A Progressive Comparison
 of Conveyor Changeover
      Technologies
Cost versus Man Hours
     This is the baseline



        100 Feet of Straight Conveyor




        $30 / hour Labor Rate




        250 Changeovers Per Year
Cost versus Man Hours
    Note set points on each comparison


         100 Feet of Straight Conveyor



         $30 / hour Labor Rate




         250 Changeovers Per Year




         Set Points
Standard: Baseline

            BASELINE




   108 Adjustment Points

   $7,500 in labor



                           60 Min.

                            250 hrs.
                           lost/year
Ratchet Handles / Manual Adjustment

                      Level 1: RATCHET HANDLE




                  108 Adjustment Points

                  $5,625 in labor


                                                45 Min.
 $1,000 for the                                 188 Hrs.
    ratchet                                     Lost/Yr.
    handles
Ratchet Handles with Set Points

                       Level 2: RATCHET HANDLE

                      With Pre-Measured Points



                                       108 Adjustment Points

                                       $3,750 in labor



                                                 30 Min.

$2,000 for the ratchet handles and               125 Hrs.
     pre-measured set points                     Lost/Yr.
Ratchet Handles with Set Points on
            One Side

                       Level 3: RATCHET HANDLE

                                one side


                                           54 Adjustment Points

                                           $1,875 in labor


                                                  15 Min.

$1,500 for the ratchet handles and                 62 Hrs.
     pre-measured set points                       Lost/Yr.
Hand Wheel Indicator
                    Level 4: HAND WHEEL DIAL INDICATOR

                                 One Side



                          3 Adjustment Points

                          $625 in labor



                                                   5 Min.

                                                   20 Hrs.
$22,500 for rail system                            Lost/Yr.
Automatic Guide Rail Adjustment

                     Level 5: AUTOMATIC ADJUSTABLE

                    With Operator Push Button Station


                            1 Adjustment Point

                            $125 in labor



                                                  1 Min.

                                                   4 hrs.
 $27,500 for rail system                          Lost/Yr.
Changeover White Paper




                   Click here for
                   White Paper
Cost versus Man Hours
                         10 YEAR Labor Cost Versus Purchase Cost
         80000
                  BASE

         70000



         60000
                            MANUAL

         50000

                                     SET POINTS
COST $




         40000                                                                  COST

                                                                     AUTO-      LABOR

         30000                                               HAND    MATIC
                                                             WHEEL
         20000                                    ONE SIDE


         10000



             0
                  1          2         3            4           5       6
                                 CHANGEOVER SOLUTIONS
            Manual                                                      Automatic
Thank you for your time!
            For more information,
   videos, webinars and white papers, visit
                 our website
              www.nercon.com

      • Sign up for Knowledge Center
              Check out our blog!

Más contenido relacionado

Más de Nercon

Conveyor Construction Levels
Conveyor Construction LevelsConveyor Construction Levels
Conveyor Construction Levels
Nercon
 

Más de Nercon (9)

Energy Efficient White Paper
Energy Efficient White PaperEnergy Efficient White Paper
Energy Efficient White Paper
 
Conveyor Construction Levels
Conveyor Construction LevelsConveyor Construction Levels
Conveyor Construction Levels
 
How to Plan for Line Controls and Integration
How to Plan for Line Controls and IntegrationHow to Plan for Line Controls and Integration
How to Plan for Line Controls and Integration
 
Guide to comparing lift equipment
Guide to comparing lift equipmentGuide to comparing lift equipment
Guide to comparing lift equipment
 
How to Choose the Right Accumulation Equipment Solutions
How to Choose the Right Accumulation Equipment SolutionsHow to Choose the Right Accumulation Equipment Solutions
How to Choose the Right Accumulation Equipment Solutions
 
Packaging Line Change-over White Paper
Packaging Line Change-over White PaperPackaging Line Change-over White Paper
Packaging Line Change-over White Paper
 
Evaluating chains by Application
Evaluating chains by ApplicationEvaluating chains by Application
Evaluating chains by Application
 
Rail Options for Fast Changeover
Rail Options for Fast ChangeoverRail Options for Fast Changeover
Rail Options for Fast Changeover
 
Mistakes to Avoid When Planning Accumulation
Mistakes to Avoid When Planning AccumulationMistakes to Avoid When Planning Accumulation
Mistakes to Avoid When Planning Accumulation
 

Último

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Último (20)

Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 

A Progressive Comparison

  • 1. A Progressive Comparison of Conveyor Changeover Technologies
  • 2. Cost versus Man Hours This is the baseline 100 Feet of Straight Conveyor $30 / hour Labor Rate 250 Changeovers Per Year
  • 3. Cost versus Man Hours Note set points on each comparison 100 Feet of Straight Conveyor $30 / hour Labor Rate 250 Changeovers Per Year Set Points
  • 4. Standard: Baseline BASELINE 108 Adjustment Points $7,500 in labor 60 Min. 250 hrs. lost/year
  • 5. Ratchet Handles / Manual Adjustment Level 1: RATCHET HANDLE 108 Adjustment Points $5,625 in labor 45 Min. $1,000 for the 188 Hrs. ratchet Lost/Yr. handles
  • 6. Ratchet Handles with Set Points Level 2: RATCHET HANDLE With Pre-Measured Points 108 Adjustment Points $3,750 in labor 30 Min. $2,000 for the ratchet handles and 125 Hrs. pre-measured set points Lost/Yr.
  • 7. Ratchet Handles with Set Points on One Side Level 3: RATCHET HANDLE one side 54 Adjustment Points $1,875 in labor 15 Min. $1,500 for the ratchet handles and 62 Hrs. pre-measured set points Lost/Yr.
  • 8. Hand Wheel Indicator Level 4: HAND WHEEL DIAL INDICATOR One Side 3 Adjustment Points $625 in labor 5 Min. 20 Hrs. $22,500 for rail system Lost/Yr.
  • 9. Automatic Guide Rail Adjustment Level 5: AUTOMATIC ADJUSTABLE With Operator Push Button Station 1 Adjustment Point $125 in labor 1 Min. 4 hrs. $27,500 for rail system Lost/Yr.
  • 10. Changeover White Paper Click here for White Paper
  • 11. Cost versus Man Hours 10 YEAR Labor Cost Versus Purchase Cost 80000 BASE 70000 60000 MANUAL 50000 SET POINTS COST $ 40000 COST AUTO- LABOR 30000 HAND MATIC WHEEL 20000 ONE SIDE 10000 0 1 2 3 4 5 6 CHANGEOVER SOLUTIONS Manual Automatic
  • 12. Thank you for your time! For more information, videos, webinars and white papers, visit our website www.nercon.com • Sign up for Knowledge Center Check out our blog!

Notas del editor

  1. Now, we’re going to talk about purchase cost of the solution compared to the man hours to make the changeover and the lost production time. Here is the assumptions in the analysis – which is also highlighted in our white paper download that we send as a follow -up:A 100 foot straight conveyor sectionA $30/hour labor rate250 Changeovers per year
  2. Beginning with the baseline (which is all manual adjustment) to fully automatic solutions, Dennis Buehring is going to walk us through his comparison which will includes top-view drawings on each slide to illustrate the set points…Dennis?
  3. Thank you, Jessica: The baseline calls out manual, slotted brackets with carriage bolts.In 100 feet, there are 108 adjustment points –That’s 60 minutes to changeover and one hour of lost production time.Of course this is the baseline and there has been no changeover upgrades, so there is no cost investment beyond the conveyors.At 250 changeover events per year, the labor costs $7,500 and with 250 hours of lost production time per year.
  4. For Level 1, we are upgrading to ratchet handles with an additional cost of $1,000.Ratchet handle make the adjustments faster, so we just saved 15 minutes of lost production time per changeover.At 250 changeovers per year, the labor costs are $5,625 and 188 hours of lost production time per year.
  5. Now add pre-measured set points like in the photo. There is no measurement required for guide rails position.Ratchet handles and pre-measured set points make it even easier to adjust guide rails, so we just saved ½ hour of lost production time per changeover compared to the base conveyor.At the same 250 changeover events per year, the labor costs are lowered to $3,750 with 125 hours of lost production time per year.
  6. Now take this same example with ratchet handles and pre-measured set points and keep it to one side of the conveyor.With set points being cut in half, we reduce changeover time to 15 minutes.
  7. On Level 4, we are upgrading to a hand wheel with a dial indicator on one side of the conveyor. This option lowers your adjustment points on this example to just three. These 3 points typically are located on one side of the conveyor with dial indicators.Though the hand wheels are all located on the same side of the conveyor, your product remains centered due to the hand wheel being connected via right and left handed threads.The added investment for a this option on hundred feet is about $22,000.But with changeover costs reduced to $625 in labor and only 20 hours of lost production time per year, the Return on Investment is 3 years in this example.
  8. On Level 5, we’re using the example of a fully automated system with an operator push button station. The additional investment for a hundred feet is about $27,500.There are only 1 adjustment point –Changeover is 1 minutes.At 250 changeovers per year, the labor costs are reduced to $125 and 4 hours of lost production time per year. The return on investment for this solution is almost 4 years.JESSICA -- Thank you Dennis – As mentioned earlier, this comparison is available in our new white paper.
  9. Everyone attending today will receive the download link to “Changeover Technology That Saves Time.”And you can review this analysis on the inside center spread of the publication.
  10. To Recap and Look at Dennis’ results in a different way we have this chart that represents costs over 10 years.The red bars represent labor costs and the blue bars represent purchase costs.In every one of Dennis’ examples, time was taken off the clock. And as you can see from the hand wheel and automatic technology that changeover time is quite minimal.And time is money – it is lost production that really adds up which isn’t on this chart – that’s the part that you need to calculate. If one changeover takes one hour, what is the cost revenue from just one hour of lost production? Take that times the number of changeovers in a day or a year and it is the lost production that adds up.Our ROI examples were based off of labor, but depending on your business, if you use lost revenue in your ROI calculation you might be able to get your ROI from a few years to a few months. Thank you for your time today, now I’ll turn it over to Joyce Fassel who will moderate your final questions.