CHAPTER III
                    PRODUCTION AND TECHNICAL ASPECTS


III.1. PROJECT LOCATION
Steel iron factory of Besi Profil Baru Ltd. is located in Village ………. sub District ………..
Regency ………………. West Java, + 80 Km from ………….
Width of project area in total + 30.000 sqm (land certificates in processing). The choosing of this
factory location based on economically and technically considering, are:
-   The site of location nearby potential market because many industries, real estates, etc that are
    being developed which need steel iron much.
-   Nearby Raw Material source, namely Krakatau Steel Ltd, where about is planned a big part of
    Raw Material purchasing from there.
-   Nearby Merak Harbor, so for delivering iron steel to other zones or to importing raw material
    from abroad more economically..
-   Nearby Jakarta Merak free toll, thus delivering transportation and distribution of iron steel to
    other region more easily.
-   Human resource is provided rather many in around the factory location and residents’ character
    are appropriate with requirements of wanted human resource quality which they are in
    generally rather diligent, tough and skilled.
-   Infrastructure and pre-facility that needed by factory are prepared in region of the factory
    location.

III.2. Production Output
This planned project shall produce Steel Iron and Profil, is a product used as frames to erect
buildings..
And for Steel Iron is resulted from heating process and forming Billet.
 Steel Iron that produced by Besi Profil Baru Ltd. have the export quality and based on
International Quality Standard.
III.3. Raw Material
Raw Material that needed for production process of Steel Iron only one sort is: Billet.

III.4. Know How

The production process of Steel Iron uses sophisticated technological machines to produce product
qualitatively. Therefore there are needed skilled workers (operator) who have good knowledge and
know-how. The machines consist of machine parts that its functions are connected each and others.
Hence, the operators must be able to maintain and anticipate damaged of machine parts.
Technology of the Steel Iron process above is a technology from abroad, so, in order to be able to
operate it, there are needed firstly know-how training being held trainings. In the case, the owner


Part of Book “A to Z Entrepreneur In Practice” Write: Harmaizar Zaharuddin                        1
of the technology is prepared to hold trainings for related operators, to come in trainers from source
factory for training personnel from local.

III.5. Production Process
Billet is heated in the oven up to reaching definitive temperature and then transferred by using
conveyor to the forming machine of Steel Iron, next, cooled by (water, air, oils or other) in
accordance with the wanted quality.
                       Diagram of Steel Iron



                               Billet




                              Heating




                              Milling




                              Forming




                              Cooling




                            Fin. Goods




Part of Book “A to Z Entrepreneur In Practice” Write: Harmaizar Zaharuddin                          2
III.6. Facilities
III.6.1.Land Improvement
The site land of factory needs the cleaning up and the making of dikes between rise fields a wide of
30.000 sqm.
To ease the raw material transportation to the warehouse, the company will make asphalt roads a
wide of + 5000 sqm, then to embellish the yard and also to comfort the view shall be made parks in
possibly areas in 750 sqm
For preventive security aspect, the company has built strongly enough fences around the factory as
high as + 2 m and a long of + 700 m.

III.6.2.Factory Building and its Supports
Besi Profil Baru Ltd. shall start Steel Iron production process in some buildings and also storing
warehouses, namely:
1.     The factory building for production process.
2.     The storing warehouse.
       It has 2 units, namely finished goods warehouse a broad of …..sqm and the raw material &
       spare parts storing warehouse a broad of ……sqm.
3.     The office building.
       The office has multistoried building (2stories) with the width of building …….sqm. It is in
       same location with the factory and stands in front area.
4.     Staff residence.
       For the need of staff in unpredictable situation, hence the temporary residence is built in the
       backside factory.
5.     The cantina.
       For the need of employees eating and drinking in the location, the company provides a
       cantina building a wide of …….m.
6.     Some other buildings.
Other building that also built are a place for praying (small mosque) in……..sqm, a policlinic and
guard station in …….sqm. Besides that, there are also built a machine house facility, sewage
treatment plant, a water tower and sport court.

III.7. Production Machines
The production factory of Beasi Profil Baru Ltd. needs production machines. They can be
differentiated in 3 categories, are: Heating, Forming and Cooling.
TABLE III.1 LIST of MACHINES


         Notes                     Total                      Price (Rp)


Part of Book “A to Z Entrepreneur In Practice” Write: Harmaizar Zaharuddin                          3
I. Heating Section:
                       1            1 unit                Rp
                       2            1 unit                Rp
                       3            1 unit                Rp
                       4            1 unit                Rp
                       5            1 unit                Rp
II. Milling Section:
                   1                1 unit                Rp
                   2                1 unit                Rp
                   3                1 unit                Rp
                   4                1 unit                Rp
                   5                1 unit                Rp
III. Forming Section:
                   1                1 unit                Rp
                   2                1 unit                Rp
                   3                1 unit                Rp
                   4                1 unit                Rp
                   5                1 unit                Rp
IV. Cooling Section:
                   1                1 unit                Rp
                   2                1 unit                Rp
                   3                1 unit                Rp
                   4                1 unit                Rp
                   5                1 unit                Rp

III.8. Other Facilities
III.8.1.FACTORY VEHICLES
For fluency of production, so there is needed vehicles facility, are:
1 unit Manager's Vehicle
2 units Mini Bus
1 unit Forklift
2 units Motor Cars

III.8.2.VEHICLES AND OFFICE EQUIPMENT
Then, for the management ease, there are needed facilities, namely:
1 unit Director Vehicle
2 units Manager Vehicles
Office Equipments
Furniture and sanitary
Air Conditioner




Part of Book “A to Z Entrepreneur In Practice” Write: Harmaizar Zaharuddin   4
III.9. Utility
III.9.1.Electricity
To fulfill need of electrical power of the project, PLN shall be used as in plan The need of
electricity is estimated more and less 6.000 kVa whereas for emergency is planned using generator
in capacity of 500 kW.
III.9.2.Water
Water, is mainly needed to fulfill daily needs and to cool machines. Capacity for plain water
estimated will be fulfilled from 2 deep well which are going to be dug in around location.
III.10. Human Resource
In principle, there are 2 important divisions in Steel Iron factory namely,      the division of
production process and management.
On account of this Steel Iron Production Project is complicated and needs skilled personnel,
besides the machines are rather sophisticated, who need to be accompany by person who really
master the technology of Steel Iron Production. Thus, the production output is correctly good
whereas can compete with other products, either local or from abroad.
Personnel of Production Division are person who needed numerously in Steel Iron factory of Besi
Profil Baru Ltd.
III.11.Project Implementation
Development of the Steel Iron factory, office, cantina and some other buildings is started to be
worked in …..1995 and shall be ready to use in ….. 1996. It is done by technicians of Besi Profil
Baru Ltd. with some Factory and Planning Consultants from local or abroad. 
As planned, commercially the factory will start to produce in initial year of 1996 with capacity
80% of normal capacity. Further, in 1997 production will reach 90,00% and 100% in 1998.


** Steel-3.Microsoft Word **




Part of Book “A to Z Entrepreneur In Practice” Write: Harmaizar Zaharuddin                     5

Más contenido relacionado

Destacado

Diagnosi Ipertensione Polmonare Arteriosa-PAH DIAGNOSIS
Diagnosi Ipertensione Polmonare Arteriosa-PAH DIAGNOSISDiagnosi Ipertensione Polmonare Arteriosa-PAH DIAGNOSIS
Diagnosi Ipertensione Polmonare Arteriosa-PAH DIAGNOSISPAHUPDATE
 
03 inpres 6 2009 ekonomi kreatif
03 inpres 6 2009 ekonomi kreatif03 inpres 6 2009 ekonomi kreatif
03 inpres 6 2009 ekonomi kreatifimecommunity
 
3-Minute Critical Thinking Advert - final draft
3-Minute Critical Thinking Advert - final draft3-Minute Critical Thinking Advert - final draft
3-Minute Critical Thinking Advert - final draftDamian T. Gordon
 
Socialondemand newsondemand purechannelapps_2014
Socialondemand newsondemand purechannelapps_2014Socialondemand newsondemand purechannelapps_2014
Socialondemand newsondemand purechannelapps_2014Chris May
 
Databases: Backup and Recovery
Databases: Backup and RecoveryDatabases: Backup and Recovery
Databases: Backup and RecoveryDamian T. Gordon
 
11 syb impact assessment 2007 aceh
11 syb impact assessment 2007 aceh11 syb impact assessment 2007 aceh
11 syb impact assessment 2007 acehimecommunity
 
Large organisations large intranets: where to start a redevelopment project
Large organisations large intranets: where to start a redevelopment projectLarge organisations large intranets: where to start a redevelopment project
Large organisations large intranets: where to start a redevelopment projectTamsin Stanford
 
Inleiding Milieurecht
Inleiding MilieurechtInleiding Milieurecht
Inleiding Milieurechtdevalk137
 
Magazine spreads
Magazine spreadsMagazine spreads
Magazine spreadszenmariku
 
Discovering and Helping Guide Christian Spiritual Progress
Discovering and Helping Guide Christian Spiritual ProgressDiscovering and Helping Guide Christian Spiritual Progress
Discovering and Helping Guide Christian Spiritual ProgressAndrew Field
 

Destacado (20)

Six Word Stories
Six Word StoriesSix Word Stories
Six Word Stories
 
Diagnosi Ipertensione Polmonare Arteriosa-PAH DIAGNOSIS
Diagnosi Ipertensione Polmonare Arteriosa-PAH DIAGNOSISDiagnosi Ipertensione Polmonare Arteriosa-PAH DIAGNOSIS
Diagnosi Ipertensione Polmonare Arteriosa-PAH DIAGNOSIS
 
03 inpres 6 2009 ekonomi kreatif
03 inpres 6 2009 ekonomi kreatif03 inpres 6 2009 ekonomi kreatif
03 inpres 6 2009 ekonomi kreatif
 
3-Minute Critical Thinking Advert - final draft
3-Minute Critical Thinking Advert - final draft3-Minute Critical Thinking Advert - final draft
3-Minute Critical Thinking Advert - final draft
 
Praktek dokter
Praktek dokterPraktek dokter
Praktek dokter
 
Socialondemand newsondemand purechannelapps_2014
Socialondemand newsondemand purechannelapps_2014Socialondemand newsondemand purechannelapps_2014
Socialondemand newsondemand purechannelapps_2014
 
Databases: Backup and Recovery
Databases: Backup and RecoveryDatabases: Backup and Recovery
Databases: Backup and Recovery
 
Team work opp
Team work oppTeam work opp
Team work opp
 
Modul 6 kab
Modul 6 kabModul 6 kab
Modul 6 kab
 
Modul 7 kab
Modul 7 kabModul 7 kab
Modul 7 kab
 
11 syb impact assessment 2007 aceh
11 syb impact assessment 2007 aceh11 syb impact assessment 2007 aceh
11 syb impact assessment 2007 aceh
 
Large organisations large intranets: where to start a redevelopment project
Large organisations large intranets: where to start a redevelopment projectLarge organisations large intranets: where to start a redevelopment project
Large organisations large intranets: where to start a redevelopment project
 
Rms ramalan smu
Rms ramalan smuRms ramalan smu
Rms ramalan smu
 
Inleiding Milieurecht
Inleiding MilieurechtInleiding Milieurecht
Inleiding Milieurecht
 
Magazine spreads
Magazine spreadsMagazine spreads
Magazine spreads
 
Map of DIT Kevin Street
Map of DIT Kevin StreetMap of DIT Kevin Street
Map of DIT Kevin Street
 
Discovering and Helping Guide Christian Spiritual Progress
Discovering and Helping Guide Christian Spiritual ProgressDiscovering and Helping Guide Christian Spiritual Progress
Discovering and Helping Guide Christian Spiritual Progress
 
Plat 01
Plat 01Plat 01
Plat 01
 
Evaluation
EvaluationEvaluation
Evaluation
 
Mind tools for project managers
Mind tools for project managersMind tools for project managers
Mind tools for project managers
 

Similar a Steel 3

camphor and allied product report (doc)
camphor and allied product report (doc)camphor and allied product report (doc)
camphor and allied product report (doc)sachin kumar
 
Inventory management group3 alacirity
Inventory management group3 alacirityInventory management group3 alacirity
Inventory management group3 alacirityKaazim Tanwar
 
industrial training internship report
industrial training internship reportindustrial training internship report
industrial training internship reportTariqJamil19
 
Report of Pakistan Steel Mill
Report of Pakistan Steel MillReport of Pakistan Steel Mill
Report of Pakistan Steel MillMuhammad Ahmed
 
Automobile pistonh
Automobile pistonhAutomobile pistonh
Automobile pistonhManoj Balla
 
PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)
PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)
PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)MD SHAHID JAMIL
 
Industrial Training Project Report on B.S.P
Industrial Training Project Report on B.S.PIndustrial Training Project Report on B.S.P
Industrial Training Project Report on B.S.PPiyush Verma
 
ffc internship report a
ffc internship report affc internship report a
ffc internship report aFazal Mehmood
 
Repairing of kiln shell crack
Repairing of kiln shell crackRepairing of kiln shell crack
Repairing of kiln shell crackmkpq pasha
 
Repairing of kiln shell crack
Repairing of kiln shell crackRepairing of kiln shell crack
Repairing of kiln shell crackmkpq pasha
 

Similar a Steel 3 (20)

909090 final
909090 final909090 final
909090 final
 
camphor and allied product report (doc)
camphor and allied product report (doc)camphor and allied product report (doc)
camphor and allied product report (doc)
 
Inventory management group3 alacirity
Inventory management group3 alacirityInventory management group3 alacirity
Inventory management group3 alacirity
 
industrial training internship report
industrial training internship reportindustrial training internship report
industrial training internship report
 
project report
project reportproject report
project report
 
Training presentation-BHILAI STEEL PLANT
Training presentation-BHILAI STEEL PLANTTraining presentation-BHILAI STEEL PLANT
Training presentation-BHILAI STEEL PLANT
 
Muhammad Bilal
Muhammad BilalMuhammad Bilal
Muhammad Bilal
 
Report of Pakistan Steel Mill
Report of Pakistan Steel MillReport of Pakistan Steel Mill
Report of Pakistan Steel Mill
 
Dalwance
DalwanceDalwance
Dalwance
 
Automobile pistonh
Automobile pistonhAutomobile pistonh
Automobile pistonh
 
PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)
PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)
PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)
 
Lord Report_Last
Lord Report_LastLord Report_Last
Lord Report_Last
 
ICE PLANT
ICE PLANTICE PLANT
ICE PLANT
 
Industrial Training Project Report on B.S.P
Industrial Training Project Report on B.S.PIndustrial Training Project Report on B.S.P
Industrial Training Project Report on B.S.P
 
Industrial trainning report
Industrial trainning reportIndustrial trainning report
Industrial trainning report
 
ffc internship report a
ffc internship report affc internship report a
ffc internship report a
 
Ch3
Ch3Ch3
Ch3
 
Repairing of kiln shell crack
Repairing of kiln shell crackRepairing of kiln shell crack
Repairing of kiln shell crack
 
Repairing of kiln shell crack
Repairing of kiln shell crackRepairing of kiln shell crack
Repairing of kiln shell crack
 
Hec me 2015
Hec me 2015Hec me 2015
Hec me 2015
 

Más de imecommunity

Más de imecommunity (20)

Exp imp-bab-03
Exp imp-bab-03Exp imp-bab-03
Exp imp-bab-03
 
Exp imp-bab-02
Exp imp-bab-02Exp imp-bab-02
Exp imp-bab-02
 
0167 surat diknas kab bondowoso
0167 surat diknas kab bondowoso0167 surat diknas kab bondowoso
0167 surat diknas kab bondowoso
 
0165 surat diknas kab banyuwangi
0165 surat diknas kab banyuwangi0165 surat diknas kab banyuwangi
0165 surat diknas kab banyuwangi
 
0164 surat diknas kab sumenep
0164 surat diknas kab sumenep0164 surat diknas kab sumenep
0164 surat diknas kab sumenep
 
Proyeksi keuangan office building
Proyeksi keuangan office buildingProyeksi keuangan office building
Proyeksi keuangan office building
 
Perhotelan
PerhotelanPerhotelan
Perhotelan
 
Perhotelan
PerhotelanPerhotelan
Perhotelan
 
Steel sm
Steel smSteel sm
Steel sm
 
Steel 1
Steel 1Steel 1
Steel 1
 
Steel
SteelSteel
Steel
 
File 2 office building
File 2 office buildingFile 2 office building
File 2 office building
 
Exp imp-rks
Exp imp-rksExp imp-rks
Exp imp-rks
 
Exp imp-di
Exp imp-diExp imp-di
Exp imp-di
 
Exp imp-bab-05
Exp imp-bab-05Exp imp-bab-05
Exp imp-bab-05
 
Exp imp-bab-04
Exp imp-bab-04Exp imp-bab-04
Exp imp-bab-04
 
Exp imp-bab-01
Exp imp-bab-01Exp imp-bab-01
Exp imp-bab-01
 
Sekolah menengah umum
Sekolah menengah umumSekolah menengah umum
Sekolah menengah umum
 
Sekolah menengah umum
Sekolah menengah umumSekolah menengah umum
Sekolah menengah umum
 
Plat 05
Plat 05Plat 05
Plat 05
 

Steel 3

  • 1. CHAPTER III PRODUCTION AND TECHNICAL ASPECTS III.1. PROJECT LOCATION Steel iron factory of Besi Profil Baru Ltd. is located in Village ………. sub District ……….. Regency ………………. West Java, + 80 Km from …………. Width of project area in total + 30.000 sqm (land certificates in processing). The choosing of this factory location based on economically and technically considering, are: - The site of location nearby potential market because many industries, real estates, etc that are being developed which need steel iron much. - Nearby Raw Material source, namely Krakatau Steel Ltd, where about is planned a big part of Raw Material purchasing from there. - Nearby Merak Harbor, so for delivering iron steel to other zones or to importing raw material from abroad more economically.. - Nearby Jakarta Merak free toll, thus delivering transportation and distribution of iron steel to other region more easily. - Human resource is provided rather many in around the factory location and residents’ character are appropriate with requirements of wanted human resource quality which they are in generally rather diligent, tough and skilled. - Infrastructure and pre-facility that needed by factory are prepared in region of the factory location. III.2. Production Output This planned project shall produce Steel Iron and Profil, is a product used as frames to erect buildings.. And for Steel Iron is resulted from heating process and forming Billet. Steel Iron that produced by Besi Profil Baru Ltd. have the export quality and based on International Quality Standard. III.3. Raw Material Raw Material that needed for production process of Steel Iron only one sort is: Billet. III.4. Know How The production process of Steel Iron uses sophisticated technological machines to produce product qualitatively. Therefore there are needed skilled workers (operator) who have good knowledge and know-how. The machines consist of machine parts that its functions are connected each and others. Hence, the operators must be able to maintain and anticipate damaged of machine parts. Technology of the Steel Iron process above is a technology from abroad, so, in order to be able to operate it, there are needed firstly know-how training being held trainings. In the case, the owner Part of Book “A to Z Entrepreneur In Practice” Write: Harmaizar Zaharuddin 1
  • 2. of the technology is prepared to hold trainings for related operators, to come in trainers from source factory for training personnel from local. III.5. Production Process Billet is heated in the oven up to reaching definitive temperature and then transferred by using conveyor to the forming machine of Steel Iron, next, cooled by (water, air, oils or other) in accordance with the wanted quality. Diagram of Steel Iron Billet Heating Milling Forming Cooling Fin. Goods Part of Book “A to Z Entrepreneur In Practice” Write: Harmaizar Zaharuddin 2
  • 3. III.6. Facilities III.6.1.Land Improvement The site land of factory needs the cleaning up and the making of dikes between rise fields a wide of 30.000 sqm. To ease the raw material transportation to the warehouse, the company will make asphalt roads a wide of + 5000 sqm, then to embellish the yard and also to comfort the view shall be made parks in possibly areas in 750 sqm For preventive security aspect, the company has built strongly enough fences around the factory as high as + 2 m and a long of + 700 m. III.6.2.Factory Building and its Supports Besi Profil Baru Ltd. shall start Steel Iron production process in some buildings and also storing warehouses, namely: 1. The factory building for production process. 2. The storing warehouse. It has 2 units, namely finished goods warehouse a broad of …..sqm and the raw material & spare parts storing warehouse a broad of ……sqm. 3. The office building. The office has multistoried building (2stories) with the width of building …….sqm. It is in same location with the factory and stands in front area. 4. Staff residence. For the need of staff in unpredictable situation, hence the temporary residence is built in the backside factory. 5. The cantina. For the need of employees eating and drinking in the location, the company provides a cantina building a wide of …….m. 6. Some other buildings. Other building that also built are a place for praying (small mosque) in……..sqm, a policlinic and guard station in …….sqm. Besides that, there are also built a machine house facility, sewage treatment plant, a water tower and sport court. III.7. Production Machines The production factory of Beasi Profil Baru Ltd. needs production machines. They can be differentiated in 3 categories, are: Heating, Forming and Cooling. TABLE III.1 LIST of MACHINES Notes Total Price (Rp) Part of Book “A to Z Entrepreneur In Practice” Write: Harmaizar Zaharuddin 3
  • 4. I. Heating Section: 1 1 unit Rp 2 1 unit Rp 3 1 unit Rp 4 1 unit Rp 5 1 unit Rp II. Milling Section: 1 1 unit Rp 2 1 unit Rp 3 1 unit Rp 4 1 unit Rp 5 1 unit Rp III. Forming Section: 1 1 unit Rp 2 1 unit Rp 3 1 unit Rp 4 1 unit Rp 5 1 unit Rp IV. Cooling Section: 1 1 unit Rp 2 1 unit Rp 3 1 unit Rp 4 1 unit Rp 5 1 unit Rp III.8. Other Facilities III.8.1.FACTORY VEHICLES For fluency of production, so there is needed vehicles facility, are: 1 unit Manager's Vehicle 2 units Mini Bus 1 unit Forklift 2 units Motor Cars III.8.2.VEHICLES AND OFFICE EQUIPMENT Then, for the management ease, there are needed facilities, namely: 1 unit Director Vehicle 2 units Manager Vehicles Office Equipments Furniture and sanitary Air Conditioner Part of Book “A to Z Entrepreneur In Practice” Write: Harmaizar Zaharuddin 4
  • 5. III.9. Utility III.9.1.Electricity To fulfill need of electrical power of the project, PLN shall be used as in plan The need of electricity is estimated more and less 6.000 kVa whereas for emergency is planned using generator in capacity of 500 kW. III.9.2.Water Water, is mainly needed to fulfill daily needs and to cool machines. Capacity for plain water estimated will be fulfilled from 2 deep well which are going to be dug in around location. III.10. Human Resource In principle, there are 2 important divisions in Steel Iron factory namely, the division of production process and management. On account of this Steel Iron Production Project is complicated and needs skilled personnel, besides the machines are rather sophisticated, who need to be accompany by person who really master the technology of Steel Iron Production. Thus, the production output is correctly good whereas can compete with other products, either local or from abroad. Personnel of Production Division are person who needed numerously in Steel Iron factory of Besi Profil Baru Ltd. III.11.Project Implementation Development of the Steel Iron factory, office, cantina and some other buildings is started to be worked in …..1995 and shall be ready to use in ….. 1996. It is done by technicians of Besi Profil Baru Ltd. with some Factory and Planning Consultants from local or abroad. As planned, commercially the factory will start to produce in initial year of 1996 with capacity 80% of normal capacity. Further, in 1997 production will reach 90,00% and 100% in 1998. ** Steel-3.Microsoft Word ** Part of Book “A to Z Entrepreneur In Practice” Write: Harmaizar Zaharuddin 5