GEF Policy reforms 
• Revision of focal area strategies 
• Results based management (RBM) 
• Streamlining of the GEF project cycle 
• Level playing field among GEF agencies 
• Resource Allocation Framework (RAF)
Revision of focal area strategies 
• Focus on priority issues 
• Programmatic approach 
• Measurable results 
• Integration across focal areas 
• Consistency with the replenishment of 
GEF4
FA strategies – revision process 
• Advisory groups (TAGs and SAG) with 
external experts, STAP, Conventions 
• Drafts and process papers posted on the 
GEF website 
• Comments received from GEF partners 
and also web-posted 
• Revised focal area strategies presented to 
Council in June ’07
Revised focal area strategies 
• Strategic objectives (long-term) with 
expected impacts 
• Strategic programs for GEF-4 with 
expected outcomes 
• Measurable indicators for impacts and 
outcomes 
• Harmonized structure among focal areas
Results based management (RBM) 
• Shift from ‘approval culture’ to RBM 
• Emphasis on cost effectiveness 
• Indicator framework following OECD 
terminology, to be further developed 
• Project log frames will support the RBM 
• Transition in reporting (PIR) to RBM, may 
include GEF-3 projects.
New GEF Project Cycle 
• Concept notes (PIFs) and PPG release 
• Work Program inclusion based on PIFs 
• Approval of fully prepared projects 
• Reduce project preparation to max 2 years 
• Streamline and simplify required project 
documentation 
• Shift the effort to implementation
Resource Allocation Framework 
• Introduced in GEF-4 for BD and CC focal 
areas 
• To cover all focal areas from GEF-5 
• Review in 2008
International Waters Focal 
Strategic Programs for GEF-4 
(2007-2010) 
Four Strategic Programs
Strategic Program 1: 
Restoring and sustaining coastal and marine 
fish stocks and associated biological diversity 
Examples: 
•Benguela Current 
•Danube Basin
Strategic Program 2 
Reducing nutrient over-enrichment and 
oxygen depletion from land-based pollution 
of coastal waters in LMEs consistent with 
the GPA 
Examples: 
• Danube Basin 
• Romania Agricultural Pollution 
Control 
• Manila 3rd Sewerage Project
Strategic Program 3 
Balancing overuse and conflicting uses 
of water resources in transboundary 
surface and groundwater basins 
Examples: 
• Nile Basin Initiative 
• Lake Victoria (LVEMP) 
• Amazon Basin Management
Strategic Program 4 
Reducing Persistent Toxic Substances 
and Adaptive Management of Waters with 
Melting Ice 
Examples: 
• Melting Glaciers 
– Himalaya/Ganges 
• Pesticides in LMEs 
• Mercury in Goldmining
As always - please do not hesitate to contact us, 
and we will do our best to support YOU!

Más contenido relacionado

La actualidad más candente

Digital Water - The Water Framework Directive data management and visualisati...
Digital Water - The Water Framework Directive data management and visualisati...Digital Water - The Water Framework Directive data management and visualisati...
Digital Water - The Water Framework Directive data management and visualisati...Environmental Protection Agency, Ireland
 
2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...Global Water Partnership
 
GEF IW Projects Indicators Framework (Merla)
GEF IW Projects Indicators Framework (Merla)GEF IW Projects Indicators Framework (Merla)
GEF IW Projects Indicators Framework (Merla)Iwl Pcu
 
6.0 Bhutan Open NAP Cas Case Study
6.0 Bhutan Open NAP Cas  Case Study6.0 Bhutan Open NAP Cas  Case Study
6.0 Bhutan Open NAP Cas Case StudyNAP Events
 
8.3.3 Subnational adaptation
8.3.3 Subnational adaptation8.3.3 Subnational adaptation
8.3.3 Subnational adaptationNAP Events
 
awright_pacislandsap.ppt
awright_pacislandsap.pptawright_pacislandsap.ppt
awright_pacislandsap.pptIwl Pcu
 
1- Presentation Medpartnership_Ivica Trumbic
1- Presentation Medpartnership_Ivica Trumbic1- Presentation Medpartnership_Ivica Trumbic
1- Presentation Medpartnership_Ivica TrumbicIwl Pcu
 
Partnership and sustainability WP8 GWPWAF_dam mogbante_28 aug
Partnership and sustainability WP8 GWPWAF_dam mogbante_28 augPartnership and sustainability WP8 GWPWAF_dam mogbante_28 aug
Partnership and sustainability WP8 GWPWAF_dam mogbante_28 augGlobal Water Partnership
 
Measuring an adaptation goal: effectiveness and adequacy
Measuring an adaptation goal: effectiveness and adequacyMeasuring an adaptation goal: effectiveness and adequacy
Measuring an adaptation goal: effectiveness and adequacyIIED
 
climate information at different scales
climate information at different scalesclimate information at different scales
climate information at different scalesNAP Events
 
Protocol for assessing sustainable soil management
Protocol for assessing sustainable soil managementProtocol for assessing sustainable soil management
Protocol for assessing sustainable soil managementExternalEvents
 
International Waters Program: New Opportunities for the World Bank
International Waters Program: New Opportunities for the World BankInternational Waters Program: New Opportunities for the World Bank
International Waters Program: New Opportunities for the World BankIwl Pcu
 
Introduction to the workshop
Introduction to the workshopIntroduction to the workshop
Introduction to the workshopNAP Events
 
Cape Cod Commission 208 plan update
Cape Cod Commission 208 plan updateCape Cod Commission 208 plan update
Cape Cod Commission 208 plan updateCCIAOR
 

La actualidad más candente (20)

Digital Water - The Water Framework Directive data management and visualisati...
Digital Water - The Water Framework Directive data management and visualisati...Digital Water - The Water Framework Directive data management and visualisati...
Digital Water - The Water Framework Directive data management and visualisati...
 
Georgia
GeorgiaGeorgia
Georgia
 
2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...
 
Beeville MLT_Administratively Complete Management Plans_Robert Bradley
Beeville MLT_Administratively Complete Management Plans_Robert BradleyBeeville MLT_Administratively Complete Management Plans_Robert Bradley
Beeville MLT_Administratively Complete Management Plans_Robert Bradley
 
Azerbaijan
AzerbaijanAzerbaijan
Azerbaijan
 
GEF IW Projects Indicators Framework (Merla)
GEF IW Projects Indicators Framework (Merla)GEF IW Projects Indicators Framework (Merla)
GEF IW Projects Indicators Framework (Merla)
 
6.0 Bhutan Open NAP Cas Case Study
6.0 Bhutan Open NAP Cas  Case Study6.0 Bhutan Open NAP Cas  Case Study
6.0 Bhutan Open NAP Cas Case Study
 
8.3.3 Subnational adaptation
8.3.3 Subnational adaptation8.3.3 Subnational adaptation
8.3.3 Subnational adaptation
 
awright_pacislandsap.ppt
awright_pacislandsap.pptawright_pacislandsap.ppt
awright_pacislandsap.ppt
 
1- Presentation Medpartnership_Ivica Trumbic
1- Presentation Medpartnership_Ivica Trumbic1- Presentation Medpartnership_Ivica Trumbic
1- Presentation Medpartnership_Ivica Trumbic
 
Partnership and sustainability WP8 GWPWAF_dam mogbante_28 aug
Partnership and sustainability WP8 GWPWAF_dam mogbante_28 augPartnership and sustainability WP8 GWPWAF_dam mogbante_28 aug
Partnership and sustainability WP8 GWPWAF_dam mogbante_28 aug
 
Measuring an adaptation goal: effectiveness and adequacy
Measuring an adaptation goal: effectiveness and adequacyMeasuring an adaptation goal: effectiveness and adequacy
Measuring an adaptation goal: effectiveness and adequacy
 
climate information at different scales
climate information at different scalesclimate information at different scales
climate information at different scales
 
Protocol for assessing sustainable soil management
Protocol for assessing sustainable soil managementProtocol for assessing sustainable soil management
Protocol for assessing sustainable soil management
 
Armenia
ArmeniaArmenia
Armenia
 
International Waters Program: New Opportunities for the World Bank
International Waters Program: New Opportunities for the World BankInternational Waters Program: New Opportunities for the World Bank
International Waters Program: New Opportunities for the World Bank
 
Introduction to the workshop
Introduction to the workshopIntroduction to the workshop
Introduction to the workshop
 
Ensuring the Effectiveness of Agricultural Best Management
Ensuring the Effectiveness of Agricultural Best ManagementEnsuring the Effectiveness of Agricultural Best Management
Ensuring the Effectiveness of Agricultural Best Management
 
Fales watershed scale conservation
Fales   watershed scale conservationFales   watershed scale conservation
Fales watershed scale conservation
 
Cape Cod Commission 208 plan update
Cape Cod Commission 208 plan updateCape Cod Commission 208 plan update
Cape Cod Commission 208 plan update
 

Destacado

IBM Messaging and Collaboration: details and what's new in v8.5.3
IBM Messaging and Collaboration: details and what's new in v8.5.3IBM Messaging and Collaboration: details and what's new in v8.5.3
IBM Messaging and Collaboration: details and what's new in v8.5.3Jacques Pavlenyi
 
Summer Project On Human Resource Policy of Nepal Airlines Corporation
Summer Project On Human Resource Policy of Nepal Airlines CorporationSummer Project On Human Resource Policy of Nepal Airlines Corporation
Summer Project On Human Resource Policy of Nepal Airlines CorporationShrestha Eliya
 
Employee Rules And Regulations
Employee Rules And RegulationsEmployee Rules And Regulations
Employee Rules And RegulationsNalaka Jayaratne
 
Recruitment & selection
Recruitment & selectionRecruitment & selection
Recruitment & selectionNISHA SHAH
 
HR Policies of Aditya Birla Group ppt
HR Policies of Aditya Birla Group pptHR Policies of Aditya Birla Group ppt
HR Policies of Aditya Birla Group pptManish Pandey
 
Hr Policy / Employee Catalogue - A template for your company
Hr Policy / Employee Catalogue - A template for your companyHr Policy / Employee Catalogue - A template for your company
Hr Policy / Employee Catalogue - A template for your companyManeesh Garg
 
Hr policies at coca cola
Hr policies at coca colaHr policies at coca cola
Hr policies at coca colaSaran Chandran
 
Change management strategy ppt
Change management strategy pptChange management strategy ppt
Change management strategy pptsonips
 
Recruitment, Selection Process Methods And Steps,
Recruitment, Selection Process Methods And Steps,Recruitment, Selection Process Methods And Steps,
Recruitment, Selection Process Methods And Steps,rajeevgupta
 

Destacado (11)

IBM Messaging and Collaboration: details and what's new in v8.5.3
IBM Messaging and Collaboration: details and what's new in v8.5.3IBM Messaging and Collaboration: details and what's new in v8.5.3
IBM Messaging and Collaboration: details and what's new in v8.5.3
 
Summer Project On Human Resource Policy of Nepal Airlines Corporation
Summer Project On Human Resource Policy of Nepal Airlines CorporationSummer Project On Human Resource Policy of Nepal Airlines Corporation
Summer Project On Human Resource Policy of Nepal Airlines Corporation
 
Hr office rules
Hr office rulesHr office rules
Hr office rules
 
Employee Rules And Regulations
Employee Rules And RegulationsEmployee Rules And Regulations
Employee Rules And Regulations
 
Hr policies
Hr policiesHr policies
Hr policies
 
Recruitment & selection
Recruitment & selectionRecruitment & selection
Recruitment & selection
 
HR Policies of Aditya Birla Group ppt
HR Policies of Aditya Birla Group pptHR Policies of Aditya Birla Group ppt
HR Policies of Aditya Birla Group ppt
 
Hr Policy / Employee Catalogue - A template for your company
Hr Policy / Employee Catalogue - A template for your companyHr Policy / Employee Catalogue - A template for your company
Hr Policy / Employee Catalogue - A template for your company
 
Hr policies at coca cola
Hr policies at coca colaHr policies at coca cola
Hr policies at coca cola
 
Change management strategy ppt
Change management strategy pptChange management strategy ppt
Change management strategy ppt
 
Recruitment, Selection Process Methods And Steps,
Recruitment, Selection Process Methods And Steps,Recruitment, Selection Process Methods And Steps,
Recruitment, Selection Process Methods And Steps,
 

Similar a GEF Policy Reforms and Focal Area Strategies

Jerker Tamelander - Mainstreaming CC in IW Projects Presentation
Jerker Tamelander - Mainstreaming CC in IW Projects PresentationJerker Tamelander - Mainstreaming CC in IW Projects Presentation
Jerker Tamelander - Mainstreaming CC in IW Projects PresentationIwl Pcu
 
C. Patterson/M. Wilson - Pacific IWRM Presentation
C. Patterson/M. Wilson - Pacific IWRM PresentationC. Patterson/M. Wilson - Pacific IWRM Presentation
C. Patterson/M. Wilson - Pacific IWRM PresentationIwl Pcu
 
Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...
Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...
Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...Iwl Pcu
 
Climate Change Screening and Programme Appraisal in MOAC - Building Institut...
Climate Change Screening and Programme Appraisal in MOAC -  Building Institut...Climate Change Screening and Programme Appraisal in MOAC -  Building Institut...
Climate Change Screening and Programme Appraisal in MOAC - Building Institut...UNDP Climate
 
Current Status of National Adaptation Plan Process in Cambodia
Current Status of National Adaptation Plan Process in CambodiaCurrent Status of National Adaptation Plan Process in Cambodia
Current Status of National Adaptation Plan Process in CambodiaNAP Global Network
 
Institutional Framework for Planning and Provision of Climate Information Ser...
Institutional Framework for Planning and Provision of Climate Information Ser...Institutional Framework for Planning and Provision of Climate Information Ser...
Institutional Framework for Planning and Provision of Climate Information Ser...UNDP Climate
 
Introduction to the Institutional Framework for Planning and Provision of CIS
Introduction to the Institutional Framework for Planning and Provision of CISIntroduction to the Institutional Framework for Planning and Provision of CIS
Introduction to the Institutional Framework for Planning and Provision of CISFAO
 
Findings Relevant to the GEF IW Learn Confernce
Findings Relevant to the GEF IW Learn ConfernceFindings Relevant to the GEF IW Learn Confernce
Findings Relevant to the GEF IW Learn ConfernceIwl Pcu
 
VNN Peatlands Project Update
VNN Peatlands Project UpdateVNN Peatlands Project Update
VNN Peatlands Project UpdateAberdeen CES
 
Overview India-EU Water Partnership Spring 2017
Overview India-EU Water Partnership Spring 2017Overview India-EU Water Partnership Spring 2017
Overview India-EU Water Partnership Spring 2017India-EU Water Partnership
 
Session 5.1: Programatic approach in building resilience
Session 5.1: Programatic approach in building resilienceSession 5.1: Programatic approach in building resilience
Session 5.1: Programatic approach in building resilienceNAP Events
 
Green week presentation eu rivers - Chris Baker
Green week presentation eu rivers - Chris BakerGreen week presentation eu rivers - Chris Baker
Green week presentation eu rivers - Chris BakerRESTORE
 
Key Air Management Initiatives - national to regional
Key Air Management Initiatives - national to regionalKey Air Management Initiatives - national to regional
Key Air Management Initiatives - national to regionalClean Air Strategic Alliance
 

Similar a GEF Policy Reforms and Focal Area Strategies (20)

2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne
2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne
2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne
 
Ching vcs methods ws oct 2011
Ching vcs methods ws oct 2011Ching vcs methods ws oct 2011
Ching vcs methods ws oct 2011
 
Jerker Tamelander - Mainstreaming CC in IW Projects Presentation
Jerker Tamelander - Mainstreaming CC in IW Projects PresentationJerker Tamelander - Mainstreaming CC in IW Projects Presentation
Jerker Tamelander - Mainstreaming CC in IW Projects Presentation
 
C. Patterson/M. Wilson - Pacific IWRM Presentation
C. Patterson/M. Wilson - Pacific IWRM PresentationC. Patterson/M. Wilson - Pacific IWRM Presentation
C. Patterson/M. Wilson - Pacific IWRM Presentation
 
Water Programme
Water ProgrammeWater Programme
Water Programme
 
Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...
Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...
Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...
 
Climate Change Screening and Programme Appraisal in MOAC - Building Institut...
Climate Change Screening and Programme Appraisal in MOAC -  Building Institut...Climate Change Screening and Programme Appraisal in MOAC -  Building Institut...
Climate Change Screening and Programme Appraisal in MOAC - Building Institut...
 
Current Status of National Adaptation Plan Process in Cambodia
Current Status of National Adaptation Plan Process in CambodiaCurrent Status of National Adaptation Plan Process in Cambodia
Current Status of National Adaptation Plan Process in Cambodia
 
Institutional Framework for Planning and Provision of Climate Information Ser...
Institutional Framework for Planning and Provision of Climate Information Ser...Institutional Framework for Planning and Provision of Climate Information Ser...
Institutional Framework for Planning and Provision of Climate Information Ser...
 
Introduction to the Institutional Framework for Planning and Provision of CIS
Introduction to the Institutional Framework for Planning and Provision of CISIntroduction to the Institutional Framework for Planning and Provision of CIS
Introduction to the Institutional Framework for Planning and Provision of CIS
 
Module 6: Measurement, Reporting and Verification (MRV) and adaptation M&E
Module 6: Measurement, Reporting and Verification (MRV) and adaptation M&EModule 6: Measurement, Reporting and Verification (MRV) and adaptation M&E
Module 6: Measurement, Reporting and Verification (MRV) and adaptation M&E
 
Findings Relevant to the GEF IW Learn Confernce
Findings Relevant to the GEF IW Learn ConfernceFindings Relevant to the GEF IW Learn Confernce
Findings Relevant to the GEF IW Learn Confernce
 
VNN Peatlands Project Update
VNN Peatlands Project UpdateVNN Peatlands Project Update
VNN Peatlands Project Update
 
Overview India-EU Water Partnership Spring 2017
Overview India-EU Water Partnership Spring 2017Overview India-EU Water Partnership Spring 2017
Overview India-EU Water Partnership Spring 2017
 
Session 5.1: Programatic approach in building resilience
Session 5.1: Programatic approach in building resilienceSession 5.1: Programatic approach in building resilience
Session 5.1: Programatic approach in building resilience
 
Perez adventures in cooperative conservation
Perez   adventures in cooperative conservationPerez   adventures in cooperative conservation
Perez adventures in cooperative conservation
 
Green week presentation eu rivers - Chris Baker
Green week presentation eu rivers - Chris BakerGreen week presentation eu rivers - Chris Baker
Green week presentation eu rivers - Chris Baker
 
Key Air Management Initiatives - national to regional
Key Air Management Initiatives - national to regionalKey Air Management Initiatives - national to regional
Key Air Management Initiatives - national to regional
 
Moore
MooreMoore
Moore
 
Coordination and Change in the Volta River Basin
Coordination and Change in the Volta River BasinCoordination and Change in the Volta River Basin
Coordination and Change in the Volta River Basin
 

Más de Iwl Pcu

Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Iwl Pcu
 
Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Iwl Pcu
 
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Iwl Pcu
 
Understanding the audience (IWC8)
Understanding the audience (IWC8)Understanding the audience (IWC8)
Understanding the audience (IWC8)Iwl Pcu
 
Effective slide designing
Effective slide designingEffective slide designing
Effective slide designingIwl Pcu
 
How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)Iwl Pcu
 
Presentation vs Publication
Presentation vs PublicationPresentation vs Publication
Presentation vs PublicationIwl Pcu
 
Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Iwl Pcu
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 

Más de Iwl Pcu (20)

Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)
 
Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)
 
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
 
Understanding the audience (IWC8)
Understanding the audience (IWC8)Understanding the audience (IWC8)
Understanding the audience (IWC8)
 
Effective slide designing
Effective slide designingEffective slide designing
Effective slide designing
 
How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)
 
Presentation vs Publication
Presentation vs PublicationPresentation vs Publication
Presentation vs Publication
 
Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
 
TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10
 
TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 

GEF Policy Reforms and Focal Area Strategies

  • 1. GEF Policy reforms • Revision of focal area strategies • Results based management (RBM) • Streamlining of the GEF project cycle • Level playing field among GEF agencies • Resource Allocation Framework (RAF)
  • 2. Revision of focal area strategies • Focus on priority issues • Programmatic approach • Measurable results • Integration across focal areas • Consistency with the replenishment of GEF4
  • 3. FA strategies – revision process • Advisory groups (TAGs and SAG) with external experts, STAP, Conventions • Drafts and process papers posted on the GEF website • Comments received from GEF partners and also web-posted • Revised focal area strategies presented to Council in June ’07
  • 4. Revised focal area strategies • Strategic objectives (long-term) with expected impacts • Strategic programs for GEF-4 with expected outcomes • Measurable indicators for impacts and outcomes • Harmonized structure among focal areas
  • 5. Results based management (RBM) • Shift from ‘approval culture’ to RBM • Emphasis on cost effectiveness • Indicator framework following OECD terminology, to be further developed • Project log frames will support the RBM • Transition in reporting (PIR) to RBM, may include GEF-3 projects.
  • 6. New GEF Project Cycle • Concept notes (PIFs) and PPG release • Work Program inclusion based on PIFs • Approval of fully prepared projects • Reduce project preparation to max 2 years • Streamline and simplify required project documentation • Shift the effort to implementation
  • 7. Resource Allocation Framework • Introduced in GEF-4 for BD and CC focal areas • To cover all focal areas from GEF-5 • Review in 2008
  • 8. International Waters Focal Strategic Programs for GEF-4 (2007-2010) Four Strategic Programs
  • 9. Strategic Program 1: Restoring and sustaining coastal and marine fish stocks and associated biological diversity Examples: •Benguela Current •Danube Basin
  • 10. Strategic Program 2 Reducing nutrient over-enrichment and oxygen depletion from land-based pollution of coastal waters in LMEs consistent with the GPA Examples: • Danube Basin • Romania Agricultural Pollution Control • Manila 3rd Sewerage Project
  • 11. Strategic Program 3 Balancing overuse and conflicting uses of water resources in transboundary surface and groundwater basins Examples: • Nile Basin Initiative • Lake Victoria (LVEMP) • Amazon Basin Management
  • 12. Strategic Program 4 Reducing Persistent Toxic Substances and Adaptive Management of Waters with Melting Ice Examples: • Melting Glaciers – Himalaya/Ganges • Pesticides in LMEs • Mercury in Goldmining
  • 13. As always - please do not hesitate to contact us, and we will do our best to support YOU!