SlideShare una empresa de Scribd logo
1 de 20
Cost of Poor Quality
Outline
Define
Cost of Poor
Quality
Where we
stand?
Benefits Way Forward
Define
• Joseph Juran - first discussed the cost of quality analysis in 1951
Define
PREVENTION
APPRAISAL
INTERNAL FAILURE
EXTERNAL FAILURE
Define
Focus on Cost of Poor Quality
Benefits of COPQ
 Direct contribution in profit
 Identify quality improvement candidates;
• Identify all failures costs
• Detect root causes and eliminate them
 Promotes the effective use of resources – Hidden factory concept
 Measure of the success of projects
 Provides incentives for doing the job right first time.
Benefits of COPQ
q
Q
• In 2007, U.S. construction industry expenditures were $1.246 trillion and out
of these, $62 billion (5%) were wasted on the direct cost of rework alone.
(Bureau of Economic Analysis, 2009)
• Annual turnover of the Australian construction industry was estimated at $A32
billion per annum whereas the cost of rework was approximated at $A4
billion (12.5%) per annum.
(Construction Expert Group, 1993)
• An average contractor is estimated to spend between 5-10 percent of the
project cost on rework.
(Construction Industry Development Board (CIBD))
Benefits of COPQ
Initiate accurate measurement of
Cost of Poor Quality
Way Forward
But how??
Senior Management support is critical for implementing COPQ programSenior Management support is critical for implementing COPQ programSenior Management support is critical for implementing COPQ programSenior Management support is critical for implementing COPQ program
Way Forward
All quality improvement occurs on a project-by-project basisAll quality improvement occurs on a project-by-project basis
- Juran- Juran
All quality improvement occurs on a project-by-project basisAll quality improvement occurs on a project-by-project basis
- Juran- Juran
Determine level of detail for COPQ measurementDetermine level of detail for COPQ measurementDetermine level of detail for COPQ measurementDetermine level of detail for COPQ measurement
Start with Internal and External Failure costs onlyStart with Internal and External Failure costs onlyStart with Internal and External Failure costs onlyStart with Internal and External Failure costs only
Select any pilot project for measurement of COPQSelect any pilot project for measurement of COPQSelect any pilot project for measurement of COPQSelect any pilot project for measurement of COPQ
Selection of projectSelection of projectSelection of projectSelection of project
Formation of COPQ teamFormation of COPQ team (preferably QA&QC + Planning)(preferably QA&QC + Planning)Formation of COPQ teamFormation of COPQ team (preferably QA&QC + Planning)(preferably QA&QC + Planning)
Mandate is given to COPQ teamMandate is given to COPQ team (for accurate measurement)(for accurate measurement)Mandate is given to COPQ teamMandate is given to COPQ team (for accurate measurement)(for accurate measurement)
Monthly reporting from COPQ teamMonthly reporting from COPQ team (Areas of improvement)(Areas of improvement)Monthly reporting from COPQ teamMonthly reporting from COPQ team (Areas of improvement)(Areas of improvement)
Way Forward
Select any specific activity or activitiesSelect any specific activity or activitiesSelect any specific activity or activitiesSelect any specific activity or activities
• Only measuring COPQ will not resolve the problems of a company
• Shall identify activities that need to be done in order to improve the quality
level of the company
Way Forward
Once COPQ team identify improvement area;Once COPQ team identify improvement area;Once COPQ team identify improvement area;Once COPQ team identify improvement area;
Perform root cause analysisPerform root cause analysisPerform root cause analysisPerform root cause analysis Suggest corrective actionSuggest corrective actionSuggest corrective actionSuggest corrective action
Results will not be over-nightResults will not be over-nightResults will not be over-nightResults will not be over-night
Way Forward
Corrective action can be investment in;Corrective action can be investment in;Corrective action can be investment in;Corrective action can be investment in;
Prevention CostPrevention CostPrevention CostPrevention Cost Appraisal CostAppraisal CostAppraisal CostAppraisal Cost
Management should not react if COPQ value is highManagement should not react if COPQ value is highManagement should not react if COPQ value is highManagement should not react if COPQ value is high
Fix the Leak
Way Forward
q
Q
(in US $)
(H&S Motor Company, USA)
Way Forward
COPQ team identified improvement area;COPQ team identified improvement area;COPQ team identified improvement area;COPQ team identified improvement area;
!! Overcome Psychological Inertia, to save all initiatives !!
Way Forward
Conclusion
 Use COPQ as a tool to identify improvement areas (Prevention
or Appraisal) in order to eliminate internal and external failures.
Failures
Eccentric Rebars Right First Time
Taking the revision cloud too seriously Red-bull reinforced concrete
Failures
Thank YouThank You

Más contenido relacionado

La actualidad más candente

Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.pptCost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
ssuser5f2474
 

La actualidad más candente (20)

Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training Module
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect Analysis
 
Cost of-poor-quality - juran institute
Cost of-poor-quality - juran instituteCost of-poor-quality - juran institute
Cost of-poor-quality - juran institute
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
 
Root cause analysis
Root cause analysisRoot cause analysis
Root cause analysis
 
Gemba Walk
Gemba WalkGemba Walk
Gemba Walk
 
Root Cause Corrective Action
Root Cause Corrective ActionRoot Cause Corrective Action
Root Cause Corrective Action
 
PDCA
PDCAPDCA
PDCA
 
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root CauseRoot Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Process fmea work_instructions
Process fmea work_instructionsProcess fmea work_instructions
Process fmea work_instructions
 
ISO 9001:2015 Introduction & Awareness Training
ISO  9001:2015 Introduction & Awareness Training ISO  9001:2015 Introduction & Awareness Training
ISO 9001:2015 Introduction & Awareness Training
 
Achieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationAchieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and Implementation
 
Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.pptCost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
 
APQP Training presentation
APQP Training  presentationAPQP Training  presentation
APQP Training presentation
 
7QC Tools
7QC Tools7QC Tools
7QC Tools
 
Quality Circle Presentation Template
Quality Circle Presentation TemplateQuality Circle Presentation Template
Quality Circle Presentation Template
 
Process fmea
Process fmea Process fmea
Process fmea
 

Destacado

Destacado (20)

Cost of quality concept and advantages
Cost of quality   concept and advantagesCost of quality   concept and advantages
Cost of quality concept and advantages
 
Controlling the Cost of Poor Quality
Controlling the Cost of Poor QualityControlling the Cost of Poor Quality
Controlling the Cost of Poor Quality
 
Term paper - impact of organizational culture on enterprise risk management (...
Term paper - impact of organizational culture on enterprise risk management (...Term paper - impact of organizational culture on enterprise risk management (...
Term paper - impact of organizational culture on enterprise risk management (...
 
Cost of poor quality
Cost of  poor qualityCost of  poor quality
Cost of poor quality
 
Project Management - Basic Concepts
Project Management - Basic ConceptsProject Management - Basic Concepts
Project Management - Basic Concepts
 
Cost Of Quality
Cost Of QualityCost Of Quality
Cost Of Quality
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Quality assurance documentation
Quality assurance documentationQuality assurance documentation
Quality assurance documentation
 
Performance on a budget
Performance on a budgetPerformance on a budget
Performance on a budget
 
PMI Project Risk Management
PMI Project Risk ManagementPMI Project Risk Management
PMI Project Risk Management
 
Human Capital Analytics
Human Capital AnalyticsHuman Capital Analytics
Human Capital Analytics
 
Document Management Spectrum
Document Management SpectrumDocument Management Spectrum
Document Management Spectrum
 
Human Capital Analytics 2.2016
Human Capital Analytics 2.2016Human Capital Analytics 2.2016
Human Capital Analytics 2.2016
 
Document Management 2010 Analysis
Document Management 2010 AnalysisDocument Management 2010 Analysis
Document Management 2010 Analysis
 
Man power review and HR budget
Man power review and  HR budgetMan power review and  HR budget
Man power review and HR budget
 
Conquering the Cost of Poor Quality
Conquering the Cost of Poor QualityConquering the Cost of Poor Quality
Conquering the Cost of Poor Quality
 
Quality and Cost Management: Methods and Results
Quality and Cost Management: Methods and ResultsQuality and Cost Management: Methods and Results
Quality and Cost Management: Methods and Results
 
Smsvn quality attitude
Smsvn quality attitudeSmsvn quality attitude
Smsvn quality attitude
 

Similar a Copq benefits of correct measurement (for slideshare)

Quality is a cost
Quality is a costQuality is a cost
Quality is a cost
batch18
 
3rd party independant reviews
3rd party independant reviews3rd party independant reviews
3rd party independant reviews
Nick Pelham
 
OOW 2008 Bonneville Power Administration (Ver#09052008)
OOW 2008 Bonneville Power Administration (Ver#09052008)OOW 2008 Bonneville Power Administration (Ver#09052008)
OOW 2008 Bonneville Power Administration (Ver#09052008)
Samuel Harrell
 
Addressing Quality Performance Across Supply Partners 2012
Addressing Quality Performance Across Supply Partners 2012Addressing Quality Performance Across Supply Partners 2012
Addressing Quality Performance Across Supply Partners 2012
Jon Halladay
 
Peirson business finance10e_power_point_05 (2)
Peirson business finance10e_power_point_05 (2)Peirson business finance10e_power_point_05 (2)
Peirson business finance10e_power_point_05 (2)
Giriraj Srinivasan
 
Earned value analysis training
Earned value analysis trainingEarned value analysis training
Earned value analysis training
Paul King
 

Similar a Copq benefits of correct measurement (for slideshare) (20)

Ray stratton aace presentation
Ray stratton aace presentationRay stratton aace presentation
Ray stratton aace presentation
 
Introduction to quality management
Introduction to quality managementIntroduction to quality management
Introduction to quality management
 
Quality is a cost
Quality is a costQuality is a cost
Quality is a cost
 
3rd party independant reviews
3rd party independant reviews3rd party independant reviews
3rd party independant reviews
 
OOW 2008 Bonneville Power Administration (Ver#09052008)
OOW 2008 Bonneville Power Administration (Ver#09052008)OOW 2008 Bonneville Power Administration (Ver#09052008)
OOW 2008 Bonneville Power Administration (Ver#09052008)
 
Project Management Essentials
Project Management EssentialsProject Management Essentials
Project Management Essentials
 
Business case using Cost of Quality
Business case using Cost of QualityBusiness case using Cost of Quality
Business case using Cost of Quality
 
Addressing Quality Performance Across Supply Partners 2012
Addressing Quality Performance Across Supply Partners 2012Addressing Quality Performance Across Supply Partners 2012
Addressing Quality Performance Across Supply Partners 2012
 
Fmq lqos introduction npi rev 2
Fmq  lqos introduction npi rev 2Fmq  lqos introduction npi rev 2
Fmq lqos introduction npi rev 2
 
Commissioning for Profit, Performance and Windsurfing Bomex 2016
Commissioning for Profit, Performance and Windsurfing Bomex 2016  Commissioning for Profit, Performance and Windsurfing Bomex 2016
Commissioning for Profit, Performance and Windsurfing Bomex 2016
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
 
Peirson business finance10e_power_point_05 (2)
Peirson business finance10e_power_point_05 (2)Peirson business finance10e_power_point_05 (2)
Peirson business finance10e_power_point_05 (2)
 
039 integrating constructability-short
039 integrating constructability-short039 integrating constructability-short
039 integrating constructability-short
 
039 Integrating Constructability-short
039 Integrating Constructability-short039 Integrating Constructability-short
039 Integrating Constructability-short
 
Commissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating ConsiderationsCommissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating Considerations
 
039 integrating construct-ability
039 integrating construct-ability039 integrating construct-ability
039 integrating construct-ability
 
039 Integrating Constructability
039 Integrating Constructability039 Integrating Constructability
039 Integrating Constructability
 
139 workplan
139 workplan139 workplan
139 workplan
 
Earned value analysis training
Earned value analysis trainingEarned value analysis training
Earned value analysis training
 
COQ-Vestas
COQ-VestasCOQ-Vestas
COQ-Vestas
 

Más de Imran Jamil

Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wire
Imran Jamil
 
Role of qa&qc in manufacturing presentation
Role of qa&qc in manufacturing   presentationRole of qa&qc in manufacturing   presentation
Role of qa&qc in manufacturing presentation
Imran Jamil
 
Cost of poor quality presentation5
Cost of poor quality presentation5Cost of poor quality presentation5
Cost of poor quality presentation5
Imran Jamil
 

Más de Imran Jamil (12)

A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time management
 
6 project quality management (ij)
6  project quality management (ij)6  project quality management (ij)
6 project quality management (ij)
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Project time management
Project time managementProject time management
Project time management
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
Project management a brief intro
Project management   a brief introProject management   a brief intro
Project management a brief intro
 
Quality Assurance and Quality Control - Areas of Improvement
Quality Assurance and Quality Control - Areas of ImprovementQuality Assurance and Quality Control - Areas of Improvement
Quality Assurance and Quality Control - Areas of Improvement
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wire
 
Role of qa&qc in manufacturing presentation
Role of qa&qc in manufacturing   presentationRole of qa&qc in manufacturing   presentation
Role of qa&qc in manufacturing presentation
 
CSWIP Intro
CSWIP IntroCSWIP Intro
CSWIP Intro
 
Cost of poor quality presentation5
Cost of poor quality presentation5Cost of poor quality presentation5
Cost of poor quality presentation5
 

Último

Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
amilabibi1
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
Kayode Fayemi
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
Kayode Fayemi
 
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
David Celestin
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
raffaeleoman
 

Último (15)

Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
 
lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
Digital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalDigital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of Drupal
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
ICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdfICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdf
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfSOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
 
Dreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIIDreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio III
 
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatment
 
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Bailey
 

Copq benefits of correct measurement (for slideshare)

  • 1. Cost of Poor Quality
  • 2. Outline Define Cost of Poor Quality Where we stand? Benefits Way Forward
  • 3. Define • Joseph Juran - first discussed the cost of quality analysis in 1951
  • 5. Define Focus on Cost of Poor Quality
  • 6. Benefits of COPQ  Direct contribution in profit  Identify quality improvement candidates; • Identify all failures costs • Detect root causes and eliminate them  Promotes the effective use of resources – Hidden factory concept  Measure of the success of projects  Provides incentives for doing the job right first time.
  • 8. • In 2007, U.S. construction industry expenditures were $1.246 trillion and out of these, $62 billion (5%) were wasted on the direct cost of rework alone. (Bureau of Economic Analysis, 2009) • Annual turnover of the Australian construction industry was estimated at $A32 billion per annum whereas the cost of rework was approximated at $A4 billion (12.5%) per annum. (Construction Expert Group, 1993) • An average contractor is estimated to spend between 5-10 percent of the project cost on rework. (Construction Industry Development Board (CIBD)) Benefits of COPQ
  • 9. Initiate accurate measurement of Cost of Poor Quality Way Forward But how??
  • 10. Senior Management support is critical for implementing COPQ programSenior Management support is critical for implementing COPQ programSenior Management support is critical for implementing COPQ programSenior Management support is critical for implementing COPQ program Way Forward All quality improvement occurs on a project-by-project basisAll quality improvement occurs on a project-by-project basis - Juran- Juran All quality improvement occurs on a project-by-project basisAll quality improvement occurs on a project-by-project basis - Juran- Juran
  • 11. Determine level of detail for COPQ measurementDetermine level of detail for COPQ measurementDetermine level of detail for COPQ measurementDetermine level of detail for COPQ measurement Start with Internal and External Failure costs onlyStart with Internal and External Failure costs onlyStart with Internal and External Failure costs onlyStart with Internal and External Failure costs only Select any pilot project for measurement of COPQSelect any pilot project for measurement of COPQSelect any pilot project for measurement of COPQSelect any pilot project for measurement of COPQ Selection of projectSelection of projectSelection of projectSelection of project Formation of COPQ teamFormation of COPQ team (preferably QA&QC + Planning)(preferably QA&QC + Planning)Formation of COPQ teamFormation of COPQ team (preferably QA&QC + Planning)(preferably QA&QC + Planning) Mandate is given to COPQ teamMandate is given to COPQ team (for accurate measurement)(for accurate measurement)Mandate is given to COPQ teamMandate is given to COPQ team (for accurate measurement)(for accurate measurement) Monthly reporting from COPQ teamMonthly reporting from COPQ team (Areas of improvement)(Areas of improvement)Monthly reporting from COPQ teamMonthly reporting from COPQ team (Areas of improvement)(Areas of improvement) Way Forward Select any specific activity or activitiesSelect any specific activity or activitiesSelect any specific activity or activitiesSelect any specific activity or activities
  • 12. • Only measuring COPQ will not resolve the problems of a company • Shall identify activities that need to be done in order to improve the quality level of the company Way Forward Once COPQ team identify improvement area;Once COPQ team identify improvement area;Once COPQ team identify improvement area;Once COPQ team identify improvement area; Perform root cause analysisPerform root cause analysisPerform root cause analysisPerform root cause analysis Suggest corrective actionSuggest corrective actionSuggest corrective actionSuggest corrective action
  • 13. Results will not be over-nightResults will not be over-nightResults will not be over-nightResults will not be over-night Way Forward Corrective action can be investment in;Corrective action can be investment in;Corrective action can be investment in;Corrective action can be investment in; Prevention CostPrevention CostPrevention CostPrevention Cost Appraisal CostAppraisal CostAppraisal CostAppraisal Cost Management should not react if COPQ value is highManagement should not react if COPQ value is highManagement should not react if COPQ value is highManagement should not react if COPQ value is high
  • 14. Fix the Leak Way Forward q Q
  • 15. (in US $) (H&S Motor Company, USA) Way Forward COPQ team identified improvement area;COPQ team identified improvement area;COPQ team identified improvement area;COPQ team identified improvement area;
  • 16. !! Overcome Psychological Inertia, to save all initiatives !! Way Forward
  • 17. Conclusion  Use COPQ as a tool to identify improvement areas (Prevention or Appraisal) in order to eliminate internal and external failures.
  • 19. Taking the revision cloud too seriously Red-bull reinforced concrete Failures

Notas del editor

  1. Monthly Reporting : Identify Baseline and then target for improvement
  2. Monthly Reporting : Identify Baseline and then target for improvement
  3. Monthly Reporting : Identify Baseline and then target for improvement
  4. Monthly Reporting : Identify Baseline and then target for improvement