SlideShare una empresa de Scribd logo
1 de 12
Descargar para leer sin conexión
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 451
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS:
CASE OF FAIZABAD ROAD FROM NISHANTGANJ CHAURAHA TO
POLYTECHNIC CHAURAHA, LUCKNOW
1Abhishek Baidya, 2 Dr. Subhrajit Banerjee, 3Dr. Indrani Chakraborty
1PG Student (MURP), Department of Planning, FOAP, Dr. A.P.J. Abdul Kalam Technical University, Lucknow, Uttar
Pradesh, India
2 Associate Professor, Department of Planning, FOAP, Dr. A.P.J. Abdul Kalam Technical University, Lucknow, Uttar
Pradesh, India
3 Professor, Department of Planning, FOAP, Dr. A.P.J. Abdul Kalam Technical University, Lucknow, Uttar Pradesh, India
-------------------------------------------------------------------***----------------------------------------------------------------
Abstract
This Paper attempted to highlight the importance of Transportation within the limited scope and framework. Moreover, in the
process, the study has acquired a better understanding of Planning According to a set of rules. The analysis of a respective
Stretch (Nishant Ganj chauraha to Polytechnic chauraha) Will depicts the impact of many activities happens.
In this paper, we have shown the Level of service by primary survey and implemented to improve L.O.S. To improve safety and
to provide orderly movement of vehicles, improvements in junctions such as installation of traffic signals, geometric
improvements has been done.
Though this study does not intend to arrive at any universal hypothesis in terms of Transportation, it could drive certain
aspects based on the analytical understanding of the studies. These aspects do not ensure the success of any design (design of
interaction spaces or academic institutions) but at least it calls the attention of the Planner to issues that are often neglected or
ignored.
Keyword – Transportation, Level of service, safety, movement of vehicles, improvements in junctions, geometric improvements
Introduction
The sustainability and quality of life in any urban center are closely linked to the quantity and quality of transport
infrastructure facilities that support it. Road transport infrastructure forms one of the key sectors, which is defined as
the road network and associated physical infrastructure such as signage, lighting, and vehicle refueling service.
Urban roads in India have a heterogeneous mix of traffic. These include the pedestrians, slow-moving vehicles like bicycles,
rickshaws both for passenger and freight movement, and fast motorized vehicles like motorcycles, scooters, three-wheelers,
cars, and public transport vehicles. The space occupied by each of these vehicles and speeds by each user is variable. Therefore,
to achieve a smooth and safe flow of traffic space allocation for different vehicles has to be carefully ensured.
This road is situated in Lucknow city Faizabad road, Uttar Pradesh, India.
Classification of road
As we know that there is a classification of roads are: -
The accessibility, mobility, and connection of roads determine their classification.
In terms of this, the type of road has accessibility. Various rates as shown in FIG.1
Whereas Efficiency of the road network system is related to mobility and connectivity.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 452
Figure 1 Speed vs accessibility
About Analyzed Road of Transportation:
Out of this type of road, the Stretch I Analyzed is Arterial Road.
The location of Road is in Lucknow municipal corporation as shown in FIG.2.
Figure 2 Location of Arterial Road
Ward 23 (Papermill) and ward 61 (Gomti Nagar) lay in Zone 4 of the LMC boundary.
Numerous National Highways (NH) and State Highways (SH) passes around the periphery of the ward, whereas NH-28 is
passing through the ward. Wards are having connectivity with a surrounding area like on the ring road and to Hazratganj CBD
of Lucknow. To further analyze the on-ground realities of the ward’s transport system, primary data has been collected by
doing various types of surveys whereas secondary is also collected to complement the process.
The total length of Arterial Road covers in Ward no.-61+23 is 7.4 km as shown in Table no.2 & out of that length of road from
Nishantganj chauraha to Polytechnic chauraha is 4.25 km which is 57.5% of the arterial road of both wards. with Average width
of 30 to 35 m wide road currently (2021) as shown in Table.1.
But according to master plan 2031, the road should be 76m & 45m wide (As from Nishantganj to kukrail pull is 45m wide and
from kukrail pull to Polytechnic is of 76 m wide road).
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 453
The road faces traffic congestion due to encroachment by the vendors and shops which needs to improve the smooth flow of
traffic. Faizabad road is an important sub-arterial road connecting N.H.24 in Polytechnic chauraha which plays an important
role in our wards.
From Nishantganj to Polytechnic it has 3 more intersections, their names are – Badshahnagar, Lekhraj chauraha & Bhoothnath.
Due to High Traffic volume density, this stretch doesn’t have any Traffic lights or any Cameras from the Smart city of Lucknow.
The character of roads changes from the regional roads to urban roads. Major land uses of Lucknow are situated along the
national highway; state highways, as well as major road arterial, sub-arterial, are not according to URDPFI standards.
Due to this, the road network faces major issues on the roads.
Table 1 Urban Road network distribution (Existing and according to IRC)
S.No. Hierarchy Right Of Way IRC Guidelines
1 Arterial road 30 – 35 Mt 50 – 60 Mt
TOTAL AREA OF WARD 23 & 61 IS 6.05 SQ KM ROAD AREA IS 1.0698 Sqkm
Cover 17.68% of the Total area of Ward 23+61 (6.05 Sqkm) as shown in Chart no.1 Given below.
Ward 23 (305 Ha. Area) Road area (55.62 Ha. Area) = 52%
Ward 61(300 Ha. Area) Road area (51.35 Ha. Area) = 48%
Out of that Total % of Arterial Road is 7.5 % of Total Road in ward 23+61.
Chart 1 61 & 23 Ward Contain Road
Total Arterial road of ward 23+61 and their respective percentage with total area taken from all over ward area is shown in
table.2 .
Table 2 Road Length
S.No. Road Types Length (km)
Of Ward 23+61
Percentage (%)
Of Ward 23+61
Area covered
(sqkm) of Ward 23+61
1 Arterial Road 7.4 7.5 0.296
Parking
Parking is a major problem due to the shortage of off-street parking facilities. Parking generally takes place along the roads in
front of the commercial establishments, public and semi-public establishments. On-street parking causes bottlenecks and
hampers smooth movement of traffic as shown in FIG.4. The local traders and shop owners are using these areas for parking. As
per CMP 2012 of Lucknow City parking survey, 56% and 26% of the total parked vehicles are two-wheelers and four-wheelers
respectively and the remaining are three-wheelers.
Off-street parking in Lucknow is maintained by LDA and LMC.
82.32
17.68
Ward 23+61
Road
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 454
The users of on-street parking are casual users who use the space for a short period.
Figure 4 unauthorized parking on Faizabad road
Figure 6 Badshah Nagar Railway Parking
Availability of parking is maximum at the Faizabad road. Badshah Nagar railway station has a capacity of 200 two-wheeler
parking at a time as shown in FIG.6. No traffic signals are present over there. Even Badshahnagar metro station has public
parking as shown in FIG.5. There is a lack of parking places at the intersections.No proper bus/ taxi stops. There is a lot of street
parking of public/ private vehicles which are using up the lanes and thus causing traffic congestion. and they take a certain
duration as shown below in chart.2 and park in an unauthorized area
Chart 2 Distribution of duration of parked vehicles
Findings related to at what time traffic congests the most
Traffic congests the most at 10:00 AM and 6:00 PM. And we got No. of the vehicle on average peak hour are shown in table.3.
42%
25%
12%
[PERC
ENTA
GE]
For 1/2 Hr.
For 1 Hr.
For 2 Hr.
For > 2 Hr.
Figure 3 Congestion created in
Polytechnic Chauraha by Paratransit
Transportation.
Figure 5 Badshah Nagar Metro Parking
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 455
Table 3 AM and PM Peak Hour
Polytechnic Indira Nagar Bhootnath Badshanagar
10:00 AM Car – 46
Bike – 86
Tempo - 26
Car – 33
Bike - 64
Car – 12
Bike - 32
Car – 24
Bike – 127
Tempo - 24
6:00 PM Car – 53
Bike – 141
Tempo - 36
Car – 61
Bike– 104
Car – 61
Bike– 103
Car – 71
Bike – 191
Tempo - 28
Road sections
Figure 7 Road Hierarchy Plan
The primary function of an Arterial Road is to deliver traffic from collector roads to freeways or expressways, and between
urban centers at the highest level of service possible.
Figure 8 Section AA’
The width of section AA’ Is near about 35 M Wide Road whereas it took 2 M wide median, & 3 lane in each road with 3 to 3.5 M
(Lane width) as shown in FIG.8 of section AA’, this road contains an elevated metro line which is shown in FIG.8 (below-left
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 456
side). According to analysis, this road width is not sufficient as infrastructure in that Arterial Road, because it is a very
Important Lane for All types of Vehicle.
Whereas LOS of this Area is Around ‘D’ which is quite more congested.
On this Road, only One fire station comes near Bhoothnath which leads to the Indiranagar area which is shown in FIG.8 (below
right side). Out of 8 fire stations all over LMC (Lucknow Municipal Corporation).
The width of the road according to master plan 2031 is 76M wide but it is not, cause of encroachment of Area by complex and
residence.
Parking on this road only has in Metro station and Low parking area makes the biggest problem for traffic jam.
Mostly Vendors are situated in Non-vending Zone even there is No vending sign is present as shown in FIG.10
Figure 9 No vending Zone near Lekhraj Market
Figure 10 Section BB’
In Section BB’ Road with is nearly 40M wide but encroached with many vendors on pavement in both side of the road. With
create a Market foot fall highly & makes difficulties for vehicle, create Traffic jam.
L.O.S. (Level of service) is ‘E’ of this road according to primary survey took in peak hr. (including morning and evening basis) as
show in FIG.11.
Different sub stretch road have different LOS. As shown in table.4, which is Survey shows L.O.S. of arterial road.
Figure 11 Unauthorized shop on pathways and even on roads.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 457
Table 4 Survey shows L.O.S. of arterial road
Metro Station on That Road
Figure 12 Metro Station on Arterial Road
Metro stations of selective stretch contain 4 stations at a respective distance as shown in FIG.12.
This Route Contain 22 North-South Station out of which:
I. 4 STATION IS IN WARD 61 &23
II. ELEVATED METRO LINE IN WARD 61 & 23
III. SINGLE ROUTE
IV. PREPARED BY DELHI METRO RAIL
CORPORATION LTD.
Metro station has a Typical station component and it has the same method as shown in FIG.13.
The reason to propose Metro Station is to strengthen the public transport system in the city.
According To Lucknow Metro DPR (October 2013) - Daily Station Loading (6:00 Am to 10:00 Pm
(Include From Both Side) is shown in table.5 given below.
Figure 13 Typical Station Component
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 458
Table 5 DAILY STATION LOADING by DPR
REFERENCE 1 Lucknow Metro DPR (October 2013)
But when we Started Primary Survey in December 2020 as shown below, we got that the value is very low compared to the
given DPR maybe because of the first pandemic that occurred and also the causes of unawareness of metro facilities provided
by the government.
Daily Station Loading (6:00 AM TO 10:00 PM ON 8/12/2020 AND 9/12/2020) Table.6 is:
Table 6 Daily Station Loading by Primary Survey
In the station they made infrastructure applying all 7 Principles which is good for all public.
They created a path for physically disabled persons to understand, they provided a lift to enter in Concourse level without any
difficulties, similarly, they also provided a special path element which helps blind people & these all features are tried to show
in FIG.14.
Figure 14 Salient feature of the metro station in Lucknow
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 459
A B C D E
Public Transport On That Road
Bus service: Lucknow Mahanagar Parivahan Sewa is an urban bus service of Uttar Pradesh State Road Transport Corporation
which operates in the city of Lucknow. All the buses run on compressed natural gas (CNG).
Operated city buses which pass through analyzed arterial road having many Busses which have their definite routes and bus
no. are:
Route no. – 11 A.C.: B.B.D. to S.G.P.G.I.
Route no. – 12: B.B.D. to Scooter India.
Route no. – 23: Gudamba to Rajni Khand
Route no. – 23A: Gudamba to Manyavar Kanshi Ram Awasiya Yojna
Route no. – 24: Engineering College to Scooter India
Route no. – 24A: Alambagh to Picnic spot
Route no. – 31: Alambagh to I.I.M.
Route no. – 33 & 33 A.C.: Engineering College to Scooter India
Route no. – 45: Viraj Khand to Pasi Qila
Route no. – 66: Gol Market to Kakori Mod Tiraha
Route no. – 68: Gol Market to Rajajipuram
Figure 15 shows existing bus stands, parking, and illegal tempo stands
Above FIG.15. showing existing bus stands, parking & illegal tempo stands in which,
Point ‘A’ is a bus stop which is now vacant and unauthorized vendors are selling on the stand, earlier stand was used to pick
persons for traveling in a bus which comes from polytechnic and goes towards Badshahnagar.
Point ‘B’ is a bus stop which is still in use but is not so much active & it helps to the person who wants to go towards
Bhoothnath market or so on.
Point ‘C’ is a bus stop which is also working but not so much active & stand is situated for the bus goes from Badshah Nagar to
Lekhraj chauraha.
Point ‘D’ is a bus stop which is very less active in this stretch and stand is situated for the bus goes from Bhoothnath to
polytechnic chauraha.
Point ‘E’ is a bus stop which is vacant now and is not in use, as it is situated in between Indiranagar metro station and
polytechnic chauraha.
It has many bus stops, but most of them are not in public use, as most of them are vacant or any vendors are present. So, we
need to improve basic needs like a proper bus stop to play a role, so, that public can take advantage and use public transport
like bus & will help to improve Traffic flow of road and better Level of Service of transportation.
According to a survey we got the result is we have maximum road density is in Faizabad rd. (arterial rd.) and have less rd.
width.
A trip made by a person shows that Faizabad rd. contain all type of trip which is:
 Internal To External
 Internal To Internal.
 External To Internal
 External To External.
And that makes an important road of the city, which connects other areas (outside of the city).
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 460
Conclusion
The reasons for Traffic congestion are mentioned below:
 Absence of traffic lights and signals at some junctions. The junctions which have traffic signals, the people barely obey the
traffic lights, i.e. no proper administration to manage the offenders breaking the traffic rules. Which is the main cause of
traffic congestion and improper traffic management by the traffic police.
 Driving habits cause more congestion than other issues, e.g., some drivers illegally enter their vehicles into an intersection,
and some drivers drive on the wrong side of the road. Vehicles crawl along looking for passengers and even stop on the
running road to drop or pick up the passenger which also gives rise to congestion.
 Lack of parking place at the intersection. No proper bus/taxi stops are constructed in the area and there’s lots of on-street
parking of public transport which are using up the lanes and that causes traffic congestion.
 Illegal and unauthorized shops on pathways and even on the roads.
 Footpaths are not properly built or lack proper facilities for people on the footpath. Some areas don’t have a separate
footpath which led people to walk on the road and make more congestion.
 Fail to mark traffic lanes and zebra crossing. Some marking of traffic lanes and zebra crossing has faded away in some
zones.
 Traffic diversions at Badshah Nagar crossing.
 Due to the fruit market below the Nishat Ganj flyover, ROW has considerably reduced which results in more time for
clearance of traffic at the Nishat Ganj crossing.
Recommended improvement from traffic congestion
Improvement of existing road
Commercial areas have congested roads, partly because of encroachment and hawkers. Thus, considering this aspect has
identified roads for widening by removing encroachments from footpaths and carriageways. Road improvement is key to
alleviating traffic congestion.
According to the Master plan, 2031 Road width is Shown in the table. 7
Table 7 Proposed ROW in Lucknow master plan 2031
AS in FIG.16 given below is proposing 76M wide road in which we segregated Vendor’s zone, service lane, and main roadways,
creation of beautiful green environment mix with the pedestrian area, in this FIG.16 we also shown bicycle track as it plays
NMT (Non-Motor Vehicle) too.
Figure 16 76-Meter-Wide Proposed Road Section
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 461
As in FIG.17 shown below is proposing 45M wide road in which again we tried to provide service lane including pedestrian
Figure 17 45-Meter-Wide Proposed Road Section
 unauthorized parking on the side of the road should be strictly prohibited.
 Shops at pathways and on the road should be Legally established properly.
Non – Motorized transport strategy
The objective is to provide continuous, encroachment-free pedestrian and NMT facilities across the city. The proposed
measures to develop facilities for pedestrians and bicyclists on the streets include:
Provide pedestrian paths/footpaths. Establish connected walking networks.
Prevent vendors, pavement dwellers, vehicle parking, and other uses from blocking walkways. Dedicated cycle track. Use street
furniture (e.g., benches) and pedestrian-friendly design features. Integrate cycling with transit. Providing bicycle
parking/rickshaw stands.
 Proper pathways should be created.
Shared bus – auto/tempo lane
The shared lane is not a high-comfort facility, nor is it appropriate at very high bus volumes. However, buses and other IPTs will
often compete for the same space near the curb.
Shared lanes can accommodate both modes at low speeds and moderate bus headways, where buses are discouraged from
passing, and autos/tempo pass buses only at stops. Inappropriate conditions, bus-auto/tempo lanes are an option on streets
where dedicated bus and separate high-comfort facilities cannot be provided.
Construction of footpaths and Zebra Crossings
 Marking of traffic road lines and zebra crossing lines should be visible and should be preferably light reflective so that they
will be visible during the night also or install “smart” pedestrian crosswalks which light up when people cross the road at
night or in foggy and rainy conditions.
 Traffic lights and signals should be installed.
Junction improvement
 As traffic increases on Faizabad road, to improve safety and to provide orderly movement of vehicles, improvements
to junctions such as installation of traffic signals, geometric improvements, etc. are necessary.
 The observed issues on the junctions mainly include congestion, interlocking (of traffic) at junctions, and on-street
parking. It has been concluded through observations that these issues are a result of the undefined available right of
way for usage by different modes and vehicular movement, pedestrian movement, etc.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 462
Figure 18 Proposed Junction design at Badshahnagar
Above FIG. 18 shows the proposed Junction design at Badshahnagar which has a Zebra crossing and shows the connectivity
with footpath, bus stop, metro station & railway station.
Problems and suggestions on the junction of Badshahnagar are shown in the table.8 given below.
Table 8 Problems and suggestions on Badshahnagar junction
This will help to improve L.O.S. of roadways and become less traffic volume density of road.
Reference
1. City mobility plan of Lucknow 2012.
2. URDPFI Guideline 2014
3. DPR of Lucknow Metro Rail, 2013
4. Smart city Lucknow.

Más contenido relacionado

Similar a IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ROAD FROM NISHANTGANJ CHAURAHA TO POLYTECHNIC CHAURAHA, LUCKNOW

Metro Development and Pedestrian Concerns
Metro Development and Pedestrian ConcernsMetro Development and Pedestrian Concerns
Metro Development and Pedestrian ConcernsIRJET Journal
 
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...IRJET Journal
 
IRJET-Impact on Employment via Public Transit System
IRJET-Impact on Employment via Public Transit SystemIRJET-Impact on Employment via Public Transit System
IRJET-Impact on Employment via Public Transit SystemIRJET Journal
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...EditorIJAERD
 
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation  Planning as Effective Mean to Rejuvenate a Pilgrimage TownTransportation  Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage TownIRJET Journal
 
Road Safety Auditing of Koratty Intersection
Road Safety Auditing of Koratty IntersectionRoad Safety Auditing of Koratty Intersection
Road Safety Auditing of Koratty IntersectionIRJET Journal
 
IRJET- Study of Existing Highways and their Capacity Improvements
IRJET- Study of Existing Highways and their Capacity ImprovementsIRJET- Study of Existing Highways and their Capacity Improvements
IRJET- Study of Existing Highways and their Capacity ImprovementsIRJET Journal
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...IRJET Journal
 
Paper id 71201923
Paper id 71201923Paper id 71201923
Paper id 71201923IJRAT
 
IMPACT ASSESSMENT OF E-RICKSHAW IN CENTRALIZED BUSINESS DEVELOPMENT AREA FOR ...
IMPACT ASSESSMENT OF E-RICKSHAW IN CENTRALIZED BUSINESS DEVELOPMENT AREA FOR ...IMPACT ASSESSMENT OF E-RICKSHAW IN CENTRALIZED BUSINESS DEVELOPMENT AREA FOR ...
IMPACT ASSESSMENT OF E-RICKSHAW IN CENTRALIZED BUSINESS DEVELOPMENT AREA FOR ...IRJET Journal
 
Effective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtsEffective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtseSAT Journals
 
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAIRJET Journal
 
IRJET- Evaluation of Social Cost Benefit of Samruddhi Mahamarg
IRJET- Evaluation of Social Cost Benefit of Samruddhi MahamargIRJET- Evaluation of Social Cost Benefit of Samruddhi Mahamarg
IRJET- Evaluation of Social Cost Benefit of Samruddhi MahamargIRJET Journal
 
Road Safety: Issues and Challenges in Vijayawada
Road Safety: Issues and Challenges in VijayawadaRoad Safety: Issues and Challenges in Vijayawada
Road Safety: Issues and Challenges in VijayawadaIRJET Journal
 
Dhruv atal 030
Dhruv atal 030Dhruv atal 030
Dhruv atal 030DRatal2505
 
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKETASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKETIRJET Journal
 
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONIRJET Journal
 
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway CrossIRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway CrossIRJET Journal
 
IRJET- Capacity Utilisation of Koothattukulam-North Palakkuzha Stretch in Ke...
IRJET- Capacity Utilisation  of Koothattukulam-North Palakkuzha Stretch in Ke...IRJET- Capacity Utilisation  of Koothattukulam-North Palakkuzha Stretch in Ke...
IRJET- Capacity Utilisation of Koothattukulam-North Palakkuzha Stretch in Ke...IRJET Journal
 
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEMPERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEMIRJET Journal
 

Similar a IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ROAD FROM NISHANTGANJ CHAURAHA TO POLYTECHNIC CHAURAHA, LUCKNOW (20)

Metro Development and Pedestrian Concerns
Metro Development and Pedestrian ConcernsMetro Development and Pedestrian Concerns
Metro Development and Pedestrian Concerns
 
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
 
IRJET-Impact on Employment via Public Transit System
IRJET-Impact on Employment via Public Transit SystemIRJET-Impact on Employment via Public Transit System
IRJET-Impact on Employment via Public Transit System
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...
 
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation  Planning as Effective Mean to Rejuvenate a Pilgrimage TownTransportation  Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
 
Road Safety Auditing of Koratty Intersection
Road Safety Auditing of Koratty IntersectionRoad Safety Auditing of Koratty Intersection
Road Safety Auditing of Koratty Intersection
 
IRJET- Study of Existing Highways and their Capacity Improvements
IRJET- Study of Existing Highways and their Capacity ImprovementsIRJET- Study of Existing Highways and their Capacity Improvements
IRJET- Study of Existing Highways and their Capacity Improvements
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
 
Paper id 71201923
Paper id 71201923Paper id 71201923
Paper id 71201923
 
IMPACT ASSESSMENT OF E-RICKSHAW IN CENTRALIZED BUSINESS DEVELOPMENT AREA FOR ...
IMPACT ASSESSMENT OF E-RICKSHAW IN CENTRALIZED BUSINESS DEVELOPMENT AREA FOR ...IMPACT ASSESSMENT OF E-RICKSHAW IN CENTRALIZED BUSINESS DEVELOPMENT AREA FOR ...
IMPACT ASSESSMENT OF E-RICKSHAW IN CENTRALIZED BUSINESS DEVELOPMENT AREA FOR ...
 
Effective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtsEffective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brts
 
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
 
IRJET- Evaluation of Social Cost Benefit of Samruddhi Mahamarg
IRJET- Evaluation of Social Cost Benefit of Samruddhi MahamargIRJET- Evaluation of Social Cost Benefit of Samruddhi Mahamarg
IRJET- Evaluation of Social Cost Benefit of Samruddhi Mahamarg
 
Road Safety: Issues and Challenges in Vijayawada
Road Safety: Issues and Challenges in VijayawadaRoad Safety: Issues and Challenges in Vijayawada
Road Safety: Issues and Challenges in Vijayawada
 
Dhruv atal 030
Dhruv atal 030Dhruv atal 030
Dhruv atal 030
 
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKETASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
 
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
 
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway CrossIRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
 
IRJET- Capacity Utilisation of Koothattukulam-North Palakkuzha Stretch in Ke...
IRJET- Capacity Utilisation  of Koothattukulam-North Palakkuzha Stretch in Ke...IRJET- Capacity Utilisation  of Koothattukulam-North Palakkuzha Stretch in Ke...
IRJET- Capacity Utilisation of Koothattukulam-North Palakkuzha Stretch in Ke...
 
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEMPERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
 

Más de IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

Más de IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Último

Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 

Último (20)

Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ROAD FROM NISHANTGANJ CHAURAHA TO POLYTECHNIC CHAURAHA, LUCKNOW

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 451 IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ROAD FROM NISHANTGANJ CHAURAHA TO POLYTECHNIC CHAURAHA, LUCKNOW 1Abhishek Baidya, 2 Dr. Subhrajit Banerjee, 3Dr. Indrani Chakraborty 1PG Student (MURP), Department of Planning, FOAP, Dr. A.P.J. Abdul Kalam Technical University, Lucknow, Uttar Pradesh, India 2 Associate Professor, Department of Planning, FOAP, Dr. A.P.J. Abdul Kalam Technical University, Lucknow, Uttar Pradesh, India 3 Professor, Department of Planning, FOAP, Dr. A.P.J. Abdul Kalam Technical University, Lucknow, Uttar Pradesh, India -------------------------------------------------------------------***---------------------------------------------------------------- Abstract This Paper attempted to highlight the importance of Transportation within the limited scope and framework. Moreover, in the process, the study has acquired a better understanding of Planning According to a set of rules. The analysis of a respective Stretch (Nishant Ganj chauraha to Polytechnic chauraha) Will depicts the impact of many activities happens. In this paper, we have shown the Level of service by primary survey and implemented to improve L.O.S. To improve safety and to provide orderly movement of vehicles, improvements in junctions such as installation of traffic signals, geometric improvements has been done. Though this study does not intend to arrive at any universal hypothesis in terms of Transportation, it could drive certain aspects based on the analytical understanding of the studies. These aspects do not ensure the success of any design (design of interaction spaces or academic institutions) but at least it calls the attention of the Planner to issues that are often neglected or ignored. Keyword – Transportation, Level of service, safety, movement of vehicles, improvements in junctions, geometric improvements Introduction The sustainability and quality of life in any urban center are closely linked to the quantity and quality of transport infrastructure facilities that support it. Road transport infrastructure forms one of the key sectors, which is defined as the road network and associated physical infrastructure such as signage, lighting, and vehicle refueling service. Urban roads in India have a heterogeneous mix of traffic. These include the pedestrians, slow-moving vehicles like bicycles, rickshaws both for passenger and freight movement, and fast motorized vehicles like motorcycles, scooters, three-wheelers, cars, and public transport vehicles. The space occupied by each of these vehicles and speeds by each user is variable. Therefore, to achieve a smooth and safe flow of traffic space allocation for different vehicles has to be carefully ensured. This road is situated in Lucknow city Faizabad road, Uttar Pradesh, India. Classification of road As we know that there is a classification of roads are: - The accessibility, mobility, and connection of roads determine their classification. In terms of this, the type of road has accessibility. Various rates as shown in FIG.1 Whereas Efficiency of the road network system is related to mobility and connectivity.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 452 Figure 1 Speed vs accessibility About Analyzed Road of Transportation: Out of this type of road, the Stretch I Analyzed is Arterial Road. The location of Road is in Lucknow municipal corporation as shown in FIG.2. Figure 2 Location of Arterial Road Ward 23 (Papermill) and ward 61 (Gomti Nagar) lay in Zone 4 of the LMC boundary. Numerous National Highways (NH) and State Highways (SH) passes around the periphery of the ward, whereas NH-28 is passing through the ward. Wards are having connectivity with a surrounding area like on the ring road and to Hazratganj CBD of Lucknow. To further analyze the on-ground realities of the ward’s transport system, primary data has been collected by doing various types of surveys whereas secondary is also collected to complement the process. The total length of Arterial Road covers in Ward no.-61+23 is 7.4 km as shown in Table no.2 & out of that length of road from Nishantganj chauraha to Polytechnic chauraha is 4.25 km which is 57.5% of the arterial road of both wards. with Average width of 30 to 35 m wide road currently (2021) as shown in Table.1. But according to master plan 2031, the road should be 76m & 45m wide (As from Nishantganj to kukrail pull is 45m wide and from kukrail pull to Polytechnic is of 76 m wide road).
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 453 The road faces traffic congestion due to encroachment by the vendors and shops which needs to improve the smooth flow of traffic. Faizabad road is an important sub-arterial road connecting N.H.24 in Polytechnic chauraha which plays an important role in our wards. From Nishantganj to Polytechnic it has 3 more intersections, their names are – Badshahnagar, Lekhraj chauraha & Bhoothnath. Due to High Traffic volume density, this stretch doesn’t have any Traffic lights or any Cameras from the Smart city of Lucknow. The character of roads changes from the regional roads to urban roads. Major land uses of Lucknow are situated along the national highway; state highways, as well as major road arterial, sub-arterial, are not according to URDPFI standards. Due to this, the road network faces major issues on the roads. Table 1 Urban Road network distribution (Existing and according to IRC) S.No. Hierarchy Right Of Way IRC Guidelines 1 Arterial road 30 – 35 Mt 50 – 60 Mt TOTAL AREA OF WARD 23 & 61 IS 6.05 SQ KM ROAD AREA IS 1.0698 Sqkm Cover 17.68% of the Total area of Ward 23+61 (6.05 Sqkm) as shown in Chart no.1 Given below. Ward 23 (305 Ha. Area) Road area (55.62 Ha. Area) = 52% Ward 61(300 Ha. Area) Road area (51.35 Ha. Area) = 48% Out of that Total % of Arterial Road is 7.5 % of Total Road in ward 23+61. Chart 1 61 & 23 Ward Contain Road Total Arterial road of ward 23+61 and their respective percentage with total area taken from all over ward area is shown in table.2 . Table 2 Road Length S.No. Road Types Length (km) Of Ward 23+61 Percentage (%) Of Ward 23+61 Area covered (sqkm) of Ward 23+61 1 Arterial Road 7.4 7.5 0.296 Parking Parking is a major problem due to the shortage of off-street parking facilities. Parking generally takes place along the roads in front of the commercial establishments, public and semi-public establishments. On-street parking causes bottlenecks and hampers smooth movement of traffic as shown in FIG.4. The local traders and shop owners are using these areas for parking. As per CMP 2012 of Lucknow City parking survey, 56% and 26% of the total parked vehicles are two-wheelers and four-wheelers respectively and the remaining are three-wheelers. Off-street parking in Lucknow is maintained by LDA and LMC. 82.32 17.68 Ward 23+61 Road
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 454 The users of on-street parking are casual users who use the space for a short period. Figure 4 unauthorized parking on Faizabad road Figure 6 Badshah Nagar Railway Parking Availability of parking is maximum at the Faizabad road. Badshah Nagar railway station has a capacity of 200 two-wheeler parking at a time as shown in FIG.6. No traffic signals are present over there. Even Badshahnagar metro station has public parking as shown in FIG.5. There is a lack of parking places at the intersections.No proper bus/ taxi stops. There is a lot of street parking of public/ private vehicles which are using up the lanes and thus causing traffic congestion. and they take a certain duration as shown below in chart.2 and park in an unauthorized area Chart 2 Distribution of duration of parked vehicles Findings related to at what time traffic congests the most Traffic congests the most at 10:00 AM and 6:00 PM. And we got No. of the vehicle on average peak hour are shown in table.3. 42% 25% 12% [PERC ENTA GE] For 1/2 Hr. For 1 Hr. For 2 Hr. For > 2 Hr. Figure 3 Congestion created in Polytechnic Chauraha by Paratransit Transportation. Figure 5 Badshah Nagar Metro Parking
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 455 Table 3 AM and PM Peak Hour Polytechnic Indira Nagar Bhootnath Badshanagar 10:00 AM Car – 46 Bike – 86 Tempo - 26 Car – 33 Bike - 64 Car – 12 Bike - 32 Car – 24 Bike – 127 Tempo - 24 6:00 PM Car – 53 Bike – 141 Tempo - 36 Car – 61 Bike– 104 Car – 61 Bike– 103 Car – 71 Bike – 191 Tempo - 28 Road sections Figure 7 Road Hierarchy Plan The primary function of an Arterial Road is to deliver traffic from collector roads to freeways or expressways, and between urban centers at the highest level of service possible. Figure 8 Section AA’ The width of section AA’ Is near about 35 M Wide Road whereas it took 2 M wide median, & 3 lane in each road with 3 to 3.5 M (Lane width) as shown in FIG.8 of section AA’, this road contains an elevated metro line which is shown in FIG.8 (below-left
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 456 side). According to analysis, this road width is not sufficient as infrastructure in that Arterial Road, because it is a very Important Lane for All types of Vehicle. Whereas LOS of this Area is Around ‘D’ which is quite more congested. On this Road, only One fire station comes near Bhoothnath which leads to the Indiranagar area which is shown in FIG.8 (below right side). Out of 8 fire stations all over LMC (Lucknow Municipal Corporation). The width of the road according to master plan 2031 is 76M wide but it is not, cause of encroachment of Area by complex and residence. Parking on this road only has in Metro station and Low parking area makes the biggest problem for traffic jam. Mostly Vendors are situated in Non-vending Zone even there is No vending sign is present as shown in FIG.10 Figure 9 No vending Zone near Lekhraj Market Figure 10 Section BB’ In Section BB’ Road with is nearly 40M wide but encroached with many vendors on pavement in both side of the road. With create a Market foot fall highly & makes difficulties for vehicle, create Traffic jam. L.O.S. (Level of service) is ‘E’ of this road according to primary survey took in peak hr. (including morning and evening basis) as show in FIG.11. Different sub stretch road have different LOS. As shown in table.4, which is Survey shows L.O.S. of arterial road. Figure 11 Unauthorized shop on pathways and even on roads.
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 457 Table 4 Survey shows L.O.S. of arterial road Metro Station on That Road Figure 12 Metro Station on Arterial Road Metro stations of selective stretch contain 4 stations at a respective distance as shown in FIG.12. This Route Contain 22 North-South Station out of which: I. 4 STATION IS IN WARD 61 &23 II. ELEVATED METRO LINE IN WARD 61 & 23 III. SINGLE ROUTE IV. PREPARED BY DELHI METRO RAIL CORPORATION LTD. Metro station has a Typical station component and it has the same method as shown in FIG.13. The reason to propose Metro Station is to strengthen the public transport system in the city. According To Lucknow Metro DPR (October 2013) - Daily Station Loading (6:00 Am to 10:00 Pm (Include From Both Side) is shown in table.5 given below. Figure 13 Typical Station Component
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 458 Table 5 DAILY STATION LOADING by DPR REFERENCE 1 Lucknow Metro DPR (October 2013) But when we Started Primary Survey in December 2020 as shown below, we got that the value is very low compared to the given DPR maybe because of the first pandemic that occurred and also the causes of unawareness of metro facilities provided by the government. Daily Station Loading (6:00 AM TO 10:00 PM ON 8/12/2020 AND 9/12/2020) Table.6 is: Table 6 Daily Station Loading by Primary Survey In the station they made infrastructure applying all 7 Principles which is good for all public. They created a path for physically disabled persons to understand, they provided a lift to enter in Concourse level without any difficulties, similarly, they also provided a special path element which helps blind people & these all features are tried to show in FIG.14. Figure 14 Salient feature of the metro station in Lucknow
  • 9. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 459 A B C D E Public Transport On That Road Bus service: Lucknow Mahanagar Parivahan Sewa is an urban bus service of Uttar Pradesh State Road Transport Corporation which operates in the city of Lucknow. All the buses run on compressed natural gas (CNG). Operated city buses which pass through analyzed arterial road having many Busses which have their definite routes and bus no. are: Route no. – 11 A.C.: B.B.D. to S.G.P.G.I. Route no. – 12: B.B.D. to Scooter India. Route no. – 23: Gudamba to Rajni Khand Route no. – 23A: Gudamba to Manyavar Kanshi Ram Awasiya Yojna Route no. – 24: Engineering College to Scooter India Route no. – 24A: Alambagh to Picnic spot Route no. – 31: Alambagh to I.I.M. Route no. – 33 & 33 A.C.: Engineering College to Scooter India Route no. – 45: Viraj Khand to Pasi Qila Route no. – 66: Gol Market to Kakori Mod Tiraha Route no. – 68: Gol Market to Rajajipuram Figure 15 shows existing bus stands, parking, and illegal tempo stands Above FIG.15. showing existing bus stands, parking & illegal tempo stands in which, Point ‘A’ is a bus stop which is now vacant and unauthorized vendors are selling on the stand, earlier stand was used to pick persons for traveling in a bus which comes from polytechnic and goes towards Badshahnagar. Point ‘B’ is a bus stop which is still in use but is not so much active & it helps to the person who wants to go towards Bhoothnath market or so on. Point ‘C’ is a bus stop which is also working but not so much active & stand is situated for the bus goes from Badshah Nagar to Lekhraj chauraha. Point ‘D’ is a bus stop which is very less active in this stretch and stand is situated for the bus goes from Bhoothnath to polytechnic chauraha. Point ‘E’ is a bus stop which is vacant now and is not in use, as it is situated in between Indiranagar metro station and polytechnic chauraha. It has many bus stops, but most of them are not in public use, as most of them are vacant or any vendors are present. So, we need to improve basic needs like a proper bus stop to play a role, so, that public can take advantage and use public transport like bus & will help to improve Traffic flow of road and better Level of Service of transportation. According to a survey we got the result is we have maximum road density is in Faizabad rd. (arterial rd.) and have less rd. width. A trip made by a person shows that Faizabad rd. contain all type of trip which is:  Internal To External  Internal To Internal.  External To Internal  External To External. And that makes an important road of the city, which connects other areas (outside of the city).
  • 10. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 460 Conclusion The reasons for Traffic congestion are mentioned below:  Absence of traffic lights and signals at some junctions. The junctions which have traffic signals, the people barely obey the traffic lights, i.e. no proper administration to manage the offenders breaking the traffic rules. Which is the main cause of traffic congestion and improper traffic management by the traffic police.  Driving habits cause more congestion than other issues, e.g., some drivers illegally enter their vehicles into an intersection, and some drivers drive on the wrong side of the road. Vehicles crawl along looking for passengers and even stop on the running road to drop or pick up the passenger which also gives rise to congestion.  Lack of parking place at the intersection. No proper bus/taxi stops are constructed in the area and there’s lots of on-street parking of public transport which are using up the lanes and that causes traffic congestion.  Illegal and unauthorized shops on pathways and even on the roads.  Footpaths are not properly built or lack proper facilities for people on the footpath. Some areas don’t have a separate footpath which led people to walk on the road and make more congestion.  Fail to mark traffic lanes and zebra crossing. Some marking of traffic lanes and zebra crossing has faded away in some zones.  Traffic diversions at Badshah Nagar crossing.  Due to the fruit market below the Nishat Ganj flyover, ROW has considerably reduced which results in more time for clearance of traffic at the Nishat Ganj crossing. Recommended improvement from traffic congestion Improvement of existing road Commercial areas have congested roads, partly because of encroachment and hawkers. Thus, considering this aspect has identified roads for widening by removing encroachments from footpaths and carriageways. Road improvement is key to alleviating traffic congestion. According to the Master plan, 2031 Road width is Shown in the table. 7 Table 7 Proposed ROW in Lucknow master plan 2031 AS in FIG.16 given below is proposing 76M wide road in which we segregated Vendor’s zone, service lane, and main roadways, creation of beautiful green environment mix with the pedestrian area, in this FIG.16 we also shown bicycle track as it plays NMT (Non-Motor Vehicle) too. Figure 16 76-Meter-Wide Proposed Road Section
  • 11. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 461 As in FIG.17 shown below is proposing 45M wide road in which again we tried to provide service lane including pedestrian Figure 17 45-Meter-Wide Proposed Road Section  unauthorized parking on the side of the road should be strictly prohibited.  Shops at pathways and on the road should be Legally established properly. Non – Motorized transport strategy The objective is to provide continuous, encroachment-free pedestrian and NMT facilities across the city. The proposed measures to develop facilities for pedestrians and bicyclists on the streets include: Provide pedestrian paths/footpaths. Establish connected walking networks. Prevent vendors, pavement dwellers, vehicle parking, and other uses from blocking walkways. Dedicated cycle track. Use street furniture (e.g., benches) and pedestrian-friendly design features. Integrate cycling with transit. Providing bicycle parking/rickshaw stands.  Proper pathways should be created. Shared bus – auto/tempo lane The shared lane is not a high-comfort facility, nor is it appropriate at very high bus volumes. However, buses and other IPTs will often compete for the same space near the curb. Shared lanes can accommodate both modes at low speeds and moderate bus headways, where buses are discouraged from passing, and autos/tempo pass buses only at stops. Inappropriate conditions, bus-auto/tempo lanes are an option on streets where dedicated bus and separate high-comfort facilities cannot be provided. Construction of footpaths and Zebra Crossings  Marking of traffic road lines and zebra crossing lines should be visible and should be preferably light reflective so that they will be visible during the night also or install “smart” pedestrian crosswalks which light up when people cross the road at night or in foggy and rainy conditions.  Traffic lights and signals should be installed. Junction improvement  As traffic increases on Faizabad road, to improve safety and to provide orderly movement of vehicles, improvements to junctions such as installation of traffic signals, geometric improvements, etc. are necessary.  The observed issues on the junctions mainly include congestion, interlocking (of traffic) at junctions, and on-street parking. It has been concluded through observations that these issues are a result of the undefined available right of way for usage by different modes and vehicular movement, pedestrian movement, etc.
  • 12. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 462 Figure 18 Proposed Junction design at Badshahnagar Above FIG. 18 shows the proposed Junction design at Badshahnagar which has a Zebra crossing and shows the connectivity with footpath, bus stop, metro station & railway station. Problems and suggestions on the junction of Badshahnagar are shown in the table.8 given below. Table 8 Problems and suggestions on Badshahnagar junction This will help to improve L.O.S. of roadways and become less traffic volume density of road. Reference 1. City mobility plan of Lucknow 2012. 2. URDPFI Guideline 2014 3. DPR of Lucknow Metro Rail, 2013 4. Smart city Lucknow.