Theory of Constraints
 Theory of Constraints is a method to identify
bottlenecks or other constraints and exploit them to
the extent possible.
 Identification of constraints allows management to take
action to alleviate the constraint in the future
 Reduce cycle time
 Time from receipt of customer order to shipment
 Improve manufacturing cycle efficiency (MCE)
 Processing time / total cycle time
 Goldratt contends that systems are analogous to chains, or
networks of chains. Like a chain, the system performance is
limited by the weakest link.
 This means that no matter how much effort you put into
improving the processes of a system, only the improvements
to the weakest link will produce any detectable system
improvement.
 Throughput is limited by the weakest link... the constraint!
Theory of Constraints
Identification and
Management of Bottlenecks
 A Bottleneck is the process or step which has
the lowest capacity and longest throughput.
 Throughput Time is the total time from the
start to the finish of a process.
 Bottlenecks can be internal or external to a
firm.
Significance of bottlenecks
 Maximum speed of the process is the speed of the
slowest operation
 Any improvements will be wasted unless the bottleneck
is relieved
 Bottlenecks must be identified and improved if the process is
to be improved
6
Where is the Bottleneck?
It takes 10 + 20 + max (15, 12) + 5 + 10 = 60 minutes to complete a loan application.
Unless more resources are added at step B, the bank will be able to complete only 3 loan
accounts per hour, or 15 new load accounts in a five-hour day.
1. Check loan
documents and
put them in
order
(10 minutes)
2.
Categorize
loans
(20
minutes)
3. Check for
credit rating
(15 minutes)
6. Complete
paperwork for
new loan
(10 minutes)
4. Enter loan
application data
into the system
(12 minutes)
Customer
5. Is
loan
approved?
(5 min)
Yes
No
Bottleneck
Measurement for TOC
 Throughput
 Inventory
 Operating expense
What is Throughput
 The rate at which the system generates money through
sales minus raw materials and purchased parts.
All the money received from customers minus raw
materials cost.
The rate at which the system makes money(sales
minus totally variable costs). Direct labor should not
be deducted in calculating Throughput.
Sales are only recognized when money is available to
the firm, i.e., production for inventory is not a part of
throughput.
What is Inventory
 All the money that system has invested in purchasing
things which it intends to sell
Some insights
 Inventory is liability not an asset
 Raw materials and finished good are inventory
 Machines and fixtures are inventory
 Scrap material is inventory
What is Operating Cost
 All the money the system spends in order to turn
inventory into throughput
All employee time is operating expense
Depreciation of a machine is a operating expense.
Scrap material thrown away.
All expenses not deducted in arriving at throughput.
This includes direct labor and all operating and
maintenance expenses
Drum
Buffer
Rope
Five
Focusing
Steps
Critical
Chain
Thinking
Processes
Theory of Constraints Covers Many Things
Five Focusing Steps
1. Identify the Constraint
2. Exploit the Constraint
3. Subordinate everything
to the Constraint
4. Elevate the Constraint
5. Repeat for the new
Constraint
Theory of Constraints - FIVE FOCUSING STEPS
(Which will Strengthen the Chain)
Step 1: Identify the system’s constraint(s).
 What is the Goal?
 What is Throughput?
 What is Inventory?
 What is Operating Expense?
15
1. Identify the System's constraints.
The process is analyzed so that a task or activity that limits the productivity of
an entire system can be identified. A system constraint may be identified by a
long queue of work or long processing times.
Step 2: Decide how to exploit the system’s constraint(s).
 What is the constraint?
 How do we get as much throughput as possible?
16
2. Decide how to exploit the system's constraints.
In this step, decisions must be made on how to modify or redesign the task or
activity so that work can be performed more effectively and efficiently.
Step 3: Subordinate everything else to the decisions of Step 2
 Throughput?
 Inventory?
 Operating Expense?
17
3. Subordinate everything else to the above decision. (step 2)
Now, management directs all its efforts to improving the performance of the
constraining task or activity and any other task or activity and any other task or
activity that directly affects the constraining task or activity.
Step 4: Elevate the system’s constraint(s).
 Throughput?
 Inventory?
 Operating Expense?
18
4. Elevate the system's constraint.
In this step, additional capacity is obtained that will increase (elevate) the overall
output of the constraining task or activity. This differs from step 2 in that the added
output comes from additional purchased capacity, such as buying a second machine
tool or implementing a new information technology.
Step 5: If a constraint is broken in Step 4, go back to Step 1.
 What might happen if the constraint is elevated?
19
5. If, in the previous step, a constraint has been broken, go back to step 1 but do not
allow inertia to cause a new constraint
This sets up a process of ongoing improvement. As a result of the focusing process,
the improvement of the original constraining task or activity may cause a different
task to become a constraining task or activity. Inertia could blind management
from taking steps to improve the system's output now limited by a new
constraint.(1)
THE THINKING PROCESSES (TP) OF TOC
 Tools that enable us to use logic to gain an
understanding of our reality and then to find ways of
improving it.
 BASIC CONSTRUCTS OF THE TOC TP:-
 Causality: “If…then…”
 Necessity: “In order to…I must…”
EXAMPLE OF CAUSALITY
 “IF…THEN…”
I get
burned.
I touch a
hot stove.
I don't get
burned
I touch a
hot stove
I am
wearing an
oven mitt.
EXAMPLE OF NECESSITY
 “In order to…I must…”
Avoid getting
burned.
Do not touch a
hot stove.
Touching a hot stove will
burn me.
CASE STUDY
Applying TOC at the Marine Corps Maintenance Center
The Marine Corps –
Maintenance Center
Intro:
 Responsible for the regeneration & reconstitution of
equipment
 Complex maintenance operations
 Repairs & overhauls of obsolete equipments
Needs:
 Increasing backlog
 Production not able to meet demands
Identifying Constraints
Managing Production
Results
29
Conclusion
 Advantages
 Improves capacity decisions in the short-run
 Avoids build up of inventory
 Aids in process understanding
 Avoids local optimization
 Improves communication between departments
 Disadvantages
 Negative impact on non-constrained areas
 Diverts attention from other areas that may be the next constraint
 Temptation to reduce capacity
 Ignores long-run considerations
 Introduction of new products
 Continuous improvement in non-constrained areas
 May lead organization away from strategy
 Not a substitute for other accounting methods
THANK YOU

Más contenido relacionado

La actualidad más candente

Implementing the Theory of Constraints (TOC) In Production
Implementing the Theory of Constraints (TOC) In ProductionImplementing the Theory of Constraints (TOC) In Production
Implementing the Theory of Constraints (TOC) In Production
Sai Praveen Chettupalli
 
Theory Of Constraints
Theory Of ConstraintsTheory Of Constraints
Theory Of Constraints
shawncarner
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
Sumon Kumar Kundu
 

La actualidad más candente (20)

Theory of Constraint
Theory of ConstraintTheory of Constraint
Theory of Constraint
 
Implementing the Theory of Constraints (TOC) In Production
Implementing the Theory of Constraints (TOC) In ProductionImplementing the Theory of Constraints (TOC) In Production
Implementing the Theory of Constraints (TOC) In Production
 
Theory of constraints and its types
Theory of constraints and its typesTheory of constraints and its types
Theory of constraints and its types
 
Theory Of Constraints
Theory Of ConstraintsTheory Of Constraints
Theory Of Constraints
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Theory of Constraints TOC in Project Management
Theory of Constraints TOC in Project ManagementTheory of Constraints TOC in Project Management
Theory of Constraints TOC in Project Management
 
Bottleneck Analysis Theory Of Constraints (TOC)
Bottleneck Analysis Theory Of Constraints (TOC)Bottleneck Analysis Theory Of Constraints (TOC)
Bottleneck Analysis Theory Of Constraints (TOC)
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Jit
JitJit
Jit
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 

Similar a Theory of Constraints

Theory Of Constraints 2
Theory Of Constraints  2Theory Of Constraints  2
Theory Of Constraints 2
MOHD ARISH
 
A p r i l 2 0 0 5 I S T R AT E G I C F I N A N C E 5 1A.docx
A p r i l  2 0 0 5 I S T R AT E G I C  F I N A N C E 5 1A.docxA p r i l  2 0 0 5 I S T R AT E G I C  F I N A N C E 5 1A.docx
A p r i l 2 0 0 5 I S T R AT E G I C F I N A N C E 5 1A.docx
ransayo
 
Lean Smpl 1
Lean Smpl 1Lean Smpl 1
Lean Smpl 1
jsgerges
 
Session 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraintsSession 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraints
ritukaushikmba25
 

Similar a Theory of Constraints (20)

Theory of constraints(toc) & its application in a manufacturing firm
Theory of constraints(toc) & its application in a manufacturing firmTheory of constraints(toc) & its application in a manufacturing firm
Theory of constraints(toc) & its application in a manufacturing firm
 
Theory Of Constraints 2
Theory Of Constraints  2Theory Of Constraints  2
Theory Of Constraints 2
 
customer relation management presentation roadmap what is known and
customer relation management presentation roadmap  what is known andcustomer relation management presentation roadmap  what is known and
customer relation management presentation roadmap what is known and
 
A p r i l 2 0 0 5 I S T R AT E G I C F I N A N C E 5 1A.docx
A p r i l  2 0 0 5 I S T R AT E G I C  F I N A N C E 5 1A.docxA p r i l  2 0 0 5 I S T R AT E G I C  F I N A N C E 5 1A.docx
A p r i l 2 0 0 5 I S T R AT E G I C F I N A N C E 5 1A.docx
 
Lean Smpl 1
Lean Smpl 1Lean Smpl 1
Lean Smpl 1
 
Session 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraintsSession 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraints
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the following
 
Which of the following approaches to service design
Which of the following approaches to service designWhich of the following approaches to service design
Which of the following approaches to service design
 
Which of the following basic types of production layout
Which of the following basic types of production layoutWhich of the following basic types of production layout
Which of the following basic types of production layout
 
mehmet tanlak - 2
mehmet tanlak - 2mehmet tanlak - 2
mehmet tanlak - 2
 
A company has actual unit demand for three consecutive years
A company has actual unit demand for three consecutive yearsA company has actual unit demand for three consecutive years
A company has actual unit demand for three consecutive years
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)
 
A company must perform a maintenance project consisting
A company must perform a maintenance project consistingA company must perform a maintenance project consisting
A company must perform a maintenance project consisting
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the following
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the following
 
Which of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecastingWhich of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecasting
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)
 

Más de Ishan Parekh

Más de Ishan Parekh (20)

Internship Presentation - Scarecrow Communications
Internship Presentation - Scarecrow CommunicationsInternship Presentation - Scarecrow Communications
Internship Presentation - Scarecrow Communications
 
Consumer Driven Marketing - Online Marketing
Consumer Driven Marketing - Online MarketingConsumer Driven Marketing - Online Marketing
Consumer Driven Marketing - Online Marketing
 
New Product Development - Automative Industry & Nanotechnology
New Product Development - Automative Industry & NanotechnologyNew Product Development - Automative Industry & Nanotechnology
New Product Development - Automative Industry & Nanotechnology
 
Business Newspapers in India
Business Newspapers in IndiaBusiness Newspapers in India
Business Newspapers in India
 
Leadership in Organizations - Amul (Case Study)
Leadership in Organizations - Amul (Case Study)Leadership in Organizations - Amul (Case Study)
Leadership in Organizations - Amul (Case Study)
 
Project Communications Management - Information Technology
Project Communications Management - Information TechnologyProject Communications Management - Information Technology
Project Communications Management - Information Technology
 
Services Marketing - Cinemax (Case Study)
Services Marketing - Cinemax (Case Study)Services Marketing - Cinemax (Case Study)
Services Marketing - Cinemax (Case Study)
 
The Osborne Effect - A Case of Nokia (Research Paper)
The Osborne Effect - A Case of Nokia (Research Paper)The Osborne Effect - A Case of Nokia (Research Paper)
The Osborne Effect - A Case of Nokia (Research Paper)
 
Integrated Marketing Communications - Marvel Studios
Integrated Marketing Communications - Marvel StudiosIntegrated Marketing Communications - Marvel Studios
Integrated Marketing Communications - Marvel Studios
 
Entrepreneurship Management - Adventure Training Center
Entrepreneurship Management - Adventure Training CenterEntrepreneurship Management - Adventure Training Center
Entrepreneurship Management - Adventure Training Center
 
Energy Management - Biomass Based Cogeneration
Energy Management - Biomass Based CogenerationEnergy Management - Biomass Based Cogeneration
Energy Management - Biomass Based Cogeneration
 
Business Models in a Digital Economy - On Demand Webinars
Business Models in a Digital Economy - On Demand WebinarsBusiness Models in a Digital Economy - On Demand Webinars
Business Models in a Digital Economy - On Demand Webinars
 
Brand Management - Walt Disney (Case Study)
Brand Management - Walt Disney (Case Study)Brand Management - Walt Disney (Case Study)
Brand Management - Walt Disney (Case Study)
 
Internship Presentation - Larsen & Toubro
Internship Presentation - Larsen & ToubroInternship Presentation - Larsen & Toubro
Internship Presentation - Larsen & Toubro
 
Internship Presentation - Vitruvian Technologies
Internship Presentation - Vitruvian TechnologiesInternship Presentation - Vitruvian Technologies
Internship Presentation - Vitruvian Technologies
 
Study of the Nokia - Microsoft Deal (Research Project)
Study of the Nokia - Microsoft Deal (Research Project)Study of the Nokia - Microsoft Deal (Research Project)
Study of the Nokia - Microsoft Deal (Research Project)
 
Management of Technology - Service Industry
Management of Technology - Service IndustryManagement of Technology - Service Industry
Management of Technology - Service Industry
 
Intellectual Property Management - Case Study (Dummy Project)
Intellectual Property Management - Case Study (Dummy Project)Intellectual Property Management - Case Study (Dummy Project)
Intellectual Property Management - Case Study (Dummy Project)
 
Industrial Marketing - Telecommunications / Telecom Sector
Industrial Marketing - Telecommunications / Telecom SectorIndustrial Marketing - Telecommunications / Telecom Sector
Industrial Marketing - Telecommunications / Telecom Sector
 
ERP - Automative Industry
ERP - Automative IndustryERP - Automative Industry
ERP - Automative Industry
 

Último

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Último (20)

BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 

Theory of Constraints

  • 1. 1 Presented By:- Chirag Chauhan #303 Ishan Parekh #315 Ankit Shah #317
  • 2. 2 Theory of Constraints  Theory of Constraints is a method to identify bottlenecks or other constraints and exploit them to the extent possible.  Identification of constraints allows management to take action to alleviate the constraint in the future  Reduce cycle time  Time from receipt of customer order to shipment  Improve manufacturing cycle efficiency (MCE)  Processing time / total cycle time
  • 3.  Goldratt contends that systems are analogous to chains, or networks of chains. Like a chain, the system performance is limited by the weakest link.  This means that no matter how much effort you put into improving the processes of a system, only the improvements to the weakest link will produce any detectable system improvement.  Throughput is limited by the weakest link... the constraint! Theory of Constraints
  • 4.
  • 5. Identification and Management of Bottlenecks  A Bottleneck is the process or step which has the lowest capacity and longest throughput.  Throughput Time is the total time from the start to the finish of a process.  Bottlenecks can be internal or external to a firm.
  • 6. Significance of bottlenecks  Maximum speed of the process is the speed of the slowest operation  Any improvements will be wasted unless the bottleneck is relieved  Bottlenecks must be identified and improved if the process is to be improved 6
  • 7. Where is the Bottleneck? It takes 10 + 20 + max (15, 12) + 5 + 10 = 60 minutes to complete a loan application. Unless more resources are added at step B, the bank will be able to complete only 3 loan accounts per hour, or 15 new load accounts in a five-hour day. 1. Check loan documents and put them in order (10 minutes) 2. Categorize loans (20 minutes) 3. Check for credit rating (15 minutes) 6. Complete paperwork for new loan (10 minutes) 4. Enter loan application data into the system (12 minutes) Customer 5. Is loan approved? (5 min) Yes No Bottleneck
  • 8. Measurement for TOC  Throughput  Inventory  Operating expense
  • 9. What is Throughput  The rate at which the system generates money through sales minus raw materials and purchased parts. All the money received from customers minus raw materials cost. The rate at which the system makes money(sales minus totally variable costs). Direct labor should not be deducted in calculating Throughput. Sales are only recognized when money is available to the firm, i.e., production for inventory is not a part of throughput.
  • 10. What is Inventory  All the money that system has invested in purchasing things which it intends to sell Some insights  Inventory is liability not an asset  Raw materials and finished good are inventory  Machines and fixtures are inventory  Scrap material is inventory
  • 11. What is Operating Cost  All the money the system spends in order to turn inventory into throughput All employee time is operating expense Depreciation of a machine is a operating expense. Scrap material thrown away. All expenses not deducted in arriving at throughput. This includes direct labor and all operating and maintenance expenses
  • 14. 1. Identify the Constraint 2. Exploit the Constraint 3. Subordinate everything to the Constraint 4. Elevate the Constraint 5. Repeat for the new Constraint Theory of Constraints - FIVE FOCUSING STEPS (Which will Strengthen the Chain)
  • 15. Step 1: Identify the system’s constraint(s).  What is the Goal?  What is Throughput?  What is Inventory?  What is Operating Expense? 15 1. Identify the System's constraints. The process is analyzed so that a task or activity that limits the productivity of an entire system can be identified. A system constraint may be identified by a long queue of work or long processing times.
  • 16. Step 2: Decide how to exploit the system’s constraint(s).  What is the constraint?  How do we get as much throughput as possible? 16 2. Decide how to exploit the system's constraints. In this step, decisions must be made on how to modify or redesign the task or activity so that work can be performed more effectively and efficiently.
  • 17. Step 3: Subordinate everything else to the decisions of Step 2  Throughput?  Inventory?  Operating Expense? 17 3. Subordinate everything else to the above decision. (step 2) Now, management directs all its efforts to improving the performance of the constraining task or activity and any other task or activity and any other task or activity that directly affects the constraining task or activity.
  • 18. Step 4: Elevate the system’s constraint(s).  Throughput?  Inventory?  Operating Expense? 18 4. Elevate the system's constraint. In this step, additional capacity is obtained that will increase (elevate) the overall output of the constraining task or activity. This differs from step 2 in that the added output comes from additional purchased capacity, such as buying a second machine tool or implementing a new information technology.
  • 19. Step 5: If a constraint is broken in Step 4, go back to Step 1.  What might happen if the constraint is elevated? 19 5. If, in the previous step, a constraint has been broken, go back to step 1 but do not allow inertia to cause a new constraint This sets up a process of ongoing improvement. As a result of the focusing process, the improvement of the original constraining task or activity may cause a different task to become a constraining task or activity. Inertia could blind management from taking steps to improve the system's output now limited by a new constraint.(1)
  • 20. THE THINKING PROCESSES (TP) OF TOC  Tools that enable us to use logic to gain an understanding of our reality and then to find ways of improving it.  BASIC CONSTRUCTS OF THE TOC TP:-  Causality: “If…then…”  Necessity: “In order to…I must…”
  • 21. EXAMPLE OF CAUSALITY  “IF…THEN…” I get burned. I touch a hot stove. I don't get burned I touch a hot stove I am wearing an oven mitt.
  • 22. EXAMPLE OF NECESSITY  “In order to…I must…” Avoid getting burned. Do not touch a hot stove. Touching a hot stove will burn me.
  • 24. Applying TOC at the Marine Corps Maintenance Center
  • 25. The Marine Corps – Maintenance Center Intro:  Responsible for the regeneration & reconstitution of equipment  Complex maintenance operations  Repairs & overhauls of obsolete equipments Needs:  Increasing backlog  Production not able to meet demands
  • 29. 29 Conclusion  Advantages  Improves capacity decisions in the short-run  Avoids build up of inventory  Aids in process understanding  Avoids local optimization  Improves communication between departments  Disadvantages  Negative impact on non-constrained areas  Diverts attention from other areas that may be the next constraint  Temptation to reduce capacity  Ignores long-run considerations  Introduction of new products  Continuous improvement in non-constrained areas  May lead organization away from strategy  Not a substitute for other accounting methods