ ‫لإلصابات‬ ‫يعرضهم‬ ‫ما‬ ‫وهو‬ ‫بأخرى‬
.

‫التصبين‬ ‫أدوات‬ ‫على‬ ‫تعتمد‬ ‫المختلفة‬ ‫الرفع‬ ‫ومعدات‬ ‫األوناش‬ ‫وألن‬
‫والرفع‬
‫ع‬ ‫الالزمة‬ ‫المعلومات‬ ‫بتوفير‬ ‫فسنقوم‬ ‫األحمال‬ ‫وتحريك‬ ‫ورفع‬ ‫لنقل‬
‫عمليات‬ ‫ن‬
‫والتصبين‬ ‫الرفع‬ ‫أدوات‬ ‫واستعمال‬ ‫والصيانة‬ ‫المناسب‬ ‫اإلختيار‬
4
‫الويرات‬ ‫أنواع‬
‫للويرات‬ ‫رئيسية‬ ‫أنواع‬ ‫ستة‬ ‫توجد‬
:

‫السالسل‬

‫الصلب‬ ‫الويرات‬

‫المعدنية‬ ‫الشبكة‬ ‫ويرات‬

‫ويرات‬
(
‫حبال‬
)
‫الصناعي‬ ‫القماش‬

‫ويرات‬
(
‫حبال‬
)
‫الطبيعي‬ ‫القماش‬

‫الصناعية‬ ‫الويرات‬ 5

‫السالسل‬
CHAINS

‫على‬ ‫وقدرتها‬ ‫قوتها‬ ‫بسبب‬ ‫بكثرة‬ ‫السالسل‬ ‫تستخدم‬
‫التكيف‬
‫الحمولة‬ ‫شكل‬ ‫مع‬
.

‫ل‬ ‫تتعرض‬ ‫ال‬ ‫حتى‬ ‫السالسل‬ ‫استخدام‬ ‫عند‬ ‫الحذر‬ ‫يجب‬
‫لكسر‬
‫المفاجئة‬ ‫الصدمات‬ ‫نتيجة‬
,
‫الخاطئ‬ ‫اإلستخدام‬ ‫أن‬ ‫كما‬
‫لإلص‬ ‫العاملين‬ ‫ويعرض‬ ‫لتدميرها‬ ‫يؤدي‬ ‫قد‬ ‫للسالسل‬
‫ابة‬
.

‫الس‬ ‫الخامات‬ ‫لرفع‬ ‫اإلختياراألفضل‬ ‫السالسل‬ ‫تعتبر‬
‫حيث‬ ‫اخنة‬
‫إلى‬ ‫تصل‬ ‫حرارة‬ ‫درجات‬ ‫تحمل‬ ‫يمكنها‬
1000
‫درجة‬
‫زي‬ ‫حالة‬ ‫في‬ ‫اآلمنة‬ ‫الحمولة‬ ‫تقليل‬ ‫مراعاة‬ ‫مع‬ ‫فهرنهايت‬
‫ادة‬
‫عن‬ ‫الحرارة‬ ‫درجة‬
600
‫طبقا‬ ‫ذلك‬ ‫ويكون‬ ‫فهرنهايت‬ ‫درجة‬
‫المصنع‬ ‫لتوصيات‬
.
6
‫السالسل‬
CHAINS

‫توضح‬ ‫السلسلة‬ ‫على‬ ‫معدنية‬ ‫لوحة‬ ‫توجد‬ ‫أن‬ ‫يجب‬
‫حجم‬
‫السلسلة‬ ‫وطول‬
,
‫المعدن‬ ‫نوع‬
,
‫والرق‬ ‫والحمولة‬ ‫القدرة‬
‫م‬
‫بالمصنع‬ ‫الخاص‬

‫المعا‬ ‫من‬ ‫مختلفة‬ ‫درجات‬ ‫من‬ ‫السالسل‬ ‫صناعة‬ ‫تتم‬
‫دن‬
‫أشهرها‬
80
‫و‬
100
‫طبقا‬ ‫وصناعتها‬ ‫إختبارها‬ ‫ويتم‬
‫والخامات‬ ‫للفحص‬ ‫األمريكية‬ ‫الجمعية‬ ‫لمعايير‬
.
‫وف‬
‫ي‬
‫يتم‬ ‫مختلفة‬ ‫درجات‬ ‫ذات‬ ‫سالسل‬ ‫أية‬ ‫استخدام‬ ‫حال‬
‫المصنع‬ ‫لتوصيات‬ ‫طبقا‬ ‫استخدامها‬

‫الحرارة‬ ‫درجات‬ ‫في‬ ‫السالسل‬ ‫استخدام‬ ‫حالة‬ ‫في‬
‫عن‬ ‫تقل‬ ‫والتي‬ ‫المنخفضة‬
(
-
40
‫فهرنهايت‬
)
‫يجب‬
‫للمصنع‬ ‫الرجوع‬
. 7
‫للسالسل‬ ‫اآلمن‬ ‫االستخدام‬ ‫جدول‬
CHAIN SLING WEAR
CHART
Chain
Size
(inches)
Minimu
m
Allowabl
e Chain
Size
(Inches)
Chain
Size
(inches)
Minimu
m
Allowabl
e Chain
Size
(Inches)
¼
3/8
½
5/8
¾
7/8
15/64
19/64
25/64
31/64
19/32
45/64
1
1 1/8
1 ¼
1 3/8
1 ½
1 ¾
13/16
29/32
1
1 3/32
1 3/16
1 13/32
8
‫السالسل‬ ‫فحص‬
CHAINS
INSPECTION
9

‫الصلب‬ ‫الويرات‬
WIRE ROPE SLINGS

‫عدة‬ ‫من‬ ‫الصلب‬ ‫الواير‬ ‫يتكون‬
‫ل‬ ‫سويا‬ ‫لفها‬ ‫يتم‬ ‫منفردة‬ ‫ويرات‬
‫تكون‬
‫لتكون‬ ‫الجدالت‬ ‫لف‬ ‫ويتم‬ ‫جدالت‬
‫د‬ ‫واير‬ ‫حول‬ ‫تلتف‬ ‫التي‬ ‫اللفات‬
‫اخلي‬
‫الواير‬ ‫مكونة‬
.

‫القلب‬ ‫يكون‬ ‫قد‬
(
‫الداخلي‬ ‫الواير‬
)
‫أكث‬ ‫فيكون‬ ‫الفايبر‬ ‫من‬ ‫مصنوعا‬
‫ر‬
‫مقاومة‬ ‫أقل‬ ‫يكون‬ ‫لكنه‬ ‫مرونة‬
‫البيئية‬ ‫للمؤثرات‬
.

‫مصنوعا‬ ‫الواير‬ ‫قلب‬ ‫يكون‬ ‫عندما‬
‫قوة‬ ‫أكثر‬ ‫يكون‬ ‫فإنه‬ ‫الصلب‬ ‫من‬
‫للحرارة‬ ‫مقاومة‬ ‫وأكثر‬
. 10
‫اللفة‬
ROPE LAY
‫معاني‬ ‫ثالثة‬ ‫من‬ ‫واحدة‬ ‫تعني‬ ‫قد‬ ‫اللفة‬

‫أوال‬
:
‫الواير‬ ‫قلب‬ ‫حول‬ ‫للجدلة‬ ‫كاملة‬ ‫لفة‬

‫ثانيا‬
:
‫الواير‬ ‫قلب‬ ‫حول‬ ‫الجدالت‬ ‫لف‬ ‫اتجاه‬
(
‫يمينا‬
‫يسارا‬ ‫أو‬
)

‫ثالثا‬
:
‫وعالقت‬ ‫الجدلة‬ ‫في‬ ‫الويرات‬ ‫لف‬ ‫اتجاه‬
‫ها‬
‫الواير‬ ‫قلب‬ ‫حول‬ ‫الجدالت‬ ‫بإتجاه‬
:
‫يكو‬ ‫ما‬ ‫عادة‬
‫ن‬
‫الجدال‬ ‫اتجاه‬ ‫عكس‬ ‫الجدلة‬ ‫على‬ ‫الويرات‬ ‫اتجاه‬
‫ت‬
‫ويسمي‬ ‫القلب‬ ‫حول‬
Regular Lay Rope
‫الجد‬ ‫اتجاه‬ ‫نفس‬ ‫في‬ ‫الويرات‬ ‫اتجاه‬ ‫كات‬ ‫وإذا‬
‫الت‬
‫يسمى‬
Lang Lay Rope
11
‫الصلب‬ ‫الويرات‬ ‫إختيار‬ ‫طريقة‬
WIRE ROPE SLING SELECTION

‫القوة‬
Strength

‫وبنائه‬ ‫ودرجته‬ ‫حجمه‬ ‫على‬ ‫بناء‬ ‫الواير‬ ‫قوة‬ ‫تتحدد‬

‫أمان‬ ‫بمعامل‬ ‫الصلب‬ ‫الواير‬ ‫صنع‬ ‫يتم‬
(
Design Factor
)
5:1
‫أن‬ ‫أي‬
‫مقدارها‬ ‫قصوى‬ ‫حمولة‬ ‫لرفع‬ ‫المصمم‬ ‫الواير‬
2
‫واختباره‬ ‫تصميمه‬ ‫يتم‬ ‫طن‬
‫يتحمل‬ ‫بحيث‬
10
‫الشاقة‬ ‫الخدمة‬ ‫ظروف‬ ‫يتحمل‬ ‫كي‬ ‫أطنان‬
.

‫من‬ ‫أقل‬ ‫أمان‬ ‫بمعامل‬ ‫الواير‬ ‫صنع‬ ‫تم‬ ‫إذا‬
5:1
‫الحمولة‬ ‫تقليل‬ ‫يتم‬ ‫أن‬ ‫يجب‬
‫الى‬ ‫تصل‬ ‫حتى‬ ‫القصوى‬
5:1
12
‫مثـــال‬
EXAMPLE
 IF WLL is 2000 KG
 Design Factor is 3:1
 SWL???
Answer
 2000*3= 6000
 2000*5=10000
 6000/1000= 60%
 (60*2000)/100=1200
 SWL=1200 KG 13
‫الصلب‬ ‫الويرات‬ ‫إختيار‬ ‫طريقة‬
WIRE ROPE SLING SELECTION

‫الواير‬ ‫حالة‬
(
‫االستهالك‬
)
Fatigue

‫ضرر‬ ‫دون‬ ‫مرات‬ ‫عدة‬ ‫اإلنثناء‬ ‫الواير‬ ‫يتحمل‬ ‫أن‬ ‫يجب‬
.

‫عل‬ ‫ويؤثر‬ ‫الحمل‬ ‫وزن‬ ‫تحت‬ ‫الثني‬ ‫نتيجة‬ ‫الواير‬ ‫على‬ ‫الضرر‬ ‫يظهر‬
‫قطر‬ ‫ى‬
‫الواير‬
.

‫ب‬ ‫الواير‬ ‫إنثناء‬ ‫لمنع‬ ‫وسيلة‬ ‫أو‬ ‫حماية‬ ‫وضع‬ ‫يجب‬ ‫ذلك‬ ‫حدوث‬ ‫لتفادي‬
‫صورة‬
‫حادة‬
14
‫الصلب‬ ‫الويرات‬ ‫إختيار‬ ‫طريقة‬
WIRE ROPE SLING SELECTION

‫الواير‬ ‫قطع‬
Abrasive
Wear

‫الوير‬ ‫وعدد‬ ‫الحجم‬ ‫على‬ ‫والجرح‬ ‫القطع‬ ‫مقاومة‬ ‫على‬ ‫الواير‬ ‫قدرة‬ ‫تعتمد‬
‫ات‬
‫والتركيب‬
(
‫الواير‬ ‫بناء‬
)

‫أقل‬ ‫لكنها‬ ‫لإلنثناء‬ ‫وقابلية‬ ‫مرونة‬ ‫أكثر‬ ‫تكون‬ ‫سمكا‬ ‫األقل‬ ‫الويرات‬
‫مقاومة‬
‫للقطع‬
.

‫للقطع‬ ‫مقاومة‬ ‫أكثر‬ ‫تكون‬ ‫سمكا‬ ‫األكثر‬ ‫الويرات‬
15
‫الصلب‬ ‫الويرات‬ ‫إختيار‬ ‫طريقة‬
WIRE ROPE SLING SELECTION

‫سوء‬
‫اإلستخدام‬
Abuse

‫شكل‬ ‫في‬ ‫لتدميره‬ ‫يؤدي‬ ‫الواير‬ ‫استخدام‬ ‫سوء‬
(
‫العصفور‬ ‫عش‬
-
‫اإللت‬
‫واءات‬
-
‫الواير‬ ‫قطع‬ ‫أو‬ ‫الواير‬ ‫قطر‬ ‫نقص‬
)
16

‫الفايبر‬ ‫الويرات‬
(
‫األحبال‬
)
FIBER ROPE

‫ل‬ ‫بسبب‬ ‫الرفع‬ ‫أنواع‬ ‫بعض‬ ‫في‬ ‫بكثرة‬ ‫الفايبر‬ ‫األحبال‬ ‫تستخدم‬
‫يونتها‬
,
‫وقدرتها‬
‫ت‬ ‫عدم‬ ‫إلى‬ ‫باإلضافة‬ ‫به‬ ‫والتمسك‬ ‫الحمل‬ ‫شكل‬ ‫ومالئمة‬ ‫التكيف‬ ‫على‬
‫شويه‬
‫الحمولة‬
.

‫تحت‬ ‫أو‬ ‫ساخنة‬ ‫أو‬ ‫حادة‬ ‫حواف‬ ‫بها‬ ‫يوجد‬ ‫ال‬ ‫خفيفة‬ ‫أحمال‬ ‫لرفع‬ ‫تستخدم‬
‫وي‬
‫أحماض‬ ‫على‬
.

‫الحمل‬ ‫وزن‬ ‫على‬ ‫المستخدم‬ ‫الواير‬ ‫حجم‬ ‫يعتمد‬
,
‫الرفع‬ ‫وزاوية‬
,
‫يجب‬ ‫كما‬
‫الو‬ ‫من‬ ‫أسرع‬ ‫بشكل‬ ‫يهترئ‬ ‫حيث‬ ‫اإلستخدام‬ ‫قبل‬ ‫جيدا‬ ‫الواير‬ ‫فحص‬
‫يرات‬
‫الصلب‬
.
17
‫الفحص‬
FIBER ROPE INSPECTION

‫ع‬ ‫والبحث‬ ‫أوال‬ ‫الخارجي‬ ‫السطح‬ ‫فحص‬ ‫يتم‬
‫ن‬
‫الجافة‬ ‫األجزاء‬
,
‫أو‬ ‫المقطوعة‬ ‫أو‬ ‫المجروحة‬
‫اللون‬ ‫متغيرة‬ ‫ويرات‬ ‫أي‬
.

‫أن‬ ‫ويجب‬ ‫الواير‬ ‫قلب‬ ‫فحص‬ ‫ذلك‬ ‫بعد‬ ‫يتم‬
‫يكون‬
‫مع‬ ‫الجديد‬ ‫الواير‬ ‫لون‬ ‫نفس‬ ‫الداخلي‬ ‫اللون‬
‫داخل‬ ‫البودرة‬ ‫تشبه‬ ‫مادة‬ ‫أي‬ ‫وجود‬ ‫مراعاة‬
‫لإلهت‬ ‫الواير‬ ‫تعرض‬ ‫على‬ ‫تدل‬ ‫حيث‬ ‫الواير‬
‫راء‬
‫الشديد‬
.

‫حال‬ ‫في‬ ‫اليد‬ ‫بأظافر‬ ‫الواير‬ ‫بحك‬ ‫قم‬ ‫أخيرا‬
‫ة‬
‫الواي‬ ‫أن‬ ‫تعني‬ ‫بسهولة‬ ‫الواير‬ ‫من‬ ‫مواد‬ ‫خروج‬
‫ر‬
‫ف‬ ‫استبعاده‬ ‫ويجب‬ ‫كيميائية‬ ‫لمواد‬ ‫تعرض‬
‫ورا‬
.
18
‫الصناعية‬ ‫الويرات‬
SYNTHETIC WEB SLINGS
‫مخت‬ ‫مواد‬ ‫من‬ ‫وتصنع‬ ‫الرفع‬ ‫عمليات‬ ‫في‬ ‫بكثرة‬ ‫الصناعية‬ ‫الويرات‬ ‫تستخدم‬
‫مثل‬ ‫لفة‬
‫فوائدها‬ ‫ومن‬ ‫والبوليستر‬ ‫والداكرون‬ ‫النايلون‬
:

‫القوة‬
:
‫إلى‬ ‫تصل‬ ‫أحمال‬ ‫رفع‬ ‫يمحنها‬ ‫حيث‬
300,000
‫رطل‬

‫المالئمة‬
:
‫حمولة‬ ‫أي‬ ‫مالئمة‬ ‫يمكنها‬ ‫حيث‬
.

‫األمان‬
:
‫الحمل‬ ‫إزالق‬ ‫ومنع‬ ‫بقوة‬ ‫بالحمل‬ ‫التمسك‬

‫الطرد‬ ‫حماية‬
:
‫الدهانات‬ ‫تزيل‬ ‫او‬ ‫السطح‬ ‫تجرح‬ ‫وال‬ ‫الطرد‬ ‫سالمة‬ ‫على‬ ‫تؤثر‬ ‫ال‬
‫عليه‬ ‫الموجودة‬
.

‫العمر‬ ‫طويلة‬
(
‫األجل‬
:)
‫ب‬ ‫وتقاوم‬ ‫البكتيريا‬ ‫و‬ ‫الفطري‬ ‫بالعفن‬ ‫تتأثر‬ ‫ال‬
‫المواد‬ ‫عض‬
‫والجرح‬ ‫للقطع‬ ‫ممتازة‬ ‫مقاومة‬ ‫ولها‬ ‫الكيميائية‬
.

‫إقتصادية‬
:
‫أطول‬ ‫خدمة‬ ‫وفترة‬ ‫أقل‬ ‫تكلفة‬
.

‫الصدمة‬ ‫إمتصاص‬
:
‫ال‬ ‫سالمة‬ ‫على‬ ‫التأثير‬ ‫دون‬ ‫عنيفة‬ ‫صدمات‬ ‫يمكنهاتحمل‬
‫واير‬
.

‫الحرارة‬ ‫مقاومة‬
:
‫إلى‬ ‫تصل‬ ‫حرارة‬ ‫درجات‬ ‫تتحمل‬
180
‫فهرنهايت‬ ‫درجة‬
(
82
‫مئوية‬ ‫درجة‬
)
19
‫الصناعي‬ ‫الواير‬ ‫إختيار‬
SELECTION OF SYNTHETIC
WEB
‫واستخدام‬ ‫خصائصه‬ ‫الصناعية‬ ‫الويرات‬ ‫من‬ ‫نوع‬ ‫لكل‬
‫اته‬
:

‫النايلون‬ ‫من‬ ‫المصنوعة‬ ‫الويرات‬
:
‫حال‬ ‫وفي‬ ‫شحوم‬ ‫أو‬ ‫قلوية‬ ‫مواد‬ ‫وجود‬ ‫حالة‬ ‫في‬ ‫تستخدم‬
‫ة‬
‫مذيبات‬ ‫أو‬ ‫كيميائية‬ ‫مواد‬ ‫وجود‬
.

‫الداكرون‬ ‫من‬ ‫المصنوعة‬ ‫الويرات‬
:
‫م‬ ‫األحماض‬ ‫من‬ ‫قوية‬ ‫تركيزات‬ ‫وجود‬ ‫حالة‬ ‫في‬ ‫تستخدم‬
‫ثل‬
‫وال‬ ‫والنيتريك‬ ‫والهيدروكلوريك‬ ‫الكبريتيك‬ ‫حمض‬
‫فورميك‬
‫العالية‬ ‫الحرارة‬ ‫درجات‬ ‫ذات‬ ‫والمواد‬
(
‫يمكنه‬ ‫ال‬ ‫النايلون‬
‫الظروف‬ ‫هذه‬ ‫تحمل‬
)
‫القلويات‬ ‫مع‬ ‫يستخدم‬ ‫ال‬ ‫الداكرون‬
‫النايلون‬ ‫أو‬ ‫البوليستر‬ ‫استخدام‬ ‫ويجب‬
.

‫البوليستر‬ ‫من‬ ‫المصنوعة‬ ‫الويرات‬
:
‫والمبيضات‬ ‫األحماض‬ ‫مع‬ ‫البوليستر‬ ‫يستخدم‬
(
‫المن‬
‫ظفات‬
)
‫الواير‬ ‫استطالة‬ ‫في‬ ‫الرغبة‬ ‫عدم‬ ‫حالة‬ ‫وفي‬ 20
‫الويرات‬ ‫فحص‬
INSPECTION OF SYNTHETIC WEB
‫اآلتي‬ ‫الحاالت‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫الواير‬ ‫استبعاد‬ ‫يتم‬
‫ة‬
:

‫بالواير‬ ‫حروق‬ ‫أو‬ ‫أحماض‬ ‫وجود‬

‫الواير‬ ‫سطح‬ ‫من‬ ‫جزء‬ ‫أي‬ ‫تمزق‬ ‫أو‬ ‫انصهار‬

‫بالواير‬ ‫ثقوب‬ ‫أو‬ ‫تمزق‬ ‫أو‬ ‫قطع‬ ‫أي‬

‫بالواير‬ ‫الخياة‬ ‫قطع‬ ‫أو‬ ‫تمزق‬

‫الغرز‬ ‫تمزق‬

‫لت‬ ‫طبقا‬ ‫بها‬ ‫المسموح‬ ‫النسبة‬ ‫يتجاوز‬ ‫قطع‬ ‫أي‬
‫وصيات‬
‫المصنع‬
21
‫في‬ ‫والتحكم‬ ‫التصبين‬ ‫أساسيات‬
‫الطرود‬
RIGGING PRINCIPALS AND
LOAD CONTROL
22
‫الثــقل‬ ‫مركــز‬
CENTER OF GRAVITY AND
SLING LOADING
‫فإن‬ ‫عمودي‬ ‫بشكل‬ ‫الطرد‬ ‫رفع‬ ‫عند‬
‫بالتساوي‬ ‫توزيعها‬ ‫سيتم‬ ‫الحمولة‬
‫إذا‬
‫المس‬ ‫منتصف‬ ‫في‬ ‫الثقل‬ ‫مركز‬ ‫كان‬
‫افة‬
‫الرفع‬ ‫نقطتي‬ ‫بين‬
.
‫الحمولة‬ ‫كانت‬ ‫إذا‬
10
‫فإن‬ ‫طن‬
‫وكل‬ ‫قفل‬ ‫وكل‬ ‫واير‬ ‫كل‬ ‫على‬ ‫الحمولة‬
‫ستكون‬ ‫رفع‬ ‫نقطة‬
5
‫طن‬
23
‫الثــقل‬ ‫مركــز‬
CENTER OF GRAVITY AND
SLING LOADING
‫منتصف‬ ‫في‬ ‫الثقل‬ ‫مركز‬ ‫يكن‬ ‫لم‬ ‫إذا‬
‫الرفع‬ ‫نقطتي‬ ‫بين‬ ‫المسافة‬
(
‫التص‬
‫بين‬
)
‫بح‬ ‫تقوم‬ ‫لن‬ ‫واألقفال‬ ‫الويرات‬ ‫فإن‬
‫مل‬
‫األحمال‬ ‫نفس‬
.
‫الق‬ ‫الرفع‬ ‫ونقاط‬ ‫واألقفال‬ ‫الويرات‬
‫ريبة‬
‫النص‬ ‫برفع‬ ‫ستقوم‬ ‫الثقل‬ ‫مركز‬ ‫من‬
‫يب‬
‫األحمال‬ ‫من‬ ‫األكبر‬
Sling 2
Sling 1
‫واير‬ ‫كل‬ ‫على‬ ‫الحمل‬ ‫لحساب‬
‫رقم‬ ‫الواير‬
2
:
10000
X
8
/
(
8
+
2
=)
8000
‫كجم‬
‫رقم‬ ‫الواير‬
1
:
10000
X
2
/
(
8
+
2
=)
2000
‫كجم‬
24
LOAD STABILITY AND CENTER OF
GRAVITY ‫الطرد‬ ‫وتوازن‬ ‫الثقل‬ ‫مركز‬ ‫تحديد‬

‫مباشرة‬ ‫الثقل‬ ‫مركز‬ ‫فوق‬ ‫الويرات‬ ‫تجميع‬ ‫يتم‬ ‫أن‬ ‫يجب‬
.

‫توازن‬ ‫على‬ ‫ذلك‬ ‫فسيؤثر‬ ‫الطرد‬ ‫ثقل‬ ‫مركز‬ ‫فوق‬ ‫الويرات‬ ‫تكن‬ ‫لم‬ ‫إذا‬
‫ه‬
(
‫تأرجح‬
‫الطرد‬
)

‫الطرد‬ ‫ثقل‬ ‫ومركز‬ ‫الواير‬ ‫بين‬ ‫ممكنة‬ ‫مسافة‬ ‫أكبر‬ ‫إبقاء‬ ‫يجب‬
25
CALCULATE WEIGHT ‫األوزان‬ ‫حساب‬

‫مثال‬
1
:
‫المسطحة‬ ‫األجسام‬

‫الوزن‬
=
‫الطول‬
X
‫العرض‬
X
‫اإلرتفاع‬
X
‫النوعي‬ ‫الوزن‬

‫للصلب‬ ‫النوعي‬ ‫الوزن‬
:
7.85
‫طن‬
/
‫م‬
3

‫الوزن‬
=
5
‫م‬
X
2
‫م‬
X
0.1
‫م‬
X
7.85
‫طن‬
/
‫م‬
3
=
7.85
‫طن‬

‫لأللومنيوم‬ ‫النوعي‬ ‫الوزن‬
:
2.64
‫طن‬
/
‫م‬
3

‫الوزن‬
=
5
‫م‬
X
2
‫م‬
X
0.1
‫م‬
X
2.64
‫طن‬
/
‫م‬
3
=
2.64
‫طن‬

‫للخرسانة‬ ‫النوعي‬ ‫الوزن‬
:
2.40
‫طن‬
/
‫م‬
3

‫الوزن‬
=
5
‫م‬
X
2
‫م‬
X
0.1
‫م‬
X
2.40
‫طن‬
/
‫م‬
3
=
2.40
‫طن‬

L= 5 m
H= 0.1 m
W= 2 m
26
CALCULATE WEIGHT ‫األوزان‬ ‫حساب‬

‫مثال‬
2
:
‫مصمته‬ ‫اسطوانة‬

‫الوزن‬
=
3.14
X
(
‫الدائرة‬ ‫قطر‬
)
²
X
‫اإلسطوانة‬ ‫طول‬
X
‫النوعي‬ ‫الوزن‬
4

‫للصلب‬ ‫النوعي‬ ‫الوزن‬
:
7.85
‫طن‬
/
‫م‬
3

‫الوزن‬
=
3.14
X
(
0.5
)
²
X
5
X
7.85
=
7.70
‫طن‬
4

‫لأللومنيوم‬ ‫النوعي‬ ‫الوزن‬
:
2.64
‫طن‬
/
‫م‬
3

‫الوزن‬
=
3.14
X
(
0.5
)
²
X
5
X
2.64
=
2.59
‫طن‬
4

‫للخرسانة‬ ‫النوعي‬ ‫الوزن‬
:
2.40
‫طن‬
/
‫م‬
3

‫الوزن‬
=
3.14
X
(
0.5
)
²
X
5
X
2.40
=
2.35
‫طن‬
4

L= 5 m
D= 0.5 m
27
‫األوزان‬ ‫على‬ ‫بناء‬ ‫الثقل‬ ‫مركز‬ ‫إيجاد‬
FINDING THE CENTER OF GRAVITY BASED ON
WEIGHTS

‫مع‬ ‫شكل‬ ‫له‬ ‫طرد‬ ‫ثقل‬ ‫مركز‬ ‫تحديد‬ ‫يمكن‬
‫قد‬
‫بسيط‬ ‫أجزاء‬ ‫إلي‬ ‫إلى‬ ‫تقسيمه‬ ‫طريق‬ ‫عن‬
‫ة‬
.

‫المنط‬ ‫في‬ ‫محصورا‬ ‫سيكون‬ ‫الثقل‬ ‫مركز‬
‫قة‬
‫بين‬ ‫الواصلة‬ ‫الخطوط‬ ‫داخل‬ ‫المحددة‬
‫الثالثة‬ ‫األجزاء‬
.

‫الكلي‬ ‫الوزن‬
=
3000
+
6000
+
2000
=
11000
‫كجم‬
2000 KG
3000 KG
6000 KG
28

‫ونقوم‬ ‫الثالثة‬ ‫األجزاء‬ ‫من‬ ‫جزأين‬ ‫نختار‬
‫معا‬ ‫للجزأين‬ ‫الثقل‬ ‫مركز‬ ‫بتحديد‬
.

‫بين‬ ‫الواصلة‬ ‫المنطقة‬ ‫في‬ ‫سيكون‬ ‫الثقل‬ ‫مركز‬
‫األثقل‬ ‫للوزن‬ ‫أقرب‬ ‫وسيكون‬ ‫الثقل‬ ‫مركزي‬

‫األثقل‬ ‫الوزن‬
=
6000
‫كجم‬

‫للجزأين‬ ‫الكلي‬ ‫الوزن‬
=
8000

6000/8000
=
¾
‫أو‬
75
%

‫يكون‬ ‫الثقل‬ ‫مركز‬
75
%
‫الوزن‬ ‫تجاه‬ ‫المسافة‬ ‫من‬
‫األثقل‬

‫واحدة‬ ‫ككتلة‬ ‫الجزأين‬ ‫مع‬ ‫التعامل‬ ‫يتم‬
2000 KG
6000 KG
75
%
29

‫الطري‬ ‫بنفس‬ ‫الثقل‬ ‫مركز‬ ‫تحديد‬ ‫يتم‬
‫السابقة‬ ‫قة‬
‫الجديد‬ ‫الثقل‬ ‫مركز‬ ‫على‬ ‫بناء‬
.

‫الواص‬ ‫المنطقة‬ ‫في‬ ‫سيكون‬ ‫الثقل‬ ‫مركز‬
‫لة‬
‫األثقل‬ ‫الوزن‬ ‫تجاه‬ ‫الثقل‬ ‫مركزي‬ ‫بين‬

‫الكلي‬ ‫الوزن‬
=
8000
+
3000
=
11000
‫كجم‬

8000
/
11000
=
73
%
‫األثقل‬ ‫الوزن‬ ‫تجاه‬
3000 KG
8000 KG
30
‫الرفع‬ ‫تجارب‬ ‫على‬ ‫بناء‬ ‫الثقل‬ ‫مركز‬ ‫إيجاد‬
FINDING CENTER OF GRAVITY BY TRAIL LIFTS
Load Cell
C
D
A
B
‫النتيجة‬ ‫وتسجيل‬ ‫الطرد‬ ‫جوانب‬ ‫من‬ ‫جانب‬ ‫رفع‬ ‫يتم‬
A= 6000 KG
B= 4000 KG
C= 2000 KG
D= 4000 KG
‫متقابلتين‬ ‫جهتين‬ ‫أوزان‬ ‫مجموع‬ ‫دائما‬ ‫يكون‬ ‫الكلي‬ ‫الوزن‬
‫الوزن‬
A+C= 6000+2000= 8000 KG
or
B+D=4000+4000= 8000 KG
31
‫الثقل‬ ‫مركز‬ ‫لتحديد‬
 A+C= 6000+2000= 8000 KG
or
 B+D=4000+4000= 8000 KG

‫مسافة‬ ‫على‬ ‫يقع‬ ‫الثقل‬ ‫مركز‬
8000
/
6000
‫تجاه‬
A
‫أو‬
75
%

‫مسافة‬ ‫على‬ ‫يقع‬ ‫الثقل‬ ‫مركز‬
4000/8000
‫تجاه‬
D
‫أو‬
50 %
C
A
D
B
50%
75%
32
‫الرفع‬ ‫تجارب‬ ‫طريق‬ ‫عن‬ ‫الثقل‬ ‫مركز‬ ‫تحديد‬
FINDING CENTER OF GRAVITY BY TRIAL LIFTS

‫زاوية‬ ‫كل‬ ‫عند‬ ‫الحمولة‬ ‫لمعرفة‬

‫في‬ ‫الطرد‬ ‫نهاية‬ ‫وزن‬ ‫ضرب‬ ‫يتم‬
(
‫الكل‬ ‫الوزن‬ ‫على‬ ‫الطرد‬ ‫جانب‬ ‫وزن‬ ‫قسمة‬ ‫ناتج‬
‫ي‬
.)
 NW= C weight x (B weight/ total)
= 2000 x (4000/8000)
=2000 x 0.5= 1000 KG
 NE= C weight x (D weight/ total)
= 2000 x (4000/8000)
=2000 x 0.5= 1000 KG
 SW= A weight x (B weight/ total)
=6000 x (4000/8000)
=6000 x 0.5= 3000 KG
 SE= A weight x (D weight/ total)
= 6000 x (4000/8000)
= 6000 x 0.5= 3000 KG
Total= 1000 + 1000+ 3000+ 3000= 8000 KG
‫المجموع‬
8000
‫سابقا‬ ‫تحديده‬ ‫تم‬ ‫كما‬ ‫كجم‬
C
A
D
B
NW NE
SW SE
2000
4000 4000
6000
33
EXAMPLES ‫أمثلة‬
‫زاوية‬
A
‫زاوية‬
B
•
‫مستقر‬ ‫غير‬ ‫الطرد‬ ‫يكون‬ ‫قد‬
.
•
‫الزاوية‬ ‫على‬ ‫الحفاظ‬ ‫يجب‬
A
‫من‬ ‫بكثير‬ ‫أقل‬
‫الزاوية‬
B
.
•
‫الثق‬ ‫مركز‬ ‫بين‬ ‫كبيرة‬ ‫مسافة‬ ‫على‬ ‫حافظ‬
‫ل‬
‫الواير‬ ‫تجميع‬ ‫نقطة‬ ‫وبين‬
.
34
‫الطرد؟؟‬ ‫واتزان‬ ‫ثبات‬ ‫على‬ ‫التصبين‬ ‫طريقة‬ ‫تؤثر‬ ‫هل‬
‫مباشرة‬ ‫الثقل‬ ‫مركز‬ ‫فوق‬ ‫الهوك‬ ‫في‬ ‫الويرات‬ ‫تجميع‬ ‫تكون‬ ‫أن‬ ‫يجب‬
35
‫ف‬ ‫للتحكم‬ ‫التصبين‬ ‫وطريقة‬ ‫الواير‬ ‫طريقة‬ ‫اختيار‬
‫الطرد‬ ‫ي‬
SELECTING SLINGS AND HITCHES FOR
LOAD CONTROL
‫التصبين‬ ‫أنواع‬
36
‫واحد‬ ‫واير‬ ‫باستخدام‬ ‫التصبين‬

‫البسيطة‬ ‫األحمال‬ ‫لرفع‬ ‫للتصبين‬ ‫واحد‬ ‫واير‬ ‫استخدام‬ ‫يمكن‬

‫للسقوط‬ ‫المعرضة‬ ‫المواد‬ ‫لرفع‬ ‫يستخدم‬ ‫ال‬
(
‫مثال‬ ‫المواسير‬
)
,
‫والخامات‬
‫للسقوط‬ ‫تتعرض‬ ‫أن‬ ‫يمكن‬ ‫التي‬ ‫واألحمال‬ ‫الطويلة‬
37
SINGLE VERTICAL HITCH

‫الطرد‬ ‫على‬ ‫عمودي‬ ‫واحد‬ ‫واير‬ ‫باستخدام‬ ‫الطرد‬ ‫رفع‬ ‫يتم‬
.

‫الواير‬ ‫بواسطة‬ ‫محموال‬ ‫يكون‬ ‫للطرد‬ ‫الكلي‬ ‫الوزن‬
.

‫الطرد‬ ‫زاوية‬
90

.

‫الط‬ ‫لحمولة‬ ‫مساوية‬ ‫رفع‬ ‫وأدوات‬ ‫وأقفال‬ ‫ويرات‬ ‫استخدام‬ ‫يمكن‬
‫رد‬
.

‫جدال‬ ‫ذات‬ ‫بالويرات‬ ‫الخاصة‬ ‫التصبين‬ ‫عيون‬ ‫تكون‬ ‫ان‬ ‫يجب‬
‫من‬ ‫ت‬
‫نوع‬
Mechanical Flemish Splice

‫أو‬ ‫الطويلة‬ ‫أو‬ ‫المتماسكة‬ ‫غير‬ ‫األحمال‬ ‫مع‬ ‫النوع‬ ‫هذا‬ ‫يستخدم‬ ‫ال‬
‫المتزنة‬ ‫غير‬
.

‫أ‬ ‫أقفال‬ ‫على‬ ‫تحتوي‬ ‫التي‬ ‫األحمال‬ ‫مع‬ ‫النوع‬ ‫هذا‬ ‫استخدام‬ ‫يتم‬
‫و‬
‫مبات‬
.
38
BRIDLE HITCH

‫الطرود‬ ‫لتصبين‬ ‫أكثر‬ ‫أو‬ ‫ويران‬ ‫استخدام‬ ‫يمكن‬
.

‫الوي‬ ‫على‬ ‫بالتساوي‬ ‫الحمل‬ ‫توزيع‬ ‫يتم‬ ‫حينما‬ ‫للطرد‬ ‫ممتاز‬ ‫اتزان‬ ‫تحقق‬ ‫الطريقة‬ ‫هذه‬
‫رات‬
.

‫مباشرة‬ ‫الطرد‬ ‫ثقل‬ ‫مركز‬ ‫فرق‬ ‫الهوك‬ ‫يكون‬ ‫أن‬ ‫يجب‬
.

‫استخدام‬ ‫يمكن‬ ‫بالتساوي‬ ‫األحمال‬ ‫لتوزيع‬
Turnbuckles
‫بالشكل‬ ‫موضح‬ ‫هو‬ ‫كما‬
.

‫الويرات‬ ‫على‬ ‫الزائد‬ ‫التحميل‬ ‫عدم‬ ‫لضمان‬ ‫بدقة‬ ‫بالويرات‬ ‫الخاصة‬ ‫الزوايا‬ ‫قياس‬ ‫يجب‬
39
3-LEG& 4-LEG BRIDLE HITCH

‫ا‬ ‫يوزن‬ ‫الثالث‬ ‫الواير‬ ‫يقوم‬ ‫حين‬ ‫في‬ ‫فقط‬ ‫ميران‬ ‫على‬ ‫موزعة‬ ‫الطرد‬ ‫حمولة‬ ‫تكون‬ ‫قد‬
‫لطرد‬
‫فقط‬ ‫ويران‬ ‫على‬ ‫الحمل‬ ‫حساب‬ ‫يتم‬ ‫لذلك‬ ‫فقط‬

‫الواي‬ ‫اعتبار‬ ‫يجب‬ ‫لذلك‬ ‫األربعة‬ ‫الويرات‬ ‫على‬ ‫بالتساوي‬ ‫موزعا‬ ‫الحمل‬ ‫يكون‬ ‫ال‬ ‫قد‬
‫ثنائي‬ ‫ر‬
‫فقط‬ ‫ويران‬ ‫وعلى‬ ‫األحمال‬ ‫وحساب‬
40
BASKET HITCH AND LOAD CONTROL

‫الطرد‬ ‫حول‬ ‫الواير‬ ‫بلف‬ ‫قم‬ ‫الطرد‬ ‫في‬ ‫أكثر‬ ‫للتحكم‬
.

‫الطرد‬ ‫تحت‬ ‫األوفرالب‬ ‫عمل‬ ‫تجنب‬
41
BASKET HITCH

‫قائ‬ ‫الزاوية‬ ‫تكون‬ ‫أن‬ ‫بشرط‬ ‫حمولته‬ ‫ضعف‬ ‫حمل‬ ‫النوع‬ ‫هذا‬ ‫في‬ ‫الواير‬ ‫يستطيع‬
‫وأن‬ ‫مة‬
‫بين‬ ‫النسبة‬ ‫تكون‬
D
(
‫الطرد‬ ‫حول‬ ‫الواير‬ ‫طرفي‬ ‫بين‬ ‫المسافة‬
)
‫وبين‬
d
(
‫الواير‬ ‫قطر‬
)
25
‫إلى‬
1
42
‫اآلمن‬ ‫الحمل‬ ‫الزاوية‬
‫الداخلية‬
200
% 90
170
% 60
140
% 45
100
% 30
‫اآلمن‬ ‫الحمل‬ ‫الزاوية‬
‫الخارجية‬
200
% 0
170
% 30
140
% 45
100
% 60
SINGLE BASKET HITCH

‫الطر‬ ‫تحت‬ ‫الواير‬ ‫وتمرير‬ ‫بالهوك‬ ‫الغاصات‬ ‫إحدى‬ ‫وضع‬ ‫طريق‬ ‫عن‬ ‫الطرد‬ ‫رفع‬ ‫يتم‬
‫ثم‬ ‫د‬
‫بالهوك‬ ‫الغاصة‬ ‫وضع‬
.

‫للواي‬ ‫ضرر‬ ‫يحدث‬ ‫ال‬ ‫حتى‬ ‫الرفع‬ ‫أثناء‬ ‫أوانزالقه‬ ‫الطرد‬ ‫دوران‬ ‫عدم‬ ‫من‬ ‫التأكد‬ ‫يجب‬
‫أو‬ ‫ر‬
‫الطرد‬
.

‫التصبين‬ ‫بزاوية‬ ‫تتأثر‬ ‫الواير‬ ‫حمولة‬
43
DOUBLE BASKET HITCH

‫اتزانه‬ ‫لضمان‬ ‫الطرد‬ ‫تحت‬ ‫تمريرهما‬ ‫يتم‬ ‫ويران‬
.

‫المساف‬ ‫زيادة‬ ‫عدم‬ ‫مراعاة‬ ‫مع‬ ‫الطرد‬ ‫اتزان‬ ‫لضمان‬ ‫كافية‬ ‫بمسافة‬ ‫بعضهما‬ ‫عن‬ ‫الويران‬ ‫ابعاد‬ ‫يجب‬
‫ة‬
‫الواير‬ ‫زاوية‬ ‫على‬ ‫تؤثر‬ ‫كبيرة‬ ‫بصورة‬
.

‫والواير‬ ‫الطرد‬ ‫بين‬ ‫الزاوية‬ ‫تكون‬ ‫أن‬ ‫يجب‬
60

‫الطرد‬ ‫انزالق‬ ‫لتفادي‬ ‫أكثر‬ ‫أو‬
.

‫ك‬ ‫االنزالق‬ ‫لمنع‬ ‫الحجم‬ ‫مختلفة‬ ‫نقاط‬ ‫حول‬ ‫الويرات‬ ‫تصبين‬ ‫يتم‬ ‫الملساء‬ ‫األسطح‬ ‫ذات‬ ‫الطرود‬
‫هو‬ ‫ما‬
‫كاملة‬ ‫لفة‬ ‫الواير‬ ‫لف‬ ‫يتم‬ ‫أو‬ ‫بالشكل‬ ‫موضح‬
(
‫مزدوجة‬
)
‫الطرد‬ ‫حول‬
.
44
DOUBLE WRAP BASKET HITCH

‫ال‬ ‫بطريقة‬ ‫فقط‬ ‫حمله‬ ‫من‬ ‫بدال‬ ‫عليه‬ ‫والضغط‬ ‫الطرد‬ ‫حول‬ ‫كاملة‬ ‫لفة‬ ‫الواير‬ ‫لف‬ ‫يتم‬
‫سلة‬
"
‫الباسكت‬
."

‫الحاجة‬ ‫حسب‬ ‫ويران‬ ‫أو‬ ‫واحد‬ ‫واير‬ ‫استخدام‬ ‫يمكن‬
.

‫ي‬ ‫حيث‬ ‫واألسطوانات‬ ‫كالمواسير‬ ‫متماسكة‬ ‫غير‬ ‫احمال‬ ‫رفع‬ ‫حالة‬ ‫في‬ ‫ممتاز‬ ‫النوع‬ ‫هذا‬
‫وفر‬
‫اتصال‬
360

‫الطرود‬ ‫وضم‬ ‫بالطرد‬
.
45
CHOKER HITCH AND LOAD CONTROL

‫بطريقة‬ ‫التصبين‬
Choker
‫بنسبة‬ ‫الطرد‬ ‫بجسم‬ ‫اتصال‬ ‫يوفر‬ ‫ال‬
360
‫درجة‬
.

‫الط‬ ‫زاوية‬ ‫لتحسين‬ ‫والطرد‬ ‫الواير‬ ‫بين‬ ‫الخشب‬ ‫من‬ ‫قطعة‬ ‫وضع‬ ‫يمكن‬
‫رد‬
‫التماسك‬ ‫وزيادة‬
.

‫صحيح‬ ‫غير‬ ‫والعكس‬ ‫الغاصة‬ ‫من‬ ‫الواير‬ ‫جسم‬ ‫إدخال‬ ‫يمكن‬
46
CHOKER HITCH

‫هي‬ ‫التصبين‬ ‫من‬ ‫النوع‬ ‫هذا‬ ‫في‬ ‫للواير‬ ‫اآلمنة‬ ‫الحمولة‬
80
%
‫من‬
‫تقل‬ ‫وأال‬ ‫الطرد‬ ‫زوايا‬ ‫في‬ ‫حماية‬ ‫عمل‬ ‫بشرط‬ ‫الواير‬ ‫حمولة‬
‫عن‬ ‫الرأسية‬ ‫الزاوية‬
60
‫بالشكل‬ ‫موضح‬ ‫هو‬ ‫كما‬ ‫درجة‬
47
‫اآلمن‬ ‫الحمل‬ ‫الزاوية‬
80
% 120
-
180
65
% 90
-
119
55
% 60
-
89
45
% 30
-
59
SINGLE CHOKER HITCH

‫القفل‬ ‫أو‬ ‫الغاصات‬ ‫إحدى‬ ‫خالل‬ ‫من‬ ‫الواير‬ ‫تمرير‬ ‫طريق‬ ‫عن‬ ‫العقدة‬ ‫يشبه‬ ‫ما‬ ‫عمل‬ ‫يتم‬
.

‫اتزا‬ ‫يصعب‬ ‫التي‬ ‫الحمال‬ ‫مع‬ ‫استخدامه‬ ‫يتم‬ ‫ال‬ ‫لذلك‬ ‫بالطرد‬ ‫كامل‬ ‫اتصال‬ ‫يوفر‬ ‫ال‬
‫بواسطة‬ ‫نها‬
‫المتماسكة‬ ‫غير‬ ‫أو‬ ‫واحد‬ ‫واير‬
.

‫لتدوير‬ ‫أو‬ ‫حمولته‬ ‫ضعف‬ ‫لرفع‬ ‫الواير‬ ‫زوج‬ ‫أيضا‬ ‫يمكن‬
/
‫الطرد‬ ‫قلب‬

‫المع‬ ‫االتجاه‬ ‫في‬ ‫الطرد‬ ‫فوق‬ ‫الغاصتين‬ ‫كال‬ ‫وضع‬ ‫يتم‬ ‫الطرد‬ ‫لقلب‬ ‫حاجة‬ ‫وجود‬ ‫عند‬
‫اكس‬
‫تدوير‬ ‫التجاه‬
/
‫خال‬ ‫من‬ ‫تمرير‬ ‫ويتم‬ ‫الطرد‬ ‫حول‬ ‫الواير‬ ‫منتصف‬ ‫ويكون‬ ‫الطرد‬ ‫قلب‬
‫ل‬
‫بالشكل‬ ‫موضح‬ ‫هو‬ ‫كما‬ ‫بالهوك‬ ‫ووضعه‬ ‫الغاصتين‬
.
48
DOUBLE CHOKER HITCH

‫الطرد‬ ‫اتزان‬ ‫على‬ ‫للمحافظة‬ ‫ويران‬ ‫استخدام‬ ‫يتم‬
.

‫ت‬ ‫الطرد‬ ‫انقالب‬ ‫احتمالية‬ ‫لكن‬ ‫للطرد‬ ‫الكامل‬ ‫اإلمساك‬ ‫عدم‬ ‫في‬ ‫الفردي‬ ‫الواير‬ ‫تشبه‬
‫أقل‬ ‫كون‬
‫المتماسكة‬ ‫غير‬ ‫األحمال‬ ‫مع‬ ‫النوع‬ ‫هذا‬ ‫استخدام‬ ‫يمكن‬ ‫لذلك‬ ‫بكثير‬
.
49
DOUBLE WRAP CHOKER HITCH

‫الط‬ ‫سطح‬ ‫مع‬ ‫اتصاله‬ ‫زاوية‬ ‫فإن‬ ‫الطرد‬ ‫حول‬ ‫مزدوجة‬ ‫لفة‬ ‫الواير‬ ‫لف‬ ‫عند‬
‫رد‬
‫تكون‬
360
‫درجة‬
.

‫الطريقة‬ ‫بهذه‬ ‫للتصبين‬ ‫ويران‬ ‫أو‬ ‫واحد‬ ‫واير‬ ‫استخدام‬ ‫يمكن‬
50
HITCHES AND LOAD CONTROL

‫الط‬ ‫سطح‬ ‫مع‬ ‫اتصاله‬ ‫زاوية‬ ‫فإن‬ ‫الطرد‬ ‫حول‬ ‫مزدوجة‬ ‫لفة‬ ‫الواير‬ ‫لف‬ ‫عند‬
‫رد‬
‫عن‬ ‫تزيد‬
360
‫درجة‬
.

‫الطرد‬ ‫تحت‬ ‫األوفرالب‬ ‫عمل‬ ‫يجب‬ ‫ال‬

‫من‬ ‫الواير‬ ‫تمديد‬ ‫تجنب‬
(
eye bolt
)
‫الواير‬ ‫على‬ ‫الحمل‬ ‫يزيد‬ ‫ذلك‬ ‫ألن‬
‫الرفع‬ ‫زاوية‬ ‫على‬ ‫ويؤثر‬

‫اسفل‬ ‫الغاصة‬ ‫سحب‬ ‫لمنع‬ ‫الغاصات‬ ‫اتجاه‬ ‫عكس‬ ‫يتم‬ ‫التصبين‬ ‫عند‬
‫الطرد‬
51
‫التصبين‬
HITCHES

‫الوصلة‬ ‫أو‬ ‫الهوك‬ ‫عرض‬
(
‫القفل‬
‫مثال‬
)
‫قط‬ ‫من‬ ‫أكبر‬ ‫تكون‬ ‫أن‬ ‫يجب‬
‫ر‬
‫نصف‬ ‫عن‬ ‫تزيد‬ ‫ال‬ ‫ولكن‬ ‫الواير‬
(
1/2
)
‫الغاصة‬ ‫طول‬
L

‫الس‬ ‫بطريقة‬ ‫التصبين‬ ‫حالة‬ ‫في‬
‫إذا‬ ‫لة‬
‫القائمة‬ ‫الزاوية‬ ‫بلغت‬
60
‫فإن‬ ‫درجة‬
‫الواير‬ ‫حمولة‬ ‫نفس‬ ‫تكون‬ ‫الحمولة‬
(
‫العمودي‬ ‫الوضع‬ ‫في‬
)
52
60
‫ومثلث‬ ‫األحمال‬ ‫حساب‬
‫التصبين‬
LOADS ON RIGGING AND
RIGGING TRIANGLE
53
SLING ANGLES ‫والويرات‬ ‫التصبين‬ ‫زوايا‬

‫الحمولة‬ ‫لحساب‬
(
‫الطرد‬
)

‫واير‬ ‫كل‬ ‫على‬ ‫الوزن‬
=
‫الواير‬ ‫على‬ ‫الوزن‬
‫عموديا‬
X
‫الطرد‬ ‫زاوية‬ ‫معامل‬
(
‫الحمولة‬
)
ß

‫الزاوية‬ ‫معامل‬
=
‫الواير‬ ‫طول‬
/
‫اإلرتفاع‬
(
L/H
)

‫الحمولة‬
=
500
x
‫الطرد‬ ‫زاوية‬ ‫معامل‬
1000 KG 500
KG
500
KG
1000 KG
H
54
‫الزوايا‬ ‫معامل‬
LOAD ANGLE FACTOR
1000 KG
H
Vertical Sling Angle ß
‫قائــمة‬ ‫الزاويــة‬
Load Angle Factor = L/H
‫الزاوية‬ ‫معامل‬
(
‫الطول‬
/
‫اإلرتفاع‬
)
0 1.00
30 1.16 (1.2)
45 1.41 (1.4)
60 2.00 (2.0)
‫واير‬ ‫كل‬ ‫على‬ ‫الوزن‬
=
‫عموديا‬ ‫الواير‬ ‫على‬ ‫الوزن‬
X
‫معامل‬
‫الطرد‬ ‫زاوية‬
(
‫الحمولة‬
)
ß
55
SLING LENGTH FOR DESIRED ANGLE
‫الزاوية‬ ‫على‬ ‫بناء‬ ‫الواير‬ ‫طول‬
Vertical Angle
‫قائمة‬ ‫زاوية‬
Length Factor
‫الواير‬ ‫طول‬ ‫معامل‬
L/H Load Angle Factor
‫الطول‬
/
‫اإلرتفاع‬
(
‫معامل‬
‫الزاوية‬
)
60 1.15 2
50 1.31 1.55
45 1.41 1.4
40 1.55 1.3
35 1.74 1.21
30 2 1.16
‫الواير‬ ‫طول‬
=
D
X
‫الواير‬ ‫طول‬ ‫معامل‬
D
=
‫الواير‬ ‫تصبين‬ ‫نقطة‬ ‫إلى‬ ‫الطرد‬ ‫ثقل‬ ‫مركز‬ ‫من‬ ‫المسافة‬
D 2
D 1
56
UNEQUAL LEGS ‫الطول‬ ‫متساوية‬ ‫غير‬ ‫ويرات‬
D 1 D 2
H
‫واير‬ ‫كل‬ ‫على‬ ‫الشد‬ ‫لحساب‬
:
‫رقم‬ ‫الواير‬ ‫على‬ ‫الشد‬
1
=
‫الكلي‬ ‫الوزن‬
X
D2
X
‫الزاوية‬ ‫معامل‬
(
D1+D2
‫الطرد‬ ‫طول‬
)
‫رقم‬ ‫الواير‬ ‫على‬ ‫الشد‬
2
=
‫الكلي‬ ‫الوزن‬
X
D1
X
‫الزاوية‬ ‫معامل‬
(
D1+D2
‫الطرد‬ ‫طول‬
)
57
SLING LOADS ‫الويرات‬ ‫على‬ ‫األحمال‬
10 Ton
‫الوزن‬ ‫الزاوية‬
5.2 15
6 30
7 45
10 60
29 80
‫زاوية‬ ‫تفضل‬
30
‫أقل‬ ‫أو‬ ‫العمودي‬ ‫على‬ ‫درجة‬
‫الزاوية‬ ‫هي‬ ‫اختيار‬ ‫أسوأ‬
60
‫العمودي‬ ‫على‬
58
‫الزاوية‬ ‫معامل‬ ‫استخدم‬
(
‫الطول‬
/
‫اإلرتفاع‬
)
‫التصب‬ ‫زاوية‬ ‫لتحديد‬
‫ين‬
H
2 2 2
‫متر‬ ‫طول‬
‫الواير‬
L
1 1.4 1.7
‫متر‬ ‫اإلرتفاع‬
H
2 1.428 1.176 ‫الزاوية‬ ‫معامل‬
L/H
60 45 30 ‫الزاوية‬
‫الواير‬ ‫حجم‬
L/H ‫الزاوية‬
1.2 30
1.4 45
2 60
4000 KG
59
‫الزاوية‬ ‫معامل‬ ‫استخدم‬
(
‫الطول‬
/
‫اإلرتفاع‬
)
‫التصب‬ ‫زاوية‬ ‫لتحديد‬
‫ين‬
H
2.4 2.4 2.4 ‫طول‬
‫الواير‬
L
2 1.7 1.2
‫متر‬ ‫اإلرتفاع‬
H
‫الزاوية‬ ‫معامل‬
L/H
‫الحمل‬
‫كل‬ ‫على‬
‫واير‬
10
‫طن‬
60
‫مثـــال‬
EXAMPLE
‫واير‬ ‫كل‬ ‫على‬ ‫الحمل‬ ‫لحساب‬

‫رقم‬ ‫الواير‬ ‫طول‬
1
=
11.3

‫اإلرتفاع‬
=
8

‫الزاوية‬ ‫معامل‬
L/H
=
11.3/8
=
1.4125

‫الواير‬ ‫حمولة‬
=
1.4125
x
10000
x
2
(/
2
+
8
=)
2825
‫كجم‬

‫الزاوية‬
=
45
‫درجة‬

‫رقم‬ ‫الواير‬ ‫طول‬
2
=
8.2

‫اإلرتفاع‬
=
8

‫الزاوية‬ ‫معامل‬
L/H
=
8.2/8
=
1.025

‫الواير‬ ‫حمولة‬
=
1.025
x
10000
x
8
(/
2
+
8
=)
8200
‫كجم‬

‫من‬ ‫أقل‬ ‫الزاوية‬
30
‫درجة‬
L1= 11.3 L2 = 8.2
H= 8
D1= 8 D2= 2
D= 10
61
10000 KG
‫واير‬ ‫كل‬ ‫على‬ ‫األحمال‬ ‫حدد‬
DETERMINE THE LOADS PLACED ON
EACH SLING

‫المواسير‬ ‫تصبين‬ ‫طريقة‬
Choker

‫الزاوية‬
=
45
‫درجة‬

‫صلب‬ ‫الويرات‬ ‫نوع‬

‫تحمل‬ ‫التي‬ ‫الويرات‬ ‫على‬ ‫الحمولة‬
‫الميزان‬
ٍ(
Spreader Beam
=)
12
‫طن‬

‫الزاوية‬ ‫معامل‬
45
=
1.4

1.4
x
12/2
=
8.4
‫طن‬

‫تحمل‬ ‫التي‬ ‫الويرات‬ ‫على‬ ‫الحمولة‬
‫المواسير‬
=
10
‫طن‬

‫الزاوية‬
90
=
10/2
=
5
‫طن‬

‫الواير‬ ‫حجم‬ ‫لتحديد‬ ‫للجدول‬ ‫بالرجوع‬
‫مع‬
‫التصبين‬ ‫طريقة‬
(
choker
= )
24
‫مم‬
10 Ton
2 Ton
62
‫األقفـــــال‬
SHACKLES
63
‫والوصالت‬ ‫واألقفال‬ ‫الهوك‬ ‫استخدام‬
APPLICATION OF HOIST HOOKS,
SHACKLES AND LINKS

‫ي‬ ‫المنتج‬ ‫تتبع‬ ‫على‬ ‫للقدرة‬
‫تم‬
‫على‬ ‫التعرف‬ ‫كود‬ ‫استخدام‬
‫المنتج‬

WLL
‫القفل‬ ‫حمولة‬

Ultimate Load
(
‫الحمولة‬
‫القصوى‬
)
‫يمكن‬ ‫ال‬ ‫حمولة‬ ‫أقل‬
‫انه‬ ‫تسبب‬ ‫أو‬ ‫رفعها‬ ‫للمنتج‬
‫أو‬ ‫يار‬
‫الرفع‬ ‫عملية‬ ‫فشل‬

Design Factor
=
Ultimate Load/WLL
‫اآلمنة‬ ‫المنطقة‬
‫القفل‬ ‫إلستخدام‬
‫القفل‬ ‫حمولة‬
‫المنتج‬ ‫على‬ ‫التعرف‬ ‫كود‬
64
SHACKLES ‫األقفال‬
 Tensile Strength ‫الشد‬ ‫قوة‬

‫الوزن‬ ‫حمل‬ ‫على‬ ‫القفل‬ ‫قدرة‬
 Ductility ‫الليونة‬

‫تشوه‬ ‫امكانية‬
(
‫تأثر‬
)
‫الزائد‬ ‫بالحمل‬ ‫القفل‬

 Fatigue Strength ‫التحمل‬

‫المتكرر‬ ‫اإلستخدام‬ ‫تحمل‬ ‫على‬ ‫القفل‬ ‫قدرة‬

1.5
‫لمدة‬ ‫اآلمن‬ ‫الحمل‬ ‫مرة‬
20000
‫دورة‬
 Impact Strength ‫الصالبة‬
(
‫الصدمات‬ ‫تحمل‬
)

‫بسرعة‬ ‫وزن‬ ‫حمل‬ ‫على‬ ‫القفل‬ ‫قدرة‬ 65
SHACKLES ‫األقفال‬
Screw Pin Shackle
‫األحمال‬ ‫ونقل‬ ‫رفع‬ ‫في‬ ‫يستخدم‬
‫رفع‬ ‫عملية‬ ‫كل‬ ‫قبل‬ ‫ربطه‬ ‫ويتم‬
Bolt Type Shackle
‫طويلة‬ ‫التركيبات‬ ‫في‬ ‫يستخدم‬
‫األجل‬
‫للفك‬ ‫الحاجة‬ ‫عدم‬ ‫حالة‬ ‫في‬
‫باستمرار‬ ‫والتركيب‬
Wide Body Shackle
‫القماش‬ ‫الويرات‬ ‫مع‬ ‫يستخدم‬
66
‫تصبين‬
(
‫توصيل‬
)
‫بالهوك‬ ‫الويرات‬
CONNECTION OF SLINGS TO HOOK

‫الغاصة‬ ‫فتح‬ ‫يجب‬ ‫ال‬
(
‫العين‬
( )
W
)
‫من‬ ‫ألكثر‬ ‫بالواير‬ ‫الخاصة‬
50
%
‫الغاصة‬ ‫طول‬ ‫من‬
(
L
)

‫يق‬ ‫أن‬ ‫يجب‬ ‫المستخدم‬ ‫الهوك‬ ‫سمك‬
‫ل‬
‫عن‬
50
%
‫الغاصة‬ ‫طول‬ ‫من‬
(
L
)

‫أن‬ ‫يجب‬ ‫القماش‬ ‫الويرات‬ ‫حالة‬ ‫في‬
‫عن‬ ‫الهوك‬ ‫سمك‬ ‫يقل‬
1/3
‫طول‬
‫الغاصة‬
(
L
)
67
45 45
‫عن‬ ‫الهوك‬ ‫على‬ ‫الزاوية‬ ‫تزيد‬ ‫أال‬ ‫يجب‬
90
‫درجة‬ ‫القفل‬ ‫على‬ ‫الزاوية‬ ‫تزيد‬ ‫أال‬ ‫يجب‬
(
‫الوصلة‬
)
‫عن‬
120
‫درجة‬
‫من‬ ‫أكثر‬ ‫وضع‬ ‫يجب‬ ‫ال‬
2
‫بالهوك‬ ‫واير‬ ‫تجميع‬ ‫وصلة‬ ‫استخدام‬ ‫يتم‬
(
‫حلقة‬
)
‫زي‬ ‫حالة‬ ‫في‬
‫ادة‬
‫عن‬ ‫الويرات‬ ‫عدد‬
2
‫واير‬
68
SHACKLES ‫األقفال‬
•
‫حالة‬ ‫في‬
Spreader
Beam
‫أقف‬ ‫استخدام‬ ‫يمكن‬
‫ال‬
‫بنز‬ ‫أو‬ ‫بمسمار‬ ‫مزودة‬
Bolt
Type Shackle
‫بينما‬
‫أقفال‬ ‫تستخدم‬
Screw
Type Shackle
‫لتصبين‬
‫الطرد‬
•
‫الخاص‬ ‫المسمار‬ ‫وضع‬ ‫يتم‬ ‫ال‬
‫المتحر‬ ‫الواير‬ ‫على‬ ‫بالقفل‬
‫ك‬
.
•
‫رصاصة‬ ‫وضع‬ ‫يفضل‬
Thimble
‫الغاصة‬ ‫على‬
(
‫العين‬
)
‫بالو‬ ‫اإلحتكاك‬ ‫لمنع‬
‫اير‬
69
SHACKLES ‫األقفال‬
•
‫ق‬ ‫بالقفل‬ ‫الخاص‬ ‫المسمار‬ ‫على‬ ‫الواير‬ ‫حركة‬
‫د‬
‫فتحه‬ ‫إلى‬ ‫تؤدي‬
•
‫الخاص‬ ‫المسمار‬ ‫وضع‬ ‫يتم‬ ‫ال‬
‫المتحر‬ ‫الواير‬ ‫على‬ ‫بالقفل‬
‫ك‬
.
70
SHACKLES ‫األقفال‬
•
‫الوا‬ ‫قطر‬ ‫من‬ ‫أكبر‬ ‫يكون‬ ‫أن‬ ‫يجب‬ ‫القفل‬ ‫حجم‬
‫ير‬
,
‫برصاصة‬ ‫غاصة‬ ‫استخدام‬ ‫ويفضل‬
(
Thimble
)
‫الواير‬ ‫لحماية‬
•
‫الخاص‬ ‫المسمار‬ ‫وضع‬ ‫يتم‬ ‫ال‬
‫المتحر‬ ‫الواير‬ ‫على‬ ‫بالقفل‬
‫ك‬
.
71
‫األقفال‬ ‫وضع‬
POINT LOADING OF SHACKLES
Pin over Pin
Body over Body
Body over Pin
72
‫باألقفال‬ ‫الويرات‬ ‫توصيل‬
CONNECTION OF SLINGS TO SHACKLE
•
‫كب‬ ‫القفل‬ ‫قطر‬ ‫يكون‬ ‫أن‬ ‫يجب‬
‫ير‬
‫الواير‬ ‫عصر‬ ‫لتفادي‬ ‫كفاية‬
•
‫قط‬ ‫من‬ ‫أكبر‬ ‫القفل‬ ‫قطر‬ ‫يكون‬ ‫أن‬ ‫يجب‬
‫ر‬
‫بالغاص‬ ‫رصاصة‬ ‫هناك‬ ‫تكن‬ ‫لم‬ ‫إذا‬ ‫الواير‬
‫ة‬
(
‫العين‬
)
Thimble 73
‫األقفال‬ ‫على‬ ‫الجانبي‬ ‫التحميل‬
SIDE LOADING OF SHACKLES
74
‫األقفال‬ ‫على‬ ‫الجانبي‬ ‫التحميل‬
SIDE LOADING OF SHACKLES
‫اآلمن‬ ‫الحمولة‬ ‫تخقيض‬ ‫نسبة‬
‫ة‬
WLL
‫الطولي‬ ‫الخط‬ ‫من‬ ‫الزاوية‬
(
in
line
)
0% 0:10
15% 11:20
25% 21:30
30% 31:45
40% 46:55
45% 56:70
50% 71:90
‫ملحوظة‬
:
‫نوع‬ ‫من‬ ‫األقفال‬ ‫على‬ ‫الجانبي‬ ‫التحميل‬ ‫يتم‬ ‫ال‬
:
G-215
,
S-215
,
G-213
,
S-213
Round Pin Shackles
75
‫الهوك‬ ‫مع‬ ‫األقفال‬
SHACKLES PLACED ON HOOKS
•
‫الهوك‬ ‫إستقرار‬ ‫من‬ ‫التأكد‬ ‫يجب‬
‫القفل‬ ‫على‬
.
•
‫أ‬ ‫تكون‬ ‫أن‬ ‫يجب‬ ‫القفل‬ ‫فتحة‬ ‫قطر‬
‫كبر‬
‫الهوك‬ ‫سمك‬ ‫من‬
76
‫كحلقة‬ ‫القفل‬ ‫استخدام‬
(
‫وصلة‬
)
‫تجميع‬
SHACKLE AS A COLLECTOR RING
•
‫وص‬ ‫أو‬ ‫كحلقة‬ ‫القفل‬ ‫استخدام‬ ‫حالة‬ ‫في‬
‫لة‬
‫المسمار‬ ‫أو‬ ‫البنز‬ ‫يكون‬ ‫أن‬ ‫يجب‬ ‫تجميع‬
‫ألعلى‬
.
•
‫عن‬ ‫تزيد‬ ‫ال‬ ‫الويرات‬ ‫زاوية‬
120
‫درجة‬
•
‫أو‬ ‫قالووظ‬ ‫بمسمار‬ ‫أقفال‬ ‫استخدام‬ ‫يتم‬
‫قالووظ‬ ‫مسمار‬
‫وبنز‬
•
‫تجميع‬ ‫وصلة‬ ‫استخدام‬ ‫حالة‬ ‫في‬
Master Link
‫الزاوية‬ ‫تزيد‬ ‫أال‬ ‫يجب‬
‫عن‬
120
‫درجة‬
77
EYE BOLTS
78
‫األنــــــــــــــواع‬
TYPES OF EYE BOLTS
 Shouldered Eye Bolt
 Non-Shouldered Eye Bolt
 Swivel Hoist Ring
 Machinery Eye Bolt 79
‫التركيب‬
EYE BOLT INSTALLATION
‫قطر‬ ‫من‬ ‫أكبر‬
Eye Bolt
‫واحدة‬ ‫لصامولة‬ ‫نحتاج‬
‫قطر‬ ‫من‬ ‫أقل‬ ‫أو‬ ‫تساوي‬
Eye Bolt
‫نحتاج‬
‫لصامولتين‬

‫الطرد‬ ‫داخل‬ ‫الكلي‬ ‫العمق‬
‫ونصف‬ ‫مرتان‬
(
2.5
)
‫قطر‬
Eye Bolt

‫األقل‬ ‫على‬ ‫القالووظ‬ ‫عمق‬
‫قطر‬ ‫مرتان‬
Eye Bolt
‫قطر‬ ‫من‬ ‫أقل‬ ‫أو‬ ‫تساوي‬
Eye Bolt
‫توجد‬ ‫وال‬
‫واحدة‬ ‫صامولة‬ ‫سوى‬

‫الطرد‬ ‫داخل‬ ‫الكلي‬ ‫العمق‬
‫القالووظ‬ ‫طول‬ ‫يساوي‬
‫قطر‬ ‫نصف‬ ‫إلى‬ ‫باإلضافة‬
Eye Bolt

2.5
‫قطر‬
Eye Bolt
80
‫عامة‬ ‫متطلـــــبات‬
EYE BOLTS- GENERAL REQUIREMENTS

‫رفع‬ ‫وسيلة‬ ‫استخدام‬ ‫مراعاة‬ ‫يجب‬
‫مناسبة‬

‫مناسب‬ ‫غير‬ ‫هوك‬ ‫استخدام‬ ‫تجنب‬
‫مناسبة‬ ‫غير‬ ‫بطريقة‬ ‫أو‬

‫بين‬ ‫للربط‬ ‫األقفال‬ ‫استخدم‬
Eye
Bolt
‫الواير‬ ‫و‬
81
‫للرفع‬ ‫وايرين‬ ‫استخدام‬
EYE BOLTS USED WITH A TWO LEGGED SLING

‫تصبح‬
Eye Bolts
‫عند‬ ‫أضعف‬
‫الجانبي‬ ‫التحميل‬
.

‫نتيج‬ ‫أثقل‬ ‫الحمل‬ ‫أيضا‬ ‫يصبح‬
‫ة‬
‫التحميل‬ ‫زاوية‬

‫استخدام‬ ‫يجب‬
Eye Bolt
‫من‬
‫النوع‬
Shoulder Nut
‫أو‬
Machinery
‫التحميل‬ ‫عند‬
‫الجانبي‬
(
‫بزاوية‬
)
82
‫الجانبي‬ ‫التحميل‬
(
‫بزاوية‬
)
ANGULAR LOADING

‫تكون‬ ‫أن‬ ‫البد‬
Eye Bolt
‫بحافة‬
‫عريضة‬
Shoulder
.

‫بالطرد‬ ‫جيدا‬ ‫ربطها‬ ‫من‬ ‫البد‬

‫اتجاه‬ ‫مع‬ ‫اتجاهها‬ ‫يكون‬ ‫أن‬ ‫يجب‬
Eye Bolt
‫بالشكل‬ ‫موضح‬ ‫هو‬ ‫كما‬
83
‫الجانبي‬ ‫التحميل‬
(
‫بزاوية‬
)
ANGULAR LOADING

‫الوض‬ ‫في‬ ‫الفتحة‬ ‫إتجاه‬ ‫يكن‬ ‫لم‬ ‫إذا‬
‫ع‬
‫تحد‬ ‫يتم‬ ‫الواير‬ ‫إلتجاه‬ ‫المناسب‬
‫يد‬
‫لتعديل‬ ‫المطلوبة‬ ‫المسافة‬
Eye
Bolt
.

‫فك‬ ‫يتم‬
Eye Bolt
‫وردة‬ ‫ووضع‬
Shim
‫وتركيب‬ ‫مناسبة‬ ‫بسماكة‬
Eye Bolt
‫ليناسب‬ ‫أخرى‬ ‫مرة‬
‫الواير‬ ‫اتجاه‬
84
‫الجانبي‬ ‫التحميل‬
(
‫بزاوية‬
)
ANGULAR LOADING

‫حمولة‬ ‫تخفيض‬ ‫يتم‬
Eye Bolt
‫الزاوية‬ ‫حسب‬
.

‫الجانبي‬ ‫التحميل‬
(
‫بزاوية‬
)
‫يكو‬
‫فقط‬ ‫ن‬
‫باستخدام‬
Eye Bolt
‫بحافة‬
‫عريضة‬
Shoulder
‫اآلمن‬ ‫الحمل‬ ‫نسبة‬
‫التخفيض‬
‫الزاوية‬
100
% 0
% 0
65
% 35
% 30
55
% 45
% 45
25
% 75
% 60
85
‫اختيار‬
EYE BOLT
SELECTION OF EYE BOLT
2 m 2 m 2 m ‫الطول‬
L
1 m 1.4 m 1.7 m ‫اإلرتفاع‬
H
2 1.428 1.176 ‫الطول‬
/
‫اإلرتفاع‬
L/H
60 45 30 ‫الزاوية‬
‫جانب‬ ‫كل‬ ‫على‬ ‫الوزن‬
‫حجم‬
Eye Bolt
H
2000 KG
86
APPLICATION OF WIRE
ROPE TERMINATIONS
87
‫األنــــــواع‬
TERMINATION TYPES
 Spelter Socket
 Swage Socket
 Turnback eye
 Wedge Socket
 Wire Rope Clip Eye
 Flemish Eye 88
‫الكــــــــــفاءة‬
TERMINATION EFFICIENCY
Swage and Spelter Socket 100%
Turnback and Flemish Eye 90%
Wedge Socket and Wire Rope Clips
80%
89
‫الفاعلية‬
/
‫الكــــفاءة‬
EFFICIENCY

‫الك‬ ‫قوة‬ ‫بين‬ ‫النسبة‬ ‫هي‬ ‫الكفاءة‬ ‫أو‬ ‫الفعالية‬
‫سر‬
‫بع‬ ‫الخاصة‬ ‫الكسر‬ ‫قوة‬ ‫وبين‬ ‫للمنتج‬ ‫المحددة‬
‫مل‬
‫الواير‬ ‫نهاية‬
(
Termination
)
‫بنسبة‬ ‫موضحة‬
‫مئوية‬
‫مثال‬
:
‫للزاويتين‬ ‫المطلوبة‬ ‫الكسر‬ ‫قوة‬ ‫هي‬ ‫ما‬
‫إذا‬ ‫الموضحتين‬
:

‫بالشكل‬ ‫موضح‬ ‫هو‬ ‫كما‬ ‫الزاوية‬

‫األمان‬ ‫معامل‬
Design Factor
‫يساوي‬
5:1

‫يساوي‬ ‫الوزن‬
10
‫طن‬

Flemish Eye
‫مستخدمة‬
30
90
‫الفاعلية‬
/
‫الكــــفاءة‬
EFFICIENCY
‫اإلجابة‬
:

‫الزاوية‬ ‫في‬
30

‫الزاوية‬ ‫معامل‬
=
1.2

‫الواير‬ ‫على‬ ‫الحمل‬
=
1.2
X
10
=
12
‫طن‬

‫الكفاءة‬ ‫أو‬ ‫الفعالية‬
=
90
%

‫األمان‬ ‫معامل‬
Design factor
=
5:1

‫المطلوبة‬ ‫الكسر‬ ‫قوة‬
( =
12
/
0.9
)
x
5
=
66.6
‫طن‬

‫الزاوية‬ ‫في‬
60

‫الزاوية‬ ‫معامل‬
=
2

‫الواير‬ ‫على‬ ‫الحمل‬
=
2
X
10
=
20
‫طن‬

‫الكفاءة‬ ‫أو‬ ‫الفعالة‬
=
90
%

‫األمان‬ ‫معامل‬
(
Design Factor
=)
5:1

‫المطلوبة‬ ‫الكسر‬ ‫قوة‬
( =
20/0.9
)
x
5
=
111.5
‫طن‬
30
91
‫بالويرات‬ ‫الخاصة‬ ‫األقفال‬
WIRE ROPE CLIPS

‫رصاصة‬ ‫استخدام‬ ‫يجب‬
Thimble
‫عمل‬ ‫عند‬
‫الواي‬ ‫تحمي‬ ‫حيث‬ ‫الكلبسات‬ ‫باستخدام‬ ‫غاصة‬
‫ر‬
.

‫ال‬ ‫الطرف‬ ‫نهاية‬ ‫عند‬ ‫قرب‬ ‫كلبس‬ ‫أول‬ ‫ربط‬ ‫يتم‬
‫ميت‬
‫ال‬ ‫على‬ ‫التبديل‬ ‫ويتم‬ ‫الصامولتين‬ ‫التربط‬
‫صامولتين‬
‫المطلوب‬ ‫للعزم‬ ‫الوصول‬ ‫يتم‬ ‫حتى‬

‫والر‬ ‫الغاصة‬ ‫ناحية‬ ‫الثاني‬ ‫الكلبس‬ ‫ربط‬ ‫يتم‬
‫صاصة‬
‫الس‬ ‫الطريقة‬ ‫بنفس‬ ‫والتعزيم‬ ‫الربط‬ ‫ويتم‬
‫ابقة‬

‫القفلين‬ ‫بين‬ ‫الثالث‬ ‫الكلبس‬ ‫ربط‬ ‫يتم‬
(
‫ال‬
‫كلبسين‬
)
‫الطريقة‬ ‫وبنفس‬ ‫السابقين‬

‫رفعه‬ ‫المراد‬ ‫الوزن‬ ‫بنفس‬ ‫الواير‬ ‫بتحميل‬ ‫قم‬
‫أو‬
‫أخ‬ ‫مرة‬ ‫الكلبسات‬ ‫على‬ ‫بالتعزيم‬ ‫قم‬ ‫ثم‬ ‫أكثر‬
‫رى‬
‫ملحوظة‬
‫مر‬ ‫الواير‬ ‫على‬ ‫التعزيم‬ ‫من‬ ‫البد‬
‫ة‬
‫رفعة‬ ‫أول‬ ‫بعد‬ ‫أخرى‬
(
‫الرفعة‬
‫التجريبية‬
)
92
‫الميت‬ ‫الطرف‬ ‫على‬ ‫أبدا‬ ‫الكلبسات‬ ‫تربط‬ ‫ال‬
NEVER SADDLE A DEAD HORSE
93
WEDGE SOCKETS ‫البسكوتة‬
 Basic Requirements ‫المتطلبات‬
‫الرئيسية‬

‫البنز‬ ‫اتجاه‬ ‫نفس‬ ‫في‬ ‫يكون‬ ‫الحي‬ ‫الواير‬

‫المناسب‬ ‫الذيل‬ ‫طول‬
(
‫من‬ ‫مكون‬ ‫واير‬ ‫استخدام‬ ‫عند‬
6
‫إلى‬
8
‫جدالت‬
)
‫يكون‬
6
‫ع‬ ‫يقل‬ ‫ال‬ ‫بحيث‬ ‫الواير‬ ‫قطر‬ ‫أضعاف‬
‫ن‬
15
‫سم‬
.

‫طول‬ ‫يكون‬ ‫لإللتفاف‬ ‫مقاومة‬ ‫ويرات‬ ‫إستخدام‬ ‫حالة‬ ‫في‬
‫األقل‬ ‫على‬ ‫الذيل‬
20
‫أيض‬ ‫يقل‬ ‫ال‬ ‫بحيث‬ ‫الواير‬ ‫قطر‬ ‫مرة‬
‫ا‬
‫عن‬
15
‫سم‬
.

‫الحي‬ ‫بالواير‬ ‫ربطه‬ ‫عدم‬ ‫مراعاة‬ ‫مع‬ ‫الذيل‬ ‫ربط‬ ‫يتم‬ 94
WEDGE SOCKETS ‫البسكوتة‬
Live Line
Socket Pin
‫البنز‬ ‫اتجاه‬ ‫نفس‬ ‫في‬ ‫يكون‬ ‫الحي‬ ‫الطرف‬
‫الذيل‬ ‫طول‬
6
‫عن‬ ‫يقل‬ ‫وال‬ ‫الواير‬ ‫قطر‬ ‫أضعاف‬
15
‫سم‬
95
WEDGE SOCKETS ‫البسكوتة‬
‫مربوط‬ ‫الحي‬ ‫الطرف‬
‫الميت‬ ‫الطرف‬ ‫مع‬
‫أن‬ ‫يجب‬ ‫الحي‬ ‫الواير‬
‫اتج‬ ‫نفس‬ ‫في‬ ‫يكون‬
‫اه‬
‫البنز‬ 96
WEDGE SOCKETS ‫البسكوتة‬
97
WEDGE SOCKETS ‫البسكوتة‬
‫المناس‬ ‫الحجم‬ ‫اختيار‬ ‫من‬ ‫دائما‬ ‫تأكد‬
‫ب‬
‫المستخدم‬ ‫للواير‬
‫مطبوع‬ ‫أو‬ ‫محفور‬ ‫يكون‬ ‫الواير‬ ‫حجم‬
‫ال‬ ‫على‬
Wedge ,
‫و‬
Socket
98
WEDGE SOCKETS ‫البسكوتة‬
OFFSHORE CRANES

‫الماء‬ ‫سطح‬ ‫على‬ ‫تعمل‬ ‫التي‬ ‫باألوناش‬ ‫الخاصة‬ ‫المتطلبات‬
20
‫على‬ ‫الواير‬ ‫قطر‬ ‫مرة‬
‫األقل‬
3
‫على‬ ‫الواير‬ ‫قطر‬ ‫أضعاف‬
‫األكثر‬
10
‫الواير‬ ‫قطر‬ ‫أضعاف‬
‫على‬
‫األقل‬
99
FLEMISH EYE TERMINATION
‫ب‬ ‫الخاصة‬ ‫الغاصة‬ ‫لعمل‬ ‫الرئيسية‬ ‫المتطلبات‬
Flemish Eye

‫إلى‬ ‫وتقسيمه‬ ‫الواير‬ ‫فك‬ ‫يتم‬
3
‫و‬ ‫جدالت‬
3
‫الواير‬ ‫قلب‬ ‫مع‬ ‫جدالت‬

‫رصاصة‬ ‫استخدام‬ ‫يتم‬
(
Sleeve
)
‫الواير‬ ‫لحجم‬ ‫مناسب‬

‫الطول‬ ‫مراعاة‬ ‫مع‬ ‫أدناه‬ ‫موضح‬ ‫هو‬ ‫كما‬ ‫الوايرات‬ ‫وجدل‬ ‫الغاصة‬ ‫عمل‬ ‫يتم‬
‫أخرى‬ ‫مرة‬ ‫الواير‬ ‫ولف‬ ‫المناسب‬

‫الواير‬ ‫قطر‬ ‫قياس‬ ‫يتم‬

‫الواير‬ ‫لحماية‬ ‫الغاصة‬ ‫على‬ ‫رصاصة‬ ‫استخدام‬ ‫يفضل‬
100
TURNBACK EYE TERMINATION
‫ب‬ ‫الخاصة‬ ‫الغاصة‬ ‫لعمل‬ ‫الرئيسية‬ ‫المتطلبات‬
Turnback Eye

‫رصاصة‬ ‫استخدام‬ ‫يتم‬
(
Sleeve
)
‫الواير‬ ‫لحجم‬ ‫مناسبة‬

‫الواي‬ ‫من‬ ‫مناسبة‬ ‫كمية‬ ‫لف‬ ‫إعادة‬ ‫ومراعاة‬ ‫الواير‬ ‫ولف‬ ‫الغاصة‬ ‫عمل‬ ‫يتم‬
‫ر‬

‫الذيل‬ ‫خروج‬ ‫من‬ ‫تأكد‬
(
‫النهاية‬
)
‫عن‬ ‫تقل‬ ‫ال‬ ‫مسافة‬
(
‫الواير‬ ‫قطر‬ ‫مرة‬
)
‫م‬
‫ن‬
‫الرصاصة‬
(
Sleeve
.)

‫الواير‬ ‫قطر‬ ‫من‬ ‫للتأكد‬ ‫والقياس‬ ‫الواير‬ ‫ضغط‬ ‫يتم‬
101
SWAGE SOCKET
‫ب‬ ‫الخاصة‬ ‫الغاصة‬ ‫لعمل‬ ‫الرئيسية‬ ‫المتطلبات‬
Swage Socket

‫للسوكيت‬ ‫الواير‬ ‫وحجم‬ ‫قطر‬ ‫مالءمة‬ ‫من‬ ‫التاكد‬

‫السوكيت‬ ‫داخل‬ ‫للواير‬ ‫محددة‬ ‫المسافة‬ ‫إدخال‬ ‫يتم‬

‫تشققات‬ ‫أو‬ ‫كسور‬ ‫حدوث‬ ‫عدم‬ ‫مراعاة‬ ‫مع‬ ‫والضغط‬ ‫الربط‬ ‫يتم‬

‫يتم‬
‫الواير‬ ‫قطر‬ ‫من‬ ‫للتأكد‬ ‫القياس‬
102
‫والتصبين‬ ‫الرفع‬ ‫أدوات‬ ‫فحص‬
INSPECTION OF HARDWARE
103
‫الفحص‬ ‫أنواع‬

‫ابتدائي‬ ‫فحص‬
:
‫اإلستخدام‬ ‫قبل‬

‫دائم‬ ‫فحص‬
/
‫متكرر‬
:
‫كل‬ ‫أو‬ ‫يوم‬ ‫كل‬
‫اإلستخدام‬ ‫قبل‬ ‫عمل‬ ‫وردية‬

‫الدوري‬ ‫الفحص‬
:
•
‫سنوي‬ ‫نصف‬ ‫أو‬ ‫سنوي‬
-
‫األعمال‬
‫العامة‬
•
‫أشهر‬ ‫ثالثة‬ ‫كل‬ ‫أو‬ ‫شهري‬
-
‫الشاقة‬ ‫الخدمات‬
104
‫الهوك‬ ‫فحص‬
INSPECTION OF HOOK

‫حا‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫الهوك‬ ‫استبعاد‬ ‫يتم‬
‫لة‬
‫بمقدار‬ ‫الهوك‬ ‫قطر‬ ‫نقص‬
5
%
‫من‬
‫الحلقة‬ ‫أسفل‬ ‫الرقبة‬ ‫أو‬ ‫الحلقة‬
.

‫حا‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫الهوك‬ ‫استبعاد‬ ‫يتم‬
‫لة‬
‫آخر‬ ‫مكان‬ ‫أي‬ ‫من‬ ‫الهوك‬ ‫حجم‬ ‫نقص‬
‫بمقدار‬
10
%

‫عن‬ ‫الهوك‬ ‫فتحة‬ ‫إتساع‬ ‫حالة‬ ‫في‬
5
%
‫عن‬ ‫تزيد‬ ‫ال‬ ‫بحيث‬
7
‫استبعاد‬ ‫يتم‬ ‫مم‬
‫الهوك‬
105
5
%
5
%
5
%
INSPECTION ‫الفحص‬
106
‫و‬ ‫أي‬ ‫وجود‬ ‫حالة‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫الواير‬ ‫استبعاد‬ ‫يتم‬
‫اير‬
‫الواير‬ ‫نهاية‬ ‫عند‬ ‫مقطوع‬
(
‫الغاصة‬
)
‫أي‬ ‫وجود‬ ‫حالة‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫الهوك‬ ‫استبعاد‬ ‫يتم‬
‫لحامات‬
INSPECTION ‫الفحص‬
107
‫قط‬ ‫نقص‬ ‫حالة‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫الواير‬ ‫استبعاد‬ ‫يتم‬
‫ر‬
‫بمقدار‬ ‫الواير‬
10
%
‫ت‬ ‫حدوث‬ ‫حالة‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫السالسل‬ ‫استبعاد‬ ‫يتم‬
‫آكل‬
‫بمقدار‬ ‫السلسة‬ ‫في‬
10
%
‫المصنع‬ ‫تعليمات‬ ‫حسب‬ ‫أو‬
‫البكرة‬ ‫إستخدام‬
WORKING WITH BLOCKS

‫الكلي‬ ‫الوزن‬
=
‫الواير‬ ‫على‬ ‫الشد‬ ‫وزن‬
(
Line Pull
)
x
‫الزاوية‬ ‫معامل‬
(
Angle Factor
)
108
‫البكرة‬ ‫إستخدام‬
WORKING WITH BLOCKS

‫السحب‬ ‫أو‬ ‫الشد‬ ‫وزن‬
=
‫الكــــــــــــلي‬ ‫الوزن‬

‫مثال‬
:
‫الكلي‬ ‫الوزن‬ ‫كان‬ ‫إذا‬
4000
‫الويرات‬ ‫وعدد‬ ‫كجم‬
2

‫السحب‬ ‫أو‬ ‫الشد‬ ‫وزن‬
=
4000/2
=
2000
‫كجم‬

‫مثال‬
2
:
‫الكلي‬ ‫الوزن‬ ‫كان‬ ‫إذا‬
4000
‫وعدد‬ ‫كجم‬
‫الويرات‬
4
.

‫السحب‬ ‫أو‬ ‫الشد‬ ‫وزن‬
=
4000/4
=
1000
‫كجم‬
109
‫أجزاءالوير‬ ‫عدد‬
4000
‫كجم‬
‫البكرة‬ ‫باستخدام‬ ‫التصبين‬
RIGGING WITH BLOCKS

‫مثال‬
1

‫الطرد‬ ‫وزن‬
1

‫الواير‬ ‫أجزاء‬
=
1

‫البكرة‬ ‫على‬ ‫الوزن‬
=
1

‫الشد‬ ‫وزن‬
=
1

‫الكلي‬ ‫الوزن‬
=
2
110
‫البكرة‬ ‫باستخدام‬ ‫التصبين‬
RIGGING WITH BLOCKS

‫مثال‬
2

‫الطرد‬ ‫وزن‬
1

‫الواير‬ ‫أجزاء‬
=
2

‫البكرة‬ ‫على‬ ‫الوزن‬
=
1

‫الشد‬ ‫وزن‬
=
1/2

‫الكلي‬ ‫الوزن‬
=
1
111
‫البكرة‬ ‫باستخدام‬ ‫التصبين‬
RIGGING WITH BLOCKS

‫مثال‬
2

‫الطرد‬ ‫وزن‬
1

‫الواير‬ ‫أجزاء‬
=
2

‫البكرة‬ ‫على‬ ‫الوزن‬
=
1

‫الشد‬ ‫وزن‬
=
1/2

‫الكلي‬ ‫الوزن‬
=
1.5
112
‫األونــاش‬ ‫فحص‬
CRANE INSPECTION
113
CRANE DOCUMENTS
‫الونش‬ ‫أوراق‬ ‫فحص‬

‫السائق‬ ‫رخصة‬

‫المعايرة‬ ‫شهادة‬

‫األحمال‬ ‫وجدول‬ ‫الونش‬ ‫كتيب‬
114
CASE STUDY
115
5 ton Load
Pick Point: 14 meters
Unloading Point: 18 meters
CRANE OUTRIGGERS
‫الونش‬ ‫ركائز‬
116
CRANE MAT/ MUDSILL
‫الونش‬ ‫طبلية‬
 Area 𝑚 2 = 0,65𝑥
𝑐𝑟𝑎𝑛𝑒 𝑚𝑎𝑠𝑠+𝑙𝑜𝑎𝑑
𝑠𝑜𝑖𝑙 𝑏𝑒𝑎𝑟𝑖𝑛𝑔 𝑝𝑟𝑒𝑠𝑠𝑢𝑟𝑒
117
118
CASE STUDY
 50 Ton Crane Lifting 4 Ton
 Ground Bearing Capacity= 28.5 ton/m2
 Mat Size Required?????
119
GOOD AND BAD PRACTICE
120
GOOD AND BAD PRACTICE
121
EXCAVATION ‫الحفر‬
122
EXCAVATION ‫الحفر‬
123
B = 1 m
D = 5 m
d = 6 m
H = 4
(4B = 4m)
(2H = 8m)
D = 5m > 4B = 4m
D + d = 11 m > 2H = 8m
CRANE DRUM
‫الونش‬ ‫رصاص‬
124
SHEAVES
125
CRANE COMPUTER- INDICATOR
126
WIND LOAD
 F= A*B*Cd
 F= Force or Wind Load
 A=Projected area of the object (length*width)
 B=Wind pressure (0.00256*V2) mph
 B=Wind Pressure (0.613*v2) meters per second
 Cd=Drag coefficient 1.2 long cylinder
 Cd=Drag coefficient 0.8 short cylinder
 Cd=Drag coefficient 2 Flat Plate
 Cd= Drag Coefficient 1.4 shorter flat plate 127
THANK YOU
128

Más contenido relacionado

Último

المحاضرة الأولى لدورة التحكم الصناعي العملية
المحاضرة الأولى لدورة التحكم الصناعي العمليةالمحاضرة الأولى لدورة التحكم الصناعي العملية
المحاضرة الأولى لدورة التحكم الصناعي العمليةsofyan20058
 
امتحانات البلاغة وإجاباتها.pdfbvvvvvvvvvvvv
امتحانات البلاغة وإجاباتها.pdfbvvvvvvvvvvvvامتحانات البلاغة وإجاباتها.pdfbvvvvvvvvvvvv
امتحانات البلاغة وإجاباتها.pdfbvvvvvvvvvvvvmhosn627
 
م. زكريا بزي - الأمن الغذائي من منظور التخطيط الإقليمي انطلاقاً من جودة تصميم...
م. زكريا بزي - الأمن الغذائي من منظور التخطيط الإقليمي انطلاقاً من جودة تصميم...م. زكريا بزي - الأمن الغذائي من منظور التخطيط الإقليمي انطلاقاً من جودة تصميم...
م. زكريا بزي - الأمن الغذائي من منظور التخطيط الإقليمي انطلاقاً من جودة تصميم...ZakariaBEZZI1
 
المحاضرة الأولى في دورة التحكم الصناعي ل
المحاضرة الأولى في دورة التحكم الصناعي لالمحاضرة الأولى في دورة التحكم الصناعي ل
المحاضرة الأولى في دورة التحكم الصناعي لsofyan20058
 
e-Implementation ver ffffffffffffffffffffffffff2.0.pptx
e-Implementation ver ffffffffffffffffffffffffff2.0.pptxe-Implementation ver ffffffffffffffffffffffffff2.0.pptx
e-Implementation ver ffffffffffffffffffffffffff2.0.pptxRedhaElhuni
 
Emergency Fire Action.pdfماذا تفعل في حالة الحريق
Emergency Fire Action.pdfماذا تفعل في حالة الحريقEmergency Fire Action.pdfماذا تفعل في حالة الحريق
Emergency Fire Action.pdfماذا تفعل في حالة الحريقDr/Mohamed Abdelkawi
 

Último (6)

المحاضرة الأولى لدورة التحكم الصناعي العملية
المحاضرة الأولى لدورة التحكم الصناعي العمليةالمحاضرة الأولى لدورة التحكم الصناعي العملية
المحاضرة الأولى لدورة التحكم الصناعي العملية
 
امتحانات البلاغة وإجاباتها.pdfbvvvvvvvvvvvv
امتحانات البلاغة وإجاباتها.pdfbvvvvvvvvvvvvامتحانات البلاغة وإجاباتها.pdfbvvvvvvvvvvvv
امتحانات البلاغة وإجاباتها.pdfbvvvvvvvvvvvv
 
م. زكريا بزي - الأمن الغذائي من منظور التخطيط الإقليمي انطلاقاً من جودة تصميم...
م. زكريا بزي - الأمن الغذائي من منظور التخطيط الإقليمي انطلاقاً من جودة تصميم...م. زكريا بزي - الأمن الغذائي من منظور التخطيط الإقليمي انطلاقاً من جودة تصميم...
م. زكريا بزي - الأمن الغذائي من منظور التخطيط الإقليمي انطلاقاً من جودة تصميم...
 
المحاضرة الأولى في دورة التحكم الصناعي ل
المحاضرة الأولى في دورة التحكم الصناعي لالمحاضرة الأولى في دورة التحكم الصناعي ل
المحاضرة الأولى في دورة التحكم الصناعي ل
 
e-Implementation ver ffffffffffffffffffffffffff2.0.pptx
e-Implementation ver ffffffffffffffffffffffffff2.0.pptxe-Implementation ver ffffffffffffffffffffffffff2.0.pptx
e-Implementation ver ffffffffffffffffffffffffff2.0.pptx
 
Emergency Fire Action.pdfماذا تفعل في حالة الحريق
Emergency Fire Action.pdfماذا تفعل في حالة الحريقEmergency Fire Action.pdfماذا تفعل في حالة الحريق
Emergency Fire Action.pdfماذا تفعل في حالة الحريق
 

Destacado

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Destacado (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Lifting and Rigging Course.pptx

  • 1. SLINGING AND RIGGING Prepared By: OC HSE Dept. 1
  • 2. GROUND RULES  Course Duration: 2 Days  Emergency Procedures  No Smoking  Mobiles Off/ Silent  Breaks 2
  • 3. COURSE OBJECTIVES By the end of this course the participant will be able to undertake/understand:  Rigging principles and load control  Load on rigging and the rigging triangle  Application of hoist hooks, shackles and links  Application of eye bolts, hoist rings and turnbuckles  Application of wire rope terminations  Inspection of Cranes and hardware  Sling hitches and application  Inspection of slings  Working with blocks 3
  • 4. ‫مقدمة‬  ‫وحيوي‬ ‫ضروري‬ ‫المختلفة‬ ‫والخامات‬ ‫المواد‬ ‫وتحريك‬ ‫نقل‬ ‫على‬ ‫القدرة‬ ‫في‬ ‫المختلفة‬ ‫العمل‬ ‫مراحل‬ ‫جميع‬ ‫في‬ ‫والصناعات‬ ‫اإلنشاءات‬ ‫مواقع‬ , ‫أن‬ ‫كما‬ ‫بصور‬ ‫المواد‬ ‫وتحريك‬ ‫نقل‬ ‫عملية‬ ‫في‬ ‫دور‬ ‫لهم‬ ‫يكون‬ ‫العاملين‬ ‫جميع‬ ‫أو‬ ‫ة‬ ‫أحيانا‬ ‫لإلصابات‬ ‫يعرضهم‬ ‫ما‬ ‫وهو‬ ‫بأخرى‬ .  ‫التصبين‬ ‫أدوات‬ ‫على‬ ‫تعتمد‬ ‫المختلفة‬ ‫الرفع‬ ‫ومعدات‬ ‫األوناش‬ ‫وألن‬ ‫والرفع‬ ‫ع‬ ‫الالزمة‬ ‫المعلومات‬ ‫بتوفير‬ ‫فسنقوم‬ ‫األحمال‬ ‫وتحريك‬ ‫ورفع‬ ‫لنقل‬ ‫عمليات‬ ‫ن‬ ‫والتصبين‬ ‫الرفع‬ ‫أدوات‬ ‫واستعمال‬ ‫والصيانة‬ ‫المناسب‬ ‫اإلختيار‬ 4
  • 5. ‫الويرات‬ ‫أنواع‬ ‫للويرات‬ ‫رئيسية‬ ‫أنواع‬ ‫ستة‬ ‫توجد‬ :  ‫السالسل‬  ‫الصلب‬ ‫الويرات‬  ‫المعدنية‬ ‫الشبكة‬ ‫ويرات‬  ‫ويرات‬ ( ‫حبال‬ ) ‫الصناعي‬ ‫القماش‬  ‫ويرات‬ ( ‫حبال‬ ) ‫الطبيعي‬ ‫القماش‬  ‫الصناعية‬ ‫الويرات‬ 5
  • 6.  ‫السالسل‬ CHAINS  ‫على‬ ‫وقدرتها‬ ‫قوتها‬ ‫بسبب‬ ‫بكثرة‬ ‫السالسل‬ ‫تستخدم‬ ‫التكيف‬ ‫الحمولة‬ ‫شكل‬ ‫مع‬ .  ‫ل‬ ‫تتعرض‬ ‫ال‬ ‫حتى‬ ‫السالسل‬ ‫استخدام‬ ‫عند‬ ‫الحذر‬ ‫يجب‬ ‫لكسر‬ ‫المفاجئة‬ ‫الصدمات‬ ‫نتيجة‬ , ‫الخاطئ‬ ‫اإلستخدام‬ ‫أن‬ ‫كما‬ ‫لإلص‬ ‫العاملين‬ ‫ويعرض‬ ‫لتدميرها‬ ‫يؤدي‬ ‫قد‬ ‫للسالسل‬ ‫ابة‬ .  ‫الس‬ ‫الخامات‬ ‫لرفع‬ ‫اإلختياراألفضل‬ ‫السالسل‬ ‫تعتبر‬ ‫حيث‬ ‫اخنة‬ ‫إلى‬ ‫تصل‬ ‫حرارة‬ ‫درجات‬ ‫تحمل‬ ‫يمكنها‬ 1000 ‫درجة‬ ‫زي‬ ‫حالة‬ ‫في‬ ‫اآلمنة‬ ‫الحمولة‬ ‫تقليل‬ ‫مراعاة‬ ‫مع‬ ‫فهرنهايت‬ ‫ادة‬ ‫عن‬ ‫الحرارة‬ ‫درجة‬ 600 ‫طبقا‬ ‫ذلك‬ ‫ويكون‬ ‫فهرنهايت‬ ‫درجة‬ ‫المصنع‬ ‫لتوصيات‬ . 6
  • 7. ‫السالسل‬ CHAINS  ‫توضح‬ ‫السلسلة‬ ‫على‬ ‫معدنية‬ ‫لوحة‬ ‫توجد‬ ‫أن‬ ‫يجب‬ ‫حجم‬ ‫السلسلة‬ ‫وطول‬ , ‫المعدن‬ ‫نوع‬ , ‫والرق‬ ‫والحمولة‬ ‫القدرة‬ ‫م‬ ‫بالمصنع‬ ‫الخاص‬  ‫المعا‬ ‫من‬ ‫مختلفة‬ ‫درجات‬ ‫من‬ ‫السالسل‬ ‫صناعة‬ ‫تتم‬ ‫دن‬ ‫أشهرها‬ 80 ‫و‬ 100 ‫طبقا‬ ‫وصناعتها‬ ‫إختبارها‬ ‫ويتم‬ ‫والخامات‬ ‫للفحص‬ ‫األمريكية‬ ‫الجمعية‬ ‫لمعايير‬ . ‫وف‬ ‫ي‬ ‫يتم‬ ‫مختلفة‬ ‫درجات‬ ‫ذات‬ ‫سالسل‬ ‫أية‬ ‫استخدام‬ ‫حال‬ ‫المصنع‬ ‫لتوصيات‬ ‫طبقا‬ ‫استخدامها‬  ‫الحرارة‬ ‫درجات‬ ‫في‬ ‫السالسل‬ ‫استخدام‬ ‫حالة‬ ‫في‬ ‫عن‬ ‫تقل‬ ‫والتي‬ ‫المنخفضة‬ ( - 40 ‫فهرنهايت‬ ) ‫يجب‬ ‫للمصنع‬ ‫الرجوع‬ . 7
  • 8. ‫للسالسل‬ ‫اآلمن‬ ‫االستخدام‬ ‫جدول‬ CHAIN SLING WEAR CHART Chain Size (inches) Minimu m Allowabl e Chain Size (Inches) Chain Size (inches) Minimu m Allowabl e Chain Size (Inches) ¼ 3/8 ½ 5/8 ¾ 7/8 15/64 19/64 25/64 31/64 19/32 45/64 1 1 1/8 1 ¼ 1 3/8 1 ½ 1 ¾ 13/16 29/32 1 1 3/32 1 3/16 1 13/32 8
  • 10.  ‫الصلب‬ ‫الويرات‬ WIRE ROPE SLINGS  ‫عدة‬ ‫من‬ ‫الصلب‬ ‫الواير‬ ‫يتكون‬ ‫ل‬ ‫سويا‬ ‫لفها‬ ‫يتم‬ ‫منفردة‬ ‫ويرات‬ ‫تكون‬ ‫لتكون‬ ‫الجدالت‬ ‫لف‬ ‫ويتم‬ ‫جدالت‬ ‫د‬ ‫واير‬ ‫حول‬ ‫تلتف‬ ‫التي‬ ‫اللفات‬ ‫اخلي‬ ‫الواير‬ ‫مكونة‬ .  ‫القلب‬ ‫يكون‬ ‫قد‬ ( ‫الداخلي‬ ‫الواير‬ ) ‫أكث‬ ‫فيكون‬ ‫الفايبر‬ ‫من‬ ‫مصنوعا‬ ‫ر‬ ‫مقاومة‬ ‫أقل‬ ‫يكون‬ ‫لكنه‬ ‫مرونة‬ ‫البيئية‬ ‫للمؤثرات‬ .  ‫مصنوعا‬ ‫الواير‬ ‫قلب‬ ‫يكون‬ ‫عندما‬ ‫قوة‬ ‫أكثر‬ ‫يكون‬ ‫فإنه‬ ‫الصلب‬ ‫من‬ ‫للحرارة‬ ‫مقاومة‬ ‫وأكثر‬ . 10
  • 11. ‫اللفة‬ ROPE LAY ‫معاني‬ ‫ثالثة‬ ‫من‬ ‫واحدة‬ ‫تعني‬ ‫قد‬ ‫اللفة‬  ‫أوال‬ : ‫الواير‬ ‫قلب‬ ‫حول‬ ‫للجدلة‬ ‫كاملة‬ ‫لفة‬  ‫ثانيا‬ : ‫الواير‬ ‫قلب‬ ‫حول‬ ‫الجدالت‬ ‫لف‬ ‫اتجاه‬ ( ‫يمينا‬ ‫يسارا‬ ‫أو‬ )  ‫ثالثا‬ : ‫وعالقت‬ ‫الجدلة‬ ‫في‬ ‫الويرات‬ ‫لف‬ ‫اتجاه‬ ‫ها‬ ‫الواير‬ ‫قلب‬ ‫حول‬ ‫الجدالت‬ ‫بإتجاه‬ : ‫يكو‬ ‫ما‬ ‫عادة‬ ‫ن‬ ‫الجدال‬ ‫اتجاه‬ ‫عكس‬ ‫الجدلة‬ ‫على‬ ‫الويرات‬ ‫اتجاه‬ ‫ت‬ ‫ويسمي‬ ‫القلب‬ ‫حول‬ Regular Lay Rope ‫الجد‬ ‫اتجاه‬ ‫نفس‬ ‫في‬ ‫الويرات‬ ‫اتجاه‬ ‫كات‬ ‫وإذا‬ ‫الت‬ ‫يسمى‬ Lang Lay Rope 11
  • 12. ‫الصلب‬ ‫الويرات‬ ‫إختيار‬ ‫طريقة‬ WIRE ROPE SLING SELECTION  ‫القوة‬ Strength  ‫وبنائه‬ ‫ودرجته‬ ‫حجمه‬ ‫على‬ ‫بناء‬ ‫الواير‬ ‫قوة‬ ‫تتحدد‬  ‫أمان‬ ‫بمعامل‬ ‫الصلب‬ ‫الواير‬ ‫صنع‬ ‫يتم‬ ( Design Factor ) 5:1 ‫أن‬ ‫أي‬ ‫مقدارها‬ ‫قصوى‬ ‫حمولة‬ ‫لرفع‬ ‫المصمم‬ ‫الواير‬ 2 ‫واختباره‬ ‫تصميمه‬ ‫يتم‬ ‫طن‬ ‫يتحمل‬ ‫بحيث‬ 10 ‫الشاقة‬ ‫الخدمة‬ ‫ظروف‬ ‫يتحمل‬ ‫كي‬ ‫أطنان‬ .  ‫من‬ ‫أقل‬ ‫أمان‬ ‫بمعامل‬ ‫الواير‬ ‫صنع‬ ‫تم‬ ‫إذا‬ 5:1 ‫الحمولة‬ ‫تقليل‬ ‫يتم‬ ‫أن‬ ‫يجب‬ ‫الى‬ ‫تصل‬ ‫حتى‬ ‫القصوى‬ 5:1 12
  • 13. ‫مثـــال‬ EXAMPLE  IF WLL is 2000 KG  Design Factor is 3:1  SWL??? Answer  2000*3= 6000  2000*5=10000  6000/1000= 60%  (60*2000)/100=1200  SWL=1200 KG 13
  • 14. ‫الصلب‬ ‫الويرات‬ ‫إختيار‬ ‫طريقة‬ WIRE ROPE SLING SELECTION  ‫الواير‬ ‫حالة‬ ( ‫االستهالك‬ ) Fatigue  ‫ضرر‬ ‫دون‬ ‫مرات‬ ‫عدة‬ ‫اإلنثناء‬ ‫الواير‬ ‫يتحمل‬ ‫أن‬ ‫يجب‬ .  ‫عل‬ ‫ويؤثر‬ ‫الحمل‬ ‫وزن‬ ‫تحت‬ ‫الثني‬ ‫نتيجة‬ ‫الواير‬ ‫على‬ ‫الضرر‬ ‫يظهر‬ ‫قطر‬ ‫ى‬ ‫الواير‬ .  ‫ب‬ ‫الواير‬ ‫إنثناء‬ ‫لمنع‬ ‫وسيلة‬ ‫أو‬ ‫حماية‬ ‫وضع‬ ‫يجب‬ ‫ذلك‬ ‫حدوث‬ ‫لتفادي‬ ‫صورة‬ ‫حادة‬ 14
  • 15. ‫الصلب‬ ‫الويرات‬ ‫إختيار‬ ‫طريقة‬ WIRE ROPE SLING SELECTION  ‫الواير‬ ‫قطع‬ Abrasive Wear  ‫الوير‬ ‫وعدد‬ ‫الحجم‬ ‫على‬ ‫والجرح‬ ‫القطع‬ ‫مقاومة‬ ‫على‬ ‫الواير‬ ‫قدرة‬ ‫تعتمد‬ ‫ات‬ ‫والتركيب‬ ( ‫الواير‬ ‫بناء‬ )  ‫أقل‬ ‫لكنها‬ ‫لإلنثناء‬ ‫وقابلية‬ ‫مرونة‬ ‫أكثر‬ ‫تكون‬ ‫سمكا‬ ‫األقل‬ ‫الويرات‬ ‫مقاومة‬ ‫للقطع‬ .  ‫للقطع‬ ‫مقاومة‬ ‫أكثر‬ ‫تكون‬ ‫سمكا‬ ‫األكثر‬ ‫الويرات‬ 15
  • 16. ‫الصلب‬ ‫الويرات‬ ‫إختيار‬ ‫طريقة‬ WIRE ROPE SLING SELECTION  ‫سوء‬ ‫اإلستخدام‬ Abuse  ‫شكل‬ ‫في‬ ‫لتدميره‬ ‫يؤدي‬ ‫الواير‬ ‫استخدام‬ ‫سوء‬ ( ‫العصفور‬ ‫عش‬ - ‫اإللت‬ ‫واءات‬ - ‫الواير‬ ‫قطع‬ ‫أو‬ ‫الواير‬ ‫قطر‬ ‫نقص‬ ) 16
  • 17.  ‫الفايبر‬ ‫الويرات‬ ( ‫األحبال‬ ) FIBER ROPE  ‫ل‬ ‫بسبب‬ ‫الرفع‬ ‫أنواع‬ ‫بعض‬ ‫في‬ ‫بكثرة‬ ‫الفايبر‬ ‫األحبال‬ ‫تستخدم‬ ‫يونتها‬ , ‫وقدرتها‬ ‫ت‬ ‫عدم‬ ‫إلى‬ ‫باإلضافة‬ ‫به‬ ‫والتمسك‬ ‫الحمل‬ ‫شكل‬ ‫ومالئمة‬ ‫التكيف‬ ‫على‬ ‫شويه‬ ‫الحمولة‬ .  ‫تحت‬ ‫أو‬ ‫ساخنة‬ ‫أو‬ ‫حادة‬ ‫حواف‬ ‫بها‬ ‫يوجد‬ ‫ال‬ ‫خفيفة‬ ‫أحمال‬ ‫لرفع‬ ‫تستخدم‬ ‫وي‬ ‫أحماض‬ ‫على‬ .  ‫الحمل‬ ‫وزن‬ ‫على‬ ‫المستخدم‬ ‫الواير‬ ‫حجم‬ ‫يعتمد‬ , ‫الرفع‬ ‫وزاوية‬ , ‫يجب‬ ‫كما‬ ‫الو‬ ‫من‬ ‫أسرع‬ ‫بشكل‬ ‫يهترئ‬ ‫حيث‬ ‫اإلستخدام‬ ‫قبل‬ ‫جيدا‬ ‫الواير‬ ‫فحص‬ ‫يرات‬ ‫الصلب‬ . 17
  • 18. ‫الفحص‬ FIBER ROPE INSPECTION  ‫ع‬ ‫والبحث‬ ‫أوال‬ ‫الخارجي‬ ‫السطح‬ ‫فحص‬ ‫يتم‬ ‫ن‬ ‫الجافة‬ ‫األجزاء‬ , ‫أو‬ ‫المقطوعة‬ ‫أو‬ ‫المجروحة‬ ‫اللون‬ ‫متغيرة‬ ‫ويرات‬ ‫أي‬ .  ‫أن‬ ‫ويجب‬ ‫الواير‬ ‫قلب‬ ‫فحص‬ ‫ذلك‬ ‫بعد‬ ‫يتم‬ ‫يكون‬ ‫مع‬ ‫الجديد‬ ‫الواير‬ ‫لون‬ ‫نفس‬ ‫الداخلي‬ ‫اللون‬ ‫داخل‬ ‫البودرة‬ ‫تشبه‬ ‫مادة‬ ‫أي‬ ‫وجود‬ ‫مراعاة‬ ‫لإلهت‬ ‫الواير‬ ‫تعرض‬ ‫على‬ ‫تدل‬ ‫حيث‬ ‫الواير‬ ‫راء‬ ‫الشديد‬ .  ‫حال‬ ‫في‬ ‫اليد‬ ‫بأظافر‬ ‫الواير‬ ‫بحك‬ ‫قم‬ ‫أخيرا‬ ‫ة‬ ‫الواي‬ ‫أن‬ ‫تعني‬ ‫بسهولة‬ ‫الواير‬ ‫من‬ ‫مواد‬ ‫خروج‬ ‫ر‬ ‫ف‬ ‫استبعاده‬ ‫ويجب‬ ‫كيميائية‬ ‫لمواد‬ ‫تعرض‬ ‫ورا‬ . 18
  • 19. ‫الصناعية‬ ‫الويرات‬ SYNTHETIC WEB SLINGS ‫مخت‬ ‫مواد‬ ‫من‬ ‫وتصنع‬ ‫الرفع‬ ‫عمليات‬ ‫في‬ ‫بكثرة‬ ‫الصناعية‬ ‫الويرات‬ ‫تستخدم‬ ‫مثل‬ ‫لفة‬ ‫فوائدها‬ ‫ومن‬ ‫والبوليستر‬ ‫والداكرون‬ ‫النايلون‬ :  ‫القوة‬ : ‫إلى‬ ‫تصل‬ ‫أحمال‬ ‫رفع‬ ‫يمحنها‬ ‫حيث‬ 300,000 ‫رطل‬  ‫المالئمة‬ : ‫حمولة‬ ‫أي‬ ‫مالئمة‬ ‫يمكنها‬ ‫حيث‬ .  ‫األمان‬ : ‫الحمل‬ ‫إزالق‬ ‫ومنع‬ ‫بقوة‬ ‫بالحمل‬ ‫التمسك‬  ‫الطرد‬ ‫حماية‬ : ‫الدهانات‬ ‫تزيل‬ ‫او‬ ‫السطح‬ ‫تجرح‬ ‫وال‬ ‫الطرد‬ ‫سالمة‬ ‫على‬ ‫تؤثر‬ ‫ال‬ ‫عليه‬ ‫الموجودة‬ .  ‫العمر‬ ‫طويلة‬ ( ‫األجل‬ :) ‫ب‬ ‫وتقاوم‬ ‫البكتيريا‬ ‫و‬ ‫الفطري‬ ‫بالعفن‬ ‫تتأثر‬ ‫ال‬ ‫المواد‬ ‫عض‬ ‫والجرح‬ ‫للقطع‬ ‫ممتازة‬ ‫مقاومة‬ ‫ولها‬ ‫الكيميائية‬ .  ‫إقتصادية‬ : ‫أطول‬ ‫خدمة‬ ‫وفترة‬ ‫أقل‬ ‫تكلفة‬ .  ‫الصدمة‬ ‫إمتصاص‬ : ‫ال‬ ‫سالمة‬ ‫على‬ ‫التأثير‬ ‫دون‬ ‫عنيفة‬ ‫صدمات‬ ‫يمكنهاتحمل‬ ‫واير‬ .  ‫الحرارة‬ ‫مقاومة‬ : ‫إلى‬ ‫تصل‬ ‫حرارة‬ ‫درجات‬ ‫تتحمل‬ 180 ‫فهرنهايت‬ ‫درجة‬ ( 82 ‫مئوية‬ ‫درجة‬ ) 19
  • 20. ‫الصناعي‬ ‫الواير‬ ‫إختيار‬ SELECTION OF SYNTHETIC WEB ‫واستخدام‬ ‫خصائصه‬ ‫الصناعية‬ ‫الويرات‬ ‫من‬ ‫نوع‬ ‫لكل‬ ‫اته‬ :  ‫النايلون‬ ‫من‬ ‫المصنوعة‬ ‫الويرات‬ : ‫حال‬ ‫وفي‬ ‫شحوم‬ ‫أو‬ ‫قلوية‬ ‫مواد‬ ‫وجود‬ ‫حالة‬ ‫في‬ ‫تستخدم‬ ‫ة‬ ‫مذيبات‬ ‫أو‬ ‫كيميائية‬ ‫مواد‬ ‫وجود‬ .  ‫الداكرون‬ ‫من‬ ‫المصنوعة‬ ‫الويرات‬ : ‫م‬ ‫األحماض‬ ‫من‬ ‫قوية‬ ‫تركيزات‬ ‫وجود‬ ‫حالة‬ ‫في‬ ‫تستخدم‬ ‫ثل‬ ‫وال‬ ‫والنيتريك‬ ‫والهيدروكلوريك‬ ‫الكبريتيك‬ ‫حمض‬ ‫فورميك‬ ‫العالية‬ ‫الحرارة‬ ‫درجات‬ ‫ذات‬ ‫والمواد‬ ( ‫يمكنه‬ ‫ال‬ ‫النايلون‬ ‫الظروف‬ ‫هذه‬ ‫تحمل‬ ) ‫القلويات‬ ‫مع‬ ‫يستخدم‬ ‫ال‬ ‫الداكرون‬ ‫النايلون‬ ‫أو‬ ‫البوليستر‬ ‫استخدام‬ ‫ويجب‬ .  ‫البوليستر‬ ‫من‬ ‫المصنوعة‬ ‫الويرات‬ : ‫والمبيضات‬ ‫األحماض‬ ‫مع‬ ‫البوليستر‬ ‫يستخدم‬ ( ‫المن‬ ‫ظفات‬ ) ‫الواير‬ ‫استطالة‬ ‫في‬ ‫الرغبة‬ ‫عدم‬ ‫حالة‬ ‫وفي‬ 20
  • 21. ‫الويرات‬ ‫فحص‬ INSPECTION OF SYNTHETIC WEB ‫اآلتي‬ ‫الحاالت‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫الواير‬ ‫استبعاد‬ ‫يتم‬ ‫ة‬ :  ‫بالواير‬ ‫حروق‬ ‫أو‬ ‫أحماض‬ ‫وجود‬  ‫الواير‬ ‫سطح‬ ‫من‬ ‫جزء‬ ‫أي‬ ‫تمزق‬ ‫أو‬ ‫انصهار‬  ‫بالواير‬ ‫ثقوب‬ ‫أو‬ ‫تمزق‬ ‫أو‬ ‫قطع‬ ‫أي‬  ‫بالواير‬ ‫الخياة‬ ‫قطع‬ ‫أو‬ ‫تمزق‬  ‫الغرز‬ ‫تمزق‬  ‫لت‬ ‫طبقا‬ ‫بها‬ ‫المسموح‬ ‫النسبة‬ ‫يتجاوز‬ ‫قطع‬ ‫أي‬ ‫وصيات‬ ‫المصنع‬ 21
  • 22. ‫في‬ ‫والتحكم‬ ‫التصبين‬ ‫أساسيات‬ ‫الطرود‬ RIGGING PRINCIPALS AND LOAD CONTROL 22
  • 23. ‫الثــقل‬ ‫مركــز‬ CENTER OF GRAVITY AND SLING LOADING ‫فإن‬ ‫عمودي‬ ‫بشكل‬ ‫الطرد‬ ‫رفع‬ ‫عند‬ ‫بالتساوي‬ ‫توزيعها‬ ‫سيتم‬ ‫الحمولة‬ ‫إذا‬ ‫المس‬ ‫منتصف‬ ‫في‬ ‫الثقل‬ ‫مركز‬ ‫كان‬ ‫افة‬ ‫الرفع‬ ‫نقطتي‬ ‫بين‬ . ‫الحمولة‬ ‫كانت‬ ‫إذا‬ 10 ‫فإن‬ ‫طن‬ ‫وكل‬ ‫قفل‬ ‫وكل‬ ‫واير‬ ‫كل‬ ‫على‬ ‫الحمولة‬ ‫ستكون‬ ‫رفع‬ ‫نقطة‬ 5 ‫طن‬ 23
  • 24. ‫الثــقل‬ ‫مركــز‬ CENTER OF GRAVITY AND SLING LOADING ‫منتصف‬ ‫في‬ ‫الثقل‬ ‫مركز‬ ‫يكن‬ ‫لم‬ ‫إذا‬ ‫الرفع‬ ‫نقطتي‬ ‫بين‬ ‫المسافة‬ ( ‫التص‬ ‫بين‬ ) ‫بح‬ ‫تقوم‬ ‫لن‬ ‫واألقفال‬ ‫الويرات‬ ‫فإن‬ ‫مل‬ ‫األحمال‬ ‫نفس‬ . ‫الق‬ ‫الرفع‬ ‫ونقاط‬ ‫واألقفال‬ ‫الويرات‬ ‫ريبة‬ ‫النص‬ ‫برفع‬ ‫ستقوم‬ ‫الثقل‬ ‫مركز‬ ‫من‬ ‫يب‬ ‫األحمال‬ ‫من‬ ‫األكبر‬ Sling 2 Sling 1 ‫واير‬ ‫كل‬ ‫على‬ ‫الحمل‬ ‫لحساب‬ ‫رقم‬ ‫الواير‬ 2 : 10000 X 8 / ( 8 + 2 =) 8000 ‫كجم‬ ‫رقم‬ ‫الواير‬ 1 : 10000 X 2 / ( 8 + 2 =) 2000 ‫كجم‬ 24
  • 25. LOAD STABILITY AND CENTER OF GRAVITY ‫الطرد‬ ‫وتوازن‬ ‫الثقل‬ ‫مركز‬ ‫تحديد‬  ‫مباشرة‬ ‫الثقل‬ ‫مركز‬ ‫فوق‬ ‫الويرات‬ ‫تجميع‬ ‫يتم‬ ‫أن‬ ‫يجب‬ .  ‫توازن‬ ‫على‬ ‫ذلك‬ ‫فسيؤثر‬ ‫الطرد‬ ‫ثقل‬ ‫مركز‬ ‫فوق‬ ‫الويرات‬ ‫تكن‬ ‫لم‬ ‫إذا‬ ‫ه‬ ( ‫تأرجح‬ ‫الطرد‬ )  ‫الطرد‬ ‫ثقل‬ ‫ومركز‬ ‫الواير‬ ‫بين‬ ‫ممكنة‬ ‫مسافة‬ ‫أكبر‬ ‫إبقاء‬ ‫يجب‬ 25
  • 26. CALCULATE WEIGHT ‫األوزان‬ ‫حساب‬  ‫مثال‬ 1 : ‫المسطحة‬ ‫األجسام‬  ‫الوزن‬ = ‫الطول‬ X ‫العرض‬ X ‫اإلرتفاع‬ X ‫النوعي‬ ‫الوزن‬  ‫للصلب‬ ‫النوعي‬ ‫الوزن‬ : 7.85 ‫طن‬ / ‫م‬ 3  ‫الوزن‬ = 5 ‫م‬ X 2 ‫م‬ X 0.1 ‫م‬ X 7.85 ‫طن‬ / ‫م‬ 3 = 7.85 ‫طن‬  ‫لأللومنيوم‬ ‫النوعي‬ ‫الوزن‬ : 2.64 ‫طن‬ / ‫م‬ 3  ‫الوزن‬ = 5 ‫م‬ X 2 ‫م‬ X 0.1 ‫م‬ X 2.64 ‫طن‬ / ‫م‬ 3 = 2.64 ‫طن‬  ‫للخرسانة‬ ‫النوعي‬ ‫الوزن‬ : 2.40 ‫طن‬ / ‫م‬ 3  ‫الوزن‬ = 5 ‫م‬ X 2 ‫م‬ X 0.1 ‫م‬ X 2.40 ‫طن‬ / ‫م‬ 3 = 2.40 ‫طن‬  L= 5 m H= 0.1 m W= 2 m 26
  • 27. CALCULATE WEIGHT ‫األوزان‬ ‫حساب‬  ‫مثال‬ 2 : ‫مصمته‬ ‫اسطوانة‬  ‫الوزن‬ = 3.14 X ( ‫الدائرة‬ ‫قطر‬ ) ² X ‫اإلسطوانة‬ ‫طول‬ X ‫النوعي‬ ‫الوزن‬ 4  ‫للصلب‬ ‫النوعي‬ ‫الوزن‬ : 7.85 ‫طن‬ / ‫م‬ 3  ‫الوزن‬ = 3.14 X ( 0.5 ) ² X 5 X 7.85 = 7.70 ‫طن‬ 4  ‫لأللومنيوم‬ ‫النوعي‬ ‫الوزن‬ : 2.64 ‫طن‬ / ‫م‬ 3  ‫الوزن‬ = 3.14 X ( 0.5 ) ² X 5 X 2.64 = 2.59 ‫طن‬ 4  ‫للخرسانة‬ ‫النوعي‬ ‫الوزن‬ : 2.40 ‫طن‬ / ‫م‬ 3  ‫الوزن‬ = 3.14 X ( 0.5 ) ² X 5 X 2.40 = 2.35 ‫طن‬ 4  L= 5 m D= 0.5 m 27
  • 28. ‫األوزان‬ ‫على‬ ‫بناء‬ ‫الثقل‬ ‫مركز‬ ‫إيجاد‬ FINDING THE CENTER OF GRAVITY BASED ON WEIGHTS  ‫مع‬ ‫شكل‬ ‫له‬ ‫طرد‬ ‫ثقل‬ ‫مركز‬ ‫تحديد‬ ‫يمكن‬ ‫قد‬ ‫بسيط‬ ‫أجزاء‬ ‫إلي‬ ‫إلى‬ ‫تقسيمه‬ ‫طريق‬ ‫عن‬ ‫ة‬ .  ‫المنط‬ ‫في‬ ‫محصورا‬ ‫سيكون‬ ‫الثقل‬ ‫مركز‬ ‫قة‬ ‫بين‬ ‫الواصلة‬ ‫الخطوط‬ ‫داخل‬ ‫المحددة‬ ‫الثالثة‬ ‫األجزاء‬ .  ‫الكلي‬ ‫الوزن‬ = 3000 + 6000 + 2000 = 11000 ‫كجم‬ 2000 KG 3000 KG 6000 KG 28
  • 29.  ‫ونقوم‬ ‫الثالثة‬ ‫األجزاء‬ ‫من‬ ‫جزأين‬ ‫نختار‬ ‫معا‬ ‫للجزأين‬ ‫الثقل‬ ‫مركز‬ ‫بتحديد‬ .  ‫بين‬ ‫الواصلة‬ ‫المنطقة‬ ‫في‬ ‫سيكون‬ ‫الثقل‬ ‫مركز‬ ‫األثقل‬ ‫للوزن‬ ‫أقرب‬ ‫وسيكون‬ ‫الثقل‬ ‫مركزي‬  ‫األثقل‬ ‫الوزن‬ = 6000 ‫كجم‬  ‫للجزأين‬ ‫الكلي‬ ‫الوزن‬ = 8000  6000/8000 = ¾ ‫أو‬ 75 %  ‫يكون‬ ‫الثقل‬ ‫مركز‬ 75 % ‫الوزن‬ ‫تجاه‬ ‫المسافة‬ ‫من‬ ‫األثقل‬  ‫واحدة‬ ‫ككتلة‬ ‫الجزأين‬ ‫مع‬ ‫التعامل‬ ‫يتم‬ 2000 KG 6000 KG 75 % 29
  • 30.  ‫الطري‬ ‫بنفس‬ ‫الثقل‬ ‫مركز‬ ‫تحديد‬ ‫يتم‬ ‫السابقة‬ ‫قة‬ ‫الجديد‬ ‫الثقل‬ ‫مركز‬ ‫على‬ ‫بناء‬ .  ‫الواص‬ ‫المنطقة‬ ‫في‬ ‫سيكون‬ ‫الثقل‬ ‫مركز‬ ‫لة‬ ‫األثقل‬ ‫الوزن‬ ‫تجاه‬ ‫الثقل‬ ‫مركزي‬ ‫بين‬  ‫الكلي‬ ‫الوزن‬ = 8000 + 3000 = 11000 ‫كجم‬  8000 / 11000 = 73 % ‫األثقل‬ ‫الوزن‬ ‫تجاه‬ 3000 KG 8000 KG 30
  • 31. ‫الرفع‬ ‫تجارب‬ ‫على‬ ‫بناء‬ ‫الثقل‬ ‫مركز‬ ‫إيجاد‬ FINDING CENTER OF GRAVITY BY TRAIL LIFTS Load Cell C D A B ‫النتيجة‬ ‫وتسجيل‬ ‫الطرد‬ ‫جوانب‬ ‫من‬ ‫جانب‬ ‫رفع‬ ‫يتم‬ A= 6000 KG B= 4000 KG C= 2000 KG D= 4000 KG ‫متقابلتين‬ ‫جهتين‬ ‫أوزان‬ ‫مجموع‬ ‫دائما‬ ‫يكون‬ ‫الكلي‬ ‫الوزن‬ ‫الوزن‬ A+C= 6000+2000= 8000 KG or B+D=4000+4000= 8000 KG 31
  • 32. ‫الثقل‬ ‫مركز‬ ‫لتحديد‬  A+C= 6000+2000= 8000 KG or  B+D=4000+4000= 8000 KG  ‫مسافة‬ ‫على‬ ‫يقع‬ ‫الثقل‬ ‫مركز‬ 8000 / 6000 ‫تجاه‬ A ‫أو‬ 75 %  ‫مسافة‬ ‫على‬ ‫يقع‬ ‫الثقل‬ ‫مركز‬ 4000/8000 ‫تجاه‬ D ‫أو‬ 50 % C A D B 50% 75% 32
  • 33. ‫الرفع‬ ‫تجارب‬ ‫طريق‬ ‫عن‬ ‫الثقل‬ ‫مركز‬ ‫تحديد‬ FINDING CENTER OF GRAVITY BY TRIAL LIFTS  ‫زاوية‬ ‫كل‬ ‫عند‬ ‫الحمولة‬ ‫لمعرفة‬  ‫في‬ ‫الطرد‬ ‫نهاية‬ ‫وزن‬ ‫ضرب‬ ‫يتم‬ ( ‫الكل‬ ‫الوزن‬ ‫على‬ ‫الطرد‬ ‫جانب‬ ‫وزن‬ ‫قسمة‬ ‫ناتج‬ ‫ي‬ .)  NW= C weight x (B weight/ total) = 2000 x (4000/8000) =2000 x 0.5= 1000 KG  NE= C weight x (D weight/ total) = 2000 x (4000/8000) =2000 x 0.5= 1000 KG  SW= A weight x (B weight/ total) =6000 x (4000/8000) =6000 x 0.5= 3000 KG  SE= A weight x (D weight/ total) = 6000 x (4000/8000) = 6000 x 0.5= 3000 KG Total= 1000 + 1000+ 3000+ 3000= 8000 KG ‫المجموع‬ 8000 ‫سابقا‬ ‫تحديده‬ ‫تم‬ ‫كما‬ ‫كجم‬ C A D B NW NE SW SE 2000 4000 4000 6000 33
  • 34. EXAMPLES ‫أمثلة‬ ‫زاوية‬ A ‫زاوية‬ B • ‫مستقر‬ ‫غير‬ ‫الطرد‬ ‫يكون‬ ‫قد‬ . • ‫الزاوية‬ ‫على‬ ‫الحفاظ‬ ‫يجب‬ A ‫من‬ ‫بكثير‬ ‫أقل‬ ‫الزاوية‬ B . • ‫الثق‬ ‫مركز‬ ‫بين‬ ‫كبيرة‬ ‫مسافة‬ ‫على‬ ‫حافظ‬ ‫ل‬ ‫الواير‬ ‫تجميع‬ ‫نقطة‬ ‫وبين‬ . 34
  • 35. ‫الطرد؟؟‬ ‫واتزان‬ ‫ثبات‬ ‫على‬ ‫التصبين‬ ‫طريقة‬ ‫تؤثر‬ ‫هل‬ ‫مباشرة‬ ‫الثقل‬ ‫مركز‬ ‫فوق‬ ‫الهوك‬ ‫في‬ ‫الويرات‬ ‫تجميع‬ ‫تكون‬ ‫أن‬ ‫يجب‬ 35
  • 36. ‫ف‬ ‫للتحكم‬ ‫التصبين‬ ‫وطريقة‬ ‫الواير‬ ‫طريقة‬ ‫اختيار‬ ‫الطرد‬ ‫ي‬ SELECTING SLINGS AND HITCHES FOR LOAD CONTROL ‫التصبين‬ ‫أنواع‬ 36
  • 37. ‫واحد‬ ‫واير‬ ‫باستخدام‬ ‫التصبين‬  ‫البسيطة‬ ‫األحمال‬ ‫لرفع‬ ‫للتصبين‬ ‫واحد‬ ‫واير‬ ‫استخدام‬ ‫يمكن‬  ‫للسقوط‬ ‫المعرضة‬ ‫المواد‬ ‫لرفع‬ ‫يستخدم‬ ‫ال‬ ( ‫مثال‬ ‫المواسير‬ ) , ‫والخامات‬ ‫للسقوط‬ ‫تتعرض‬ ‫أن‬ ‫يمكن‬ ‫التي‬ ‫واألحمال‬ ‫الطويلة‬ 37
  • 38. SINGLE VERTICAL HITCH  ‫الطرد‬ ‫على‬ ‫عمودي‬ ‫واحد‬ ‫واير‬ ‫باستخدام‬ ‫الطرد‬ ‫رفع‬ ‫يتم‬ .  ‫الواير‬ ‫بواسطة‬ ‫محموال‬ ‫يكون‬ ‫للطرد‬ ‫الكلي‬ ‫الوزن‬ .  ‫الطرد‬ ‫زاوية‬ 90  .  ‫الط‬ ‫لحمولة‬ ‫مساوية‬ ‫رفع‬ ‫وأدوات‬ ‫وأقفال‬ ‫ويرات‬ ‫استخدام‬ ‫يمكن‬ ‫رد‬ .  ‫جدال‬ ‫ذات‬ ‫بالويرات‬ ‫الخاصة‬ ‫التصبين‬ ‫عيون‬ ‫تكون‬ ‫ان‬ ‫يجب‬ ‫من‬ ‫ت‬ ‫نوع‬ Mechanical Flemish Splice  ‫أو‬ ‫الطويلة‬ ‫أو‬ ‫المتماسكة‬ ‫غير‬ ‫األحمال‬ ‫مع‬ ‫النوع‬ ‫هذا‬ ‫يستخدم‬ ‫ال‬ ‫المتزنة‬ ‫غير‬ .  ‫أ‬ ‫أقفال‬ ‫على‬ ‫تحتوي‬ ‫التي‬ ‫األحمال‬ ‫مع‬ ‫النوع‬ ‫هذا‬ ‫استخدام‬ ‫يتم‬ ‫و‬ ‫مبات‬ . 38
  • 39. BRIDLE HITCH  ‫الطرود‬ ‫لتصبين‬ ‫أكثر‬ ‫أو‬ ‫ويران‬ ‫استخدام‬ ‫يمكن‬ .  ‫الوي‬ ‫على‬ ‫بالتساوي‬ ‫الحمل‬ ‫توزيع‬ ‫يتم‬ ‫حينما‬ ‫للطرد‬ ‫ممتاز‬ ‫اتزان‬ ‫تحقق‬ ‫الطريقة‬ ‫هذه‬ ‫رات‬ .  ‫مباشرة‬ ‫الطرد‬ ‫ثقل‬ ‫مركز‬ ‫فرق‬ ‫الهوك‬ ‫يكون‬ ‫أن‬ ‫يجب‬ .  ‫استخدام‬ ‫يمكن‬ ‫بالتساوي‬ ‫األحمال‬ ‫لتوزيع‬ Turnbuckles ‫بالشكل‬ ‫موضح‬ ‫هو‬ ‫كما‬ .  ‫الويرات‬ ‫على‬ ‫الزائد‬ ‫التحميل‬ ‫عدم‬ ‫لضمان‬ ‫بدقة‬ ‫بالويرات‬ ‫الخاصة‬ ‫الزوايا‬ ‫قياس‬ ‫يجب‬ 39
  • 40. 3-LEG& 4-LEG BRIDLE HITCH  ‫ا‬ ‫يوزن‬ ‫الثالث‬ ‫الواير‬ ‫يقوم‬ ‫حين‬ ‫في‬ ‫فقط‬ ‫ميران‬ ‫على‬ ‫موزعة‬ ‫الطرد‬ ‫حمولة‬ ‫تكون‬ ‫قد‬ ‫لطرد‬ ‫فقط‬ ‫ويران‬ ‫على‬ ‫الحمل‬ ‫حساب‬ ‫يتم‬ ‫لذلك‬ ‫فقط‬  ‫الواي‬ ‫اعتبار‬ ‫يجب‬ ‫لذلك‬ ‫األربعة‬ ‫الويرات‬ ‫على‬ ‫بالتساوي‬ ‫موزعا‬ ‫الحمل‬ ‫يكون‬ ‫ال‬ ‫قد‬ ‫ثنائي‬ ‫ر‬ ‫فقط‬ ‫ويران‬ ‫وعلى‬ ‫األحمال‬ ‫وحساب‬ 40
  • 41. BASKET HITCH AND LOAD CONTROL  ‫الطرد‬ ‫حول‬ ‫الواير‬ ‫بلف‬ ‫قم‬ ‫الطرد‬ ‫في‬ ‫أكثر‬ ‫للتحكم‬ .  ‫الطرد‬ ‫تحت‬ ‫األوفرالب‬ ‫عمل‬ ‫تجنب‬ 41
  • 42. BASKET HITCH  ‫قائ‬ ‫الزاوية‬ ‫تكون‬ ‫أن‬ ‫بشرط‬ ‫حمولته‬ ‫ضعف‬ ‫حمل‬ ‫النوع‬ ‫هذا‬ ‫في‬ ‫الواير‬ ‫يستطيع‬ ‫وأن‬ ‫مة‬ ‫بين‬ ‫النسبة‬ ‫تكون‬ D ( ‫الطرد‬ ‫حول‬ ‫الواير‬ ‫طرفي‬ ‫بين‬ ‫المسافة‬ ) ‫وبين‬ d ( ‫الواير‬ ‫قطر‬ ) 25 ‫إلى‬ 1 42 ‫اآلمن‬ ‫الحمل‬ ‫الزاوية‬ ‫الداخلية‬ 200 % 90 170 % 60 140 % 45 100 % 30 ‫اآلمن‬ ‫الحمل‬ ‫الزاوية‬ ‫الخارجية‬ 200 % 0 170 % 30 140 % 45 100 % 60
  • 43. SINGLE BASKET HITCH  ‫الطر‬ ‫تحت‬ ‫الواير‬ ‫وتمرير‬ ‫بالهوك‬ ‫الغاصات‬ ‫إحدى‬ ‫وضع‬ ‫طريق‬ ‫عن‬ ‫الطرد‬ ‫رفع‬ ‫يتم‬ ‫ثم‬ ‫د‬ ‫بالهوك‬ ‫الغاصة‬ ‫وضع‬ .  ‫للواي‬ ‫ضرر‬ ‫يحدث‬ ‫ال‬ ‫حتى‬ ‫الرفع‬ ‫أثناء‬ ‫أوانزالقه‬ ‫الطرد‬ ‫دوران‬ ‫عدم‬ ‫من‬ ‫التأكد‬ ‫يجب‬ ‫أو‬ ‫ر‬ ‫الطرد‬ .  ‫التصبين‬ ‫بزاوية‬ ‫تتأثر‬ ‫الواير‬ ‫حمولة‬ 43
  • 44. DOUBLE BASKET HITCH  ‫اتزانه‬ ‫لضمان‬ ‫الطرد‬ ‫تحت‬ ‫تمريرهما‬ ‫يتم‬ ‫ويران‬ .  ‫المساف‬ ‫زيادة‬ ‫عدم‬ ‫مراعاة‬ ‫مع‬ ‫الطرد‬ ‫اتزان‬ ‫لضمان‬ ‫كافية‬ ‫بمسافة‬ ‫بعضهما‬ ‫عن‬ ‫الويران‬ ‫ابعاد‬ ‫يجب‬ ‫ة‬ ‫الواير‬ ‫زاوية‬ ‫على‬ ‫تؤثر‬ ‫كبيرة‬ ‫بصورة‬ .  ‫والواير‬ ‫الطرد‬ ‫بين‬ ‫الزاوية‬ ‫تكون‬ ‫أن‬ ‫يجب‬ 60  ‫الطرد‬ ‫انزالق‬ ‫لتفادي‬ ‫أكثر‬ ‫أو‬ .  ‫ك‬ ‫االنزالق‬ ‫لمنع‬ ‫الحجم‬ ‫مختلفة‬ ‫نقاط‬ ‫حول‬ ‫الويرات‬ ‫تصبين‬ ‫يتم‬ ‫الملساء‬ ‫األسطح‬ ‫ذات‬ ‫الطرود‬ ‫هو‬ ‫ما‬ ‫كاملة‬ ‫لفة‬ ‫الواير‬ ‫لف‬ ‫يتم‬ ‫أو‬ ‫بالشكل‬ ‫موضح‬ ( ‫مزدوجة‬ ) ‫الطرد‬ ‫حول‬ . 44
  • 45. DOUBLE WRAP BASKET HITCH  ‫ال‬ ‫بطريقة‬ ‫فقط‬ ‫حمله‬ ‫من‬ ‫بدال‬ ‫عليه‬ ‫والضغط‬ ‫الطرد‬ ‫حول‬ ‫كاملة‬ ‫لفة‬ ‫الواير‬ ‫لف‬ ‫يتم‬ ‫سلة‬ " ‫الباسكت‬ ."  ‫الحاجة‬ ‫حسب‬ ‫ويران‬ ‫أو‬ ‫واحد‬ ‫واير‬ ‫استخدام‬ ‫يمكن‬ .  ‫ي‬ ‫حيث‬ ‫واألسطوانات‬ ‫كالمواسير‬ ‫متماسكة‬ ‫غير‬ ‫احمال‬ ‫رفع‬ ‫حالة‬ ‫في‬ ‫ممتاز‬ ‫النوع‬ ‫هذا‬ ‫وفر‬ ‫اتصال‬ 360  ‫الطرود‬ ‫وضم‬ ‫بالطرد‬ . 45
  • 46. CHOKER HITCH AND LOAD CONTROL  ‫بطريقة‬ ‫التصبين‬ Choker ‫بنسبة‬ ‫الطرد‬ ‫بجسم‬ ‫اتصال‬ ‫يوفر‬ ‫ال‬ 360 ‫درجة‬ .  ‫الط‬ ‫زاوية‬ ‫لتحسين‬ ‫والطرد‬ ‫الواير‬ ‫بين‬ ‫الخشب‬ ‫من‬ ‫قطعة‬ ‫وضع‬ ‫يمكن‬ ‫رد‬ ‫التماسك‬ ‫وزيادة‬ .  ‫صحيح‬ ‫غير‬ ‫والعكس‬ ‫الغاصة‬ ‫من‬ ‫الواير‬ ‫جسم‬ ‫إدخال‬ ‫يمكن‬ 46
  • 47. CHOKER HITCH  ‫هي‬ ‫التصبين‬ ‫من‬ ‫النوع‬ ‫هذا‬ ‫في‬ ‫للواير‬ ‫اآلمنة‬ ‫الحمولة‬ 80 % ‫من‬ ‫تقل‬ ‫وأال‬ ‫الطرد‬ ‫زوايا‬ ‫في‬ ‫حماية‬ ‫عمل‬ ‫بشرط‬ ‫الواير‬ ‫حمولة‬ ‫عن‬ ‫الرأسية‬ ‫الزاوية‬ 60 ‫بالشكل‬ ‫موضح‬ ‫هو‬ ‫كما‬ ‫درجة‬ 47 ‫اآلمن‬ ‫الحمل‬ ‫الزاوية‬ 80 % 120 - 180 65 % 90 - 119 55 % 60 - 89 45 % 30 - 59
  • 48. SINGLE CHOKER HITCH  ‫القفل‬ ‫أو‬ ‫الغاصات‬ ‫إحدى‬ ‫خالل‬ ‫من‬ ‫الواير‬ ‫تمرير‬ ‫طريق‬ ‫عن‬ ‫العقدة‬ ‫يشبه‬ ‫ما‬ ‫عمل‬ ‫يتم‬ .  ‫اتزا‬ ‫يصعب‬ ‫التي‬ ‫الحمال‬ ‫مع‬ ‫استخدامه‬ ‫يتم‬ ‫ال‬ ‫لذلك‬ ‫بالطرد‬ ‫كامل‬ ‫اتصال‬ ‫يوفر‬ ‫ال‬ ‫بواسطة‬ ‫نها‬ ‫المتماسكة‬ ‫غير‬ ‫أو‬ ‫واحد‬ ‫واير‬ .  ‫لتدوير‬ ‫أو‬ ‫حمولته‬ ‫ضعف‬ ‫لرفع‬ ‫الواير‬ ‫زوج‬ ‫أيضا‬ ‫يمكن‬ / ‫الطرد‬ ‫قلب‬  ‫المع‬ ‫االتجاه‬ ‫في‬ ‫الطرد‬ ‫فوق‬ ‫الغاصتين‬ ‫كال‬ ‫وضع‬ ‫يتم‬ ‫الطرد‬ ‫لقلب‬ ‫حاجة‬ ‫وجود‬ ‫عند‬ ‫اكس‬ ‫تدوير‬ ‫التجاه‬ / ‫خال‬ ‫من‬ ‫تمرير‬ ‫ويتم‬ ‫الطرد‬ ‫حول‬ ‫الواير‬ ‫منتصف‬ ‫ويكون‬ ‫الطرد‬ ‫قلب‬ ‫ل‬ ‫بالشكل‬ ‫موضح‬ ‫هو‬ ‫كما‬ ‫بالهوك‬ ‫ووضعه‬ ‫الغاصتين‬ . 48
  • 49. DOUBLE CHOKER HITCH  ‫الطرد‬ ‫اتزان‬ ‫على‬ ‫للمحافظة‬ ‫ويران‬ ‫استخدام‬ ‫يتم‬ .  ‫ت‬ ‫الطرد‬ ‫انقالب‬ ‫احتمالية‬ ‫لكن‬ ‫للطرد‬ ‫الكامل‬ ‫اإلمساك‬ ‫عدم‬ ‫في‬ ‫الفردي‬ ‫الواير‬ ‫تشبه‬ ‫أقل‬ ‫كون‬ ‫المتماسكة‬ ‫غير‬ ‫األحمال‬ ‫مع‬ ‫النوع‬ ‫هذا‬ ‫استخدام‬ ‫يمكن‬ ‫لذلك‬ ‫بكثير‬ . 49
  • 50. DOUBLE WRAP CHOKER HITCH  ‫الط‬ ‫سطح‬ ‫مع‬ ‫اتصاله‬ ‫زاوية‬ ‫فإن‬ ‫الطرد‬ ‫حول‬ ‫مزدوجة‬ ‫لفة‬ ‫الواير‬ ‫لف‬ ‫عند‬ ‫رد‬ ‫تكون‬ 360 ‫درجة‬ .  ‫الطريقة‬ ‫بهذه‬ ‫للتصبين‬ ‫ويران‬ ‫أو‬ ‫واحد‬ ‫واير‬ ‫استخدام‬ ‫يمكن‬ 50
  • 51. HITCHES AND LOAD CONTROL  ‫الط‬ ‫سطح‬ ‫مع‬ ‫اتصاله‬ ‫زاوية‬ ‫فإن‬ ‫الطرد‬ ‫حول‬ ‫مزدوجة‬ ‫لفة‬ ‫الواير‬ ‫لف‬ ‫عند‬ ‫رد‬ ‫عن‬ ‫تزيد‬ 360 ‫درجة‬ .  ‫الطرد‬ ‫تحت‬ ‫األوفرالب‬ ‫عمل‬ ‫يجب‬ ‫ال‬  ‫من‬ ‫الواير‬ ‫تمديد‬ ‫تجنب‬ ( eye bolt ) ‫الواير‬ ‫على‬ ‫الحمل‬ ‫يزيد‬ ‫ذلك‬ ‫ألن‬ ‫الرفع‬ ‫زاوية‬ ‫على‬ ‫ويؤثر‬  ‫اسفل‬ ‫الغاصة‬ ‫سحب‬ ‫لمنع‬ ‫الغاصات‬ ‫اتجاه‬ ‫عكس‬ ‫يتم‬ ‫التصبين‬ ‫عند‬ ‫الطرد‬ 51
  • 52. ‫التصبين‬ HITCHES  ‫الوصلة‬ ‫أو‬ ‫الهوك‬ ‫عرض‬ ( ‫القفل‬ ‫مثال‬ ) ‫قط‬ ‫من‬ ‫أكبر‬ ‫تكون‬ ‫أن‬ ‫يجب‬ ‫ر‬ ‫نصف‬ ‫عن‬ ‫تزيد‬ ‫ال‬ ‫ولكن‬ ‫الواير‬ ( 1/2 ) ‫الغاصة‬ ‫طول‬ L  ‫الس‬ ‫بطريقة‬ ‫التصبين‬ ‫حالة‬ ‫في‬ ‫إذا‬ ‫لة‬ ‫القائمة‬ ‫الزاوية‬ ‫بلغت‬ 60 ‫فإن‬ ‫درجة‬ ‫الواير‬ ‫حمولة‬ ‫نفس‬ ‫تكون‬ ‫الحمولة‬ ( ‫العمودي‬ ‫الوضع‬ ‫في‬ ) 52 60
  • 54. SLING ANGLES ‫والويرات‬ ‫التصبين‬ ‫زوايا‬  ‫الحمولة‬ ‫لحساب‬ ( ‫الطرد‬ )  ‫واير‬ ‫كل‬ ‫على‬ ‫الوزن‬ = ‫الواير‬ ‫على‬ ‫الوزن‬ ‫عموديا‬ X ‫الطرد‬ ‫زاوية‬ ‫معامل‬ ( ‫الحمولة‬ ) ß  ‫الزاوية‬ ‫معامل‬ = ‫الواير‬ ‫طول‬ / ‫اإلرتفاع‬ ( L/H )  ‫الحمولة‬ = 500 x ‫الطرد‬ ‫زاوية‬ ‫معامل‬ 1000 KG 500 KG 500 KG 1000 KG H 54
  • 55. ‫الزوايا‬ ‫معامل‬ LOAD ANGLE FACTOR 1000 KG H Vertical Sling Angle ß ‫قائــمة‬ ‫الزاويــة‬ Load Angle Factor = L/H ‫الزاوية‬ ‫معامل‬ ( ‫الطول‬ / ‫اإلرتفاع‬ ) 0 1.00 30 1.16 (1.2) 45 1.41 (1.4) 60 2.00 (2.0) ‫واير‬ ‫كل‬ ‫على‬ ‫الوزن‬ = ‫عموديا‬ ‫الواير‬ ‫على‬ ‫الوزن‬ X ‫معامل‬ ‫الطرد‬ ‫زاوية‬ ( ‫الحمولة‬ ) ß 55
  • 56. SLING LENGTH FOR DESIRED ANGLE ‫الزاوية‬ ‫على‬ ‫بناء‬ ‫الواير‬ ‫طول‬ Vertical Angle ‫قائمة‬ ‫زاوية‬ Length Factor ‫الواير‬ ‫طول‬ ‫معامل‬ L/H Load Angle Factor ‫الطول‬ / ‫اإلرتفاع‬ ( ‫معامل‬ ‫الزاوية‬ ) 60 1.15 2 50 1.31 1.55 45 1.41 1.4 40 1.55 1.3 35 1.74 1.21 30 2 1.16 ‫الواير‬ ‫طول‬ = D X ‫الواير‬ ‫طول‬ ‫معامل‬ D = ‫الواير‬ ‫تصبين‬ ‫نقطة‬ ‫إلى‬ ‫الطرد‬ ‫ثقل‬ ‫مركز‬ ‫من‬ ‫المسافة‬ D 2 D 1 56
  • 57. UNEQUAL LEGS ‫الطول‬ ‫متساوية‬ ‫غير‬ ‫ويرات‬ D 1 D 2 H ‫واير‬ ‫كل‬ ‫على‬ ‫الشد‬ ‫لحساب‬ : ‫رقم‬ ‫الواير‬ ‫على‬ ‫الشد‬ 1 = ‫الكلي‬ ‫الوزن‬ X D2 X ‫الزاوية‬ ‫معامل‬ ( D1+D2 ‫الطرد‬ ‫طول‬ ) ‫رقم‬ ‫الواير‬ ‫على‬ ‫الشد‬ 2 = ‫الكلي‬ ‫الوزن‬ X D1 X ‫الزاوية‬ ‫معامل‬ ( D1+D2 ‫الطرد‬ ‫طول‬ ) 57
  • 58. SLING LOADS ‫الويرات‬ ‫على‬ ‫األحمال‬ 10 Ton ‫الوزن‬ ‫الزاوية‬ 5.2 15 6 30 7 45 10 60 29 80 ‫زاوية‬ ‫تفضل‬ 30 ‫أقل‬ ‫أو‬ ‫العمودي‬ ‫على‬ ‫درجة‬ ‫الزاوية‬ ‫هي‬ ‫اختيار‬ ‫أسوأ‬ 60 ‫العمودي‬ ‫على‬ 58
  • 59. ‫الزاوية‬ ‫معامل‬ ‫استخدم‬ ( ‫الطول‬ / ‫اإلرتفاع‬ ) ‫التصب‬ ‫زاوية‬ ‫لتحديد‬ ‫ين‬ H 2 2 2 ‫متر‬ ‫طول‬ ‫الواير‬ L 1 1.4 1.7 ‫متر‬ ‫اإلرتفاع‬ H 2 1.428 1.176 ‫الزاوية‬ ‫معامل‬ L/H 60 45 30 ‫الزاوية‬ ‫الواير‬ ‫حجم‬ L/H ‫الزاوية‬ 1.2 30 1.4 45 2 60 4000 KG 59
  • 60. ‫الزاوية‬ ‫معامل‬ ‫استخدم‬ ( ‫الطول‬ / ‫اإلرتفاع‬ ) ‫التصب‬ ‫زاوية‬ ‫لتحديد‬ ‫ين‬ H 2.4 2.4 2.4 ‫طول‬ ‫الواير‬ L 2 1.7 1.2 ‫متر‬ ‫اإلرتفاع‬ H ‫الزاوية‬ ‫معامل‬ L/H ‫الحمل‬ ‫كل‬ ‫على‬ ‫واير‬ 10 ‫طن‬ 60
  • 61. ‫مثـــال‬ EXAMPLE ‫واير‬ ‫كل‬ ‫على‬ ‫الحمل‬ ‫لحساب‬  ‫رقم‬ ‫الواير‬ ‫طول‬ 1 = 11.3  ‫اإلرتفاع‬ = 8  ‫الزاوية‬ ‫معامل‬ L/H = 11.3/8 = 1.4125  ‫الواير‬ ‫حمولة‬ = 1.4125 x 10000 x 2 (/ 2 + 8 =) 2825 ‫كجم‬  ‫الزاوية‬ = 45 ‫درجة‬  ‫رقم‬ ‫الواير‬ ‫طول‬ 2 = 8.2  ‫اإلرتفاع‬ = 8  ‫الزاوية‬ ‫معامل‬ L/H = 8.2/8 = 1.025  ‫الواير‬ ‫حمولة‬ = 1.025 x 10000 x 8 (/ 2 + 8 =) 8200 ‫كجم‬  ‫من‬ ‫أقل‬ ‫الزاوية‬ 30 ‫درجة‬ L1= 11.3 L2 = 8.2 H= 8 D1= 8 D2= 2 D= 10 61 10000 KG
  • 62. ‫واير‬ ‫كل‬ ‫على‬ ‫األحمال‬ ‫حدد‬ DETERMINE THE LOADS PLACED ON EACH SLING  ‫المواسير‬ ‫تصبين‬ ‫طريقة‬ Choker  ‫الزاوية‬ = 45 ‫درجة‬  ‫صلب‬ ‫الويرات‬ ‫نوع‬  ‫تحمل‬ ‫التي‬ ‫الويرات‬ ‫على‬ ‫الحمولة‬ ‫الميزان‬ ٍ( Spreader Beam =) 12 ‫طن‬  ‫الزاوية‬ ‫معامل‬ 45 = 1.4  1.4 x 12/2 = 8.4 ‫طن‬  ‫تحمل‬ ‫التي‬ ‫الويرات‬ ‫على‬ ‫الحمولة‬ ‫المواسير‬ = 10 ‫طن‬  ‫الزاوية‬ 90 = 10/2 = 5 ‫طن‬  ‫الواير‬ ‫حجم‬ ‫لتحديد‬ ‫للجدول‬ ‫بالرجوع‬ ‫مع‬ ‫التصبين‬ ‫طريقة‬ ( choker = ) 24 ‫مم‬ 10 Ton 2 Ton 62
  • 64. ‫والوصالت‬ ‫واألقفال‬ ‫الهوك‬ ‫استخدام‬ APPLICATION OF HOIST HOOKS, SHACKLES AND LINKS  ‫ي‬ ‫المنتج‬ ‫تتبع‬ ‫على‬ ‫للقدرة‬ ‫تم‬ ‫على‬ ‫التعرف‬ ‫كود‬ ‫استخدام‬ ‫المنتج‬  WLL ‫القفل‬ ‫حمولة‬  Ultimate Load ( ‫الحمولة‬ ‫القصوى‬ ) ‫يمكن‬ ‫ال‬ ‫حمولة‬ ‫أقل‬ ‫انه‬ ‫تسبب‬ ‫أو‬ ‫رفعها‬ ‫للمنتج‬ ‫أو‬ ‫يار‬ ‫الرفع‬ ‫عملية‬ ‫فشل‬  Design Factor = Ultimate Load/WLL ‫اآلمنة‬ ‫المنطقة‬ ‫القفل‬ ‫إلستخدام‬ ‫القفل‬ ‫حمولة‬ ‫المنتج‬ ‫على‬ ‫التعرف‬ ‫كود‬ 64
  • 65. SHACKLES ‫األقفال‬  Tensile Strength ‫الشد‬ ‫قوة‬  ‫الوزن‬ ‫حمل‬ ‫على‬ ‫القفل‬ ‫قدرة‬  Ductility ‫الليونة‬  ‫تشوه‬ ‫امكانية‬ ( ‫تأثر‬ ) ‫الزائد‬ ‫بالحمل‬ ‫القفل‬   Fatigue Strength ‫التحمل‬  ‫المتكرر‬ ‫اإلستخدام‬ ‫تحمل‬ ‫على‬ ‫القفل‬ ‫قدرة‬  1.5 ‫لمدة‬ ‫اآلمن‬ ‫الحمل‬ ‫مرة‬ 20000 ‫دورة‬  Impact Strength ‫الصالبة‬ ( ‫الصدمات‬ ‫تحمل‬ )  ‫بسرعة‬ ‫وزن‬ ‫حمل‬ ‫على‬ ‫القفل‬ ‫قدرة‬ 65
  • 66. SHACKLES ‫األقفال‬ Screw Pin Shackle ‫األحمال‬ ‫ونقل‬ ‫رفع‬ ‫في‬ ‫يستخدم‬ ‫رفع‬ ‫عملية‬ ‫كل‬ ‫قبل‬ ‫ربطه‬ ‫ويتم‬ Bolt Type Shackle ‫طويلة‬ ‫التركيبات‬ ‫في‬ ‫يستخدم‬ ‫األجل‬ ‫للفك‬ ‫الحاجة‬ ‫عدم‬ ‫حالة‬ ‫في‬ ‫باستمرار‬ ‫والتركيب‬ Wide Body Shackle ‫القماش‬ ‫الويرات‬ ‫مع‬ ‫يستخدم‬ 66
  • 67. ‫تصبين‬ ( ‫توصيل‬ ) ‫بالهوك‬ ‫الويرات‬ CONNECTION OF SLINGS TO HOOK  ‫الغاصة‬ ‫فتح‬ ‫يجب‬ ‫ال‬ ( ‫العين‬ ( ) W ) ‫من‬ ‫ألكثر‬ ‫بالواير‬ ‫الخاصة‬ 50 % ‫الغاصة‬ ‫طول‬ ‫من‬ ( L )  ‫يق‬ ‫أن‬ ‫يجب‬ ‫المستخدم‬ ‫الهوك‬ ‫سمك‬ ‫ل‬ ‫عن‬ 50 % ‫الغاصة‬ ‫طول‬ ‫من‬ ( L )  ‫أن‬ ‫يجب‬ ‫القماش‬ ‫الويرات‬ ‫حالة‬ ‫في‬ ‫عن‬ ‫الهوك‬ ‫سمك‬ ‫يقل‬ 1/3 ‫طول‬ ‫الغاصة‬ ( L ) 67
  • 68. 45 45 ‫عن‬ ‫الهوك‬ ‫على‬ ‫الزاوية‬ ‫تزيد‬ ‫أال‬ ‫يجب‬ 90 ‫درجة‬ ‫القفل‬ ‫على‬ ‫الزاوية‬ ‫تزيد‬ ‫أال‬ ‫يجب‬ ( ‫الوصلة‬ ) ‫عن‬ 120 ‫درجة‬ ‫من‬ ‫أكثر‬ ‫وضع‬ ‫يجب‬ ‫ال‬ 2 ‫بالهوك‬ ‫واير‬ ‫تجميع‬ ‫وصلة‬ ‫استخدام‬ ‫يتم‬ ( ‫حلقة‬ ) ‫زي‬ ‫حالة‬ ‫في‬ ‫ادة‬ ‫عن‬ ‫الويرات‬ ‫عدد‬ 2 ‫واير‬ 68
  • 69. SHACKLES ‫األقفال‬ • ‫حالة‬ ‫في‬ Spreader Beam ‫أقف‬ ‫استخدام‬ ‫يمكن‬ ‫ال‬ ‫بنز‬ ‫أو‬ ‫بمسمار‬ ‫مزودة‬ Bolt Type Shackle ‫بينما‬ ‫أقفال‬ ‫تستخدم‬ Screw Type Shackle ‫لتصبين‬ ‫الطرد‬ • ‫الخاص‬ ‫المسمار‬ ‫وضع‬ ‫يتم‬ ‫ال‬ ‫المتحر‬ ‫الواير‬ ‫على‬ ‫بالقفل‬ ‫ك‬ . • ‫رصاصة‬ ‫وضع‬ ‫يفضل‬ Thimble ‫الغاصة‬ ‫على‬ ( ‫العين‬ ) ‫بالو‬ ‫اإلحتكاك‬ ‫لمنع‬ ‫اير‬ 69
  • 70. SHACKLES ‫األقفال‬ • ‫ق‬ ‫بالقفل‬ ‫الخاص‬ ‫المسمار‬ ‫على‬ ‫الواير‬ ‫حركة‬ ‫د‬ ‫فتحه‬ ‫إلى‬ ‫تؤدي‬ • ‫الخاص‬ ‫المسمار‬ ‫وضع‬ ‫يتم‬ ‫ال‬ ‫المتحر‬ ‫الواير‬ ‫على‬ ‫بالقفل‬ ‫ك‬ . 70
  • 71. SHACKLES ‫األقفال‬ • ‫الوا‬ ‫قطر‬ ‫من‬ ‫أكبر‬ ‫يكون‬ ‫أن‬ ‫يجب‬ ‫القفل‬ ‫حجم‬ ‫ير‬ , ‫برصاصة‬ ‫غاصة‬ ‫استخدام‬ ‫ويفضل‬ ( Thimble ) ‫الواير‬ ‫لحماية‬ • ‫الخاص‬ ‫المسمار‬ ‫وضع‬ ‫يتم‬ ‫ال‬ ‫المتحر‬ ‫الواير‬ ‫على‬ ‫بالقفل‬ ‫ك‬ . 71
  • 72. ‫األقفال‬ ‫وضع‬ POINT LOADING OF SHACKLES Pin over Pin Body over Body Body over Pin 72
  • 73. ‫باألقفال‬ ‫الويرات‬ ‫توصيل‬ CONNECTION OF SLINGS TO SHACKLE • ‫كب‬ ‫القفل‬ ‫قطر‬ ‫يكون‬ ‫أن‬ ‫يجب‬ ‫ير‬ ‫الواير‬ ‫عصر‬ ‫لتفادي‬ ‫كفاية‬ • ‫قط‬ ‫من‬ ‫أكبر‬ ‫القفل‬ ‫قطر‬ ‫يكون‬ ‫أن‬ ‫يجب‬ ‫ر‬ ‫بالغاص‬ ‫رصاصة‬ ‫هناك‬ ‫تكن‬ ‫لم‬ ‫إذا‬ ‫الواير‬ ‫ة‬ ( ‫العين‬ ) Thimble 73
  • 74. ‫األقفال‬ ‫على‬ ‫الجانبي‬ ‫التحميل‬ SIDE LOADING OF SHACKLES 74
  • 75. ‫األقفال‬ ‫على‬ ‫الجانبي‬ ‫التحميل‬ SIDE LOADING OF SHACKLES ‫اآلمن‬ ‫الحمولة‬ ‫تخقيض‬ ‫نسبة‬ ‫ة‬ WLL ‫الطولي‬ ‫الخط‬ ‫من‬ ‫الزاوية‬ ( in line ) 0% 0:10 15% 11:20 25% 21:30 30% 31:45 40% 46:55 45% 56:70 50% 71:90 ‫ملحوظة‬ : ‫نوع‬ ‫من‬ ‫األقفال‬ ‫على‬ ‫الجانبي‬ ‫التحميل‬ ‫يتم‬ ‫ال‬ : G-215 , S-215 , G-213 , S-213 Round Pin Shackles 75
  • 76. ‫الهوك‬ ‫مع‬ ‫األقفال‬ SHACKLES PLACED ON HOOKS • ‫الهوك‬ ‫إستقرار‬ ‫من‬ ‫التأكد‬ ‫يجب‬ ‫القفل‬ ‫على‬ . • ‫أ‬ ‫تكون‬ ‫أن‬ ‫يجب‬ ‫القفل‬ ‫فتحة‬ ‫قطر‬ ‫كبر‬ ‫الهوك‬ ‫سمك‬ ‫من‬ 76
  • 77. ‫كحلقة‬ ‫القفل‬ ‫استخدام‬ ( ‫وصلة‬ ) ‫تجميع‬ SHACKLE AS A COLLECTOR RING • ‫وص‬ ‫أو‬ ‫كحلقة‬ ‫القفل‬ ‫استخدام‬ ‫حالة‬ ‫في‬ ‫لة‬ ‫المسمار‬ ‫أو‬ ‫البنز‬ ‫يكون‬ ‫أن‬ ‫يجب‬ ‫تجميع‬ ‫ألعلى‬ . • ‫عن‬ ‫تزيد‬ ‫ال‬ ‫الويرات‬ ‫زاوية‬ 120 ‫درجة‬ • ‫أو‬ ‫قالووظ‬ ‫بمسمار‬ ‫أقفال‬ ‫استخدام‬ ‫يتم‬ ‫قالووظ‬ ‫مسمار‬ ‫وبنز‬ • ‫تجميع‬ ‫وصلة‬ ‫استخدام‬ ‫حالة‬ ‫في‬ Master Link ‫الزاوية‬ ‫تزيد‬ ‫أال‬ ‫يجب‬ ‫عن‬ 120 ‫درجة‬ 77
  • 79. ‫األنــــــــــــــواع‬ TYPES OF EYE BOLTS  Shouldered Eye Bolt  Non-Shouldered Eye Bolt  Swivel Hoist Ring  Machinery Eye Bolt 79
  • 80. ‫التركيب‬ EYE BOLT INSTALLATION ‫قطر‬ ‫من‬ ‫أكبر‬ Eye Bolt ‫واحدة‬ ‫لصامولة‬ ‫نحتاج‬ ‫قطر‬ ‫من‬ ‫أقل‬ ‫أو‬ ‫تساوي‬ Eye Bolt ‫نحتاج‬ ‫لصامولتين‬  ‫الطرد‬ ‫داخل‬ ‫الكلي‬ ‫العمق‬ ‫ونصف‬ ‫مرتان‬ ( 2.5 ) ‫قطر‬ Eye Bolt  ‫األقل‬ ‫على‬ ‫القالووظ‬ ‫عمق‬ ‫قطر‬ ‫مرتان‬ Eye Bolt ‫قطر‬ ‫من‬ ‫أقل‬ ‫أو‬ ‫تساوي‬ Eye Bolt ‫توجد‬ ‫وال‬ ‫واحدة‬ ‫صامولة‬ ‫سوى‬  ‫الطرد‬ ‫داخل‬ ‫الكلي‬ ‫العمق‬ ‫القالووظ‬ ‫طول‬ ‫يساوي‬ ‫قطر‬ ‫نصف‬ ‫إلى‬ ‫باإلضافة‬ Eye Bolt  2.5 ‫قطر‬ Eye Bolt 80
  • 81. ‫عامة‬ ‫متطلـــــبات‬ EYE BOLTS- GENERAL REQUIREMENTS  ‫رفع‬ ‫وسيلة‬ ‫استخدام‬ ‫مراعاة‬ ‫يجب‬ ‫مناسبة‬  ‫مناسب‬ ‫غير‬ ‫هوك‬ ‫استخدام‬ ‫تجنب‬ ‫مناسبة‬ ‫غير‬ ‫بطريقة‬ ‫أو‬  ‫بين‬ ‫للربط‬ ‫األقفال‬ ‫استخدم‬ Eye Bolt ‫الواير‬ ‫و‬ 81
  • 82. ‫للرفع‬ ‫وايرين‬ ‫استخدام‬ EYE BOLTS USED WITH A TWO LEGGED SLING  ‫تصبح‬ Eye Bolts ‫عند‬ ‫أضعف‬ ‫الجانبي‬ ‫التحميل‬ .  ‫نتيج‬ ‫أثقل‬ ‫الحمل‬ ‫أيضا‬ ‫يصبح‬ ‫ة‬ ‫التحميل‬ ‫زاوية‬  ‫استخدام‬ ‫يجب‬ Eye Bolt ‫من‬ ‫النوع‬ Shoulder Nut ‫أو‬ Machinery ‫التحميل‬ ‫عند‬ ‫الجانبي‬ ( ‫بزاوية‬ ) 82
  • 83. ‫الجانبي‬ ‫التحميل‬ ( ‫بزاوية‬ ) ANGULAR LOADING  ‫تكون‬ ‫أن‬ ‫البد‬ Eye Bolt ‫بحافة‬ ‫عريضة‬ Shoulder .  ‫بالطرد‬ ‫جيدا‬ ‫ربطها‬ ‫من‬ ‫البد‬  ‫اتجاه‬ ‫مع‬ ‫اتجاهها‬ ‫يكون‬ ‫أن‬ ‫يجب‬ Eye Bolt ‫بالشكل‬ ‫موضح‬ ‫هو‬ ‫كما‬ 83
  • 84. ‫الجانبي‬ ‫التحميل‬ ( ‫بزاوية‬ ) ANGULAR LOADING  ‫الوض‬ ‫في‬ ‫الفتحة‬ ‫إتجاه‬ ‫يكن‬ ‫لم‬ ‫إذا‬ ‫ع‬ ‫تحد‬ ‫يتم‬ ‫الواير‬ ‫إلتجاه‬ ‫المناسب‬ ‫يد‬ ‫لتعديل‬ ‫المطلوبة‬ ‫المسافة‬ Eye Bolt .  ‫فك‬ ‫يتم‬ Eye Bolt ‫وردة‬ ‫ووضع‬ Shim ‫وتركيب‬ ‫مناسبة‬ ‫بسماكة‬ Eye Bolt ‫ليناسب‬ ‫أخرى‬ ‫مرة‬ ‫الواير‬ ‫اتجاه‬ 84
  • 85. ‫الجانبي‬ ‫التحميل‬ ( ‫بزاوية‬ ) ANGULAR LOADING  ‫حمولة‬ ‫تخفيض‬ ‫يتم‬ Eye Bolt ‫الزاوية‬ ‫حسب‬ .  ‫الجانبي‬ ‫التحميل‬ ( ‫بزاوية‬ ) ‫يكو‬ ‫فقط‬ ‫ن‬ ‫باستخدام‬ Eye Bolt ‫بحافة‬ ‫عريضة‬ Shoulder ‫اآلمن‬ ‫الحمل‬ ‫نسبة‬ ‫التخفيض‬ ‫الزاوية‬ 100 % 0 % 0 65 % 35 % 30 55 % 45 % 45 25 % 75 % 60 85
  • 86. ‫اختيار‬ EYE BOLT SELECTION OF EYE BOLT 2 m 2 m 2 m ‫الطول‬ L 1 m 1.4 m 1.7 m ‫اإلرتفاع‬ H 2 1.428 1.176 ‫الطول‬ / ‫اإلرتفاع‬ L/H 60 45 30 ‫الزاوية‬ ‫جانب‬ ‫كل‬ ‫على‬ ‫الوزن‬ ‫حجم‬ Eye Bolt H 2000 KG 86
  • 87. APPLICATION OF WIRE ROPE TERMINATIONS 87
  • 88. ‫األنــــــواع‬ TERMINATION TYPES  Spelter Socket  Swage Socket  Turnback eye  Wedge Socket  Wire Rope Clip Eye  Flemish Eye 88
  • 89. ‫الكــــــــــفاءة‬ TERMINATION EFFICIENCY Swage and Spelter Socket 100% Turnback and Flemish Eye 90% Wedge Socket and Wire Rope Clips 80% 89
  • 90. ‫الفاعلية‬ / ‫الكــــفاءة‬ EFFICIENCY  ‫الك‬ ‫قوة‬ ‫بين‬ ‫النسبة‬ ‫هي‬ ‫الكفاءة‬ ‫أو‬ ‫الفعالية‬ ‫سر‬ ‫بع‬ ‫الخاصة‬ ‫الكسر‬ ‫قوة‬ ‫وبين‬ ‫للمنتج‬ ‫المحددة‬ ‫مل‬ ‫الواير‬ ‫نهاية‬ ( Termination ) ‫بنسبة‬ ‫موضحة‬ ‫مئوية‬ ‫مثال‬ : ‫للزاويتين‬ ‫المطلوبة‬ ‫الكسر‬ ‫قوة‬ ‫هي‬ ‫ما‬ ‫إذا‬ ‫الموضحتين‬ :  ‫بالشكل‬ ‫موضح‬ ‫هو‬ ‫كما‬ ‫الزاوية‬  ‫األمان‬ ‫معامل‬ Design Factor ‫يساوي‬ 5:1  ‫يساوي‬ ‫الوزن‬ 10 ‫طن‬  Flemish Eye ‫مستخدمة‬ 30 90
  • 91. ‫الفاعلية‬ / ‫الكــــفاءة‬ EFFICIENCY ‫اإلجابة‬ :  ‫الزاوية‬ ‫في‬ 30  ‫الزاوية‬ ‫معامل‬ = 1.2  ‫الواير‬ ‫على‬ ‫الحمل‬ = 1.2 X 10 = 12 ‫طن‬  ‫الكفاءة‬ ‫أو‬ ‫الفعالية‬ = 90 %  ‫األمان‬ ‫معامل‬ Design factor = 5:1  ‫المطلوبة‬ ‫الكسر‬ ‫قوة‬ ( = 12 / 0.9 ) x 5 = 66.6 ‫طن‬  ‫الزاوية‬ ‫في‬ 60  ‫الزاوية‬ ‫معامل‬ = 2  ‫الواير‬ ‫على‬ ‫الحمل‬ = 2 X 10 = 20 ‫طن‬  ‫الكفاءة‬ ‫أو‬ ‫الفعالة‬ = 90 %  ‫األمان‬ ‫معامل‬ ( Design Factor =) 5:1  ‫المطلوبة‬ ‫الكسر‬ ‫قوة‬ ( = 20/0.9 ) x 5 = 111.5 ‫طن‬ 30 91
  • 92. ‫بالويرات‬ ‫الخاصة‬ ‫األقفال‬ WIRE ROPE CLIPS  ‫رصاصة‬ ‫استخدام‬ ‫يجب‬ Thimble ‫عمل‬ ‫عند‬ ‫الواي‬ ‫تحمي‬ ‫حيث‬ ‫الكلبسات‬ ‫باستخدام‬ ‫غاصة‬ ‫ر‬ .  ‫ال‬ ‫الطرف‬ ‫نهاية‬ ‫عند‬ ‫قرب‬ ‫كلبس‬ ‫أول‬ ‫ربط‬ ‫يتم‬ ‫ميت‬ ‫ال‬ ‫على‬ ‫التبديل‬ ‫ويتم‬ ‫الصامولتين‬ ‫التربط‬ ‫صامولتين‬ ‫المطلوب‬ ‫للعزم‬ ‫الوصول‬ ‫يتم‬ ‫حتى‬  ‫والر‬ ‫الغاصة‬ ‫ناحية‬ ‫الثاني‬ ‫الكلبس‬ ‫ربط‬ ‫يتم‬ ‫صاصة‬ ‫الس‬ ‫الطريقة‬ ‫بنفس‬ ‫والتعزيم‬ ‫الربط‬ ‫ويتم‬ ‫ابقة‬  ‫القفلين‬ ‫بين‬ ‫الثالث‬ ‫الكلبس‬ ‫ربط‬ ‫يتم‬ ( ‫ال‬ ‫كلبسين‬ ) ‫الطريقة‬ ‫وبنفس‬ ‫السابقين‬  ‫رفعه‬ ‫المراد‬ ‫الوزن‬ ‫بنفس‬ ‫الواير‬ ‫بتحميل‬ ‫قم‬ ‫أو‬ ‫أخ‬ ‫مرة‬ ‫الكلبسات‬ ‫على‬ ‫بالتعزيم‬ ‫قم‬ ‫ثم‬ ‫أكثر‬ ‫رى‬ ‫ملحوظة‬ ‫مر‬ ‫الواير‬ ‫على‬ ‫التعزيم‬ ‫من‬ ‫البد‬ ‫ة‬ ‫رفعة‬ ‫أول‬ ‫بعد‬ ‫أخرى‬ ( ‫الرفعة‬ ‫التجريبية‬ ) 92
  • 93. ‫الميت‬ ‫الطرف‬ ‫على‬ ‫أبدا‬ ‫الكلبسات‬ ‫تربط‬ ‫ال‬ NEVER SADDLE A DEAD HORSE 93
  • 94. WEDGE SOCKETS ‫البسكوتة‬  Basic Requirements ‫المتطلبات‬ ‫الرئيسية‬  ‫البنز‬ ‫اتجاه‬ ‫نفس‬ ‫في‬ ‫يكون‬ ‫الحي‬ ‫الواير‬  ‫المناسب‬ ‫الذيل‬ ‫طول‬ ( ‫من‬ ‫مكون‬ ‫واير‬ ‫استخدام‬ ‫عند‬ 6 ‫إلى‬ 8 ‫جدالت‬ ) ‫يكون‬ 6 ‫ع‬ ‫يقل‬ ‫ال‬ ‫بحيث‬ ‫الواير‬ ‫قطر‬ ‫أضعاف‬ ‫ن‬ 15 ‫سم‬ .  ‫طول‬ ‫يكون‬ ‫لإللتفاف‬ ‫مقاومة‬ ‫ويرات‬ ‫إستخدام‬ ‫حالة‬ ‫في‬ ‫األقل‬ ‫على‬ ‫الذيل‬ 20 ‫أيض‬ ‫يقل‬ ‫ال‬ ‫بحيث‬ ‫الواير‬ ‫قطر‬ ‫مرة‬ ‫ا‬ ‫عن‬ 15 ‫سم‬ .  ‫الحي‬ ‫بالواير‬ ‫ربطه‬ ‫عدم‬ ‫مراعاة‬ ‫مع‬ ‫الذيل‬ ‫ربط‬ ‫يتم‬ 94
  • 95. WEDGE SOCKETS ‫البسكوتة‬ Live Line Socket Pin ‫البنز‬ ‫اتجاه‬ ‫نفس‬ ‫في‬ ‫يكون‬ ‫الحي‬ ‫الطرف‬ ‫الذيل‬ ‫طول‬ 6 ‫عن‬ ‫يقل‬ ‫وال‬ ‫الواير‬ ‫قطر‬ ‫أضعاف‬ 15 ‫سم‬ 95
  • 96. WEDGE SOCKETS ‫البسكوتة‬ ‫مربوط‬ ‫الحي‬ ‫الطرف‬ ‫الميت‬ ‫الطرف‬ ‫مع‬ ‫أن‬ ‫يجب‬ ‫الحي‬ ‫الواير‬ ‫اتج‬ ‫نفس‬ ‫في‬ ‫يكون‬ ‫اه‬ ‫البنز‬ 96
  • 98. WEDGE SOCKETS ‫البسكوتة‬ ‫المناس‬ ‫الحجم‬ ‫اختيار‬ ‫من‬ ‫دائما‬ ‫تأكد‬ ‫ب‬ ‫المستخدم‬ ‫للواير‬ ‫مطبوع‬ ‫أو‬ ‫محفور‬ ‫يكون‬ ‫الواير‬ ‫حجم‬ ‫ال‬ ‫على‬ Wedge , ‫و‬ Socket 98
  • 99. WEDGE SOCKETS ‫البسكوتة‬ OFFSHORE CRANES  ‫الماء‬ ‫سطح‬ ‫على‬ ‫تعمل‬ ‫التي‬ ‫باألوناش‬ ‫الخاصة‬ ‫المتطلبات‬ 20 ‫على‬ ‫الواير‬ ‫قطر‬ ‫مرة‬ ‫األقل‬ 3 ‫على‬ ‫الواير‬ ‫قطر‬ ‫أضعاف‬ ‫األكثر‬ 10 ‫الواير‬ ‫قطر‬ ‫أضعاف‬ ‫على‬ ‫األقل‬ 99
  • 100. FLEMISH EYE TERMINATION ‫ب‬ ‫الخاصة‬ ‫الغاصة‬ ‫لعمل‬ ‫الرئيسية‬ ‫المتطلبات‬ Flemish Eye  ‫إلى‬ ‫وتقسيمه‬ ‫الواير‬ ‫فك‬ ‫يتم‬ 3 ‫و‬ ‫جدالت‬ 3 ‫الواير‬ ‫قلب‬ ‫مع‬ ‫جدالت‬  ‫رصاصة‬ ‫استخدام‬ ‫يتم‬ ( Sleeve ) ‫الواير‬ ‫لحجم‬ ‫مناسب‬  ‫الطول‬ ‫مراعاة‬ ‫مع‬ ‫أدناه‬ ‫موضح‬ ‫هو‬ ‫كما‬ ‫الوايرات‬ ‫وجدل‬ ‫الغاصة‬ ‫عمل‬ ‫يتم‬ ‫أخرى‬ ‫مرة‬ ‫الواير‬ ‫ولف‬ ‫المناسب‬  ‫الواير‬ ‫قطر‬ ‫قياس‬ ‫يتم‬  ‫الواير‬ ‫لحماية‬ ‫الغاصة‬ ‫على‬ ‫رصاصة‬ ‫استخدام‬ ‫يفضل‬ 100
  • 101. TURNBACK EYE TERMINATION ‫ب‬ ‫الخاصة‬ ‫الغاصة‬ ‫لعمل‬ ‫الرئيسية‬ ‫المتطلبات‬ Turnback Eye  ‫رصاصة‬ ‫استخدام‬ ‫يتم‬ ( Sleeve ) ‫الواير‬ ‫لحجم‬ ‫مناسبة‬  ‫الواي‬ ‫من‬ ‫مناسبة‬ ‫كمية‬ ‫لف‬ ‫إعادة‬ ‫ومراعاة‬ ‫الواير‬ ‫ولف‬ ‫الغاصة‬ ‫عمل‬ ‫يتم‬ ‫ر‬  ‫الذيل‬ ‫خروج‬ ‫من‬ ‫تأكد‬ ( ‫النهاية‬ ) ‫عن‬ ‫تقل‬ ‫ال‬ ‫مسافة‬ ( ‫الواير‬ ‫قطر‬ ‫مرة‬ ) ‫م‬ ‫ن‬ ‫الرصاصة‬ ( Sleeve .)  ‫الواير‬ ‫قطر‬ ‫من‬ ‫للتأكد‬ ‫والقياس‬ ‫الواير‬ ‫ضغط‬ ‫يتم‬ 101
  • 102. SWAGE SOCKET ‫ب‬ ‫الخاصة‬ ‫الغاصة‬ ‫لعمل‬ ‫الرئيسية‬ ‫المتطلبات‬ Swage Socket  ‫للسوكيت‬ ‫الواير‬ ‫وحجم‬ ‫قطر‬ ‫مالءمة‬ ‫من‬ ‫التاكد‬  ‫السوكيت‬ ‫داخل‬ ‫للواير‬ ‫محددة‬ ‫المسافة‬ ‫إدخال‬ ‫يتم‬  ‫تشققات‬ ‫أو‬ ‫كسور‬ ‫حدوث‬ ‫عدم‬ ‫مراعاة‬ ‫مع‬ ‫والضغط‬ ‫الربط‬ ‫يتم‬  ‫يتم‬ ‫الواير‬ ‫قطر‬ ‫من‬ ‫للتأكد‬ ‫القياس‬ 102
  • 103. ‫والتصبين‬ ‫الرفع‬ ‫أدوات‬ ‫فحص‬ INSPECTION OF HARDWARE 103
  • 104. ‫الفحص‬ ‫أنواع‬  ‫ابتدائي‬ ‫فحص‬ : ‫اإلستخدام‬ ‫قبل‬  ‫دائم‬ ‫فحص‬ / ‫متكرر‬ : ‫كل‬ ‫أو‬ ‫يوم‬ ‫كل‬ ‫اإلستخدام‬ ‫قبل‬ ‫عمل‬ ‫وردية‬  ‫الدوري‬ ‫الفحص‬ : • ‫سنوي‬ ‫نصف‬ ‫أو‬ ‫سنوي‬ - ‫األعمال‬ ‫العامة‬ • ‫أشهر‬ ‫ثالثة‬ ‫كل‬ ‫أو‬ ‫شهري‬ - ‫الشاقة‬ ‫الخدمات‬ 104
  • 105. ‫الهوك‬ ‫فحص‬ INSPECTION OF HOOK  ‫حا‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫الهوك‬ ‫استبعاد‬ ‫يتم‬ ‫لة‬ ‫بمقدار‬ ‫الهوك‬ ‫قطر‬ ‫نقص‬ 5 % ‫من‬ ‫الحلقة‬ ‫أسفل‬ ‫الرقبة‬ ‫أو‬ ‫الحلقة‬ .  ‫حا‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫الهوك‬ ‫استبعاد‬ ‫يتم‬ ‫لة‬ ‫آخر‬ ‫مكان‬ ‫أي‬ ‫من‬ ‫الهوك‬ ‫حجم‬ ‫نقص‬ ‫بمقدار‬ 10 %  ‫عن‬ ‫الهوك‬ ‫فتحة‬ ‫إتساع‬ ‫حالة‬ ‫في‬ 5 % ‫عن‬ ‫تزيد‬ ‫ال‬ ‫بحيث‬ 7 ‫استبعاد‬ ‫يتم‬ ‫مم‬ ‫الهوك‬ 105 5 % 5 % 5 %
  • 106. INSPECTION ‫الفحص‬ 106 ‫و‬ ‫أي‬ ‫وجود‬ ‫حالة‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫الواير‬ ‫استبعاد‬ ‫يتم‬ ‫اير‬ ‫الواير‬ ‫نهاية‬ ‫عند‬ ‫مقطوع‬ ( ‫الغاصة‬ ) ‫أي‬ ‫وجود‬ ‫حالة‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫الهوك‬ ‫استبعاد‬ ‫يتم‬ ‫لحامات‬
  • 107. INSPECTION ‫الفحص‬ 107 ‫قط‬ ‫نقص‬ ‫حالة‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫الواير‬ ‫استبعاد‬ ‫يتم‬ ‫ر‬ ‫بمقدار‬ ‫الواير‬ 10 % ‫ت‬ ‫حدوث‬ ‫حالة‬ ‫في‬ ‫الخدمة‬ ‫من‬ ‫السالسل‬ ‫استبعاد‬ ‫يتم‬ ‫آكل‬ ‫بمقدار‬ ‫السلسة‬ ‫في‬ 10 % ‫المصنع‬ ‫تعليمات‬ ‫حسب‬ ‫أو‬
  • 108. ‫البكرة‬ ‫إستخدام‬ WORKING WITH BLOCKS  ‫الكلي‬ ‫الوزن‬ = ‫الواير‬ ‫على‬ ‫الشد‬ ‫وزن‬ ( Line Pull ) x ‫الزاوية‬ ‫معامل‬ ( Angle Factor ) 108
  • 109. ‫البكرة‬ ‫إستخدام‬ WORKING WITH BLOCKS  ‫السحب‬ ‫أو‬ ‫الشد‬ ‫وزن‬ = ‫الكــــــــــــلي‬ ‫الوزن‬  ‫مثال‬ : ‫الكلي‬ ‫الوزن‬ ‫كان‬ ‫إذا‬ 4000 ‫الويرات‬ ‫وعدد‬ ‫كجم‬ 2  ‫السحب‬ ‫أو‬ ‫الشد‬ ‫وزن‬ = 4000/2 = 2000 ‫كجم‬  ‫مثال‬ 2 : ‫الكلي‬ ‫الوزن‬ ‫كان‬ ‫إذا‬ 4000 ‫وعدد‬ ‫كجم‬ ‫الويرات‬ 4 .  ‫السحب‬ ‫أو‬ ‫الشد‬ ‫وزن‬ = 4000/4 = 1000 ‫كجم‬ 109 ‫أجزاءالوير‬ ‫عدد‬ 4000 ‫كجم‬
  • 110. ‫البكرة‬ ‫باستخدام‬ ‫التصبين‬ RIGGING WITH BLOCKS  ‫مثال‬ 1  ‫الطرد‬ ‫وزن‬ 1  ‫الواير‬ ‫أجزاء‬ = 1  ‫البكرة‬ ‫على‬ ‫الوزن‬ = 1  ‫الشد‬ ‫وزن‬ = 1  ‫الكلي‬ ‫الوزن‬ = 2 110
  • 111. ‫البكرة‬ ‫باستخدام‬ ‫التصبين‬ RIGGING WITH BLOCKS  ‫مثال‬ 2  ‫الطرد‬ ‫وزن‬ 1  ‫الواير‬ ‫أجزاء‬ = 2  ‫البكرة‬ ‫على‬ ‫الوزن‬ = 1  ‫الشد‬ ‫وزن‬ = 1/2  ‫الكلي‬ ‫الوزن‬ = 1 111
  • 112. ‫البكرة‬ ‫باستخدام‬ ‫التصبين‬ RIGGING WITH BLOCKS  ‫مثال‬ 2  ‫الطرد‬ ‫وزن‬ 1  ‫الواير‬ ‫أجزاء‬ = 2  ‫البكرة‬ ‫على‬ ‫الوزن‬ = 1  ‫الشد‬ ‫وزن‬ = 1/2  ‫الكلي‬ ‫الوزن‬ = 1.5 112
  • 114. CRANE DOCUMENTS ‫الونش‬ ‫أوراق‬ ‫فحص‬  ‫السائق‬ ‫رخصة‬  ‫المعايرة‬ ‫شهادة‬  ‫األحمال‬ ‫وجدول‬ ‫الونش‬ ‫كتيب‬ 114
  • 115. CASE STUDY 115 5 ton Load Pick Point: 14 meters Unloading Point: 18 meters
  • 117. CRANE MAT/ MUDSILL ‫الونش‬ ‫طبلية‬  Area 𝑚 2 = 0,65𝑥 𝑐𝑟𝑎𝑛𝑒 𝑚𝑎𝑠𝑠+𝑙𝑜𝑎𝑑 𝑠𝑜𝑖𝑙 𝑏𝑒𝑎𝑟𝑖𝑛𝑔 𝑝𝑟𝑒𝑠𝑠𝑢𝑟𝑒 117
  • 118. 118
  • 119. CASE STUDY  50 Ton Crane Lifting 4 Ton  Ground Bearing Capacity= 28.5 ton/m2  Mat Size Required????? 119
  • 120. GOOD AND BAD PRACTICE 120
  • 121. GOOD AND BAD PRACTICE 121
  • 123. EXCAVATION ‫الحفر‬ 123 B = 1 m D = 5 m d = 6 m H = 4 (4B = 4m) (2H = 8m) D = 5m > 4B = 4m D + d = 11 m > 2H = 8m
  • 127. WIND LOAD  F= A*B*Cd  F= Force or Wind Load  A=Projected area of the object (length*width)  B=Wind pressure (0.00256*V2) mph  B=Wind Pressure (0.613*v2) meters per second  Cd=Drag coefficient 1.2 long cylinder  Cd=Drag coefficient 0.8 short cylinder  Cd=Drag coefficient 2 Flat Plate  Cd= Drag Coefficient 1.4 shorter flat plate 127