SlideShare una empresa de Scribd logo
1 de 50
Descargar para leer sin conexión
PEMERINTAH KOTA SURABAYA
TAHUN 2013
Surabaya Mass Rapid Transportation (SMART)
Tram and Monorail Project
SURABAYA CITY OVERVIEW
SURABAYA CITY ON EAST JAVA REGIONAL NATIONAL
AND GERBANGKERTOSUSILA (GKS) SCOPE
Kawasan Perkotaan Inti
Kota Surabaya
Kawasan Perkotaan di Sekitarnya
Kab. Gresik
Kab. Bangkalan
B
C
A
Kab. Mojokerto
Kota Mojokerto
Kab. Sidoarjo
Kab. Lamongan
• East Java through GKS is a center of Eastern
Indonesia (KTI)
• Surabaya as the capital of East Java is
becoming a core area of GKS
• GKS total population in 2011 of 9.166.755 and
30,34% were in Surabaya
4
MEDAN
SEMARANG
YOGYAKARTA
DENPASAR
MATARAM
KUPANG
AMBON
MAKASSAR
KENDARI
BIAK
MANADOSINGAPURA
KUALALUMPUR
BALIKPAPAN
SURABAYA
TAIPEIHONGKONG
JAKARTA
BANDUNG
SAUDI ARABIA
JEDDAH
SORONG
BANDAR
S.BEGAWAN
BATAM
PADANG
BANJARMASIN
TARAKAN
PALANGKARAYA
RUTE DOMESTIK
RUTE INTERNASIONAL
S u r a b a y a a s t h e g a t e o f E a s t J a v a
Juanda Airport: 21 Airlines, 24.000 Passengers, 240 movements/day
Tanjung Perak : 17 Shipping companies, 14.915 visits, 2.138 International arrival
Railways : 24 Main Train Reguler Remote Jakarta – Surabaya
TOTAL POPULATION
P o p u l a t i o n a n d n u m b e r o f v e h i c l e i n S u r a b a y a C i t y
Population growth leads to the growth of private vehicle users and the growth in the
number of private vehicles is far above the population growth
2008 2009 2010 2011
Jumlah Penduduk 2,903,382 2,938,225 2,929,528 3,024,321
Jumlah Sepeda Motor 1,028,686 3,007,739 4,465,144 5,726,514
Jumlah Mobil 244,435 526,837 823,849 974,266
2,903,382 2,938,225 2,929,528 3,024,321
1,028,686
3,007,739
4,465,144
5,726,514
244,435
526,837
823,849 974,266
-
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
3.500.000
3.000.000
2.784.196
2.903.382
2.938.225
2.929.528
3.024.321
Grafik Jmlh Pertambahan Penduduk Surabaya 2007 - 2011
65-22%
1,1-3,3%
53-15%
• Traffic congestion on various
protocol roads in Surabaya is
driven by the increasing number
of vehicles
• In 2012 there were additional
1,402,190 units of motorcycles,
the number increased when
compared to the year 2011
amounted to 1.27466 million
Sumber: METROPOLIS-Around Surabaya, Jawa Pos,
Sabtu 27 April 2013
Sumber: METROPOLIS, Jawa Pos, minggu 28
April 2013
T h e R e a l i t y i n S u r a b a y a C i t y
D i s t r i b u t i o n o f P o p u l a t i o n a n d A c t i v i t y C e n t e r s
● An adequate public transport infrastructure is needed to support the mobility
of community from their residential to workplace and activity centers.
● A distribution of activity centers encourages community mobility and it has
potential as traffic generation and attraction.
Terminal, Stasiun
Pelabuhan
Perdagangan jasa
Fasum
industri
Pergudangan
Distribution Location of Settlements Location of Activity Centers
T r a n s p o r t S t r a t e g y i n S u r a b a y a S p a t i a l P l a n
Development and construction of an integrated transport system through the
development of mass transit to improve transportation services and control the use
of private transport
CITY TRANSPORTATION
COMPARISON OF TOTAL VEHICLES IN EAST JAVA AND
SURABAYA IN 2011
T o t a l V e h i c l e s i n S u r a b a y a
• In 2011 total vehicle in East Java was 10.645.817
• Total vehicles in Surabaya was 6.700.780 or + 62% of vehicle in East Java
• Total of the biggest East Java PKB came from Surabaya amounted to Rp. 967,1
Milyar  East : Rp. 328,2 M (33,93%)
 North : Rp. 255,3 M (26,39%)
 West : Rp. 212,1 M (21,93%)
 South : Rp. 171,5 M (17,73%)
6,700,780
10,645,817
-
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
Kota Surabaya Propinsi Jawa Timur
Kota Surabaya
Propinsi Jawa Timur
Year Motorcycles Cars
2008 1.028.686 244.435
2009 3.007.739 526.837
2010 4.465.144 823.849
2011 5.726.514 974.266
TYPE OF VEHICLE YEAR
2008 2009 2010 2011
HEAVY GOODS VEHICLES 154 361 397 547
MOTORCYCLES 1.028.686 3.007.739 4.465.144 5.726.514
TRUCK 135.308 205.885 226.474 280.388
BUS 776 6.690 8.944 11.698
PRIVATE CARS 244.435 526.837 823.849 974.266
TOTAL 1.409.360 3.747.512 5.524.808 6.993.413
CRITERIA YEAR
2008 2009 2010 2011
ROAD LENGTH (Km) 1.400 1.421,52 1.426,152 1.426,647
Table of total vehicle (based on type) year 2008 - 2011
Total Road Length (km) year 2008-2011
C o m p a r i s o n o f t h e n u m b e r o f P r i v a t e V e h i c l e a n d R o a d L e n g t h
The growth of motorcycle that reaches more than 20% per year and the
growth of private cars that excess 15% per year can not be balanced by the
growth of network and road capacity
Mayjen Sungkono
HR Muhammad
Kertajaya
Panjang Jiwo
1,075
1,025
0,948
1,046
0,709
0,740
17.00-18.00
07.15-08.15
17.00-18.00
08.00-09.00
07.30-08.30
1,345
1,108
1,096
0,813
0,617
15.45-16.45
06.30-07.30
18.30-19.30
06.15-0715
06.30-07.30
16.45-17.45 0,574 16.00-17.00
0,702
0,669 06.45-0745 1,096 06.30-07.30
18.30-1930 0,625 17.15-18.15
V/C per direction
B-T Time T-B Time
Name of Roads
Ahmad Yani
1,221
V/C per direction
U-S
Name of Roads
Wonokromo
Darmo (KBS-AL FALAH)
Diponegoro
Urip Sumoharjo
Darmo
1,448
0,956
1,104
0,976
0,969
0,668
0,575
0,754
1,045
0,615
0,772
07.00-08.00
16.30-17.30
07.45-8.45
16.00-17.00
08.00-09.00
15.15-16.15
07.45-08.45
16.30-17.30
07.30-08.30
15.45-16.45
07.45-08.45
16.00-17.00
1,794
1,613
1,432
1,214
1,399
1,142
0,675
0,680
1,232
1,001
0,962
0,790
07.00-08.00
18.30-17.30
07.00-08.00
16.30-17.30
07.15-08.15
16.00-17.00
06.00-07.00
17.00-18.00
06.15-07.15
16.00-17.00
07.15-08.15
16.15-17.15
Time S-U Time
Darmo - Urip Sumoharjo Basuki Rahmad
Bundaran Satelit
Viaduct Gubeng Wonokromo
T r a f f i c S i t u a t i o n
Density and VC Ration in several areas
of Surabaya has already high
Angguna
0.17%
Bus Kota Besar
0.14%
Bus Kota Sedang
0.03%
Kend. Dinas
0.21%
Lainnya
28.42% Mikrolet/Bemo
5.79%
Mobil Pribadi
1.60%
Sepeda Motor
50.95%
Sepeda/Becak
12.56%
Taxi
Argo
0.11%
Taxi Non Argo
0.03%
Bekerja
24.52%
Belanja
7.69%
Bisnis
0.24%
Kep. Sosial
0.40%Lainnya
3.09%
Pulang
49.70%
Sekolah/Kursu
s
14.36%
Industri/Pabrik
5.34% Lainnya
8.06%
Pasar/Toko
12.39%
Perkantoran
8.23%
Rumah
49.81%
Sawah/Tambak
0.12%
Sekolah
15.87%
Terminal
0.18%
Industri/Pabrik
5.30% Lainnya
8.11%
Pasar/Toko
12.31%
Perkantoran
8.21%
Rumah
50.05%
Sawah/Tambak
0.13%
Sekolah
15.73%
Terminal
0.16%
BASED ON MODE THAT IS USED BASED ON THE PURPOSE OF TRAVEL
BASED ON THE ORIGIN OF TRAVEL BASED ON THE DESTINATION
Sumber:
Studi permodelan transportasi,Dishub Pemkot surabaya 2012)
T r a v e l C h a r a c t e r i s t i c o f 2 0 1 2
T r i p G e n e r a t i o n
• Based on a Demand Study
from Surabaya Transport
Modeling Study shows that key
passenger travel of pull areas
are in the center of the city, with
the addition of some suburban
areas.
• More than 50% of vehicle
operating in Surabaya is
motorcycle
• It can be seen that North-South
corridors have high demand.
M i k r o l e t
K e r e t a A p i
B i s K o t a
T a k s i
A n g g u n a
S i t u a t i o n o f P u b l i c T r a n s p o r t S e r v i c e s
u m
1. Rail networks serve inter -city/
regency routes (regional)
2. There are many crossings
1. The certainty of departures
2. Headway 2-20 minutes
3. Operating speed < 15 km/ hour
1. The certainty of departures
2. Headway 10 – 60 minutes
3. Serves north-south routes,
4.Allowed to drop and take
passenger not in a bus-stop
1. Quality of service
2.Serve all routes by request
3.Private operator (company)
1. Unscheduled
2.The number has decreased
3.Serve all routes by request
4.Mostly owned by individual
B u s K o t a
The interest in the use of public transport is low so that need quality improvement as one
solution to overcome the problems of transportation and provide options for road
users in performing their activities
THE EFFORTS IN OVERCOMING TRANSPORT ISSUES
PRIMARY ARTERY
SECONDARY ARTERY
PRIMARY COLLECTOR
SECONDARY COLLECTORC
TOLL ROAD
OWRR
(OUTER
WEST RING
ROAD)
MWRR
(MIDLE WEST
RING ROAD)
12345
67
2
3
4
5
6
LAMONG
PORT
TJ.PERAK
PORT
JUANDA
AIR PORT
MWRR
(MIDLE WEST
RING ROAD)
SURABAYA-GEMPOL
TOL ROAD
(EXISTING)
SURABAYA-
MOJOKERTO TOL
ROAD (EXISTING)
WARU JUANDA -
TOL ROAD
(EXISTING)
MERR (MIDLE
EAST RING
ROAD)
OERR (OUTER
EAST RING
ROAD)
SURABAYA-
GRESIK TOL ROAD
(EXISTING)
SURAMADU
BRIDGE
HIGHWAY ROAD
FRONTAGE ROAD
JL. AHMAD YANI +
FRONTAGE ROAD
(EXISTING)
JL.
KENJERAN(EXISTING)
1
M a i n r o a d n e t w o r k d e v e l o p m e n t
I
IIIII
IV
V
VI
VII
•Length ± 26, 657 km
•The function is to
reduce the congestion
on the North-South
corridor Surabaya
D i v i s i o n o f W e s t R i n g R o a d ( 2 0 1 2 - 2 0 1 5 )
Length of Inner West Ring Road along ±
13,91 km from Greges to jl. Mastrip
Outer West Ring Road Center West Ring Road
 Development Plan of Outer East Ring Road be
done gradually (long-term) from the access of
Suramadu Bridge to Gunung Anyar (Kali
Perbatasan)- P0ndok Tjandra, with :
1. Total of Length Road= 16,542 Km
2. Width of the Road = 40 – 60 m
D i v i s i o n o f E a s t R i n g R o a d
MERR IIB
MERR IIA
MERR IIC
SISI GUNUNG
ANYAR
• MERR IIA (1625 m) AND MERR IIB (2850 m) HAS
BEEN CONSTRUCTED AND OPERATE
• MERR IIC ROAD LENGTH= 6.250 M, ROW 40 M
WITH TOTAL LAND OF 261.154 M2
• THE FOLLOWING EVENTS OF 2013-2014 ARE ON
GUNUNG ANYAR SIDE
Middle East Ring Road ( s/d 2014) Outer East Ring Road (2012 – 2017)
Public transport development policy is geared to quickly implement an integrated
mass transit (Simart / Surabaya Integrated Mass Rapid Transit)
POLICY OF PUBLIC TRANSPORT DEVELOPMENT IN SURABAYA
P u b l i c T r a n s p o r t S e r v i c e I m p r o v e m e n t
I
N
T
E
G
R
A
TON IMASS TRANSIT
AKAP / AKDP BUS
CITY BUS
RAIL
ANGKOT
TRANSPORT PLAN
Integrating inter-mode transport
(land, sea, air)
D e v e l o p m e n t o f a n I n t e g r a t e d M a s s T r a n s p o r t S y s t e m
Sumber :
Pra Studi Kelayakan AUMC Pemkot Sby (2012)
T h e P l a n o f M o n o r a i l & T r a m T r a c k
KETERANGAN :
MONORAIL
TRAM
No Stasiun Hinterland
US-1 Joyoboyo Trem Terminal Intermoda
US-2 Bonbin Kebun Binatang, Masjid dan Sekolah
US-3 Taman Bungkul Taman, Rumah Sakit
US-4 Bintoro Sekolah
US-5 Pandegiling Hotel, Perdagangan, Bank, Travel
US-6 Panglima Sudirman Pasar Modern
US-7 Kombepol M Duryat Toko Buku, Exhibition, Hotel, Pusat Kuline
US-8 Tegalsari Pusat Kuliner, Pusat Perbelanjaan
US-9 Embong Malang Pusat Perbelanjaan, Pasar Modern, Hote
US-10 Kedungdoro Pusat Onderdil, Pusat Perhiasan, Hotel, Pusat K
US-11 Pasar Blauran Pusat Perbelanjaan, Pusat sepatu, Pusat Kuliner, Pus
US-12 Bubutan Pusat Mur Baut
US-13 Pasar Turi Museum, Pasar Modern, Kantor Pemerinta
US-14 Kemayoran Gedung DPRD, Masjid, Sekolah, Heritage
US-15 Indrapura Kantor Pemerintah
US-16 Rajawali Pusat Perbelanjaan
US-17 Jembatan Merah Pusat Perbelanjaan, Heritage, Hotel, Pusat Perda
US-18 Veteran Pusat Perkantoran
US-19 Tugu Pahlawan Pusat Perkantoran
US-20 Baliwerti Pusat Perdagangan
US-21 Siola Pusat sepatu, Pusat Kuliner, Heritage
US-22 Genteng Pusat Oleh-oleh
US-23 Tunjungan Hotel, Perdagangan, Bank, Travel
US-24 Gub. Suryo Sekolah, Gedung Kesenian
US-25 Bambu Runcing Pusat Perkantoran
US-26 Sonokembang Pusat Perkantoran
Nomor Nama Stasiun
BT-1 Kejawan Tr
BT-2 Mulyosari Fe
BT-3 ITS Se
BT-4 GOR kertajaya indah Tr
BT-5 Darmahusada Indah Timur Tr
BT-6 Unair Kampus C Tr
BT-7 Darmahusada Fe
BT-8 RS Dr Sutomo Tr
BT-9 Stasiun Gubeng Ke
BT-10 Jl Raya Gubeng Fe
BT-11 Irian Barat AM
BT-12 Bung Tomo Tr
BT-13 Ngagel
BT-14 Wonokromo KA
BT-15 Joyoboyo AM
BT-16 Adityawarman Tr
BT-17 Pakis Fe
BT-18 Dukuh Kupang Fe
BT-19 Bundaran Satelit Fe
BT-20 HR Muhammad P+
BT-21 Simpang Darmo Permai Fe
BT-22 Lontar Tr
BT-23 Unesa Tr
BT-24 Lidah Kulon Fe
Tram (Utara Selatan)
Joyoboyo – JMP ± 16,7 Km
Monorail (Timur - Barat)
Kejawan – Lidah kulon ± 23 Km
Kejawan
Joyoboyo
JMP
Lidah kulon
34.85
15.11
34.80
34.82
14.80
14.62
14.91
31.46
33.53
30.74
24.86
15.19
14.97
14.91
20.81
14.91
14.91
14.91
14.91
25.17
24.86
25.11
34.80
14.91
24.86
14.91
14.91
24.69
34.80
34.80
34.80
60.29
35.32
34.80
34.73
24.99
36.79
30.36
30.36
39.63
14.91
17.40
14.91
14.95
36.02
34.81
40.08
30.36
30.36
24.00
19.00
19.00
19.00
26.08
19.71
24.31
24.86
35.09
32.32
32.32
32.32
32.32
32.32
32.80
32.32
32.32
32.32
9.94
9.94
9.94
9.94
9.94
9.94
9.94
9.97
9.94
7.46
7.56
15.10
20.15
14.91
14.91
14.91
14.91
14.91
14.91
14.56
14.91
14.91
14.91
KECAMATAN
WONOKROMO
L a n d u s e i n M RT c o r r i d o r s
MRT tracks connect the center of Sub City which is the center of growth and
activities on local, regional, and national scale.
PUSAT
SUB
KOTA
PUSAT
SUB
KOTA
PUSAT
REGIONAL
& CBDL
PUSAT
KOTA
& CBD
PUSAT
CBD
PUSAT
CBD
PUSAT
CBD
PUSAT
CBD
PUSAT
CBD
PUSAT
CBD
PUSAT
SUB
KOTA
PUSAT
CBD
•There are many tracks of cultural heritage
• It does not reduce the capacity of the road due to mixed traffic
• Constrained due to the viaduct
•The first stage starts from Joyoboyo to JMP , the next step is Tanjung
Perak Development
• Maximum distance between station : 0,75 km ; min : 0,40 km
Use of Tram on North – South Track
N o r t h – S o u t h T r a c k ( 1 6 , 7 0 K m )
Jalur Timur -
Use of Monorail on East – West Track :
• Reducing conflict points by intersection making
• Monorail capacity is greater than busway
• It is easier in land acquisition due to elevated
• A modern themed area
• Starts from Kejawan Putih Tambak to Lidah Kulon
• Maximum distance between station : 1,70 km ; min : 0,40 km
Ciputra
E a s t – W e s t T r a c k ( 2 3 , k m )
VARIABEL MONORAIL TRAM
CORRIDOR LENGTH 23 KM 16,7 KM
DEPO LOCATION KENJERAN & JOYOBOYO JOYOBOYO
TOTAL HALT 23 UNIT 29 UNIT
DISTANCE BETWEEN HALT MINIMUM 500 - 2000 M MINIMUM 500 - 1000 M
AVERAGE OF DEMAND/yr 43.717.742 27.936.900
*INVESTMENT (Rp) 8.505.801.575.302 1.260.218.638.027
CAPACITY /CIRCUIT 400 PNP 200 PNP
TOTAL CIRCUIT 4 GERBONG 2 CARRIAGE
ECONOMICAL FARE 37.000-40.000 8000- 10.000
PASSENGER CAPACITY SIT 177 ; STAND 238 200 PASSENGERS
HEADWAY 10 MINUTES 10 MINUTES
WILLINGNESS TO PAY (WTP) 6000-10.000 6000-10.000
SUBSIDY/PASSENGER 27.500-30000 2000-4000
NEED OF FLEET 18 unit (4 modules) 21 unit (5 modules with 30,8 m
length)
T h e P l a n o f M o n o r a i l & Tr a m M o d e
*Investment cost include : construction of station; trajectory and construction; halt; JPO; socializing cost;
design cost; studies and supervision; fleet; depo
Jl. Pasar keputran Jl. HR. Muhammad
Jl. Bukit Darmo Boulevard Jl. HR. Muhammad
M o n o r a i l V i s u a l i z a t i o n
Jl.Basuki Rahmad
Jl. Tunjungan
Jl. Embong Malang
Jl. Pahlawan
T r a m T r a c k V i s u a l i z a t i o n
INTEGRATION OF SURABAYA MRT WITH REGIONAL RAIL
& FEEDER
RAIL NETWORK DEVELOPMENT PLAN
IN GERBANGKERTOSUSILA AREA
M R T I n t e g r a t i o n & R a i l T r a c k D e v e l o p m e n t P l a n
Pelabuhan
Teluk
Lamong
Rencana Pengembangan. Jalur Rel
Angkutan Massal Cepat
Tahap 1 Double track Gubeng Juanda & Mojokerto
Tahap 2 Double track Pasar Turi -Bojonegoro
Tahap 3 Kearah Gresik dan Lamongan (existing)
Tahap 4 Rencana Akses kearah Teluk Lamong
Bandara Juanda
SIDOARJO
Mojokerto
Sta Waru –T. Purabaya
Sta. Wonokromo
Sta. Gubeng
Gresik
Babat - Lamongan
MRT tracks are integrated with network development plan of Railways with
integration points of mode transfer in Wonokromo and Gubeng Station
Sumber :
Rencana Sistem Angkutan Umum Dishub Pemkot Sby (2012)
1.The operation of Mass Rapid Transit will
change the whole pattern of public
transport routes in Surabaya City
2.MRT requires feeder which is able to
support them.
3.Urban transport will connects MRT
corridors with many areas and pulic
facilities in Surabaya City.
1 2
3
P u b l i i c T r a n s p o r t D e v e l o p m e n t P l a n
Rute Trunk (14 trayek)Rute AMC (2 Koridor) Rute Feeder (34 trayek)
T. Benowo
T. Balongsari
T. Manukan
T. Dkh Kupang
T. Dkh Menanggal
T. Bratang
T. Keputih
T.Kenjeran
T.Tambak Wedi
T.Petekan
I n t e g r a t i o n P l a n b e t w e e n M R T a n d f e e d e r
BRANDING STRATEGY
Surotram dan Boyorail are fast, comfortable, and
cultured transport which capable to be the best solution
to overcome negative impacts of transport issues in
Surabaya City.
 Surotram logo represents shark (suro)
 Boyorail logo represents crocodile (boyo)
 Orange means passenger familiarity and comfortable
transport
 Green has chosen for Boyorail as supporting the concept
of Go Green
B r a n d i n g S t r a t e g y
R u t e
It is one of ways to introduce and improve the image of
Surabaya. It can be a marketing way to wider society.
B r a n d i n g S t r a t e g y
PARK & RIDE, TERMINAL, HALT AND DEPO FACLITIES
2
51 32 4
79
1011
121314
15 5
1
12
3
PLAN OF PARK AND RIDE LOCATION
ALTERNATIVE
 SENTRA BULAK (DEPO)
 KANTOR DINAS PARIWISATA (PARK & RIDE)
 PASAR TUNJUNGAN (PARK & RIDE)
 TERMINAL JOYOBOYO (TERMINAL)
 TVRI (PARK & RIDE)
 PASAR KEPUTRAN (TERMINAL INTEGRASI MODA)
 AHMAD YANI (EX IGLAS) (PARK AND RIDE)
 Jl. HR MUHAMMAD
L o c a t i o n P l a n o f P a r k & R i d e
Jl Kertajaya (samping UPTSA)
Pasar Tunjungan Pasar Tunjungan
V i s u a l i z a t i o n o f P a r k & R i d e L o c a t i o n P l a n
PASAR KEPUTRAN
JL. BASUKI RAHMAD (PATUNG KARAPAN SAPI) JOYOBOYO
JL. AHMAD YANI (EX IGLAS)
V i s u a l i z a t i o n o f P a r k & R i d e L o c a t i o n P l a n
Movement (transfer) integration between Monorail and Tram in Jl.
Basuki Rahmad and Pasar Keputran
I n t e g r a t i o n C o n c e p t b e t w e e n M o n o r a i l a n d T r a m
S t a t i o n & H a l t D e s i g n C o n c e p t
Kebun Binatang Surabaya
Jalur Tram
Jalur Monorail
TERMINAL JOYOBOYO
M R T M o n o r a i l a n d T r a m I n t e r m o d e T e r m i n a l
IMPLEMENTATION STRATEGY SiMART
• GRADUALLY IMPLEMENTED
• IT IS PLANNED TO DEVELOP ITS IN 55
INTERSECTIONS IN STRATEGIC AREAS
• TO IMPROVE TRAFFIC MANAGEMENT SYSTEM
IN SURABAYA
INTELLIGENT TRANSPORTATION SYSTEM – ATCS DEVELOPMENT
45
NO LOKASI ZONA
1 JL. DIPONEGORO-JL. RAYA DARMO BARAT-SELATAN
2 JL. CILIWUNG - JL. DIPONEGORO BARAT-SELATAN
3 JL. KUTAI - JL. DIPONEGORO BARAT-SELATAN
4 JL. MUSI - JL. DIPONEGORO BARAT-SELATAN
5 JL. Dr. SOETOMO - JL. DIPONEGORO BARAT-SELATAN
6 JL. KARTINI - JL. DIPONEGORO BARAT-SELATAN
7 JL. PASAR KEMBANG - JL. DIPONEGORO BARAT-SELATAN
8 JL. KEDUNGDORO - JL. KEDUNGSARI UTARA-PUSAT
9 JL. EMBONG MALANG - JL. KEDUNGDORO UTARA-PUSAT
10 JL. PRABAN - JL. BLAURAN UTARA-PUSAT
11 JL. TEMBAAN - JL. BUBUTAN UTARA-PUSAT
12 JL. PAHLAWAN - JL. TEMBAAN UTARA-PUSAT
13 JL. KEBONROJO - JL. VETERAN UTARA-PUSAT
14 JL. PRABAN - JL. TUNJUNGAN UTARA-PUSAT
15 JL. RAYA DARMO - JL. Dr. SOETOMO UTARA-PUSAT
NO PANJANG
01-02 413 METER
02-03 253 METER
03-04 450 METER
04-05 225 METER
05-06 856 METER
06-07 425 METER
07 - 08 1.958,5METER
08 - 09 544,5 METER
09 - 10 3.105 METER
10 - 11 1.127 METER
11 - 12 205,5 METER
12 - 13 433,5 METER
13 - 14 1.410,5METER
14 - 15 3.360 METER
I n t e l l e g e n t T r a n s p o r t a t i o n s y s t e m ( I T S )
I T S & T r a f f i c M a n a g e m e n t S y s t e m
ITS development as traffic management system that integrated to control the use
of private vehicle in particular areas to drive community’s interest in the use of
MRT
I T S & T r a f f i c M a n a g e m e n t S y s t e m
On street parking limitation with intensive supervision and parking facility
construction ( off street parking) and parking area (building)
BICYCLE TRACK PROVISION
5
4
3
2
1
Tahap I + 8,86 km
Provision of bicycle track to promote the use of bicycle as mode of
transportation that environmentally friendly, because of that matter MRT
should provide some spaces for cyclist.
FACILITY CONSTRUCTION FOR PEDESTRIAN
NO LOKASI PEDESTRIAN TERBANGUN
1 JL. RAYA DARMO
2 JL. SONOKEMBANG
3 JL. KAYOON
4 JL. KEPUTRAN
5 JL. URIP SUMOHARJO
6 JL. PANGLIMA SUDIRMAN
7 JL. BASUKI RAHMAD
8 JL. WALIKOTA MUSTAJAB
9 JL. PEMUDA
10 JL. RAJAWALI
11 JL. VETERAN
12 JL. GEMBLONGAN
13 JL. DHARMAWANGSA
14 JL. PROF. MAYJEN MOESTOPO
15 JL. AIRLANGGA
16 JL. STASIUN GUBENG
17 TAMAN LANSIA
18 JL. RAYA GUBENG
19 TAMAN PERSAHABATAN
20 JL. GENTENG KALI
21 FRONTAGE ROAD A. YANI
22 TAMAN MUNDU
Pedestrian construction to support MRT and to improve
the safety and comfort of pedestrians
Thank You
A convenience of living in town is the right of every citizen,
MRT development is an effort to realize that.

Más contenido relacionado

La actualidad más candente

Pola Penanganan Drainase Perkotaan
Pola Penanganan Drainase PerkotaanPola Penanganan Drainase Perkotaan
Pola Penanganan Drainase Perkotaaninfosanitasi
 
Studio Perencanaan Laporan Akhir Fokus Area Kota Kendal
Studio Perencanaan Laporan Akhir Fokus Area Kota KendalStudio Perencanaan Laporan Akhir Fokus Area Kota Kendal
Studio Perencanaan Laporan Akhir Fokus Area Kota KendalLaras Kun Rahmanti Putri
 
Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...
Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...
Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...WRI Ross Center for Sustainable Cities
 
Sustainable Non Motorised Transport- case studies from around the world
Sustainable Non Motorised Transport- case studies from around the worldSustainable Non Motorised Transport- case studies from around the world
Sustainable Non Motorised Transport- case studies from around the worldBhargavi Rao
 
TUGAS 8 PPT PERENCANAAN TRANSPORTASI ARY.pptx
TUGAS 8 PPT PERENCANAAN TRANSPORTASI ARY.pptxTUGAS 8 PPT PERENCANAAN TRANSPORTASI ARY.pptx
TUGAS 8 PPT PERENCANAAN TRANSPORTASI ARY.pptxRishaf Salman
 
Bab 4 pendekatan dan metodologi
Bab 4   pendekatan dan metodologiBab 4   pendekatan dan metodologi
Bab 4 pendekatan dan metodologidandi rustandi
 
Analisis sistem transportasi
Analisis sistem transportasiAnalisis sistem transportasi
Analisis sistem transportasitafqr
 
Masalah lalu lintas
Masalah lalu lintasMasalah lalu lintas
Masalah lalu lintasOpa Opa
 
Kebijakan dan Strategi Nasional Pembangunan Sanitasi
Kebijakan dan Strategi Nasional Pembangunan SanitasiKebijakan dan Strategi Nasional Pembangunan Sanitasi
Kebijakan dan Strategi Nasional Pembangunan Sanitasiinfosanitasi
 
MultiModal Transportation in New DElhi
MultiModal Transportation in New DElhiMultiModal Transportation in New DElhi
MultiModal Transportation in New DElhiHamza Hashmi
 
Dasar-dasar sistem pengelolaan sampah
Dasar-dasar sistem pengelolaan sampahDasar-dasar sistem pengelolaan sampah
Dasar-dasar sistem pengelolaan sampahinfosanitasi
 
SMART CITY & SMART VILAGE
SMART CITY & SMART VILAGESMART CITY & SMART VILAGE
SMART CITY & SMART VILAGESiti Sahati
 
Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lampiran 3
Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lampiran 3Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lampiran 3
Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lampiran 3infosanitasi
 
Implementasi kriteria perancangan kota
Implementasi kriteria perancangan kotaImplementasi kriteria perancangan kota
Implementasi kriteria perancangan kotaMerisa Kadrina
 
Prinsip dasar perencanaan transportasi
Prinsip dasar perencanaan transportasiPrinsip dasar perencanaan transportasi
Prinsip dasar perencanaan transportasiAchmadNurdiansyah3
 

La actualidad más candente (20)

Pola Penanganan Drainase Perkotaan
Pola Penanganan Drainase PerkotaanPola Penanganan Drainase Perkotaan
Pola Penanganan Drainase Perkotaan
 
City Structure and Urban Mobility
City Structure and Urban MobilityCity Structure and Urban Mobility
City Structure and Urban Mobility
 
Transportasi merupakan urat nadi pertumbuhan ekonomi
Transportasi merupakan urat nadi pertumbuhan ekonomiTransportasi merupakan urat nadi pertumbuhan ekonomi
Transportasi merupakan urat nadi pertumbuhan ekonomi
 
Studio Perencanaan Laporan Akhir Fokus Area Kota Kendal
Studio Perencanaan Laporan Akhir Fokus Area Kota KendalStudio Perencanaan Laporan Akhir Fokus Area Kota Kendal
Studio Perencanaan Laporan Akhir Fokus Area Kota Kendal
 
Ek per. aksesibilitas
Ek per. aksesibilitasEk per. aksesibilitas
Ek per. aksesibilitas
 
Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...
Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...
Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...
 
Sustainable Non Motorised Transport- case studies from around the world
Sustainable Non Motorised Transport- case studies from around the worldSustainable Non Motorised Transport- case studies from around the world
Sustainable Non Motorised Transport- case studies from around the world
 
TUGAS 8 PPT PERENCANAAN TRANSPORTASI ARY.pptx
TUGAS 8 PPT PERENCANAAN TRANSPORTASI ARY.pptxTUGAS 8 PPT PERENCANAAN TRANSPORTASI ARY.pptx
TUGAS 8 PPT PERENCANAAN TRANSPORTASI ARY.pptx
 
morfologi Konsep citra kota
morfologi Konsep citra kotamorfologi Konsep citra kota
morfologi Konsep citra kota
 
Bab 4 pendekatan dan metodologi
Bab 4   pendekatan dan metodologiBab 4   pendekatan dan metodologi
Bab 4 pendekatan dan metodologi
 
Analisis sistem transportasi
Analisis sistem transportasiAnalisis sistem transportasi
Analisis sistem transportasi
 
Ek per. aksesibilitas
Ek per. aksesibilitasEk per. aksesibilitas
Ek per. aksesibilitas
 
Masalah lalu lintas
Masalah lalu lintasMasalah lalu lintas
Masalah lalu lintas
 
Kebijakan dan Strategi Nasional Pembangunan Sanitasi
Kebijakan dan Strategi Nasional Pembangunan SanitasiKebijakan dan Strategi Nasional Pembangunan Sanitasi
Kebijakan dan Strategi Nasional Pembangunan Sanitasi
 
MultiModal Transportation in New DElhi
MultiModal Transportation in New DElhiMultiModal Transportation in New DElhi
MultiModal Transportation in New DElhi
 
Dasar-dasar sistem pengelolaan sampah
Dasar-dasar sistem pengelolaan sampahDasar-dasar sistem pengelolaan sampah
Dasar-dasar sistem pengelolaan sampah
 
SMART CITY & SMART VILAGE
SMART CITY & SMART VILAGESMART CITY & SMART VILAGE
SMART CITY & SMART VILAGE
 
Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lampiran 3
Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lampiran 3Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lampiran 3
Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lampiran 3
 
Implementasi kriteria perancangan kota
Implementasi kriteria perancangan kotaImplementasi kriteria perancangan kota
Implementasi kriteria perancangan kota
 
Prinsip dasar perencanaan transportasi
Prinsip dasar perencanaan transportasiPrinsip dasar perencanaan transportasi
Prinsip dasar perencanaan transportasi
 

Destacado

[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)shrdcinfo
 
Daftar Perkiraan Daftar Harga Tanah Surabaya 2016
Daftar Perkiraan Daftar Harga Tanah Surabaya 2016Daftar Perkiraan Daftar Harga Tanah Surabaya 2016
Daftar Perkiraan Daftar Harga Tanah Surabaya 2016Eka Darmadi
 
ATCS ~ Surabaya Intelligent Transportation System (SITS)
ATCS ~ Surabaya Intelligent Transportation System (SITS)ATCS ~ Surabaya Intelligent Transportation System (SITS)
ATCS ~ Surabaya Intelligent Transportation System (SITS)Irvan Wahyu
 
Penyusunan rdtr berbasis bidang tanah 1
Penyusunan rdtr berbasis bidang tanah 1Penyusunan rdtr berbasis bidang tanah 1
Penyusunan rdtr berbasis bidang tanah 1Yulianto Dwi Prasetyo
 
INDONESIA TRANSPORTATION SECTOR OVERVIEW
INDONESIA TRANSPORTATION SECTOR OVERVIEWINDONESIA TRANSPORTATION SECTOR OVERVIEW
INDONESIA TRANSPORTATION SECTOR OVERVIEWtribudia
 
Pertumbuhan dan Perkembangan Kota Surabaya dari Masa ke Masa
Pertumbuhan dan Perkembangan Kota Surabaya dari Masa ke MasaPertumbuhan dan Perkembangan Kota Surabaya dari Masa ke Masa
Pertumbuhan dan Perkembangan Kota Surabaya dari Masa ke MasaMia Nur Aisyah Firdaus
 
Studio Rencana Kota; Tata Ruang BWK 3 Kota Semarang
Studio Rencana Kota; Tata Ruang BWK 3 Kota SemarangStudio Rencana Kota; Tata Ruang BWK 3 Kota Semarang
Studio Rencana Kota; Tata Ruang BWK 3 Kota SemarangNurlina Y.
 
Rencana Tata Ruang Wilayah Kota Surabaya
Rencana Tata Ruang Wilayah Kota SurabayaRencana Tata Ruang Wilayah Kota Surabaya
Rencana Tata Ruang Wilayah Kota SurabayaPenataan Ruang
 
RDTR, RTBL dan Peraturan Zonasi dalam sistem perencanaan tata ruang di Indonesia
RDTR, RTBL dan Peraturan Zonasi dalam sistem perencanaan tata ruang di IndonesiaRDTR, RTBL dan Peraturan Zonasi dalam sistem perencanaan tata ruang di Indonesia
RDTR, RTBL dan Peraturan Zonasi dalam sistem perencanaan tata ruang di IndonesiaFitri Indra Wardhono
 
Toponimi Jalan bertema "Pulau"
Toponimi Jalan bertema "Pulau"Toponimi Jalan bertema "Pulau"
Toponimi Jalan bertema "Pulau"Hamida ID
 
GRAHA GOLF by PT Intiland Development Tbk
GRAHA GOLF by PT Intiland Development Tbk GRAHA GOLF by PT Intiland Development Tbk
GRAHA GOLF by PT Intiland Development Tbk Herman Herman
 
Slide presentation Norhayati sharif
Slide presentation Norhayati sharifSlide presentation Norhayati sharif
Slide presentation Norhayati sharifREFLESIA
 
pesantren Thaybah surabaya
pesantren Thaybah surabayapesantren Thaybah surabaya
pesantren Thaybah surabayasutrisno_link
 
03_Toponimi Keputih Gang II
03_Toponimi Keputih Gang II03_Toponimi Keputih Gang II
03_Toponimi Keputih Gang IIHamida ID
 
Analisis Kemampuan Daerah (Pembiayaan Pembangunan )Kota Surabaya
Analisis Kemampuan Daerah (Pembiayaan Pembangunan )Kota SurabayaAnalisis Kemampuan Daerah (Pembiayaan Pembangunan )Kota Surabaya
Analisis Kemampuan Daerah (Pembiayaan Pembangunan )Kota SurabayaLatifah Tio
 
Ii. karakteristik komponen lalu lintas
Ii. karakteristik komponen lalu lintasIi. karakteristik komponen lalu lintas
Ii. karakteristik komponen lalu lintasgusriantodanr2161
 

Destacado (20)

[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
 
Daftar Perkiraan Daftar Harga Tanah Surabaya 2016
Daftar Perkiraan Daftar Harga Tanah Surabaya 2016Daftar Perkiraan Daftar Harga Tanah Surabaya 2016
Daftar Perkiraan Daftar Harga Tanah Surabaya 2016
 
ATCS ~ Surabaya Intelligent Transportation System (SITS)
ATCS ~ Surabaya Intelligent Transportation System (SITS)ATCS ~ Surabaya Intelligent Transportation System (SITS)
ATCS ~ Surabaya Intelligent Transportation System (SITS)
 
Penyusunan rdtr berbasis bidang tanah 1
Penyusunan rdtr berbasis bidang tanah 1Penyusunan rdtr berbasis bidang tanah 1
Penyusunan rdtr berbasis bidang tanah 1
 
INDONESIA TRANSPORTATION SECTOR OVERVIEW
INDONESIA TRANSPORTATION SECTOR OVERVIEWINDONESIA TRANSPORTATION SECTOR OVERVIEW
INDONESIA TRANSPORTATION SECTOR OVERVIEW
 
Pertumbuhan dan Perkembangan Kota Surabaya dari Masa ke Masa
Pertumbuhan dan Perkembangan Kota Surabaya dari Masa ke MasaPertumbuhan dan Perkembangan Kota Surabaya dari Masa ke Masa
Pertumbuhan dan Perkembangan Kota Surabaya dari Masa ke Masa
 
Studio Rencana Kota; Tata Ruang BWK 3 Kota Semarang
Studio Rencana Kota; Tata Ruang BWK 3 Kota SemarangStudio Rencana Kota; Tata Ruang BWK 3 Kota Semarang
Studio Rencana Kota; Tata Ruang BWK 3 Kota Semarang
 
23
2323
23
 
Rencana Tata Ruang Wilayah Kota Surabaya
Rencana Tata Ruang Wilayah Kota SurabayaRencana Tata Ruang Wilayah Kota Surabaya
Rencana Tata Ruang Wilayah Kota Surabaya
 
RDTR, RTBL dan Peraturan Zonasi dalam sistem perencanaan tata ruang di Indonesia
RDTR, RTBL dan Peraturan Zonasi dalam sistem perencanaan tata ruang di IndonesiaRDTR, RTBL dan Peraturan Zonasi dalam sistem perencanaan tata ruang di Indonesia
RDTR, RTBL dan Peraturan Zonasi dalam sistem perencanaan tata ruang di Indonesia
 
Toponimi Jalan bertema "Pulau"
Toponimi Jalan bertema "Pulau"Toponimi Jalan bertema "Pulau"
Toponimi Jalan bertema "Pulau"
 
GRAHA GOLF by PT Intiland Development Tbk
GRAHA GOLF by PT Intiland Development Tbk GRAHA GOLF by PT Intiland Development Tbk
GRAHA GOLF by PT Intiland Development Tbk
 
Slide presentation Norhayati sharif
Slide presentation Norhayati sharifSlide presentation Norhayati sharif
Slide presentation Norhayati sharif
 
Aspek fisik
Aspek fisikAspek fisik
Aspek fisik
 
pesantren Thaybah surabaya
pesantren Thaybah surabayapesantren Thaybah surabaya
pesantren Thaybah surabaya
 
03_Toponimi Keputih Gang II
03_Toponimi Keputih Gang II03_Toponimi Keputih Gang II
03_Toponimi Keputih Gang II
 
Pertumbuhan kota surabaya
Pertumbuhan kota surabayaPertumbuhan kota surabaya
Pertumbuhan kota surabaya
 
Toponimi kelurahan klampis asem
Toponimi kelurahan klampis asemToponimi kelurahan klampis asem
Toponimi kelurahan klampis asem
 
Analisis Kemampuan Daerah (Pembiayaan Pembangunan )Kota Surabaya
Analisis Kemampuan Daerah (Pembiayaan Pembangunan )Kota SurabayaAnalisis Kemampuan Daerah (Pembiayaan Pembangunan )Kota Surabaya
Analisis Kemampuan Daerah (Pembiayaan Pembangunan )Kota Surabaya
 
Ii. karakteristik komponen lalu lintas
Ii. karakteristik komponen lalu lintasIi. karakteristik komponen lalu lintas
Ii. karakteristik komponen lalu lintas
 

Similar a Surabaya mass rapid transportation (smart)

[Urban transportation policy program]city paper presentation sebrang perai
[Urban transportation policy program]city paper presentation sebrang perai[Urban transportation policy program]city paper presentation sebrang perai
[Urban transportation policy program]city paper presentation sebrang peraishrdcinfo
 
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)shrdcinfo
 
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)Desi Waluyanti
 
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)shrdcinfo
 
MANIDEEPA BAIDYA DISSERTATION
MANIDEEPA BAIDYA DISSERTATIONMANIDEEPA BAIDYA DISSERTATION
MANIDEEPA BAIDYA DISSERTATIONMANIDEEPA BAIDYA
 
PROMOTING BICYCLE TRANSPORT ON SECONDARY ROADS
PROMOTING BICYCLE TRANSPORT ON SECONDARY ROADSPROMOTING BICYCLE TRANSPORT ON SECONDARY ROADS
PROMOTING BICYCLE TRANSPORT ON SECONDARY ROADSKrishna Saw
 
"The Strategic Urban Development Plan and the Urban Transport Development Pla...
"The Strategic Urban Development Plan and the Urban Transport Development Pla..."The Strategic Urban Development Plan and the Urban Transport Development Pla...
"The Strategic Urban Development Plan and the Urban Transport Development Pla...Patricia Moe
 
Smart City Traffic Management
Smart City Traffic ManagementSmart City Traffic Management
Smart City Traffic ManagementANITHASELVASOFIA
 
Seoul public transportation
Seoul public transportation Seoul public transportation
Seoul public transportation simrc
 
Problem Identification of Traffic and Transport : Muzaffarpur City, Bihar
Problem Identification of Traffic and Transport : Muzaffarpur City, BiharProblem Identification of Traffic and Transport : Muzaffarpur City, Bihar
Problem Identification of Traffic and Transport : Muzaffarpur City, BiharIRJET Journal
 
Final presentation of sutainble kajang
Final presentation of sutainble kajangFinal presentation of sutainble kajang
Final presentation of sutainble kajangMalek Algadi
 
Presentation of kajang futue development
Presentation of kajang futue developmentPresentation of kajang futue development
Presentation of kajang futue developmentsarah_hazim
 
Final presentation of sutainble kajang
Final presentation of sutainble kajangFinal presentation of sutainble kajang
Final presentation of sutainble kajangHassan Alhaj Alhaj
 
SOLVING CONGESTION AT 4 LEGGED FATAL INTERSECTION BASED ON PROPORTIONATE TRA...
 SOLVING CONGESTION AT 4 LEGGED FATAL INTERSECTION BASED ON PROPORTIONATE TRA... SOLVING CONGESTION AT 4 LEGGED FATAL INTERSECTION BASED ON PROPORTIONATE TRA...
SOLVING CONGESTION AT 4 LEGGED FATAL INTERSECTION BASED ON PROPORTIONATE TRA...IAEME Publication
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADNorma Nun
 
Metro Mart Magazine- May 2013
Metro Mart Magazine- May 2013Metro Mart Magazine- May 2013
Metro Mart Magazine- May 2013ONE ROOF INDIA
 
Project Report Modified222
Project Report Modified222Project Report Modified222
Project Report Modified222Ratan Patil
 

Similar a Surabaya mass rapid transportation (smart) (20)

[Urban transportation policy program]city paper presentation sebrang perai
[Urban transportation policy program]city paper presentation sebrang perai[Urban transportation policy program]city paper presentation sebrang perai
[Urban transportation policy program]city paper presentation sebrang perai
 
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
 
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
 
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
 
MANIDEEPA BAIDYA DISSERTATION
MANIDEEPA BAIDYA DISSERTATIONMANIDEEPA BAIDYA DISSERTATION
MANIDEEPA BAIDYA DISSERTATION
 
Greater Jakarta Transport - on the way to transformation
Greater Jakarta Transport - on the way to transformationGreater Jakarta Transport - on the way to transformation
Greater Jakarta Transport - on the way to transformation
 
PROMOTING BICYCLE TRANSPORT ON SECONDARY ROADS
PROMOTING BICYCLE TRANSPORT ON SECONDARY ROADSPROMOTING BICYCLE TRANSPORT ON SECONDARY ROADS
PROMOTING BICYCLE TRANSPORT ON SECONDARY ROADS
 
Improvement of urban transport system
Improvement of urban transport systemImprovement of urban transport system
Improvement of urban transport system
 
"The Strategic Urban Development Plan and the Urban Transport Development Pla...
"The Strategic Urban Development Plan and the Urban Transport Development Pla..."The Strategic Urban Development Plan and the Urban Transport Development Pla...
"The Strategic Urban Development Plan and the Urban Transport Development Pla...
 
Smart City Traffic Management
Smart City Traffic ManagementSmart City Traffic Management
Smart City Traffic Management
 
Seoul public transportation
Seoul public transportation Seoul public transportation
Seoul public transportation
 
land transport master plan.pptx
land transport master plan.pptxland transport master plan.pptx
land transport master plan.pptx
 
Problem Identification of Traffic and Transport : Muzaffarpur City, Bihar
Problem Identification of Traffic and Transport : Muzaffarpur City, BiharProblem Identification of Traffic and Transport : Muzaffarpur City, Bihar
Problem Identification of Traffic and Transport : Muzaffarpur City, Bihar
 
Final presentation of sutainble kajang
Final presentation of sutainble kajangFinal presentation of sutainble kajang
Final presentation of sutainble kajang
 
Presentation of kajang futue development
Presentation of kajang futue developmentPresentation of kajang futue development
Presentation of kajang futue development
 
Final presentation of sutainble kajang
Final presentation of sutainble kajangFinal presentation of sutainble kajang
Final presentation of sutainble kajang
 
SOLVING CONGESTION AT 4 LEGGED FATAL INTERSECTION BASED ON PROPORTIONATE TRA...
 SOLVING CONGESTION AT 4 LEGGED FATAL INTERSECTION BASED ON PROPORTIONATE TRA... SOLVING CONGESTION AT 4 LEGGED FATAL INTERSECTION BASED ON PROPORTIONATE TRA...
SOLVING CONGESTION AT 4 LEGGED FATAL INTERSECTION BASED ON PROPORTIONATE TRA...
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPAD
 
Metro Mart Magazine- May 2013
Metro Mart Magazine- May 2013Metro Mart Magazine- May 2013
Metro Mart Magazine- May 2013
 
Project Report Modified222
Project Report Modified222Project Report Modified222
Project Report Modified222
 

Último

Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 

Último (20)

Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 

Surabaya mass rapid transportation (smart)

  • 1. PEMERINTAH KOTA SURABAYA TAHUN 2013 Surabaya Mass Rapid Transportation (SMART) Tram and Monorail Project
  • 3. SURABAYA CITY ON EAST JAVA REGIONAL NATIONAL AND GERBANGKERTOSUSILA (GKS) SCOPE Kawasan Perkotaan Inti Kota Surabaya Kawasan Perkotaan di Sekitarnya Kab. Gresik Kab. Bangkalan B C A Kab. Mojokerto Kota Mojokerto Kab. Sidoarjo Kab. Lamongan • East Java through GKS is a center of Eastern Indonesia (KTI) • Surabaya as the capital of East Java is becoming a core area of GKS • GKS total population in 2011 of 9.166.755 and 30,34% were in Surabaya
  • 4. 4 MEDAN SEMARANG YOGYAKARTA DENPASAR MATARAM KUPANG AMBON MAKASSAR KENDARI BIAK MANADOSINGAPURA KUALALUMPUR BALIKPAPAN SURABAYA TAIPEIHONGKONG JAKARTA BANDUNG SAUDI ARABIA JEDDAH SORONG BANDAR S.BEGAWAN BATAM PADANG BANJARMASIN TARAKAN PALANGKARAYA RUTE DOMESTIK RUTE INTERNASIONAL S u r a b a y a a s t h e g a t e o f E a s t J a v a Juanda Airport: 21 Airlines, 24.000 Passengers, 240 movements/day Tanjung Perak : 17 Shipping companies, 14.915 visits, 2.138 International arrival Railways : 24 Main Train Reguler Remote Jakarta – Surabaya
  • 5. TOTAL POPULATION P o p u l a t i o n a n d n u m b e r o f v e h i c l e i n S u r a b a y a C i t y Population growth leads to the growth of private vehicle users and the growth in the number of private vehicles is far above the population growth 2008 2009 2010 2011 Jumlah Penduduk 2,903,382 2,938,225 2,929,528 3,024,321 Jumlah Sepeda Motor 1,028,686 3,007,739 4,465,144 5,726,514 Jumlah Mobil 244,435 526,837 823,849 974,266 2,903,382 2,938,225 2,929,528 3,024,321 1,028,686 3,007,739 4,465,144 5,726,514 244,435 526,837 823,849 974,266 - 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 7,000,000 3.500.000 3.000.000 2.784.196 2.903.382 2.938.225 2.929.528 3.024.321 Grafik Jmlh Pertambahan Penduduk Surabaya 2007 - 2011 65-22% 1,1-3,3% 53-15%
  • 6. • Traffic congestion on various protocol roads in Surabaya is driven by the increasing number of vehicles • In 2012 there were additional 1,402,190 units of motorcycles, the number increased when compared to the year 2011 amounted to 1.27466 million Sumber: METROPOLIS-Around Surabaya, Jawa Pos, Sabtu 27 April 2013 Sumber: METROPOLIS, Jawa Pos, minggu 28 April 2013 T h e R e a l i t y i n S u r a b a y a C i t y
  • 7. D i s t r i b u t i o n o f P o p u l a t i o n a n d A c t i v i t y C e n t e r s ● An adequate public transport infrastructure is needed to support the mobility of community from their residential to workplace and activity centers. ● A distribution of activity centers encourages community mobility and it has potential as traffic generation and attraction. Terminal, Stasiun Pelabuhan Perdagangan jasa Fasum industri Pergudangan Distribution Location of Settlements Location of Activity Centers
  • 8. T r a n s p o r t S t r a t e g y i n S u r a b a y a S p a t i a l P l a n Development and construction of an integrated transport system through the development of mass transit to improve transportation services and control the use of private transport
  • 10. COMPARISON OF TOTAL VEHICLES IN EAST JAVA AND SURABAYA IN 2011 T o t a l V e h i c l e s i n S u r a b a y a • In 2011 total vehicle in East Java was 10.645.817 • Total vehicles in Surabaya was 6.700.780 or + 62% of vehicle in East Java • Total of the biggest East Java PKB came from Surabaya amounted to Rp. 967,1 Milyar  East : Rp. 328,2 M (33,93%)  North : Rp. 255,3 M (26,39%)  West : Rp. 212,1 M (21,93%)  South : Rp. 171,5 M (17,73%) 6,700,780 10,645,817 - 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000 12,000,000 Kota Surabaya Propinsi Jawa Timur Kota Surabaya Propinsi Jawa Timur Year Motorcycles Cars 2008 1.028.686 244.435 2009 3.007.739 526.837 2010 4.465.144 823.849 2011 5.726.514 974.266
  • 11. TYPE OF VEHICLE YEAR 2008 2009 2010 2011 HEAVY GOODS VEHICLES 154 361 397 547 MOTORCYCLES 1.028.686 3.007.739 4.465.144 5.726.514 TRUCK 135.308 205.885 226.474 280.388 BUS 776 6.690 8.944 11.698 PRIVATE CARS 244.435 526.837 823.849 974.266 TOTAL 1.409.360 3.747.512 5.524.808 6.993.413 CRITERIA YEAR 2008 2009 2010 2011 ROAD LENGTH (Km) 1.400 1.421,52 1.426,152 1.426,647 Table of total vehicle (based on type) year 2008 - 2011 Total Road Length (km) year 2008-2011 C o m p a r i s o n o f t h e n u m b e r o f P r i v a t e V e h i c l e a n d R o a d L e n g t h The growth of motorcycle that reaches more than 20% per year and the growth of private cars that excess 15% per year can not be balanced by the growth of network and road capacity
  • 12. Mayjen Sungkono HR Muhammad Kertajaya Panjang Jiwo 1,075 1,025 0,948 1,046 0,709 0,740 17.00-18.00 07.15-08.15 17.00-18.00 08.00-09.00 07.30-08.30 1,345 1,108 1,096 0,813 0,617 15.45-16.45 06.30-07.30 18.30-19.30 06.15-0715 06.30-07.30 16.45-17.45 0,574 16.00-17.00 0,702 0,669 06.45-0745 1,096 06.30-07.30 18.30-1930 0,625 17.15-18.15 V/C per direction B-T Time T-B Time Name of Roads Ahmad Yani 1,221 V/C per direction U-S Name of Roads Wonokromo Darmo (KBS-AL FALAH) Diponegoro Urip Sumoharjo Darmo 1,448 0,956 1,104 0,976 0,969 0,668 0,575 0,754 1,045 0,615 0,772 07.00-08.00 16.30-17.30 07.45-8.45 16.00-17.00 08.00-09.00 15.15-16.15 07.45-08.45 16.30-17.30 07.30-08.30 15.45-16.45 07.45-08.45 16.00-17.00 1,794 1,613 1,432 1,214 1,399 1,142 0,675 0,680 1,232 1,001 0,962 0,790 07.00-08.00 18.30-17.30 07.00-08.00 16.30-17.30 07.15-08.15 16.00-17.00 06.00-07.00 17.00-18.00 06.15-07.15 16.00-17.00 07.15-08.15 16.15-17.15 Time S-U Time Darmo - Urip Sumoharjo Basuki Rahmad Bundaran Satelit Viaduct Gubeng Wonokromo T r a f f i c S i t u a t i o n Density and VC Ration in several areas of Surabaya has already high
  • 13. Angguna 0.17% Bus Kota Besar 0.14% Bus Kota Sedang 0.03% Kend. Dinas 0.21% Lainnya 28.42% Mikrolet/Bemo 5.79% Mobil Pribadi 1.60% Sepeda Motor 50.95% Sepeda/Becak 12.56% Taxi Argo 0.11% Taxi Non Argo 0.03% Bekerja 24.52% Belanja 7.69% Bisnis 0.24% Kep. Sosial 0.40%Lainnya 3.09% Pulang 49.70% Sekolah/Kursu s 14.36% Industri/Pabrik 5.34% Lainnya 8.06% Pasar/Toko 12.39% Perkantoran 8.23% Rumah 49.81% Sawah/Tambak 0.12% Sekolah 15.87% Terminal 0.18% Industri/Pabrik 5.30% Lainnya 8.11% Pasar/Toko 12.31% Perkantoran 8.21% Rumah 50.05% Sawah/Tambak 0.13% Sekolah 15.73% Terminal 0.16% BASED ON MODE THAT IS USED BASED ON THE PURPOSE OF TRAVEL BASED ON THE ORIGIN OF TRAVEL BASED ON THE DESTINATION Sumber: Studi permodelan transportasi,Dishub Pemkot surabaya 2012) T r a v e l C h a r a c t e r i s t i c o f 2 0 1 2
  • 14. T r i p G e n e r a t i o n • Based on a Demand Study from Surabaya Transport Modeling Study shows that key passenger travel of pull areas are in the center of the city, with the addition of some suburban areas. • More than 50% of vehicle operating in Surabaya is motorcycle • It can be seen that North-South corridors have high demand.
  • 15. M i k r o l e t K e r e t a A p i B i s K o t a T a k s i A n g g u n a S i t u a t i o n o f P u b l i c T r a n s p o r t S e r v i c e s u m 1. Rail networks serve inter -city/ regency routes (regional) 2. There are many crossings 1. The certainty of departures 2. Headway 2-20 minutes 3. Operating speed < 15 km/ hour 1. The certainty of departures 2. Headway 10 – 60 minutes 3. Serves north-south routes, 4.Allowed to drop and take passenger not in a bus-stop 1. Quality of service 2.Serve all routes by request 3.Private operator (company) 1. Unscheduled 2.The number has decreased 3.Serve all routes by request 4.Mostly owned by individual B u s K o t a The interest in the use of public transport is low so that need quality improvement as one solution to overcome the problems of transportation and provide options for road users in performing their activities
  • 16. THE EFFORTS IN OVERCOMING TRANSPORT ISSUES
  • 17. PRIMARY ARTERY SECONDARY ARTERY PRIMARY COLLECTOR SECONDARY COLLECTORC TOLL ROAD OWRR (OUTER WEST RING ROAD) MWRR (MIDLE WEST RING ROAD) 12345 67 2 3 4 5 6 LAMONG PORT TJ.PERAK PORT JUANDA AIR PORT MWRR (MIDLE WEST RING ROAD) SURABAYA-GEMPOL TOL ROAD (EXISTING) SURABAYA- MOJOKERTO TOL ROAD (EXISTING) WARU JUANDA - TOL ROAD (EXISTING) MERR (MIDLE EAST RING ROAD) OERR (OUTER EAST RING ROAD) SURABAYA- GRESIK TOL ROAD (EXISTING) SURAMADU BRIDGE HIGHWAY ROAD FRONTAGE ROAD JL. AHMAD YANI + FRONTAGE ROAD (EXISTING) JL. KENJERAN(EXISTING) 1 M a i n r o a d n e t w o r k d e v e l o p m e n t
  • 18. I IIIII IV V VI VII •Length ± 26, 657 km •The function is to reduce the congestion on the North-South corridor Surabaya D i v i s i o n o f W e s t R i n g R o a d ( 2 0 1 2 - 2 0 1 5 ) Length of Inner West Ring Road along ± 13,91 km from Greges to jl. Mastrip Outer West Ring Road Center West Ring Road
  • 19.  Development Plan of Outer East Ring Road be done gradually (long-term) from the access of Suramadu Bridge to Gunung Anyar (Kali Perbatasan)- P0ndok Tjandra, with : 1. Total of Length Road= 16,542 Km 2. Width of the Road = 40 – 60 m D i v i s i o n o f E a s t R i n g R o a d MERR IIB MERR IIA MERR IIC SISI GUNUNG ANYAR • MERR IIA (1625 m) AND MERR IIB (2850 m) HAS BEEN CONSTRUCTED AND OPERATE • MERR IIC ROAD LENGTH= 6.250 M, ROW 40 M WITH TOTAL LAND OF 261.154 M2 • THE FOLLOWING EVENTS OF 2013-2014 ARE ON GUNUNG ANYAR SIDE Middle East Ring Road ( s/d 2014) Outer East Ring Road (2012 – 2017)
  • 20. Public transport development policy is geared to quickly implement an integrated mass transit (Simart / Surabaya Integrated Mass Rapid Transit) POLICY OF PUBLIC TRANSPORT DEVELOPMENT IN SURABAYA P u b l i c T r a n s p o r t S e r v i c e I m p r o v e m e n t
  • 21. I N T E G R A TON IMASS TRANSIT AKAP / AKDP BUS CITY BUS RAIL ANGKOT TRANSPORT PLAN Integrating inter-mode transport (land, sea, air) D e v e l o p m e n t o f a n I n t e g r a t e d M a s s T r a n s p o r t S y s t e m
  • 22. Sumber : Pra Studi Kelayakan AUMC Pemkot Sby (2012) T h e P l a n o f M o n o r a i l & T r a m T r a c k KETERANGAN : MONORAIL TRAM No Stasiun Hinterland US-1 Joyoboyo Trem Terminal Intermoda US-2 Bonbin Kebun Binatang, Masjid dan Sekolah US-3 Taman Bungkul Taman, Rumah Sakit US-4 Bintoro Sekolah US-5 Pandegiling Hotel, Perdagangan, Bank, Travel US-6 Panglima Sudirman Pasar Modern US-7 Kombepol M Duryat Toko Buku, Exhibition, Hotel, Pusat Kuline US-8 Tegalsari Pusat Kuliner, Pusat Perbelanjaan US-9 Embong Malang Pusat Perbelanjaan, Pasar Modern, Hote US-10 Kedungdoro Pusat Onderdil, Pusat Perhiasan, Hotel, Pusat K US-11 Pasar Blauran Pusat Perbelanjaan, Pusat sepatu, Pusat Kuliner, Pus US-12 Bubutan Pusat Mur Baut US-13 Pasar Turi Museum, Pasar Modern, Kantor Pemerinta US-14 Kemayoran Gedung DPRD, Masjid, Sekolah, Heritage US-15 Indrapura Kantor Pemerintah US-16 Rajawali Pusat Perbelanjaan US-17 Jembatan Merah Pusat Perbelanjaan, Heritage, Hotel, Pusat Perda US-18 Veteran Pusat Perkantoran US-19 Tugu Pahlawan Pusat Perkantoran US-20 Baliwerti Pusat Perdagangan US-21 Siola Pusat sepatu, Pusat Kuliner, Heritage US-22 Genteng Pusat Oleh-oleh US-23 Tunjungan Hotel, Perdagangan, Bank, Travel US-24 Gub. Suryo Sekolah, Gedung Kesenian US-25 Bambu Runcing Pusat Perkantoran US-26 Sonokembang Pusat Perkantoran Nomor Nama Stasiun BT-1 Kejawan Tr BT-2 Mulyosari Fe BT-3 ITS Se BT-4 GOR kertajaya indah Tr BT-5 Darmahusada Indah Timur Tr BT-6 Unair Kampus C Tr BT-7 Darmahusada Fe BT-8 RS Dr Sutomo Tr BT-9 Stasiun Gubeng Ke BT-10 Jl Raya Gubeng Fe BT-11 Irian Barat AM BT-12 Bung Tomo Tr BT-13 Ngagel BT-14 Wonokromo KA BT-15 Joyoboyo AM BT-16 Adityawarman Tr BT-17 Pakis Fe BT-18 Dukuh Kupang Fe BT-19 Bundaran Satelit Fe BT-20 HR Muhammad P+ BT-21 Simpang Darmo Permai Fe BT-22 Lontar Tr BT-23 Unesa Tr BT-24 Lidah Kulon Fe Tram (Utara Selatan) Joyoboyo – JMP ± 16,7 Km Monorail (Timur - Barat) Kejawan – Lidah kulon ± 23 Km Kejawan Joyoboyo JMP Lidah kulon
  • 23. 34.85 15.11 34.80 34.82 14.80 14.62 14.91 31.46 33.53 30.74 24.86 15.19 14.97 14.91 20.81 14.91 14.91 14.91 14.91 25.17 24.86 25.11 34.80 14.91 24.86 14.91 14.91 24.69 34.80 34.80 34.80 60.29 35.32 34.80 34.73 24.99 36.79 30.36 30.36 39.63 14.91 17.40 14.91 14.95 36.02 34.81 40.08 30.36 30.36 24.00 19.00 19.00 19.00 26.08 19.71 24.31 24.86 35.09 32.32 32.32 32.32 32.32 32.32 32.80 32.32 32.32 32.32 9.94 9.94 9.94 9.94 9.94 9.94 9.94 9.97 9.94 7.46 7.56 15.10 20.15 14.91 14.91 14.91 14.91 14.91 14.91 14.56 14.91 14.91 14.91 KECAMATAN WONOKROMO L a n d u s e i n M RT c o r r i d o r s MRT tracks connect the center of Sub City which is the center of growth and activities on local, regional, and national scale. PUSAT SUB KOTA PUSAT SUB KOTA PUSAT REGIONAL & CBDL PUSAT KOTA & CBD PUSAT CBD PUSAT CBD PUSAT CBD PUSAT CBD PUSAT CBD PUSAT CBD PUSAT SUB KOTA PUSAT CBD
  • 24. •There are many tracks of cultural heritage • It does not reduce the capacity of the road due to mixed traffic • Constrained due to the viaduct •The first stage starts from Joyoboyo to JMP , the next step is Tanjung Perak Development • Maximum distance between station : 0,75 km ; min : 0,40 km Use of Tram on North – South Track N o r t h – S o u t h T r a c k ( 1 6 , 7 0 K m )
  • 25. Jalur Timur - Use of Monorail on East – West Track : • Reducing conflict points by intersection making • Monorail capacity is greater than busway • It is easier in land acquisition due to elevated • A modern themed area • Starts from Kejawan Putih Tambak to Lidah Kulon • Maximum distance between station : 1,70 km ; min : 0,40 km Ciputra E a s t – W e s t T r a c k ( 2 3 , k m )
  • 26. VARIABEL MONORAIL TRAM CORRIDOR LENGTH 23 KM 16,7 KM DEPO LOCATION KENJERAN & JOYOBOYO JOYOBOYO TOTAL HALT 23 UNIT 29 UNIT DISTANCE BETWEEN HALT MINIMUM 500 - 2000 M MINIMUM 500 - 1000 M AVERAGE OF DEMAND/yr 43.717.742 27.936.900 *INVESTMENT (Rp) 8.505.801.575.302 1.260.218.638.027 CAPACITY /CIRCUIT 400 PNP 200 PNP TOTAL CIRCUIT 4 GERBONG 2 CARRIAGE ECONOMICAL FARE 37.000-40.000 8000- 10.000 PASSENGER CAPACITY SIT 177 ; STAND 238 200 PASSENGERS HEADWAY 10 MINUTES 10 MINUTES WILLINGNESS TO PAY (WTP) 6000-10.000 6000-10.000 SUBSIDY/PASSENGER 27.500-30000 2000-4000 NEED OF FLEET 18 unit (4 modules) 21 unit (5 modules with 30,8 m length) T h e P l a n o f M o n o r a i l & Tr a m M o d e *Investment cost include : construction of station; trajectory and construction; halt; JPO; socializing cost; design cost; studies and supervision; fleet; depo
  • 27. Jl. Pasar keputran Jl. HR. Muhammad Jl. Bukit Darmo Boulevard Jl. HR. Muhammad M o n o r a i l V i s u a l i z a t i o n
  • 28. Jl.Basuki Rahmad Jl. Tunjungan Jl. Embong Malang Jl. Pahlawan T r a m T r a c k V i s u a l i z a t i o n
  • 29. INTEGRATION OF SURABAYA MRT WITH REGIONAL RAIL & FEEDER
  • 30. RAIL NETWORK DEVELOPMENT PLAN IN GERBANGKERTOSUSILA AREA
  • 31. M R T I n t e g r a t i o n & R a i l T r a c k D e v e l o p m e n t P l a n Pelabuhan Teluk Lamong Rencana Pengembangan. Jalur Rel Angkutan Massal Cepat Tahap 1 Double track Gubeng Juanda & Mojokerto Tahap 2 Double track Pasar Turi -Bojonegoro Tahap 3 Kearah Gresik dan Lamongan (existing) Tahap 4 Rencana Akses kearah Teluk Lamong Bandara Juanda SIDOARJO Mojokerto Sta Waru –T. Purabaya Sta. Wonokromo Sta. Gubeng Gresik Babat - Lamongan MRT tracks are integrated with network development plan of Railways with integration points of mode transfer in Wonokromo and Gubeng Station
  • 32. Sumber : Rencana Sistem Angkutan Umum Dishub Pemkot Sby (2012) 1.The operation of Mass Rapid Transit will change the whole pattern of public transport routes in Surabaya City 2.MRT requires feeder which is able to support them. 3.Urban transport will connects MRT corridors with many areas and pulic facilities in Surabaya City. 1 2 3 P u b l i i c T r a n s p o r t D e v e l o p m e n t P l a n
  • 33. Rute Trunk (14 trayek)Rute AMC (2 Koridor) Rute Feeder (34 trayek) T. Benowo T. Balongsari T. Manukan T. Dkh Kupang T. Dkh Menanggal T. Bratang T. Keputih T.Kenjeran T.Tambak Wedi T.Petekan I n t e g r a t i o n P l a n b e t w e e n M R T a n d f e e d e r
  • 35. Surotram dan Boyorail are fast, comfortable, and cultured transport which capable to be the best solution to overcome negative impacts of transport issues in Surabaya City.  Surotram logo represents shark (suro)  Boyorail logo represents crocodile (boyo)  Orange means passenger familiarity and comfortable transport  Green has chosen for Boyorail as supporting the concept of Go Green B r a n d i n g S t r a t e g y R u t e It is one of ways to introduce and improve the image of Surabaya. It can be a marketing way to wider society.
  • 36. B r a n d i n g S t r a t e g y
  • 37. PARK & RIDE, TERMINAL, HALT AND DEPO FACLITIES
  • 38. 2 51 32 4 79 1011 121314 15 5 1 12 3 PLAN OF PARK AND RIDE LOCATION ALTERNATIVE  SENTRA BULAK (DEPO)  KANTOR DINAS PARIWISATA (PARK & RIDE)  PASAR TUNJUNGAN (PARK & RIDE)  TERMINAL JOYOBOYO (TERMINAL)  TVRI (PARK & RIDE)  PASAR KEPUTRAN (TERMINAL INTEGRASI MODA)  AHMAD YANI (EX IGLAS) (PARK AND RIDE)  Jl. HR MUHAMMAD L o c a t i o n P l a n o f P a r k & R i d e
  • 39. Jl Kertajaya (samping UPTSA) Pasar Tunjungan Pasar Tunjungan V i s u a l i z a t i o n o f P a r k & R i d e L o c a t i o n P l a n
  • 40. PASAR KEPUTRAN JL. BASUKI RAHMAD (PATUNG KARAPAN SAPI) JOYOBOYO JL. AHMAD YANI (EX IGLAS) V i s u a l i z a t i o n o f P a r k & R i d e L o c a t i o n P l a n
  • 41. Movement (transfer) integration between Monorail and Tram in Jl. Basuki Rahmad and Pasar Keputran I n t e g r a t i o n C o n c e p t b e t w e e n M o n o r a i l a n d T r a m
  • 42. S t a t i o n & H a l t D e s i g n C o n c e p t
  • 43. Kebun Binatang Surabaya Jalur Tram Jalur Monorail TERMINAL JOYOBOYO M R T M o n o r a i l a n d T r a m I n t e r m o d e T e r m i n a l
  • 45. • GRADUALLY IMPLEMENTED • IT IS PLANNED TO DEVELOP ITS IN 55 INTERSECTIONS IN STRATEGIC AREAS • TO IMPROVE TRAFFIC MANAGEMENT SYSTEM IN SURABAYA INTELLIGENT TRANSPORTATION SYSTEM – ATCS DEVELOPMENT 45 NO LOKASI ZONA 1 JL. DIPONEGORO-JL. RAYA DARMO BARAT-SELATAN 2 JL. CILIWUNG - JL. DIPONEGORO BARAT-SELATAN 3 JL. KUTAI - JL. DIPONEGORO BARAT-SELATAN 4 JL. MUSI - JL. DIPONEGORO BARAT-SELATAN 5 JL. Dr. SOETOMO - JL. DIPONEGORO BARAT-SELATAN 6 JL. KARTINI - JL. DIPONEGORO BARAT-SELATAN 7 JL. PASAR KEMBANG - JL. DIPONEGORO BARAT-SELATAN 8 JL. KEDUNGDORO - JL. KEDUNGSARI UTARA-PUSAT 9 JL. EMBONG MALANG - JL. KEDUNGDORO UTARA-PUSAT 10 JL. PRABAN - JL. BLAURAN UTARA-PUSAT 11 JL. TEMBAAN - JL. BUBUTAN UTARA-PUSAT 12 JL. PAHLAWAN - JL. TEMBAAN UTARA-PUSAT 13 JL. KEBONROJO - JL. VETERAN UTARA-PUSAT 14 JL. PRABAN - JL. TUNJUNGAN UTARA-PUSAT 15 JL. RAYA DARMO - JL. Dr. SOETOMO UTARA-PUSAT NO PANJANG 01-02 413 METER 02-03 253 METER 03-04 450 METER 04-05 225 METER 05-06 856 METER 06-07 425 METER 07 - 08 1.958,5METER 08 - 09 544,5 METER 09 - 10 3.105 METER 10 - 11 1.127 METER 11 - 12 205,5 METER 12 - 13 433,5 METER 13 - 14 1.410,5METER 14 - 15 3.360 METER I n t e l l e g e n t T r a n s p o r t a t i o n s y s t e m ( I T S )
  • 46. I T S & T r a f f i c M a n a g e m e n t S y s t e m ITS development as traffic management system that integrated to control the use of private vehicle in particular areas to drive community’s interest in the use of MRT
  • 47. I T S & T r a f f i c M a n a g e m e n t S y s t e m On street parking limitation with intensive supervision and parking facility construction ( off street parking) and parking area (building)
  • 48. BICYCLE TRACK PROVISION 5 4 3 2 1 Tahap I + 8,86 km Provision of bicycle track to promote the use of bicycle as mode of transportation that environmentally friendly, because of that matter MRT should provide some spaces for cyclist.
  • 49. FACILITY CONSTRUCTION FOR PEDESTRIAN NO LOKASI PEDESTRIAN TERBANGUN 1 JL. RAYA DARMO 2 JL. SONOKEMBANG 3 JL. KAYOON 4 JL. KEPUTRAN 5 JL. URIP SUMOHARJO 6 JL. PANGLIMA SUDIRMAN 7 JL. BASUKI RAHMAD 8 JL. WALIKOTA MUSTAJAB 9 JL. PEMUDA 10 JL. RAJAWALI 11 JL. VETERAN 12 JL. GEMBLONGAN 13 JL. DHARMAWANGSA 14 JL. PROF. MAYJEN MOESTOPO 15 JL. AIRLANGGA 16 JL. STASIUN GUBENG 17 TAMAN LANSIA 18 JL. RAYA GUBENG 19 TAMAN PERSAHABATAN 20 JL. GENTENG KALI 21 FRONTAGE ROAD A. YANI 22 TAMAN MUNDU Pedestrian construction to support MRT and to improve the safety and comfort of pedestrians
  • 50. Thank You A convenience of living in town is the right of every citizen, MRT development is an effort to realize that.