What Is Six Sigma?
A method that provides organizations tools to improve the capability of their business
processes. This increase in performance and decrease in process variation lead to defect
reduction and improvement in profits, employee morale, and quality of products or services. Six
Sigma quality is a term generally used to indicate a process is well controlled (within process
limits ±3s from the center line in a control chart, and requirements/tolerance limits ±6s from
the center line).
Examples of Successful Lean Six Sigma Projects at Local Organizations Completed by
Participants from our Training Program:
 Reducing the cycle time to manufacture solar cells in a research laboratory
 Reducing defects in the manufacturing process for natural gas dehydrators
 Reducing the number of weld repairs in pipeline construction projects
 Reducing IT systemdowntime for an accounting firm
 Reducing Medicare billing rejections for a home healthcare organization
 Reducing waste in the isometrics drawing production process for an engineering design
firm
 Reducing the risk of IT security threats for a pipeline control system
 Reducing the environmental impact of batch chemical processes
 Improving consistency of scoring for an annual staff performance appraisal process in
order to reduce the perception of unfairness and favoritism associated with this process
Finding and Selecting Good Six Sigma Projects
External Defects
 Anything you have recently been audited or formally rejected for
 Anything you haven’t been audited or rejected for, but you know is out of specification
or not meeting regulations
 Anything you inspect and/or contain to protect the customer
 Anything you cover for by having a guy in the customer’s plant, etc.
Internal Defects
 Any scrap issues, parts, or materials
 Anything you rework/recycle in house – you should keep accurate track of rework by
defect
 Anything you have a poka yoke for – you should know how often the poka-yoke is
catching something and then try to figure out how to prevent it rather than catch it
Efficiency/Capacity Issues
 Anywhere you make less parts than expected
 Anytime you are currently working non-customer driven overtime
 Any process where you are running slower than expected cycle
 Any process or machine with downtime
Any process with premium freight costs
Any process that has added labor to make the required cycle Other Plant Cost Drivers or
Measurables
Any cost driver with a negative variance may point to a project
Any plant metric that is important and runs at an unacceptable level or with large amounts of
variation is a good indicator for a project
Less Obvious Areas for Improvement
Material Utilization
Any part which uses more than the standard amount of material
Any part in which the amount of material used varies – reduce the variation and shift usage to
the lowest limit
Understanding Process Variation
How much variation is there in your incoming materials and/or process parameters and how
does this affect your output?
Where do you need the input controlled to always have a good output?
Can you scientifically adjust your process to compensate for changing material, weather, etc.?
Can your Black Belt help your supplier do a project to control the incoming product where you
need it?
Does understanding your inputs allow you to produce a good part using less material?
Maintenance
For high failure rate or high replacement cost items, what causes the failure?
Can you reduce the failure rate by understanding and controlling the process?
Study how to predict failures so replacements can be made during scheduled, rather than
unscheduled, downtime.
Efficiency/Capacity Issues
Learn how to speed up or slow down your cycle time by changing your process inputs.
Use this knowledge to produce customer overtime parts on straight time, or to do scheduled
preventive maintenance during the week on straight time.
General Guidelines for Project Selection
Any project should have identifiable process inputs and outputs.
A good Six Sigma project should never have a pre-determined solution.
If you already know the answer, then just go fix it!
For projects that have operator or operator training as an input, focus on ways to reduce
operator variation, therefore making your process more robust to different or untrained
operators.
All projects need to be approached from the perspective of understanding the variation in
process inputs, controlling them, and eliminating the defects.
Example #1
Problem: We are experiencing slow cycle time at Station 30 because we are getting bad parts
from Station 20 and have to rework them.
Non-Six Sigma Solution: Rebalance the line in order to do the rework and keep your cycle time
below specifications while not spending extra labor cost.
Six Sigma Solution: Investigate and control key inputs that contribute to making a bad part
production at Station 20.
Example #2
Problem: We have had two quality related issues reported this year for missing armrest screws.
Non-Six Sigma Solution: Add sensors to detect screws further down the line. If screws are
missing, operator manually fixes.
Six Sigma Solution: Determine process inputs causing missing screws. For example, auto gun
does not always feed correctly due to air pressure variation. Either study range required for 100
percent operation and control in that range, or find way to make gun more robust to range of
variation experienced.
balanced scorecard – definition
What exactly is a Balanced Scorecard? A definition often quoted is: 'A strategic planning and
management system used to align business activities to the vision statement of an
organization'. More cynically, and in some cases realistically, a Balanced Scorecard attempts to
translate the sometimes vague, pious hopes of a company's vision/mission statement into the
practicalities of managing the business better at every level.
A Balanced Scorecard approach is to take a holistic view of an organization and co-ordinate
MDIs so that efficiencies are experienced by all departments and in a joined-up fashion.
To embark on the Balanced Scorecard path an organization first must know (and understand)
the following:
 The company's mission statement
 The company's strategic plan/vision
Then
 The financial status of the organization
 How the organization is currently structured and operating
 The level of expertise of their employees

Más contenido relacionado

La actualidad más candente

Where Does The Time Go?
Where Does The Time Go?Where Does The Time Go?
Where Does The Time Go?gstevick1980
 
Case Studies2
Case Studies2Case Studies2
Case Studies2dtrumpy
 
TPM&Kaizen(Junu)
TPM&Kaizen(Junu)TPM&Kaizen(Junu)
TPM&Kaizen(Junu)pjunwoo365
 
Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)Anand Subramaniam
 
Six sigma presentation for masters students
Six sigma presentation for masters studentsSix sigma presentation for masters students
Six sigma presentation for masters studentsTapanNeogi
 
Continuous process improvement (4)
Continuous process improvement (4)Continuous process improvement (4)
Continuous process improvement (4)083805154
 
5 s presentation-converted
5 s presentation-converted5 s presentation-converted
5 s presentation-convertedSiddharth Pal
 
just-in-time-by-sashi-prabhu
 just-in-time-by-sashi-prabhu just-in-time-by-sashi-prabhu
just-in-time-by-sashi-prabhusashi prabhu
 
Jvh Lean Presentation For 2009
Jvh Lean Presentation For 2009Jvh Lean Presentation For 2009
Jvh Lean Presentation For 2009guest88801083
 
Six Sigma Process Capability Study (PCS) Training Module
Six Sigma Process Capability Study (PCS) Training Module Six Sigma Process Capability Study (PCS) Training Module
Six Sigma Process Capability Study (PCS) Training Module Frank-G. Adler
 
Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean ProjectsAnand Subramaniam
 
Continuous improvement strategies
Continuous improvement strategiesContinuous improvement strategies
Continuous improvement strategiesgarimatomar18
 
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollySMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollyRicky Smith CMRP, CMRT
 

La actualidad más candente (20)

Where Does The Time Go?
Where Does The Time Go?Where Does The Time Go?
Where Does The Time Go?
 
Case Studies2
Case Studies2Case Studies2
Case Studies2
 
Six Sigma Overview
Six Sigma OverviewSix Sigma Overview
Six Sigma Overview
 
TPM&Kaizen(Junu)
TPM&Kaizen(Junu)TPM&Kaizen(Junu)
TPM&Kaizen(Junu)
 
Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance Technician
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)
 
Process Capability[1]
Process Capability[1]Process Capability[1]
Process Capability[1]
 
TPM: Quality Maintenance (Hinshitsu Hozen) Poster
TPM: Quality Maintenance (Hinshitsu Hozen) PosterTPM: Quality Maintenance (Hinshitsu Hozen) Poster
TPM: Quality Maintenance (Hinshitsu Hozen) Poster
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
Six sigma presentation for masters students
Six sigma presentation for masters studentsSix sigma presentation for masters students
Six sigma presentation for masters students
 
Continuous process improvement (4)
Continuous process improvement (4)Continuous process improvement (4)
Continuous process improvement (4)
 
5 s presentation-converted
5 s presentation-converted5 s presentation-converted
5 s presentation-converted
 
just-in-time-by-sashi-prabhu
 just-in-time-by-sashi-prabhu just-in-time-by-sashi-prabhu
just-in-time-by-sashi-prabhu
 
Jvh Lean Presentation For 2009
Jvh Lean Presentation For 2009Jvh Lean Presentation For 2009
Jvh Lean Presentation For 2009
 
Six Sigma Process Capability Study (PCS) Training Module
Six Sigma Process Capability Study (PCS) Training Module Six Sigma Process Capability Study (PCS) Training Module
Six Sigma Process Capability Study (PCS) Training Module
 
Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean Projects
 
DFR Methods Survey 2014
DFR Methods Survey 2014DFR Methods Survey 2014
DFR Methods Survey 2014
 
Continuous improvement strategies
Continuous improvement strategiesContinuous improvement strategies
Continuous improvement strategies
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
 
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollySMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
 

Similar a What is six sigma

Basic overview six sigma
Basic overview six sigmaBasic overview six sigma
Basic overview six sigmaKhushmeetKhushi
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017shyaminfo00
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017shyaminfo00
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newshyaminfo00
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newshyaminfo00
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newshyaminfo06
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newNoahliamwilliam
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) neweshwaryyyy
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017shyaminfo06
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017eshwaryyyy
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Noahliamwilliam
 
Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017indi7257
 
Uop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newUop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newindi7257
 
Lean 6 Sigma On Line Training From Searchtec
Lean 6 Sigma  On Line Training From SearchtecLean 6 Sigma  On Line Training From Searchtec
Lean 6 Sigma On Line Training From Searchtecsearchtec
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizenGopala P.
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizenpgopala
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation pptbwu.nl
 
module-1-introduction-on-lean-six-sigma.pdf
module-1-introduction-on-lean-six-sigma.pdfmodule-1-introduction-on-lean-six-sigma.pdf
module-1-introduction-on-lean-six-sigma.pdfipdadesigns
 
Applying Lean Sigma Into Validation
Applying Lean Sigma Into ValidationApplying Lean Sigma Into Validation
Applying Lean Sigma Into Validationtjcornish
 

Similar a What is six sigma (20)

Basic overview six sigma
Basic overview six sigmaBasic overview six sigma
Basic overview six sigma
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Uop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newUop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--new
 
Lean 6 Sigma On Line Training From Searchtec
Lean 6 Sigma  On Line Training From SearchtecLean 6 Sigma  On Line Training From Searchtec
Lean 6 Sigma On Line Training From Searchtec
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizen
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizen
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
module-1-introduction-on-lean-six-sigma.pdf
module-1-introduction-on-lean-six-sigma.pdfmodule-1-introduction-on-lean-six-sigma.pdf
module-1-introduction-on-lean-six-sigma.pdf
 
Applying Lean Sigma Into Validation
Applying Lean Sigma Into ValidationApplying Lean Sigma Into Validation
Applying Lean Sigma Into Validation
 

Más de Muhammad Islam

Más de Muhammad Islam (14)

Glossary of-strat-planning
Glossary of-strat-planningGlossary of-strat-planning
Glossary of-strat-planning
 
Directory
DirectoryDirectory
Directory
 
Delve online services
Delve online servicesDelve online services
Delve online services
 
Characteristics of risk managmnt
Characteristics of risk managmntCharacteristics of risk managmnt
Characteristics of risk managmnt
 
Product description
Product descriptionProduct description
Product description
 
Mhrm degree examinationmodel question paper paper
Mhrm degree examinationmodel question paper paperMhrm degree examinationmodel question paper paper
Mhrm degree examinationmodel question paper paper
 
Enterpuner
EnterpunerEnterpuner
Enterpuner
 
Delve online shopping
Delve online shoppingDelve online shopping
Delve online shopping
 
Basic framework of budgeting
Basic framework of budgetingBasic framework of budgeting
Basic framework of budgeting
 
Analogy
AnalogyAnalogy
Analogy
 
181
181181
181
 
Entre project final
Entre project finalEntre project final
Entre project final
 
income@balance sheet
income@balance sheetincome@balance sheet
income@balance sheet
 
start up Enterpuner
start up Enterpunerstart up Enterpuner
start up Enterpuner
 

Último

Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...RaniT11
 
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdfMASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdfCocity Enterprises
 
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call GirlsKurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call GirlsPriya Reddy
 
Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...robinsonayot
 
Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...
Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...
Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...janibaber266
 
Q1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfQ1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfAdnet Communications
 
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...Henry Tapper
 
Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Adnet Communications
 
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...kajalverma014
 
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budgetSareena Khatun
 
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...priyasharma62062
 
Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...
Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...
Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...priyasharma62062
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirementsmarketingkingdomofku
 
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsMahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsDeepika Singh
 
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdf
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdfSeeman_Fiintouch_LLP_Newsletter_May-2024.pdf
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdfAshis Kumar Dey
 
Toronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfToronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfJinJiang6
 
GIFT City Overview India's Gateway to Global Finance
GIFT City Overview  India's Gateway to Global FinanceGIFT City Overview  India's Gateway to Global Finance
GIFT City Overview India's Gateway to Global FinanceGaurav Kanudawala
 
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.hyt3577
 
Bhubaneswar🌹Ravi Tailkes ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
Bhubaneswar🌹Ravi Tailkes  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...Bhubaneswar🌹Ravi Tailkes  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
Bhubaneswar🌹Ravi Tailkes ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...Call Girls Mumbai
 

Último (20)

Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...
 
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdfMASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
 
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call GirlsKurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
 
Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...
 
Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...
Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...
Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...
 
Q1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfQ1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdf
 
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
 
Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024
 
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
 
W.D. Gann Theory Complete Information.pdf
W.D. Gann Theory Complete Information.pdfW.D. Gann Theory Complete Information.pdf
W.D. Gann Theory Complete Information.pdf
 
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
 
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
 
Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...
Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...
Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
 
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsMahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdf
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdfSeeman_Fiintouch_LLP_Newsletter_May-2024.pdf
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdf
 
Toronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfToronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdf
 
GIFT City Overview India's Gateway to Global Finance
GIFT City Overview  India's Gateway to Global FinanceGIFT City Overview  India's Gateway to Global Finance
GIFT City Overview India's Gateway to Global Finance
 
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
 
Bhubaneswar🌹Ravi Tailkes ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
Bhubaneswar🌹Ravi Tailkes  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...Bhubaneswar🌹Ravi Tailkes  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
Bhubaneswar🌹Ravi Tailkes ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
 

What is six sigma

  • 1. What Is Six Sigma? A method that provides organizations tools to improve the capability of their business processes. This increase in performance and decrease in process variation lead to defect reduction and improvement in profits, employee morale, and quality of products or services. Six Sigma quality is a term generally used to indicate a process is well controlled (within process limits ±3s from the center line in a control chart, and requirements/tolerance limits ±6s from the center line). Examples of Successful Lean Six Sigma Projects at Local Organizations Completed by Participants from our Training Program:  Reducing the cycle time to manufacture solar cells in a research laboratory  Reducing defects in the manufacturing process for natural gas dehydrators  Reducing the number of weld repairs in pipeline construction projects  Reducing IT systemdowntime for an accounting firm  Reducing Medicare billing rejections for a home healthcare organization  Reducing waste in the isometrics drawing production process for an engineering design firm  Reducing the risk of IT security threats for a pipeline control system  Reducing the environmental impact of batch chemical processes  Improving consistency of scoring for an annual staff performance appraisal process in order to reduce the perception of unfairness and favoritism associated with this process Finding and Selecting Good Six Sigma Projects External Defects  Anything you have recently been audited or formally rejected for  Anything you haven’t been audited or rejected for, but you know is out of specification or not meeting regulations  Anything you inspect and/or contain to protect the customer  Anything you cover for by having a guy in the customer’s plant, etc. Internal Defects  Any scrap issues, parts, or materials  Anything you rework/recycle in house – you should keep accurate track of rework by defect
  • 2.  Anything you have a poka yoke for – you should know how often the poka-yoke is catching something and then try to figure out how to prevent it rather than catch it Efficiency/Capacity Issues  Anywhere you make less parts than expected  Anytime you are currently working non-customer driven overtime  Any process where you are running slower than expected cycle  Any process or machine with downtime Any process with premium freight costs Any process that has added labor to make the required cycle Other Plant Cost Drivers or Measurables Any cost driver with a negative variance may point to a project Any plant metric that is important and runs at an unacceptable level or with large amounts of variation is a good indicator for a project Less Obvious Areas for Improvement Material Utilization Any part which uses more than the standard amount of material Any part in which the amount of material used varies – reduce the variation and shift usage to the lowest limit Understanding Process Variation How much variation is there in your incoming materials and/or process parameters and how does this affect your output? Where do you need the input controlled to always have a good output? Can you scientifically adjust your process to compensate for changing material, weather, etc.? Can your Black Belt help your supplier do a project to control the incoming product where you need it? Does understanding your inputs allow you to produce a good part using less material?
  • 3. Maintenance For high failure rate or high replacement cost items, what causes the failure? Can you reduce the failure rate by understanding and controlling the process? Study how to predict failures so replacements can be made during scheduled, rather than unscheduled, downtime. Efficiency/Capacity Issues Learn how to speed up or slow down your cycle time by changing your process inputs. Use this knowledge to produce customer overtime parts on straight time, or to do scheduled preventive maintenance during the week on straight time. General Guidelines for Project Selection Any project should have identifiable process inputs and outputs. A good Six Sigma project should never have a pre-determined solution. If you already know the answer, then just go fix it! For projects that have operator or operator training as an input, focus on ways to reduce operator variation, therefore making your process more robust to different or untrained operators. All projects need to be approached from the perspective of understanding the variation in process inputs, controlling them, and eliminating the defects. Example #1 Problem: We are experiencing slow cycle time at Station 30 because we are getting bad parts from Station 20 and have to rework them. Non-Six Sigma Solution: Rebalance the line in order to do the rework and keep your cycle time below specifications while not spending extra labor cost. Six Sigma Solution: Investigate and control key inputs that contribute to making a bad part production at Station 20. Example #2 Problem: We have had two quality related issues reported this year for missing armrest screws.
  • 4. Non-Six Sigma Solution: Add sensors to detect screws further down the line. If screws are missing, operator manually fixes. Six Sigma Solution: Determine process inputs causing missing screws. For example, auto gun does not always feed correctly due to air pressure variation. Either study range required for 100 percent operation and control in that range, or find way to make gun more robust to range of variation experienced. balanced scorecard – definition What exactly is a Balanced Scorecard? A definition often quoted is: 'A strategic planning and management system used to align business activities to the vision statement of an organization'. More cynically, and in some cases realistically, a Balanced Scorecard attempts to translate the sometimes vague, pious hopes of a company's vision/mission statement into the practicalities of managing the business better at every level. A Balanced Scorecard approach is to take a holistic view of an organization and co-ordinate MDIs so that efficiencies are experienced by all departments and in a joined-up fashion. To embark on the Balanced Scorecard path an organization first must know (and understand) the following:  The company's mission statement  The company's strategic plan/vision Then  The financial status of the organization  How the organization is currently structured and operating  The level of expertise of their employees